Initiating a Project
BeginnerLesson 3 of 9 in Project Management Foundations Course
What you will learn
- Turn a problem or opportunity into a clear project proposal, check whether the options are feasible, and record what the proposal takes for granted.
- Turn a business need into a project proposalDescribe the problem or opportunity behind a project, compare the current and desired situation, and list realistic options, including doing nothing.
- Check whether each option is feasibleTest the options for technical, economic, legal, operational and schedule feasibility, and report a clear recommendation with its conditions.
- Tell assumptions, constraints, risks and issues apartClassify the statements that shape early decisions, record them in an assumption log, and decide how and when to check them.
- Turn a business need into a project proposal
- Write a business case that compares the options and justifies the investment, use simple financial measures to compare options, and plan how the promised benefits will be measured and delivered.
- Build a business case that supports a decisionExplain what a business case is for, what it contains and who owns it, and keep it up to date as the project passes its decision points.
- Compare options with simple financial measuresCalculate and interpret payback period, return on investment, net present value and benefit-cost ratio, and know what each measure leaves out.
- Plan how benefits will be measured and realizedConnect outputs to outcomes and benefits, set baselines, targets and owners for each benefit, and plan when the benefits will be checked.
- Build a business case that supports a decision
- Explain who directs, funds and runs the project, and agree how decisions are made, who may make them, and when problems must be escalated.
- Compare the sponsor's role with the other key rolesDescribe what the sponsor, the steering committee, the project manager and the team each do, and how their responsibilities differ.
- Set decision rights, tolerances and escalationAgree who may decide what, set the limits within which the project manager can act alone, and define how and when problems move up.
- Compare the sponsor's role with the other key roles
- Find the people and groups the project affects or depends on, record what matters about them, and classify them so that engagement can be planned.
- Find everyone the project affectsUse several sources and techniques to identify internal and external stakeholders early, and keep the list up to date.
- Build and classify the initial stakeholder registerRecord stakeholders' roles, expectations, power, interest and attitude in a register, and classify them with a power/interest grid.
- Find everyone the project affects
- Write the short document that formally authorizes the project, with clear objectives and success criteria, high-level boundaries, milestones and budget, and named authority.
- Explain what a charter does and what it containsDescribe the purpose of the project charter, who writes and approves it, what it typically contains, and how it differs from related documents.
- Write clear objectives and success criteriaWrite objectives that state results, make them SMART, attach measurable success criteria, and separate project success, product success and benefits.
- Set high-level boundaries, milestones and budgetDescribe the project at the right level of detail: the main deliverables, what is in and out of scope, summary milestones, the approved budget and the conditions for closing.
- Explain what a charter does and what it contains
- Bring the sponsor, team and key stakeholders together at a kickoff meeting, and tailor the initiation steps to predictive, adaptive or hybrid ways of working.
- Plan and run the kickoff meetingPrepare the kickoff, choose the participants and agenda, run the meeting so that everyone leaves with the same understanding, and follow up with clear actions.
- Adapt initiation to the delivery approachKeep the purpose of initiation constant while adjusting its documents and depth for predictive, adaptive and hybrid projects of different sizes.
- Plan and run the kickoff meeting
Initiating a Project study guide
1Start with a need and test the options
An idea becomes a project proposal when people can explain the need, the change they want and the options open to them. Evidence about the current situation keeps the team from buying a solution too soon. Feasibility checks then show which options can work, while assumptions, constraints, risks and issues make the limits of the proposal visible. Northfield Clinics provides a running example of these early decisions.
1.1 From a problem to realistic options
A business need is a problem to solve, an opportunity to take or a requirement to meet. A customer request, a new regulation, new technology or an organizational goal can trigger it. Start by explaining why change matters. A request to buy a particular system already contains a solution; it leaves the underlying need untested.
Describe the gap
A needs assessment compares the current state with the desired future state. Gather evidence: service data, complaints, costs, deadlines and the views of people affected. The difference between the two states is the gap the project should close.
Northfield Clinics runs four clinics with about 40,000 booked appointments a year. Patients book by phone between 8 a.m. and 5 p.m. Staff make reminders manually when they have time. The missed-appointment rate is 12%, or 4,800 appointments a year. The desired future state includes booking, changing and canceling appointments at any hour, automatic reminders, and a missed-appointment rate of 7% or lower. At the same booking volume, 7% is 2,800 missed appointments: a gap of 2,000 appointments, or 5 percentage points.
Write a problem statement that names the problem, who is affected, its scale and why it matters now. For example: "Across our four clinics, 12% of booked appointments are missed, costing about $96,000 a year in lost revenue, and patients can book only during office hours." The statement gives several solutions a fair hearing. "We need online booking software" does not explain what improvement the investment must achieve.
Compare ways to close the gap
Northfield considers four options:
- A: Do nothing. Continue with the current booking and reminder process.
- B: Subscribe to a cloud booking system. Configure an existing product.
- C: Build in-house. Develop a new booking system with the IT team.
- D: Do minimum. Hire a part-time assistant to make reminder calls.
Do nothing is the baseline for comparison. It still carries the lost revenue, patient frustration and risk of patients leaving. Do minimum makes a limited improvement; here it addresses reminders but leaves the office-hours booking problem. For each option, ask which part of the gap it closes and what it adds compared with the baseline.
The proposal also shows strategic fit. Northfield's goal is to make care easier to access. Round-the-clock booking serves that goal. A technically attractive idea without a link to an organizational goal is harder to justify.
A senior manager may send a project mandate, a short request that starts initiation. An external customer's contract or statement of work can also be an input. Neither replaces the organization's authorization of the project. Before settling on an option, check causes as well as symptoms: repeated "why?" questions can reveal that long phone queues come from a booking process limited to office hours, not simply too few phone lines.
Key Takeaways
- Begin with an evidenced need and a clear current-to-future gap.
- Compare realistic options against do nothing, including its continuing costs and risks.
- Show how the proposal supports an organizational goal.
- A mandate or customer request starts investigation; it does not authorize the full project.
1.2 Feasibility across five dimensions
Feasibility asks whether an option can realistically work in this organization. A feasibility study tests options before a large commitment. Its findings feed the business case, which asks whether the investment is worthwhile and which option gives the best value. The two documents can develop together.
Use the TELOS checks
The five dimensions cover different ways an apparently good idea can fail:
- Technical: Are the technology and skills available? Will it connect to existing systems?
- Economic: Can the organization afford the option, and are its expected benefits worth its whole-life costs?
- Legal: Can it meet the relevant laws, contracts, licenses and data-protection rules?
- Operational: Will people use it, and can it fit their working processes?
- Schedule: Can it be ready by the required date?
Resource availability can need a separate check. A new product may also need evidence of market demand. A working demonstration answers only part of the technical question; it says little about affordability, adoption or deadlines.
Apply the same test to each option
First state the decision and list the options. Set criteria, including must-have conditions, before rating them. Gather evidence through demonstrations, quotes, small tests, expert interviews and legal advice. Record each rating with its reason, the conditions still to satisfy and the recommendation.
For Northfield's cloud option B, work through the evidence:
- The vendor offers a tested connection to the patient-records system. This supports technical feasibility.
- The $150,000 upfront cost fits within $200,000 available from the board. Expected benefits of $75,000 a year exceed the $20,000 running cost. Both affordability and value support economic feasibility.
- Third-party storage of patient data needs a data-processing agreement and a security review. Record these as conditions to satisfy.
- Receptionists need training. Patients without internet access still need phone booking. Keeping that route makes the proposed process workable.
- A four-to-five-month setup can meet the June 30 deadline if work starts in January.
The in-house option C is different. Northfield's two-person IT team has no experience building a patient-facing web application, and the estimate is 9 to 12 months. It misses the fixed deadline. Option D, reminder calls, can work across the dimensions but closes only part of the need.
Separate a condition from a score
A must-have condition is a pass-or-fail boundary. An option that cannot meet a fixed legal deadline is ruled out even if its other scores are excellent. Among options that pass those boundaries, ratings help compare strengths and weaknesses. Northfield takes B forward with conditions and uses A as its reference; it rejects C on schedule grounds.
A finding of "not feasible" prevents wasted investment. Recheck feasibility when important evidence changes: supplier capacity, staffing, prices or a revised requirement can change the recommendation. A study commissioned only to defend a favorite product loses the value of comparing alternatives.
Key Takeaways
- TELOS checks technical, economic, legal, operational and schedule feasibility.
- Economic feasibility includes whole-life value as well as affordability.
- Use common criteria and evidence for all realistic options.
- A failed must-have condition rules an option out.
- Record conditions and revisit feasibility when evidence changes.
1.3 Assumptions, constraints, risks and issues
Early proposals mix things people know, things they believe and things that might happen. Separating them helps decision-makers see what needs action now and what still needs checking.
Sort a statement by its meaning
An assumption is treated as true for planning without proof. "The vendor's connection works with our version of the patient-records system" is an assumption until the team tests it. An assumption can create risk if it is false.
A constraint is a known limit. Northfield must go live by June 30 because the current scheduling contract ends that day. A firm budget ceiling and the number of staff available can also constrain the proposal. The team plans within these limits.
A risk is an uncertain event or condition that could affect an objective. A negative risk is a threat, such as staff resistance slowing adoption. A positive risk is an opportunity, such as a possible 10% vendor discount for signing before March 31. Both are uncertain when first recorded.
An issue is a problem that already exists and needs action. The East clinic manager has resigned, leaving nobody there to approve the pilot schedule. That vacancy is an issue now. When a threat happens, its consequences are handled as an issue.
Apply four short questions:
- Is it a fixed, known limit? Record a constraint.
- Is it believed true but unproven? Record an assumption.
- Could it happen and affect an objective? Record a risk.
- Is the problem already present? Record an issue.
"Funding will be approved in February" is an assumption when the team plans on that belief. "We cannot spend more than $150,000 upfront" is a constraint. "Integration testing could overrun" is a risk. "Testing has already slipped two weeks" is an issue. The topic can be the same; its status changes the action needed.
Make uncertainty manageable
An assumption log records assumptions and constraints, their owners, the date raised, their status, and how and when they will be checked. Assigning an owner makes the check someone's job. A due date places it before a decision that depends on it. Northfield requests a test connection before signing the contract because failed integration would threaten the whole proposal.
If the test fails, update the assumption's status and the plans and business case that relied on it. The failed test is an issue; a possible later delay remains a risk. Do not leave the original belief marked as confirmed.
Initiation records the major threats, opportunities and overall riskiness needed for the approval decision. Describe a risk as a cause, uncertain event and effect: "Because our patient-records system is an older version, the booking connection may fail, delaying go-live." A label such as "technology" supplies none of that reasoning. The initial high-level record gives decision-makers enough information to judge exposure before detailed response planning.
Key Takeaways
- An assumption is unproven; a constraint is a known limit.
- A risk may occur; an issue already exists.
- Risks include positive opportunities and negative threats.
- Give important assumptions an owner, a checking method and a due date.
- Write high-level risks as a cause, uncertain event and effect.
- Update plans and justification when an assumption proves false.
2Judge value and plan the benefits
A project can be possible without being worth its cost. The business case connects the need, the options, whole-life costs and expected value so the sponsor can request a sound investment decision. Financial measures show different sides of that value, while a benefits plan sets out how the organization will turn delivered outputs into improvements. The numbers matter alongside risk, strategic fit and the people who will use the result.
2.1 A business case that supports a decision
A business case is the documented justification for investing in a project. It compares realistic options by their benefits, costs and risks, then recommends a course of action. A useful case makes the requested decision clear: spend money on initiation, approve delivery, revise the proposal or stop.
Build the argument
Start with an executive summary of the need, the recommendation and the funding requested. Explain the problem or opportunity and its strategic fit. Show the options considered, including do nothing, so the reader can see what the preferred option adds. Include:
- Expected benefits, their measures and any dis-benefits.
- One-time costs, ongoing costs and the timescale.
- Financial appraisal over a stated period.
- Major risks, important assumptions and known constraints.
- The recommendation, the reasons for it and the approval needed.
Whole-life costs continue beyond delivery. Northfield's cloud system costs $150,000 upfront and $20,000 each year to operate. Ignoring the subscription would overstate the project's value. Training and integration also belong in the comparison even though they are less visible than the product's price.
A benefit is an improvement that stakeholders value. A dis-benefit is an effect that at least one stakeholder sees as negative. Some patients may find online booking harder, and receptionists may value the direct patient contact they lose. A changed task is not inherently a dis-benefit for everyone. Record who experiences the negative effect and how it will be handled; Northfield keeps phone booking available.
Five questions can organize the case
Some organizations use a five-case structure. The strategic case explains why change is needed. The economic case compares value across options. The commercial case tests whether the solution can be bought on workable terms. The financial case checks affordability. The management case shows whether the change can be delivered. Economic value and available funding answer different questions: an attractive return does not provide the upfront cash.
Ownership continues after approval
The sponsor owns the business case and remains accountable for justification. A business analyst, finance specialist and project manager may help prepare it. The project manager reports changes that threaten its reasons or estimates.
An outline case uses early estimates to support a limited decision to fund initiation. A fuller case uses better evidence to support funding the whole project. Review it at decision gates and after major changes. If costs rise above credible benefits, revising or stopping can protect the organization from further loss.
Money is not the only source of justification. A safety or mandatory compliance project can have a low financial return and still be necessary. Its case compares the value of compliant ways to meet the need. Writing the case after choosing a supplier, showing only a favored option or promising vague "better service" prevents a meaningful investment decision.
Key Takeaways
- Compare benefits, whole-life costs and risks across realistic options.
- The sponsor owns the business case even when others prepare it.
- An outline case supports initiation; a fuller case supports the whole investment.
- Review justification at gates and after major changes.
- Record dis-benefits from the affected stakeholder’s viewpoint.
2.2 Payback, ROI and discounted value
Financial measures compare different features of an investment. Use the same appraisal period and discount rate for comparable options. Northfield assesses five years of benefits; the initial investment occurs now and the yearly net benefits arrive at each year-end.
Start with net benefits
Both booking options offer $75,000 in yearly benefits: $40,000 from 2,000 fewer missed appointments at $20 each, plus $35,000 from 1,400 reception hours at $25 each. Option B costs $150,000 upfront and $20,000 yearly to run, leaving $55,000 net annual benefit. C costs $220,000 upfront and $10,000 yearly, leaving $65,000 net.
Payback is the time until cumulative net benefits recover the initial investment. With equal yearly net benefits, divide investment by net annual benefit. B gives $150,000 ÷ $55,000 ≈ 2.73 years; C gives $220,000 ÷ $65,000 ≈ 3.38 years. B leaves $95,000 unrecovered after year 1 and $40,000 after year 2, then crosses zero during year 3. With uneven flows, add the actual yearly amounts instead of using one annual figure. Simple payback ignores later benefits and discounting.
ROI measures the gain as a percentage of investment: (total net benefits − investment) ÷ investment × 100%. B generates 5 × $55,000 = $275,000 before the initial investment is deducted. Its five-year ROI is ($275,000 − $150,000) ÷ $150,000 ≈ 83.3%. C gives ($325,000 − $220,000) ÷ $220,000 ≈ 47.7%. Simple ROI ignores when the money arrives.
Allow for timing
A dollar today is worth more than a later dollar. Discounting expresses future money in today's value. PV = future amount ÷ (1 + r)ᵗ, where r is the annual discount rate and t the number of years. Write 8% as 0.08, so 1 + r is 1.08. B's year-2 net benefit has PV $55,000 ÷ 1.08² ≈ $47,154. Finance usually sets the rate.
NPV adds the present values of future net benefits and subtracts the initial investment. At 8%, the factors for five equal year-end payments total about 3.9927. B's PV is about $219,599 and its NPV about $69,599. C's NPV is about $39,526. Positive NPV means forecast value above the required return. A higher NPV gives more value in today's money; it is not cash already earned. Unequal flows must be discounted separately.
BCR = PV of benefits ÷ PV of costs. B has benefits of about $299,453 and costs of about $229,854, including discounted running costs: BCR ≈ 1.30. C's BCR is about 1.15. Above 1 means benefits exceed costs.
IRR is the discount rate that makes NPV zero, found by trial or spreadsheet. B's IRR is about 24%; C's is about 15%, both above 8%. B wins all four comparisons here. When rankings conflict, NPV is generally preferred because it reflects value's size and timing. Also weigh feasibility, risk, strategic fit and estimate reliability before choosing.
Key Takeaways
- Subtract annual running costs before using net benefits.
- Payback shows recovery time; ROI shows percentage gain over a stated period.
- Discount future amounts to present value before adding them for NPV.
- NPV subtracts the initial investment; BCR divides discounted benefits by discounted costs.
- IRR is the rate at which NPV is zero.
- Financial forecasts support a decision alongside feasibility and risk.
2.3 From delivered outputs to measured benefits
A project delivers things, but the organization gains value by using them. The chain is output → outcome → benefit. An output is a delivered product, such as a configured booking system or trained staff. An outcome is a changed situation when those outputs are used: patients book online and receive automatic reminders. A benefit is a valued, measurable improvement, such as fewer missed appointments and recovered revenue.
Plan what happens after handover
Benefits are planned during initiation even when they will appear months or years after the project closes. Delivery of an output alone cannot show that its intended use or value followed. A benefits management plan, also called a benefits realization plan, records each benefit's description, measure, baseline, target and target date. It also names its owner, data source, review frequency, dependencies and any related dis-benefits.
Northfield's missed-appointment benefit can be written as a complete record:
- Measure: Missed appointments divided by all booked appointments.
- Baseline: 12%, or 4,800 of 40,000 appointments last year.
- Target: 7% or lower within 12 months after go-live.
- Owner: Director of Operations.
- Evidence: Monthly booking-system reports.
- Dependencies: Automatic reminders switched on and at least 30% of appointments booked online.
- Expected annual value: 2,000 fewer missed appointments × $20 = $40,000.
The baseline is measured before change starts. Use the same definition afterward. If a later report excludes canceled appointments while the original includes them, the rates may move because the counting rule changed. Agree the calculation and data source before comparing periods.
Give ownership to the business
The benefit owner is a person in the business who can make the improvement happen and track it. This is often the sponsor or an operational manager. The project manager delivers the agreed outputs and arranges handover; that role usually ends before long-term benefit measurement. The operational owner must remain available after the team leaves.
Benefits can be financial, such as recovered revenue, or non-financial, such as safer service. Tangible benefits are directly measurable. Intangible benefits, such as trust, need a suitable indicator, perhaps a survey score. A non-financial benefit can still be measured: satisfaction does not need a dollar value to have a target.
Saved staff time needs careful treatment. Northfield values 1,400 saved hours at $25 per hour, or $35,000. It counts this as a cash saving because it will leave a part-time reception vacancy unfilled. If all wages stay the same and the hours go to other work, report released capacity as a non-cash benefit. Counting those same hours again as a separate saving would double-count the improvement. Review progress after go-live with the named owner and the agreed reports.
Key Takeaways
- Outputs are delivered things; outcomes are changes in use; benefits are valued improvements.
- Record a baseline, target date, measure and business owner for each benefit.
- Use the same measurement definition before and after change.
- Saved time is a cash saving only when spending actually falls.
3Give people clear authority
Funding, direction and daily delivery need different kinds of decisions. A named sponsor keeps the project connected to its business purpose, while the project manager coordinates the work within agreed limits. Clear roles, decision gates and tolerances let routine work move forward and bring significant problems to the right person early. Governance is useful when it tells people what they may decide and what information they must provide.
3.1 The sponsor and the delivery roles
The sponsor provides resources and senior support, owns the business case and is accountable for enabling project success. Some methods call this person the executive. A sponsor needs enough authority to secure funding, time to make decisions and interest in the result. Naming a whole committee as sponsor leaves accountability unclear.
Separate direction from daily delivery
During initiation, the sponsor confirms the need, secures funding, appoints or approves the project manager, and approves and issues the charter. The sponsor champions the project with senior leaders and removes obstacles between departments. After approval, the sponsor continues to judge justification and makes decisions beyond the project manager's authority. Accountability for benefits continues after closure, directly or through a named benefit owner.
The project manager leads the team toward the agreed objectives. This person coordinates planning, delivery, risks, issues and reporting within the approved limits. At Northfield the Director of Operations sponsors the booking project; a business-systems manager manages it.
A practical distinction is whether and why versus how and when. The sponsor judges purpose, funding and direction. The project manager manages delivery of the agreed outputs. If a department refuses to release staff, the project manager may need the sponsor's help across departmental boundaries. The sponsor should resolve that obstacle without taking over the team's daily task assignments.
Include user and supplier interests
A steering committee, also called a project board, is a small group that directs the project. It normally brings together the sponsor as chair, senior user representation and senior supplier representation. Users will work with the result and help realize benefits. Suppliers design or build it and can be internal or external.
Northfield's committee includes the Director of Operations, the Clinical Director, and the Head of IT with the vendor's account manager. The Clinical Director brings the users' view; IT and the vendor bring the delivery view. Their perspectives help test whether proposed decisions protect value and can be carried out.
Understand the supporting roles
Team members produce assigned deliverables, estimate their work and raise risks and issues early. Functional managers provide departmental staff. A business analyst clarifies needs and requirements. A project management office, or PMO, supplies standards, templates and support and may review projects.
A role describes a responsibility; a person may hold several roles. A small project manager may also do business analysis. Keeping sponsor and project manager as separate people is usual because someone must judge the investment while someone else concentrates on delivering it. An unavailable sponsor causes delayed decisions; a sponsor who directs every task weakens the project manager's authority. Agree availability and reporting expectations when assigning the roles.
Key Takeaways
- The sponsor owns justification, secures support and authorizes the project.
- The project manager coordinates delivery within agreed authority.
- The steering committee brings sponsor, user and supplier perspectives.
- Team members deliver work and raise risks and issues early.
- A role is a responsibility, not necessarily a separate person.
3.2 Decision gates, tolerances and escalation
Project governance defines how the project is directed and held accountable. It specifies who decides what, when decisions happen and what evidence they need. A decision gate is a planned review where the sponsor or steering committee can continue, change course, pause or stop. The outline business case may support a gate to fund initiation; the fuller case and charter support approval of the project.
Write authority and limits together
Authority levels state what the project manager may decide. Northfield allows task assignments, spending up to $5,000 per item and date moves that do not affect a milestone. Changes to scope or milestones need sponsor approval; changes to objectives need the steering committee.
A tolerance is an explicitly delegated permitted deviation from a target before escalation is required. Northfield has a $150,000 budget and a funded +10% cost tolerance. Ten percent is $15,000, giving a forecast ceiling of $165,000. Within that limit, the project manager manages costs and reports them. A forecast above it goes to the steering committee. This delegation does not remove the separate per-item approval limit.
A tolerance cannot relax a hard constraint. The June 30 go-live date has zero time tolerance because the old scheduling contract ends then. Any forecast beyond June 30 needs immediate escalation. An interim milestone with slack, such as completing the pilot on May 31, can have a one-week tolerance.
Escalate the forecast
Management by exception lets the project manager handle routine work while senior decision-makers act when forecasts leave the agreed limits. Do not wait until the money has been spent or the date missed.
Suppose the vendor announces a four-week connection delay and the forecast becomes July 28. Northfield's project manager alerts the sponsor at once, then provides the impact, options and recommendation within two working days. The decision might involve a revised launch arrangement, extra vendor capacity or a changed date if the decision-makers can resolve the underlying constraint.
An escalation path names the recipient, timing and required information. A useful report explains the problem, effects on objectives, available options and recommended response. Sending only "the vendor is late" leaves the sponsor without a decision to make.
Assign responsibility with RACI
A RACI chart gives each named activity a Responsible person who does the work, one Accountable person who approves and answers for it, people Consulted before the work, and people Informed of the result. For "prepare the project charter for approval," Northfield assigns the project manager R, sponsor A, Clinical Director C and clinic managers I. Preparing a draft and authorizing the project can need separate rows. Giving one activity two Accountable people makes the final decision unclear.
Key Takeaways
- Decision gates review progress and continued justification.
- Write decision rights and tolerances so they agree.
- Escalate a forecast breach before the breach occurs.
- A tolerance cannot loosen a hard constraint or a separate approval limit.
- Send the impact, options and recommendation through the agreed escalation path.
- Each RACI activity has exactly one Accountable person.
4Find and understand the stakeholders
The people who approve a project are only part of the stakeholder picture. Users, suppliers and people whose work changes can shape whether the result is accepted and used. Start identification before objectives are fixed, then record expectations, influence and attitude in an initial register. Classification helps focus attention, while regular review keeps the record useful as people, interests and circumstances change.
4.1 Who can affect or be affected by the project?
A stakeholder is a person, group or organization that may affect the project, be affected by it or believe it is affected. Belief matters because people act on their view of the change. Supporters and opponents both belong in the picture.
Internal stakeholders include the sponsor, team, other departments and senior management. External stakeholders include customers, suppliers, regulators and community groups. Stakeholders can be affected indirectly, even if they never use the delivered product. A regulator, for example, can set conditions without joining the project team.
Start before the charter is settled
Identification begins during initiation because stakeholders help shape objectives, boundaries and success criteria. A team that writes a charter using only senior managers' views may miss daily users' needs. Identification continues at each phase and after major changes, such as a new supplier or a department reorganization.
Use several sources. The business case and draft charter show expected value and who makes decisions. Organization charts reveal departments and reporting relationships. Contracts identify customers and suppliers. A needs assessment points to people experiencing the problem. Lessons from similar projects show groups that earlier teams missed.
Follow the work to find the people
Brainstorm with the team, interview managers and experts, and use checklists of typical groups. Ask every person identified, "Who else should we talk to?" Then walk through the process being changed. At each step, ask who does the work, supplies information, approves it or receives the result.
For Northfield, a patient calls, a receptionist checks availability, a clinician uses the appointment list and staff send reminders. This exposes stakeholders beyond the sponsor: receptionists, clinicians, patients, IT staff and the patient-records supplier. Questions about who pays and who can block approval add the Finance Director and data protection officer.
Northfield's initial list includes the Director of Operations; Clinical and Finance Directors; four clinic managers; about 20 receptionists; doctors and nurses; patients; the IT team; the booking vendor; the patient-records vendor; the data protection officer; and the health-privacy regulator.
Look for different experiences
Ask who gains and who loses something. Receptionists may welcome fewer repetitive calls yet fear job cuts or loss of valued patient contact. Patients with internet access and patients without it have different needs. Listing only "patients" can hide the importance of retaining phone booking.
Low formal authority does not make a stakeholder unimportant. Receptionists influence whether the new screens are used effectively; dissatisfied patients can affect the organization's reputation. Record those groups early so the charter and feasibility work reflect their needs. Review the list again when a new clinic manager, supplier or organized group becomes involved.
Key Takeaways
- Include people who affect, are affected by or believe they are affected by the project.
- Find stakeholders early enough to shape objectives and success criteria.
- Combine document review, interviews, brainstorming and a process walk-through.
- Ask who gains, who loses, who uses, who pays and who can block approval.
4.2 A useful initial stakeholder register
The stakeholder register records who has been identified and what matters about them. It begins in initiation and changes throughout the project. A list of names alone cannot guide decisions: the team also needs to understand expectations, influence and attitude.
Record identity and assessment
Identity fields include name or group, position, organization, contact details and project role. Assessment fields capture requirements, expectations, interest, power, possible impact, current attitude and the phase when involvement matters most. Classification can record internal or external status, support or resistance, and a position on a grid.
Northfield's receptionist entry names about 20 staff across four clinics. They are internal daily users who expect clear training, less phone work and job security. Their interest is high. Individual formal power is low, but the group has more influence. Evidence of concern about job cuts supports a current engagement level of resistant, with supportive as the desired level.
Match attention to power and interest
The power/interest grid uses two dimensions: ability to influence decisions and resources, and degree of concern about the project.
- High power, high interest: Manage closely.
- High power, low interest: Keep satisfied.
- Low power, high interest: Keep informed.
- Low power, low interest: Monitor.
Northfield's sponsor has high power and interest. The Finance Director has high power with less day-to-day interest and is kept satisfied. The data protection officer can stop the project and is strongly interested because patient data is central, so the team manages this relationship closely. A job title alone does not fix a quadrant.
Receptionists and patients have high interest and low individual power. Keeping them informed provides a starting point, but receptionists also need involvement in testing because adoption depends on their work. A local newspaper with little present power or interest can be monitored.
Capture attitude separately
Power and interest do not tell you whether someone supports the project. An engagement scale can record unaware, resistant, neutral, supportive and leading, with current and desired levels. The gap informs later engagement planning. Other models include influence/impact grids and the salience model, which considers power, legitimacy and urgency.
Classifications change. Receptionists may gain influence through a union; a privacy incident elsewhere may increase a regulator's interest. Review the register at phases and after major events, updating the evidence behind each judgment.
The register contains sensitive assessments of people. Restrict those fields to people who need them, and share a general names-and-roles version where useful. Write "asked how the change affects staffing" with its evidence, instead of an unsupported label such as "difficult." Neutral records help people plan engagement without turning concern into a personal judgment.
Key Takeaways
- Record expectations and influence as well as names and roles.
- Use power and interest to choose an initial level of attention.
- Record support or resistance separately from grid position.
- Review classifications when circumstances change.
- Restrict sensitive judgments and base notes on evidence.
5Authorize a project with a clear charter
The charter turns an approved proposal into an authorized project. It gives the project manager authority and records the sponsor's agreement on results, boundaries and the limits of decision-making. Clear objectives and measures let different stakeholders judge success using the same standards. A short set of deliverables, exclusions, milestones and budget figures provides direction before detailed planning begins.
5.1 What the charter authorizes
A project charter formally authorizes the project and gives the project manager authority to use organizational resources for its work. The sponsor approves and issues it. Work beyond initiation should wait for that approval.
The charter is also the high-level agreement between sponsor and project manager. It states why the project exists, what it will achieve, its main boundaries and who has authority. Usually a few pages are enough to provide a shared reference when purpose, priorities or responsibilities are questioned.
Build from the initiation evidence
Inputs include the business case and benefits plan, needs assessment, feasibility findings and initial stakeholder register. An external contract or statement of work describes customer commitments. Organizational policies, templates, expert judgment and lessons from similar projects help the team prepare a workable agreement.
The project manager often drafts the charter with the sponsor and key stakeholders. Appointing the manager early lets that person help shape the objectives they must deliver. Drafting the document does not grant authority to approve it.
Include the decisions the team needs
A charter normally records:
- The purpose, justification, measurable objectives and success criteria.
- A high-level description, boundaries, key deliverables and requirements.
- Overall risk, major assumptions and constraints.
- Summary milestones and the preapproved budget.
- Key stakeholders and who accepts results and approves closure.
- Exit criteria for normal closing or possible cancellation.
- The assigned project manager, responsibilities and authority limits.
- The sponsor's name and authorizing role.
For Northfield, authority must be explicit enough to connect daily spending decisions with the total forecast limit and fixed June 30 date. A document that only says "install a booking system" leaves the manager without a clear basis for using staff or making trade-offs.
Distinguish the related documents
The business case justifies investment. The charter authorizes and frames the project. The project management plan, developed during planning, explains how the work will be done in detail. A contract creates binding commitments with an external party. Buying from a vendor and authorizing the internal team are separate decisions.
Some methods first use a project brief to support starting initiation. A later project initiation document (PID) brings together the business case, plans, roles and controls to support authorizing the project. These are separate, related documents, not interchangeable names for a charter. An adaptive charter can be lighter while still explaining purpose, beneficiaries, what "done" means and how the team will work.
Changes to the charter need sponsor approval, with decisions routed to the steering committee where the governance requires it. The project manager cannot rewrite the objectives, budget or authority alone. Keeping detailed task lists in planning documents prevents routine scheduling updates from obscuring the charter's authorizing decisions.
Key Takeaways
- The sponsor issues the charter and authorizes use of resources.
- The project manager can draft the charter but cannot authorize the project alone.
- Include purpose, results, boundaries, authority and approval requirements.
- The business case justifies; the charter authorizes; the plan explains delivery.
- Charter changes need sponsor approval and the agreed decision route.
- A project brief and PID support distinct decisions in methods that use them.
5.2 Objectives and measures of success
An objective states a result the project will achieve. "Install software" names an activity. "Patients can book online at all four clinics by June 30" describes the result that activity should create.
Make the result SMART
SMART means Specific, Measurable, Achievable, Relevant and Time-bound. Rewrite "Improve booking soon" as: "Make online booking available to patients at all four Northfield clinics by June 30, within the approved upfront budget of $150,000."
The result is specific about service and locations. It can be checked for availability, date and spending. The feasibility study supports achievability, and easier patient access gives relevance. June 30 supplies the time limit. Adding a date to an impossible target would not make it achievable.
Each objective needs at least one success criterion, a measurable standard agreed with the sponsor and key stakeholders during initiation. Without agreement, IT may judge success by a working system while receptionists judge it by whether daily booking is manageable.
Judge success at three levels
Project success concerns delivery within agreed time, cost, scope and quality. Northfield can check whether all four clinics went live by June 30 within its approved budget.
Product success concerns whether the result works and is used. Northfield targets at least 30% of appointments booked online in the six months after go-live.
Business success concerns benefits. Northfield targets a fall in missed appointments from 12% to 7% within 12 months. A timely installation can fail to produce this improvement if patients do not adopt it. Conversely, delayed delivery can still produce valuable long-term benefits; the delivery delay and benefit should be judged separately.
Connect each measure to evidence
Acceptance criteria apply to a specific deliverable. A patient must be able to book, change or cancel from a phone, and the booking page must achieve at least 99.5% availability. These checks support accepting the system. They do not establish the later missed-appointment benefit.
A key performance indicator (KPI) is a measure tracked over time. Define online booking share as online bookings divided by all bookings, using monthly booking-system reports for six months after go-live. For every criterion, state what counts, the data source and when it is checked. Measure a baseline now if none exists.
State the priority when limits compete
Scope, time, cost, quality and risk can pull in different directions. Northfield's hard June 30 date comes first because the old contract expires, budget comes second and extra features are flexible. The manager can develop options around those priorities, then obtain the required approvals. A preference for extra features does not permit a missed contractual date. Replace vague words such as "better" and "user-friendly" with agreed tests or measures that show the intended result.
Key Takeaways
- Write objectives as results and check all five SMART elements.
- Agree measurable success criteria during initiation.
- Judge delivery, product use and business benefits separately.
- Acceptance criteria test deliverables; KPIs track performance over time.
- Define the data source, timing and priorities among constraints.
5.3 Boundaries, milestones and the summary budget
A charter gives enough detail to agree the project without prescribing every task. Its high-level description names the change and main outputs. Northfield will select, configure and launch a cloud booking system with automatic reminders, connect it to patient records at four clinics and train staff.
Make inclusions and exclusions explicit
Key deliverables are the configured system, the connection to patient records, trained receptionists and clinic managers, patient guidance on a web page and leaflet, and support handed to IT. Deliverables describe things handed over; they are not a list of all the work needed to make them.
Northfield's in-scope list covers the four existing clinics; booking, changing and canceling appointments; email and text reminders; and staff training. Its out-of-scope list names the new clinic opening next year, online payment, video consultations and replacement of the patient-records system. Explicit exclusions stop a stakeholder assuming that "online booking" includes every service available online.
High-level requirements state the main conditions: patients can book at any hour from a phone or computer, data stays within approved protection arrangements, and phone booking remains available. These conditions guide later detailed requirements work.
Mark significant moments
A milestone has zero duration. "Pilot completed" marks a point; "run the pilot" is work that takes time. Northfield's summary sequence is:
- Charter approved: January 15.
- Vendor contract signed: February 15.
- Patient-records connection tested: April 30.
- One-clinic pilot completed: May 31.
- All four clinics live: June 30.
- Project closed: July 31.
These dates show the decision-makers the main path to delivery. Task durations, dependencies and individual assignments are developed in planning.
State the approved funding
Northfield's upfront budget includes $55,000 for setup and configuration, $45,000 for integration, $20,000 for training, $18,000 for project management and $12,000 contingency. The first two total $100,000; training and management bring this to $138,000; contingency gives $150,000. The $20,000 annual subscription is an operating cost after handover and belongs in the business case. It is separate from the project budget.
Define acceptance and exit
Approval requirements say who signs off results. The Clinical Director accepts the system after the pilot, and the sponsor approves closure. Normal exit requires all four clinics live, trained staff, IT support handed over and lessons recorded. The steering committee will consider cancellation if the patient-records connection cannot work by April 30.
Exit criteria make a closing or stopping decision possible; they are not additional tasks to hide in the budget. An unclear charter invites extra work through unstated expectations. An overly detailed charter freezes choices before enough is known. Main deliverables, clear exclusions, summary milestones and funding provide the needed boundaries.
Key Takeaways
- Name main deliverables and explicit in-scope and out-of-scope boundaries.
- High-level requirements guide the later detailed requirements.
- Milestones mark moments and have zero duration.
- Separate the preapproved project budget from operating costs.
- Name who accepts results and the conditions for closing or cancellation.
6Bring people together and begin
Approval gives a project authority; a kickoff turns that agreement into shared working understanding. The sponsor, team and key stakeholders need to know the purpose, boundaries, roles and immediate actions before work gathers pace. Predictive, adaptive and hybrid projects answer the same initiation questions, but commit different amounts of detail upfront. The effort should match the size, risk and complexity of the change.
6.1 A kickoff with decisions and owned actions
A kickoff meeting brings the sponsor, team and key stakeholders together at the start of project work. It establishes shared understanding of purpose, objectives, scope, roles and next steps, and starts working relationships. People need a chance to raise questions, not just receive a presentation.
Prepare for a useful conversation
Agree the meeting's goals with the sponsor. Invite people needed to understand and begin the work, including users whose processes will change. Northfield needs receptionist input as well as managers and suppliers. Send the approved charter and agenda in advance, prepare a short presentation, arrange enough time, test remote access and assign a note-taker.
A small project may have one kickoff shortly after charter approval. A large project can have a planning kickoff and another before main delivery. Separate internal and customer or vendor meetings can help when the audiences need different discussions. Adaptive teams can begin with a short start-up meeting or a kickoff for the first iteration, using the approved purpose and authority.
Divide the roles
The sponsor opens the meeting and explains why the project matters. This shows support and confirms authority. The project manager prepares and facilitates the meeting and leads discussion of scope, roles, milestones and working methods.
Northfield's 90-minute agenda gives each part a purpose:
- Welcome and introductions: 10 minutes.
- Sponsor's explanation of the need: 10 minutes.
- Objectives, scope and success criteria: 15 minutes.
- Roles, governance and decisions: 15 minutes.
- Milestones and next steps: 15 minutes.
- Risks, assumptions and open questions: 15 minutes.
- Ways of working and communication: 5 minutes.
- Actions and close: 5 minutes.
The four 15-minute sections use 60 minutes; the remaining sections use 30. Keep space for two-way discussion within the agenda so overlooked assumptions and user concerns can surface.
Leave with a usable record
Notes capture decisions, actions, open questions and new risks. Each action needs an owner and due date. Agree a meeting rhythm, such as weekly team check-ins and monthly steering reviews. Send notes within a day or two and update the stakeholder register or assumption log when the discussion adds information.
A kickoff can start the team's working agreements, sometimes recorded in a team charter. "We answer team messages within one working day" states an observable behavior. "We record meeting decisions in the notes the same day" makes follow-up clear. A team charter describes how people work together; the sponsor's project charter provides project authorization.
If a question cannot be resolved in the meeting, record who will investigate it and by when. Ending with "someone should check training dates" leaves work unowned. Capture the action while the relevant people are present.
Key Takeaways
- Use the approved charter to prepare shared understanding at kickoff.
- The sponsor explains purpose; the project manager prepares and facilitates.
- Include key users and allow questions.
- Record decisions and actions with owners and due dates.
- Follow up promptly and update the relevant records.
6.2 Initiation for predictive, adaptive and hybrid work
Every delivery approach needs a justified purpose, intended outcomes and boundaries, governance, stakeholders and approval to proceed. Tailoring changes the depth and form of the initiation work. Size, risk and complexity determine how much evidence and control are needed.
Predictive initiation
A predictive project starts with a fuller business case and charter describing deliverables, milestones and budget. Detailed planning follows before the main delivery work. This suits stable, well-understood requirements, such as fitting out a building. The early agreement can be more specific because the team knows much of what must be delivered.
Adaptive initiation
Adaptive work uses a short, outcome-focused start. A product vision explains who the product serves, their problem and its advantage over the current alternative. A lean charter or business case states success measures and authority. A named product owner sets priorities; an initial high-level feature list gives a starting point; working agreements support the team.
Northfield's vision can be expressed as: "For patients who struggle to reach us by phone, online booking provides booking, changes and cancellations at any hour, unlike the current office-hours phone line." It describes the user and value without fixing every screen. The team delivers in short iterations and uses finished increments and feedback to review both the features and continuing justification. Uncertain features do not remove the need for funding, sponsorship or success measures.
Hybrid initiation
A hybrid project combines approaches. Northfield fixes the go-live date, budget and governance in a predictive charter. It configures patient booking pages in two-week iterations, using feedback from receptionists and a small patient group. The detailed pages can evolve within agreed boundaries; changes that affect fixed commitments still follow the approval route.
Tailor approvals and effort
Some methods use two decisions at the start. A quick start-up appoints the sponsor and project manager, prepares an outline business case and project brief, and plans initiation. Approval then allows initiation work. The initiation step develops the detailed case, plans and controls, assembled in a project initiation document for approval of the project. This limits spending on an untested proposal.
A small internal change may need a one-page charter, a short stakeholder list and a 30-minute kickoff. A large regulated project needs a formal feasibility study, detailed case, steering committee and several approvals. Document length should follow the decisions and evidence needed.
Before leaving initiation, confirm that the business case is approved, the charter signed, authority clear, sponsor and governance in place, initial stakeholders identified, and major assumptions, constraints and risks recorded. Agree benefit owners and measures, and hold or schedule the kickoff. Predictive work moves into detailed planning; adaptive work moves into first iterations. Revisit justification at later gates and as evidence from delivery arrives.
Key Takeaways
- Every approach needs purpose, justification, authority and success measures.
- Predictive initiation commits more detail before delivery.
- Adaptive initiation focuses on vision, outcomes and priorities, then learns through increments.
- Hybrid work combines fixed commitments with iterative delivery.
- Tailor documentation to size, risk and complexity.
- Keep reviewing the business case after initiation.
Initiating a Project examples
1Turn a request into a tested proposal
12 steps
- 1IntroductionA request is the starting point
A manager asks for a new booking system. Before committing, the team needs evidence about the problem, options for improving it and the limits those options face.
Follow Northfield Clinics from a need statement through feasibility and uncertainty. Each step produces information for an approval decision: what should change, what can work and what still needs checking.
- 2ExampleDescribe the current state
Northfield has four clinics and about 40,000 booked appointments a year. Patients book by phone between 8 a.m. and 5 p.m.; reminders depend on staff having time.
At a 12% missed-appointment rate, 4,800 visits are missed yearly. This evidence explains the problem more clearly than a request to "buy online software." The problem includes both booking access and missed visits.
- 3ExampleMake the gap visible
The desired future state allows patients to book, change or cancel at any hour and receive automatic reminders. The missed-appointment target is 7% or lower.
At 40,000 appointments, 7% means 2,800 missed visits. Compared with 4,800 today, the gap is 2,000 visits, or 5 percentage points. The proposal can now compare options by how much of that gap they close.
- 4ChallengeSeparate the need from the product
A restaurant’s proposal says, "Buy self-service ordering screens." What should its problem statement explain before that product is selected?
---reveal---
It should explain the ordering problem, who experiences it, the size of its effect and why change matters now. Evidence about queues, mistakes or access needs would support comparing responses. The proposed screen is a possible solution, not the need itself.
- 5ExplanationInclude a baseline option
Northfield compares doing nothing, cloud subscription, in-house development and a reminder-call assistant. The assistant improves reminders but leaves office-hours booking unchanged.
Doing nothing remains a baseline with continuing costs and risks.
- 6ExplanationTest all five dimensions
TELOS checks technical capability, economic affordability and value, legal compliance, operational use and schedule feasibility.
For each option, set criteria, gather evidence and record conditions. A vendor demonstration helps test capability; interviews help test use in daily work. The same criteria must apply across options so the comparison is not designed merely to confirm a favorite.
- 7ExampleWork through the cloud option
Option B costs $150,000 upfront within $200,000 available, with $75,000 in annual benefits and $20,000 in running costs. A tested integration supports technical feasibility.
It still needs a data agreement, security review, training and continued phone booking. A four-to-five-month setup can fit a January start and June 30 launch. Record those conditions alongside the recommendation.
- 8ChallengeUse a must-have condition
A project has a fixed opening deadline. One option scores best overall but would finish a month late; another meets the deadline with a lower score. Can the strongest total score keep the late option eligible?
---reveal---
No. Failure of a must-have condition rules an option out. A high score elsewhere cannot compensate for missing the fixed deadline. Compare value among the options that satisfy all required conditions.
- 9ExplanationSort four kinds of statement
An assumption is an unproven planning belief; a constraint is a known limit. A risk is uncertain; an issue already exists.
“The supplier will provide trainers” needs confirmation. A confirmed absence that disrupts training needs action now.
- 10ExampleGive the belief a check
Northfield assumes the booking connection works with its existing patient-records version. The assumption log names an owner, test method, due date and status.
The test belongs before contract signing because the decision depends on it. If it fails, update the belief and the plans and case built on it. Describe any resulting risk with a cause, uncertain event and effect, not the single word "technology."
- 11ChallengeConnect feasibility and uncertainty
An events team chooses a system to reduce entry queues. It assumes the venue has reliable network access; a test now confirms it does not. What changes in the proposal?
---reveal---
Record the failed assumption and current network issue, then reassess technical feasibility and options for meeting the queue objective. The need remains, but the selected solution needs new evidence or changes. Update the plans and business case before further commitment.
- 12RecapWhat goes to the decision-maker?
The proposal brings together an evidenced need, realistic options and feasibility findings. It also identifies the assumptions requiring checks, the hard constraints, and the major risks and issues.
A useful approval discussion can now focus on a specific choice: which option can close the gap, under what conditions, and what evidence is still needed before committing more resources?
2Calculate value and make benefits measurable
18 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionValue needs a case and a plan
- 2ExplanationPrepare the case for a decision
- 3ChallengeA major estimate changes
- 4ExampleFind the yearly net amount
- 5ExampleCalculate simple payback
- 6Key InsightCheck cumulative recovery
- 7ExampleCalculate five-year ROI
- 8ChallengeWhen does the studio recover its investment?
- 9ExplanationPut future money on today’s basis
- 10ExampleBuild NPV from discounted flows
- 11ExampleKeep BCR’s benefits and costs separate
- 12ExplanationRead the measures together
- 13ConnectionFollow value beyond the output
- 14ExampleWrite one complete benefit record
- 15ChallengeJudge a claim about saved time
- 16TipKeep measures comparable
- 17ChallengeA positive forecast meets missing ownership
- 18RecapCarry the decision and benefit record forward
3Give the manager room to act
10 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionMake the authority usable
- 2ExplanationAssign sponsor and manager
- 3ExampleBring the right views to direction
- 4ChallengeFind the right owner of the obstacle
- 5ExampleCalculate the cost boundary
- 6Key InsightA fixed date stays fixed
- 7ExampleEscalate the forecast with a decision
- 8ExplanationRead a RACI row precisely
- 9ChallengeTwo limits apply to the same choice
- 10RecapKeep direction and delivery connected
4Build the first stakeholder picture
11 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionLook beyond the project team
- 2ExampleFollow one booking journey
- 3TipUse more than one route to the list
- 4ChallengeA group expects an effect
- 5ExplanationTurn names into a register
- 6ExplanationRead the four grid positions
- 7ExampleClassify for this project
- 8ChallengeUpdate the assessment after change
- 9Key InsightKeep attitude and sensitive evidence separate
- 10ChallengeA missing user changes the early decisions
- 11RecapUse and review the first picture
5Write a charter that guides decisions
14 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionA short agreement with real authority
- 2ExplanationUse the evidence already gathered
- 3ConnectionKeep each document’s job clear
- 4ChallengeDrafting is not authorizing
- 5ExampleReplace an activity with a result
- 6ExplanationCheck success at three levels
- 7ExampleDefine what the evidence means
- 8ChallengeDo not confuse acceptance with benefits
- 9ExampleWrite the boundary on both sides
- 10ExampleMark dates without creating tasks
- 11ExampleSeparate delivery funding from operation
- 12ChallengeApply a closing condition
- 13ChallengeProtect priorities through approval
- 14RecapThe charter as a decision reference
6Launch with shared purpose and the right depth
10 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionMove from approval to coordinated work
- 2ExplanationPrepare the participants and meeting
- 3ExampleGive each part time to work
- 4ChallengeTurn an open question into work
- 5TipFollow up and agree working behavior
- 6ExplanationPredictive work fixes more early detail
- 7ConnectionAdaptive and hybrid starts
- 8ExampleTailor the approval effort
- 9ChallengeKeep the purpose while reducing paperwork
- 10RecapCheck readiness for the next work
Initiating a Project practice questions
Set 1: The first initiation decisions10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Build a proposal people can approve10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Connect evidence, money and authority10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Test the proposal before commitment10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Resolve competing initiation decisions10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Acceptance criteria
Action item
Adaptive approach
Approval requirements
Assumption
Assumption log
Authority level
B
Baseline
Benefit
Benefit owner
Benefit-cost ratio
Benefits management plan
Business case
Business need
C
Commercial case
Constraint
D
Decision gate
Deliverable
Dis-benefit
Discount rate
Do-nothing option
E
Economic feasibility
Engagement level
Exit criteria
External stakeholder
F
Feasibility study
Financial case
Functional manager
H
Hybrid approach
I
Internal rate of return
Internal stakeholder
Issue
K
Key performance indicator
Kickoff meeting
M
Management by exception
Milestone
Must-have condition
N
Needs assessment
Net annual benefit
Net present value
O
Objective
Operational feasibility
Outcome
Outline business case
Output
P
Payback period
Power/interest grid
Preapproved budget
Predictive approach
Present value
Problem statement
Product success
Product vision
Project brief
Project charter
Project governance
Project initiation document
Project management office
Project management plan
Project manager
Project sponsor
R
RACI chart
Return on investment
Risk
S
Salience model
Schedule feasibility
Scope boundary
SMART objective
Stakeholder
Stakeholder identification
Stakeholder interest
Stakeholder power
Stakeholder register
Steering committee
Strategic fit
Success criteria
T
Tailoring
Team charter
Technical feasibility
Time value of money
Tolerance
W
Whole-life costs