Project Stakeholders and Communication

Stakeholders, Communication, and the Project Team

Learn how to find and analyze the people who can make or break a project, and how to keep them engaged. You map stakeholders on a power–interest grid, assess their engagement, and plan engagement actions and communication. You write clear, honest status reports and run focused meetings. You also set up a project team with a team charter and ground rules, guide it through its stages of development, and choose a fitting approach when conflict arises. Worked examples follow one workplace project from start to finish.

BeginnerLesson 8 of 9 in Project Management Foundations Course

What you will learn

  1. Find everyone who can affect or is affected by a project, record what matters about them, and judge how much attention each one needs.
    • Identify stakeholders and keep a stakeholder register
      Define who counts as a stakeholder, find stakeholders systematically from the start of the project, and record them in a stakeholder register that stays current.
    • Map stakeholders on a power–interest grid
      Rate each stakeholder's power and interest, place them in the four quadrants of the grid, and choose the level of attention each quadrant calls for.
    • Assess stakeholder attitudes and engagement levels
      Describe how engaged each stakeholder is now, decide the level the project needs, and use the gap to set priorities.
  2. Turn the stakeholder analysis into concrete engagement actions and a communication plan that gets the right information to the right people at the right time, in a form they can use.
    • Plan engagement actions for each stakeholder
      Write a stakeholder engagement plan that sets out how the project will close the gap between each key stakeholder's current and desired engagement and keep expectations realistic.
    • Choose how to communicate: the communication model, methods and channels
      Explain how a message travels from sender to receiver, compare communication methods and media, and calculate how team size changes the number of communication channels.
    • Build a communication plan
      Analyze stakeholders' information needs and set out who receives what information, why, when, how and from whom, including feedback and escalation routes.
  3. Report the project's status honestly and clearly, make progress visible with simple visual tools, and run the meetings and logs that keep information, actions and decisions on track.
    • Write a clear status report
      Produce a status report that shows where the project stands against the plan, what comes next, and which decisions or help are needed from the reader.
    • Make progress visible with dashboards and agile reporting
      Use dashboards, information radiators, burndown and burnup charts and iteration reviews to show status at a glance, and read them correctly.
    • Run status meetings and keep action, issue and decision logs
      Plan and run focused project meetings, record what was agreed, and use logs and feedback to check whether stakeholders stay engaged.
  4. Agree how the team will work together through a team charter and ground rules, make roles clear, and support the team as it moves through its stages of development.
    • Write a team charter
      Create a team charter together with the team that records its purpose, values, working agreements and decision rules, and tell it apart from the project charter.
    • Set ground rules and clarify roles and responsibilities
      Agree specific ground rules for team behavior and apply them consistently, and use a responsibility assignment matrix so everyone knows who does, approves, advises on and is told about each piece of work.
    • Recognize the stages of team development
      Describe the forming, storming, norming, performing and adjourning stages, recognize each from the team's behavior, and explain why teams can move back to an earlier stage.
    • Support the team through each stage
      Adjust the project manager's actions to the team's stage of development, use recognition, training and team-role models to raise performance, and handle the particular challenges of temporary and dispersed project teams.
  5. Recognize where project conflict comes from, tell useful disagreement from harmful conflict, and choose a resolution approach that fits the situation.
    • Understand the sources and effects of project conflict
      Identify the typical sources of conflict in projects, distinguish task conflict from relationship conflict, spot conflict early, and prevent avoidable conflict.
    • Choose and apply a conflict-resolution approach
      Compare the five common approaches to conflict, choose one that fits the situation, and work through a conflict step by step.

Project Stakeholders and Communication study guide

5 chapters

1

Find stakeholders and understand their needs

A project depends on people who fund it, approve its work, supply resources, and use its results. Some are easy to see; others become visible only when a decision affects them. Start with a broad search, then assess each person’s power, interest, and engagement. These are different questions: who matters, how they can affect the work, and what support the project needs from them. Together, the answers help you decide where to spend your time.

1.1 Who belongs in the stakeholder register

A stakeholder is a person, group, or organization that can affect the project, is affected by it, or believes it will be affected. A belief matters because it can change behavior. Staff who fear that new software will remove jobs need to be heard even when no job cuts are planned.

Search beyond the project team

Internal stakeholders work within the organization: the sponsor, project manager, team, functional managers who lend staff, user departments, and steering committee. External stakeholders include customers, suppliers, contractors, regulators, communities, and the media. One person can hold several roles. A department head may both sponsor a project and use its results.

Begin during initiation with the project charter and business case. Read contracts and organization charts, ask the sponsor and team, and check lessons from similar projects. Trace the result from design and delivery through everyday use and ongoing support. At each point ask who will use, pay for, approve, supply, support, or be disrupted by it. Ask each person you interview, “Who else should we speak to?” This often reveals people outside your usual contacts.

Missed stakeholders can bring late requirements or block acceptance. For example, overlooking a fire inspector during a building project can lead to changes after rooms are finished. Early identification gives the team time to include approval needs in its work.

Record information you can act on

The stakeholder register records who the stakeholders are and what the project needs to know about them. The project manager owns and updates it. Useful fields include name and role, organization, contact details, expectations, requirements, power, interest, current attitude, relevant phases, and communication preferences. Later analysis can add a grid classification.

Consider an online retailer replacing the software used by 40 customer-support agents:

StakeholderWhat matters to themWhat to record or check
Head of Customer SupportFaster responses to customersSponsor influence and success expectations
Support agentsWorkload and learning the systemDaily-use needs and training concerns
IT security managerSafe handling of customer dataApproval role and review dates
Software vendorDelivering the contracted systemConfiguration responsibilities and contacts
CustomersResponse speed and service qualityFeedback from satisfaction surveys

Customers can be represented through survey data; you do not need to interview each one. A large group needs separate entries when its members have different interests. Agents and team leads, for example, may face different changes to their work.

Keep the register useful and current

Review the register at each phase start, when people join or leave, and when scope or circumstances change. An approval contact may change even when the project itself stays the same. Replace vague judgments such as “difficult person” with factual observations about requirements or behavior. Keep sensitive assessments available only to people who need them; the full analysis does not belong on a general project noticeboard.

Key Takeaways

  • A stakeholder can affect the project, be affected by it, or believe they will be affected.
  • Search across the full life of the result, including approval, daily use, and support.
  • The project manager maintains a register of roles, needs, influence, and communication preferences.
  • Split groups when their interests differ and keep sensitive assessments restricted.

1.2 The power–interest grid

A stakeholder’s job title alone cannot tell you how to engage them. Power is their ability to influence the project’s decisions or outcome. Interest is how much they care about the project or are affected by it. Judge both in relation to this project.

Power can come from budget authority, control of staff, expert knowledge, or a required approval. People without senior titles can also influence adoption. A chief executive may have high authority but little interest in a small project; a user group may have little individual authority but care deeply about the result.

Match attention to the quadrant

The power–interest grid combines the two ratings into four starting strategies.

PowerInterestStrategyWhat it means in practice
HighHighManage closelyInvolve in decisions and consult often
HighLowKeep satisfiedGive focused updates and consult on specific concerns
LowHighKeep informedShare regular information and listen to concerns
LowLowMonitorProvide general information and watch for change

“Keep satisfied” and “keep informed” are easy to confuse. The first protects the support of a powerful person who wants limited detail. The second gives interested people enough information and a voice even when they have little formal authority. Every quadrant still calls for respectful, honest communication.

Build and use the grid
  1. Take the stakeholders from the register.
  2. Agree a rating scale and define what counts as high or low.
  3. Rate power and interest with the sponsor or team to reduce personal bias.
  4. Place each stakeholder in a quadrant and choose an initial strategy.
  5. Record the result, tailor the actions, and set review points.

For the support-software project, use scores of 1–5 and count 4 or 5 as high. The Head of Customer Support scores 5 for both: manage closely. The Head of Finance scores power 5 and interest 2: keep satisfied. Support agents score power 2 and interest 5: keep informed. The facilities team scores 1 and 2: monitor. The vendor’s account manager, at 3 and 4, also falls in keep informed under this scale.

These ratings guide different actions. Finance may need a one-page monthly cost update. Agents may need demonstrations, a newsletter every two weeks, and an FAQ. A quadrant selects an initial level of attention; the person’s particular concern determines the useful detail.

Reassess as the project changes

The security manager’s interest may rise sharply as approval approaches. Agents may gain power by organizing through representatives or refusing to adopt the tool. Review the grid at phase changes and after major events. Low formal power never makes user adoption unimportant.

Other mapping tools emphasize different attributes. A power–influence grid considers active involvement in shaping the project; an influence–impact grid considers the ability to change the plan or its execution. The salience model combines power, legitimacy, and urgency. Stakeholders with all three usually need particular attention. These tools help direct engagement effort, and their candid assessments need limited distribution.

Key Takeaways

  • Assess power and interest for the particular project, using evidence and a shared scale.
  • High power and high interest call for close management.
  • Keep high-power, low-interest stakeholders satisfied; keep low-power, high-interest stakeholders informed.
  • Monitor low-power, low-interest stakeholders for changes.
  • Review positions as approval needs, circumstances, or collective influence change.

1.3 Current and desired engagement

The grid shows how much attention a stakeholder needs, but it does not show whether they support the project. A powerful, highly interested stakeholder might be a strong supporter or a determined opponent. Assess attitude and engagement alongside power and interest.

Describe the current position

A common engagement scale has five categories:

LevelMeaning
UnawareDoes not know about the project or its effects
ResistantKnows about the change and opposes it
NeutralKnows about it and neither supports nor opposes it
SupportiveSupports the change
LeadingActively works to make the project succeed

Use conversations, interviews, short surveys, meeting behavior, and team observations as evidence. Record what you saw or heard, such as “asked for training to move outside peak season.” Silence alone does not show support. Ask a quiet stakeholder how the change will affect their work before assigning a level.

Mark the gap the project needs to close

A stakeholder engagement assessment matrix puts stakeholders in rows and the five levels in columns. Mark C for current engagement and D for desired engagement. The desired level reflects the contribution needed from that stakeholder. Making everyone Leading would create work without a clear purpose.

In the support-software project, the Head of Customer Support is currently Supportive but needs to be Leading: agents need visible backing from their own director. Finance is Neutral and needs to be Supportive for the next year’s subscription approval. Agents are Resistant and need to become Supportive because successful use depends on them. Security is Unaware and needs to be Supportive before approving the design.

The categories are not equally spaced numerical steps. A move from Unaware to Supportive cannot be treated as a precise quantity of effort. Look at what the change requires: a briefing may resolve lack of awareness, while resistance caused by workload may need a change to the training plan.

Set priorities from impact and timing

The security manager is a priority because they have high power, have not been briefed, and control an approval needed before go-live. Agents also need early attention because adoption determines whether the expected service benefits appear. A large apparent gap for a remote, low-interest stakeholder may be less urgent than a smaller gap around an imminent decision.

Resistance gives you information. Someone may fear job loss, remember a failed earlier project, or see a real flaw in the design. Listen for the reason before choosing an action. Repeated objections to training dates may reveal a staffing problem that affects delivery, not simply dislike of change.

Repeat the assessment during the project. Record new evidence, compare C with D, and use movement or lack of movement to review engagement actions. If someone attends a demonstration but still refuses to use the result, attendance alone is not enough evidence to mark them Supportive.

Key Takeaways

  • Attitude is separate from power and interest.
  • The five levels are Unaware, Resistant, Neutral, Supportive, and Leading.
  • Mark current and desired engagement with C and D; set D to the level the project needs.
  • Prioritize gaps using power, timing, and consequences, not arithmetic on category positions.
  • Listen for the reason behind resistance and reassess using evidence.
2

Plan engagement and communication

Stakeholder analysis becomes useful when it changes what people do together. Engagement actions address the reasons for missing support, while communication makes sure people receive and understand information they can use. A plan connects these needs to named owners, suitable methods, and clear timing. The same project facts reach different audiences at different levels of detail, with feedback and escalation routes to keep decisions moving.

2.1 Actions that build useful involvement

A stakeholder engagement plan sets out how stakeholders will be involved in the project’s decisions and work. It belongs within the project management plan. For each key person or group, it identifies the engagement needed, the actions to build it, an owner, and timing.

Communication shares information. Engagement involves people through consultation, decisions, collaboration, and agreement. An email announcing training shares information; inviting users to test the software and shape the training plan involves them. The communication plan helps carry out engagement actions, but a list of messages alone cannot do the whole job.

Turn an assessment into an action

Start with the register, power–interest grid, and C/D assessment. For each priority gap:

  1. Identify the reason for the current attitude or level.
  2. Choose an action that addresses that reason.
  3. Name the person who will carry it out.
  4. Set a date or trigger.
  5. Define evidence that will show whether it worked.

The best owner may be a team lead or trusted colleague with a strong relationship. Assigning every action to the project manager can ignore those relationships and create a bottleneck.

Work through the support-software example

The 40 agents resist training during the November–December peak. Their desired level is Supportive. Sending more promotional emails leaves the workload concern untouched. The support team lead instead moves training outside the peak, invites four agents into a pilot, and publishes answers to workload and job-security questions. Pilot agents report back to colleagues.

The plan names the team lead as owner and schedules the pilot before wider training. Signs of success include pilot agents recommending the tool and at least 90% of agents attending training. Attendance is one useful measure; conversations and later use help establish whether support has actually improved.

Security needs a different action. The manager is Unaware, and approval is required before go-live. The project manager arranges a week-2 briefing, shares the data-flow design, and agrees review dates. Written approval criteria agreed by week 4 provide evidence that security is involved early enough to influence the design.

Make expectations explicit

Managing expectations means confirming what the project will deliver, what it will not deliver, and when. A manager may assume a reporting module is included even though the charter excludes it. Discuss the gap early, refer to the scope and constraints, and confirm the understanding in writing. Warn people promptly when a change affects an earlier expectation.

Engagement continues in adaptive projects. A product owner represents customer and business needs. An iteration review, also called a sprint review or demo, lets stakeholders inspect working results and give feedback at the end of a short cycle. A lighter written plan can work alongside this frequent contact.

Review engagement actions when phases, stakeholders, or attitudes change. Share useful arrangements widely, but limit access to sensitive assessments. If an action produces no movement toward the desired level, ask whether it addressed the real concern before repeating it.

Key Takeaways

  • Engagement involves people in decisions and work; communication shares information.
  • Each engagement action needs a reason, owner, timing, and evidence of success.
  • Choose actions that address the cause of resistance, including valid flaws in the plan.
  • Confirm scope and timing expectations and review actions as the project changes.

2.2 Messages, methods, and communication channels

Communication works when the receiver understands the meaning the sender intended. Sending a message is only one part of that process. A delivered email can still leave its reader unsure what to do.

Check the meaning received

In the sender–receiver model, the sender encodes an idea into words, figures, or images and transmits it through a medium. The receiver decodes it. Noise can interfere anywhere: jargon, distractions, strong emotions, language differences, a weak connection, or too many competing messages. An acknowledgment confirms receipt; feedback shows understanding. “Received” is different from “We will finish the review by Thursday.”

Use active listening to check meaning: give full attention, paraphrase the concern, ask clarifying questions, and avoid interrupting. A written message should state its purpose first and identify the required action, owner, and deadline.

Choose a method for the job
MethodHow it worksUseful application
InteractiveReal-time exchangeComplex decisions, sensitive news, checking understanding
PushSent to named recipientsReports, email confirmations, notices
PullStored for people to accessFAQs, shared files, dashboards, reference material

When go-live slips by two weeks, call the sponsor first so questions can be answered. Confirm the date and reason by email to create a record. Update the agents’ FAQ as a reference, then ask team leads to announce the update and check understanding. Posting information does not ensure that people look for it.

The method is different from the medium. A virtual tool can support an interactive video call, a pushed email, or a pulled wiki. Face-to-face discussion offers tone, body language, and immediate feedback, but needs shared space and separate notes. Physical documents provide a lasting record but are slower to update. Virtual media reach dispersed people quickly and can be searchable, but face connection problems, message overload, missing tone, and time-zone gaps.

Choose for urgency, complexity, sensitivity, audience size and location, stakeholder preferences, language, culture, and the need for a record. Important informal agreements need written confirmation. Communication may be upward to the sponsor, downward to the team, horizontal to peers, or external to customers and suppliers; formal written records suit approvals, contracts, and change decisions.

Calculate possible one-to-one channels

For a group of n people, count every pair once:

Channels=n(n−1)2

Six people give 6×5=30 person-to-person counts, but each pair appears twice. Dividing by 2 gives 15 channels. With nine people, 9×8/2=36 channels: 21 more after adding only three people. Include the project manager in the head count. The formula counts possible pairs, not messages actually sent, and shows why growing teams need structure.

Tone and expression matter, but the claim that 93% of all communication is nonverbal misuses Mehrabian’s findings. Those experiments concerned judgments of feelings when words, tone, and facial expression conflicted. They do not assign those percentages to project reports or technical instructions.

Key Takeaways

  • Feedback checks understanding; acknowledgment only confirms receipt.
  • Interactive communication allows exchange, push sends information, and pull makes it available.
  • Choose the medium for the message, audience, urgency, sensitivity, and record needed.
  • Count possible one-to-one channels with n(n − 1)/2, including the project manager.
  • Active listening checks meaning through attention, paraphrasing, and clarifying questions.
  • The 7–38–55 findings do not describe communication in general.

2.3 A communication plan people can use

A communication plan, also called a communications management plan, describes how project information is created, shared, collected, and stored. It answers who needs what information, why, when, how, and from whom. It turns stakeholder needs into arrangements people can follow.

Find the requirements first

Ask each audience what it needs to decide, do, or understand. Establish detail, frequency, format, language, confidentiality, and access needs. Use the register, grid, engagement plan, organization charts, contracts, and reporting duties. Starting with a favorite tool can leave the real information need unresolved: a dashboard is useful only when it shows what its readers need.

The plan records the audience, information, purpose, method and medium, frequency or trigger, and sender. It also identifies approvals needed before confidential information is released, feedback arrangements, escalation routes and time limits, templates, a glossary, storage locations, constraints, and review arrangements. This prevents gaps in ownership as well as gaps in the recipient list.

Build the communication matrix

For the support-software project, the main rows could be:

AudienceInformation and purposeTiming and mediumOwner
SponsorStatus, decisions, early warningFriday report and 30-minute callProject manager
FinanceBudget and forecastOne-page monthly emailProject manager
Support agentsChanges, training, questionsNewsletter every two weeks, FAQ, demosSupport team lead
IT security managerDesign and approval evidenceReviews at agreed milestonesTechnical lead
Project teamTasks, priorities, blockersDaily 15-minute stand-up, weekly planning, chatProject manager
VendorDelivery dependenciesWeekly call; contract changes in writingProject manager

A scheduled report provides routine visibility. A trigger handles events that cannot wait for that schedule, such as a critical approval delay. Build a way to ask questions into each important arrangement. For a confidential design review, record both the authorized audience and the person who approves release.

State how problems move upward

An escalation path names who handles a problem beyond the current level’s authority and how quickly to raise it. For example, a team member raises a blocker with the project manager within one working day. The project manager goes to the sponsor when the effect exceeds agreed cost or schedule limits. The sponsor takes decisions beyond their own authority to the steering committee. Clear routes prevent a problem from sitting between people who each expect someone else to act.

Tailor the detail while keeping the facts consistent. Senior managers need overall status, decisions, and top risks; the team needs task-level information. A short summary cannot call the project on track while the detailed plan shows a two-week delay. Review the communication plan at each phase start and when the register changes. Feedback about missed messages, overload, or inaccessible information tells you which arrangements need adjustment.

Key Takeaways

  • Analyze information needs before selecting formats and tools.
  • Record audience, content, purpose, timing, method, and sender.
  • Include confidentiality, feedback, storage, escalation, and review arrangements.
  • Tailor detail to the audience while keeping project facts consistent.
  • Review the plan when phases or stakeholder needs change.
3

Report progress and keep decisions moving

Useful reporting lets people see what has happened, where the project stands, and what help it needs next. A clear report connects evidence to a decision; a dashboard makes selected facts easy to scan. Meetings and logs then turn those facts into agreed action. Keep the reporting cycle linked to stakeholder needs, so that a sponsor can make timely decisions and the team can coordinate work without spending its week producing updates.

3.1 An honest, useful status report

A status report compares the project’s current position with its baseline for scope, schedule, cost, and quality. A progress report describes accomplishments during a period. A forecast predicts future results, such as the finish date or final cost. One regular report often combines all three, but each answers a different question.

Put decisions near the top

Begin with a header naming the project, reporting period, author, and date. Give the overall status and a short summary, then show accomplishments, next period’s work, milestones, costs, risks, issues, changes, and decisions needed. Compare planned milestone dates with forecasts, and show budget, spending so far, and expected final cost separately.

For each important problem, give its cause, impact, and action. “Three of five interfaces tested” provides evidence; “good progress” leaves the reader guessing. Report completed results against the plan, not just activities such as the number of meetings held. A task described as “90% done” for weeks needs better evidence from finished work and accepted milestones.

Apply agreed RAG thresholds

RAG stands for red, amber, green; many US organizations use yellow for amber. Agree thresholds in advance. Green usually means within agreed limits, amber signals deviation or risk that is recoverable with current plans or limited help, and red signals that sponsor help or a decision is needed because agreed limits are or will be exceeded. The precise thresholds belong to the organization or project.

For the support-software project, the budget is $120,000 and forecast final cost is $129,000. First find the overrun, then compare it with the budget:

129000−120000=9000 9000120000×100=7.5%

The forecast is $9,000, or 7.5%, above budget. With green up to 5% over, amber above 5% through 10%, and red above 10%, cost is amber. Using the amount spent so far would answer a different question from the expected final overrun.

Training was planned for November 13 and is now forecast for November 20, five working days late in this schedule. With green on time, amber up to 10 working days late, and red beyond that, schedule is also amber.

Turn facts into a request

A useful opening could read: “Overall status: Amber. Migration finished on schedule, but training moved to November 20 because the vendor’s training environment was late. Forecast cost is $129,000 against a $120,000 budget. By October 30, approve an additional $9,000 through the budget change process or approve a revised training plan within budget.”

The summary gives a conclusion, cause, impact, and dated decision. It does not treat an existing contingency reserve inside the budget as extra money above that budget.

Use a consistent format and the frequency agreed in the communication plan. Keep the main report short, with supporting detail in attachments. A watermelon report looks green while serious problems remain hidden. Report problems early with recovery actions; change a rating back to green only when evidence supports it.

Key Takeaways

  • Status compares the present with the baseline; progress describes accomplishments; a forecast predicts the future.
  • Lead with the conclusion and decisions needed, backed by results and numbers.
  • Use RAG thresholds agreed in advance and calculate variances against the correct baseline.
  • Give each major problem a cause, impact, action, and owner.
  • Report bad news early and change ratings only when evidence supports the change.

3.2 Dashboards, boards, and progress charts

A dashboard is a compact visual summary of selected project measures. It may show milestone dates, budget against forecast, RAG ratings, top risks, and open issues. It helps readers spot where attention is needed, but each indicator still needs reliable data and a short explanation.

An information radiator is a visible display people can read without asking for an update. A wall task board, shared online board, or blocker list can serve this purpose. A task board with To do, In progress, and Done columns shows the flow of work. These displays are pull communication: information is available when someone looks at it.

Read a burndown chart

A burndown chart shows remaining work on the vertical axis and time on the horizontal axis. The unit might be hours, tasks, or story points. An ideal line falls from the starting total to zero at the planned end. The actual line shows what remains according to the latest data. Above the ideal means more work remains than planned; below it means less remains.

A 10-day iteration starts with 60 hours of work. A straight ideal line assumes the same planned reduction each day:

60/10=6

The ideal reduction is 6 hours per day. At the end of day 4:

60−4×6=36

The ideal remaining work is 36 hours. Actual remaining work is 42 hours, so the difference is:

42−36=6

There are 6 more hours remaining than planned. The team investigates blockers and decides what can be completed or moved to a later iteration. The chart prompts that conversation; it does not identify the cause by itself.

A flat line can mean work is not being finished or the chart is not being updated. A rising line can mean work was added or underestimated. Ask about the work and data before choosing a response.

Separate completed work from changing scope

A burnup chart shows completed work rising toward a separate total-scope line. When scope increases, the total line rises. Keeping the two lines separate helps readers see both delivered work and a changing target. On a burndown, new work and slower completion can both increase the amount remaining, so the reason needs investigation.

An iteration review lets stakeholders see and try working results and provide feedback. It gives evidence beyond a claimed completion percentage. A daily stand-up, often 15 minutes, helps the team coordinate what comes next and remove blockers. It serves the team’s planning needs; it is not a round of individual status reports to the manager.

Choose measures that help decisions

Too many dashboard measures hide the important ones. Choose a small set that supports action, and check how each is calculated and updated. Spending half the budget does not establish that half the work is complete. Use evidence of delivered and accepted work when describing progress, and use cost information to describe spending and forecasts.

Key Takeaways

  • A dashboard summarizes selected measures; check the evidence behind its indicators.
  • An information radiator makes current work visible through pull communication.
  • A burndown shows remaining work; above the ideal line means more remains than planned.
  • A burnup separates completed work from the total-scope target.
  • Iteration reviews show working results; stand-ups help the team coordinate.
  • Money spent is not a measure of work completed.

3.3 Focused meetings and clear follow-up

A project meeting earns its time when it creates shared understanding, resolves a decision, or coordinates action. Give it a clear purpose and invite the people needed for that purpose. Send an agenda in advance, assign time to each item, and identify a facilitator and note-taker.

A kickoff meeting brings the team and key stakeholders together at project start or the start of the main execution phase. It establishes objectives, scope, plan, roles, communication arrangements, and ground rules. A later status meeting uses that shared understanding to compare current work with the plan.

Run a short status meeting

A 30-minute weekly agenda might allow 5 minutes for previous actions, 10 for milestone progress, 10 for new risks and issues, and 5 for decisions and new actions. Start and finish on time. Move detailed technical problem-solving into a separate discussion with the people involved, so the full group is not waiting through work it cannot contribute to.

Meeting time adds up across the whole team. Eight people in a weekly one-hour meeting use 8 person-hours per week. Over 20 weeks:

8×20=160

That is 160 person-hours. At 30 minutes per meeting, the same group uses 80 person-hours, saving 80. A shorter meeting is useful when the agenda still achieves its purpose.

Record agreements in the right place

Minutes summarize attendees, decisions, actions, and open questions. They are not a transcript. Send them promptly, for example within one working day. An action should name both an owner and a due date: “Agree customer-data access approval criteria. Owner: Priya Shah. Due: October 9.”

RecordWhat belongs in itUseful fields
Action logAgreed tasks to carry outTask, owner, due date, status
Issue logProblems that already existDescription, impact, priority, owner, target date, status
Decision logDecisions already madeDecision, authority, date, reason

An uncertain future event belongs in the risk register. If a training environment might arrive late, it is a risk. Once its delivery is late, the delay is an issue. The response can also create actions, such as arranging an alternative environment. Recording a decision’s reason helps a new member understand why the team chose it and reduces repeated debate.

Check whether people remain engaged

The reporting cycle also gives evidence about engagement. Compare current and desired levels using feedback, attendance, complaints, surveys, and adoption. If training attendance is 60% against a 90% target, investigate before assuming the agents are simply uncooperative. In the software project, moving sessions to quieter hours and asking team leads to promote them may address the barrier.

Update the register, grid, and plans when the evidence changes. Review previous actions at the next meeting. A list of unfinished actions with no owner or due date cannot tell the team who should act next.

Key Takeaways

  • Give meetings a purpose, timed agenda, needed attendees, and recorded outcomes.
  • Minutes record decisions and actions without reproducing every spoken word.
  • Action logs track tasks; issue logs track current problems; decision logs preserve choices and reasons.
  • A risk is uncertain; an issue already exists.
  • Use engagement evidence to update assessments and plans.
4

Agree how the team works and support its development

A project team needs agreements about decisions, responsibilities, and everyday behavior as well as a task plan. These agreements help people coordinate and settle misunderstandings. Team needs also change: a new group may need clear direction, while an experienced group can solve many problems itself. Recognizing those changes helps a project manager provide useful support, welcome new members, and bring temporary teams to a proper close.

4.1 The team charter and decision rules

A team charter records how team members agree to work together. It includes purpose, shared values, communication, meetings, decisions, conflict handling, and other working agreements. Agile teams often use the term working agreement for similar arrangements.

Separate the two charters
DocumentMain purposeWho creates or issues it
Project charterAuthorizes the project and the project manager; sets objectives, high-level scope, and success criteriaSponsor
Team charterRecords how members work and behave togetherTeam, with facilitation

A team charter authorizes nothing. Its value is shared expectations. When a problem appears, members have an agreed reference point; new members can also learn the team’s practices quickly.

The project manager facilitates a session in which the team writes the charter together. Invite practical suggestions, agree what members can follow, and have everyone acknowledge the result. Agreements people helped create are easier to own than rules delivered without discussion. Keep the document short, usually one or two pages, and revisit it when membership changes or an agreement stops working.

Write observable agreements

“Communicate well” gives little guidance. “Reply to direct questions in team chat within four working hours” identifies a behavior others can observe. For the support-software team, the purpose might be “Deliver the new support system by March 1 so agents can resolve customer requests faster.” Other entries can specify the chat channel, written records, daily stand-up time, and when unresolved disagreements reach the project manager.

Virtual and hybrid teams need agreements about overlapping hours, tools, response times, and written decision records. “Four working hours” needs a shared understanding of each member’s working schedule; otherwise people in different time zones may expect replies while colleagues are asleep.

Agree how decisions are made
RuleWhat agreement means
UnanimityEveryone agrees
MajorityMore than half agree
ConsensusEveryone can accept and support the decision, even if it is not their first choice
Leader decides after consultingThe leader hears input and makes the decision

Choose rules for particular kinds of decisions. Consensus does not require everyone to prefer the same option. A member can support a workable choice while believing another choice would have been better. Majority voting can produce a decision without that shared acceptance.

A practical charter entry could say, “Developers seek consensus on technical choices. If there is no agreement within two working days, the technical lead decides.” The time limit and fallback prevent an urgent choice from remaining open indefinitely. Explain the rule before the dispute, so the team is not trying to agree on a process while defending competing proposals.

Use the charter in everyday work and review it in retrospectives. When a rule repeatedly fails, discuss whether the rule, the conditions, or members’ behavior needs to change.

Key Takeaways

  • The project charter authorizes the project; the team charter records working agreements.
  • The team creates and acknowledges its charter with the project manager facilitating.
  • Specific agreements guide behavior better than vague intentions.
  • Consensus means everyone can support a decision; unanimity means everyone agrees.
  • Decision rules can include a time limit and an agreed fallback.

4.2 Ground rules and responsibility assignment

Ground rules set expectations for acceptable team behavior. They usually sit in the team charter. Keep them few, specific, observable, and agreed by the people who will follow them. Every member, including the project manager, shares responsibility for maintaining them.

Useful examples include “Update the task board before stand-up,” “Criticize ideas, not people,” and “Tell the task owner as soon as you know a deadline is at risk.” Raise breaches early and first in private. Refer to the agreement: “We agreed to update the board before stand-up.” Apply rules consistently; repeated exceptions for one person weaken their credibility. A rule repeatedly broken by many members may need revision.

Make the work responsibilities clear

Unclear roles create duplicated tasks, missed work, and conflict. A role description states authority, the decisions the person can make; responsibility, the work expected of them; and competence, the knowledge and skills needed.

A responsibility assignment matrix links activities to people. The common RACI format distinguishes four relationships:

LetterRoleMeaning
RResponsibleDoes the work
AAccountableOwns the result and approves it
CConsultedProvides input through two-way communication
IInformedReceives updates through one-way communication

Each activity has exactly one accountable person and at least one responsible person. The same person can hold A and R.

Check the software project’s rows

For “Define ticket categories,” the support team lead is R, the Head of Customer Support is A, pilot agents are C, and security is I. The agents help shape a system they will use, but the department head owns the result.

For “Approve customer-data access settings,” the IT security manager is both A and R, the technical lead is C, and the project manager is I. Combining A and R is valid because one person performs and owns that activity.

For “Run agent training,” the vendor trainer is R, the project manager is A, the support team lead is C, and the Head of Customer Support is I. The person delivering a session is different from the person accountable for the activity’s outcome.

Review the matrix with the named people

Check every row for a missing R or more than one A. Two accountable people leave ownership unclear; no responsible person leaves the work unassigned. Too many consulted people can also slow work, so identify whose input actually changes it.

Share and confirm the matrix with the people named. A chart they have never seen cannot establish shared expectations. Use its I entries to help build the communication plan, put agreed roles into the team charter, and review rows when responsibilities change.

Key Takeaways

  • Ground rules are shared, observable agreements that apply to the project manager too.
  • R does the work; A owns and approves its result; C gives input; I receives updates.
  • Each activity needs exactly one A and at least one R.
  • A person can hold both A and R for the same activity.
  • Confirm the matrix with the people named and connect it to communication arrangements.

4.3 How a project team develops

People do not become an effective team simply because their names appear on the same plan. They need to learn their roles, work through differences, and build ways of coordinating. Tuckman’s model names common patterns in this development.

Bruce Tuckman described forming, storming, norming, and performing in 1965. Tuckman and Mary Ann Jensen added adjourning in 1977. The model helps project managers recognize team needs; it does not set a timetable that every team follows.

Recognize the five stages
StageTypical behaviorWhat you may notice
FormingPolite, uncertain, looking for directionQuestions about purpose, roles, and where to begin
StormingChallenging ideas, priorities, roles, or leadershipTension and repeated disagreement about the approach
NormingAgreeing methods and building trustClearer roles, shared rules, helpful feedback
PerformingWorking interdependently and solving problemsMembers coordinate and adapt without constant direction
AdjourningCompleting work and leaving the temporary teamClosure, recognition, uncertainty about next assignments

During forming, output is often low because people are still learning how the team works. During storming, productivity can dip as competing ideas become visible. Norming brings more reliable coordination, and performing brings high productivity and the ability to solve many problems within the team. Adjourning can bring a sense of loss as well as satisfaction.

Follow the evidence in a project

In week 1 of the software project, members keep asking who decides what: forming. In week 3, developers repeatedly argue about database design and challenge the project manager’s approach: storming. By week 6, the team agrees a code-review rule and settles disagreements through it: norming. In week 10, members reorganize tasks to absorb a vendor delay without waiting for instructions: performing.

The useful evidence is the behavior. A quiet team may be polite and uncertain, or it may be skilled and coordinated; quietness alone cannot distinguish forming from performing. Look at whether members understand their roles and handle dependencies themselves.

Expect changes and setbacks

Teams can move quickly through a stage, stay in storming, or return to earlier patterns. New members, a new leader, changed goals, or rising pressure can disturb established agreements. Two specialists joining a norming team may bring back questions about roles or arguments about methods. A short project may finish before the team reaches performing.

A good team can disagree. Storming can expose differences that need to be settled, while suppressing them can leave the same conflict waiting to return. Keep disagreements focused on work and help members build agreements they can use. Recognizing a stage helps explain what support is useful; it should not become a label used to dismiss a real problem.

Key Takeaways

  • The five stages are forming, storming, norming, performing, and adjourning.
  • Identify stages from team behavior, not from the week number or quietness alone.
  • Handled well, storming brings differences into the open.
  • Membership, leadership, goals, or pressure can move a team back to earlier patterns.

4.4 Support that fits the team’s needs

A project manager helps the team by matching support to what members currently need. Clear goals, suitable skills, resources, fair workloads, feedback, and working tools all affect performance. Personally following the ground rules makes the manager’s expectations credible.

Adjust support as the team develops
StageUseful project-manager actions
FormingClarify objectives and roles; introduce people; hold a kickoff; agree the charter
StormingFacilitate disagreements, clarify responsibilities, and use the charter
NormingEncourage decisions, offer feedback, and reinforce working agreements
PerformingDelegate, remove obstacles, protect focus, and recognize results
AdjourningRecognize contributions, capture lessons, and support next assignments

A performing team does not need the manager to approve every small task. A forming team still needs enough direction to begin. Reassess when membership or conditions change; past independence does not mean a reorganized team needs no support.

Develop skills and recognize contributions

Training closes skill gaps needed for the work. Team building develops trust and working relationships through activities such as introductions and joint planning. Tying it to real work gives members practice in coordinating the tasks they actually face.

Recognition acknowledges a contribution; a reward is tangible, such as time off or a bonus. Make either specific, timely, fair, and connected to useful behavior. Thanking members for a successful cross-team handover encourages collaboration. A single prize that only one member can win may work against it. Ask about preferences: some people welcome public praise, while others prefer private thanks.

Notice the team’s mix of behaviors

Belbin’s nine team roles describe behavioral contributions:

  • Plant: develops creative ideas.
  • Resource Investigator: finds outside contacts and opportunities.
  • Coordinator: clarifies goals and delegates.
  • Shaper: drives progress through obstacles.
  • Monitor Evaluator: weighs options logically.
  • Teamworker: supports cooperation.
  • Implementer: turns ideas into practical plans.
  • Completer Finisher: checks details and deadlines.
  • Specialist: contributes deep expertise.

People usually show several roles. These are behavioral preferences, not fixed personality types or a requirement for nine separate people. A team with many idea generators may need stronger checking and follow-through. Use the model to consider missing contributions, then connect that observation to the work.

Handle temporary and dispersed working

In a matrix organization, a member reports to both a functional manager and a project manager. Competing priorities can reduce availability. Agree commitments with functional managers, clarify priorities, and give useful feedback to line managers, especially when you do not control pay or appraisals.

Dispersed teams offer wider access to skills and less travel, but have time-zone gaps, less informal contact, and technology problems. Agree overlapping hours, use video for important conversations, record decisions, and rotate inconvenient meeting times fairly.

When a newcomer joins, explain the charter, roles, tools, and current status, then pair them with an experienced colleague. Expect a short productivity dip while members adjust. At the end, make time for lessons, thanks, and transition to new assignments.

Key Takeaways

  • Match direction, facilitation, support, and delegation to the team’s current needs.
  • Training builds needed skills; team building develops trust and working relationships.
  • Recognition and rewards work best when specific, timely, fair, and suited to the person.
  • Belbin roles describe contributions people can combine, not fixed personality types.
  • Agree availability with functional managers when people serve two reporting lines.
  • Dispersed teams need explicit communication agreements and fair meeting arrangements.
  • Onboard new members and support closure when the team disbands.
5

Understand conflict and choose a response

Project work brings together people with different priorities and limited time and resources. Disagreement can expose a weak plan or improve a decision, but personal attacks damage trust. Start by finding what the conflict is about and what each person needs. Then choose an approach that fits the importance, urgency, authority, and relationships involved, and follow the agreement through into the work.

5.1 What project conflict is really about

Conflict arises when people see their goals, interests, values, or needs as incompatible. Projects create many opportunities for this: teams are temporary, deadlines are tight, resources are shared, and people face change. Managing conflict is part of coordinating the work.

Look for the source

A classic project-management study by Thamhain and Wilemon identified seven sources: schedules, project priorities, staffing and resources, technical opinions and trade-offs, administrative procedures, cost, and personality. Across the life cycle, schedules, priorities, and staffing were the three most intense sources in that study. The ranking changed between phases, with priorities leading early in a project.

Use these categories to investigate a dispute. A heated argument between two leads may concern the same specialist’s availability. Calling it a personality clash without checking the work leaves the resource problem in place. Personal friction can also hide behind a technical debate, so ask about both the practical facts and the relationship.

Distinguish task and relationship conflict
TypeFocusLikely effect
Task conflictIdeas, methods, priorities, or decisionsCan improve decisions when handled respectfully
Relationship conflictPersonal friction and attacksTends to damage trust and performance

Two engineers can disagree about a design and still respect each other. Asking for evidence can expose a risk before the team commits to a choice. Calling a colleague careless turns attention toward the person and can make the same debate harmful. Task conflict can become relationship conflict when people feel attacked.

The aim is useful, early resolution, not silence. A team that never questions a proposal may be avoiding concerns. Make room for people to challenge assumptions while keeping discussion specific to the work.

Recognize early warning signs

Watch for the same dispute returning each week, avoidance, unexplained silence, sarcasm, growing email copy lists, missed handovers, and repeated complaints about one colleague. Investigate before the pattern becomes entrenched. A missed handover might be a single oversight, but repeated missed handovers between the same people deserve a conversation.

In the software project, two leads need the only database specialist in the same week. One needs migration scripts before a Thursday test window; the other needs performance tuning before go-live. The visible argument concerns a person’s allocation. The practical causes include resources, priorities, and schedule. Understanding those causes gives the team something it can change.

Prevent avoidable disputes

Clear roles and a RACI chart reduce uncertainty about who owns decisions and work. Agreed priorities and realistic schedules reduce incompatible demands. Ground rules and a conflict process in the team charter give people a way to raise concerns. Open communication lets someone say that two promised tasks cannot both be completed with the available time before the problem becomes personal.

Key Takeaways

  • Conflict can come from schedules, priorities, resources, technical choices, procedures, cost, or personality.
  • Investigate the work and the relationship before deciding the cause.
  • Respectful task disagreement can improve decisions; personal friction tends to damage performance.
  • Recurring disputes, avoidance, sarcasm, and missed handovers can signal conflict.
  • Clear responsibilities, priorities, schedules, and working agreements prevent avoidable conflict.

5.2 Choose a conflict approach and follow through

A conflict response should fit the situation. The Thomas–Kilmann model uses assertiveness, pursuing your own concerns, and cooperativeness, meeting the other person’s concerns. These dimensions describe five common approaches.

Compare the approaches
ApproachWhat happensWhen it fits
Collaborate / problem solveSeek a solution meeting both sides’ real interestsImportant issue, time to explore, trust, lasting commitment needed
Compromise / reconcileEach side gives up somethingModerate stakes, similar power, or a quick temporary settlement
Force / directImpose a decision through authorityEmergency or an urgent safety, legal, or ethical decision
Smooth / accommodateGive way and emphasize agreementThe issue matters more to the other side or you realize you were wrong
Withdraw / avoidStep back or postponeTrivial issue, cooling-off time, missing information, or another person better placed

Collaboration is high in both dimensions. Forcing is high in assertiveness and low in cooperativeness; accommodating is the reverse. Avoiding is low in both, while compromise sits between the extremes. No approach is best in every situation. Collaboration can build a lasting solution but takes time; repeated forcing can damage commitment, and repeated avoidance can let problems grow.

Find interests behind positions

A position is the demand someone states. An interest is the need behind it. “I need the specialist all next week” is a position. “The scripts must be ready before Thursday’s test window” identifies a reason and a timing constraint.

In the support-software dispute, migration scripts need two days before Thursday, while tuning needs three days before go-live after that week. Splitting the week equally might leave neither task complete. The leads instead allocate Monday and Tuesday to scripts and Wednesday through Friday to tuning. The tuning tester prepares data during the first two days. Both underlying needs are met. That is collaboration, not a compromise in which each loses part of the time required.

Work through the conversation
  1. Address the conflict early, privately, and at a suitable time.
  2. Let each side explain; listen and keep people separate from the problem.
  3. Identify interests behind stated positions.
  4. Agree the facts and a shared goal.
  5. Generate options together.
  6. Choose an option and confirm agreement.
  7. Record the agreement and follow up.

Smoothing can lower tension while leaving the cause unresolved. A pause can help people cool down, but agree when the conversation resumes. In an emergency, use appropriate authority to protect people or meet a mandatory requirement without waiting for lengthy negotiation.

If the decision exceeds the project manager’s authority, follow the escalation route. Two functional managers competing for a shared specialist may need a sponsor or resource owner to decide. Escalation brings the issue to the person with authority; it should include the facts, effects, and decision needed.

Key Takeaways

  • Choose a response for the issue’s stakes, urgency, relationships, and available authority.
  • Collaboration seeks to meet both interests; compromise leaves each side partly satisfied.
  • A position states a demand; an interest explains the need behind it.
  • Listen, agree facts, generate options, record an agreement, and follow up.
  • Use escalation when the needed priority or resource decision exceeds your authority.
  • Avoidance and smoothing can leave the underlying problem unresolved.

Project Stakeholders and Communication examples

5 Walkthroughs

1

From stakeholder search to engagement priorities

11 steps
Build and use a stakeholder analysis for a customer-support software project.
  1. 1
    IntroductionThree questions about the people involved

    An online retailer is replacing the software used by 40 support agents. Delivering the tool is only part of success: people must approve it, learn it, and use it. Those people are its stakeholders, and missing one can sink adoption.

    Work through three questions: Who can affect or experience the change? How much power and interest do they have? What engagement does the project need from them? Each answer adds something to the next decision.

  2. 2
    ExplanationLook beyond the kickoff list

    A stakeholder can affect the project, be affected by it, or believe it will affect them. Begin with the charter, contracts, organization chart, and interviews.

    Trace who will use, fund, approve, supply, support, or be disrupted by the system. The agents are visible users, but customers experience response times and security holds an approval. Ask each contact who else needs to be involved.

  3. 3
    ExampleCreate a useful register entry

    Record the support agents as daily users who worry about learning the system during the busy season. Include their expectations, contact route, interest, current attitude, and training preferences.

    Record security separately: its main concern is customer-data handling, and it must approve before go-live. The project manager keeps the register current and limits access to sensitive assessments.

  4. 4
    ChallengeFind a missing group

    A depot is changing its booking system. Managers and the vendor are listed. Night-shift staff believe the change will remove their jobs, although no cuts are planned. Do they belong in the register, and why?

    ---reveal---

    Yes. People who believe the project will affect them are stakeholders. Record the concern factually and speak with them; the absence of planned cuts does not remove their need for engagement.

  5. 5
    ExplanationRate power and interest separately

    Power means the ability to influence this project’s decisions or outcome. It may come from an approval, resource control, expertise, or collective action. Interest means how much someone cares or is affected.

    Agree a scale with the team or sponsor. On a 1–5 scale with 4–5 high, the software project’s Finance head scores power 5 and interest 2. That combination calls for keep satisfied.

  6. 6
    ExampleChoose the quadrant’s starting strategy

    The Head of Customer Support scores 5 for power and 5 for interest: manage closely, including regular consultation on decisions. Agents score 2 and 5: keep informed, with useful updates and listening.

    Facilities scores 1 and 2: monitor. Finance needs concise information about cost. Agents need fuller information about workflows and training. A quadrant guides attention; it does not measure a person’s worth.

  7. 7
    ChallengeRespond to a change in influence

    Users had little individual power and high interest. They now act through a representative who can block adoption, while their interest stays high. How should the engagement strategy change?

    ---reveal---

    Reassess their power as high and manage closely. Keep regular information flowing, but add close consultation on decisions affecting adoption. Keeping the old rating would overlook their new ability to affect the outcome.

  8. 8
    ExplanationAdd the engagement assessment

    Power and interest do not reveal support. Use Unaware, Resistant, Neutral, Supportive, Leading to describe engagement. Mark C for current and D for desired in an assessment matrix.

    Set D to the contribution the project needs. Leading means active work to make the project succeed; Supportive means backing the change. A low-interest observer may need no more than Neutral.

  9. 9
    ExampleChoose evidence and a priority

    Security is C = Unaware and D = Supportive: nobody has briefed the manager, yet approval is required before go-live. Agents are C = Resistant and D = Supportive because they fear peak-season training.

    Security comes first because power and timing make the gap urgent. The levels are categories, so counting columns cannot tell you the effort needed. Ask agents about workload to understand their resistance.

  10. 10
    ChallengeCombine attention and engagement

    A finance director can block funding next week but has not heard about a change. A small user group supports it and wants optional updates. What engagement gap should receive attention first, and what evidence should be sought?

    ---reveal---

    Brief the finance director first and check the support needed for the funding decision. Their power, lack of awareness, and near deadline create the priority. Use a conversation to assess understanding and attitude, then update the register and C/D assessment.

  11. 11
    RecapKeep the analysis alive

    Search broadly and keep the register current. Assess power and interest for the project, then assess engagement using evidence of awareness and support.

    Use the grid to choose an initial level of attention and the C/D gap to identify missing involvement. Review both when phases, people, or circumstances change; the next step is to turn the priority gaps into owned actions.

2

Turn stakeholder needs into a communication plan

13 steps
Choose engagement actions, communication methods, and clear reporting and escalation arrangements.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionStart with a need, then choose an action
  2. 2
    ExplanationSeparate information from involvement
  3. 3
    ExampleAddress the workload concern
  4. 4
    ChallengeChoose an action that addresses the cause
  5. 5
    ExplanationCheck the meaning received
  6. 6
    ExampleUse three methods for a delayed date
  7. 7
    ExampleCount the possible channels
  8. 8
    ChallengeApply the formula to a new team
  9. 9
    TipSelect media for the message
  10. 10
    ExampleBuild a row from an information need
  11. 11
    ExplanationGive blockers a route to authority
  12. 12
    ChallengePlan communication for an approval
  13. 13
    RecapConnect actions, understanding, and ownership
3

Turn reporting evidence into decisions

15 steps
Write a clear status update, interpret a progress chart, and record actions that move work forward.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionReport so someone can act
  2. 2
    ExplanationSeparate three kinds of information
  3. 3
    ExampleCalculate the cost deviation
  4. 4
    ExampleApply the agreed threshold
  5. 5
    ExampleWrite the request with the impact
  6. 6
    ChallengeUse a new report’s numbers
  7. 7
    Key InsightRead the display behind the color
  8. 8
    ExampleFind the ideal remaining work
  9. 9
    ExampleCompare actual with ideal
  10. 10
    ChallengeInterpret two rising burnup lines
  11. 11
    TipKeep the meeting focused
  12. 12
    ExplanationPut each item in its log
  13. 13
    ChallengeTurn a meeting outcome into follow-up
  14. 14
    ConnectionUse the cycle to check engagement
  15. 15
    RecapEvidence, decisions, and follow-through
4

Build working agreements and support the team

17 steps
Use a charter and RACI, recognize team stages, and adjust practical support.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionGive the team a way to work together
  2. 2
    ExplanationWrite the team’s charter together
  3. 3
    ExampleChoose a usable decision rule
  4. 4
    ChallengeApply the agreed rule
  5. 5
    TipMake ground rules observable
  6. 6
    ExplanationSeparate doing from owning
  7. 7
    ChallengeRepair an unclear responsibility row
  8. 8
    ExplanationRecognize forming and storming
  9. 9
    ExplanationLook for coordination and closure
  10. 10
    ChallengeRecognize a return to earlier patterns
  11. 11
    ExampleMatch support to the current stage
  12. 12
    ChallengeChoose help for a performing team
  13. 13
    ExplanationRecognize the contribution you need
  14. 14
    TipSupport skills and collaboration
  15. 15
    ConnectionCoordinate across managers and locations
  16. 16
    ChallengeRespond to two linked team problems
  17. 17
    RecapUse agreements and behavior together
5

Resolve a shared-resource conflict

12 steps
Identify the cause, uncover interests, compare responses, and agree a workable solution.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionStart with the needs behind the argument
  2. 2
    ExplanationIdentify the source before labeling people
  3. 3
    Key InsightKeep useful disagreement focused on work
  4. 4
    ChallengeDiagnose the immediate cause
  5. 5
    ExplanationCompare five responses
  6. 6
    ExampleFind the interests behind the positions
  7. 7
    ExampleTest a workable schedule
  8. 8
    ChallengeApply the reasoning to a new dispute
  9. 9
    TipKnow when another response fits
  10. 10
    ExplanationRecord the agreement and follow up
  11. 11
    ChallengeChoose authority and a useful next step
  12. 12
    RecapResolve the work and protect the relationship

Project Stakeholders and Communication practice questions

50 Practice Questions in 5 sets

Set 1: Apply plans and interpret project evidence10 Practice Questions

Question 1 of 10

A stakeholder understands and backs the change but is not actively working to promote it. What current engagement level fits?
  1. Neutral, because active promotion has not begun.
  2. Leading, because awareness is already established.
  3. Unaware, because their participation is limited.
  4. Supportive, because they back the proposed change.
Show answerHide answer
Answer: D
Supportive means aware of and supportive of the change. Leading adds active work to make the project succeed, which is absent here. Neutral would understate the expressed support merely because the stakeholder is not promoting the project.

Question 2 of 10

A team consists of one project manager and six other members. How many possible one-to-one communication channels does it have?
  1. 21 channels.
  2. 15 channels.
  3. 42 channels.
  4. 28 channels.
Show answerHide answer
Answer: A
There are seven people in total, including the project manager. The formula gives 7×6/2=21 possible pairs. Fifteen comes from using six people and leaving the manager out; 42 counts each pair in both directions.

Question 3 of 10

A communication plan names the audience, report content, frequency, and email format. Reports are repeatedly late because everyone assumes someone else sends them. What field is missing?
  1. The location where previous reports are stored.
  2. The person responsible for sending the report.
  3. The glossary defining the report’s terminology.
  4. The stakeholder’s preferred level of detail.
Show answerHide answer
Answer: B
The plan needs a named sender so responsibility is clear. Audience, content, timing, and format cannot resolve an ownership gap on their own. A storage location helps people find past reports, but it does not establish who must prepare and send the next one.

Question 4 of 10

A project forecasts $96,000 against a $90,000 budget. An existing $8,000 contingency is already inside that budget. The approved plan offers no recovery within budget. What should the report request?
  1. Use contingency and report the forecast as within budget.
  2. Reduce the baseline by $6,000 and keep the forecast unchanged.
  3. Show $6,000 over and request an authorized budget decision.
  4. Add contingency to the budget without requesting a change.
Show answerHide answer
Answer: C
The forecast is $6,000 above the approved budget. Because the contingency is already included in that budget, it is not a separate source of money above it. Report the overrun and seek an authorized decision through the change process; adding the reserve again would double count it.

Question 5 of 10

An iteration starts with 48 tasks over 8 days. At the end of day 3, 33 tasks remain. Against a straight ideal burndown, what is the position?
  1. 3 tasks ahead, because ideal remaining is 36.
  2. 15 tasks behind, because 15 have been completed.
  3. 3 tasks ahead, because ideal remaining is 30.
  4. 3 tasks behind, because ideal remaining is 30.
Show answerHide answer
Answer: D
The ideal reduction is 6 tasks per day, leaving 30 after three days. Actual remaining work is 33, so 3 more tasks remain than planned. Calling that ahead reverses the meaning of a burndown: a higher remaining-work value means the team is behind the ideal line.

Question 6 of 10

A burnup chart shows completed work rising toward a separate total-scope line. What does a rise in the total-scope line show?
  1. The team has completed additional work.
  2. The amount of planned scope has increased.
  3. The team has used more of its budget.
  4. The amount of remaining work has reached zero.
Show answerHide answer
Answer: B
The total-scope line represents the amount of work included in the target, so its rise shows added scope. The completed-work line separately records delivery. Reading a scope increase as completed progress confuses two different quantities displayed on the same chart.

Question 7 of 10

The security lead performs and approves an access review. A developer advises before the review, and the manager receives its outcome. How should security be marked in RACI?
  1. A and R for the access review.
  2. A and C for the access review.
  3. R and I for the access review.
  4. C and I for the access review.
Show answerHide answer
Answer: A
Security both performs the review and owns its approved result, so A and R belong to the same person. That combination is allowed. C describes giving advice; the developer’s input does not turn the person doing and approving the work into a consulted-only participant.

Question 8 of 10

A performing team manages its own task dependencies but is blocked by a tool purchase only the manager can authorize. What support fits?
  1. Approve every task before allowing work to resume.
  2. Rewrite the team charter before any tool is obtained.
  3. Remove the tool blocker while keeping work delegated.
  4. Require daily individual plans for manager approval.
Show answerHide answer
Answer: C
The team’s independent coordination supports delegation. The manager should remove the obstacle that lies beyond the team’s authority. Adding task-by-task approvals would increase supervision without solving the stated tool problem or matching the team’s demonstrated capability.

Question 9 of 10

During a design debate, engineers compare test evidence respectfully and discover a failure risk. Their manager wants to ban disagreement to improve harmony. What response best protects project performance?
  1. End the debate and keep the existing design unchanged.
  2. Keep evidence-based debate and prevent personal attacks.
  3. Ask each engineer to avoid discussing design weaknesses.
  4. Treat the disagreement as proof that teamwork has failed.
Show answerHide answer
Answer: B
The disagreement is task conflict and has already exposed a risk. Keeping it evidence-based can improve the design while respectful ground rules protect relationships. Banning disagreement may create quiet meetings, but it would remove the useful challenge that revealed the problem.

Question 10 of 10

Two leads need one tester. Testing A needs two days before Wednesday, and testing B needs two days before Friday. Both can start Monday, and Friday is available for other work. What arrangement meets both needs?
  1. Split every day equally between the two testing tasks.
  2. Assign B Monday–Tuesday and A Wednesday–Thursday.
  3. Assign A three days and move B to the next week.
  4. Assign A Monday–Tuesday and B Wednesday–Thursday.
Show answerHide answer
Answer: D
Testing A finishes before Wednesday and testing B before Friday under the proposed sequence. Both receive two full days, so their underlying needs are met through collaboration. Putting B first would make A finish after its deadline even though the total available time is sufficient.
Set 2: Recognize needs and choose useful first steps10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A manager posts a reference manual on a shared site for people to open when needed. What communication method is this?
  1. Interactive communication through a virtual medium.
  2. Pull communication through a virtual medium.
  3. Push communication through a written medium.
  4. Interactive communication through a written medium.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A library is changing its reservation system. Volunteers believe their duties will change, although the project has not decided this. How should the project treat them?
  1. List them after a change to duties is confirmed.
  2. List them because they believe they will be affected.
  3. List them if they control the system’s funding.
  4. List them after the new system enters daily use.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A director can stop a small equipment project but wants little detail about it. What starting engagement strategy fits?
  1. Keep informed through frequent task-level updates.
  2. Monitor through occasional general announcements.
  3. Manage closely through frequent design decisions.
  4. Keep satisfied through focused, relevant updates.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A user group has little formal authority but cares deeply about a new booking process. What communication arrangement follows from its grid position?
  1. Provide regular useful updates and listen to concerns.
  2. Send brief summaries only before budget approvals.
  3. Wait for the group to request an individual briefing.
  4. Invite the group to approve all project expenditure.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

Technicians oppose training because every session overlaps with essential maintenance. Session times can change. What action best addresses the reason for resistance?
  1. Send reminders describing the benefits of training.
  2. Ask the sponsor to announce attendance expectations.
  3. Agree session times that preserve maintenance cover.
  4. Publish an attendance table after each session ends.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A project has a $50,000 budget and a $54,000 forecast. Cost is green up to 5% over, amber above 5% through 10%, and red above 10%. What cost status follows?
  1. Green, because the forecast overrun is 4%.
  2. Red, because any forecast overrun exceeds budget.
  3. Amber, because the forecast overrun is 8%.
  4. Amber, because the forecast overrun is 7.4%.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

Which document records the team’s agreements about meeting behavior and decision rules?
  1. The team charter, created together by team members.
  2. The project charter, issued by the project sponsor.
  3. The stakeholder register, maintained by the manager.
  4. The decision log, recording choices already made.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A RACI row names two responsible people, no accountable person, one consulted person, and one informed person. What must be fixed?
  1. Replace one responsible person with an informed person.
  2. Replace the consulted person with another responsible person.
  3. Give both responsible people accountability for the result.
  4. Agree exactly one accountable owner for the activity.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

Members are polite but uncertain about their roles and repeatedly ask the leader where to begin. What stage does this behavior suggest?
  1. Norming, as shared working methods become established.
  2. Forming, as members seek purpose and direction.
  3. Performing, as members coordinate work independently.
  4. Adjourning, as members prepare to leave the team.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

Two leads argue about access to one analyst. Both have promised the analyst’s full week to their tasks, no shared priorities are agreed, and discussion has become personal. What should the manager address?
  1. The personal tension, leaving allocations with each lead.
  2. The task allocation, postponing discussion of personal attacks.
  3. The competing commitments and the personal conduct together.
  4. The reporting process, treating availability as already agreed.
Show answerHide answer

Save this lesson to see this answer.

Set 3: Connect stakeholder needs with team decisions10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A new supplier will maintain a delivered system after launch. The register covers design and rollout contacts only. What update is needed?
  1. Add maintenance contacts and their support expectations.
  2. Wait until launch before asking who will maintain it.
  3. Replace the rollout users with the new supplier entry.
  4. Put the supplier only in the final lessons report.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

An unbriefed permit approver must decide in four days. A low-power advisory group is Neutral and needs to be Supportive in three months. No other facts change the priorities. What gap deserves attention first?
  1. The advisory group’s gap, because support is always more urgent.
  2. Both gaps equally, because each moves toward Supportive.
  3. The approver’s gap, because power and timing make it urgent.
  4. Neither gap yet, because neither stakeholder has objected.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A department head assumes the project includes a mobile reporting feature, but the agreed scope excludes it. What action best manages expectations?
  1. Promise the feature and ask the team to find spare time.
  2. Clarify scope and limits; confirm the shared understanding.
  3. Delay the discussion until the department tests the result.
  4. Remove the department head from engagement activities.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A sensitive design change needs approval in five days. The reviewer works remotely, wants a discussion, and only an authorized version may be shared. What communication arrangement best meets all three needs?
  1. Post the draft publicly and request comments before the deadline.
  2. Email every design version and let the reviewer choose one.
  3. Send the monthly summary and mention that approval is pending.
  4. Clear release, hold a timely call, and store its decision.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A server delivery might be late next month; today its agreed delivery date has not passed. In which record should this possible event be tracked?
  1. The issue log, as a current delivery failure.
  2. The decision log, as an approved date change.
  3. The risk register, as an uncertain future event.
  4. The minutes, as a completed supplier action.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

Five members prefer Plan A. Two prefer Plan B but can accept and support A. What decision rule is satisfied by everyone’s stated acceptance?
  1. Consensus, because every member can support the choice.
  2. Unanimity of preference, because the choices are identical.
  3. Leader decides, because the preferences are different.
  4. No agreement, because every first preference must match.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

Members have agreed working methods, trust is growing, and they give helpful feedback, but still need some support. What stage does this suggest?
  1. Storming, with unresolved disputes over authority.
  2. Norming, with shared methods and stronger trust.
  3. Forming, with unclear purpose and uncertain roles.
  4. Adjourning, with transitions out of the team.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A dispersed team’s newest member misses decisions made in local chat. The manager also learns that a single “best individual” prize discourages members from helping each other. What pair of changes fits these problems?
  1. Record decisions accessibly and keep the individual prize.
  2. Recognize collaboration and leave decisions in local chat.
  3. Record decisions accessibly and recognize collaboration.
  4. Rotate meeting times and increase the individual prize.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A minor dispute has become heated, and both people agree they need an hour to cool down before continuing. What approach is being used for now?
  1. Forcing, because the discussion ends immediately.
  2. Collaborating, because all concerns are already met.
  3. Accommodating, because one side accepts the other’s demand.
  4. Withdrawing, because the issue is temporarily postponed.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A leaking pipe is damaging equipment. The authorized site lead can order an immediate shutdown, while a full group discussion would delay containment. What response fits now?
  1. Direct the shutdown, then address the consequences with the team.
  2. Split operating time equally while the parties discuss preferences.
  3. Postpone the decision until all interested parties can attend.
  4. Accommodate the preference of whoever wants work to continue.
Show answerHide answer

Save this lesson to see this answer.

Set 4: Analyze changing conditions and competing demands10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A compliance reviewer previously had high power and low interest. A new approval is now due in three days, and the reviewer asks to join design decisions. What change should the project make?
  1. Keep satisfied and leave engagement actions unchanged.
  2. Keep informed and hand approval duties to the team.
  3. Monitor and wait for the reviewer to object formally.
  4. Manage closely and revise the involvement arrangements.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A stakeholder attends meetings without speaking. The team has no other evidence of their attitude. How should it assess current engagement?
  1. Mark Supportive because attendance establishes support.
  2. Ask directly and gather evidence before assigning a level.
  3. Mark Resistant because they do not contribute comments.
  4. Mark Leading because they have made time to attend.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A pilot’s users still oppose rollout after receiving accurate benefit briefings. They explain that a required approval step adds work, and the project can redesign it. What should the engagement plan change?
  1. Involve users in improving the step and check whether support changes.
  2. Increase briefing frequency and retain the step without discussion.
  3. Lower the desired engagement level and keep the rollout plan unchanged.
  4. Transfer the concern to the newsletter editor and close the pilot.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A team has one manager and eight other members. Three more people join. The sponsor needs to discuss a sensitive delay and retain the agreed date. What combination is correct?
  1. 27 new channels; post the date and wait for the sponsor to find it.
  2. 30 new channels; send the date without arranging a discussion.
  3. 30 new channels; discuss the delay and confirm the date in writing.
  4. 60 new channels; discuss the delay and confirm the date in writing.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A report forecasts $132,000 against a $125,000 budget and an approval milestone 6 working days late. Cost is green up to 5% over, amber above 5% through 10%; schedule is green on time, amber up to 5 days late, red beyond. How should the areas be rated?
  1. Cost green; schedule amber.
  2. Cost amber; schedule red.
  3. Cost amber; schedule amber.
  4. Cost red; schedule red.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A burndown stays flat for three days. The team has not checked whether its task records were updated. What should it do before concluding that no work was completed?
  1. Assume completed work exactly matches the ideal line.
  2. Change the work estimate to force the line downward.
  3. Report that the team has stopped working on the project.
  4. Check completion evidence and the chart’s update process.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

In RACI, which role gives input through two-way communication before work or a decision is completed?
  1. Consulted, providing relevant advice and input.
  2. Informed, receiving updates about the work.
  3. Accountable, owning and approving the result.
  4. Responsible, performing the assigned work.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A team that had coordinated independently gains two specialists. Roles become unclear, and one specialist also receives conflicting priorities from a functional manager. What support fits?
  1. Onboard specialists and leave time commitments to each member.
  2. Agree availability but leave the unclear role arrangements unchanged.
  3. Onboard, clarify roles, and agree availability with the functional manager.
  4. Clarify roles and reward members for meeting both competing demands.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A team repeatedly misses handovers between two members, who now avoid each other. What should the manager do?
  1. Treat missed handovers as proof of a personality clash.
  2. Investigate handovers and the relationship privately.
  3. Wait for a deadline failure before discussing it.
  4. Remove all technical disagreements from meeting agendas.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A testing row has no R and two A entries. A third person is marked I but must advise on safety before testing starts. What complete repair is needed?
  1. Keep both A entries, add R, and send the adviser a final update.
  2. Choose one A, leave R empty, and change the adviser to C.
  3. Add R, retain both A entries, and change the adviser to C.
  4. Choose one A, assign R, and change the adviser from I to C.
Show answerHide answer

Save this lesson to see this answer.

Set 5: Make decisions across the whole project10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A rollout combines office staff and field staff in one register entry. Field staff need offline access, office staff do not, and a maintenance contractor has not been listed. What register changes best support delivery?
  1. Keep one user entry and add the contractor after the system is accepted.
  2. Split the users but leave maintenance to the organization after handover.
  3. Split the user groups and add the contractor’s support needs now.
  4. Keep one user entry and record only the needs shared by both groups.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A project uses scores 1–5, with 4–5 high on each axis. A supplier contact has power 3 and interest 5. What is the grid’s starting strategy?
  1. Keep satisfied.
  2. Manage closely.
  3. Monitor.
  4. Keep informed.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A review group grows from 5 to 8 people. The team sends instructions by email; every recipient acknowledges receipt but no one confirms the required action. What does the manager need to recognize?
  1. 18 channels were added; obtain feedback about understanding.
  2. 3 channels were added; obtain feedback about understanding.
  3. 18 channels were added; receipt already establishes understanding.
  4. 28 channels were added; receipt already establishes agreement.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

The manager can resolve delays up to 2 working days; longer delays need a sponsor decision. A new blocker forecasts 4 days of delay, and a decision is needed tomorrow. The sponsor is available today, but the routine report is monthly. What should the manager do?
  1. Wait for the routine report, with the delay marked urgent.
  2. Raise the impact and decision with the sponsor today; keep a record.
  3. Use the manager’s delay authority and report the decision afterward.
  4. Update the shared dashboard and assume the sponsor will respond.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A dashboard is green because a report says 80% of the budget is spent. The plan required 8 accepted outputs by now, but only 5 are accepted. No forecast is provided. What reporting correction is justified?
  1. Retain green because spending establishes completion against plan.
  2. Infer exactly 62.5% of the whole project is complete and keep green.
  3. Predict the final cost from the acceptance count without more data.
  4. Report the acceptance gap and obtain forecasts before rating on evidence.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A status meeting ends with “Someone should ask the supplier about testing soon.” What should be added to make this a trackable action?
  1. A named owner and a general request to act when possible.
  2. A due date and a request for any available member to act.
  3. A named owner, a specific task, and an agreed due date.
  4. A task description and a note to discuss ownership next time.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A supplier missed delivery yesterday. The sponsor chooses a workaround, and Jo must organize it by July 8. Training attendance is also below target, with no cause known. What follow-up is complete?
  1. Log the delay, decision, and owned action; investigate the attendance gap.
  2. Log the delay as a future risk and mark low attendance as resistance.
  3. Log the workaround only and wait to see whether attendance improves.
  4. Log all items as decisions and assign the supplier every follow-up task.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

Who should develop the team’s working agreements?
  1. The sponsor, when formally authorizing the project.
  2. The team together, with the project manager facilitating.
  3. The project manager, writing the rules before inviting input.
  4. The functional managers, agreeing rules on behalf of members.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

Project work is complete and members are preparing for new assignments. What stage and response fit this transition?
  1. Adjourning; release members and omit a lessons review.
  2. Performing; delegate work and postpone member transitions.
  3. Norming; reinforce agreements for the team’s ongoing work.
  4. Adjourning; capture lessons and recognize contributions.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

Two managers each demand an analyst for the whole week. In discussion, one needs a two-day review by Wednesday and the other a two-day check by Friday. Both tasks can start Monday; the analyst controls the task sequence. What resolves the conflict?
  1. Give each task alternate half-days regardless of its deadline.
  2. Defer both tasks until each manager withdraws the original demand.
  3. Complete the review Monday–Tuesday and the check Wednesday–Thursday.
  4. Complete the check Monday–Tuesday and the review Wednesday–Thursday.
Show answerHide answer

Save this lesson to see this answer.

Stuck on your own question? Homework Help

Key Terms

107 Key Terms, each with its definition

A

Accommodation
Accommodation, also called smoothing, gives way to the other party and emphasizes agreement, sometimes leaving the underlying issue unresolved.
“The lead accommodates a colleague’s preference because the issue matters much more to that colleague.”
Accountable
The Accountable person in RACI owns and approves an activity’s result; each activity has exactly one accountable owner.
“The project manager is Accountable for training even though the vendor delivers the sessions.”
Acknowledgment
Acknowledgment is confirmation that a message was received, without establishing that it was understood or agreed with.
“The receipt confirmation tells the manager that the notice arrived, but leaves understanding untested.”
Action log
An action log tracks agreed tasks with their owners, due dates, and status so that commitments can be followed through.
“The action log assigns a revised training schedule to a named team member and records when it must be ready.”
Active listening
Active listening means giving full attention, paraphrasing meaning, and asking clarifying questions without interrupting the speaker.
“The manager checks her understanding by asking whether the training dates are the user’s main concern.”
Adjourning
Adjourning is the stage when the project work ends and the temporary team disbands, with members moving to other assignments.
“During adjourning, the manager captures lessons and thanks members before they leave for new work.”
Assertiveness
Assertiveness in the Thomas–Kilmann model is the extent to which a person pursues their own concerns in a conflict.
“Forcing combines high assertiveness with little attention to satisfying the other party’s concerns.”
Attitude
A stakeholder’s attitude is whether they support or oppose the project and the reasons behind that position.
“The user’s negative attitude comes from a workload concern, even though she has high interest.”
Authority
Authority is the right to make specified decisions within a role, setting the boundary of what the role holder can decide.
“The lead can choose the test sequence but must escalate a request for additional project funding.”
Avoidance
Avoidance, also called withdrawal, steps back from or postpones a conflict, for example to cool down or gather missing information.
“Both parties pause the discussion and agree to return after the missing schedule evidence is available.”

B

Baseline
A baseline is an agreed reference for project scope, schedule, or cost against which current results and forecasts are compared.
“The approved budget remains the comparison point when the latest forecast predicts a cost overrun.”
Belbin team roles
Belbin team roles describe nine kinds of behavioral contribution in teams; people can show several roles rather than one fixed type.
“The team examines its role balance after noticing many creative ideas but little checking of details.”
Burndown chart
A burndown chart plots remaining work against time, often comparing the actual amount left with an ideal planned reduction.
“The actual burndown line is above ideal because more tasks remain than the plan expected today.”
Burnup chart
A burnup chart plots completed work against time alongside a separate total-scope line, making changes to the target visible.
“The scope line rises after new work is added, while the completed-work line still records delivered tasks.”

C

Collaboration
Collaboration is a conflict approach in which people work together to find a solution that meets both sides’ real interests.
“Two leads who need the same specialist sequence their tasks so that each receives the specialist time needed before its deadline.”
Communication
Communication is the exchange of information so that the receiver understands the meaning the sender intended to convey.
“The lead asks the installer to explain the next step to check that the instructions were understood.”
Communication channel
A one-to-one communication channel is a possible link between a pair of people; n people have n(n − 1)/2 such links.
“Adding members increases possible communication pairs faster than it increases the group’s head count.”
Communication plan
A communication plan describes how project information is created, shared, collected, and stored, with audiences, timing, and owners.
“The communication plan assigns a monthly forecast summary to Finance and weekly decision updates to the sponsor.”
Communication requirements analysis
Communication requirements analysis identifies each audience’s information, purpose, detail, timing, format, and confidentiality needs.
“Before choosing a dashboard, the manager asks which decisions the sponsor needs its measures to support.”
Completer Finisher
A Completer Finisher is the Belbin team role associated with checking details and deadlines so that work is finished carefully.
“The Completer Finisher checks the release details and spots a missing approval before the deadline.”
Compromise
Compromise is a conflict approach in which each side gives up something and is partly satisfied by the settlement.
“The managers compromise on a temporary allocation while accepting that neither receives everything requested.”
Conflict
Conflict is disagreement that arises when people see their goals, interests, values, or needs as incompatible.
“Two team leads claim the same specialist for the same days, creating a conflict over resources and schedule.”
Consensus
Consensus means everyone can accept and support a decision, even when the chosen option is not each person’s first preference.
“The group reaches consensus after all members say they can support the chosen approach despite different preferences.”
Consulted
A Consulted person in RACI gives relevant input through two-way communication before the work or decision is completed.
“Pilot users are Consulted about workflow categories before the team finalizes the configuration.”
Cooperativeness
Cooperativeness in the Thomas–Kilmann model is the extent to which a person seeks to meet the other party’s concerns.
“Collaboration combines cooperativeness with assertiveness to seek a result meeting both sides’ interests.”
Coordinator
A Coordinator is the Belbin team role associated with clarifying goals and delegating contributions so that the team’s work is directed.
“The Coordinator helps members agree what they are trying to achieve and how each person can contribute.”

D

Daily stand-up
A daily stand-up is a short team meeting to coordinate upcoming work and blockers, often lasting about 15 minutes.
“The team uses its stand-up to adjust handovers after learning that a test environment is unavailable.”
Dashboard
A dashboard is a compact visual summary of selected project measures, supported by current data and explanations behind the indicators.
“The sponsor’s dashboard shows milestone forecasts, top risks, and open issues needing decisions.”
Decision log
A decision log records what was decided, by whom, when, and why, preserving the reasoning behind project choices.
“A new team member reads the decision log to understand why the rollout was divided into two stages.”
Decoding
Decoding is the receiver’s interpretation of a transmitted message, influenced by language, context, and possible interference.
“Different interpretations of the word urgent show why the team needs a shared response-time agreement.”
Dispersed team
A dispersed team works across locations and often time zones, needing deliberate communication and coordination to maintain shared work.
“The dispersed team rotates inconvenient meeting times and records decisions for colleagues who are offline.”

E

Encoding
Encoding is turning an idea into a message using words, figures, images, or another representation for a receiver.
“The analyst encodes the schedule change in a short written notice and a revised milestone diagram.”
Engagement
Stakeholder engagement is involvement in project decisions and work through activities such as consultation and collaboration.
“Users help shape the training sessions, giving them a practical role in preparing the change.”
Engagement assessment matrix
An engagement assessment matrix marks current and desired engagement for each stakeholder across the five engagement levels.
“The matrix marks the manager whose funding approval is needed as currently Neutral, with Supportive as the desired level.”
Escalation path
An escalation path identifies who handles a problem beyond the current authority level, including the trigger and time limit for raising it.
“The manager raises a budget decision to the sponsor when the agreed authority threshold is exceeded.”
External stakeholder
An external stakeholder is a person, group, or organization outside the organization running the project that can influence or experience its effects.
“The maintenance contractor is an external stakeholder with an interest in the handover arrangements.”

F

Feedback
Feedback is the receiver’s response showing what they understood or how they reacted to the sender’s message.
“The reviewer replies with the approval deadline in her own words, allowing the sender to check meaning.”
Forcing
Forcing, also called directing or competing, imposes one decision through assertive use of authority rather than joint agreement.
“The authorized site lead directs an immediate shutdown to contain an emergency before wider discussion.”
Forecast
A forecast is a prediction of a future project result, such as the expected completion date or final cost, based on current information.
“The forecast moves the finish date after the team confirms the vendor’s revised delivery schedule.”
Forming
Forming is the stage when members meet, are uncertain about roles and purpose, and look to the leader for direction.
“In forming, the new team asks what it must achieve and who can make the first technical decisions.”

G

Ground rules
Ground rules are specific, shared expectations for team behavior that all members, including the project manager, help maintain.
“The team refers to its agreed task-board update rule when several handovers start missing information.”

I

Ideal line
The ideal line on a burndown chart shows the planned fall from starting work to zero at the end of the iteration or release.
“A straight ideal line for 30 tasks over 6 days reduces the planned remainder by 5 tasks per day.”
Implementer
An Implementer is the Belbin team role associated with turning ideas into practical plans that the team can carry out.
“The Implementer translates the proposed rollout approach into a workable sequence of preparation tasks.”
Information radiator
An information radiator is a visible work display that people can read without asking for an update, on a wall or online.
“The shared blocker board lets team members see which tasks need help before the daily meeting.”
Informed
An Informed person in RACI receives updates about an activity through one-way communication, without being asked for input.
“The department head is Informed when training is complete and receives the attendance summary.”
Interactive communication
Interactive communication is a real-time exchange between people that supports questions, clarification, and immediate feedback.
“The project manager uses a call to explain sensitive news and answer the sponsor’s questions.”
Interest
Stakeholder interest is how much a person or group cares about a particular project or is affected by its results.
“Daily users have high interest because the new workflow will change much of their working day.”
Internal stakeholder
An internal stakeholder belongs to the organization running the project, such as a sponsor, team member, or user department.
“The operations manager is an internal stakeholder because her department will use the system.”
Issue
An issue is a problem that already exists and needs attention, as distinct from an uncertain event that may happen later.
“An environment the team needs is unavailable today, so the team treats that blockage as an issue rather than a future risk.”
Issue log
An issue log tracks existing problems, including their impact, priority, owner, target resolution date, and current status.
“The missed delivery enters the issue log with an owner responsible for coordinating the response.”
Iteration review
An iteration review lets stakeholders inspect working results at the end of a short cycle and provide feedback on what they see.
“At the iteration review, users try the completed booking flow and explain what still needs adjustment.”

K

Keep informed
Keep informed is the grid strategy for low-power, high-interest stakeholders, combining useful regular information with listening.
“The user group receives demonstrations and has a route to raise concerns about the new process.”
Keep satisfied
Keep satisfied is the grid strategy for high-power, low-interest stakeholders, using focused updates and attention to their concerns.
“Finance receives a concise cost summary and is consulted before a decision affecting its funding commitment.”
Kickoff meeting
A kickoff meeting aligns the team and key stakeholders on objectives, scope, plans, roles, communication, and working arrangements.
“At kickoff, the supplier and user team confirm who makes decisions and how they will coordinate reviews.”

L

Leading
Leading is the engagement level of a stakeholder who actively works to make the project succeed as well as supporting it.
“The director demonstrates Leading engagement by helping departments prepare for the transition.”

M

Majority
A majority decision is supported by more than half of those deciding, without requiring agreement from every participant.
“Five of eight members support the proposal, so it passes under the team’s majority decision rule.”
Manage closely
Manage closely is the grid strategy for stakeholders with high power and high interest, involving frequent consultation and decision involvement.
“The sponsor joins regular decision discussions because her power and interest are both high.”
Managing expectations
Managing expectations means aligning understanding about the project’s scope, limits, timing, and changes to its commitments.
“The manager confirms that mobile reporting is excluded before the department plans around that feature.”
Matrix organization
A matrix organization gives project members both a project reporting line and a functional reporting line, which can create competing priorities.
“The project and functional managers agree how much of the engineer’s time is available for the review.”
Minutes
Meeting minutes record attendees, decisions, actions, and open questions, providing a concise outcome record rather than a transcript.
“The minutes name the review owner and due date so absent members can see the agreed commitment.”
Monitor
Monitor is the grid strategy for low-power, low-interest stakeholders, using general communication and watching for changes.
“The facilities contact receives general updates until a change makes the work relevant to that team.”
Monitor Evaluator
A Monitor Evaluator is the Belbin team role associated with judging options logically and weighing them before the team commits.
“The Monitor Evaluator compares the proposed approaches against the project’s agreed decision criteria.”

N

Neutral
Neutral is the engagement level of a stakeholder who knows about the project and neither supports nor opposes it.
“The department head remains Neutral after the briefing and has not expressed support or objections.”
Noise
Noise is anything that blocks or distorts a message, including jargon, distraction, emotion, language differences, and technology problems.
“An unstable connection acts as noise when the reviewer misses part of the explanation about access rights.”
Norming
Norming is the stage when members agree working methods, clarify roles, develop trust, and give each other useful feedback.
“The team enters norming as it agrees a review process and begins using it to settle differences.”

O

Onboarding
Onboarding introduces a new member to the team’s charter, roles, tools, current work, and relationships so they can contribute.
“A colleague helps the newcomer find the task board and understand decisions made before she joined.”

P

Performing
Performing is the stage when members work interdependently, solve most problems themselves, and coordinate with high productivity.
“A performing team reorganizes its work around a supplier delay without waiting for detailed instructions.”
Plant
A Plant is the Belbin team role associated with generating creative ideas and approaches that help the team consider new possibilities.
“The member contributing as a Plant suggests a new approach when the existing design reaches a limit.”
Position
A position is the demand a person states in a conflict, which may conceal several ways of meeting the need behind it.
“The request for a specialist all week is a position that needs discussion of the actual work and deadlines.”
Power
Stakeholder power is the ability to influence a project’s decisions or outcome through authority, resources, knowledge, or other influence.
“The approval holder has high power because the project cannot launch without her decision.”
Power–interest grid
A power–interest grid groups stakeholders by power and interest to guide the project’s initial level of attention to each.
“The grid places the highly influential but lightly involved director in the keep-satisfied quadrant.”
Product owner
A product owner represents customer and business needs in adaptive project work and helps connect those needs to the work delivered.
“The product owner brings customer priorities into the discussion of the next iteration’s work.”
Progress report
A progress report describes what the project accomplished during a reporting period, including completed work and achieved milestones.
“The progress section records two accepted interfaces completed during the past reporting week.”
Project charter
A project charter is issued by the sponsor to authorize the project and project manager and establish high-level objectives and scope.
“The sponsor issues the project charter before the team develops its own working agreements.”
Pull communication
Pull communication stores information where people can access it when they choose, making it useful for reference and large audiences.
“The updated FAQ is pull communication, so team leads announce that a new answer is available.”
Push communication
Push communication sends information to specific recipients without showing by itself whether they read or understood it.
“An emailed weekly status report pushes information to the named sponsor and department heads.”

R

RACI chart
A RACI chart assigns Responsible, Accountable, Consulted, and Informed roles to activities, with one A and at least one R per activity.
“The team checks every RACI row for ownership before confirming the matrix with the people named.”
RAG status
RAG status uses red, amber, and green ratings against agreed thresholds to show project condition and the need for action or help.
“The cost rating is amber under the project’s thresholds even though some budget remains unspent.”
Recognition
Recognition acknowledges a contribution through appreciation, such as specific thanks in a meeting or a note to a line manager.
“The manager privately thanks the tester for a handover that helped two departments coordinate.”
Relationship conflict
Relationship conflict is personal friction between people that tends to damage trust, cooperation, and performance.
“A discussion becomes relationship conflict when members start attacking each other instead of the proposal.”
Resistant
Resistant is the engagement level of a stakeholder who knows about the project and opposes the change it brings.
“Operators are Resistant because the proposed training schedule leaves their shift without enough cover.”
Resource Investigator
A Resource Investigator is the Belbin team role associated with finding outside contacts, ideas, and opportunities for the team.
“The Resource Investigator finds an external contact who can help the team explore a delivery option.”
Responsibility
Responsibility is the work or duty expected of a role holder, which should be clear enough for people to coordinate their contributions.
“The role description gives the analyst responsibility for preparing the acceptance-test evidence.”
Responsibility assignment matrix
A responsibility assignment matrix links activities to people or roles, making the expected contribution to each piece of work explicit.
“The matrix shows who carries out each review and who owns its result before testing begins.”
Responsible
A Responsible person in RACI performs the work assigned to an activity; several people can be responsible for one activity.
“The vendor trainer is Responsible for delivering the agreed sessions to the user groups.”
Reward
A reward is a tangible benefit given for a contribution, such as a bonus or time off, ideally linked to useful team behavior.
“The reward recognizes a shared delivery result so that members have a reason to support each other.”

S

Salience model
The salience model assesses stakeholder power, legitimacy, and urgency to help decide which stakeholders need particular attention.
“The team uses salience alongside its register to examine which claims need prompt engagement.”
Shaper
A Shaper is the Belbin team role associated with drive and momentum, helping the team overcome obstacles to progress.
“The member contributing as a Shaper presses the group to address the blocker that keeps delaying work.”
Specialist
A Specialist is the Belbin team role associated with contributing deep expert knowledge that the team needs for its work.
“The Specialist explains a technical constraint that the team must understand before choosing an approach.”
Stakeholder
A stakeholder is a person, group, or organization that can affect a project, is affected by it, or believes it will be affected.
“Residents who expect noise from the planned renovation belong in the stakeholder register.”
Stakeholder engagement plan
A stakeholder engagement plan sets out actions, owners, and timing for involving stakeholders effectively in project decisions and work.
“The plan names a team lead to organize a pilot before the wider group is asked to adopt the tool.”
Stakeholder register
A stakeholder register records stakeholders and their roles, needs, influence, relevant phases, and communication preferences.
“After the reviewer changes roles, the project manager updates the contact and approval information in the register.”
Status report
A status report describes where a project currently stands against its baseline for scope, schedule, cost, and quality.
“The report compares the milestone’s planned date with its latest forecast and explains the delay.”
Storming
Storming is the stage when members challenge ideas, roles, priorities, or leadership, bringing differences and tension into the open.
“The team’s arguments about priorities signal storming and a need to clarify how decisions will be made.”
Supportive
Supportive is the engagement level of a stakeholder who knows about the change and supports it without necessarily championing it.
“The user now supports the new process after her team’s scheduling concern has been resolved.”

T

Tailoring
Tailoring communication means adjusting detail, emphasis, and format for an audience while keeping the underlying project facts consistent.
“The sponsor receives the key delay and decision request, while the team receives the detailed recovery tasks.”
Task conflict
Task conflict concerns ideas, methods, priorities, or decisions and can improve project choices when handled respectfully.
“The engineers’ task conflict exposes a weak assumption before the team selects its final design.”
Team building
Team building develops trust and working relationships through activities such as introductions and joint planning of real work.
“The team builds working relationships while planning a handover together and clarifying dependencies.”
Team charter
A team charter records shared agreements on purpose, values, behavior, communication, decisions, meetings, and conflict handling.
“The team charter explains when an unresolved technical choice moves to the technical lead for a decision.”
Teamworker
A Teamworker is the Belbin team role associated with supporting cooperation and helping members work well together.
“The Teamworker helps colleagues coordinate a difficult handover and maintain a constructive conversation.”
Training
Training develops the knowledge or skills people need to perform project work, addressing a gap in the team’s capabilities.
“The new analyst receives training on the test tool before being assigned to prepare the test evidence.”
Tuckman’s model
Tuckman’s model describes common team-development patterns through forming, storming, norming, performing, and adjourning.
“The manager uses the model to interpret changed team behavior after new specialists join.”

U

Unanimity
Unanimity is a decision rule requiring everyone to agree with the decision, so no member remains in disagreement.
“The team checks every member’s agreement on a decision that requires unanimity rather than a vote.”
Unaware
Unaware is the engagement level of a stakeholder who does not know about the project or its effects on them.
“The new approval manager is Unaware because no one has briefed him about the planned change.”
Underlying interest
An underlying interest is the need or reason behind a stated demand, which can reveal options for a workable agreement.
“The need to finish a two-day review before Thursday explains why a lead demands a specialist’s time.”

W

Watermelon report
A watermelon report shows a favorable green status while serious problems inside the project remain concealed or understated.
“A green report hides an unresolved delay that the team already knows will affect the delivery date.”
Working agreement
A working agreement is an agreed way a team coordinates and behaves together, a term often used in agile teams.
“The working agreement specifies how members record decisions made when some colleagues are offline.”

About this lesson

By StudeliReport a mistake

Make your own Study Materials

Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.

Get Started