- Learn
- Business & Economics
- Operations & Supply Chain
- Operations Management
- Quality Management
Quality Management and Statistical Process Control
IntermediateLesson 4 of 9 in Operations Management Course
What you will learn
- Define quality from the customer's and the producer's side, explain why it matters to an operation's strategy, and sort and measure the costs of good and poor quality.
- Define quality for products and servicesUse the main definitions and dimensions of quality to describe what customers expect from a product or a service, and explain why quality matters to a business.
- Classify and calculate the costs of qualitySort quality-related costs into prevention, appraisal, internal failure and external failure, total them, and use the result to decide where improvement spending pays off.
- Define quality for products and services
- Explain the principles of total quality management and the ideas of its founders, run improvement cycles, and describe how the ISO 9001 quality management system standard and its certification work.
- Explain the principles of total quality managementDescribe what total quality management is, the ideas of Deming, Juran, Crosby and others that shaped it, and the roles of leadership, employees and suppliers.
- Drive continuous improvement with PDCA, benchmarking and Taguchi's ideasRun a Plan-Do-Check-Act improvement cycle, learn from benchmarking partners, and use Taguchi's quality loss function to see why hitting the target matters.
- Explain what ISO 9001 requires and how certification worksDescribe the ISO 9000 family, the quality management principles and the structure of ISO 9001, and explain what certification does and does not show.
- Explain the principles of total quality management
- Measure process performance in defects per million opportunities, lead an improvement project through DMAIC, and use the seven basic quality tools to collect data, set priorities and find root causes.
- Measure performance with Six Sigma metricsExplain the two meanings of Six Sigma, calculate defects per unit and defects per million opportunities, convert them to a sigma level, and describe the Six Sigma roles.
- Lead an improvement project through DMAICApply the five DMAIC phases to a real process problem, choose suitable tools for each phase, and know how DMADV differs.
- Collect and prioritize data with check sheets, histograms and Pareto chartsName the seven basic quality tools, record data with check sheets, read the shape of a histogram, and build a Pareto chart to choose which problem to tackle first.
- Find causes with flowcharts, cause-and-effect diagrams and scatter diagramsMap a process with a flowchart, brainstorm possible causes with a cause-and-effect diagram, and test a suspected relationship with a scatter diagram.
- Measure performance with Six Sigma metrics
- Distinguish natural from assignable variation, build and read control charts for variables and for attributes, and respond correctly to the signals they give.
- Explain variation and how control charts detect itSeparate natural from assignable causes of variation, explain how sampling and three-sigma limits work, choose the right chart for the data, and keep control limits apart from specification limits.
- Build and interpret x̄ and R chartsCalculate center lines and control limits for x̄ and R charts from sample data, plot new samples, and decide whether the process mean or its spread has changed.
- Build and interpret p-charts and c-chartsSet up control charts for attribute data, using a p-chart for the proportion of defective units and a c-chart for the number of defects, and interpret their signals.
- Read control chart patterns and respond to signalsRecognize the run rules and typical patterns that signal assignable causes, decide when to act, and avoid adjusting a stable process.
- Explain variation and how control charts detect it
- Judge whether a stable process can meet its specifications with the capability indices Cp and Cpk, estimate the share of output outside the limits, and choose how to improve.
- Calculate and interpret Cp and CpkCalculate the capability ratio Cp and the capability index Cpk from the specification limits and the process mean and standard deviation, and interpret the results.
- Use capability results to estimate defects and choose improvementsEstimate the share of output outside the specifications, connect capability with Six Sigma quality, and decide whether to center the process, reduce its variation or take other action.
- Calculate and interpret Cp and Cpk
Quality Management study guide
1Explain what quality means and what it costs
Customers judge whether an output meets their needs, while operations teams need requirements they can measure and deliver. Product and service dimensions make those expectations concrete. Quality costs then connect customer outcomes with training, inspection, scrap, rework and failures after delivery, so an improvement decision can account for both its spending and the losses it avoids.
1.1 Quality in products and services
Quality starts with requirements: what customers ask for, what they reasonably expect, and what applicable rules demand. A product can look impressive and still fail at the job its customer needs it to do.
Four views of quality
| View | Main question | Hotel example |
|---|---|---|
| User-based | Is it fit for the customer's use? | The guest sleeps well in a quiet, clean room. |
| Manufacturing-based | Does it meet the requirements? | Housekeeping completes the 20-point cleaning standard. |
| Product-based | How much of a desired attribute does it provide? | The room measures 30 m² and has a 140 cm wide bed. |
| Value-based | Is the quality worth the price? | The guest weighs comfort against the room rate. |
Juran's phrase fitness for use captures the user view. Crosby's conformance to requirements captures the manufacturing view, which also applies to services. Specifications connect these views: they translate what users value into something the operation can deliver and check.
Grade describes the category of requirements. Quality describes how well those requirements are met. A safe, clean budget airline that runs on time can deliver high quality within a basic grade. Expensive furnishings do not make a dirty hotel room high quality.
Product and service dimensions
Garvin's eight product dimensions help make a broad judgment specific:
- Performance: the main job, such as a washing machine's spin speed.
- Features: additional functions, such as a delayed-start timer.
- Reliability: working without failure over a stated period.
- Conformance: meeting the design specifications.
- Durability: the length of useful life.
- Serviceability: ease and speed of repair.
- Aesthetics: how the product looks, feels or sounds.
- Perceived quality: judgments based on reputation or brand.
Reliability and durability are related but answer different questions. A machine may be easy to repair repeatedly and last a long time, yet have poor reliability because it often breaks down.
Service quality depends on both the outcome and the interaction. Services are intangible, often happen as the customer receives them, and can involve the customer in producing the result. SERVQUAL groups service quality into reliability (keeping promises), assurance (competence and courtesy that build trust), tangibles (facilities, equipment and appearance), empathy (individual attention) and responsiveness (prompt help).
For each dimension, subtract expectation from perception. If customers expect responsiveness of 6.5 on a 7-point scale but perceive 5.2, the gap is . The negative result identifies a shortfall. Set priorities using both the gap and the importance customers attach to the dimension; the largest gap need not deserve the first investment.
Design quality into the whole operation
Quality of design concerns the requirements chosen. Quality of conformance concerns delivering them consistently. Inspection can detect departures, but purchasing, design, production and service teams all help create quality. Each next process step is an internal customer of the team before it.
Better quality can support sales, prices and customer loyalty while reducing scrap, rework, warranty work and liability risk. Safety also creates an ethical responsibility: managers must consider harm to people, not just the financial cost of a recall.
Key Takeaways
- Quality means meeting requirements, including expected and regulatory requirements.
- Grade and quality describe different things.
- Product dimensions make quality measurable beyond a feature count.
- SERVQUAL gaps are perception minus expectation; priorities also depend on importance.
- Design and conformance involve the whole operation.
1.2 The four costs of quality
Quality costs include both the work that supports good quality and the losses caused by poor quality. Separating them shows whether a team is preventing problems or spending its capacity fixing them.
Classify by purpose and timing
| Category | What creates the cost? | Examples |
|---|---|---|
| Prevention | Keeping defects from occurring | Training, design reviews, supplier development, preventive maintenance |
| Appraisal | Checking whether requirements are met | Incoming inspection, final tests, audits, instrument calibration |
| Internal failure | A defect found before delivery | Scrap, rework, downtime, retesting reworked items, selling seconds |
| External failure | A defect found after delivery | Warranty repairs, returns, complaints, recalls, liability and lost goodwill |
Prevention plus appraisal is the cost of good quality, also called the cost of conformance. Internal plus external failure is the cost of poor quality, or nonconformance.
Use the activity's reason, not its department name, to classify it. A final inspection is appraisal. Re-inspecting a repaired defect is internal failure because that extra check exists only because the original work failed. A quality department can incur costs in all four categories.
Build a cost report
- List quality-related activities and their costs for the same period.
- Classify each activity by its purpose and when the defect was found.
- Total each category, then add all four for the cost of quality (COQ).
- Divide by sales or output to compare periods or sites of different sizes.
- Investigate the largest failure costs and the causes behind them.
A manufacturer with annual sales of $8,000,000 records training of $40,000, design reviews of $25,000 and supplier qualification of $15,000. Prevention totals $80,000. Incoming inspection of $30,000 and final testing of $50,000 make appraisal $80,000. Scrap of $70,000 and rework of $45,000 make internal failure $115,000. Warranty repairs of $90,000 and return handling of $35,000 make external failure $125,000.
The total is $400,000. As a share of sales, . Failure costs total $240,000, or of COQ. Most recorded quality spending therefore deals with failures.
Evaluate prevention spending
Suppose another $30,000 funds training and a mistake-proof fixture. Internal failure falls by $40,000, external failure by $50,000 and appraisal by $10,000. The new total is dollars, about 4.1% of unchanged sales. Prevention rose, yet total quality cost fell by $70,000.
The traditional trade-off view expects a point where extra prevention and appraisal cost more than the failures avoided. TQM stresses that effective prevention can reduce failure and appraisal together as defects approach zero. Crosby's phrase quality is free refers to these avoided losses; training and process changes still require resources.
Accounts miss some losses. Unhappy customers may never return, and staff busy correcting errors cannot produce new work. Feigenbaum called this lost productive capacity the hidden plant. A low recorded COQ is therefore not proof that few quality problems exist. Finding a defect later generally adds more handling, repair and customer consequences. Inspection discovers defects; it does not remove their causes.
Key Takeaways
- COQ adds prevention, appraisal, internal failure and external failure.
- Classify a cost by why it exists and when the defect was found.
- Retesting reworked items is an internal failure cost.
- Compare total costs before and after an improvement, including its extra spending.
- Sales percentages and cost per unit support fair comparisons.
- Recorded costs miss lost goodwill and capacity spent fixing errors.
2Build a quality culture with TQM, continuous improvement and ISO 9001
Quality depends on everyday management choices: what leaders measure, what employees can change and how suppliers are selected. TQM connects these choices to continuous improvement. PDCA and benchmarking turn ideas into tested changes, Taguchi explains the value of staying near target, and ISO 9001 provides a system for responsibilities, evidence and follow-through across the organization.
2.1 Leadership, employees and suppliers
Total quality management (TQM) makes customer-focused improvement part of how the whole organization works. Leaders set the direction, employees solve problems with evidence, and functions share responsibility for the result customers receive.
Ideas that shaped TQM
| Contributor | Central contribution | Management implication |
|---|---|---|
| Deming | Reduce variation and improve the system | Give workers a process that can succeed. |
| Juran | Fitness for use; planning, control and improvement | Design for needs, maintain performance and raise it. |
| Crosby | Conformance to requirements; prevention; zero defects | Prevent errors and track the price of nonconformance. |
| Feigenbaum | Total quality control across departments | Quality is a company-wide responsibility. |
| Ishikawa | Quality circles and cause-and-effect diagrams | Involve employees in structured problem solving. |
| Shewhart | Control charts, developed in the 1920s | Separate stable variation from signals of change. |
Deming argued that most quality problems arise from the system management creates. His management principles include a lasting purpose toward improvement, training, removing fear and barriers between departments, and choosing suppliers on more than price. He rejected dependence on mass inspection and slogans or quotas that demand results without giving people the means to achieve them.
Juran's quality trilogy separates three kinds of work. Planning creates products and processes that meet customer needs. Control keeps performance at its planned level. Improvement raises that level. A team that maintains a weak process has achieved control without achieving improvement.
Crosby's zero-defects standard rejects treating avoidable defects as an acceptable target. His prevention focus asks what makes correct work possible at the first attempt. Measuring the cost of nonconformance makes scrap, rework and customer failures visible to managers.
Give employees the means to act
Empowerment combines authority with training and information. A worker allowed to stop a line can prevent a known defect from reaching the next operation. Front-desk staff authorized to refund up to $100 can resolve a guest's complaint promptly. Authority without the skill to judge the problem is incomplete empowerment.
Quality circles are small groups from the same work area that meet regularly to identify and solve quality problems. They can collect check-sheet data, prioritize with a Pareto chart and investigate with a fishbone diagram. Management must respond to what they find and provide resources for changes outside the group's authority.
Connect customers, suppliers and daily work
TQM brings together continuous improvement, Six Sigma, benchmarking, employee empowerment, just-in-time production, Taguchi's ideas and basic quality tools. These are ways to improve the system, not separate departments that take over ownership of quality.
Lower inventory in just-in-time (JIT) production exposes defects that a large buffer could hide. A faulty batch quickly interrupts the next step, creating pressure to solve the cause. Long-term supplier partnerships support joint improvement and more reliable incoming quality. Selecting a cheap input that raises scrap or stoppages can increase the operation's total cost.
A poster asking employees to “do better” does not change a confusing instruction or an unreliable machine. Leaders need to fund training, remove barriers and keep improvement active beyond one project. Purchasing, design, operations and service must align their measures so that one team's apparent saving does not create another team's failure cost.
Key Takeaways
- TQM is customer-focused, organization-wide and sustained by leadership.
- Deming emphasizes improving the system and reducing variation.
- Juran distinguishes planning, control and improvement.
- Empowerment requires authority, training and information.
- Supplier partnerships and low inventory expose and help solve quality problems.
2.2 PDCA, benchmarking and target loss
Continuous improvement, or kaizen, means ongoing small improvements made by people throughout the organization. Larger changes such as new technology can complement this daily work. A structured cycle helps a team learn whether a change actually helps.
Use Plan-Do-Check-Act
- Plan: define the problem, study current performance and choose a change with a predicted result.
- Do: test the change, preferably on a small scale.
- Check: compare actual results with the prediction.
- Act: adopt a successful change as the new standard, or learn from an unsuccessful test and plan again.
PDCA is also called the Shewhart or Deming cycle. Deming preferred PDSA, with Study stressing learning from results. The final phase matters: a successful pilot does not automatically change everyday practice.
A clinic records an average wait of 32 minutes before patients see a nurse. Data point to paperwork at reception. The team predicts online pre-registration will reduce the wait to 20 minutes and trials it on Mondays for two weeks. Trial days average 22 minutes, a reduction of . The clinic makes pre-registration standard across the week and begins another cycle on the remaining delay. Checking the result against the prediction reveals both the gain and the gap still to close.
Learn from a benchmarking partner
Benchmarking compares performance and practices with a strong performer. Choose the process and measure, form a team, select partners, collect and analyze comparable data, then adapt the practices that explain the difference.
Partners can be another unit of the same organization, competitors or organizations in another industry. A hospital can learn about check-in from an airline. Matching a headline time is not enough: the team needs to understand the method that produced it and whether it fits its own work.
Aim for the target
Taguchi's robustness means designing a product or process to work well despite changes in materials, use or environment. When removing a source of variation is too costly, design can reduce its effect. Target-oriented quality asks how close output is to the intended value, even when it passes specification checks.
Taguchi's quality loss function expresses that idea:
Here, is the measured value, the target and a cost constant. A known loss at deviation lets you estimate that constant. The modeled loss is to customers, the firm and society; it need not be an actual invoice for each unit.
A part targets 12.0 mm. Replacement at a 0.5 mm deviation costs $20. First calculate dollars per mm². At 12.2 mm, the deviation is 0.2 mm, so dollars. At 12.1 mm, dollars. Doubling the deviation quadruples loss because the deviation is squared.
The “goal-post” view treats all passing units as equally good. The loss function shows why output near a specification edge can still impose more loss than output near target. Reducing variation around the target therefore has value before a part crosses a limit.
Key Takeaways
- PDCA tests a predicted change and makes successful work the standard.
- Benchmarking examines the practices behind performance gaps.
- Robustness reduces sensitivity to sources of variation.
- Taguchi loss grows with squared deviation from the target.
2.3 ISO 9001 and the quality management system
A quality management system (QMS) is the organized way an operation sets responsibilities, runs processes, checks results and improves. ISO 9001 states requirements for that system. It applies to service organizations as well as manufacturers.
Know the ISO family
ISO, the International Organization for Standardization, publishes the standards. ISO 9000 supplies fundamentals and vocabulary. ISO 9001 supplies requirements used for certification. ISO 9004 gives guidance for sustained success. ISO 9000 and ISO 9004 are not certification standards. The current ISO 9001:2026 edition was published in September 2026, replacing the 2015 edition with a three-year transition for existing certificates.
Seven principles support the family: customer focus, leadership, engagement of people, the process approach, improvement, evidence-based decision making and relationship management. Together they connect customer needs, capable employees, linked processes and decisions based on evidence.
Follow the system through clauses 4–10
| Clause | Focus | What the organization manages |
|---|---|---|
| 4 | Context | Relevant issues, interested parties, scope and processes |
| 5 | Leadership | Commitment, policy and responsibilities |
| 6 | Planning | Risks, opportunities, objectives and changes |
| 7 | Support | Resources, competence, communication and documented information |
| 8 | Operation | Design, purchasing, production, service delivery and release |
| 9 | Performance evaluation | Monitoring, customer satisfaction, internal audit and management review |
| 10 | Improvement | Nonconformity, corrective action and continual improvement |
These requirements fit PDCA: plan the system in clauses 4–6, support and perform the work in 7–8, check it in 9 and improve it in 10. Leadership remains central. The shared high-level structure also helps organizations combine quality with other management systems, such as ISO 14001 for the environment.
Risk-based thinking asks what could prevent the intended result and what opportunities could improve it. The 2026 revision separates consideration of risks and opportunities and strengthens attention to quality culture, ethical behavior and change management. Documented information should support effective work and evidence of conformity; the standard does not prescribe a pile of identical manuals for every organization.
Understand certification
An independent certification body audits the QMS; ISO does not certify organizations. An accredited body has itself been assessed by an accreditation body. The initial audit normally includes a readiness and system-design review followed by a check of implementation and effectiveness. Nonconformities need appropriate correction and corrective action. Certificates normally run for three years, with surveillance at least annually and recertification at the end.
Consider a shop whose final-inspection micrometer is three months overdue for calibration. This is a nonconformity involving monitoring and measuring resources under clause 7. Recalibrating addresses the immediate problem. The shop also assesses parts measured since the last valid calibration, finds why the schedule failed and gives a named person responsibility supported by reminders. A later check tests whether the action prevents recurrence.
Certification concerns the management system. It does not set a product's dimensions or guarantee every shipment is defect-free. Product requirements and performance still need their own evidence.
Broader excellence approaches examine management and results beyond a certification threshold. Examples include the Baldrige framework and award in the United States, the EFQM Model in Europe, and the Deming Prize, established by JUSE in Japan in 1951.
Key Takeaways
- ISO 9001 gives QMS requirements; ISO 9000 and ISO 9004 serve different purposes.
- The seven principles connect people, processes, customers and evidence.
- Clauses 4–10 follow a PDCA structure.
- Independent certification bodies audit systems; ISO publishes standards.
- Corrective action addresses causes and checks effectiveness.
- Certification does not guarantee defect-free products.
3Improve processes with Six Sigma and the seven basic quality tools
A useful improvement project begins with a customer requirement that can be measured. Six Sigma turns defects into comparable metrics, while DMAIC gives the team a route from a problem to a sustained change. The basic quality tools support that work by collecting observations, showing distributions, identifying priorities and examining possible causes before a solution is adopted.
3.1 Defects, opportunities and sigma levels
Six Sigma is both a performance goal and a way to manage improvement projects. Its business performance goal is 3.4 defects per million opportunities, using a convention about long-term movement of the process mean. Its project approach reduces variation and defects through data and trained teams.
Count the right quantity
A unit is an item or transaction. A defect is a failure to meet a customer requirement. An opportunity is a distinct chance for such a failure on a unit. A defective unit has at least one defect: an invoice with two errors contributes two defects but one defective invoice.
An accounts-payable team checks 500 invoices with four opportunities each: amount, account code, date and supplier number. It finds 14 errors. First count opportunities: . Then and .
DPU describes defects per invoice; DPMO describes defects relative to the defined opportunities. Adding trivial opportunities lowers reported DPMO without removing an error. Comparisons need consistent definitions tied to customer requirements.
Interpret sigma levels
The common business convention allows the mean to shift by 1.5 standard deviations over time. Approximate conversions under this convention are:
| Sigma level | DPMO |
|---|---|
| 2 | 308,538 |
| 3 | 66,807 |
| 4 | 6,210 |
| 5 | 233 |
| 6 | 3.4 |
The invoice result of 7,000 DPMO lies just below four sigma, about 3.96. It is not a four-sigma result simply because it is close to the table value.
For a centered six-sigma process, each specification limit is six standard deviations from the target. After a 1.5-sigma shift, the nearer limit is standard deviations from the mean. The normal tail beyond that limit is about 3.4 per million. With no shift and perfect centering, the two tails total about 0.002 per million. The shift is a reporting convention, not a claim that every process physically drifts by exactly that amount.
Six Sigma quality and three-sigma control limits answer different questions. For a stable, approximately normal plotted statistic, three-sigma chart limits contain about 99.73% of points. That describes chart behavior, not whether individual products meet customer specifications. In capability terms, centered six-sigma performance has and, after the assumed shift, .
Organize improvement work
Motorola developed Six Sigma in the mid-1980s; its use expanded after General Electric adopted it in the mid-1990s. Executive leaders and champions select projects, resource them and remove barriers. Master Black Belts coach and train. Black Belts lead projects, often full time. Green Belts contribute alongside their normal jobs.
Lean Six Sigma combines lean's attention to waste and delay with Six Sigma's attention to variation and defects. A faster process that still makes errors and a precise process full of avoidable waiting each leave room for improvement.
Key Takeaways
- Defects and defective units count different things.
- DPMO divides defects by all meaningful opportunities.
- The 3.4 DPMO convention includes a 1.5-sigma mean shift.
- Three-sigma control limits are not a Six Sigma product specification.
- Lean and Six Sigma address complementary process problems.
3.2 From customer needs to controlled improvement
DMAIC improves an existing process through Define, Measure, Analyze, Improve and Control. The phases connect the customer's problem to a verified cause, a tested change and a way to keep the gain.
Define a measurable problem
Define the customer, problem, goal, boundaries and team in a project charter. Convert customer language into critical-to-quality (CTQ) characteristics. “I need test results fast” becomes “result reported within 60 minutes of sample collection.” The clock's start and finish must be clear enough for different people to measure the same thing.
A SIPOC diagram names suppliers, inputs, process, outputs and customers at a high level. It helps the team agree which process it is improving before detailed mapping begins.
Measure and analyze before choosing a fix
In Measure, map the current process, choose measures, check the measurement system and collect a baseline. For a hospital laboratory, 72 late results among 400 timed samples give late. The project seeks no more than 5% late within six months.
In Analyze, look for and verify root causes. A Pareto chart of the 72 late results shows that 44 waited for a courier who collected samples only every 90 minutes. This category accounts for of late results. Delay-time data support the explanation that the collection schedule creates waiting.
A fishbone diagram can organize suspected causes, stratification can reveal different shifts or locations, and a scatter diagram can show related variables. A plausible story or a correlation is a starting point for verification. Neither alone establishes a root cause.
Improve and keep the gain
In Improve, develop changes that address verified causes and pilot them. The laboratory tests collections every 30 minutes. The pilot produces 12 late results among 200 samples, or 6%. This is a large reduction from 18%, but it has not yet reached the 5% goal. Reporting the gain accurately helps the team choose the next improvement.
In Control, standardize the new collection schedule, train the people involved, assign an owner and monitor the late proportion with a daily p-chart. A control plan states what is measured, who checks it and what happens if performance changes. Mistake-proofing and standard work help make the successful method the routine method.
The laboratory can start another cycle on the remaining causes. Closing a project does not end responsibility for the process; the process owner takes over its ongoing control.
Choose the cycle for the job
| Cycle | Main purpose | Final work |
|---|---|---|
| DMAIC | Improve an existing process | Implement and control a tested improvement |
| DMADV | Design a new process or major redesign | Design and verify against CTQs |
DMADV stands for Define, Measure, Analyze, Design and Verify and forms part of Design for Six Sigma. It is useful when improving the present design cannot deliver the required performance.
Two shortcuts weaken DMAIC. Jumping from Define to a preferred solution skips evidence about the cause. Stopping after Improve leaves gains exposed when no owner, standard or monitoring is in place. The first shortcut risks solving the wrong problem; the second risks losing a successful change.
Key Takeaways
- Define turns customer needs into measurable CTQs and a scoped project.
- Measure establishes a trustworthy baseline.
- Analyze verifies causes before solutions are selected.
- Improve pilots changes; Control assigns ownership and sustains them.
- DMAIC improves an existing process; DMADV designs and verifies a new one.
3.3 Data collection, distributions and priorities
The basic quality tools turn observations into patterns a team can act on. A check sheet collects the data, a histogram shows a measurement distribution, and a Pareto chart helps decide which problem deserves attention first.
Collect data consistently
The common operations list contains the check sheet, histogram, Pareto chart, flowchart, cause-and-effect diagram, scatter diagram and control chart. Classic lists use stratification in place of the flowchart. Each tool answers a different question; the value comes from selecting and combining them.
A check sheet records events as they happen, often with tally marks. Define categories, timing, the recorder and counting rules before collection. If two inspectors classify the same fault differently, the total will be difficult to interpret. A defect-location sheet marks faults on a drawing, helping reveal repeated damage at the same place.
Stratification divides data by source, such as machine, shift, supplier or location. An overall defect rate of 3% can hide 1% on the day shift and 6% at night. The difference directs investigation toward conditions that vary between shifts; it does not prove that the shift itself causes the defects.
Read a histogram
A histogram divides a measured variable into numerical intervals and shows the frequency in each. Its bars follow numerical order and touch because neighboring intervals belong to one measurement scale. Read the center, spread and shape. Two peaks can suggest two sources with different settings.
A bell shape suggests approximate normality, but the histogram has lost time order. A process that changed during collection can still produce a plausible-looking overall distribution. Use a control chart to judge stability. Specification limits on the histogram help show how individual output compares with requirements.
Build a Pareto chart
A Pareto chart sorts separate problem categories by frequency or cost, from largest to smallest, usually with a cumulative-percentage line. An “other” group goes last. The Pareto principle says a few categories often account for much of the problem; 80/20 is a guide, not a required data split.
An injection-molding line records 200 defects in a week:
| Category | Count | Share | Cumulative share |
|---|---|---|---|
| Short shots | 92 | 46% | 46% |
| Flash | 54 | 27% | 73% |
| Sink marks | 28 | 14% | 87% |
| Warping | 14 | 7% | 94% |
| Color streaks | 8 | 4% | 98% |
| Other | 4 | 2% | 100% |
Short shots and flash together contribute 73% of the count. If the goal is fewer defects, they are strong starting candidates.
Now attach costs per defect: $0.50, $0.80, $1.50, $12.00, $2.00 and $1.00 respectively. Category costs are $46.00, $43.20, $42.00, $168.00, $16.00 and $4.00, totaling $319.20. Warping contributes about 53% of cost despite only 7% of the count. A cost-ranked chart therefore puts warping first.
Choose the measure to match the decision. Frequency identifies common faults; cost identifies expensive losses. After selecting a category, investigate its causes with more detailed tools. A tall Pareto bar names a problem category, not the mechanism producing it.
Key Takeaways
- Check sheets need consistent categories and counting rules.
- Stratification can expose patterns hidden in combined data.
- Histograms show distributions, not time stability.
- Pareto charts rank categories by the measure that matters to the decision.
- Cumulative percentages add category shares in chart order.
- A frequent defect and an expensive defect need not be the same category.
3.4 Process routes and possible causes
Once a problem has a clear name and measure, the next task is to understand how it arises. Process maps reveal the route work follows. Fishbone diagrams organize possible causes. Scatter diagrams examine relationships in paired data.
Map the process that actually runs
A flowchart shows process steps in order. Ovals mark the start and end, rectangles show activities, diamonds show decisions, and arrows show the flow. Follow real work through handoffs, waits and rework loops, including the paths used when something goes wrong.
For a delivery service, map order entry, preparation, packing, dispatch and delivery. A decision such as “Is packaging ready?” can send work into a waiting loop. If the map shows only the intended route, the delay may disappear from the picture even though customers still experience it.
Separate possible causes from proof
A cause-and-effect diagram, or fishbone/Ishikawa diagram, places one effect at the head and possible causes on branches. Manufacturing teams often use the 6 Ms: methods, machines, materials, manpower or people, measurement, and mother nature or environment. Service teams can use policies, procedures, people and place.
For “late home deliveries,” a restaurant might identify:
- People: new drivers do not know the area.
- Methods: drivers wait until a full batch of orders is ready.
- Machines: scooters break down.
- Materials: packaging is unavailable at busy times.
- Measurement: the promise clock starts at order entry.
- Environment: rain and traffic slow travel.
Repeatedly asking “why?” can trace a symptom to a deeper cause. Drivers waiting for a full load may point to a batching rule set when orders were less frequent. The 5 Whys helps develop a causal explanation, but the number five is not proof. The team must collect data or test a change to establish whether the suspected cause really matters.
Read paired data
A scatter diagram plots each pair of values as one point. Rising points indicate a positive relationship; falling points a negative one. A curve can show a nonlinear relationship. A shapeless cloud gives no clear linear pattern.
The correlation coefficient runs from to and measures the direction and strength of a linear relationship. A value close to zero can still accompany a strong curved relationship. A single outlier or a narrow range of observations can also mislead interpretation.
A bakery records oven temperature and burnt-cookie percentage for six batches: 180 °C and 2.1%; 185 °C and 2.6%; 190 °C and 2.9%; 195 °C and 3.6%; 200 °C and 3.9%; 205 °C and 4.5%. The points rise nearly along a line, with . Higher readings accompany more burning.
That association does not prove temperature is the cause. Line speed could affect both readings and burning. A controlled test of a lower, tightly regulated temperature helps distinguish these explanations before the bakery changes its standard.
The control chart adds a time-based view to these tools. It monitors whether process behavior stays stable or develops signals of special causes. A flowchart explains the route, a fishbone suggests mechanisms and a control chart shows when behavior changes.
Key Takeaways
- Flowcharts should show actual work, including waits and rework loops.
- Fishbone branches contain possible causes that still need evidence.
- The 5 Whys traces symptoms toward deeper causes.
- Scatter diagrams show relationships; correlation alone does not prove cause.
- Correlation measures linear association and can be distorted by outliers.
4Monitor processes with statistical process control charts
Process data mean more when their order is preserved. Control charts compare current samples with a stable baseline and help distinguish routine fluctuation from evidence of change. Choosing a chart depends on whether the observations are measurements, defective units or counts of flaws. Interpreting its limits and patterns then guides investigation without adding variation through unnecessary adjustments.
4.1 Variation and chart selection
Every process varies. Statistical process control (SPC) uses time-ordered data to distinguish stable variation from evidence that the process has changed. This lets a team investigate causes while work is running.
Distinguish two kinds of variation
Common-cause, natural or random variation comes from many small sources built into the system, such as minor material differences and machine vibration. A process with only these causes is in statistical control: its behavior is stable and predictable.
Special-cause, or assignable variation, comes from a specific source that can be investigated, such as a changed setting, damaged tool or different material batch. A chart signal is evidence to investigate; it does not identify the cause by itself.
A control chart plots a statistic in time order against a center line, upper control limit (UCL) and lower control limit (LCL). The statistic can be a subgroup mean, range, proportion or count. Three-sigma limits sit three standard deviations of the plotted statistic from its center.
Understand sampling and false alarms
Measurement charts often use subgroups of four or five items produced close together. Their within-subgroup variation represents short-term behavior. Means vary less than individual measurements:
The central limit theorem explains why sample means approach a normal distribution as sample size grows. Four or five measurements can work well for roughly normal individual data; strong skew can require larger subgroups.
For a stable, approximately normal plotted statistic, about 99.73% of points fall inside three-sigma limits. About 0.27%, roughly one in 370, fall outside by chance. Such a Type I error is a false alarm. A Type II error misses a real change. Two-sigma limits detect smaller changes sooner but increase the normal-statistic false-alarm rate to about 4.6%. Counts, proportions and ranges have different distributions, so these exact rates do not transfer to every chart.
Choose a chart and establish a baseline
| Data | Question | Chart |
|---|---|---|
| Continuous measurements | Has the mean changed? | Mean chart, paired with a range chart |
| Continuous measurements | Has within-subgroup spread changed? | R chart |
| Good/defective classification | Has the defective proportion changed? | p-chart |
| Number of flaws in a fixed inspection unit | Has the defect count changed? | c-chart |
Begin with about 20–25 subgroups collected under representative conditions. Calculate preliminary lines and limits, examine signals, investigate causes and revise the baseline only when evidence justifies it. Removing a point requires a documented assignable cause; deleting inconvenient high points would make a misleading baseline. Validated limits then monitor new output.
Keep customer requirements separate
Control limits describe observed process behavior: the voice of the process. Specification limits state requirements set by the customer or designer: the voice of the customer. An average chart describes subgroup means, not the distribution of individual products, so individual specifications do not belong on it.
A stable process can predictably make defective output. SPC establishes stability; capability analysis asks whether that stable spread and mean can meet the specifications. Improving a stable but inadequate process requires a planned change to the system.
Key Takeaways
- Common causes produce stable variation; special causes call for investigation.
- A chart plots a statistic in time order.
- Three-sigma limits balance sensitivity against false alarms.
- Choose the chart for measurements, defective units or defect counts.
- Control limits describe behavior; specification limits describe requirements.
- Stable does not mean capable.
4.2 Subgroup averages and ranges
Use an average chart and an R chart together for repeated subgroups of measurements. The average chart tracks location; the R chart tracks within-subgroup spread. A stable mean can hide rising variation, and a stable range can accompany a shifted mean.
Calculate each subgroup's values
The subgroup mean is the sum divided by subgroup size . The range is largest minus smallest. Five consecutive bottles contain 499.8, 500.6, 500.1, 501.0 and 499.5 mL. Their sum is 2,501.0 mL, giving mL. Their range is mL, regardless of the order of those observations.
Across equal-sized subgroups, average the means to get the grand mean and average the ranges to get . These are the chart center lines.
Set limits with subgroup factors
The factors incorporate three-sigma limits and depend on items in each subgroup, not the number of subgroups collected.
| n | A₂ | D₃ | D₄ |
|---|---|---|---|
| 2 | 1.880 | 0 | 3.267 |
| 3 | 1.023 | 0 | 2.574 |
| 4 | 0.729 | 0 | 2.282 |
| 5 | 0.577 | 0 | 2.114 |
| 6 | 0.483 | 0 | 2.004 |
| 7 | 0.419 | 0.076 | 1.924 |
| 8 | 0.373 | 0.136 | 1.864 |
| 9 | 0.337 | 0.184 | 1.816 |
| 10 | 0.308 | 0.223 | 1.777 |
For 25 subgroups of five bottles, suppose mL and mL. The average-chart allowance is mL. Thus the lower and upper limits are about 499.16 and 501.24 mL. The range limits are zero and mL.
A new subgroup contains 502.0, 501.4, 501.9, 501.2 and 501.5 mL. Its mean is 501.6 mL and its range is 0.8 mL. Read the R chart first: the range is inside its limits. The mean then exceeds the average-chart UCL, giving evidence of an upward shift without a range signal. Investigate a setting change or another cause; the chart does not prove which one occurred.
If spread is out of control, resolve it before trusting mean-chart limits based on that spread. During baseline analysis, only exclude subgroups when investigation establishes an assignable cause.
Use sigma on the correct scale
With an established individual standard deviation, mean-chart limits can be calculated directly:
At a 100 g process mean, individual g and give a mean standard deviation of 1 g, so limits are 97 and 103 g.
The average range can estimate individual spread: . For five-item subgroups, . The bottle example gives mL. This individual-unit estimate is used for capability; the smaller standard deviation of subgroup means is not.
Key Takeaways
- Track means and ranges together, reading the R chart first.
- Range means largest minus smallest.
- Look up factors using subgroup size n.
- Mean-chart limits use the variation of means, not individual specifications.
- Average range divided by d₂ estimates individual standard deviation.
- A signal supports investigation without proving its cause.
4.3 Defective proportions and flaw counts
Attribute charts monitor classifications and counts. The central choice is what each recorded value represents: defective units or individual defects. One form with three errors contributes one defective form but three defects.
Build a p-chart for defective units
A p-chart tracks the fraction classified as defective. Pool the baseline counts:
For a sample of size , three-sigma limits are:
A proportion cannot be negative, so replace a negative LCL with zero. Its upper bound is one. The binomial model describes good/defective classifications; the usual limits use a normal approximation. Samples should be large enough to expect several defective units. Very small samples with a very low defective rate usually give zeros and reveal little about change.
An office inspects 20 samples of 100 claim forms and finds 120 defective forms. The total inspected is 2,000, so . The sample-proportion standard deviation is . Limits are about : set the LCL to zero and the UCL to about 0.131.
In a new sample, 15 of 100 forms have at least one error. The plotted proportion is 0.15, above the upper limit, so investigate. Two defective forms give 0.02, inside the limits. Do not plot 15 or 2 directly on a proportion scale.
When sample sizes differ, calculate limits using each sample's own size. Larger samples have narrower limits because their proportions vary less. Use total defectives divided by total inspected for the center line; an unweighted average of unequal-sample proportions can distort it.
Build a c-chart for defect counts
A c-chart counts flaws within a fixed inspection unit. The unit might be one door or 100 m of fabric. A Poisson model underlies the limits and links the variance to the mean count:
Again, replace a negative lower limit with zero. At an average of 16 flaws per 100 m, , giving limits of 4 and 28. A count of 31 is high enough to signal; a count of 3 is also outside. A low signal can indicate improvement, missed inspection or faulty records. Investigate it before crediting the process with a gain.
Match counts to exposure
| Chart | Plotted value | Size condition |
|---|---|---|
| p | Proportion defective | Sample-specific limits when n varies |
| np | Number of defective units | Constant sample size |
| c | Number of individual defects | Constant inspection-unit size |
| u | Defects per unit | Allows varying inspected quantity |
Doubling fabric length creates more chances to find flaws. A c-chart that treats 100 m and 200 m as equal inspection units confuses exposure with quality. Use a u-chart when the inspected quantity varies.
Key Takeaways
- A p-chart counts each defective unit once.
- Pool baseline defective counts and inspected totals for p̄.
- Use each sample size to calculate its p-chart limits.
- A c-chart counts every defect in a fixed inspection unit.
- Use a u-chart when inspected quantity varies.
- Investigate unusually low counts as well as high ones.
4.4 Patterns, signals and process responses
A process can change without producing a point outside its control limits. Runs and patterns make time order useful: several moderately high points can provide evidence that one isolated high point cannot.
Recognize selected signals
The Western Electric rules signal when any of these occurs:
- One point lies beyond three sigma.
- Two of three consecutive points lie beyond two sigma on the same side.
- Four of five consecutive points lie beyond one sigma on the same side.
- Eight consecutive points lie on the same side of the center line.
The same-side condition matters for the second and third rules. Points on opposite sides do not combine into that signal. Many organizations also flag six consecutive points that steadily rise or fall. Choose and document the rules before monitoring; adding more rules increases the opportunities for false alarms.
For independent points equally likely above or below the center line, eight specified points all above have probability . All on either the upper or lower side have probability . This probability concerns that particular eight-point block, not the chance of ever seeing a run during unlimited monitoring.
Read a run in context
A filling chart has center 500.2 mL and limits 499.16–501.24 mL. Eight successive means are 500.4, 500.6, 500.3, 500.5, 500.7, 500.4, 500.6 and 500.5 mL. Every point is within the limits, but all eight are above the center. The same-side rule signals a possible upward shift. Check what changed around the start of the run.
Typical patterns help guide that search:
| Pattern | Possible sources to examine |
|---|---|
| Sudden change in level | New setting, supplier or operator |
| Gradual trend | Tool wear, fatigue or temperature drift |
| Repeating cycles | Shifts, daily temperature or maintenance schedules |
| Too many points near the center | Wrong limits, mixed sources within subgroups or edited data |
| Wide erratic swings | Mixed processes or overadjustment |
These are investigation leads. The pattern alone does not prove the particular explanation.
Respond with a prepared action plan
Record the signal and assess whether output should be stopped or held. Search for the assignable cause, correct it, review output made since the last good sample and record the finding and action. An action plan gives operators a clear starting point and names responsibilities.
Do not adjust a stable process after every small departure from target. This tampering, or overadjustment, adds variation by reacting to common causes. Deming's funnel experiment illustrates why repeatedly compensating for random differences can worsen performance.
A stable but off-target process can still need deliberate recentering. Plan that change using capability and customer requirements. It differs from chasing each random result.
Keep limits meaningful
Validated limits stay fixed during routine monitoring. Preliminary limits can change when baseline investigation justifies revision, such as removing subgroups with documented assignable causes. After a lasting process improvement, collect stable new data to establish a new baseline. Recalculating limits with every fresh point can follow the drift and hide the change the chart should reveal.
Key Takeaways
- Patterns inside limits can still signal change.
- Western Electric zone rules require qualifying points on the same side.
- Chart patterns guide investigation but do not identify a cause with certainty.
- A prepared action plan links signals to investigation and output checks.
- Tampering reacts to common-cause fluctuations; planned improvement changes the system.
- Keep validated limits fixed until an investigated change justifies a new baseline.
5Assess and improve process capability
A stable process is predictable, but its predictable output may still miss customer requirements. Capability analysis compares individual-unit spread and centering with specification limits. Cp and Cpk help separate these two issues, normal tail areas estimate the expected failures, and the results guide a choice between recentering, reducing variation and reviewing the design with the customer.
5.1 Spread, centering and capability indices
Process capability asks whether a stable process can meet customer or design specifications. First establish statistical control. If the process keeps changing, its past mean and spread do not give a reliable prediction of future output.
Compare tolerance with process spread
The lower and upper specification limits are LSL and USL. Their difference is the tolerance width. For roughly normal individual output, the natural spread is six individual standard deviations:
Cp measures potential capability if the process is centered. It ignores the current mean. Cpk includes that mean:
Calculate the distance to each specification limit, divide each by three individual standard deviations, and take the smaller result. The nearer limit is the more restrictive side. With two-sided specifications, Cpk cannot exceed Cp; they match when the mean is halfway between the limits. If the mean lies beyond a specification limit, Cpk is negative.
Work a shaft example
A shaft must measure mm, giving LSL 24.95 mm and USL 25.05 mm. A stable process has mean 25.02 mm and individual standard deviation 0.01 mm.
- Tolerance width: mm.
- Natural spread: mm.
- Potential capability: .
- Upper-side index: .
- Lower-side index: .
- Actual centering index: .
The spread could fit well inside the specifications, but the mean sits close to the upper limit. A high Cp alone hides this weakness.
Interpret typical values
For a stable, centered normal process:
| Cp | Meaning | Approximate output outside specifications |
|---|---|---|
| Below 1 | Six-sigma spread exceeds tolerance | More than the Cp = 1 case |
| 1 | Limits are three sigma from the mean | 2,700 per million |
| About 1.33 | Limits are about four sigma away | 63 per million |
| 2 | Limits are six sigma away | 0.002 per million |
Many organizations require at least 1.33 for suppliers, with higher requirements for safety-critical features. The requirement must come from the actual customer or design agreement, not from the chart's control limits.
The filling-line example connects SPC to capability. Its mean is 500.2 mL, estimated individual standard deviation is about 0.774 mL, and specifications are 497–503 mL. Cp is about 1.29 and Cpk about 1.21. Better centering helps, but Cp itself remains below 1.33, so variation also needs to fall to meet that requirement.
Use individual-unit sigma, not the standard deviation of subgroup means. Dividing sigma by the square root of subgroup size would exaggerate capability. The normal-tail defect estimates also require a stable, roughly normal process; a capability number alone does not establish that distributional fit.
Key Takeaways
- Establish stability before interpreting capability.
- Cp compares tolerance width with six individual standard deviations.
- Cpk accounts for the distance to the nearer specification limit.
- Cpk cannot exceed Cp under the two-sided formulas.
- High Cp can hide poor centering.
- Use individual-unit sigma, not the standard deviation of sample means.
5.2 Failure estimates and capability improvements
Capability results help estimate customer failures and choose an improvement. The next step depends on whether the process is unstable, off center, too variable, or has more than one of these problems.
Estimate both tails
For stable, approximately normal output, convert each specification limit to a z-value:
Read the lower tail below the LSL and the upper tail above the USL, then add them. For shafts with mean 25.02 mm and sigma 0.01 mm, the limits 24.95 and 25.05 mm give z-values of −7 and 3. The upper tail is about 0.135%, or 1,350 per million; the lower tail is negligible. Doubling the nearer tail would overstate failures because the process is not centered.
For a mean inside the specifications, the standardized distance to the nearer limit is . Cpk of 1 puts that limit three sigma away, about 1.33 puts it four away, and 1.5 puts it 4.5 away. The last gives about 3.4 per million beyond that limit, linking Cpk to the shifted Six Sigma convention.
Choose the improvement that fits the problem
| Finding | Action | Expected effect |
|---|---|---|
| Cp is adequate but Cpk is much lower | Move the mean toward the specification midpoint | Raises Cpk while Cp stays unchanged if sigma stays constant |
| Cp is too low | Reduce variation through better methods, materials, equipment or maintenance | Raises both indices when the mean is inside specifications |
| Requirements permit a design change | Agree revised specifications with the customer or designer | Changes the tolerance being assessed |
| Chart signals instability | Find and resolve assignable causes | Establishes a basis for capability analysis |
For the shaft, moving the mean from 25.02 to 25.00 mm while keeping sigma at 0.01 mm raises Cpk from 1.00 to about 1.67. Cp remains 1.67 because neither tolerance nor spread changed. The cost of recentering depends on the process.
Halving sigma doubles Cp and Cpk when the mean and specifications stay fixed. When the mean is outside a specification, Cpk is negative; reducing spread around that mean does not restore conformance, so the mean also needs attention. Use a DMAIC project to identify and test changes that reduce variation. Widening specifications requires genuine design permission; changing limits in a report does not improve the product's ability to perform.
If improvement cannot happen immediately, 100% inspection can help sort output. It raises appraisal and internal failure costs and can still miss defects. It is a temporary protection while the underlying process is addressed.
Build evidence that lasts
Capability studies commonly use at least 100 individual observations or 20–25 subgroups collected while charts show stable behavior. Enough data are needed to estimate spread well. Cp and Cpk use within-subgroup variation, such as average range divided by its table factor. Pp and Ppk use overall standard deviation, which includes variation between subgroups over the observation period.
Continue charting after a favorable capability result. A change in mean or spread can make yesterday's result irrelevant. A stable but incapable process needs a planned improvement. A stable and capable one needs ongoing monitoring. An apparently favorable overall index from an unstable process first calls for resolving instability, not a promise that future output will meet specifications.
Key Takeaways
- Add the two specification tails separately; they need not be equal.
- The nearer specification limit is 3Cpk standard deviations from the mean.
- Centering raises Cpk without changing Cp when sigma is unchanged.
- Reducing sigma raises Cp and raises Cpk when the mean is inside the specifications.
- Pp and Ppk use overall variation; Cp and Cpk use within-subgroup variation.
Quality Management examples
1From customer requirements to quality costs
10 steps
- 1IntroductionConnect the promise to the cost
A repair service can offer few extras and still deliver excellent quality if it meets its promises. Begin by translating that promise into requirements. Then follow what happens financially when work meets those requirements or needs correction.
You will separate quality from grade, interpret service gaps and work through a cost-of-quality decision.
- 2ExampleOne room, several judgments
A hotel advertises a 30 m² room with a 140 cm wide bed. Those are measurable attributes: the product-based view.
The guest needs quiet, cleanliness and comfort: the user-based view. Housekeeping checks a 20-point standard: the manufacturing-based view. The operation connects the views by making sure its measurable cleaning and room standards support the guest's needs.
- 3Key InsightA basic offer can meet its promise
Grade is the level of requirements, while quality is how well they are met. A basic transport service does not need luxury seating to provide safe, clean, punctual travel.
More features change the offer, but they do not by themselves establish conformance or fitness for use. A luxury hotel with dirty rooms can have a high grade and low quality.
- 4ChallengeInterpret the service gap
A service desk's expected responsiveness is 6.4 and perceived responsiveness is 5.6. What is the gap, and is it enough by itself to set the first improvement priority?
---reveal---
The gap is , so service falls short. Priority also depends on the importance customers give responsiveness compared with other dimensions. A larger raw gap elsewhere need not matter more.
- 5ExplanationFollow the reason for each cost
Group quality costs by purpose and timing. Prevention stops defects; appraisal checks whether work meets requirements. Internal failure handles defects found before delivery, while external failure handles defects found afterward.
Routine final testing is appraisal. Retesting after rework is internal failure because the extra check exists only because the original work failed.
- 6ExampleAdd the four categories
A manufacturer's prevention totals $80,000 and appraisal totals $80,000. Scrap and rework contribute $115,000 internal failure; warranty and return handling contribute $125,000 external failure.
Total COQ is dollars. Failure costs total $240,000, so most recorded quality spending deals with work that went wrong.
- 7ExamplePut the total in context
With annual sales of $8,000,000, a $400,000 COQ is of sales.
Failure costs are of COQ. These percentages answer different questions: one compares quality costs with the business's sales; the other describes the mix within quality costs.
- 8ChallengeAccount for the prevention investment
The firm adds $30,000 prevention. Internal failure falls by $40,000, external failure by $50,000 and appraisal by $10,000. Starting from $400,000, what is the new COQ?
---reveal---
It is dollars. The gross reductions total $100,000, but the net saving is $70,000 after paying for prevention.
- 9ChallengeConnect conformance with customer value
A delivery firm meets every internal scan requirement but frequently misses the delivery time customers need. It proposes more checks of those same scans. What should it investigate?
---reveal---
Check whether the design requirements capture customer timing needs. More appraisal against an incomplete specification does not correct the design gap. Measures must connect conformance to what customers need the service to accomplish.
- 10RecapChoose requirements and count consequences
Quality joins customer needs with requirements the operation can deliver. Grade identifies the level of the offer, and service-gap priorities also depend on importance.
Use the four quality-cost categories to trace prevention, checking and failures. Evaluate an investment by its effect on the total, while remembering that lost goodwill and capacity used for rework may be missing from the accounts.
2Build a quality system that keeps improving
13 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionMake improvement part of daily work
- 2ExplanationImprove the system employees work in
- 3ChallengeGive authority a practical purpose
- 4ConnectionBring suppliers into the system
- 5ExamplePlan a waiting-time trial
- 6ExampleCompare results and change the standard
- 7ExplanationUse distance from target as a cost
- 8ChallengeCompare two deviations
- 9ExplanationUse a QMS to connect the work
- 10ExampleResolve an overdue micrometer
- 11ChallengeRead the certificate accurately
- 12ChallengeTurn a good idea into controlled practice
- 13RecapSupport people, test changes and assign ownership
3Measure defects and work through DMAIC
16 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionMove from a defect count to a tested improvement
- 2ExplanationCount defects and opportunities
- 3ExampleCalculate the invoice rate
- 4ChallengeExplain the Six Sigma convention
- 5ExampleDefine the customer clock
- 6ExampleVerify and test a cause
- 7ChallengeKeep the pilot gain
- 8ExplanationMake observations comparable
- 9ExampleChoose a priority measure
- 10ChallengeSeparate shape from stability
- 11ExplanationMap waits and repeated work
- 12ExampleTurn a delay into possible causes
- 13ExampleRead an association carefully
- 14ChallengeChoose evidence after brainstorming
- 15ChallengePlace the tools in the project
- 16RecapUse each tool for its own question
4Build charts and respond to their signals
20 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionWatch a process in time order
- 2ExplanationSeparate routine variation from a change
- 3Key InsightUse the variation of the plotted statistic
- 4ChallengeKeep behavior apart from requirements
- 5ExampleCalculate a bottle subgroup
- 6ExampleBuild the baseline lines
- 7ExampleCalculate the mean-chart allowance
- 8ExampleCalculate range limits and read spread
- 9ChallengeRead the new mean
- 10ExplanationCount whole defective forms
- 11ExampleCalculate the p-chart limits
- 12ChallengePlot a proportion on the right scale
- 13ExampleCount flaws within fixed exposure
- 14TipRecheck the inspection-unit size
- 15ExplanationNotice a pattern before a limit crossing
- 16ChallengeInterpret an eight-point run
- 17Key InsightAvoid chasing routine fluctuations
- 18TipPreserve a useful baseline
- 19ChallengeInvestigate before changing limits
- 20RecapMatch the statistic, check spread and respond
5Calculate capability and choose an improvement
12 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionAsk whether stable output fits the specification
- 2ExplanationStart with the right limits and spread
- 3ExampleCalculate potential capability
- 4ExampleCheck the nearer side
- 5ChallengeChoose the interpretation
- 6ExampleConvert each limit to a z-value
- 7ExampleTranslate the tails into expected failures
- 8ExampleRecenter without changing spread
- 9ChallengeKnow when centering is insufficient
- 10ConnectionKeep watching after the capability study
- 11ChallengePut stability before a favorable index
- 12RecapLet the finding determine the improvement
Quality Management practice questions
Set 1: Apply quality methods to process decisions10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Quality foundations and first calculations10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Interpret evidence and compare improvements10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Make decisions from quality data10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Resolve harder quality and capability cases10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Accreditation
Aesthetics
Appraisal cost
Assurance
Average range
B
Benchmarking
C
c-chart
Cause-and-effect diagram
Centering
Certification
Check sheet
Common-cause variation
Conformance
Control limit
Control plan
Control-chart factor
Corrective action
Correlation coefficient
Cost of poor quality
Cost of quality
Cp
Cpk
Critical-to-quality characteristic
D
Defect
Defective unit
DMADV
DMAIC
DPMO
DPU
Durability
E
Empathy
Employee empowerment
External failure cost
F
Features
Fitness for use
Flowchart
G
Grade
Grand mean
H
Hidden plant
Histogram
I
Inspection unit
Internal customer
Internal failure cost
ISO 9001
K
Kaizen
L
Lean Six Sigma
N
Nonconformity
np-chart
O
Opportunity
Out-of-control action plan
Overall variation
P
p-chart
Pareto chart
PDCA
Perceived quality
Performance
Pooled proportion
Pp and Ppk
Prevention cost
Process capability
Q
Quality
Quality circle
Quality loss function
Quality management system
Quality robustness
Quality trilogy
R
R chart
Range
Rational subgroup
Reliability
Responsiveness
Risk-based thinking
Run
S
Scatter diagram
Serviceability
SERVQUAL
Sigma level
SIPOC
Six Sigma
Special-cause variation
Specification limit
Statistical control
Statistical process control
Stratification
Subgroup mean
T
Tampering
Tangibles
Target-oriented quality
Tolerance
Total quality management
Type I error
Type II error
U
u-chart
W
Western Electric rules
Within-subgroup variation
Z
Zero defects
#
5 Whys
About this lesson
Make your own Study Materials
Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.