Inventory Management
IntermediateLesson 6 of 9 in Operations Management Course
What you will learn
- Describe the jobs inventory does in an operation, name the costs that inventory decisions change, and use ABC analysis to decide which items deserve the closest control.
- Describe the functions and types of inventoryName the kinds of inventory an organization holds, explain what each kind of stock is for, and track inventory with the measures that ordering decisions use.
- Identify the costs of holding, ordering and running outSort the costs of an inventory system into holding, ordering or setup, shortage and purchase costs, and explain how each one changes with the order quantity.
- Rank items with ABC analysis to set control prioritiesClassify items by their annual usage value and use the classes to decide where forecasting, review and safety stock decisions need the most attention.
- Describe the functions and types of inventory
- Find the order or production quantity that minimizes annual inventory costs, read the answer from a cost graph and a formula, and adapt it when delivery is gradual or suppliers offer quantity discounts.
- Build the total cost curve behind the economic order quantityState the assumptions of the economic order quantity model, write the annual ordering, holding and total cost as functions of the order size, and find the best quantity from a table or graph.
- Calculate the EOQ and judge its sensitivityCompute the economic order quantity, the number of orders, the time between orders and the annual cost, and explain why small errors in the inputs change the cost very little.
- Size production runs with gradual replenishmentUse the production order quantity model when units arrive gradually during a production run, and compare its run size and costs with the basic EOQ.
- Evaluate quantity discountsDecide whether to order enough to earn a lower price by comparing the total annual cost, including the purchase cost, at each price break.
- Build the total cost curve behind the economic order quantity
- Decide when to reorder in a continuous review system, size safety stock for uncertain demand and lead times, and measure the service the stock provides.
- Set the reorder point when demand and lead time are knownExplain how a continuous review system works and calculate the reorder point from the demand rate and the lead time, including lead times longer than the order cycle.
- Add safety stock for uncertain demandSize the safety stock and reorder point for a target cycle service level when daily demand is normally distributed, and explain what the service level does and does not promise.
- Handle uncertain lead times and measure service by fill rateSize safety stock when lead times vary as well as demand, and calculate the fill rate that a reorder point achieves.
- Set the reorder point when demand and lead time are known
- Calculate target levels and order quantities when stock is checked at fixed intervals, and choose between continuous and periodic review for a given item and service target.
- Calculate order quantities in a periodic review systemSet the target inventory level for a fixed review interval and a cycle service level, and work out each order as the gap between the target and the inventory position.
- Choose between continuous and periodic reviewCompare the two review systems on cost, safety stock and practicality, and recommend a policy for an item with a given value, supplier and service target.
- Calculate order quantities in a periodic review system
- Choose how much to order for a single selling period by balancing the cost of running short against the cost of leftovers, for discrete and normally distributed demand.
- Balance underage and overage costs with the critical ratioRecognize single-period decisions, calculate the underage and overage costs and the critical ratio, and find the best order quantity from a discrete demand distribution.
- Find the newsvendor order quantity for normally distributed demandTurn the critical ratio into a z value, calculate the best order quantity when demand is normal, and explain how margins and uncertainty move the answer.
- Balance underage and overage costs with the critical ratio
Inventory Management study guide
1Understand the stock an operation needs
A stock decision starts with the job the stock must do. Materials waiting for production, spare parts and goods ready for sale all use money and space, but a shortage can interrupt work or lose a customer. Learn to describe these roles, track stock with the right measures and separate the costs that change with an ordering decision. Then use annual usage value to focus attention on the items with the greatest financial importance.
1.1 Identify stock and track what is available
Inventory is material or goods held for later use or sale. A hospital holds medicine; a manufacturer holds parts and finished products. The purpose of a stock item helps explain why it is there and what would happen if it ran out.
Name the type and the job
The main inventory types describe where an item sits in the operation:
| Type | What it contains |
|---|---|
| Raw materials and purchased parts | Inputs waiting to be used in production |
| Work-in-process (WIP) | Items that have entered production but are unfinished |
| Maintenance, repair and operating supplies (MRO) | Spares, lubricants, gloves and other supplies that keep work going |
| Finished goods | Completed products ready for customers |
The function describes why stock is held. Cycle stock comes from ordering or making batches. Safety stock covers unexpected demand or delivery delays. Anticipation stock is built before a known peak. Pipeline stock is traveling between locations. Decoupling stock lets one production stage continue when another slows or stops. Buying ahead may also secure a discount or avoid an announced price increase.
A bicycle maker uses 40 tires a day and receives 400 every 10 working days. Stock falls from 400 to zero between receipts, giving about 200 tires of average cycle stock. An extra 40 tires for late deliveries are safety stock. Tires on a truck are pipeline stock; frames welded in winter for spring sales are anticipation stock.
Decide where demand comes from
Independent demand comes from customers and must be forecast. Dependent demand follows from another item's production plan. Making 500 bicycles requires 1,000 wheels, so wheel requirements can be calculated. The order models here address independent demand; dependent requirements are planned through material requirements planning.
Count commitments as well as shelves
The inventory position accounts for stock already ordered and demand already promised:
With 120 units on hand, 400 ordered and 30 backordered, the position is 490 units. The shelf count alone would suggest a much greater need to order. A backorder reduces what remains available to serve new demand even though the goods have not yet left the shelf.
Read inventory performance
Turnover compares annual cost of goods sold with average inventory value. Days of supply compares average inventory value with daily cost of goods sold. Use cost values on both sides, not sales revenue on one side and cost on the other.
With annual cost of goods sold of $3,600,000 and average inventory of $450,000:
Using 365 days, days of supply are about 45.6. Higher turnover means less money tied up for a given sales flow. Very high turnover can also accompany stockouts, so service and comparable operations matter when judging it. Cutting stock without making demand, deliveries or setups more reliable can leave production idle or customers waiting.
Key Takeaways
- Inventory types describe its stage or use; inventory functions explain why it is held.
- Independent demand is forecast; dependent demand is calculated from a production plan.
- Inventory position adds outstanding orders and subtracts backorders from on-hand stock.
- Turnover and days of supply use inventory and goods sold valued at cost.
- Judge stock reductions alongside their effect on service and production continuity.
1.2 Separate the costs an order changes
An inventory decision changes several costs at once. A large delivery spreads the work of ordering across more units, but leaves more stock waiting to be used. To compare choices, identify the cost driver and its unit: per item, per order or per year.
Holding cost
Holding cost, written , is the cost of keeping one unit for a period. Annual holding cost includes the cost of capital, space, handling, insurance, relevant taxes and expected losses from spoilage, damage, theft or obsolescence. Capital cost reflects interest or the return the money could earn elsewhere.
A holding rate converts unit cost into a money amount:
For a $25 item and a 20% annual rate, holding cost is $5 per unit per year. Entering 20 or 0.20 as the money cost would confuse the rate with the result. Many firms estimate annual rates at roughly 20% to 40%; the appropriate estimate comes from the costs of the actual operation. Capital is often the largest component, so expensive stock commonly costs more to carry.
Ordering and setup costs
Ordering cost is the fixed cost of one order. It can include preparing the purchase order, follow-up work, receipt and inspection, invoice processing and a fixed delivery fee. The purchase price of each item is separate: doubling an order's quantity doubles the goods purchased, but does not necessarily double the paperwork.
For internal production, setup cost plays the same role. A changeover may require labor, stop output and create start-up scrap. These costs occur when a run starts, so fewer, larger runs reduce the number of setups.
Shortages and purchases
A shortage cost arises when stock cannot meet demand. It may be lost margin, rush shipping, backorder handling, idle equipment or lost future business. These effects can be difficult to price. A service target gives planners another way to decide how much protection to hold.
Annual purchase cost is unit price times annual demand. At a fixed price, changing the batch size leaves this annual cost unchanged. A quantity discount changes that conclusion: the price then depends on the order size, so purchase cost must enter the comparison.
Classify a purchase decision
For a café buying coffee beans, a $30 fixed delivery fee is ordering cost. Interest, extra storage and beans going stale are holding costs. A customer leaving because coffee is unavailable creates shortage cost. The price per kilogram is purchase cost.
Include only costs the decision changes. Rent that must be paid for an existing warehouse regardless of stock does not belong in the relevant holding cost. Extra space rented for a larger order does. Larger batches lower annual ordering cost but raise average inventory and holding cost; extra safety stock raises holding cost while reducing expected shortages. Match the time units before adding costs: a monthly demand rate and an annual holding charge need conversion to a common period.
Key Takeaways
- Convert a holding rate into money per unit per year before using it as holding cost.
- Ordering and setup costs are charged per order or production run.
- Include annual purchase cost when quantity changes the unit price.
- Compare costs that change with the decision, using matching periods.
1.3 Use ABC analysis to focus control effort
A planner cannot give every item the same attention. ABC analysis ranks items by annual usage value so that control effort follows financial importance. Usage value measures a flow through the operation over a year, not the inventory sitting in storage today.
Build the ranking
For each item, multiply annual demand in units by unit cost. Sort the resulting values from highest to lowest. Divide each value by the total, then add the shares down the sorted list to find cumulative shares. Choose class boundaries after seeing where value is concentrated.
| Item | Annual units | Unit cost | Annual usage value |
|---|---|---|---|
| P1 | 1,200 | $60.00 | $72,000 |
| P2 | 500 | $140.00 | $70,000 |
| P3 | 2,000 | $10.00 | $20,000 |
| P4 | 800 | $15.00 | $12,000 |
| P5 | 3,000 | $3.00 | $9,000 |
| P6 | 400 | $12.50 | $5,000 |
| P10 | 3,500 | $1.00 | $3,500 |
| P7 | 6,000 | $0.50 | $3,000 |
| P8 | 250 | $12.00 | $3,000 |
| P9 | 1,000 | $2.50 | $2,500 |
The total is $200,000. P1 and P2 contribute $142,000: 71% of value from 20% of the ten items. Treating these as A items leaves P3–P5 as B items, contributing $41,000 or 20.5%. The remaining five C items contribute $17,000 or 8.5%. The cumulative share is 71% after P2 and 91.5% after P5.
This illustrates the Pareto pattern: a small share of items often accounts for most usage value. Typical A classes contain about 15–20% of items and 70–80% of value; B classes about 30% of items and 15–25% of value; C classes about 50–55% of items and 5–10% of value. These are guides for choosing boundaries, not quotas to impose on every list.
Turn classes into control policies
A items warrant accurate forecasts, frequent or continuous review, close supplier contact and careful order and safety-stock settings. C items often suit a simple periodic, two-bin or min–max rule. B items receive an intermediate level of attention.
P7 has the greatest unit demand, but only $3,000 of usage value, placing it in C. P8 costs more per unit than P3, but its small demand also places it in C. Neither units alone nor price alone gives the ranking.
Check what value leaves out
A cheap component can stop an entire production line when missing. Long lead times, short shelf lives and operational importance can justify raising an item's control priority. A low class also need not mean a low service level: holding extra units of a cheap C item may cost little compared with the disruption of a shortage. Class tells the planner where to spend attention; service policy still reflects the consequences of running out.
Key Takeaways
- Rank items by annual demand times unit cost.
- Calculate cumulative value shares after sorting the items.
- Class boundaries guide management attention and can be adjusted.
- A cheap item may still need high availability if a shortage is costly.
- Usage value is an annual flow, not the value currently stored.
2Choose economical order and production quantities
Batch size determines how often an operation orders or sets up and how much stock waits between uses. Start with the basic cost curves and calculate the economic order quantity, then test how sensitive the result is to changing inputs. Gradual production changes the average stock, while discounts change the purchase cost. Each case needs its own cost comparison, with time periods, prices and feasible quantities kept consistent.
2.1 Build and read the inventory cost curves
The economic order quantity, or EOQ, minimizes annual ordering plus holding cost. Its basic model assumes known, constant demand and lead time, instant receipt of each complete order, no quantity discounts and no shortages. Ordering and holding are the only costs that change with batch size.
Start with the stock pattern
Each delivery raises inventory to the order quantity . Constant demand then reduces it steadily to zero just as the next delivery arrives. The resulting sawtooth has average stock . Holding cost applies to that average, not the maximum immediately after receipt.
Let be annual demand, fixed cost per order and annual holding cost per unit. Dividing demand by batch size gives the number of orders per year. The costs are:
As quantity increases, annual ordering cost falls because fewer orders are needed. Holding cost rises in a straight line because average stock increases in direct proportion to quantity.
Add costs at each quantity
With annual demand of 10,000 units, $40 per order and $5 per unit per year, the comparison is:
| Order quantity | Annual ordering | Annual holding | Total |
|---|---|---|---|
| 100 | $4,000.00 | $250.00 | $4,250.00 |
| 200 | $2,000.00 | $500.00 | $2,500.00 |
| 300 | $1,333.33 | $750.00 | $2,083.33 |
| 400 | $1,000.00 | $1,000.00 | $2,000.00 |
| 500 | $800.00 | $1,250.00 | $2,050.00 |
| 600 | $666.67 | $1,500.00 | $2,166.67 |
| 800 | $500.00 | $2,000.00 | $2,500.00 |
For example, ordering 400 units requires 25 orders. Their annual cost is $1,000. Average stock is 200 units, also costing $1,000 annually. The total is $2,000.
Read the minimum correctly
Plot quantity on the horizontal axis and annual cost on the vertical axis. The falling ordering curve and rising holding line cross at 400. The total curve is their vertical sum: it is U-shaped and reaches its minimum above that crossing. The minimum is not an intersection between the total curve and one of its components.
In a spreadsheet, put quantities in column A, ordering cost in B, holding cost in C and their sum in D. Plot all three cost columns against A. Smaller quantity increments near the bottom improve the estimate of the best quantity.
The curve is fairly flat near the minimum. Moving from 400 to 500 raises cost by 2.5%; moving to 300 raises it by about 4.2%. Equal percentage moves above and below the optimum have different effects because ordering cost rises sharply at small quantities. Fixed-price annual purchases stay the same across the table, so adding them would raise the entire total curve without moving its minimum.
Key Takeaways
- Basic EOQ assumes constant known demand, instant replenishment and no shortages or price breaks.
- Average cycle stock is half the order quantity.
- Annual ordering cost falls as quantity rises; annual holding cost rises.
- The total curve is the sum of the two component costs.
- The optimum occurs where annual ordering and holding costs are equal.
- Fixed-price purchase cost does not move the optimum.
2.2 Calculate EOQ and assess a practical quantity
The cost-curve crossing gives a direct formula for the best order quantity. Equate annual ordering and holding costs, then solve for the positive quantity:
The same minimum follows by setting the cost derivative to zero: .
Calculate the quantity and its consequences
Annual demand is 10,000 units, ordering cost is $40, unit cost is $25 and the annual holding rate is 20%.
- Convert the rate to money: dollars per unit per year.
- Substitute: units.
- Find order frequency: orders per year.
- With 250 working days, the interval is working days.
- Annual ordering cost is . Average stock is 200 units, so holding also costs $1,000. Total relevant annual cost is $2,000.
A shortcut for minimum cost is . Average cycle stock ties up dollars. This investment is separate from the annual holding charge on it.
Match units before substitution
If demand is 800 units per month and holding cost is annual, first use units per year. Leaving demand monthly makes the answer too small by a factor of about 3.46. Also keep the goods' price out of : ordering cost is the fixed cost of placing one order, not the amount spent on the items.
Understand the square root
Demand and ordering cost enter under a square root. If demand grows 40%, EOQ grows by , about 18%, to roughly 473 units. Doubling ordering cost multiplies EOQ by about 1.41, not 2. Holding cost works in the opposite direction: a higher carrying cost makes smaller orders economical.
For a proposed quantity, the cost penalty can be found without rebuilding the full table:
At 500 instead of 400, this becomes : only 2.5% above minimum. That flatness makes reasonable estimates of ordering and holding costs useful even when they are imperfect.
Check practical restrictions
Round to whole units or a pack multiple. Compare the costs of the nearest feasible quantities if the choice is close. The formula's exact output does not override a supplier's case size.
A different stock pattern needs a different model. Gradual replenishment changes holding cost; price breaks require purchase-cost comparisons. Uncertain demand or lead time requires safety stock for the chosen service target. A single selling season with discounted leftovers calls for a newsvendor decision.
Key Takeaways
- Calculate holding cost in money before substituting into EOQ.
- Use the same period for demand and holding cost.
- EOQ responds to square roots of input changes.
- Compute order frequency and timing from the chosen quantity.
- Compare nearby practical quantities using their total cost.
2.3 Size a production run when stock arrives gradually
During a production run, finished units arrive while customers or the next process are already using them. Stock builds more slowly than production output. The production order quantity (POQ) model, also called economic production quantity, accounts for this overlap.
Find the stock that actually accumulates
Let production rate be and demand rate , measured over the same time unit, with . Stock increases at the net rate . A run producing units lasts days, giving:
After production stops, demand drains the stock until the next run. The basic assumptions of constant known demand, fixed costs and no shortages still apply; receipt is gradual instead of instantaneous.
Balance setup and holding
Annual setup cost remains , but annual holding cost becomes . Setting these costs equal gives:
The factor is less than one. Each run can therefore be larger than an instant-delivery EOQ with the same demand and costs, because some of the output is consumed before it can accumulate.
Work through a run
A line serves annual demand of 10,000 units over 250 working days. Daily demand is 40 units and production is 100 units per day. Setup costs $54 per run and annual holding costs $5 per unit.
The accumulation factor is . Then:
The run lasts days. During those six days, 240 units are used and 360 remain. Maximum stock is 360, average stock is 180, and the full cycle lasts working days. The nonproduction portion lasts nine days as stock falls from 360 to zero.
Annual setup cost is dollars. Holding cost is dollars, for a total of $1,800. About 16.7 runs are needed per year. Charging holding cost on 300 units, half the run size, would overstate the stock actually held.
Compare rates and setup improvements
Instant delivery with the same inputs gives an EOQ of about 465 units. Gradual production gives 600, about 1.29 times as much. The comparison concerns run size; its maximum stock is still only 360.
Halving setup cost divides the economical run size by , taking it from 600 to about 424 units. Shorter, cheaper changeovers make smaller runs economical. Keep annual demand in the numerator and matched daily rates inside . If production cannot exceed demand, stock cannot rebuild during a run, so this repeating build-and-drain pattern cannot operate.
Key Takeaways
- Gradual replenishment lets demand use some units during production.
- Production must exceed demand, with both rates in matching units.
- Maximum stock is run size times the accumulation factor; average stock is half that.
- At the POQ optimum, annual setup cost equals annual holding cost.
- Lower setup cost makes smaller economical production runs possible.
2.4 Compare the full cost of quantity discounts
A lower price can justify a larger order, but the cheapest unit price need not give the lowest annual cost. An all-units discount applies the lower price to every unit in an order that reaches the required quantity. The purchase saving must be compared with ordering and holding costs.
Build feasible candidates
Use annual demand , ordering cost and the price available at each quantity. If holding cost is a rate of price, recalculate for each price range. Total annual cost is:
For each range, calculate its EOQ. Keep it if it lies within the range; raise it to the minimum quantity if it lies below the range. If it lies above the range, discard that price because the quantity already qualifies for a lower price. Then compare the feasible candidates' full costs.
Evaluate three price levels
Demand is 8,000 units annually, ordering costs $60 and the holding rate is 25%. Prices are $10.00 for orders of 1–999, $9.60 for 1,000–2,499 and $9.45 for 2,500 or more.
| Price | Annual holding per unit | EOQ, approximately | Candidate |
|---|---|---|---|
| $10.00 | $2.50 | 620 | 620 |
| $9.60 | $2.40 | 632 | 1,000 |
| $9.45 | $2.3625 | 637 | 2,500 |
The second EOQ cannot buy at $9.60 because 632 units do not reach 1,000. The same issue raises the third candidate to 2,500.
| Candidate | Annual purchases | Annual ordering | Annual holding | Total |
|---|---|---|---|---|
| 620 | $80,000 | $774.19 | $775.00 | $81,549.19 |
| 1,000 | $76,800 | $480.00 | $1,200.00 | $78,480.00 |
| 2,500 | $75,600 | $192.00 | $2,953.13 | $78,745.13 |
Ordering 1,000 gives the lowest annual cost. Moving to 2,500 saves $1,200 in annual purchases and $288 in ordering, but adds $1,753.13 in holding. The net increase is $265.13.
Keep the price rule attached to the calculation
An EOQ is only a candidate if its price is available at that quantity. Leaving purchase cost out hides the main benefit of a discount. Using one holding cost for every price also distorts the comparison when holding cost is a percentage of item value.
If holding cost is a fixed money amount per unit per year, all ranges share the same unconstrained EOQ; price breaks still generate additional candidates. Check storage space, shelf life and obsolescence before accepting a large order. An incremental discount, which lowers the price only on units above a break, has a different purchase-cost calculation from the all-units schedule used here.
Key Takeaways
- All-units discounts change the price of every unit in a qualifying order.
- Compare purchase, ordering and holding costs at feasible candidate quantities.
- Recalculate holding cost at each price when it is a percentage of price.
- The largest discount can cost more overall because of extra stock.
3Choose when to reorder and how much protection to hold
An economical batch size does not tell a planner when to place the order. Goods must last until replenishment arrives, and demand or delivery delays can use up that cover sooner than expected. Set the reorder point first for known demand, then add safety stock for a chosen cycle service level. Where both demand and lead time vary, combine their uncertainty and distinguish the probability of a stockout from the number of units customers must wait for.
3.1 Set the reorder point using inventory position
A continuous review system updates inventory position after each receipt and withdrawal. When the position falls to the reorder point (ROP), the operation orders a fixed quantity, often its EOQ. Quantity answers how much to order; the reorder point answers when, expressed as a stock level.
Cover the time until receipt
Lead time runs from placing the order until goods are available to use. It includes supplier processing, transport, receiving and inspection. With known constant demand and lead time, the reorder point equals demand during that time:
Here is demand per day and is lead time in days. Reordering must happen before the shelf is empty because demand continues while the order is being filled.
Annual demand of 10,000 units over 250 working days gives units per working day. A six-working-day lead time requires units. With an order size of 400, place an order for 400 whenever inventory position reaches 240. The 240 units cover consumption until the receipt arrives.
Use one clock
A lead time of two working weeks means ten working days for a five-day operation. At 40 units per day, the reorder point is 400 units. Multiplying 40 by two would treat weeks as days and leave only two days of cover. Convert calendar and working periods carefully: a daily forecast and the lead-time count must describe the same operating schedule.
Allow more than one outstanding order
Lead time can exceed the interval between orders. At 40 units per day, a 400-unit order lasts ten working days. If lead time is 14 days, the reorder point is 560 units, exceeding the order size.
That is workable because the trigger uses inventory position. With 160 units on hand and a 400-unit order outstanding, position is . Place the next order. Adding that new order raises position to 960, so the same shelf count does not trigger another order immediately. The earlier receipt later moves units from on order to on hand without changing total position.
Using only on-hand stock would lose the record of goods already coming. It could trigger duplicate orders or make a reorder point above the maximum shelf stock appear impossible.
Apply a simple physical trigger
A two-bin system makes the reorder signal visible. When the working bin empties, place an order and draw from the reserve bin, which holds enough to cover lead-time demand. This suits inexpensive items that do not need elaborate monitoring.
The deterministic reorder point contains no extra protection. For normally distributed lead-time demand, a trigger at the mean covers only about half the cycles without a shortage. Safety stock raises the trigger above expected demand when a higher cycle service level is required.
Key Takeaways
- The reorder point covers demand until an order becomes available.
- Use matching time units for demand and lead time.
- Trigger orders from inventory position, including outstanding orders and backorders.
- A reorder point can exceed the order quantity when lead time is long.
3.2 Add safety stock for uncertain demand
A forecast gives expected demand, but actual demand can be higher before the delivery arrives. Safety stock is the extra stock above average lead-time demand. It raises the reorder point:
The cycle service level (CSL) is the probability of completing one replenishment cycle without a stockout. A 95% CSL allows stockouts in about 5% of cycles over time. It counts cycles, not the fraction of units supplied immediately.
Match protection to uncertainty
For normally distributed lead-time demand:
The value is the standard normal percentile for the chosen CSL. Useful values are 1.282 for 90%, 1.645 for 95%, 1.960 for 97.5%, 2.326 for 99% and 3.090 for 99.9%.
With a fixed lead time and independent daily demand errors of equal standard deviation:
Variances add across days. Standard deviations therefore grow with the square root of the number of days. Multiplying a daily standard deviation by lead time would overstate this uncertainty.
Work out the buffer and trigger
Mean demand is 40 units per day, daily error standard deviation is 8 units and lead time is nine days. Average lead-time demand is 360 units. Its standard deviation is units. For 95% CSL:
Round safety stock up to 40 whole units. The reorder point is units. With a 400-unit order quantity, average stock is units under the usual cycle-stock approximation.
Price a higher service target
For the same item, 99% needs about 55.8 units of buffer, rounded up to 56. The reorder point becomes 416. At 99.9%, about 74.2 units round up to 75 and the trigger becomes 435. At $5 holding cost per unit per year, these buffers cost $200, $280 and $375 annually for the three service targets. The last increments of service require increasing stock; a normal distribution has no finite upper bound, so finite safety stock cannot give exactly 100% CSL.
Use forecast errors, and name the service measure
The relevant variation is demand that differs from the forecast. If predictable seasonality is already in the forecast, it should not also be treated as random error. With roughly normal errors, a daily MAD of 6.4 gives an estimated daily standard deviation of units.
At 25 cycles per year and 95% CSL, about 1.25 cycles per year are expected to have a shortage. A shortage cycle may miss just a few units; it does not lose all of that cycle's demand. The fill rate measures the share of units met directly from stock. Keep that separate from the probability used to choose .
Key Takeaways
- Safety stock adds protection above mean lead-time demand.
- For independent daily errors and fixed lead time, scale standard deviation by the square root of lead time.
- Choose the z value from the target cycle service level.
- Round safety stock up to preserve at least the target protection.
- Higher safety stock raises annual holding cost.
- A 95% cycle service level does not mean a 95% unit fill rate.
3.3 Combine delivery uncertainty and measure units filled
A supplier can vary in delivery time even when demand is steady. The buffer must account for the uncertainty that actually changes demand before receipt. After choosing the reorder point, measure service in the units that matter to customers.
Combine independent sources of variation
With constant daily demand and lead-time standard deviation , lead-time demand has standard deviation . At 40 units per day, mean lead time six days and lead-time standard deviation 1.5 days, this is 60 units. A 95% buffer is 98.7 units, rounded up to 99, making the reorder point 339.
When daily demand and lead time both vary independently, and daily demand errors are independent with a common standard deviation, use:
With daily mean 40, daily standard deviation 8, mean lead time six and lead-time standard deviation 1.5:
At 95%, safety stock is about 103.8, rounded up to 104. Mean demand is 240, so reorder at 344. Add variances before taking the square root; adding the two standard deviations would give about 79.6 and overstate the buffer. The delivery term contributes 3,600 of the 3,984 variance units. More reliable lead times would therefore address the larger source of uncertainty in this example.
Distinguish events from units
The fill rate is the fraction of demand supplied immediately from stock. A cycle short by two units is a failed cycle for CSL, but contributes only two unfilled units to the fill-rate calculation.
For normally distributed lead-time demand, expected shortage per cycle is:
The standard normal loss function is . Here is the normal density and its cumulative probability. Read the loss function from a table or calculate it with statistical software. It measures expected excess beyond the stock threshold, not merely the chance of crossing it.
For the continuous-review backorder model, use:
At , and , the loss function is about 0.0209. Expected shortage is about 0.50 units per cycle. Fill rate is about 99.87%, even though CSL is 95%. Over 25 cycles, about 12.5 of 10,000 demanded units wait for stock.
At the same CSL and lead-time uncertainty, a larger quantity raises this fill rate: expected shortage per cycle stays the same but there are fewer replenishment cycles per year. It also raises cycle stock. A promise to customers must therefore specify whether service means cycles without any shortage or units filled immediately.
Key Takeaways
- When both demand and lead time vary independently, add their variance contributions.
- Compare the variance terms to see which source of uncertainty matters most.
- The normal loss function measures expected units short after scaling by lead-time demand standard deviation.
- In the backorder model, fill rate equals one minus expected shortage per cycle divided by order quantity.
- At a fixed CSL, a larger order quantity raises fill rate and cycle stock.
4Order at scheduled reviews and choose a policy
Some suppliers accept orders whenever they are needed; others deliver on fixed days or offer savings when items travel together. A review policy has to fit that schedule as well as the item’s value and shortage risk. Calculate an order-up-to target for scheduled reviews, account for existing orders and compare the extra safety stock with savings in ordering, transport or counting. A min–max rule adds a threshold that can prevent frequent small orders.
4.1 Calculate a periodic review target and order
A periodic review system checks inventory position every fixed interval . At each review, the order restores the position to a target . Timing is fixed; the quantity changes with demand since the previous review.
Protect until the next order can arrive
An order placed now must cover demand until the delivery from the next review arrives. The next review is days away and its order then takes another days. This makes the protection interval , longer than the lead time alone.
With constant lead time and independent daily demand errors of equal standard deviation, the target for a normal-demand CSL is:
The first term covers average demand. The second covers forecast error over the same protection interval. Using for the mean but only for the buffer would underprotect the system between reviews.
Set a weekly target
A shop open every day sells an average of 40 units daily, with daily error standard deviation 8. Reviews are seven days apart and delivery takes three days. For 95% CSL, use and a ten-day protection interval.
Average demand is units. Safety stock is units. The target is about 441.6, rounded up to 442 whole units.
At a review with 150 on hand and nothing on order, order units. If 100 units are already ordered, inventory position is 250, so order only 192. Counting just the shelf stock would order the same requirement twice.
Subtract the whole position
The order quantity is:
Outstanding orders reduce the new order; backorders increase it. A position already at or above target needs no order. The target is the position after ordering, not the quantity that must physically be on the shelf that day.
Understand the interval choice
Supplier schedules, combined delivery routes or counting costs often set the review interval. An EOQ can suggest a starting interval through . A 400-unit EOQ at 40 units per day suggests ten working days.
With no variability, the target is simply . Once the system is operating steadily, each scheduled order replaces the units used since the preceding review. A starting stock surplus or outstanding backorders can make an individual order differ.
For the shop's three-day lead time, continuous review needs about 22.8 units of safety stock, rounded to 23. Weekly review needs about 42 because a shortage can develop before the next review even notices it. The longer protection interval explains the extra buffer.
Key Takeaways
- Periodic review fixes the review interval and varies the order quantity.
- The protection interval includes both the review interval and lead time.
- The target covers mean demand plus safety stock over that full interval.
- Subtract inventory position, including outstanding orders and backorders.
- Order zero if the position is already at or above target.
4.2 Choose a review system that fits the item
An inventory policy must work with the supplier, the item and the information available. Compare systems at the same service target, then weigh stock costs against the work and transport costs of running the policy.
Compare what stays fixed
| Feature | Continuous review | Periodic review |
|---|---|---|
| Fixed element | Order quantity | Review interval |
| Variable element | Time between orders | Order quantity |
| Trigger | Position reaches reorder point | Scheduled review |
| Information | Up-to-date transactions | Position at each review |
| Protection interval | Lead time | Review interval plus lead time |
| Typical advantage | Less safety stock for the same CSL | Combined orders and scheduled deliveries |
Continuous review suits valuable A items, critical components with high shortage costs and items already tracked automatically. It works well when suppliers accept orders at variable times. Periodic review suits a group of items bought from one supplier, a fixed delivery route or low-value items that are costly to check individually.
Put a cost on the extra protection
For mean daily demand of 40, daily error standard deviation 8, lead time three days and 95% CSL, continuous review needs 23 units of safety stock. With weekly reviews, periodic review needs 42. At $5 per unit per year, the rounded buffers cost $115 and $210 respectively.
The extra $95 per year is a cost of scheduled review for this item, not a complete policy verdict. If grouping orders saves more than this in ordering, counting or transport and other costs are equal, periodic review can have the lower total cost. Use the same CSL and forecast assumptions on both sides of the comparison.
Use a threshold to skip small orders
A min–max system combines scheduled reviews with a minimum trigger. At a review, order up to the maximum only if inventory position is at or below the minimum. In notation , the second symbol denotes the maximum stock position, not the ordering cost used in EOQ.
With a minimum of 200 and maximum of 600, position 240 triggers no order. Position 180 triggers an order for units. At exactly 200, the rule triggers an order for 400. Skipping replenishment above the minimum avoids many small orders.
Match attention to consequences
A items usually justify continuous review and carefully maintained settings. C items often suit periodic, two-bin or min–max rules, sometimes with generous safety stock because each extra unit costs little. A cheap part that stops production still deserves strong protection. B items can use either policy depending on suppliers and costs.
Barcode scanning, RFID and ERP software make transaction tracking easier and can create order proposals automatically. The planner still chooses and checks the order quantity, reorder point or target, and safety stock. Accurate tracking makes a rule executable; the settings determine whether it gives suitable cost and service.
Key Takeaways
- Continuous review fits valuable or critical items and reliable transaction records.
- Periodic review can save ordering and transport cost by grouping purchases.
- Compare both policies at the same named service target.
- Periodic min–max orders up to a maximum only when position is at or below a minimum.
- ABC class guides attention; shortage consequences also shape the policy.
- Automatic ordering still needs checked parameters.
5Choose one order for a selling season
A one-time order has a different risk from regularly replenished stock. Unsold goods may lose value after the event or season, while missed demand cannot be recovered with another delivery. Price those two errors per unit, then use their balance to choose a demand percentile. A discrete demand table gives the quantity directly; a normal forecast requires a z value. The resulting order can lie above or below average demand.
5.1 Balance missed sales and leftovers
The newsvendor model chooses a single order before demand is known. It fits one selling period in which unmet demand is lost and leftovers cannot later be sold at full price. Fresh goods for a day, event merchandise and seasonal fashion all create this decision.
Price the two errors
The underage cost is the loss from having one unit too few. It is selling price minus unit cost, plus any additional lost goodwill. The overage cost is the loss from having one unit too many: unit cost minus salvage value, plus any disposal cost. Salvage is the money recovered from a leftover unit.
A festival cake sells for $30, costs $12 and can be sold to staff for $4 after the festival. Missing a sale loses $18 of margin; a leftover loses $8. The full selling price is not the underage loss because the unmade cake also saves its production cost.
Choose the demand percentile
Adding another unit pays when its expected selling benefit exceeds its expected leftover loss. For an existing quantity , compare with . This balance gives the critical ratio:
For the cakes, . Choose the smallest demand quantity whose cumulative probability reaches the ratio.
| Demand | Probability | Cumulative probability |
|---|---|---|
| 20 | 0.10 | 0.10 |
| 21 | 0.15 | 0.25 |
| 22 | 0.20 | 0.45 |
| 23 | 0.25 | 0.70 |
| 24 | 0.15 | 0.85 |
| 25 | 0.10 | 0.95 |
| 26 | 0.05 | 1.00 |
At 22, cumulative probability is 0.45, below 0.692. At 23 it reaches 0.70, so order 23 cakes. Compare the cumulative column, not the probability of exactly one demand outcome.
Check the economic result
For any demand outcome, profit equals sales revenue plus salvage revenue minus the cost of all cakes made. Weight those profits by their demand probabilities.
For an order of 23, demand of 20 leaves three cakes. Profit is dollars. At demand 21 it is $362, at 22 it is $388, and at any demand of 23 or more all cakes sell for profit of $414. The expected profit is:
Orders of 22 and 24 give expected profits of $386.90 and $393.00. The near tie between 23 and 24 shows how little a nearby choice can cost.
With continuous demand, the probability of meeting all demand at the optimum equals it. With discrete demand, the selected cumulative probability can exceed it, as 0.70 exceeds 0.692 here. Higher underage cost relative to overage cost moves the order upward; a greater loss on leftovers moves it downward.
Ordering the average or most likely demand ignores these unequal losses. Forgetting salvage overstates the overage cost and pushes the order too low. Goods that carry forward without loss belong to a repeating replenishment decision instead of this one-period leftover trade-off.
Key Takeaways
- Newsvendor decisions have one selling period, lost demand and reduced-value leftovers.
- Underage cost is missed margin plus any additional shortage penalty.
- Overage cost is unit cost minus salvage plus disposal cost.
- The critical ratio selects the economically appropriate demand percentile.
- For discrete demand, choose the smallest quantity whose cumulative probability reaches the ratio.
5.2 Convert the critical ratio into a normal order quantity
When one-period demand is reasonably normal, its critical percentile can be calculated from a mean and standard deviation. Costs still choose the percentile; the forecast tells where that percentile lies in units.
Turn probability into stock
Let be forecast mean demand and the standard deviation of demand around that forecast. Find the standard normal value satisfying , then calculate:
Use the cumulative probability , not its complement. A ratio above 0.5 gives a positive z value and an order above the mean. A ratio below 0.5 gives a negative value and an order below the mean.
Work through a seasonal order
Winter coats cost $60, sell for $150 and clear for $40. Underage cost is $90 and overage cost is $20. Thus and . With mean demand of 1,000 coats and standard deviation 200:
This choice gives about an 81.8% chance of meeting the season's entire demand in the continuous normal approximation. The remaining roughly 18.2% of seasons have a shortage; this percentage counts seasons, not the share of demand left unfilled.
Compare changed costs
If coats instead sell for $75 and clear for $20, while cost stays $60, underage cost becomes $15 and overage $40. The ratio is about 0.273, with . The order becomes roughly 879 coats. The negative adjustment reflects the greater cost of leftovers relative to missed margin.
If the original high-price case also loses $10 in future business for each missed sale, underage cost rises to $100. The ratio becomes about 0.833, z about 0.967 and the order about 1,193 coats. Add this goodwill effect to the money loss per unit, not to the percentage margin.
Interpret changing uncertainty
The sign of z determines what greater forecast uncertainty does. Above a 0.5 ratio, a larger standard deviation raises the order; below 0.5, it lowers it. At exactly 0.5, z is zero and the optimum is the mean regardless of the standard deviation. More uncertainty therefore does not always justify more units in a single-period decision.
Check forecast errors or past demand for a roughly normal shape. Also check that the mean is several standard deviations above zero so negative demand has negligible modeled probability. A positive mean alone does not establish normality. Round the calculated quantity to a whole unit or practical pack size; compare nearby feasible quantities when that choice matters. The adjustment resembles a safety buffer, but its percentile comes from underage and overage costs, not a separate management service target.
Key Takeaways
- Find z from the cumulative probability equal to the critical ratio.
- Normal one-period quantity equals mean demand plus z times its standard deviation.
- A critical ratio below one-half gives an order below mean demand.
- Extra lost goodwill raises underage cost and the order quantity.
- The effect of uncertainty depends on the sign of z.
- Check the normal shape and the risk of negative modeled demand.
Inventory Management examples
1Read an operation’s inventory
10 steps
- 1IntroductionStart with the purpose of stock
A repair business holds parts so repairs can start without waiting for each supplier delivery. Some parts arrive in batches; others are held as a buffer because urgent repairs are unpredictable. Each reason is a stock function, and it shapes how much to hold.
Follow three questions: what job does the stock do, what costs change when the buyer orders more, and which items deserve the closest attention (the work of ABC analysis)?
- 2ExplanationName the type and its function
A stock type describes the item’s stage or use: purchased parts, unfinished work, finished goods or MRO supplies. A stock function explains why it is held.
Cycle stock comes from batches. Safety stock covers surprises. Anticipation stock prepares for a known peak; pipeline stock travels between locations. Decoupling stock keeps one stage working when another stops.
- 3ChallengeIdentify two different buffers
The repair business stores extra motors for unexpected failures and builds finished replacement units before a scheduled summer shutdown. What function does each stock serve?
---reveal---
Extra motors are safety stock because failures are uncertain. Finished replacement units are anticipation stock because the shutdown is known in advance. Both may look like spare stock, but their purposes differ.
- 4ExampleInclude goods already ordered
A parts record shows 75 on hand, 200 on order and 20 backordered. The buyer’s inventory position is:
The outstanding receipt increases future availability; accepted demand still waiting for supply reduces it. A count of 75 alone would omit both commitments. Receiving the 200 later moves it from on order to on hand without changing position.
- 5ConnectionDistinguish a forecast from a requirement
Replacement pumps sold to independent repair customers need a demand forecast. Seals used in a planned pump assembly run follow from the number of pumps and seals per pump. That requirement is dependent demand.
For performance, compare goods sold at cost with average inventory at cost. Turnover counts annual turns; days of supply expresses the same stock in time at the average usage rate.
- 6ExplanationGive each cost its driver
A fixed fee for placing and receiving an order is ordering cost. Interest, extra space and expected deterioration belong to holding cost. Missed repair work, emergency shipping and lost goodwill are shortage costs. The price of each spare is purchase cost.
Check the unit attached to each amount. A fee per order and a price per item cannot be added as though they were the same input.
- 7ChallengeDecide what a larger order changes
A part costs $45, its annual holding rate is 20% and each order incurs $18 of processing work. What are H and S for the ordering model?
---reveal---
Holding cost is dollars per unit per year. Ordering cost is $18 per order. The $45 price is not added to S, because it is paid for each unit, not once per order.
- 8ExampleCompare annual usage values
Annual use is 600 motors at $50 and 8,000 washers at $0.25. Motors contribute $30,000 of annual usage value; washers contribute $2,000.
The washer quantity is larger, but motors carry more annual financial flow. ABC analysis sorts this demand-times-cost value, then builds cumulative percentage shares to choose management’s A, B and C boundaries.
- 9ChallengeRecommend attention and availability
Washers have a small annual usage value, but a missing washer prevents a repair from being finished. How should the buyer use the ABC result?
---reveal---
A simple control rule may suit this low-value item, but the shortage consequence supports strong availability. Extra safety stock may be inexpensive. ABC guides attention; it does not require poor service for every C item or replace a check of operational criticality.
- 10RecapUse three checks before choosing a rule
First identify the stock’s purpose and whether demand is independent or calculated from a plan. Then compare costs that change with the decision, keeping rates and money amounts distinct. Finally rank annual usage value and check criticality before assigning control effort.
Inventory position carries incoming orders and backorders into the decision; shelf stock alone cannot do that.
2Work from cost curves to an order quantity
17 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionChoose the model from the receipt pattern
- 2ExplanationBuild the two basic curves
- 3ChallengeCalculate a point on the graph
- 4ExampleFind the exact crossing
- 5ExampleTurn the quantity into a schedule
- 6ChallengePredict the effect of a cost change
- 7TipCompare feasible pack multiples
- 8ExplanationAccount for use during production
- 9ExampleCalculate the run quantity
- 10ExampleFind peak and average stock
- 11ChallengeCheck the annual production costs
- 12ExplanationAdd prices before judging a discount
- 13ExampleBuild the price candidates
- 14ExampleCompare the full annual totals
- 15ChallengeExplain why the cheapest price loses
- 16ChallengeChoose what must change in the model
- 17RecapRead quantity, stock and cost separately
3Build a reorder point and read its service
15 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionProtect the wait for delivery
- 2ExampleSet a known-demand trigger
- 3ChallengeAllow overlapping orders
- 4ExplanationChoose what a service target counts
- 5ExampleScale daily error to the whole wait
- 6ExampleAdd the buffer to the mean
- 7ChallengeRaise the service target
- 8ExplanationAccount for varying delivery duration
- 9ExampleAdd independent variance terms
- 10ChallengeFind the combined buffer and priority
- 11ExplanationMeasure shortage size with the loss function
- 12ExampleConvert units short to a fill rate
- 13Key InsightQuantity changes the exposure count
- 14ChallengeInterpret two service reports
- 15RecapKeep the uncertainty and service units clear
4Run a scheduled review and compare its cost
10 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionFit the order rule to the buying schedule
- 2ExplanationProtect until the next review’s receipt
- 3ExampleCalculate expected demand and its buffer
- 4ChallengeCount the pipeline before ordering
- 5TipHandle a position already above target
- 6ExplanationCompare the same service target
- 7ChallengeMake a policy recommendation
- 8ExplanationAdd a minimum trigger
- 9ChallengeConnect the stock count to the hybrid rule
- 10RecapChoose with timing, information and total cost
5Choose a one-period order from costs
11 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionPrice the risk of one more unit
- 2ExampleCalculate the two losses
- 3ExplanationConvert cost balance into probability
- 4ExampleAdd demand probabilities in order
- 5ChallengeExplain the discrete choice
- 6ExplanationUse a normal forecast for another item
- 7ExampleConvert the percentile into units
- 8ChallengeTest a changed cost balance
- 9Key InsightRead the sign before changing uncertainty
- 10ChallengeChoose the right response to better salvage
- 11RecapChoose the percentile before finding the quantity
Inventory Management practice questions
Set 1: Replenishment models and service measures10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Stock, costs and first ordering decisions10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Compare costs and diagnose stock policies10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Apply models across operating decisions10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Evaluate and improve inventory decisions10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
ABC analysis
All-units discount
Annual cycle-stock holding cost
Annual ordering cost
Annual usage value
Anticipation stock
B
Backorder
C
Class A item
Continuous review
Cost penalty
Critical ratio
Cumulative demand probability
Cumulative value share
Cycle service level
Cycle stock
D
Days of supply
Decoupling stock
Dependent demand
E
Economic order quantity
EOQ sensitivity
ERP order proposal
Expected shortage per cycle
F
Feasible candidate quantity
Fill rate
Forecast error
G
Grouped replenishment
H
Holding cost
Holding rate
I
Incremental discount
Independent demand
Inventory
Inventory position
Inventory turnover
L
Lead time
Lead-time demand
Lead-time demand standard deviation
Lead-time variability
M
Maximum production stock
Min–max policy
MRO supplies
N
Net stock accumulation rate
Newsvendor model
Normal demand percentile
Normal newsvendor quantity
O
One-period demand standard deviation
One-period forecast mean
Order frequency
Ordering cost
Overage cost
P
Periodic review
Pipeline stock
Price break
Production order quantity
Production run time
Protection interval
Purchase cost
R
Reorder point
Review interval
S
Safety factor z
Safety stock
Salvage value
Sawtooth stock pattern
Setup cost
Shortage cost
Standard normal loss function
T
Target level
Time between orders
Two-bin system
U
Underage cost
V
Variance contribution
W
Work-in-process
About this lesson