Inventory Management

Learn how operations decide how much stock to hold, how much to order and when. Start with the jobs inventory does, the costs it creates and ABC analysis. Then calculate economic order quantities, production run sizes and the effect of quantity discounts, set reorder points and safety stock for a target service level, run periodic review systems and choose between review policies. Finish with the newsvendor model for one-time orders of seasonal or perishable goods. Every method comes with worked numbers and the mistakes to avoid.

IntermediateLesson 6 of 9 in Operations Management Course

What you will learn

  1. Describe the jobs inventory does in an operation, name the costs that inventory decisions change, and use ABC analysis to decide which items deserve the closest control.
    • Describe the functions and types of inventory
      Name the kinds of inventory an organization holds, explain what each kind of stock is for, and track inventory with the measures that ordering decisions use.
    • Identify the costs of holding, ordering and running out
      Sort the costs of an inventory system into holding, ordering or setup, shortage and purchase costs, and explain how each one changes with the order quantity.
    • Rank items with ABC analysis to set control priorities
      Classify items by their annual usage value and use the classes to decide where forecasting, review and safety stock decisions need the most attention.
  2. Find the order or production quantity that minimizes annual inventory costs, read the answer from a cost graph and a formula, and adapt it when delivery is gradual or suppliers offer quantity discounts.
    • Build the total cost curve behind the economic order quantity
      State the assumptions of the economic order quantity model, write the annual ordering, holding and total cost as functions of the order size, and find the best quantity from a table or graph.
    • Calculate the EOQ and judge its sensitivity
      Compute the economic order quantity, the number of orders, the time between orders and the annual cost, and explain why small errors in the inputs change the cost very little.
    • Size production runs with gradual replenishment
      Use the production order quantity model when units arrive gradually during a production run, and compare its run size and costs with the basic EOQ.
    • Evaluate quantity discounts
      Decide whether to order enough to earn a lower price by comparing the total annual cost, including the purchase cost, at each price break.
  3. Decide when to reorder in a continuous review system, size safety stock for uncertain demand and lead times, and measure the service the stock provides.
    • Set the reorder point when demand and lead time are known
      Explain how a continuous review system works and calculate the reorder point from the demand rate and the lead time, including lead times longer than the order cycle.
    • Add safety stock for uncertain demand
      Size the safety stock and reorder point for a target cycle service level when daily demand is normally distributed, and explain what the service level does and does not promise.
    • Handle uncertain lead times and measure service by fill rate
      Size safety stock when lead times vary as well as demand, and calculate the fill rate that a reorder point achieves.
  4. Calculate target levels and order quantities when stock is checked at fixed intervals, and choose between continuous and periodic review for a given item and service target.
    • Calculate order quantities in a periodic review system
      Set the target inventory level for a fixed review interval and a cycle service level, and work out each order as the gap between the target and the inventory position.
    • Choose between continuous and periodic review
      Compare the two review systems on cost, safety stock and practicality, and recommend a policy for an item with a given value, supplier and service target.
  5. Choose how much to order for a single selling period by balancing the cost of running short against the cost of leftovers, for discrete and normally distributed demand.
    • Balance underage and overage costs with the critical ratio
      Recognize single-period decisions, calculate the underage and overage costs and the critical ratio, and find the best order quantity from a discrete demand distribution.
    • Find the newsvendor order quantity for normally distributed demand
      Turn the critical ratio into a z value, calculate the best order quantity when demand is normal, and explain how margins and uncertainty move the answer.

Inventory Management study guide

5 chapters

1

Understand the stock an operation needs

A stock decision starts with the job the stock must do. Materials waiting for production, spare parts and goods ready for sale all use money and space, but a shortage can interrupt work or lose a customer. Learn to describe these roles, track stock with the right measures and separate the costs that change with an ordering decision. Then use annual usage value to focus attention on the items with the greatest financial importance.

1.1 Identify stock and track what is available

Inventory is material or goods held for later use or sale. A hospital holds medicine; a manufacturer holds parts and finished products. The purpose of a stock item helps explain why it is there and what would happen if it ran out.

Name the type and the job

The main inventory types describe where an item sits in the operation:

TypeWhat it contains
Raw materials and purchased partsInputs waiting to be used in production
Work-in-process (WIP)Items that have entered production but are unfinished
Maintenance, repair and operating supplies (MRO)Spares, lubricants, gloves and other supplies that keep work going
Finished goodsCompleted products ready for customers

The function describes why stock is held. Cycle stock comes from ordering or making batches. Safety stock covers unexpected demand or delivery delays. Anticipation stock is built before a known peak. Pipeline stock is traveling between locations. Decoupling stock lets one production stage continue when another slows or stops. Buying ahead may also secure a discount or avoid an announced price increase.

A bicycle maker uses 40 tires a day and receives 400 every 10 working days. Stock falls from 400 to zero between receipts, giving about 200 tires of average cycle stock. An extra 40 tires for late deliveries are safety stock. Tires on a truck are pipeline stock; frames welded in winter for spring sales are anticipation stock.

Decide where demand comes from

Independent demand comes from customers and must be forecast. Dependent demand follows from another item's production plan. Making 500 bicycles requires 1,000 wheels, so wheel requirements can be calculated. The order models here address independent demand; dependent requirements are planned through material requirements planning.

Count commitments as well as shelves

The inventory position accounts for stock already ordered and demand already promised:

IP=on hand+on order−backorders

With 120 units on hand, 400 ordered and 30 backordered, the position is 490 units. The shelf count alone would suggest a much greater need to order. A backorder reduces what remains available to serve new demand even though the goods have not yet left the shelf.

Read inventory performance

Turnover compares annual cost of goods sold with average inventory value. Days of supply compares average inventory value with daily cost of goods sold. Use cost values on both sides, not sales revenue on one side and cost on the other.

With annual cost of goods sold of $3,600,000 and average inventory of $450,000:

turnover=3,600,000/450,000=8

Using 365 days, days of supply are about 45.6. Higher turnover means less money tied up for a given sales flow. Very high turnover can also accompany stockouts, so service and comparable operations matter when judging it. Cutting stock without making demand, deliveries or setups more reliable can leave production idle or customers waiting.

Key Takeaways

  • Inventory types describe its stage or use; inventory functions explain why it is held.
  • Independent demand is forecast; dependent demand is calculated from a production plan.
  • Inventory position adds outstanding orders and subtracts backorders from on-hand stock.
  • Turnover and days of supply use inventory and goods sold valued at cost.
  • Judge stock reductions alongside their effect on service and production continuity.

1.2 Separate the costs an order changes

An inventory decision changes several costs at once. A large delivery spreads the work of ordering across more units, but leaves more stock waiting to be used. To compare choices, identify the cost driver and its unit: per item, per order or per year.

Holding cost

Holding cost, written H, is the cost of keeping one unit for a period. Annual holding cost includes the cost of capital, space, handling, insurance, relevant taxes and expected losses from spoilage, damage, theft or obsolescence. Capital cost reflects interest or the return the money could earn elsewhere.

A holding rate I converts unit cost C into a money amount:

H=IC

For a $25 item and a 20% annual rate, holding cost is $5 per unit per year. Entering 20 or 0.20 as the money cost would confuse the rate with the result. Many firms estimate annual rates at roughly 20% to 40%; the appropriate estimate comes from the costs of the actual operation. Capital is often the largest component, so expensive stock commonly costs more to carry.

Ordering and setup costs

Ordering cost S is the fixed cost of one order. It can include preparing the purchase order, follow-up work, receipt and inspection, invoice processing and a fixed delivery fee. The purchase price of each item is separate: doubling an order's quantity doubles the goods purchased, but does not necessarily double the paperwork.

For internal production, setup cost plays the same role. A changeover may require labor, stop output and create start-up scrap. These costs occur when a run starts, so fewer, larger runs reduce the number of setups.

Shortages and purchases

A shortage cost arises when stock cannot meet demand. It may be lost margin, rush shipping, backorder handling, idle equipment or lost future business. These effects can be difficult to price. A service target gives planners another way to decide how much protection to hold.

Annual purchase cost is unit price times annual demand. At a fixed price, changing the batch size leaves this annual cost unchanged. A quantity discount changes that conclusion: the price then depends on the order size, so purchase cost must enter the comparison.

Classify a purchase decision

For a café buying coffee beans, a $30 fixed delivery fee is ordering cost. Interest, extra storage and beans going stale are holding costs. A customer leaving because coffee is unavailable creates shortage cost. The price per kilogram is purchase cost.

Include only costs the decision changes. Rent that must be paid for an existing warehouse regardless of stock does not belong in the relevant holding cost. Extra space rented for a larger order does. Larger batches lower annual ordering cost but raise average inventory and holding cost; extra safety stock raises holding cost while reducing expected shortages. Match the time units before adding costs: a monthly demand rate and an annual holding charge need conversion to a common period.

Key Takeaways

  • Convert a holding rate into money per unit per year before using it as holding cost.
  • Ordering and setup costs are charged per order or production run.
  • Include annual purchase cost when quantity changes the unit price.
  • Compare costs that change with the decision, using matching periods.

1.3 Use ABC analysis to focus control effort

A planner cannot give every item the same attention. ABC analysis ranks items by annual usage value so that control effort follows financial importance. Usage value measures a flow through the operation over a year, not the inventory sitting in storage today.

Build the ranking

For each item, multiply annual demand in units by unit cost. Sort the resulting values from highest to lowest. Divide each value by the total, then add the shares down the sorted list to find cumulative shares. Choose class boundaries after seeing where value is concentrated.

ItemAnnual unitsUnit costAnnual usage value
P11,200$60.00$72,000
P2500$140.00$70,000
P32,000$10.00$20,000
P4800$15.00$12,000
P53,000$3.00$9,000
P6400$12.50$5,000
P103,500$1.00$3,500
P76,000$0.50$3,000
P8250$12.00$3,000
P91,000$2.50$2,500

The total is $200,000. P1 and P2 contribute $142,000: 71% of value from 20% of the ten items. Treating these as A items leaves P3–P5 as B items, contributing $41,000 or 20.5%. The remaining five C items contribute $17,000 or 8.5%. The cumulative share is 71% after P2 and 91.5% after P5.

This illustrates the Pareto pattern: a small share of items often accounts for most usage value. Typical A classes contain about 15–20% of items and 70–80% of value; B classes about 30% of items and 15–25% of value; C classes about 50–55% of items and 5–10% of value. These are guides for choosing boundaries, not quotas to impose on every list.

Turn classes into control policies

A items warrant accurate forecasts, frequent or continuous review, close supplier contact and careful order and safety-stock settings. C items often suit a simple periodic, two-bin or min–max rule. B items receive an intermediate level of attention.

P7 has the greatest unit demand, but only $3,000 of usage value, placing it in C. P8 costs more per unit than P3, but its small demand also places it in C. Neither units alone nor price alone gives the ranking.

Check what value leaves out

A cheap component can stop an entire production line when missing. Long lead times, short shelf lives and operational importance can justify raising an item's control priority. A low class also need not mean a low service level: holding extra units of a cheap C item may cost little compared with the disruption of a shortage. Class tells the planner where to spend attention; service policy still reflects the consequences of running out.

Key Takeaways

  • Rank items by annual demand times unit cost.
  • Calculate cumulative value shares after sorting the items.
  • Class boundaries guide management attention and can be adjusted.
  • A cheap item may still need high availability if a shortage is costly.
  • Usage value is an annual flow, not the value currently stored.
2

Choose economical order and production quantities

Batch size determines how often an operation orders or sets up and how much stock waits between uses. Start with the basic cost curves and calculate the economic order quantity, then test how sensitive the result is to changing inputs. Gradual production changes the average stock, while discounts change the purchase cost. Each case needs its own cost comparison, with time periods, prices and feasible quantities kept consistent.

2.1 Build and read the inventory cost curves

The economic order quantity, or EOQ, minimizes annual ordering plus holding cost. Its basic model assumes known, constant demand and lead time, instant receipt of each complete order, no quantity discounts and no shortages. Ordering and holding are the only costs that change with batch size.

Start with the stock pattern

Each delivery raises inventory to the order quantity Q. Constant demand then reduces it steadily to zero just as the next delivery arrives. The resulting sawtooth has average stock Q/2. Holding cost applies to that average, not the maximum immediately after receipt.

Let D be annual demand, S fixed cost per order and H annual holding cost per unit. Dividing demand by batch size gives the number of orders per year. The costs are:

ordering=DS/Q,holding=QH/2 TC(Q)=DS/Q+QH/2

As quantity increases, annual ordering cost falls because fewer orders are needed. Holding cost rises in a straight line because average stock increases in direct proportion to quantity.

Add costs at each quantity

With annual demand of 10,000 units, $40 per order and $5 per unit per year, the comparison is:

Order quantityAnnual orderingAnnual holdingTotal
100$4,000.00$250.00$4,250.00
200$2,000.00$500.00$2,500.00
300$1,333.33$750.00$2,083.33
400$1,000.00$1,000.00$2,000.00
500$800.00$1,250.00$2,050.00
600$666.67$1,500.00$2,166.67
800$500.00$2,000.00$2,500.00

For example, ordering 400 units requires 25 orders. Their annual cost is $1,000. Average stock is 200 units, also costing $1,000 annually. The total is $2,000.

Read the minimum correctly

Plot quantity on the horizontal axis and annual cost on the vertical axis. The falling ordering curve and rising holding line cross at 400. The total curve is their vertical sum: it is U-shaped and reaches its minimum above that crossing. The minimum is not an intersection between the total curve and one of its components.

In a spreadsheet, put quantities in column A, ordering cost in B, holding cost in C and their sum in D. Plot all three cost columns against A. Smaller quantity increments near the bottom improve the estimate of the best quantity.

The curve is fairly flat near the minimum. Moving from 400 to 500 raises cost by 2.5%; moving to 300 raises it by about 4.2%. Equal percentage moves above and below the optimum have different effects because ordering cost rises sharply at small quantities. Fixed-price annual purchases stay the same across the table, so adding them would raise the entire total curve without moving its minimum.

Key Takeaways

  • Basic EOQ assumes constant known demand, instant replenishment and no shortages or price breaks.
  • Average cycle stock is half the order quantity.
  • Annual ordering cost falls as quantity rises; annual holding cost rises.
  • The total curve is the sum of the two component costs.
  • The optimum occurs where annual ordering and holding costs are equal.
  • Fixed-price purchase cost does not move the optimum.

2.2 Calculate EOQ and assess a practical quantity

The cost-curve crossing gives a direct formula for the best order quantity. Equate annual ordering and holding costs, then solve for the positive quantity:

DS/Q=QH/2⇒Q∗=2DS/H

The same minimum follows by setting the cost derivative to zero: −DS/Q2+H/2=0.

Calculate the quantity and its consequences

Annual demand is 10,000 units, ordering cost is $40, unit cost is $25 and the annual holding rate is 20%.

  1. Convert the rate to money: H=0.20×25=5 dollars per unit per year.
  2. Substitute: Q∗=2×10,000×40/5=160,000=400 units.
  3. Find order frequency: 10,000/400=25 orders per year.
  4. With 250 working days, the interval is 250/25=10 working days.
  5. Annual ordering cost is 25×40=1,000. Average stock is 200 units, so holding also costs $1,000. Total relevant annual cost is $2,000.

A shortcut for minimum cost is TC∗=2DSH. Average cycle stock ties up 200×25=5,000 dollars. This investment is separate from the annual holding charge on it.

Match units before substitution

If demand is 800 units per month and holding cost is annual, first use D=800×12=9,600 units per year. Leaving demand monthly makes the answer too small by a factor of about 3.46. Also keep the goods' price out of S: ordering cost is the fixed cost of placing one order, not the amount spent on the items.

Understand the square root

Demand and ordering cost enter under a square root. If demand grows 40%, EOQ grows by 1.4, about 18%, to roughly 473 units. Doubling ordering cost multiplies EOQ by about 1.41, not 2. Holding cost works in the opposite direction: a higher carrying cost makes smaller orders economical.

For a proposed quantity, the cost penalty can be found without rebuilding the full table:

TC(Q)TC∗=12(QQ∗+Q∗Q)

At 500 instead of 400, this becomes 0.5(1.25+0.8)=1.025: only 2.5% above minimum. That flatness makes reasonable estimates of ordering and holding costs useful even when they are imperfect.

Check practical restrictions

Round to whole units or a pack multiple. Compare the costs of the nearest feasible quantities if the choice is close. The formula's exact output does not override a supplier's case size.

A different stock pattern needs a different model. Gradual replenishment changes holding cost; price breaks require purchase-cost comparisons. Uncertain demand or lead time requires safety stock for the chosen service target. A single selling season with discounted leftovers calls for a newsvendor decision.

Key Takeaways

  • Calculate holding cost in money before substituting into EOQ.
  • Use the same period for demand and holding cost.
  • EOQ responds to square roots of input changes.
  • Compute order frequency and timing from the chosen quantity.
  • Compare nearby practical quantities using their total cost.

2.3 Size a production run when stock arrives gradually

During a production run, finished units arrive while customers or the next process are already using them. Stock builds more slowly than production output. The production order quantity (POQ) model, also called economic production quantity, accounts for this overlap.

Find the stock that actually accumulates

Let production rate be p and demand rate d, measured over the same time unit, with p>d. Stock increases at the net rate p−d. A run producing Q units lasts Q/p days, giving:

Imax⁡=Q(1−d/p),Iavg=Q2(1−d/p)

After production stops, demand drains the stock until the next run. The basic assumptions of constant known demand, fixed costs and no shortages still apply; receipt is gradual instead of instantaneous.

Balance setup and holding

Annual setup cost remains DS/Q, but annual holding cost becomes Q(1−d/p)H/2. Setting these costs equal gives:

Qp∗=2DSH(1−d/p)

The factor 1−d/p is less than one. Each run can therefore be larger than an instant-delivery EOQ with the same demand and costs, because some of the output is consumed before it can accumulate.

Work through a run

A line serves annual demand of 10,000 units over 250 working days. Daily demand is 40 units and production is 100 units per day. Setup costs $54 per run and annual holding costs $5 per unit.

The accumulation factor is 1−40/100=0.6. Then:

Qp∗=2×10,000×545×0.6=600

The run lasts 600/100=6 days. During those six days, 240 units are used and 360 remain. Maximum stock is 360, average stock is 180, and the full cycle lasts 600/40=15 working days. The nonproduction portion lasts nine days as stock falls from 360 to zero.

Annual setup cost is 10,000×54/600=900 dollars. Holding cost is 180×5=900 dollars, for a total of $1,800. About 16.7 runs are needed per year. Charging holding cost on 300 units, half the run size, would overstate the stock actually held.

Compare rates and setup improvements

Instant delivery with the same inputs gives an EOQ of about 465 units. Gradual production gives 600, about 1.29 times as much. The comparison concerns run size; its maximum stock is still only 360.

Halving setup cost divides the economical run size by 2, taking it from 600 to about 424 units. Shorter, cheaper changeovers make smaller runs economical. Keep annual demand D in the numerator and matched daily rates inside 1−d/p. If production cannot exceed demand, stock cannot rebuild during a run, so this repeating build-and-drain pattern cannot operate.

Key Takeaways

  • Gradual replenishment lets demand use some units during production.
  • Production must exceed demand, with both rates in matching units.
  • Maximum stock is run size times the accumulation factor; average stock is half that.
  • At the POQ optimum, annual setup cost equals annual holding cost.
  • Lower setup cost makes smaller economical production runs possible.

2.4 Compare the full cost of quantity discounts

A lower price can justify a larger order, but the cheapest unit price need not give the lowest annual cost. An all-units discount applies the lower price to every unit in an order that reaches the required quantity. The purchase saving must be compared with ordering and holding costs.

Build feasible candidates

Use annual demand D, ordering cost S and the price P available at each quantity. If holding cost is a rate I of price, recalculate H=IP for each price range. Total annual cost is:

TC=PD+DS/Q+QH/2

For each range, calculate its EOQ. Keep it if it lies within the range; raise it to the minimum quantity if it lies below the range. If it lies above the range, discard that price because the quantity already qualifies for a lower price. Then compare the feasible candidates' full costs.

Evaluate three price levels

Demand is 8,000 units annually, ordering costs $60 and the holding rate is 25%. Prices are $10.00 for orders of 1–999, $9.60 for 1,000–2,499 and $9.45 for 2,500 or more.

PriceAnnual holding per unitEOQ, approximatelyCandidate
$10.00$2.50620620
$9.60$2.406321,000
$9.45$2.36256372,500

The second EOQ cannot buy at $9.60 because 632 units do not reach 1,000. The same issue raises the third candidate to 2,500.

CandidateAnnual purchasesAnnual orderingAnnual holdingTotal
620$80,000$774.19$775.00$81,549.19
1,000$76,800$480.00$1,200.00$78,480.00
2,500$75,600$192.00$2,953.13$78,745.13

Ordering 1,000 gives the lowest annual cost. Moving to 2,500 saves $1,200 in annual purchases and $288 in ordering, but adds $1,753.13 in holding. The net increase is $265.13.

Keep the price rule attached to the calculation

An EOQ is only a candidate if its price is available at that quantity. Leaving purchase cost out hides the main benefit of a discount. Using one holding cost for every price also distorts the comparison when holding cost is a percentage of item value.

If holding cost is a fixed money amount per unit per year, all ranges share the same unconstrained EOQ; price breaks still generate additional candidates. Check storage space, shelf life and obsolescence before accepting a large order. An incremental discount, which lowers the price only on units above a break, has a different purchase-cost calculation from the all-units schedule used here.

Key Takeaways

  • All-units discounts change the price of every unit in a qualifying order.
  • Compare purchase, ordering and holding costs at feasible candidate quantities.
  • Recalculate holding cost at each price when it is a percentage of price.
  • The largest discount can cost more overall because of extra stock.
3

Choose when to reorder and how much protection to hold

An economical batch size does not tell a planner when to place the order. Goods must last until replenishment arrives, and demand or delivery delays can use up that cover sooner than expected. Set the reorder point first for known demand, then add safety stock for a chosen cycle service level. Where both demand and lead time vary, combine their uncertainty and distinguish the probability of a stockout from the number of units customers must wait for.

3.1 Set the reorder point using inventory position

A continuous review system updates inventory position after each receipt and withdrawal. When the position falls to the reorder point (ROP), the operation orders a fixed quantity, often its EOQ. Quantity answers how much to order; the reorder point answers when, expressed as a stock level.

Cover the time until receipt

Lead time runs from placing the order until goods are available to use. It includes supplier processing, transport, receiving and inspection. With known constant demand and lead time, the reorder point equals demand during that time:

ROP=dL

Here d is demand per day and L is lead time in days. Reordering must happen before the shelf is empty because demand continues while the order is being filled.

Annual demand of 10,000 units over 250 working days gives d=40 units per working day. A six-working-day lead time requires ROP=40×6=240 units. With an order size of 400, place an order for 400 whenever inventory position reaches 240. The 240 units cover consumption until the receipt arrives.

Use one clock

A lead time of two working weeks means ten working days for a five-day operation. At 40 units per day, the reorder point is 400 units. Multiplying 40 by two would treat weeks as days and leave only two days of cover. Convert calendar and working periods carefully: a daily forecast and the lead-time count must describe the same operating schedule.

Allow more than one outstanding order

Lead time can exceed the interval between orders. At 40 units per day, a 400-unit order lasts ten working days. If lead time is 14 days, the reorder point is 560 units, exceeding the order size.

That is workable because the trigger uses inventory position. With 160 units on hand and a 400-unit order outstanding, position is 160+400=560. Place the next order. Adding that new order raises position to 960, so the same shelf count does not trigger another order immediately. The earlier receipt later moves units from on order to on hand without changing total position.

Using only on-hand stock would lose the record of goods already coming. It could trigger duplicate orders or make a reorder point above the maximum shelf stock appear impossible.

Apply a simple physical trigger

A two-bin system makes the reorder signal visible. When the working bin empties, place an order and draw from the reserve bin, which holds enough to cover lead-time demand. This suits inexpensive items that do not need elaborate monitoring.

The deterministic reorder point contains no extra protection. For normally distributed lead-time demand, a trigger at the mean covers only about half the cycles without a shortage. Safety stock raises the trigger above expected demand when a higher cycle service level is required.

Key Takeaways

  • The reorder point covers demand until an order becomes available.
  • Use matching time units for demand and lead time.
  • Trigger orders from inventory position, including outstanding orders and backorders.
  • A reorder point can exceed the order quantity when lead time is long.

3.2 Add safety stock for uncertain demand

A forecast gives expected demand, but actual demand can be higher before the delivery arrives. Safety stock is the extra stock above average lead-time demand. It raises the reorder point:

ROP=dˉL+SS

The cycle service level (CSL) is the probability of completing one replenishment cycle without a stockout. A 95% CSL allows stockouts in about 5% of cycles over time. It counts cycles, not the fraction of units supplied immediately.

Match protection to uncertainty

For normally distributed lead-time demand:

SS=zσLT

The value z is the standard normal percentile for the chosen CSL. Useful values are 1.282 for 90%, 1.645 for 95%, 1.960 for 97.5%, 2.326 for 99% and 3.090 for 99.9%.

With a fixed lead time and independent daily demand errors of equal standard deviation:

σLT=σdL

Variances add across days. Standard deviations therefore grow with the square root of the number of days. Multiplying a daily standard deviation by lead time would overstate this uncertainty.

Work out the buffer and trigger

Mean demand is 40 units per day, daily error standard deviation is 8 units and lead time is nine days. Average lead-time demand is 360 units. Its standard deviation is 89=24 units. For 95% CSL:

SS=1.645×24=39.48

Round safety stock up to 40 whole units. The reorder point is 360+40=400 units. With a 400-unit order quantity, average stock is 400/2+40=240 units under the usual cycle-stock approximation.

Price a higher service target

For the same item, 99% needs about 55.8 units of buffer, rounded up to 56. The reorder point becomes 416. At 99.9%, about 74.2 units round up to 75 and the trigger becomes 435. At $5 holding cost per unit per year, these buffers cost $200, $280 and $375 annually for the three service targets. The last increments of service require increasing stock; a normal distribution has no finite upper bound, so finite safety stock cannot give exactly 100% CSL.

Use forecast errors, and name the service measure

The relevant variation is demand that differs from the forecast. If predictable seasonality is already in the forecast, it should not also be treated as random error. With roughly normal errors, a daily MAD of 6.4 gives an estimated daily standard deviation of 1.25×6.4=8 units.

At 25 cycles per year and 95% CSL, about 1.25 cycles per year are expected to have a shortage. A shortage cycle may miss just a few units; it does not lose all of that cycle's demand. The fill rate measures the share of units met directly from stock. Keep that separate from the probability used to choose z.

Key Takeaways

  • Safety stock adds protection above mean lead-time demand.
  • For independent daily errors and fixed lead time, scale standard deviation by the square root of lead time.
  • Choose the z value from the target cycle service level.
  • Round safety stock up to preserve at least the target protection.
  • Higher safety stock raises annual holding cost.
  • A 95% cycle service level does not mean a 95% unit fill rate.

3.3 Combine delivery uncertainty and measure units filled

A supplier can vary in delivery time even when demand is steady. The buffer must account for the uncertainty that actually changes demand before receipt. After choosing the reorder point, measure service in the units that matter to customers.

Combine independent sources of variation

With constant daily demand d and lead-time standard deviation σL, lead-time demand has standard deviation dσL. At 40 units per day, mean lead time six days and lead-time standard deviation 1.5 days, this is 60 units. A 95% buffer is 98.7 units, rounded up to 99, making the reorder point 339.

When daily demand and lead time both vary independently, and daily demand errors are independent with a common standard deviation, use:

σLT=Lˉσd2+dˉ2σL2

With daily mean 40, daily standard deviation 8, mean lead time six and lead-time standard deviation 1.5:

σLT=6×64+402×1.52=3,984≈63.1

At 95%, safety stock is about 103.8, rounded up to 104. Mean demand is 240, so reorder at 344. Add variances before taking the square root; adding the two standard deviations would give about 79.6 and overstate the buffer. The delivery term contributes 3,600 of the 3,984 variance units. More reliable lead times would therefore address the larger source of uncertainty in this example.

Distinguish events from units

The fill rate is the fraction of demand supplied immediately from stock. A cycle short by two units is a failed cycle for CSL, but contributes only two unfilled units to the fill-rate calculation.

For normally distributed lead-time demand, expected shortage per cycle is:

ESC=σLTG(z)

The standard normal loss function is G(z)=φ(z)−z[1−Φ(z)]. Here φ is the normal density and Φ its cumulative probability. Read the loss function from a table or calculate it with statistical software. It measures expected excess beyond the stock threshold, not merely the chance of crossing it.

For the continuous-review backorder model, use:

fill rate=1−ESC/Q

At σLT=24, z=1.645 and Q=400, the loss function is about 0.0209. Expected shortage is about 0.50 units per cycle. Fill rate is about 99.87%, even though CSL is 95%. Over 25 cycles, about 12.5 of 10,000 demanded units wait for stock.

At the same CSL and lead-time uncertainty, a larger quantity raises this fill rate: expected shortage per cycle stays the same but there are fewer replenishment cycles per year. It also raises cycle stock. A promise to customers must therefore specify whether service means cycles without any shortage or units filled immediately.

Key Takeaways

  • When both demand and lead time vary independently, add their variance contributions.
  • Compare the variance terms to see which source of uncertainty matters most.
  • The normal loss function measures expected units short after scaling by lead-time demand standard deviation.
  • In the backorder model, fill rate equals one minus expected shortage per cycle divided by order quantity.
  • At a fixed CSL, a larger order quantity raises fill rate and cycle stock.
4

Order at scheduled reviews and choose a policy

Some suppliers accept orders whenever they are needed; others deliver on fixed days or offer savings when items travel together. A review policy has to fit that schedule as well as the item’s value and shortage risk. Calculate an order-up-to target for scheduled reviews, account for existing orders and compare the extra safety stock with savings in ordering, transport or counting. A min–max rule adds a threshold that can prevent frequent small orders.

4.1 Calculate a periodic review target and order

A periodic review system checks inventory position every fixed interval R. At each review, the order restores the position to a target T. Timing is fixed; the quantity changes with demand since the previous review.

Protect until the next order can arrive

An order placed now must cover demand until the delivery from the next review arrives. The next review is R days away and its order then takes another L days. This makes the protection interval R+L, longer than the lead time alone.

With constant lead time and independent daily demand errors of equal standard deviation, the target for a normal-demand CSL is:

T=dˉ(R+L)+zσdR+L

The first term covers average demand. The second covers forecast error over the same protection interval. Using R+L for the mean but only L for the buffer would underprotect the system between reviews.

Set a weekly target

A shop open every day sells an average of 40 units daily, with daily error standard deviation 8. Reviews are seven days apart and delivery takes three days. For 95% CSL, use z=1.645 and a ten-day protection interval.

Average demand is 40×10=400 units. Safety stock is 1.645×810≈41.6 units. The target is about 441.6, rounded up to 442 whole units.

At a review with 150 on hand and nothing on order, order 442−150=292 units. If 100 units are already ordered, inventory position is 250, so order only 192. Counting just the shelf stock would order the same requirement twice.

Subtract the whole position

The order quantity is:

q=max⁡(0,T−IP) IP=on hand+on order−backorders

Outstanding orders reduce the new order; backorders increase it. A position already at or above target needs no order. The target is the position after ordering, not the quantity that must physically be on the shelf that day.

Understand the interval choice

Supplier schedules, combined delivery routes or counting costs often set the review interval. An EOQ can suggest a starting interval through R≈Q∗/dˉ. A 400-unit EOQ at 40 units per day suggests ten working days.

With no variability, the target is simply d(R+L). Once the system is operating steadily, each scheduled order replaces the dR units used since the preceding review. A starting stock surplus or outstanding backorders can make an individual order differ.

For the shop's three-day lead time, continuous review needs about 22.8 units of safety stock, rounded to 23. Weekly review needs about 42 because a shortage can develop before the next review even notices it. The longer protection interval explains the extra buffer.

Key Takeaways

  • Periodic review fixes the review interval and varies the order quantity.
  • The protection interval includes both the review interval and lead time.
  • The target covers mean demand plus safety stock over that full interval.
  • Subtract inventory position, including outstanding orders and backorders.
  • Order zero if the position is already at or above target.

4.2 Choose a review system that fits the item

An inventory policy must work with the supplier, the item and the information available. Compare systems at the same service target, then weigh stock costs against the work and transport costs of running the policy.

Compare what stays fixed
FeatureContinuous reviewPeriodic review
Fixed elementOrder quantityReview interval
Variable elementTime between ordersOrder quantity
TriggerPosition reaches reorder pointScheduled review
InformationUp-to-date transactionsPosition at each review
Protection intervalLead timeReview interval plus lead time
Typical advantageLess safety stock for the same CSLCombined orders and scheduled deliveries

Continuous review suits valuable A items, critical components with high shortage costs and items already tracked automatically. It works well when suppliers accept orders at variable times. Periodic review suits a group of items bought from one supplier, a fixed delivery route or low-value items that are costly to check individually.

Put a cost on the extra protection

For mean daily demand of 40, daily error standard deviation 8, lead time three days and 95% CSL, continuous review needs 23 units of safety stock. With weekly reviews, periodic review needs 42. At $5 per unit per year, the rounded buffers cost $115 and $210 respectively.

The extra $95 per year is a cost of scheduled review for this item, not a complete policy verdict. If grouping orders saves more than this in ordering, counting or transport and other costs are equal, periodic review can have the lower total cost. Use the same CSL and forecast assumptions on both sides of the comparison.

Use a threshold to skip small orders

A min–max system combines scheduled reviews with a minimum trigger. At a review, order up to the maximum only if inventory position is at or below the minimum. In notation s,S, the second symbol denotes the maximum stock position, not the ordering cost used in EOQ.

With a minimum of 200 and maximum of 600, position 240 triggers no order. Position 180 triggers an order for 600−180=420 units. At exactly 200, the rule triggers an order for 400. Skipping replenishment above the minimum avoids many small orders.

Match attention to consequences

A items usually justify continuous review and carefully maintained settings. C items often suit periodic, two-bin or min–max rules, sometimes with generous safety stock because each extra unit costs little. A cheap part that stops production still deserves strong protection. B items can use either policy depending on suppliers and costs.

Barcode scanning, RFID and ERP software make transaction tracking easier and can create order proposals automatically. The planner still chooses and checks the order quantity, reorder point or target, and safety stock. Accurate tracking makes a rule executable; the settings determine whether it gives suitable cost and service.

Key Takeaways

  • Continuous review fits valuable or critical items and reliable transaction records.
  • Periodic review can save ordering and transport cost by grouping purchases.
  • Compare both policies at the same named service target.
  • Periodic min–max orders up to a maximum only when position is at or below a minimum.
  • ABC class guides attention; shortage consequences also shape the policy.
  • Automatic ordering still needs checked parameters.
5

Choose one order for a selling season

A one-time order has a different risk from regularly replenished stock. Unsold goods may lose value after the event or season, while missed demand cannot be recovered with another delivery. Price those two errors per unit, then use their balance to choose a demand percentile. A discrete demand table gives the quantity directly; a normal forecast requires a z value. The resulting order can lie above or below average demand.

5.1 Balance missed sales and leftovers

The newsvendor model chooses a single order before demand is known. It fits one selling period in which unmet demand is lost and leftovers cannot later be sold at full price. Fresh goods for a day, event merchandise and seasonal fashion all create this decision.

Price the two errors

The underage cost Cu is the loss from having one unit too few. It is selling price minus unit cost, plus any additional lost goodwill. The overage cost Co is the loss from having one unit too many: unit cost minus salvage value, plus any disposal cost. Salvage is the money recovered from a leftover unit.

A festival cake sells for $30, costs $12 and can be sold to staff for $4 after the festival. Missing a sale loses $18 of margin; a leftover loses $8. The full selling price is not the underage loss because the unmade cake also saves its production cost.

Choose the demand percentile

Adding another unit pays when its expected selling benefit exceeds its expected leftover loss. For an existing quantity Q, compare P(D>Q)Cu with P(D≤Q)Co. This balance gives the critical ratio:

CR=CuCu+Co

For the cakes, CR=18/26≈0.692. Choose the smallest demand quantity whose cumulative probability reaches the ratio.

DemandProbabilityCumulative probability
200.100.10
210.150.25
220.200.45
230.250.70
240.150.85
250.100.95
260.051.00

At 22, cumulative probability is 0.45, below 0.692. At 23 it reaches 0.70, so order 23 cakes. Compare the cumulative column, not the probability of exactly one demand outcome.

Check the economic result

For any demand outcome, profit equals sales revenue plus salvage revenue minus the cost of all cakes made. Weight those profits by their demand probabilities.

For an order of 23, demand of 20 leaves three cakes. Profit is 30×20+4×3−12×23=336 dollars. At demand 21 it is $362, at 22 it is $388, and at any demand of 23 or more all cakes sell for profit of $414. The expected profit is:

0.10(336)+0.15(362)+0.20(388)+0.55(414)=393.20

Orders of 22 and 24 give expected profits of $386.90 and $393.00. The near tie between 23 and 24 shows how little a nearby choice can cost.

With continuous demand, the probability of meeting all demand at the optimum equals it. With discrete demand, the selected cumulative probability can exceed it, as 0.70 exceeds 0.692 here. Higher underage cost relative to overage cost moves the order upward; a greater loss on leftovers moves it downward.

Ordering the average or most likely demand ignores these unequal losses. Forgetting salvage overstates the overage cost and pushes the order too low. Goods that carry forward without loss belong to a repeating replenishment decision instead of this one-period leftover trade-off.

Key Takeaways

  • Newsvendor decisions have one selling period, lost demand and reduced-value leftovers.
  • Underage cost is missed margin plus any additional shortage penalty.
  • Overage cost is unit cost minus salvage plus disposal cost.
  • The critical ratio selects the economically appropriate demand percentile.
  • For discrete demand, choose the smallest quantity whose cumulative probability reaches the ratio.

5.2 Convert the critical ratio into a normal order quantity

When one-period demand is reasonably normal, its critical percentile can be calculated from a mean and standard deviation. Costs still choose the percentile; the forecast tells where that percentile lies in units.

Turn probability into stock

Let μ be forecast mean demand and σ the standard deviation of demand around that forecast. Find the standard normal value satisfying Φ(z)=CR, then calculate:

Q∗=μ+zσ

Use the cumulative probability CR, not its complement. A ratio above 0.5 gives a positive z value and an order above the mean. A ratio below 0.5 gives a negative value and an order below the mean.

Work through a seasonal order

Winter coats cost $60, sell for $150 and clear for $40. Underage cost is $90 and overage cost is $20. Thus CR=90/110≈0.818 and z≈0.908. With mean demand of 1,000 coats and standard deviation 200:

Q∗=1,000+0.908×200≈1,182

This choice gives about an 81.8% chance of meeting the season's entire demand in the continuous normal approximation. The remaining roughly 18.2% of seasons have a shortage; this percentage counts seasons, not the share of demand left unfilled.

Compare changed costs

If coats instead sell for $75 and clear for $20, while cost stays $60, underage cost becomes $15 and overage $40. The ratio is about 0.273, with z≈−0.605. The order becomes roughly 879 coats. The negative adjustment reflects the greater cost of leftovers relative to missed margin.

If the original high-price case also loses $10 in future business for each missed sale, underage cost rises to $100. The ratio becomes about 0.833, z about 0.967 and the order about 1,193 coats. Add this goodwill effect to the money loss per unit, not to the percentage margin.

Interpret changing uncertainty

The sign of z determines what greater forecast uncertainty does. Above a 0.5 ratio, a larger standard deviation raises the order; below 0.5, it lowers it. At exactly 0.5, z is zero and the optimum is the mean regardless of the standard deviation. More uncertainty therefore does not always justify more units in a single-period decision.

Check forecast errors or past demand for a roughly normal shape. Also check that the mean is several standard deviations above zero so negative demand has negligible modeled probability. A positive mean alone does not establish normality. Round the calculated quantity to a whole unit or practical pack size; compare nearby feasible quantities when that choice matters. The adjustment zσ resembles a safety buffer, but its percentile comes from underage and overage costs, not a separate management service target.

Key Takeaways

  • Find z from the cumulative probability equal to the critical ratio.
  • Normal one-period quantity equals mean demand plus z times its standard deviation.
  • A critical ratio below one-half gives an order below mean demand.
  • Extra lost goodwill raises underage cost and the order quantity.
  • The effect of uncertainty depends on the sign of z.
  • Check the normal shape and the risk of negative modeled demand.

Inventory Management examples

5 Walkthroughs

1

Read an operation’s inventory

10 steps
Follow a repair business from the purpose of its stock to costs and control priorities.
  1. 1
    IntroductionStart with the purpose of stock

    A repair business holds parts so repairs can start without waiting for each supplier delivery. Some parts arrive in batches; others are held as a buffer because urgent repairs are unpredictable. Each reason is a stock function, and it shapes how much to hold.

    Follow three questions: what job does the stock do, what costs change when the buyer orders more, and which items deserve the closest attention (the work of ABC analysis)?

  2. 2
    ExplanationName the type and its function

    A stock type describes the item’s stage or use: purchased parts, unfinished work, finished goods or MRO supplies. A stock function explains why it is held.

    Cycle stock comes from batches. Safety stock covers surprises. Anticipation stock prepares for a known peak; pipeline stock travels between locations. Decoupling stock keeps one stage working when another stops.

  3. 3
    ChallengeIdentify two different buffers

    The repair business stores extra motors for unexpected failures and builds finished replacement units before a scheduled summer shutdown. What function does each stock serve?

    ---reveal---

    Extra motors are safety stock because failures are uncertain. Finished replacement units are anticipation stock because the shutdown is known in advance. Both may look like spare stock, but their purposes differ.

  4. 4
    ExampleInclude goods already ordered

    A parts record shows 75 on hand, 200 on order and 20 backordered. The buyer’s inventory position is:

    75+200−20=255

    The outstanding receipt increases future availability; accepted demand still waiting for supply reduces it. A count of 75 alone would omit both commitments. Receiving the 200 later moves it from on order to on hand without changing position.

  5. 5
    ConnectionDistinguish a forecast from a requirement

    Replacement pumps sold to independent repair customers need a demand forecast. Seals used in a planned pump assembly run follow from the number of pumps and seals per pump. That requirement is dependent demand.

    For performance, compare goods sold at cost with average inventory at cost. Turnover counts annual turns; days of supply expresses the same stock in time at the average usage rate.

  6. 6
    ExplanationGive each cost its driver

    A fixed fee for placing and receiving an order is ordering cost. Interest, extra space and expected deterioration belong to holding cost. Missed repair work, emergency shipping and lost goodwill are shortage costs. The price of each spare is purchase cost.

    Check the unit attached to each amount. A fee per order and a price per item cannot be added as though they were the same input.

  7. 7
    ChallengeDecide what a larger order changes

    A part costs $45, its annual holding rate is 20% and each order incurs $18 of processing work. What are H and S for the ordering model?

    ---reveal---

    Holding cost is 0.20×45=9 dollars per unit per year. Ordering cost is $18 per order. The $45 price is not added to S, because it is paid for each unit, not once per order.

  8. 8
    ExampleCompare annual usage values

    Annual use is 600 motors at $50 and 8,000 washers at $0.25. Motors contribute $30,000 of annual usage value; washers contribute $2,000.

    The washer quantity is larger, but motors carry more annual financial flow. ABC analysis sorts this demand-times-cost value, then builds cumulative percentage shares to choose management’s A, B and C boundaries.

  9. 9
    ChallengeRecommend attention and availability

    Washers have a small annual usage value, but a missing washer prevents a repair from being finished. How should the buyer use the ABC result?

    ---reveal---

    A simple control rule may suit this low-value item, but the shortage consequence supports strong availability. Extra safety stock may be inexpensive. ABC guides attention; it does not require poor service for every C item or replace a check of operational criticality.

  10. 10
    RecapUse three checks before choosing a rule

    First identify the stock’s purpose and whether demand is independent or calculated from a plan. Then compare costs that change with the decision, keeping rates and money amounts distinct. Finally rank annual usage value and check criticality before assigning control effort.

    Inventory position carries incoming orders and backorders into the decision; shelf stock alone cannot do that.

2

Work from cost curves to an order quantity

17 steps
Build an EOQ, evaluate gradual production and compare a quantity discount with its extra stock cost.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionChoose the model from the receipt pattern
  2. 2
    ExplanationBuild the two basic curves
  3. 3
    ChallengeCalculate a point on the graph
  4. 4
    ExampleFind the exact crossing
  5. 5
    ExampleTurn the quantity into a schedule
  6. 6
    ChallengePredict the effect of a cost change
  7. 7
    TipCompare feasible pack multiples
  8. 8
    ExplanationAccount for use during production
  9. 9
    ExampleCalculate the run quantity
  10. 10
    ExampleFind peak and average stock
  11. 11
    ChallengeCheck the annual production costs
  12. 12
    ExplanationAdd prices before judging a discount
  13. 13
    ExampleBuild the price candidates
  14. 14
    ExampleCompare the full annual totals
  15. 15
    ChallengeExplain why the cheapest price loses
  16. 16
    ChallengeChoose what must change in the model
  17. 17
    RecapRead quantity, stock and cost separately
3

Build a reorder point and read its service

15 steps
Move from known lead-time demand to demand uncertainty, delivery uncertainty and unit fill rate.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionProtect the wait for delivery
  2. 2
    ExampleSet a known-demand trigger
  3. 3
    ChallengeAllow overlapping orders
  4. 4
    ExplanationChoose what a service target counts
  5. 5
    ExampleScale daily error to the whole wait
  6. 6
    ExampleAdd the buffer to the mean
  7. 7
    ChallengeRaise the service target
  8. 8
    ExplanationAccount for varying delivery duration
  9. 9
    ExampleAdd independent variance terms
  10. 10
    ChallengeFind the combined buffer and priority
  11. 11
    ExplanationMeasure shortage size with the loss function
  12. 12
    ExampleConvert units short to a fill rate
  13. 13
    Key InsightQuantity changes the exposure count
  14. 14
    ChallengeInterpret two service reports
  15. 15
    RecapKeep the uncertainty and service units clear
4

Run a scheduled review and compare its cost

10 steps
Set a periodic target, place a review order and compare it with continuous review and min–max.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionFit the order rule to the buying schedule
  2. 2
    ExplanationProtect until the next review’s receipt
  3. 3
    ExampleCalculate expected demand and its buffer
  4. 4
    ChallengeCount the pipeline before ordering
  5. 5
    TipHandle a position already above target
  6. 6
    ExplanationCompare the same service target
  7. 7
    ChallengeMake a policy recommendation
  8. 8
    ExplanationAdd a minimum trigger
  9. 9
    ChallengeConnect the stock count to the hybrid rule
  10. 10
    RecapChoose with timing, information and total cost
5

Choose a one-period order from costs

11 steps
Balance a pop-up shop’s missed sales and leftovers, then convert the same cost balance into a normal-demand order.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionPrice the risk of one more unit
  2. 2
    ExampleCalculate the two losses
  3. 3
    ExplanationConvert cost balance into probability
  4. 4
    ExampleAdd demand probabilities in order
  5. 5
    ChallengeExplain the discrete choice
  6. 6
    ExplanationUse a normal forecast for another item
  7. 7
    ExampleConvert the percentile into units
  8. 8
    ChallengeTest a changed cost balance
  9. 9
    Key InsightRead the sign before changing uncertainty
  10. 10
    ChallengeChoose the right response to better salvage
  11. 11
    RecapChoose the percentile before finding the quantity

Inventory Management practice questions

50 Practice Questions in 5 sets

Set 1: Replenishment models and service measures10 Practice Questions

Question 1 of 10

A factory plans 320 carts, each requiring four wheels. How is the wheel requirement of 1,280 units classified?
  1. Independent demand from the wheel forecast
  2. Anticipation stock for a seasonal peak
  3. Dependent demand from the cart plan
  4. Pipeline stock on its delivery route
Show answerHide answer
Answer: C
The wheel requirement follows directly from the production plan: four wheels for each of 320 carts. It is dependent demand because another item determines it. A forecast of independent wheel sales would concern external customer demand, which the cart plan does not describe.

Question 2 of 10

A plant uses 600 units monthly. Ordering costs $50, each unit costs $20 and its annual holding rate is 20%. What EOQ matches these inputs?
  1. About 122 units
  2. About 424 units
  3. About 849 units
  4. About 1,897 units
Show answerHide answer
Answer: B
Annual demand is 7,200 and annual holding cost is 0.20×20=4 dollars per unit. EOQ is 2×7,200×50/4≈424. About 122 results from using monthly demand with annual holding cost, so those inputs describe different periods.

Question 3 of 10

A line makes 90 units daily while demand uses 30 daily. A production run contains 450 units. What maximum stock accumulates?
  1. 150 units
  2. 225 units
  3. 450 units
  4. 300 units
Show answerHide answer
Answer: D
The run lasts five days, during which demand consumes 150 of the 450 units produced. Maximum stock is therefore 300, also given by 450 times one minus 30 divided by 90. A maximum of 450 would ignore the units consumed while production is still running.

Question 4 of 10

A supplier offers an all-units price break at 800 units. The EOQ calculated at that lower price is 610. What quantity is the candidate for that price range?
  1. 800 units
  2. 610 units
  3. 190 units
  4. 1,410 units
Show answerHide answer
Answer: A
The lower price requires an order of at least 800, so raise its unconstrained EOQ to 800. That is the candidate to compare with other ranges using full annual cost. Ordering 610 would minimize the curve for a price that is unavailable at that quantity.

Question 5 of 10

Daily forecast errors are independent with standard deviation 6 units. Lead time is four days, mean demand is 25 daily and the target CSL is 95% (z = 1.645). What reorder point uses a buffer rounded up to whole units?
  1. 110 units
  2. 140 units
  3. 120 units
  4. 124 units
Show answerHide answer
Answer: C
Lead-time standard deviation is 64=12. Safety stock is 19.74, rounded up to 20, and mean lead-time demand is 100, giving a trigger of 120. A trigger of 140 uses the daily standard deviation times four instead of adding daily variances.

Question 6 of 10

A continuous-review backorder system has expected shortage of 1.8 units per cycle and order quantity of 300. What is its unit fill rate?
  1. 98.20%
  2. 99.40%
  3. 94.00%
  4. 60.00%
Show answerHide answer
Answer: B
Fill rate is 1−1.8/300=0.994, or 99.40%. Expected shortage is measured in units, so it must be divided by cycle demand before turning it into a percentage. Subtracting 1.8 percentage points directly would confuse a unit count with a fraction of demand.

Question 7 of 10

A shop reviews every five days and has a four-day lead time. Mean daily demand is 18, with independent daily errors of standard deviation 4. At 95% CSL (z = 1.645), 70 are on hand, 50 on order and 6 backordered. What order restores the rounded-up target?
  1. 68 units
  2. 88 units
  3. 118 units
  4. 18 units
Show answerHide answer
Answer: A
The nine-day target is 18×9+1.645×49=181.74, rounded to 182. Position is 70+50−6=114, so order 68. Ordering 118 ignores the 50 units already due to arrive and duplicates their contribution to the target.

Question 8 of 10

A periodically reviewed item has minimum 160 and maximum 470. Inventory position at the review is exactly 160. What order does the min–max rule place?
  1. No order
  2. 160 units
  3. 470 units
  4. 310 units
Show answerHide answer
Answer: D
The rule triggers at or below the minimum, so a position of exactly 160 qualifies. Restoring position to 470 requires 310 units. Placing no order would incorrectly treat the minimum as a strict less-than threshold instead of including equality.

Question 9 of 10

One-day bouquets sell for $22, cost $9 and salvage for $2. Demand is 40, 50 or 60 with probabilities 0.25, 0.45 and 0.30. What quantity maximizes expected profit?
  1. 50 bouquets
  2. 40 bouquets
  3. 60 bouquets
  4. 55 bouquets
Show answerHide answer
Answer: A
Underage cost is 13 and overage cost is 7, giving a critical ratio of 0.65. Cumulative probabilities reach 0.25 at 40 and 0.70 at 50, so order 50. Ordering 60 exceeds the critical percentile; ordering the most likely demand happens to agree here but does not account for the cost balance.

Question 10 of 10

Seasonal kits sell for $70, cost $30 and salvage for $10. Each lost sale also costs $20 in future business. Normal demand has mean 600 and standard deviation 100. Cumulative normal values are 0.667 → z 0.431 and 0.750 → z 0.674. What whole-unit order follows?
  1. 643 kits
  2. 700 kits
  3. 557 kits
  4. 667 kits
Show answerHide answer
Answer: D
Underage cost includes goodwill: 70−30+20=60, while overage is 20. The ratio is 0.75, so Q∗=600+0.674×100≈667. Ordering 643 uses the 0.667 percentile obtained by omitting the stated future-business loss.
Set 2: Stock, costs and first ordering decisions10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A periodic review target is 510 units. At a review, 145 are on hand, 120 are on order and 25 are backordered. How many units should be ordered?
  1. 365 units
  2. 220 units
  3. 270 units
  4. 295 units
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

An event mug sells for $24, costs $10 and has a $3 salvage value. There are no other shortage or disposal costs. What is its overage cost per unit?
  1. $14
  2. $7
  3. $21
  4. $10
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A processor builds finished stock in September for a predictable December sales peak. What function does this stock serve?
  1. Safety stock
  2. Anticipation stock
  3. Pipeline stock
  4. Decoupling stock
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

An item costs $32 and has an annual holding rate of 25%. What is its holding cost per unit per year?
  1. $0.25
  2. $25.00
  3. $32.00
  4. $8.00
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A store uses 700 seals at $18 each, 2,000 clips at $4 each and 250 valves at $44 each annually. What item has the highest annual usage value?
  1. Seals, at $12,600
  2. Clips, at $8,000
  3. Valves, at $11,000
  4. Valves, at $44,000
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

Under basic EOQ assumptions, an order is 360 units and annual holding cost is $6 per unit. What is annual cycle-stock holding cost?
  1. $2,160
  2. $540
  3. $1,080
  4. $360
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A repair supplier uses 7,200 units annually. Ordering costs $25 per order and holding costs $4 per unit per year. What is the EOQ?
  1. 150 units
  2. 300 units
  3. 450 units
  4. 600 units
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A depot uses 9,000 filters over 250 working days. Supplier lead time is five working days. With certain demand and delivery, at what inventory position should it reorder?
  1. 36 filters
  2. 1,800 filters
  3. 250 filters
  4. 180 filters
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A service target specifies a 97.5% cycle service level. What does that target measure?
  1. Cycles completed without any stockout
  2. Units filled immediately from stock
  3. Orders delivered within the lead time
  4. Items assigned to the highest ABC class
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A supplier’s EOQ is 500 units. Demand rises by 44% while order cost and annual holding cost per unit stay unchanged. The planner keeps ordering 500. About how far above the new minimum is the relevant annual cost?
  1. 1.67%
  2. 8.33%
  3. 20.00%
  4. 44.00%
Show answerHide answer

Save this lesson to see this answer.

Set 3: Compare costs and diagnose stock policies10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A plant must pay $18,000 annual rent on its current storeroom regardless of stock. A larger order would also require $900 in extra rented space. What storage cost changes with that decision?
  1. $18,000
  2. $900
  3. $18,900
  4. $17,100
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A distributor’s annual usage values are $48,000, $27,000, $15,000 and $10,000. Management assigns the smallest leading group reaching at least 75% of value to class A. How many items enter class A?
  1. One item
  2. Three items
  3. Four items
  4. Two items
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

At a proposed batch size, basic EOQ annual ordering cost is $1,440 and holding cost is $640. What happens to their sum if the batch is doubled?
  1. It stays at $2,080
  2. It falls to $1,040
  3. It falls to $2,000
  4. It rises to $4,160
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A line serves 12,000 units over 250 working days. It produces 120 units daily, with setup cost $45 and annual holding cost $5 per unit. About how much average cycle stock does its optimal production run hold?
  1. 180 units
  2. 300 units
  3. 232 units
  4. 360 units
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

Annual demand is 4,000, order cost $40 and annual holding rate 20%. All-units prices are $12 below 1,000 and $11.80 from 1,000. The feasible candidates are about 365 at the first price and 1,000 at the second. What is the lowest-cost choice?
  1. 365 units; about $48,876 annually
  2. 1,000 units; about $48,540 annually
  3. 1,000 units; about $48,380 annually
  4. 365 units; about $48,000 annually
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A part is used at 22 per working day. Lead time is 15 working days and fixed order quantity is 250. There are 80 on hand and one 250-unit order outstanding, with no backorders. What should continuous review do now?
  1. Wait until stock falls to 22
  2. Wait for the outstanding order
  3. Order another 250 units now
  4. Order only 80 units this time
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A service team uses a constant 16 parts per day. Lead time has mean seven days and standard deviation two days. For 95% CSL, z = 1.645. What reorder point follows after rounding safety stock up?
  1. 144 parts
  2. 165 parts
  3. 342 parts
  4. 53 parts
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

Two review policies provide the same CSL. Continuous review needs 28 buffer units; periodic review needs 47. Holding costs $8 per unit per year. Grouped periodic orders save $130 annually; all other costs are equal. What is the annual cost advantage?
  1. Periodic review saves $22
  2. Continuous review saves $130
  3. Periodic review saves $152
  4. Continuous review saves $22
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A one-period product has underage cost $18 and overage cost $12. What critical ratio should set the demand percentile?
  1. 0.60
  2. 0.40
  3. 1.50
  4. 0.67
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A one-time order has critical ratio 0.30. Mean normal demand stays fixed while demand standard deviation increases. What happens to the optimal quantity?
  1. It rises above its previous level
  2. It stays fixed at the mean
  3. It falls below its previous level
  4. It stays fixed below the mean
Show answerHide answer

Save this lesson to see this answer.

Set 4: Apply models across operating decisions10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

Annual cost of goods sold is $2,190,000 and average inventory value is $300,000. Using 365 days, what are turnover and days of supply?
  1. 7.3 turns; 41.1 days
  2. 7.3 turns; 50.0 days
  3. 6.0 turns; 50.0 days
  4. 6.0 turns; 60.8 days
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A buyer spends $28 preparing each order and pays $9 per purchased unit. What amount is the fixed ordering-cost input for EOQ?
  1. $9
  2. $37
  3. $28
  4. $252
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

An item’s EOQ is 720 units. Its annual holding cost per unit becomes four times as large, while demand and order cost stay fixed. What is the new EOQ?
  1. 360 units
  2. 180 units
  3. 1,440 units
  4. 720 units
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A production model has annual demand 15,000, setup cost $48 and annual holding cost $4. Production is three times the daily demand rate. What optimal run size and maximum stock follow, approximately?
  1. 600-unit run; 600 maximum
  2. 735-unit run; 490 maximum
  3. 735-unit run; 735 maximum
  4. 600-unit run; 400 maximum
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

Annual demand is 6,000 and order cost $30. An all-units price drops from $8.00 to $7.90 at 1,200 units; holding is fixed at $2 per unit per year at both prices. What order choice minimizes full annual cost?
  1. 1,200 units; about $48,750
  2. 424 units; about $48,249
  3. 1,200 units; about $47,550
  4. 424 units; about $48,849
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

An item’s reorder point is 300. Stock is 110 on hand, 240 on order and 30 backordered. Demand then uses 20 more units. What does continuous review do if the fixed order quantity is 240?
  1. Order 190 units
  2. Wait for the outstanding order
  3. Order 240 units
  4. Order 300 units
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

Daily errors are roughly normal with MAD 4.8 units. They are independent across days, and lead time is 16 days. At 95% CSL (z = 1.645), what whole-unit safety stock is needed?
  1. 158 units
  2. 20 units
  3. 32 units
  4. 40 units
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A store reviews every four days, with five-day lead time. Mean daily demand is 24 and independent daily error standard deviation is 5. It targets 99% CSL (z = 2.326). At review, 90 are on hand, 80 on order and 10 backordered. What order restores the rounded-up target?
  1. 56 units
  2. 81 units
  3. 126 units
  4. 91 units
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A supplier visits only every Tuesday. A buyer combines many low-value items into that delivery, and individual daily checks are costly. What review policy best matches these constraints?
  1. Continuous review with separate daily orders
  2. Periodic review with Tuesday order cycles
  3. Continuous review with one fixed truckload
  4. Newsvendor review for each weekly receipt
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

Event prints sell for $36, cost $14 and salvage for $4. Each leftover also costs $1 to handle. Demand is 70, 80, 90 or 100 with probabilities 0.15, 0.30, 0.30 and 0.25. What order follows from the costs?
  1. 100 prints
  2. 80 prints
  3. 90 prints
  4. 85 prints
Show answerHide answer

Save this lesson to see this answer.

Set 5: Evaluate and improve inventory decisions10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A low-usage, low-cost fuse stops the whole assembly line when missing. What adjustment to a value-based ABC policy is justified?
  1. Keep minimal availability because its usage value is low
  2. Raise control priority because shortage disruption is high
  3. Rank it only by unit demand because its price is low
  4. Remove its safety stock because replacement is cheap
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A basic EOQ cost table gives total ordering-plus-holding costs of $1,950 at 300 units and $1,800 at 400. Annual purchases cost $42,000 at every quantity. What happens when purchases are included?
  1. The two totals become equal
  2. The 300-unit choice becomes cheaper
  3. The minimum moves to a larger quantity
  4. Each total rises by $42,000
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

Annual demand is 5,000, ordering costs $20 and holding costs $2 per unit per year. Orders must be multiples of 200. What feasible quantity has the lowest relevant annual cost?
  1. 200 units; $700
  2. 400 units; $650
  3. 600 units; about $767
  4. 400 units; $450
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A price is $20 for orders below 500, then $19 for all units from 500 onward. Annual demand is 2,000, ordering cost $40 and annual holding cost is a fixed $8 per unit. What quantity minimizes full annual cost?
  1. 500 units; $40,160
  2. 141 units; about $41,131
  3. 141 units; about $39,131
  4. 500 units; $38,160
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A continuous-review item has mean daily demand 30, independent daily errors with standard deviation 10 and lead time four days. Its reorder point is 160. Lead time rises to nine days, while demand and the desired CSL remain unchanged. What reorder point preserves the same z value?
  1. 310 units
  2. 360 units
  3. 240 units
  4. 330 units
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

An item has mean daily demand 30, daily error standard deviation 4, mean lead time five days and lead-time standard deviation two days, with independence. Either daily error standard deviation or lead-time standard deviation can be halved. What change reduces lead-time demand variance more?
  1. Halve daily error SD; variance falls by 60
  2. Halve daily error SD; variance falls by 2,700
  3. Halve lead-time SD; variance falls by 2,700
  4. Halve lead-time SD; variance falls by 60
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A periodic system has no demand variability, uses 12 units daily and reviews every six days. Lead time is four days. Once it operates steadily, what are its target and usual review order?
  1. 120 target; 72 ordered
  2. 72 target; 120 ordered
  3. 48 target; 72 ordered
  4. 120 target; 120 ordered
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A periodic min–max policy has minimum 210 and maximum 650. At review there are 95 on hand, 160 on order and 30 backordered. What order should it place?
  1. 425 units
  2. 555 units
  3. No order
  4. 440 units
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A pop-up seller charges $28 per item, pays $12 and salvages leftovers for $4. Demand is 10, 12 or 14 with probabilities 0.20, 0.50 and 0.30. What is the expected profit from the optimal whole-unit quantity?
  1. $180.80 from 14 units
  2. $182.40 from 12 units
  3. $192.00 from 12 units
  4. $160.00 from 10 units
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A seasonal product sells for $50, costs $30 and salvages for $10. Normal demand has mean 900 and standard deviation 120. The selling price then rises to $70 with the same demand forecast. Use z = 0 at probability 0.5 and z = 0.431 at probability 0.667. How does the best whole-unit order change?
  1. From 900 to about 848
  2. From 900 to about 1,003
  3. From 900 to about 952
  4. From 952 to about 900
Show answerHide answer

Save this lesson to see this answer.

Stuck on your own question? Homework Help

Key Terms

71 Key Terms, each with its definition

A

ABC analysis
ABC analysis groups items by annual usage value so planners can assign more control effort to items with greater financial importance.
The distributor uses ABC analysis to decide which supplier forecasts deserve the most frequent attention.
All-units discount
An all-units discount gives a lower price to every unit in an order once that order reaches the supplier’s required quantity.
A buyer compares a qualifying all-units discount with the extra storage needed for the larger order.
Annual cycle-stock holding cost
Annual cycle-stock holding cost is average cycle stock times annual holding cost per unit, equal to QH/2 in basic EOQ.
The buyer charges annual cycle-stock holding cost on half the order quantity when stock drains evenly to zero.
Annual ordering cost
Annual ordering cost is fixed cost per order multiplied by the number of orders in a year, written as DS/Q in the EOQ model.
Increasing each batch reduces annual ordering cost because the same demand is supplied by fewer orders.
Annual usage value
Annual usage value is annual demand in units multiplied by unit cost, measuring the item’s annual financial flow through the operation.
An inexpensive clip can have high annual usage value when the factory consumes millions of clips each year.
Anticipation stock
Anticipation stock is inventory built before a known future demand peak or supply event, often to spread production across time.
A producer builds anticipation stock in quieter months to meet a predictable festival-season sales peak.

B

Backorder
A backorder is accepted customer demand not yet supplied, which reduces inventory position because future stock is already committed to it.
A depot subtracts backorders before deciding how much of an incoming delivery is available for new customers.

C

Class A item
A class A item belongs to the high-priority ABC group, whose relatively few items usually contribute most of total annual usage value.
A class A item receives close review because small planning errors can have a substantial financial effect.
Continuous review
Continuous review updates inventory position after transactions and places a fixed-size order when position reaches the reorder point.
Scanning each withdrawal lets continuous review identify the point at which a new replenishment order is due.
Cost penalty
A cost penalty is the extra relevant inventory cost from using a quantity different from the cost-minimizing quantity under the same inputs.
The cost penalty of a nearby pack multiple may be small because the EOQ cost curve is flat near its minimum.
Critical ratio
The critical ratio is underage cost divided by total underage and overage cost, selecting the economically preferred demand percentile.
A high critical ratio reflects a large missed-sale loss relative to the loss on a leftover unit.
Cumulative demand probability
A cumulative demand probability is the chance that demand is at or below a quantity, used to locate the critical percentile in a demand table.
The seller chooses the first table quantity whose cumulative demand probability reaches the critical ratio.
Cumulative value share
A cumulative value share is the percentage of total annual usage value contributed by all items down to a position in a sorted ranking.
The buyer marks a class boundary where the cumulative value share reaches the chosen management cutoff.
Cycle service level
The cycle service level is the probability of no stockout in one replenishment cycle, determined by how much lead-time demand the reorder point covers.
A 95% cycle service level allows shortages in about five of every hundred replenishment cycles over time.
Cycle stock
Cycle stock is inventory held because goods are ordered or produced in batches and then used gradually between replenishments.
A café’s cycle stock of beans falls between its regular deliveries as drinks are prepared for customers.

D

Days of supply
Days of supply is average inventory value divided by daily cost of goods sold, showing how long average stock covers that demand rate.
A buyer tracks days of supply to spot items holding several months of stock despite steady customer demand.
Decoupling stock
Decoupling stock is inventory between process stages that lets one stage keep operating when another stage slows down or stops.
A buffer of molded parts provides decoupling stock between molding equipment and the final assembly line.
Dependent demand
Dependent demand is the requirement for an item calculated from a plan for another item, using the quantities needed to make it.
A plan for 200 four-legged stools creates dependent demand for 800 legs before allowing for production losses.

E

Economic order quantity
The economic order quantity is the batch size minimizing annual ordering plus holding cost under the basic model’s stated assumptions.
The planner calculates economic order quantity after matching annual demand with an annual per-unit holding cost.
EOQ sensitivity
EOQ sensitivity describes how the calculated optimum changes when demand, ordering cost or holding cost changes, following square-root relationships.
The planner uses EOQ sensitivity to see why a 44% increase in demand calls for only a 20% larger batch.
ERP order proposal
An ERP order proposal is a software suggestion to replenish an item based on transaction records and settings such as quantity, trigger or target.
A planner checks an ERP order proposal after a lead-time change to confirm that its stock settings are still suitable.
Expected shortage per cycle
The expected shortage per cycle is the average number of units not immediately filled in a replenishment cycle, averaged over all demand outcomes.
Dividing expected shortage per cycle by order quantity gives the unfilled demand fraction in the backorder model.

F

Feasible candidate quantity
A feasible candidate quantity satisfies a price range’s minimum and maximum requirements and is retained for the total-cost comparison.
The buyer evaluates each feasible candidate quantity at its available price, including annual purchase cost.
Fill rate
The fill rate is the fraction of demanded units supplied immediately from available stock, measuring shortage size instead of counting shortage cycles.
A cycle short by one unit lowers fill rate slightly but still counts as a failed cycle for cycle service level.
Forecast error
A forecast error is the difference between actual demand and its forecast; the distribution of these errors supplies inventory uncertainty estimates.
Predictable seasonal demand belongs in the forecast, while remaining forecast error helps size the safety buffer.

G

Grouped replenishment
Grouped replenishment combines orders for several items, often from one supplier, to reduce shared ordering, counting or transport costs.
A weekly truck route makes grouped replenishment attractive even though periodic review requires more safety stock.

H

Holding cost
Holding cost is the cost of keeping one unit in stock for a stated period, including capital, relevant storage and expected inventory losses.
A buyer includes both financing and spoilage in the holding cost of ingredients waiting to be processed.
Holding rate
A holding rate expresses annual carrying cost as a share of unit cost; multiplying the rate by unit cost gives annual holding cost per unit.
With a 20% holding rate, a part costing $50 incurs $10 of annual holding cost for each average unit stored.

I

Incremental discount
An incremental discount lowers the price only on units above a specified break, so its purchase-cost calculation differs from an all-units discount.
A buyer reads the price schedule carefully to see whether a discount applies to the full order or only extra units.
Independent demand
Independent demand comes from external customers instead of another item’s production plan and must be estimated with a demand forecast.
A shop forecasts independent demand for replacement tires sold directly to cyclists during the coming month.
Inventory
Inventory is the stock of materials and goods an organization holds for later use or sale, including supplies used to keep work running.
A clinic holds inventory of medicines and gloves so staff can treat patients without waiting for deliveries.
Inventory position
Inventory position is on-hand stock plus outstanding orders minus backorders, measuring stock after incoming supply and accepted unmet demand.
A planner checks inventory position before ordering so a delivery already on its way is not ordered twice.
Inventory turnover
Inventory turnover is annual cost of goods sold divided by average inventory value, expressing how many times inventory turns in a year.
A retailer compares inventory turnover with similar retailers while checking whether stockouts have increased.

L

Lead time
Lead time is the time from placing an order until the goods become available for use, including processing, transport, receipt and inspection.
A planner includes receiving inspection in lead time because arriving goods cannot yet be used before that check.
Lead-time demand
Lead-time demand is the total demand occurring between placing an order and having its receipt available, combining its expected amount and uncertainty.
A buyer estimates lead-time demand before setting a trigger that must last until the supplier’s receipt can be used.
Lead-time demand standard deviation
The lead-time demand standard deviation measures the spread of demand around its expected total during replenishment, in units of the item.
With independent daily errors, lead-time demand standard deviation grows with the square root of a fixed lead time.
Lead-time variability
Lead-time variability is the spread of delivery duration around its average, adding uncertainty to demand that must be covered before receipt.
Two suppliers with the same average delivery time can require different buffers because their lead-time variability differs.

M

Maximum production stock
Maximum production stock is the peak inventory at the end of a production run, equal to run size times one minus the demand-to-production ratio.
A 600-unit run can have maximum production stock below 600 because demand uses units while the line runs.
Min–max policy
A periodic min–max policy orders up to a maximum position only when the reviewed position is at or below a minimum trigger.
A min–max policy skips an order above its minimum, avoiding small replenishments at every scheduled review.
MRO supplies
MRO supplies are maintenance, repair and operating items that support the operation, such as spare parts, lubricants and protective gloves.
A factory keeps MRO supplies of replacement belts so a worn belt can be changed without a long interruption.

N

Net stock accumulation rate
The net stock accumulation rate is production rate minus demand rate during a run, showing how quickly finished stock builds while output continues.
If production makes 80 daily and demand uses 30, the net stock accumulation rate is 50 units per day.
Newsvendor model
The newsvendor model chooses a one-time order before uncertain demand when missed demand is lost and leftovers lose value after the selling period.
A stall uses the newsvendor model for event merchandise that cannot be sold later at its original price.
Normal demand percentile
A normal demand percentile is a quantity with a stated probability of demand falling at or below it, found from the mean plus a z adjustment.
The retailer converts its cost-selected normal demand percentile into units using forecast mean and standard deviation.
Normal newsvendor quantity
The normal newsvendor quantity is mean demand plus the critical-ratio z value times demand standard deviation for one selling period.
The normal newsvendor quantity falls below mean demand when the cost balance selects a ratio below one-half.

O

One-period demand standard deviation
The one-period demand standard deviation measures the uncertainty in total demand for the selling period around its forecast mean.
A larger one-period demand standard deviation lowers the optimal order when the critical ratio is below one-half.
One-period forecast mean
The one-period forecast mean is expected total demand during the single selling period, serving as the center of the normal newsvendor calculation.
A seasonal buyer adds the cost-selected z adjustment to the one-period forecast mean before rounding the order.
Order frequency
Order frequency is the number of replenishment orders placed in a period, found by dividing demand for that period by the order quantity.
An order frequency of 20 per working year means the buyer places an order about every 12.5 working days in a 250-day year.
Ordering cost
Ordering cost is the fixed cost incurred each time an order is placed and received, separate from the price paid for its units.
A fixed delivery charge and purchase-order processing both contribute to the ordering cost of a shipment.
Overage cost
The overage cost is the loss from one leftover unit, calculated as unit cost minus salvage value plus any cost of disposal.
Improved clearance recovery lowers overage cost because each leftover returns more of its original purchase cost.

P

Periodic review
Periodic review checks inventory position at fixed intervals and orders enough at each check to restore the position to a chosen target.
A buyer uses periodic review for items combined into the supplier’s weekly delivery, varying each item’s order quantity.
Pipeline stock
Pipeline stock is inventory in transit between locations that has entered the supply flow but has not yet arrived at its destination.
Parts traveling from a supplier to an assembly plant remain pipeline stock during their transport journey.
Price break
A price break is an order quantity threshold at which a supplier’s pricing schedule begins to offer a different unit price.
An EOQ below the price break must be raised to the threshold before the discounted price is available.
Production order quantity
The production order quantity is the economical run size when units arrive gradually during production while demand consumes some of them.
A factory uses production order quantity to choose a run size without treating the whole run as instant stock.
Production run time
Production run time is the duration needed to make a batch, found by dividing its quantity by the production rate in matching units.
A 400-unit batch made at 100 per working day has a production run time of four working days.
Protection interval
The protection interval is the period demand must be covered before the next replenishment opportunity arrives; periodic review uses review plus lead time.
A seven-day review and two-day lead time give a nine-day protection interval for setting the periodic target.
Purchase cost
Purchase cost is the amount paid for the goods, calculated annually as unit purchase price multiplied by annual demand.
A quantity discount reduces annual purchase cost but can add more holding cost than the price saving is worth.

R

Reorder point
A reorder point is the inventory position that triggers replenishment, covering expected demand during lead time plus any safety stock.
The buyer uses the reorder point to decide when to order and uses the chosen batch size to decide how much.
Review interval
The review interval is the fixed time between inventory checks in a periodic policy, set by practical schedules or an economical starting interval.
Extending a review interval from weekly to every two weeks lengthens the demand period that stock must protect.

S

Safety factor z
The safety factor z is the standard normal percentile matching a target cycle service level, used to scale lead-time demand standard deviation.
For a 95% cycle service level, the buyer applies a safety factor z of 1.645 before rounding buffer units up.
Safety stock
Safety stock is extra inventory above expected demand held to protect against unexpectedly high demand or delayed replenishment.
A service depot adds safety stock of filters because urgent repair demand sometimes exceeds the forecast.
Salvage value
The salvage value is the amount recovered from a leftover unit after the main selling period, reducing its net overage loss.
A florist includes the salvage value of discounted remaining bouquets when choosing how many to prepare.
Sawtooth stock pattern
A sawtooth stock pattern shows stock jumping at an instant delivery and then falling steadily until the next receipt in the basic EOQ model.
A sawtooth stock pattern for a 500-unit order ranges from 500 to zero, with average cycle stock of 250.
Setup cost
Setup cost is the cost of preparing a process for one production run, including changeover work, lost output and start-up scrap.
Reducing setup cost lets a factory produce smaller batches without paying as much for frequent changeovers.
Shortage cost
Shortage cost is the loss caused by an item being unavailable when needed, such as missed margin, expediting or interrupted production.
A missing spare can create shortage cost through idle equipment even when the spare itself is inexpensive.
Standard normal loss function
The standard normal loss function gives expected excess above a z threshold, which becomes expected units short after scaling by standard deviation.
The planner looks up the standard normal loss function to distinguish expected shortage size from stockout probability.

T

Target level
A target level is the inventory position restored by an order at a periodic review, covering mean protection-interval demand plus safety stock.
A target level of 500 does not mean ordering 500 each time; the buyer first subtracts current inventory position.
Time between orders
The time between orders is the average interval covered by one batch, calculated as quantity divided by demand per matching time unit.
At steady demand of 25 units a day, an order of 250 gives a time between orders of ten working days.
Two-bin system
A two-bin system triggers replenishment when a working bin empties, while a reserve bin supplies demand during the delivery lead time.
A workshop uses a two-bin system for inexpensive screws so the empty working bin provides a visible order signal.

U

Underage cost
The underage cost is the loss from one unit of unmet demand, equal to missed contribution margin plus any additional lost goodwill.
Including future-business loss raises underage cost and makes a larger one-period order economically attractive.

V

Variance contribution
A variance contribution is one additive source of squared uncertainty in combined lead-time demand when the model’s independence conditions hold.
The buyer compares each variance contribution to decide whether forecast improvement or delivery reliability matters more.

W

Work-in-process
Work-in-process consists of partly finished items that have entered production but are not yet ready to be sold as finished goods.
Unpainted bicycle frames waiting after welding are work-in-process until the remaining production steps are complete.

About this lesson

By StudeliReport a mistake

Make your own Study Materials

Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.