- Learn
- Business & Economics
- Operations & Supply Chain
- Operations Management
- Process Design and Capacity
Process Design and Capacity
IntermediateLesson 3 of 9 in Operations Management Course
What you will learn
- Match manufacturing and service processes to the volume and variety they must handle, and explain the cost, flexibility and customer-contact trade-offs of each choice.
- Match a manufacturing process type to volume and varietyDescribe the process types from project and job shop to continuous flow, place them on the product-process matrix, and explain why a good fit between product and process matters.
- Design service processes around customer contactClassify service processes by labor intensity, customization and customer contact, and decide which parts of a service to run like a factory and which to design around the customer.
- Match a manufacturing process type to volume and variety
- Draw process maps and service blueprints that expose delays, handoffs and fail points, and measure flow with throughput rate, cycle time, throughput time, work in process and Little’s law.
- Draw flowcharts, process charts and time-function mapsUse standard mapping symbols to describe a process as it really runs, separate value-adding steps from delays and movements, and show where elapsed time goes.
- Blueprint a service and design out fail pointsBuild a service blueprint that separates what customers see from what happens behind the scenes, and use it to find and prevent the steps where the service is likely to fail.
- Measure flow with throughput time, cycle time and Little’s lawCalculate throughput rate, cycle time, throughput time, work in process and throughput efficiency, and use Little’s law to connect them.
- Draw flowcharts, process charts and time-function maps
- Measure capacity, utilization and efficiency, work out the resources a demand forecast requires, and choose how much capacity to add, and when, under uncertain demand.
- Measure capacity, utilization and efficiencyDistinguish design capacity, effective capacity and actual output, calculate utilization, efficiency and overall equipment effectiveness, and interpret the results.
- Calculate capacity requirements and choose a capacity strategyTranslate a demand forecast into the number of machines or staff needed, set a capacity cushion, and choose the size and timing of capacity changes.
- Evaluate capacity options under uncertain demandUse expected monetary value and decision trees to compare capacity alternatives when future demand is uncertain, and interpret the result with its limits.
- Measure capacity, utilization and efficiency
- Identify the step that limits a process, calculate process capacity and throughput time, and use the theory of constraints to raise output by managing that step.
- Find the bottleneck and calculate process capacityCalculate the capacity of each step, including steps with parallel resources, to find the bottleneck, the process capacity, the cycle time and the throughput time with no waiting.
- Manage a constraint with the theory of constraintsApply the five focusing steps, drum-buffer-rope and throughput accounting to raise the output and profit of a constrained process, including choosing the best product mix.
- Find the bottleneck and calculate process capacity
- Find the volume at which an operation covers its costs, for one product and for a product mix, and use cost crossover points to choose between processes.
- Find the break-even point for one productSeparate fixed and variable costs, calculate break-even volume and sales, find the volume for a target profit, and state the assumptions behind the model.
- Extend break-even to product mixes and process choiceCalculate the break-even sales of a multiproduct operation from its sales mix, and use crossover points between cost lines to choose the cheapest process for an expected volume.
- Find the break-even point for one product
- Describe a waiting-line system, calculate its performance with single-server and multi-server models, and choose the number of servers that balances service cost against the cost of waiting.
- Describe a waiting-line system and its costsIdentify the arrival pattern, queue rules and service structure of a waiting line, name it in Kendall notation, and explain the trade-off between service cost and waiting cost.
- Calculate single-server waiting-line measuresApply the M/M/1 and M/D/1 models to calculate utilization, line length and waiting time, check the results with Little’s law, and explain why waits grow rapidly as utilization approaches 100%.
- Compare multi-server options and choose a service levelUse the M/M/s model to calculate waits with several servers, compare the total cost of different staffing levels, and apply pooling and the psychology of waiting to service design.
- Describe a waiting-line system and its costs
Process Design and Capacity study guide
1Choose a process type that fits volume and variety
Choosing a process shapes cost, speed and flexibility long after the first order is filled. A workshop needs room for different jobs; a dedicated line needs enough repeated demand to justify its equipment. Service processes add another question: where does customer contact help, and where does it disrupt routine work? Compare manufacturing and service choices, then connect the design to the volume, variety and experience customers need.
1.1 Choose how products will be made
A process turns inputs into outputs through a set of activities. Choosing its basic design commits an operation to equipment, skills and ways of working that may be costly to change. Start with what customers need: how much of each product, and how different the orders are.
Match volume and variety
Volume is output per period; variety is the range of products or differences between orders. Five process types span the usual range:
| Process | Typical demand | Example |
|---|---|---|
| Project | One large, unique output | Building a bridge |
| Jobbing or job shop | Low volume, highly different orders | A custom tailor |
| Batch | Repeated groups with changeovers | A bakery changing bread types |
| Mass | High volume, narrow variety | Appliance assembly |
| Continuous | Very high volume of flowing output | A paper mill |
A batch need not be small. Its defining feature is production in separate groups, with a changeover between products. In a project, the product commonly stays in place while people and equipment come to it.
Heizer's process focus describes a flexible job shop with resources grouped by function. Repetitive focus assembles standard modules on a line. Product focus uses specialized resources for high-volume, low-variety output. Mass customization combines high volume with customer choice through modules, flexible equipment, fast changeovers and late customization. Configuring a laptop from standard components is different from designing every component afresh.
Understand the cost of a mismatch
The product-process matrix compares product structure with process structure: jumbled job-shop flow, disconnected batch flow, connected assembly-line flow and continuous flow. Its diagonal represents a good match. As a product becomes standardized and demand grows, a move toward line production can make sense.
Moving toward continuous flow generally raises fixed costs and equipment specialization, lowers variable cost per unit, makes work more repetitive and reduces flexibility. Flow becomes more regular; work in process and elapsed time usually fall. The low variable cost pays off only at enough volume to spread the fixed investment.
A standard high-volume part made in a job shop carries avoidable handling and labor costs. A dedicated line handling many custom orders loses time to changeovers and disruptions. The most automated process is therefore not the best choice for every product.
Work through a product range
A furniture maker builds 40 made-to-measure kitchens each year, 30 cabinet models in runs of 500, and 4,000 identical flat-pack bookshelves per day. Kitchens fit jobbing: shared tools and skilled workers accommodate each design. Cabinets fit batch production: repeat a model, then change the setup. Bookshelves fit mass production: repeated steps justify a dedicated line.
The workshop that makes kitchens would give the bookshelf needless flexibility and a high unit cost. The bookshelf line would need constant changes to build kitchens. Functional equipment groupings support the workshop; equipment arranged in task order supports the line. Check expected volume, cost and the flexibility customers value before committing to either design.
Key Takeaways
- Choose the process from volume per product and the variety of orders.
- Batch production makes separate groups; batch size can be large.
- More specialized processes usually have higher fixed costs and lower variable costs.
- Mass customization keeps standard modules while allowing customer choice.
- The product-process matrix shows the cost of mismatching products and processes.
1.2 Design contact that customers value
A service often needs the customer to take part while it is delivered. A consultation hour left unused today cannot be stored for tomorrow. Process design must therefore consider both the work and when customers need it.
Classify the service with clear axes
Slack's volume–variety classification runs from professional services, with few customized transactions and much staff discretion, through service shops, which combine front-office and back-office work, to mass services, with many standardized transactions. A consultant, a hotel and a supermarket illustrate this range.
Schmenner's service process matrix asks two different questions: how large is labor cost relative to facilities and equipment, and how much interaction and customization does the service involve?
| Labor intensity | Low interaction/customization | High interaction/customization |
|---|---|---|
| Low | Service factory: airline, hotel | Service shop: hospital, auto repair |
| High | Mass service: retailing, schools | Professional service: law, accounting |
Here, labor intensity is a cost ratio, not a count of employees. A large airline employs many people but also uses expensive aircraft. Also, Slack's service shops and Schmenner's service shop are different categories; name the framework when classifying an operation.
Low labor intensity puts emphasis on capital, technology and smoothing demand. High labor intensity puts emphasis on hiring, training and staff schedules. Customization makes cost, quality and expectations harder to control. Standardization makes consistency easier but can leave customers feeling that their needs are ignored.
Separate customer contact from supporting work
The customer contact model links greater time spent by the customer in the system with more variation and less freedom to organize work efficiently. Customers arrive at different times, ask questions and bring different needs.
Decoupling separates the high-contact front office from the low-contact back office. The front office supports the customer experience; the back office can use standard procedures, scheduled work and batching. In a bank, an adviser meets customers while check clearing takes place backstage.
Consider an accounting firm where every client initially meets a senior accountant. Clients can upload documents through a questionnaire. Junior staff and software prepare standard returns in the back office. Senior accountants meet clients who need complex advice. This saves scarce specialist time while preserving contact where judgment matters.
Choose a redesign deliberately
Options include moving unseen work backstage, automating routine steps, offering standard service packages, using customer self-service, or postponing customization. A sandwich shop prepares standard ingredients and assembles each order when requested.
Self-service uses the customer's time and effort, so test whether customers accept it and can complete it easily. Removing contact that customers value can damage perceived quality even if staff cost falls. Keep diagnosis, advice or reassurance where they improve the experience; organize routine work around reliable flow. A service blueprint makes these contact decisions visible and shows which backstage steps each encounter depends on.
Key Takeaways
- Service capacity must be available when customers need it; unused time cannot be stored.
- Name the classification framework because service-shop labels differ.
- Schmenner uses labor intensity and interaction/customization as separate axes.
- Decouple customer-facing work from routine supporting work where it improves the service.
- Self-service has a cost in customer effort.
- Preserve contact that customers value.
2Map and measure how work flows through a process
A process can look fast when each task is timed separately and still make a customer wait for days. Maps show the path, ownership and delays that task times miss. Service blueprints add the customer’s experience and the hidden work behind it. Flow measures then connect the map to numbers: how often units finish, how long they stay, and how many are inside. Use the same process boundary to make those measures fit together.
2.1 Make delays and handoffs visible
A process map shows what work happens, in what order, and how materials, information or customers move. Observe the as-is process before drawing a to-be process. The official procedure may leave out queues, exceptions and workarounds that explain poor performance.
Choose a map that answers the question
A flowchart shows sequence and decisions. Use an oval or rounded rectangle for the start and end, rectangles for activities, diamonds for decisions and arrows for flow. Label each decision exit. For “Form complete?”, show both “yes” and “no,” including where an incomplete form goes.
A process chart records each step, its time and distance, using five categories:
- Operation, a circle: something is made or changed.
- Transport, an arrow: the item moves.
- Inspection, a square: the item is checked.
- Delay, a D shape: the item waits for the next step.
- Storage, a triangle: the item is kept in a controlled place.
Checking a finished part is inspection; correcting it is an operation. Controlled storage differs from an item simply waiting because the next worker is busy.
A swim-lane map gives each role or department its own lane. A crossing arrow is a handoff. For an order, lanes might be customer, sales, credit, warehouse and delivery. Follow the information that must cross each boundary: missing details or unclear ownership can stop an otherwise fast process.
A time-function map adds a horizontal time scale to the lanes. Long bars reveal whether elapsed time comes from active work or waiting. An order that takes 12 days but needs only about 2 days of activity has substantial delay between tasks.
Use time to locate the opportunity
A laptop repair chart records 14 minutes of operations, 4 minutes of inspections, 8 minutes of transport and 54 minutes of delay. Total elapsed time is:
If the operations are the value-adding work, the value-added ratio is:
Waiting consumes 54 of the 80 minutes. Reducing those waits is the main opportunity to shorten the customer's experience. Making the 14 minutes of repair slightly faster would leave most of the delay intact.
Value-added analysis asks whether a step changes the output in a way the customer would pay for. Transport, inspection, delay and storage usually do not add value, but some remain necessary. A required safety inspection should be assessed for how well it works, not removed just because it does not transform the item.
Set the right boundary and detail
Use a high-level map to find the major stages and handoffs, then expand the stage that needs investigation. Record the same beginning and end when comparing current and proposed times. Include failed checks, returns for missing information and repeated work. A map of only the smooth route can hide the very delays it is meant to explain.
Key Takeaways
- Map actual work before proposing a new process.
- Label decision exits and include rework loops.
- Process charts distinguish operation, transport, inspection, delay and storage.
- Swim lanes show ownership and handoffs; time-function maps show elapsed time.
- Value-added time divided by elapsed time identifies how much time changes the output.
2.2 Protect the service at its fail points
A customer sees only part of a service. A service blueprint connects that experience to the employees and systems that make it possible. It helps explain why a pleasant interaction can still end in a late, incomplete or incorrect result.
Build the layers around the customer
Choose one service and customer group, then trace the customer's actions from beginning to end. Put the provider's actions under the customer step they support. Read the layers from top to bottom:
- Physical evidence: the website, room, signs, confirmation or invoice the customer encounters.
- Customer actions: what the customer does.
- The line of interaction, separating customers from visible employee actions.
- Onstage actions: employee work the customer sees.
- The line of visibility, separating visible and hidden employee work.
- Backstage actions: employee work out of sight.
- The line of internal interaction, separating contact employees from supporting functions.
- Support processes: IT, purchasing and other departments.
An arrow crossing the line of interaction represents a service encounter. The line of visibility is a design choice: selected backstage work can be shown to build trust, while complex routine work can remain hidden.
Mark failures and waits
Add activity times, waits and the limits customers can tolerate. Mark a likely harmful error or delay as a fail point, often with F, and a customer wait with W. A handoff that depends on copying details manually deserves attention because information may be lost or changed.
For an auto repair service, customers book, drop off the car, approve extra work and collect it. The adviser receives the car, confirms the complaint, asks for approval and explains the bill. The technician diagnoses, repairs and road-tests backstage. Booking software and parts ordering support these actions.
Three fail points suggest different protections. If the complaint can be recorded wrongly, the adviser reads it back for confirmation. If a needed part may be missing, stock for common jobs is checked at booking. If the promised completion time will be missed, the adviser contacts the customer before that time. Each protection is attached to a named failure, so staff know when and why to act.
Prevent errors at the step
Fail-safing, also called poka-yoke, prevents an error or catches it immediately. A required-field check can stop an incomplete booking from entering the process. An appointment reminder reduces missed appointments. A checklist completed with a patient helps catch omissions before treatment.
A customer journey alone is not a full blueprint: it omits the hidden work that supports each encounter. Physical evidence also matters because customers use it to judge service quality. After marking a fail point, specify a prevention or recovery action and who owns it; an F on the page does not protect the customer by itself.
Key Takeaways
- Blueprints connect customer actions to onstage, backstage and support work.
- The line of visibility separates work customers see from work they do not see.
- Mark waits and fail points, then attach a protection and an owner.
- Fail-safing prevents errors or catches them before they reach the customer.
2.3 Connect inventory, output and time
A busy process can finish units frequently while each unit spends a long time inside it. Separate the pace of completion from the journey of one unit before calculating flow performance.
Define the measures
Throughput rate is average completed units per period. Cycle time is the average interval between successive completions, the reciprocal of throughput rate. At 50 claims per working day, cycle time is of a working day. Throughput time is the elapsed time for one unit, including waiting. Work in process (WIP) counts units that have entered but not yet left.
Textbooks and workplaces use “cycle time” and “throughput time” differently. Here, throughput time includes waits. Work content adds all activity time; throughput time with no waiting measures elapsed activity time. For a chair, a frame takes 10 minutes and a seat 6 minutes in parallel, followed by 8 minutes of assembly. Work content is 24 worker-minutes; elapsed time with no waiting is:
The parallel workers reduce elapsed time, not the amount of work needed.
Apply Little's law
For stable long-run averages:
Use one boundary and compatible time units. Stable means average inflow equals average outflow; a queue that grows continually has no stable average WIP. The relation does not require a particular arrival or service-time distribution.
An office completes 50 claims per working day and holds 400 claims on average. Average throughput time is:
At the same completion rate, reducing WIP to 200 claims reduces the average time to 4 days. The condition that output stays at 50 matters: releasing so little work that the bottleneck goes idle could lower output too.
For a clinic receiving 20 patients per hour with an average visit of 30 minutes, convert the time to 0.5 hour. Average occupancy is 10 patients, including those waiting and being treated. This helps plan space with room for busier periods; it is not a count of staff required.
Measure how much of the journey is work
Throughput efficiency is work content divided by throughput time, expressed as a percentage. If each claim needs 2 hours of work and the office uses 8-hour working days, the 8-day journey is 64 working hours:
Do not replace work content with elapsed parallel activity time in this definition. At another boundary, such as just the waiting line, Little's law uses only waiting customers and their time in line. In queue notation, the whole system uses , while the line uses . Count people or items, rate and time over that same boundary throughout.
Key Takeaways
- Cycle time is the interval between completions; throughput time is one unit’s full journey.
- Work content sums activity time; elapsed parallel activity time counts the longest branch.
- Little’s law connects stable long-run averages over one boundary.
- Convert rates and times to compatible units before multiplying.
- At unchanged throughput rate, less WIP means shorter throughput time.
- Average occupancy does not determine staffing by itself.
3Measure capacity and plan how much is needed
A capacity figure is useful only when its operating conditions and time period are clear. Ideal output, planned output and actual output tell different stories about losses. Demand forecasts must also be translated into resource hours, including setups and spare capacity. After sizing the resources, compare when to add them and what each option earns under uncertain demand, keeping expected payoff and financial risk distinct.
3.1 Read capacity figures correctly
Capacity describes how much an operation can deliver in a stated period. “300 units” is incomplete; “300 units per shift” is usable. Where products need very different amounts of work, measure capacity in machine hours or standard hours, or state the product mix.
Separate three output levels
Design capacity is the theoretical maximum under ideal conditions. Effective capacity allows for the planned way the operation runs: product mix, maintenance, cleaning, breaks, changeovers and quality standards. Actual output is what it really delivers after unplanned losses such as breakdowns, shortages and absence.
Two ratios answer different questions:
A sandwich line makes up to 150 sandwiches per hour. Two 8-hour shifts on 5 days give design capacity of 12,000 per week. Effective capacity is 10,000 after planned stops; actual output is 9,000. Utilization is 75%, while efficiency is 90%.
The 3,000-unit total gap has two parts: 2,000 from planned losses and 1,000 from unplanned losses. Faster changeovers could raise effective capacity; fewer breakdowns could raise efficiency. Investigate which losses are avoidable before choosing an action. A new line with effective capacity of 10,000 and expected efficiency of 85% should deliver 8,500 per week, not 10,000.
Break equipment losses into parts
Overall equipment effectiveness (OEE) combines availability, performance and quality:
Suppose planned production time is 480 minutes, with 48 minutes of breakdowns. Running time is 432 minutes, so availability is 0.90. The ideal cycle time is 1 minute per unit, and the machine makes 400 units: performance is , about 0.926. Of these, 380 are good, so quality is 0.95.
Multiplying the unrounded factors gives OEE of about 79%. Check it directly: 380 good units at 1 ideal minute each use 380 of the 480 planned minutes. The factors locate different losses; a machine may be available but slow, or fast while making defects.
Choose the measure for the decision
Services often use input measures such as staff hours, beds or seats because their outputs differ. Manufacturing with a changing mix also needs workload measures: 100 simple units and 100 complex units can use very different capacity.
Long-range decisions concern facilities and major equipment more than about a year ahead. Intermediate decisions, roughly 3–18 months, concern staffing, subcontracting and inventory. Short-range decisions, up to about 3 months, concern schedules, overtime and assignments. High utilization alone does not show good performance: a nonbottleneck running faster can build unwanted inventory, while a variable service operating near full utilization develops long waits.
Key Takeaways
- Capacity needs both an output or resource measure and a time period.
- Utilization uses design capacity; efficiency uses effective capacity.
- Separate planned losses from unplanned losses before choosing an improvement.
- OEE multiplies availability, performance and quality.
- High utilization can create inventory or waiting when it is pursued in the wrong place.
3.2 Plan enough resources and choose when to add them
Capacity planning connects a demand forecast to the resources needed to deliver it. Convert units into processing and setup time, compare that load with usable time, then evaluate the cost and risk of closing any gap.
Include processing, setups and a cushion
For one product, required machines or staff are:
Demand per year is D, processing time per unit is p, lot size is Q, setup time per lot is s, available annual time per resource is N, and the desired capacity cushion is C as a fraction. Use the same time unit for p, s and N, then round the resource count up.
Demand of 120,000 units at 3 minutes each needs 360,000 processing minutes. Lots of 500 require 240 setups; at 60 minutes each, setups add 14,400 minutes. Total load is 374,400 minutes.
One machine working 250 days, two 8-hour shifts per day, provides 4,000 hours or 240,000 minutes. A 15% cushion leaves 204,000 minutes planned for workload. The requirement is about 1.84 machines, so install 2. Their combined 480,000 minutes give planned utilization of 78%; rounding up leaves a larger actual cushion than the minimum.
A capacity cushion is capacity above expected load, measured here as 100% minus average utilization. Uncertain demand, costly lost sales and services without storable output favor larger cushions. Stable demand and expensive equipment favor smaller ones. Ignoring setup time or rounding down can leave a facility unable to meet its plan.
Decide size and timing
Economies of scale lower average cost as fixed costs spread across more units and specialization becomes worthwhile. Beyond a certain size, coordination, complexity and congestion create diseconomies of scale. The best operating level is the output with the lowest average unit cost.
A lead strategy adds capacity before demand arrives, protecting sales but risking idle resources. A lag strategy waits until growth appears, using existing capacity more fully but risking lost sales or costly overtime. An average or straddle strategy alternates between capacity above and below demand. Small increments preserve flexibility; one large addition can gain scale economies but creates a period of spare capacity.
With capacity of 10,000 and annual demand forecasts of 9,000, 11,000 and 13,000, 2,000-unit modules added before years 2 and 3 give capacity of 12,000 and 14,000. A lagging addition after year 2 leaves 1,000 unserved that year, then another 1,000 in year 3 with capacity at 12,000.
Manage demand as well as supply
Compare adding capacity with subcontracting, changing hours, or changing demand timing. Reservations, appointments, higher peak prices and longer quoted lead times can ease overload. Promotions, off-peak prices or products with opposite seasonal peaks can use spare capacity. A service needs capacity for arrival peaks; an acceptable daily average can still hide a severely overloaded hour.
Key Takeaways
- Convert demand into processing time plus setup time.
- Divide workload by resource time after allowing for the desired cushion.
- Round required resources up and recheck the resulting utilization.
- Lead, lag and average strategies trade service risk against spare capacity.
- Scale economies can reverse when coordination and congestion grow.
- Demand timing can be changed as well as capacity.
3.3 Compare uncertain capacity investments
A forecast can leave several plausible demand outcomes. A capacity decision should show what each option earns in each outcome and how likely those outcomes are. This makes the trade-off between upside, downside and flexibility visible.
Calculate expected monetary value
A state of nature is an outcome the manager does not control, such as high or low demand. Give the states probabilities that sum to 1. For each alternative, multiply every payoff by its probability and add:
For profit payoffs, choose the highest EMV; for costs, choose the lowest expected cost. Use payoffs on the same basis: investment costs must be included consistently, and amounts from different years need a comparable present-value basis.
Suppose high demand has probability 0.4 and low demand 0.6. Payoffs below are thousands of dollars, net of investment:
| Alternative | High demand | Low demand | EMV |
|---|---|---|---|
| Large expansion | 800 | −200 | 200 |
| Small expansion | 400 | 100 | 220 |
| Do nothing | 0 | 0 | 0 |
For the large option, 320 from the high-demand branch plus −120 from the low-demand branch gives 200. For the small option, 160 plus 60 gives 220. The small expansion has the higher EMV even though the large expansion has the greatest possible gain.
EMV is a probability-weighted average across repeated comparable decisions. The small expansion will pay either 400 or 100 in this decision, not 220. A firm unable to survive the large option's loss must also consider that downside; EMV alone does not represent its tolerance for risk.
Read and solve a decision tree
Draw decisions as squares and uncertain outcomes as circles. Branches from a chance node carry their probabilities; terminal paths show payoffs. Draw from left to right, then solve from right to left. Calculate a chance node's EMV before choosing the best branch at the preceding decision.
A later decision, such as expanding a small facility only after high demand appears, belongs after the demand outcome. Evaluate that decision separately in the branch where it is available. This shows how staged capacity can preserve useful options.
Test whether the choice is fragile
Let p be the probability of high demand in the table. Large and small expansions tie when:
This simplifies to , giving . Above about 43%, the large option has the higher EMV. The current estimate of 40% is close to that cutoff, so better demand information could change the recommendation. Do not select an option just because it wins in the most favorable state or because its single best payoff is largest.
Key Takeaways
- EMV weights each payoff by the probability of its state.
- Fold decision trees back from outcomes toward the first decision.
- An expected payoff is not the payoff guaranteed in one decision.
- Test probability cutoffs and consider whether the downside is affordable.
4Find bottlenecks and manage the constraint
A process succeeds at the pace of its limiting resource. Faster work elsewhere can leave the same output and more unfinished items. Find the constraint by comparing each resource group’s capacity with its workload, including parallel workers and product mix. Then decide how to protect its time, control releases and allocate scarce minutes to products that earn the most from them. Recalculate when an improvement moves the constraint.
4.1 Find what limits the whole process
The slowest task does not necessarily limit output: several people may perform it in parallel. Find each resource group's capacity relative to its workload, then identify the group that constrains the complete process.
Convert task times into capacity
For identical resources serving separate units in parallel:
The equivalent time per completed unit is task time divided by the resource count. The bottleneck has the lowest effective capacity relative to demand. Its capacity is the process capacity; its effective time is the process cycle time at full output.
A phone repair process has diagnosis at 4 minutes with one technician, repair at 6 minutes with two technicians, and test-and-clean at 5 minutes with one person. Capacities are 15, 20 and 12 phones per hour. Test-and-clean is the bottleneck, despite repair having the longest individual task time. The process can deliver 12 per hour, one completion every 5 minutes.
One phone still needs minutes with no waiting. Parallel repair technicians each handle a different phone; they do not reduce one phone's 6-minute repair. At 12 completions per hour, diagnosis uses 80% of its capacity, repair 60%, and test-and-clean 100%. Idle time at a nonbottleneck is part of running at the system's pace.
Distinguish parallel resources from parallel tasks
When different parts of the same unit are prepared simultaneously, use the longest branch for elapsed time before joining them. A chair frame taking 10 minutes and a seat taking 6, followed by 8-minute assembly, takes 18 minutes with no waiting. With one worker at each task, capacities are 6 frames, 10 seats and 7.5 assemblies per hour. Frames limit complete chairs to 6 per hour.
Adding capacity changes the comparison. In the phone shop, a second test-and-clean worker raises that stage to 24 per hour, but diagnosis then limits output to 15. The improvement raises process output from 12 to 15, not to 24. A third repair technician would leave output unchanged because repair already has spare capacity.
Check a changing product mix
For several products, add the minutes each product needs at each resource. A press has 2,400 minutes per week. Demand of 200 X at 6 minutes and 150 Y at 10 minutes requires:
Load is 112.5% of available time, so the mix cannot be supplied by that press. Repeat the calculation for every resource; another product mix may move the bottleneck. When all resources can meet demand, the market limits sales.
Do not average stage capacities or add task times to obtain an output rate. Those calculations describe neither the slowest resource group nor the process's sustainable completion rate.
Key Takeaways
- Compare capacity after allowing for parallel resources.
- Process capacity is the bottleneck capacity, not an average of stage capacities.
- Cycle time at full output differs from one unit’s elapsed processing time.
- Improving a bottleneck can move the limit to another step.
- For a product mix, compare each resource’s total workload with available time.
4.2 Use the constraint to guide decisions
The theory of constraints (TOC) directs improvement toward whatever limits the system's goal. A constraint can be physical, such as a machine or scarce skill, a market with insufficient demand, or a policy such as rewarding every department for maximum local output.
Follow the focusing cycle
- Identify the system's constraint.
- Exploit it: use existing capacity well, prevent starvation and defective input, and work on output customers need.
- Subordinate other work to it: release and process work at the pace the constraint needs.
- Elevate it if needed, using more capacity, another shift or outsourcing.
- Return to identification when it moves; prevent old rules from becoming the next constraint.
An hour lost at an active bottleneck loses an hour of system output. An hour saved at a nonbottleneck does not increase output while the same constraint remains. Protecting the bottleneck therefore comes before trying to keep every resource busy.
In the phone shop, test-and-clean takes 5 minutes and limits output to 12 per hour. Move 1 minute of packing to repair. Repair now takes 7 minutes with two technicians, or 3.5 effective minutes per unit; test-and-clean takes 4 minutes. Diagnosis also takes 4 minutes, so output rises to 15 per hour without extra staff. Diagnosis and test-and-clean now tie, and both must be considered in the next improvement.
Control release with drum-buffer-rope
The drum is the constraint's schedule. A buffer of work protects it from upstream disruptions. The rope signals when to release new work, linking release to the constraint's consumption. Too much release creates WIP and long throughput times without creating more sales. Too little can starve the constraint.
Rank products by scarce time
In throughput accounting, throughput (T) is sales revenue minus totally variable costs, usually materials. Inventory (I) is money tied up in things intended for sale. Operating expense (OE) is money spent turning inventory into throughput. Net profit is T minus OE. Here, throughput is money from sales, not a count of finished units.
Product P sells for 90 dollars with 45 of materials and uses 15 bottleneck minutes. Its throughput is 45 dollars, or 3 per constraint minute. Product Q sells for 100, uses 40 of materials and 30 minutes: 60 dollars per unit, but only 2 per constraint minute.
With 2,400 minutes and demand for 100 P and 50 Q, make P first: 100 P use 1,500 minutes, leaving 900 for 30 Q. Total throughput is 6,300 dollars. With OE of 5,000, profit is 1,300. Making Q first yields 5,700 throughput and 700 profit. Ranking by the larger unit margin would lose 600 dollars. The ranking uses a single active constraint and the stated demand limits; allocate its minutes until demand is met, then use any remainder for the next product.
Key Takeaways
- Exploit existing constraint capacity before paying to elevate it.
- Subordinate other work to the system’s constraint.
- Drum-buffer-rope protects the constraint while controlling WIP.
- TOC throughput is money from sales minus totally variable costs.
- Rank products by throughput per constraint minute, subject to demand limits.
- Recheck the system when the constraint moves.
5Use break-even analysis for volume and process decisions
Capacity decisions commit money before sales are certain. Contribution shows how each sale helps cover that commitment, and break-even shows the volume needed to avoid a loss. A product mix changes the contribution earned per sales dollar; a process choice changes fixed and variable costs. Use these relationships to compare feasible volumes, check profit targets and identify where a different process becomes cheaper.
5.1 Calculate break-even and target output
Sales first pay for the variable costs of making each unit. What remains contributes toward fixed costs and then profit. Break-even analysis finds the sales volume at which that contribution exactly covers fixed costs.
Build the profit equation
Let F be fixed cost per period, V variable cost per unit, P selling price per unit and x units sold in that period. Within the relevant operating range, F stays fixed and V stays constant per unit. Total variable cost, Vx, rises with volume.
The contribution per unit is . At break-even, profit is zero:
The contribution margin ratio is , the fraction of each sales dollar available for fixed costs and profit. Break-even sales value is:
Dividing fixed cost by selling price would ignore the cost of making the units. Allocated overhead per unit is also not a variable cost simply because it has been expressed “per unit.”
Work from contribution to profit
A bakery has monthly fixed costs of 12,000 dollars, a price of 4.00 per loaf and variable cost of 1.60. Contribution is 2.40 per loaf. Break-even volume is 5,000 loaves, and break-even sales are 20,000 dollars. Check: 5,000 contributions of 2.40 exactly cover 12,000.
At 6,500 loaves, contribution is 15,600 and profit is 3,600. For a target profit of 6,000, the required volume is:
If units are indivisible, round a fractional requirement up. Fixed cost of 10,000 and contribution of 3 gives 3,333.3 units, so 3,334 are needed to avoid a loss.
Read the chart and test feasibility
On a break-even chart, total cost starts at fixed cost on the vertical axis and rises with slope V. Revenue starts at zero and rises with slope P. Their crossing is break-even; their vertical difference is profit or loss. Lower fixed cost, lower variable cost or a higher selling price lowers break-even volume.
Compare the requirement with demand and capacity. If the bakery can produce only 6,000 loaves per month, it can reach break-even but not the 7,500-loaf profit target. Its maximum monthly profit is 2,400 dollars. A break-even point above capacity cannot be achieved at that capacity.
The linear model assumes stable price, stable variable cost per unit, fixed cost unchanged within the range, and all output sold. A second shift or extra machine may raise fixed cost in a step; recalculate for that operating range. Keep cost and sales periods aligned. Monthly fixed costs and annual sales do not belong in the same calculation.
Key Takeaways
- Contribution per unit is price minus variable cost per unit.
- Break-even units equal fixed cost divided by contribution.
- Add target profit to fixed cost before dividing by contribution.
- Round fractional whole-unit requirements up.
- Check demand, capacity and the relevant cost range.
5.2 Compare sales mixes and process costs
A business selling several products cannot use one product's contribution ratio for all its sales. A process choice also needs more than the lowest variable cost: fixed investment matters at the expected volume.
Weight a mix by sales value
For a stable sales mix, find each product's dollar sales and its share W of total dollar sales. Multiply each contribution margin ratio by that share, then add:
A café forecasts 10,000 coffees at 3 dollars, 5,000 sandwiches at 6, and 4,000 muffins at 2.50. Sales values are 30,000, 30,000 and 10,000, so weights are , and . With variable costs of 1.20, 3.60 and 1.00, contribution ratios are 0.60, 0.40 and 0.60.
The weighted ratio is , about 0.514. Fixed cost of 18,000 dollars gives break-even sales of 35,000. Allocate these sales by the weights, then divide by prices: 5,000 coffees, 2,500 sandwiches and 2,000 muffins. Their contributions total 18,000, confirming the result.
Unit shares would give the wrong weighted ratio because products have different prices. A shift toward lower-contribution-ratio products raises break-even sales. If the café sold only sandwiches, a 0.40 ratio would require 45,000 dollars in sales. The original result depends on the original mix.
Find cost crossovers
For process j, total cost is fixed cost plus variable cost times volume. To compare processes 1 and 2, set their total costs equal:
Consider annual costs, all in dollars:
| Process | Fixed cost | Variable cost per unit |
|---|---|---|
| A: general equipment | 10,000 | 20 |
| B: batch equipment | 40,000 | 8 |
| C: dedicated line | 100,000 | 3 |
A and B cross at 2,500 units. B and C cross at 12,000. A is cheapest below 2,500, B between 2,500 and 12,000, and C above 12,000; adjacent choices tie at the boundaries. At 5,000 units their costs are 110,000, 80,000 and 115,000, confirming B's advantage.
A and C also cross, near 5,294 units, but B is cheaper than both there. A pairwise crossing is not necessarily a point where the best choice changes. Compare all lines in every candidate range.
Connect cost to process design
Flexible processes with lower fixed costs fit small volumes; specialized processes with lower variable costs become attractive at larger volumes. Also check capacity, quality, flexibility and forecast uncertainty. Near a crossover, a small forecast change can reverse the cost ranking. Crossover compares process costs, while break-even compares revenue with cost; a cheap process can still be unprofitable.
Key Takeaways
- Weight contribution ratios by dollar sales shares, not unit shares.
- Multiproduct break-even depends on the assumed sales mix.
- Crossover analysis sets two process total costs equal.
- Compare all alternatives; some pairwise crossings never change the best choice.
- Check volume uncertainty, capacity and flexibility alongside cost.
- Break-even and crossover answer different questions.
6Analyze waiting lines and choose a service level
Customers can wait even when average capacity exceeds demand because arrivals and service times vary. Waiting-line models connect that variation to average line lengths, time and staffing cost. Start by identifying the system, then work from one server to a shared line with several servers. Compare service options using compatible rates, the right waiting-cost boundary and peak demand, while also considering how customers experience a wait.
6.1 Describe arrivals, service and waiting costs
A waiting line can form even when average service capacity exceeds average demand. Arrivals may cluster and some services may take longer than others. A model must describe this variation and the way customers move through the system.
Describe the system before choosing a formula
Start with the arriving population. It may be effectively unlimited, as for shoppers at a large store, or limited, as for six machines maintained by one technician. Describe line capacity and customer behavior: balking means not joining, reneging means leaving before service, and jockeying means switching lines.
The queue discipline decides who is served next. First-in, first-out (FIFO) follows arrival order; priority systems and appointments use different rules. A channel is a server working in parallel with others. A phase is a sequential service step. Several tellers sharing one line are multiple channels in one phase; an order window followed by a collection window has multiple phases.
Turn times into rates
The arrival rate is λ customers per period. Poisson arrivals mean random arrival counts with exponential times between arrivals; the mean interval is . The service rate μ is one busy server's completions per period. A mean service time of 4 minutes gives per hour, not 4 per hour.
Kendall notation A/B/s describes the arrival distribution, service-time distribution and number of servers. M denotes Poisson arrivals or exponential service times, D constant service time and G a general distribution. M/M/1 is one server with Poisson arrivals and exponential service times. M/D/1 keeps the arrivals but fixes service duration. M/M/s has s parallel servers.
Keep line and system measures separate
Use L for average customers in the system and Lq for those waiting. W is average time from arrival to departure; Wq is time in line. Server utilization is ρ, and P0 is the probability the whole system is empty.
Time in service is included in W but excluded from Wq. The number being served averages less than the number of installed servers when they are sometimes idle.
Price the waiting you mean
Total cost per period combines server cost and waiting cost. For s servers at Cs dollars each per hour, service cost is sCs. If each customer-hour in line costs Cw, waiting cost per hour is CwLq. Use L instead if the cost also applies during service.
For example, 2 customers waiting on average with a cost of 18 dollars per customer-hour generate 36 dollars of waiting cost per hour. Multiplying by Wq alone would omit how many customers experience the wait. Adding servers raises service cost but usually lowers waiting cost. For customers, waiting costs can include lost goodwill; for a firm's own employees or equipment, they can be directly measured lost productive time.
Key Takeaways
- Random variation can create waits despite spare average capacity.
- Channels are parallel servers; phases are sequential steps.
- Convert mean service duration into a per-server service rate.
- L and W count the system; Lq and Wq count only the line.
- Waiting cost per hour uses average customers waiting, not waiting time alone.
6.2 Calculate a single-server queue
Single-server models show why a small rise in demand can produce a large rise in waiting. First check that the model fits, then keep rates, customer counts and times distinct.
Fit the M/M/1 model
M/M/1 assumes Poisson arrivals from an unlimited population, exponential service times, one server, FIFO service, unlimited waiting room and no balking or reneging. A steady state requires . At or above full average capacity there is no finite steady-state mean; the following formulas cannot describe it.
The probability of more than k customers in the system is . This counts the customer being served as well as anyone in line.
Work through the pharmacy
Customers arrive at 12 per hour. A 4-minute mean service gives per hour. Utilization is 0.8 and P0 is 0.2. The capacity gap is 3 per hour, so W is hour, or 20 minutes. L is customers.
For the line, Lq is customers and Wq is hour, or 16 minutes. Check that 16 minutes of waiting plus 4 of service gives the 20-minute total. Little's law also checks both counts: 12 arrivals per hour times hour gives 4 in the system.
More than 3 customers are present with probability , about 41%. Using the third power would count 3 or more, a different event.
If arrivals rise to 14 per hour while service stays at 15, W becomes 1 hour and L becomes 14. Arrivals rose by about 17%, yet system time tripled. As utilization nears 100%, the spare capacity needed to clear bursts disappears.
Change the service-time pattern
M/D/1 has the same Poisson arrivals but a constant service duration. Its line measures are:
Add to Lq for L, and to Wq for W. At 12 arrivals and 15 services per hour, Lq is 1.6, Wq is 8 minutes, L is 2.4 and W is 12 minutes. Fixing service duration halves waiting in line compared with M/M/1 at the same rates. It does not halve total time because service time is still 4 minutes.
A small population, such as eight machines needing repair, requires a limited-population model: each machine already down reduces the number still able to fail. Do not treat its arrival rate as independent of how many are already waiting.
Key Takeaways
- Check M/M/1 assumptions and before calculating steady-state measures.
- Use rates in one time unit, then convert the resulting times.
- Check + mean service time and both forms of Little’s law.
- M/M/1 waits rise sharply near full utilization.
- At equal rates, M/D/1 halves line waiting, not total system time.
- Tail probabilities count everyone in the system.
6.3 Choose servers using waits and cost
Adding servers changes both the cost of providing service and the cost of delay. Compare feasible staffing levels using the same arrival pattern, cost boundary and service target.
Model one line with parallel servers
M/M/s has Poisson arrivals, exponential service times, one FIFO line and s identical parallel servers. Use an unlimited population and line, with no balking or reneging. Stability requires , and utilization per server is . The arrival rate belongs to the whole line; μ remains the rate of one server.
For spreadsheet calculation, set and . The empty-system probability and queue length are:
Then , and . These are the same M/M/s relations expressed with shorter intermediate variables. Use unrounded values until the final result.
Compare help-desk staffing
A help desk receives 12 calls per hour; each agent serves 8 per hour. One agent is insufficient. With two agents, utilization is 75%, P0 is , Lq is and Wq is about 9.6 minutes. Total time is about 17.1 minutes after adding 7.5 minutes of service.
With three agents, utilization is 50%, P0 is , Lq is and Wq is about 1.2 minutes. Total time is about 8.7 minutes. A 50% increase in capacity cuts the line wait by much more than 50%; waiting changes nonlinearly with utilization.
Agents cost 20 dollars per hour and waiting in line costs 30 per caller-hour. Two agents cost about 97.86 dollars per hour including waiting; three cost about 67.11. The third agent's wage is outweighed by lower waiting cost. If service time also carries the waiting cost, use L in both alternatives: totals become about 142.86 and 112.11, leaving the same choice.
Pool demand and manage the experience
Two separate M/M/1 lines, each receiving 6 calls per hour with , have a 22.5-minute average line wait. Pooling them into the two-agent shared line cuts that to about 9.6 minutes. Sharing lets an available agent serve the next caller even when arrivals are unevenly split. A common line also supports arrival-order fairness.
Evaluate busy periods with their own arrival rates. Faster service, less variation, appointments and off-peak demand shifts are alternatives to extra servers. Meet a stated waiting target as well as comparing costs.
Customers also experience a wait psychologically. Maister's proposals suggest that occupied, explained, predictable and fair waits can feel shorter; anxiety, isolation and waiting before service can feel longer. People may accept more delay for a valued service. Test useful responses such as estimated wait displays, menus or forms during the wait, and a shared line; these change the experience without replacing adequate capacity.
Key Takeaways
- M/M/s uses total arrivals and a per-server service rate.
- Check stability, then compare total service and waiting costs.
- Pooling lets shared capacity respond to uneven arrivals.
- Adding servers changes waiting nonlinearly.
- Analyze peak periods and a stated service target.
- Improve information and fairness as well as actual waiting.
Process Design and Capacity examples
1Choose a process for products and customers
11 steps
- 1IntroductionStart with the demand
A lamp maker sells bespoke installations, recurring design ranges and one standard desk lamp. Its support team also handles routine replacement orders and complex lighting advice. Choosing one process for all this work would make some tasks expensive and others inflexible. Start by separating what repeats from what changes, which is the volume and variety of demand and what points to the right process for each kind of work, then decide where customers need direct contact.
- 2ExplanationRead volume and variety
Volume asks how much of each product is needed per period. Variety asks how much the orders differ. Bespoke installations have low volume and high variety; a standard desk lamp has high volume and low variety. Process choice follows this demand pattern because flexible skills and dedicated equipment solve different production problems.
- 3ExampleAssign the production work
The company builds 60 bespoke installations per year, eight lamp designs in recurring runs, and 2000 identical desk lamps per day. Use jobbing for the bespoke work, batch production for the recurring design runs, and mass production for the desk lamp. A batch is defined by a group followed by a changeover, so even a large run can still be a batch.
- 4Key InsightSee the cost behind the choice
A job shop shares general-purpose resources and skilled people across varied orders. A dedicated line commits more fixed cost to specialized equipment but lowers variable cost per unit at sufficient volume. The product-process matrix places suitable matches near its diagonal. Growing demand can justify a move toward more connected, specialized flow as a product becomes standardized.
- 5ChallengeDiagnose a mismatch
The manager proposes putting every bespoke installation through the desk-lamp line because that line has the lowest variable cost. What problem would this create?
---reveal---
The line’s rigidity conflicts with the different installation designs. Frequent changes and disruption can erase its low unit-cost advantage. The workshop’s flexibility serves the bespoke orders even though each unit uses more labor.
- 6ConnectionOffer choice through modules
The desk lamp could offer customer-selected bases, colors and controls without returning to fully bespoke manufacture. Mass customization keeps standard modules and combines them late in the process. Fast changeovers and flexible equipment support this design. The finished choices vary, while much of the underlying work still repeats at high volume.
- 7ExplanationClassify service work carefully
Slack’s service types run from professional services through service shops to mass services as transactions become more standardized. Schmenner instead compares labor intensity with interaction and customization. Its categories are service factory, service shop, mass service and professional service. State the framework: the same “service shop” label does not identify the same category in both.
- 8ExampleSeparate support tasks
Routine replacement orders require an item number, delivery details and a standard payment. Complex lighting advice requires questions and expert judgment. Move routine entry into a simple online flow and back-office processing; keep advice in the front office. This decoupling lets the team schedule predictable work while keeping personal contact where it adds value.
- 9TipCount customer effort
Self-service transfers work to the customer. Check that people can identify the part, enter the details and recover from an error without repeating everything by phone. A lower staff-time figure can hide greater customer effort. Also plan service capacity for when requests arrive: unused adviser time today cannot be stored to handle tomorrow’s peak.
- 10ChallengeConnect the product and service design
The configurable lamp range grows. Buyers can choose standard modules easily, but some need advice about unusual spaces. How can the company keep efficient production and useful customer contact?
---reveal---
Assemble standard modules late for customer configurations, and offer expert front-office advice for unusual needs. Process ordinary orders backstage. Standardize repeatable work while preserving the interaction that helps customers choose.
- 11RecapMatch each kind of work
Use volume and variety to choose the production flow, and compare its flexibility with its fixed and variable cost. Modular design can add choice without making every task unique. For service, identify the classification framework and separate valued customer contact from routine support. A useful process design fits both the work customers request and the experience they need.
2Trace an equipment return from arrival to completion
14 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionStart with the demand
- 2ExplanationMap the actual route
- 3ExampleAdd the elapsed time
- 4ChallengeLocate the main delay
- 5ExplanationAdd what the customer sees
- 6ExampleConnect the visible handoff to support
- 7ChallengeChoose protection for the failure
- 8ExplanationSeparate pace from journey
- 9ExampleUse the unfinished returns
- 10ExampleMeasure the share spent working
- 11Key InsightHandle parallel work correctly
- 12ChallengeSet an inventory target
- 13ChallengeConnect the map to the numbers
- 14RecapRead the path and the averages together
3Size capacity and compare uncertain expansions
15 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionStart with the demand
- 2ExplanationRead the capacity benchmarks
- 3ExampleCompute both ratios
- 4ChallengePredict output from effective capacity
- 5ConnectionLocate equipment losses
- 6ExampleCalculate next year’s workload
- 7ExampleAllow for the cushion
- 8Key InsightCheck the capacity after rounding
- 9ChallengeCompare timing choices
- 10TipCheck scale and demand timing
- 11ExplanationPut the outcomes on one basis
- 12ExampleCalculate expected payoffs
- 13ChallengeFind where the recommendation changes
- 14ChallengeCheck more than the average
- 15RecapBuild a feasible, affordable plan
4Improve a diagnostic shop at its constraint
12 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionStart with the demand
- 2ExampleCalculate the three capacities
- 3Key InsightKeep the unit’s journey separate
- 4ChallengeAdd a checker
- 5ExplanationUse the existing limit well
- 6ExampleMove work before buying capacity
- 7ChallengeControl the work entering the shop
- 8ExplanationMeasure the money from scarce time
- 9ExampleAllocate the constraint minutes
- 10ChallengeTest a competing product priority
- 11ConnectionRecheck the limit after a mix change
- 12RecapFollow the system’s scarce time
5Use contribution to choose a feasible process
12 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionStart with the demand
- 2ExplanationFind what each sale contributes
- 3ExampleFind the zero-profit point
- 4ExampleAdd a profit target
- 5ChallengeCheck the capacity limit
- 6TipKeep the cost range valid
- 7ExplanationWeight a product mix by revenue
- 8ExampleCalculate the mixed break-even
- 9ChallengePredict the effect of a mix shift
- 10ExampleSet two process costs equal
- 11ChallengeChoose at a forecast volume
- 12RecapIdentify which comparison you need
6Choose service capacity for a busy counter
18 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionStart with the demand
- 2ExplanationIdentify the system and the rates
- 3ChallengeCount steps and servers
- 4ExampleCalculate total system time
- 5ExampleExtract the line wait
- 6ChallengeCheck a tail probability
- 7ExampleRemove service-duration variation
- 8Key InsightNotice the cost of high utilization
- 9ExplanationPlan a shared two-server line
- 10ExampleCalculate the empty probability
- 11ExampleTurn queue count into waiting time
- 12ChallengeCompare pooling with separate lines
- 13ConnectionPrice only the time that costs money
- 14ExampleCompare a third agent
- 15ChallengeAdd a service target
- 16TipAnalyze the busy hour
- 17ConnectionImprove the waiting experience
- 18RecapChoose from a complete service comparison
Process Design and Capacity practice questions
Set 1: Read processes and calculate their limits10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Connect flow, money and service decisions10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Evaluate capacity and service alternatives10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Test the design when demand changes10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Make recommendations from connected evidence10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
As-is process
Average strategy
B
Back office
Balking
Batch process
Best operating level
Bottleneck
Bottleneck time
Break-even point
C
Capacity
Capacity cushion
Channel
Continuous process
Contribution margin ratio
Contribution per unit
Crossover point
Cycle time
D
Decision tree
Decoupling
Delay
Design capacity
Diseconomies of scale
Drum-buffer-rope
E
Economies of scale
Effective capacity
Efficiency
Elevation
Expected monetary value
Exploiting a constraint
F
Fail point
Fail-safing
Fixed cost
Flowchart
Front office
I
Inspection
J
Job shop
Jockeying
K
Kendall notation
L
Labor intensity
Lag strategy
Lead strategy
Line of interaction
Line of visibility
Little's law
M
M/D/1 model
M/M/1 model
M/M/s model
Mass customization
Mass production
Mass service
O
Operation
Overall equipment effectiveness
P
Parallel resources
Perceived waiting
Phase
Physical evidence
Poisson arrivals
Pooling
Process
Process chart
Product-process matrix
Professional service
Project process
Q
Queue discipline
R
Relevant range
Reneging
Resource load
S
Sales mix
Sensitivity analysis
Service blueprint
Service process matrix
Service rate
Service shop
Service-level target
Setup time
State of nature
Steady state
Subordination
Support process
Swim-lane map
T
Theory of constraints
Throughput accounting
Throughput efficiency
Throughput per constraint minute
Throughput rate
Throughput time
Time-function map
U
Utilization
V
Value-added ratio
Variable cost per unit
Variety
Volume
W
Waiting cost
Weighted contribution margin ratio
Work content
Work in process
About this lesson
Make your own Study Materials
Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.