- Learn
- Business & Economics
- Operations & Supply Chain
- Operations Management
- Operations Strategy and Productivity
Operations Strategy and Productivity
IntermediateLesson 1 of 9 in Operations Management Course
What you will learn
- Describe any organization's operations as the transformation of inputs into goods and services, compare goods with services, and explain how volume, variety, variation and visibility shape the way an operation works.
- Describe operations as a transformation processDefine operations management, identify the inputs, transformation and outputs of an operation, and place operations among the other functions of an organization.
- Compare goods and services and what the difference means for operationsDistinguish goods from services by their characteristics, place real offerings on the goods–services continuum, and explain how the difference affects capacity, quality, location and customer contact.
- Explain how volume, variety, variation and visibility shape an operationUse the four Vs to describe how operations differ and to predict their costs and the way they are managed.
- Describe operations as a transformation process
- Calculate single-factor and multifactor productivity, measure productivity change correctly, and interpret what the figures say about an operation and what drives them.
- Calculate single-factor productivity and productivity changeCompute productivity for one input such as labor, machine time or energy, express it in correct units, and calculate the percentage change between periods.
- Calculate multifactor productivity with inputs valued in moneyCombine several inputs into one measure by converting them to money, calculate and compare multifactor productivity, and avoid the errors that distort it.
- Interpret productivity figures and explain what drives themDistinguish productivity from efficiency and effectiveness, explain the labor, capital and management drivers of productivity, and recognize the special problems of measuring service productivity.
- Calculate single-factor productivity and productivity change
- Explain what quality, speed, dependability, flexibility and cost mean for an operation, analyze the trade-offs between them, and use order winners and qualifiers to decide which priorities matter most.
- Explain the five competitive priorities of an operationDefine quality, speed, dependability, flexibility and cost as performance objectives, show what each means in different operations, and explain their external and internal benefits.
- Analyze the trade-offs between prioritiesExplain why improving one priority can cost another, read an efficient frontier, and distinguish repositioning along trade-offs from improving the whole operation.
- Identify order winners and qualifiersClassify the criteria customers use into order winners, qualifiers and less important factors, and explain how they differ between segments and change over a product's life cycle.
- Explain the five competitive priorities of an operation
- Connect mission and business strategy to operations, make the strategic operations decisions consistently, develop and implement an operations strategy, and decide which activities to keep in-house or outsource.
- Link mission, business strategy and operations strategyExplain how operations strategy follows from the mission and business strategy, view it from four perspectives, and judge how much operations contributes to competitive advantage.
- Make the strategic operations decisions consistentlyName the main decision areas of operations, separate structural from infrastructural decisions, and check that all decisions support the same competitive priorities.
- Develop and implement an operations strategyUse SWOT analysis, key success factors, core competencies and activity maps to build an operations strategy, then put it into practice and keep it current.
- Decide what to make in-house and what to outsourceExplain outsourcing and its forms, apply core competencies and comparative advantage to the decision, and compare total costs and risks before choosing.
- Link mission, business strategy and operations strategy
- Explain why organizations globalize their operations and what risks they face, and choose between international, multidomestic, global and transnational operations strategies.
- Explain why and how operations go globalDescribe the reasons, forms and risks of global operations, compare locations by total landed cost and unit labor cost, and recognize the cultural and ethical issues involved.
- Select an international operations strategyUse the cost-reduction and local-responsiveness pressures to distinguish international, multidomestic, global and transnational strategies, and choose the one that fits a business.
- Explain why and how operations go global
Operations Strategy and Productivity study guide
1Explain what operations do and how goods and services differ
Every organization creates value through operations, whether its output is a physical product, a service, or a mixture. Start by mapping what changes and which resources do the work. Then use the characteristics of goods and services and the four Vs to explain why operations need different staffing, equipment, and capacity choices. These descriptions give you a practical basis for comparing processes before judging their performance.
1.1 Map inputs, work, and outputs
A factory changes materials, a bank changes information, and a clinic changes a patient's health. Operations management organizes the resources and processes that create these goods and services. Production means creating goods and services; it includes much more than manufacturing.
Follow the transformation
The input–transformation–output model asks three questions: what enters, what happens to it, and what leaves? A transformation may change physical form, location, possession, storage, information, or a person's physical or psychological state. A retailer transfers possession; a warehouse stores goods; a publisher changes information into a usable form.
Separate two kinds of input. Transformed resources are the materials, information, or customers being changed. Transforming resources are the staff and facilities doing the work. Facilities include buildings, equipment, and technology. A passenger is a transformed resource in air travel because the operation changes the passenger's location. The pilot and aircraft are transforming resources.
Work through a restaurant
Start with ingredients, orders, bookings, and diners. These are transformed resources: ingredients become meals, information guides the order, and diners leave fed. The cooks, servers, ovens, refrigerators, kitchen, and dining room are transforming resources. They provide the people and facilities that carry out the work.
The outputs include both meals and a dining experience. Waste food, discarded packaging, and emissions also leave the operation. Mapping only the saleable meal would hide resources lost as waste. Feedback completes the model: complaints about cold food can lead to a change in collection times between kitchen and table.
Choose the level of analysis
At the supply-network level, examine the restaurant alongside growers, distributors, and customers. At the operation level, examine the restaurant as a whole. At the process level, follow a particular flow such as receiving ingredients or serving an order. The useful boundary depends on the problem: delayed ingredients may require a network view, while slow table service may require a process view.
Processes supply one another. The kitchen is an internal supplier to the servers, who are its internal customers. A clear handoff needs the right meal, order information, and timing. This way of thinking also applies to an accounting team that supplies cost information to operations.
Connect operations with other functions
Marketing understands customers and creates demand. Finance and accounting raise, allocate, and track money. Operations creates the offering. Human resources, IT, and engineering support these core functions, although the boundaries vary between organizations. Clinical work is part of a hospital's operations, even though doctors and nurses are professionals.
Operations decisions reach beyond routine work. Staffing, equipment, and methods shape cost, quality, and the customer's experience. Calling operations a factory department would miss the same decisions in a school, software company, or bank.
Key Takeaways
- Transformed resources are what changes; transforming resources are the staff and facilities doing the work.
- Map useful outputs, unwanted outputs, and feedback.
- Choose supply network, operation, or process as the boundary for the problem.
- Internal customers depend on the outputs of other processes.
1.2 Design for a mix of goods and services
A customer can store a chair, transport it, and sell it to someone else. A haircut is an activity the customer experiences. This difference changes how operations plans capacity, checks quality, and reaches customers.
Place the offering on a continuum
A good is a tangible product that can be owned. A service is an intangible activity or performance for a customer. Most offerings combine both: a car includes financing and a warranty, a restaurant supplies food and service, and a hotel provides a room with cleaning and reception.
Servitization means adding services to goods. An equipment maker may sell maintenance contracts or charge for machine use by the hour. Operations then has to support the installed equipment as well as build it. A successful sale creates a continuing service obligation.
Understand typical service features
Services are often produced and consumed together, cannot be stored, and vary with the customer and employee. Customers may participate in the process. Many services depend on expert knowledge, and many are spread across local sites near users. These features describe tendencies: streaming music can be standardized and delivered without personal contact.
An unused appointment today cannot be held as an appointment for tomorrow. That lost capacity makes timing central. A factory can build inventory before a demand peak; a service often needs appointments, reservations, staff schedules, queues, or lower prices at quiet times. A tax-preparation office hires temporary staff near the filing deadline because customer information arrives in a peak. It cannot finish returns before the relevant documents arrive.
Check quality where it occurs
Goods can often be inspected before delivery. Service quality is experienced during delivery, including courtesy, waiting time, and the setting. Training and clear procedures help employees deliver a consistent experience. Service recovery means putting a failure right quickly, such as correcting a booking and giving the customer a clear new arrival time.
Intangibility does not prevent measurement. A repair service can track repeat faults, waiting times, and satisfaction. A short wait is useful evidence, but it does not replace checking whether the repair actually worked.
Organize customer contact
Services that process customers usually need to be accessible to them. Factories have more freedom to locate away from customers and ship goods. A front office has high customer contact, such as hotel reception. A back office, such as hotel laundry, can standardize work away from the customer.
Consider a meal-kit business. Ingredients and packaging are goods; planning menus, designing recipes, delivering boxes, and answering questions are services. The operation must manage perishable inventory and delivery time windows together. Improving packing speed while making delivery unreliable would damage the whole offering.
Knowledge and technology matter in services as well as manufacturing. Hospitals, airlines, and data centers need skilled people and expensive equipment.
Key Takeaways
- Most offerings bundle tangible goods with services.
- Unused service capacity expires, so match capacity with the timing of demand.
- Service quality depends on both the outcome and the delivery experience.
- Front-office and back-office work can need different processes.
- Servitization adds ongoing service responsibilities to a goods operation.
1.3 Use the four Vs to explain process choices
Two operations can sell similar things and still need very different ways of working. The four Vs describe the workload and the customer's contact with it: volume, variety, variation in demand, and visibility. Use the profile to explain staffing, equipment, coordination, and unit cost.
Read each dimension
| Dimension | Meaning | Operational consequence |
|---|---|---|
| Volume | How much is produced | High volume supports repetition, specialization, and dedicated equipment. |
| Variety | How many different offerings are produced | High variety needs broader skills, flexible resources, and more coordination. |
| Variation | How demand changes over time | Peaks need capacity responses; quiet times leave resources idle. |
| Visibility | How much customers see and experience | High visibility needs contact skills and attention to perceived waiting and quality. |
High volume spreads repeated work across many units and tends to lower unit cost. A large fast-food outlet can use dedicated equipment and standard procedures. A small café making each dish to order has less repetition and more varied tasks.
High variety raises the number of different requests the process must handle. A taxi adapts its route to each passenger; a bus follows a standard route and timetable. The taxi's flexibility requires a different cost structure. Variety concerns the range offered, while variation concerns demand over time. A business can offer one product yet face a sharp seasonal peak.
Follow demand and contact
A beach resort must handle a summer peak and idle winter capacity. More stable demand makes staff and facilities easier to use evenly. High variation creates a need for forecasting, flexible staffing, and decisions about how much spare capacity to carry.
At a hair salon customers experience the work as it happens. Staff must manage conversations, expectations, and waiting as well as technical work. An online retailer's warehouse has lower visibility: work can be scheduled and standardized without customers watching each step. A single business can combine high-visibility sales with low-visibility processing.
Compare two hotels
A budget chain has high volume and low variety: standard rooms, few extras, and repeated routines. Online booking and self check-in reduce visibility. Demand still varies, but the simplified process supports a lower cost per night.
A small luxury hotel has lower volume, more services on request, and constant staff interaction. Its broader skills and personal attention cost more. That profile makes sense when guests value the service and will pay for it. Visibility is a design choice with benefits and costs, not a score to minimize.
Look for a deliberate combination
High volume and low variety commonly go together. Mass customization combines high volume with tailored output by using special process designs, such as standard modules assembled to order. It does not remove the need to coordinate variety.
Key Takeaways
- Volume is quantity; variety is range; variation is demand over time; visibility is customer exposure.
- High volume tends to reduce unit cost through repetition and specialization.
- Variety, demand swings, and customer contact create distinct management needs.
- A four-V profile should fit the market and the price customers will pay.
- Mass customization needs a process designed to combine scale with tailored output.
2Measure productivity and use it to judge improvement
An increase in output can come from better methods or simply from using more resources. Productivity ratios let you separate those possibilities. Calculate single-factor and multifactor measures, keep their units and price bases consistent, and compare changes against the earlier period. Then examine quality and customer outcomes so that a favorable number leads to a sound judgment about the operation.
2.1 Calculate output per unit of input
Making more output does not tell you whether resources were used better. Productivity measures output relative to input. A larger operation may produce more while getting less from each labor-hour, machine-hour, kilogram of material, or kilowatt-hour of energy.
Build the ratio
Productivity = output ÷ input.
A single-factor, or partial, measure uses one input. Name both sides of the ratio: “brochures per labor-hour” is meaningful; “productivity is 15” leaves out what was counted. Choose the input that matches the question. For energy productivity, divide output by energy used, not by its money cost unless the measure explicitly asks for that.
For labor, add all hours worked. Five employees working eight hours contribute 5 × 8 = 40 labor-hours. Dividing by five employees would ignore their working time and give a different measure.
Work through the print shop
The shop makes 600 brochures in 40 labor-hours. Labor productivity is 600 ÷ 40 = 15 brochures per labor-hour. With new layout software it makes 720 brochures in the same 40 hours, so productivity becomes 720 ÷ 40 = 18 brochures per labor-hour.
Productivity change = (new productivity − old productivity) ÷ old productivity × 100%.
The increase is (18 − 15) ÷ 15 × 100% = 20%. The old value is the comparison base. Dividing by 18 answers a different question: how large the increase is relative to the new level.
Now suppose the 720 brochures require five employees to work nine hours each. Total labor is 45 hours, and productivity is 720 ÷ 45 = 16 brochures per labor-hour. Production rose 20%, but productivity rose only (16 − 15) ÷ 15 × 100%, about 6.7%. Extra output came partly from extra time.
Compare like with like
Plant X makes 2,000 units in 400 labor-hours; plant Y makes 2,250 units in 500 labor-hours. Both employ ten people. Per employee, Y looks better: 225 units against 200. Per labor-hour, X makes 5.0 units and Y makes 4.5. Hours reveal which plant gets more output from the measured labor input.
The same logic applies beyond manufacturing. Twelve call-center agents working 40 hours each handle 2,880 calls: 2,880 ÷ 480 = 6 calls per agent-hour. A greenhouse producing 9,000 kg of tomatoes with 15,000 kWh achieves 0.6 kg per kWh.
State the limit of the measure
A labor ratio leaves out equipment, materials, and energy. Replacing workers with machines can raise labor productivity while increasing other inputs. Also check that output definitions, quality, and period lengths match. Counting calls handled is useful only alongside evidence about the service those calls provided.
Key Takeaways
- Calculate total labor-hours before dividing output by labor.
- Keep output and input units attached to the result.
- Calculate percentage change using the earlier productivity as the base.
- Production growth can come from using more inputs.
- A partial measure leaves other resources out of the comparison.
2.2 Combine inputs without mixing units
A new machine may save labor while using more capital and materials. Multifactor productivity brings several inputs into one denominator so that a gain in one resource does not hide extra use of another. The inputs first need a common unit.
Value the inputs
Multifactor productivity = output ÷ (labor + materials + energy + capital + miscellaneous inputs).
Hours, kilograms, and kilowatt-hours cannot be added directly. Multiply each quantity by its price or cost, then add the money values. Labor input might be hours × cost per hour; capital charges represent the equipment resources used during the period, including depreciation and financing.
Keep the input coverage consistent between comparisons. Leaving energy out of one week makes that week's denominator too small. When the measure covers all inputs, it is often called total factor productivity. Official economic measures also use the names multifactor and total factor productivity, with more detailed methods for combining input and output quantities.
Calculate the workshop's first week
The furniture workshop produces 375 chairs. Labor is 400 hours at $25 per hour, or $10,000. Add materials of $6,500, energy of $1,200, and capital charges of $2,300. Total input is $20,000.
375 ÷ 20,000 = 0.01875 chairs per dollar of input. Rescaling makes this easier to read: multiply by 1,000 to get 18.75 chairs per $1,000. Rescaling changes the reporting unit, not the underlying performance.
Compare the second week
Output rises to 420 chairs. Labor costs $9,600, materials $7,300, energy $1,100, and capital $3,000, totaling $21,000. Productivity is 420 ÷ 21,000 × 1,000 = 20 chairs per $1,000. Its increase from 18.75 is about 6.7%.
Labor productivity rose from 375 ÷ 400 = 0.9375 to 420 ÷ 384, about 1.094 chairs per labor-hour: roughly 16.7%. That larger gain leaves out the extra capital and material inputs. The multifactor measure shows the broader resource result.
Remove price changes from time comparisons
When products differ, output can be valued in money. Use constant prices: the same base-period prices for every period. Apply this rule to inputs too. Otherwise selling-price or input-price movements can look like changes in resource use.
A bakery's output worth $56,000 at base prices and inputs worth $40,000 gives 1.4 dollars of output per dollar of input. Raising selling prices by 10% makes current-price output $61,600 and the apparent ratio 1.54, even with no physical change. Likewise, a higher energy price can depress a current-price ratio while kWh and output stay fixed.
Key Takeaways
- Convert unlike inputs to a common money unit before adding them.
- Include the same input categories in both periods.
- Use constant prices for input and output comparisons over time.
- Report tiny ratios per a convenient amount, such as $1,000.
- Labor and multifactor gains can differ because other inputs change.
- A selling-price increase alone is not a physical productivity gain.
2.3 Judge what a productivity gain means
A ratio can rise while customers receive worse service. Interpreting productivity requires checking the output being counted, the inputs being used, and whether the operation is achieving the outcomes people value.
Separate three questions
| Measure | Question | Example |
|---|---|---|
| Productivity | How much output comes from each unit of input? | Resolved cases per labor-hour |
| Efficiency | How does actual performance compare with a standard or planned rate? | Output compared with the process's planned output |
| Effectiveness | Are the right goals being achieved? | Whether customer problems stay solved |
A call center may end calls quickly and meet its handling-time standard while leaving customers' problems unresolved. It can look efficient on that measure yet be ineffective. Defining useful output helps prevent this conflict.
Find the driver
Three broad drivers are labor, capital, and management. Labor improvements include skills, training, health, and motivation. Capital includes equipment, technology, and infrastructure. Management organizes the resources through methods, layout, schedules, and the adoption of technology. A better sequence of tasks can reduce waiting without buying equipment.
Longer hours increase input as well as possible output. If output rises in the same proportion, output per hour stays unchanged. Fatigue can also increase errors. Better productivity mainly comes from better methods, skills, technology, and organization, not simply from more effort.
Examine the measurement
Quality changes can disappear inside a simple count. A phone can offer far more capability than an older model even though each counts as one phone. Weather, supplier disruption, and price movements can also change a measured result without a change in internal methods. Research and advice are especially hard to count as standard units.
Services add variation in customer needs and task complexity. A clinic's patients per hour leave out whether diagnoses are correct. Service improvements can come from self-service, standard procedures, technology, and staffing that matches demand, but the outcome still needs checking.
For example, bank branch A processes 12 loan applications per employee-day and branch B processes 9. Check complexity, errors, approval reversals, and customer satisfaction before ranking their performance. More simple applications are not equivalent to more difficult applications completed correctly.
Connect improvement to wider outcomes
At the economy level, labor productivity is real output, such as real GDP, per hour worked. Sustained growth allows higher wages and profits without relying on higher prices and supports higher living standards over time. Small annual differences compound: 2% growth roughly doubles output per hour in 35 years; 1% takes about 70 years.
Use productivity alongside quality, delivery, safety, and sustainability. Cutting inspections may raise short-term throughput but create defects and rework. Moving costs onto workers, customers, or the environment gives an incomplete account of improvement.
Key Takeaways
- Productivity, efficiency, and effectiveness answer different questions.
- Labor skills, capital, and management all affect output per input.
- Check service complexity and quality before comparing counts.
- Longer hours alone do not raise output per hour.
- Sustained productivity growth compounds over time.
- Judge resource gains alongside quality, delivery, safety, and sustainability.
3Set competitive priorities and manage the trade-offs between them
Operations needs a clear meaning of success. Quality, speed, dependability, flexibility, and cost describe different aspects of performance, and customer priorities decide which matter most. Use order winners and qualifiers to identify the market requirement, then examine whether a performance conflict is a true trade-off or an opportunity to improve. This connects customer choice to the capabilities the operation should build.
3.1 Turn priorities into measures
“Better performance” needs a precise meaning. Competitive priorities, also called performance objectives, describe what an operation must deliver to compete. The five standard priorities are quality, speed, dependability, flexibility, and cost.
Define the five priorities
| Priority | Meaning | Possible measure |
|---|---|---|
| Quality | Conforming to requirements and being fit for purpose | Defect or repeat-treatment rate |
| Speed | Time from request to receipt | Delivery lead time |
| Dependability | Delivering when promised | On-time delivery rate |
| Flexibility | Changing output, range, design, or timing | Time needed to change the output mix |
| Cost | Resources spent producing the offering | Cost per order or treatment |
Quality is doing things right, not adding luxury. A budget flight can deliver high quality when it is safe, clean, and matches its promise. Internally, fewer errors mean less scrap, rework, and complaint handling. This also makes work more dependable.
Speed concerns elapsed time. It matters to a customer waiting for an order and to an operation with inventory waiting between steps. Faster flow reduces work held in the process and exposure to obsolescence. Speed can also describe new-product development.
Dependability concerns the promise. If 470 of 500 orders arrive by their promised dates, the rate is 94%. A ten-day delivery that always arrives on day ten is slow but dependable. A two-day promise often met on day four is less dependable even if its actual delivery is shorter.
Name the flexibility needed
Product or service flexibility introduces new or changed designs. Mix flexibility changes the range or combination supplied. Volume flexibility changes output levels up or down. Delivery flexibility changes timing. A bakery introducing a new recipe, switching its daily assortment, adding output for a festival, and accepting an earlier collection request is exercising different forms of flexibility.
These abilities also help the operation cope with disrupted supplies or sudden demand. Their value depends on what customers need and what the process can change quickly.
Connect customer benefits with internal benefits
Cost includes staff, facilities, equipment, and materials. Low cost supports a competitive price and a workable margin. The other priorities can reduce cost internally: quality reduces waste, speed reduces waiting inventory, dependability reduces disruption, and flexibility reduces time lost switching work.
In a hospital, quality concerns correct and safe care, speed concerns waiting for treatment, and dependability concerns keeping appointment promises. In a car plant the same labels refer to defects, order lead time, and promised delivery dates. Define the measure in the actual operation before comparing scores.
Operations also affects workers, communities, and the environment. The triple bottom line considers people, planet, and profit. Measures of safety, energy, waste, and emissions make these effects visible alongside customer and cost performance. Some frameworks group speed, dependability, and flexibility under “response.”
Key Takeaways
- Quality means meeting requirements and being fit for purpose.
- Speed measures elapsed time; dependability measures keeping the promise.
- Distinguish product, mix, volume, and delivery flexibility.
- Better quality and flow can lower internal costs.
- Define each priority with measures suited to the operation.
- People, planet, and profit extend the view of performance.
3.2 Distinguish trade-offs from improvement
Fast delivery, a wide range, and low cost can pull a process in different directions. A trade-off means gaining on one objective at the expense of another with the current resources and methods. First ask whether the operation is already using those resources well.
Read the efficient frontier
An efficient frontier joins the best combinations currently achievable for the objectives being compared. On the frontier, moving toward one objective gives up some of another unless methods or technology change. Inside it, an operation can improve more than one objective by closing a performance gap.
Compare similar pump plants. A offers four variants at $40 each; B offers one variant at $32; C offers two variants at $41. A and B represent different frontier positions in this comparison: B is cheaper, while A has more range. A outperforms C on both cost and variety. C should investigate its process before accepting a trade-off as unavoidable.
If A reduces changeover times and supplies the same four variants at $35, it changes the best available combination. Improvement has pushed the frontier outward. Moving from A's original position toward B's sacrifices variety for lower cost; that is repositioning.
Use focus deliberately
Skinner's trade-off argument links manufacturing priorities to business strategy. His focused factory concentrates on a limited set of products, markets, and objectives. A plant within a plant separates focused units inside a larger facility. A custom-order unit and a standard-volume unit can use different schedules and processes without forcing every job through one compromise.
Focus does not excuse poor execution. A low-cost operation still needs adequate quality and dependable delivery. It chooses which capabilities to excel at once essential standards are met.
Build capabilities together
The sand cone model proposes cumulative layers: build quality, then dependability, then speed and flexibility, and finally cost efficiency. Continue strengthening the earlier layers as later ones grow. Fewer defects make flow more predictable; predictable work helps speed; less disruption and waste support lower cost. Evidence across plants is mixed, so the model is a useful improvement guide rather than a fixed sequence every operation must follow.
Identify the useful gap
A polar, or radar, diagram plots objectives on separate axes. Compare required and achieved performance on the same defined scale. If speed required is 8 and achieved is 5, the shortfall is 3. If cost performance required is 6 and achieved is 7, that target is already exceeded.
Customer importance is a separate judgment used to rank which gaps matter most. Do not subtract an importance score from a performance score: they measure different things.
Key Takeaways
- A trade-off holds for the current resources, methods, and technology.
- Inside the frontier, remove inefficiency before accepting a sacrifice.
- Repositioning changes the mix of objectives; improvement can raise several together.
- Focus gives different markets processes suited to their needs.
- The sand cone model builds later capabilities on continuing earlier improvements.
- Compare required and actual performance on the same scale.
3.3 Find what qualifies and what wins orders
Customers do not value every extra improvement equally. Some requirements decide whether a supplier is considered at all; others decide who gets the order. Order qualifiers and order winners help operations spend effort where it affects buying decisions.
Separate the roles
| Factor | Role in the purchase | Operations response |
|---|---|---|
| Qualifier | Minimum needed to enter consideration | Meet the threshold reliably |
| Order winner | Criterion that wins against competitors | Develop superior performance |
| Less important factor | Has little effect on this segment's choice | Avoid unnecessary spending |
A qualifier can be critical even when exceeding it wins little extra business. Required certification is a good example. A qualifier whose failure causes rapid, heavy order loss is order-losing sensitive. Food safety and fixed publication deadlines can have this role.
Analyze a segment
Start by dividing the market into groups with distinct needs. List the criteria each group actually uses, classify them, and check won and lost orders. Customers' stated preferences are useful evidence, but buying behavior can reveal a different priority.
A commercial printer serves annual-report clients and routine-flyer clients. Annual reports need faultless work and arrival by a fixed publication date as qualifiers. Exceptional print and finishing quality wins the order. For routine flyers, acceptable quality qualifies; low price and next-day delivery win. One factory may need separate units to serve both groups well.
Price is what the customer pays. Cost is what operations spends. Winning orders with a low price does not ensure a profit if the process still has high costs.
Revisit the classification over time
A feature that once won orders can become a minimum expectation when competitors catch up. Reliable, defect-free output may stop distinguishing a supplier but remain essential for qualification. Failing to maintain it loses consideration even if another feature is outstanding.
Priorities change over the product life cycle. At introduction, novelty, design, and performance matter; operations handles frequent changes and short runs. In growth, availability and sound quality push capacity expansion and reliability. At maturity, price and dependable supply push standardization and cost reduction. In decline, price pressure and excess capacity push tighter cost control.
Connect the market with process choices
Hill's framework links corporate objectives, marketing strategy, how products win orders, process choice, and supporting infrastructure. The order-winning step bridges the customer's decision and the operation's design. A promise of quick custom work requires flexible processes, suitable staff skills, and schedules that let small jobs move.
Key Takeaways
- Meet qualifiers reliably before competing on order winners.
- A qualifier can be vital even when extra performance earns little reward.
- Classify factors separately for each market segment.
- Order winners can become qualifiers as markets change.
- Price is a buying criterion; cost determines whether that price is viable.
- Use order criteria to guide process and infrastructure decisions.
4Build an operations strategy that supports the business
A competitive promise becomes credible through a connected set of operations choices. Link the business direction to assets, people, processes, and measures, and check that these choices reinforce one another. The same reasoning guides implementation and decisions about outsourcing. Cost matters, but so do the capabilities the organization needs to keep and the risks it accepts when another firm performs the work.
4.1 Connect operations decisions to the business
An organization's purpose needs a practical way to deliver it. Operations strategy sets the long-term role, objectives, and resources of operations. It connects the business's chosen position with a consistent pattern of decisions about how work gets done.
Follow purpose into action
A mission states what the organization offers and whom it serves. Strategy sets the plan for achieving that purpose. Marketing, finance, and operations each need a functional strategy that supports it. Tactics are the shorter-term actions used to carry the strategy out.
Operations supports advantage through differentiation, low cost, and response. Differentiation creates something customers value as distinctive, including an experience. Low cost supports an attractive price. Response combines flexibility, dependability, and speed. The business chooses its competitive position; operations builds the ability to deliver it.
Use four perspectives
| Perspective | Starting question |
|---|---|
| Top-down | What does the business strategy require? |
| Bottom-up | What does operating experience reveal? |
| Market requirements | What do customers need and use to choose? |
| Operations resources | What do capabilities, assets, and constraints allow? |
These perspectives need to work together. A market may want rapid customization, while current equipment permits only long standard runs. The strategy must reconcile the requirement and the capability through investment, process changes, or a different promise. Useful improvements can also emerge from employees' daily experience and become part of the strategy.
Judge operations' contribution
Hayes and Wheelwright describe four stages. Stage 1, internally neutral, aims to stop operations holding the business back. Stage 2, externally neutral, matches competitors' standards. Stage 3, internally supportive, provides strong operations that support the business strategy. Stage 4, externally supportive, makes operations capabilities a foundation of competitive success and helps shape the business strategy itself.
The distinction between stages 3 and 4 concerns strategic contribution. At stage 3 operations delivers a chosen direction well. At stage 4 a distinctive capability opens directions the business can choose. Merely reaching a short-term output target does not establish stage 4.
Check a coherent example
A low-cost airline uses one aircraft type, quick gate turnarounds, point-to-point routes, lower-fee secondary airports, and online-only sales. Each choice supports the lowest-fare position through lower training, maintenance, selling, or facility costs and more flights per aircraft. Safety and punctuality remain qualifiers; price wins the target customer's order.
A full-service airline's lounges, connections, and onboard service support a different offering and bring different costs. Its operations must match that promise. Review the strategy as customers, competitors, and technology change; a daily roster is a tactic within it, not the whole strategy.
Key Takeaways
- Operations strategy is a long-term pattern of decisions supporting the business.
- Tactics carry the strategy into shorter-term action.
- Reconcile top-down, bottom-up, market, and resource perspectives.
- Stage 4 capabilities help shape business strategy, beyond supporting it.
4.2 Make the main decisions fit together
A strong location cannot rescue a process designed for the wrong customer promise. Strategic operations decisions depend on one another. Fit, or consistency, means that their combined effect supports the same competitive priorities.
Recognize the ten decision areas
The main areas are design of goods and services; managing quality; process and capacity design; location; layout; human resources and job design; supply chain management; inventory; scheduling; and maintenance. Each area turns a broad priority into practical choices.
For speed, product design might limit optional features, layout might shorten travel, and scheduling might protect urgent jobs. For dependable delivery, supplier selection, inventory availability, staff skills, and equipment maintenance all affect whether the promise can be kept.
Separate assets from operating systems
| Decision type | What it shapes | Examples |
|---|---|---|
| Structural | Physical assets and the supply network | Capacity, facilities, location, process technology, in-house scope |
| Infrastructural | People and systems that run the assets | Workforce, quality systems, planning, measurement, development |
Structural decisions often require large investments, take time, and cost more to reverse. Infrastructural decisions are generally easier to change, but they matter just as much. A sophisticated machine with poor training and maintenance may perform badly.
The areas interact. Location fixes access to labor, transport times, and available space. Process technology shapes required skills and maintenance. The importance of each area varies: hotel performance depends heavily on location and staff, supermarket operations on supply and inventory, and a capital-intensive plant on process, capacity, and equipment reliability.
Trace a consistent system
A fast-casual food chain competes on speed and consistent quality. It uses a short menu with shared ingredients, counter assembly, a straight flow from ordering to collection, standard portions, and frequent fresh deliveries. Cross-trained staff shift between stations; schedules add staff at lunch peaks; preventive maintenance happens outside opening hours.
These choices reinforce one another. Shared ingredients simplify stocking and training. Cross-training helps clear a busy station. Equipment availability protects flow. Adding many unusual menu items would have consequences across design, supply, layout, and skills.
Find a conflict before investing
A furniture maker promises custom designs in two weeks but uses a long line and large standard batches. Process and scheduling serve low unit cost while the market promise needs flexibility and speed. A separate flexible cell could serve custom work, or the business could change its promise.
An operations strategy matrix puts decision areas on one axis and priorities on the other. In each cell, record how the decision supports the priority and where it creates a conflict. This connects later analytical tools—such as capacity, quality, inventory, and scheduling methods—to what the strategy needs them to achieve.
Key Takeaways
- The ten areas cover offering design, assets, people, flow, and equipment care.
- Structural decisions shape assets; infrastructural decisions shape systems and people.
- Check interactions before making a hard-to-reverse investment.
- A strategy matrix reveals how decisions support or conflict with priorities.
- An efficient process can still be the wrong process for the customer promise.
4.3 Build, carry out, and review the strategy
Developing a strategy means choosing a workable set of activities, then giving people the resources and measures to carry them out. Analysis is useful only when it changes decisions about the operation.
Start with the position
A SWOT analysis separates internal strengths and weaknesses from external opportunities and threats. Skilled staff are an internal strength; a rise in market demand is an external opportunity. A competitor's new low-cost process is a threat, while your own unreliable equipment is a weakness.
Use the analysis to choose competitive priorities. Build on strengths, correct or work around weaknesses, take opportunities, and prepare for threats. A list of four headings without a decision leaves the strategy unfinished.
Connect success factors with capabilities
Key success factors are the few things a firm must do well to win in its market. A parcel carrier needs on-time delivery, accurate tracking, and network coverage. Core competencies are valuable capabilities the firm does especially well and competitors find hard to copy. The first asks what success requires; the second asks what the organization can do distinctively well.
An activity map links the competitive advantage to success factors and the activities supporting them. It tests whether activities reinforce one another and exposes activities with no strategic purpose. A whole system of linked activities is harder to imitate than one isolated practice.
Work through a bicycle maker
The maker has skilled frame builders and accurate custom sizing, but small scale and high unit costs. Demand for electric and fitted bicycles offers an opportunity; low-cost imports are a threat. Custom fit and quality suit its strengths better than a low-price promise.
Accurate fitting and delivery within three weeks are key success factors. Custom frame building is the core competency. Partner shops perform fittings; a flexible production cell builds one frame at a time; standard components are held ready so only the frame waits for customization. The activities connect the distinctive capability to the delivery promise.
Put the choices into practice
Organize the processes, hire and train for the required skills, integrate suppliers, and coordinate marketing and finance. Measures and rewards must support the same direction. If managers demand speed but reward only large batches and low immediate cost, staff have a reason to delay small custom jobs.
For the bicycle maker, reviewing fitting errors and delivery performance gives more useful strategic feedback than counting frames alone. The measures follow the promise and reveal whether supporting activities work.
Keep the strategy current
Monitor performance against market requirements. Competitors can copy a feature, customer priorities can shift, and a new technology can change what the operation can do. Product life-cycle changes may make an earlier order winner a qualifier.
Key Takeaways
- SWOT separates internal capabilities from external conditions.
- Key success factors describe market requirements; core competencies describe distinctive ability.
- Activity maps show how practical choices reinforce the advantage.
- Implementation needs aligned skills, suppliers, measures, and rewards.
- Review the strategy when market requirements or capabilities change.
4.4 Compare making and buying the work
A supplier's quoted price is only one part of an outsourcing decision. The operation must compare the costs that change, the capabilities it needs to retain, and the risks of relying on another organization.
Separate ownership from geography
Outsourcing contracts an external supplier for work the organization could perform itself. Offshoring moves work to another country, either within the firm or to a supplier. Nearshoring moves it to a nearby country; reshoring brings it back home. A company-owned foreign factory is offshored but remains in-house. A local payroll contractor is outsourced without offshoring.
Reasons to outsource include specialist skills, technology, lower costs, easier volume changes, and freeing management attention and capital for core competencies. The important question is what the firm gives up as well as what it gains.
Compare relevant costs
Compare avoidable in-house costs with the full buying cost. Costs that continue under both choices do not create a saving. Add freight, contracting, coordination, monitoring, and quality checks to the supplier price.
Suppose in-house cost is $12 per component and all of it disappears if the activity stops. A supplier quotes $9.50, freight adds $0.80, and management and checks add $0.70. Buying costs $11, so the saving is $1, about 8.3% of the in-house cost.
Now suppose $2 of the $12 is factory overhead that continues. Only $10 is avoided. Buying at $11 adds $1 per unit, or costs $13 including the continuing overhead. Comparing $11 with the full $12 would claim a saving that does not occur.
Protect the capability that matters
Comparative advantage concerns lower opportunity cost: using resources for one activity means giving up their use elsewhere. At the firm level, a specialist may do support work relatively better while the firm concentrates on its distinctive strength. Being able to perform an activity internally does not by itself make that the best use of scarce people and equipment.
Keep core competencies and activities creating competitive advantage in-house. Losing the know-how can make future improvements or a return to internal production difficult. A supplier may also learn designs, become a competitor, or gain bargaining power when replacement is hard.
Weigh risks as well as costs
Risks include poor quality or delivery, hidden transaction costs, disrupted supply, intellectual-property leakage, and ethical or reputational damage. Assess the supplier's ability to meet the priorities before treating its capacity as a substitute for your own.
A weighted scoring method can combine cost, quality, delivery, strategic importance, and risk. Give each factor a weight, score the options on a consistent scale, multiply, and add. For example, let quality carry 70% of the weight and cost 30%, with higher scores better on both. An in-house option scoring 9 for quality and 6 for cost totals 0.7 × 9 + 0.3 × 6 = 8.1. A supplier scoring 7 and 8 totals 7.3. The better cost score does not outweigh the quality difference at these weights. A small projected saving is weak support for surrendering the capability customers choose you for.
Key Takeaways
- Outsourcing concerns who does the work; offshoring concerns where it happens.
- Compare full buying cost with the in-house costs that disappear.
- Continuing overhead remains under both choices.
- Consider opportunity cost and retain core competencies.
- Check supplier quality, delivery, control, knowledge, and ethical risks.
- Weighted scores organize evidence; their weights express strategic priorities.
5Plan operations across national borders
Cross-border operations offer access to customers, suppliers, knowledge, and talent, while adding coordination and risk. Compare locations using full arrival costs and output per labor-hour, then examine how much control and resilience each arrangement provides. Finally, use cost pressure and local market differences to choose an international operations strategy and the organization of activities that supports it.
5.1 Compare global options by full cost and risk
Cross-border operations can reach markets, resources, skills, and knowledge that a domestic operation cannot access as easily. The decision needs more than a wage comparison. Distance changes cost, coordination, control, and exposure to disruption.
Choose how to operate abroad
Forms include exporting, licensing, franchising, contract manufacturing, joint ventures, and fully owned foreign facilities. A joint venture shares ownership with a local partner; a fully owned facility keeps ownership within the firm. Both require capital investment abroad. Licensing, franchising, and contract-manufacturing commitments depend on the agreement and scale.
Reasons include lower costs, supply-chain access, proximity to customers, faster delivery, local adaptation, learning about markets, sharing improvements, and attracting talent. Different motives point to different locations and levels of control.
Calculate the full arrival cost
Total landed cost is the full cost of getting a unit where it is needed. Include purchase or production cost, freight, duties, extra inventory, quality checks, and coordination.
A domestic part costs $20. An overseas quote is $14; freight is $2.50; duty is 5% of purchase price, or $0.70; extra inventory, checks, and coordination cost $1.60. Total landed cost is $18.80, saving $1.20 per part.
If the supplier's currency rises 15%, the purchase price becomes $16.10 and duty becomes $0.805. Holding the other stated costs fixed gives $16.10 + $2.50 + $0.805 + $1.60 = $21.005, about $21.01. The original saving has reversed. Update every cost tied to the changing price, not just the purchase line.
Compare labor per unit
Unit labor cost = hourly labor cost ÷ units produced per hour.
At $30 per hour and 20 units per hour, labor costs $1.50 per unit. At $6 per hour and 3 units per hour, it costs $2.00. The lower-wage site has the higher unit labor cost because its output per hour is much lower.
Examine exposure and responsibility
Exchange rates, political change, trade policy, regulation, time zones, language, remote quality control, and intellectual-property protection all affect global operations. Long, concentrated supply lines can turn one disruption into widespread shortages, as the COVID-19 pandemic and the 2021 Suez Canal blockage illustrated. Dual sourcing, nearshoring, safety stock, and mapping suppliers' suppliers can reduce particular exposures, with their own costs.
Apply a code of conduct, audit sites and suppliers, and meet local legal requirements and the firm's stricter standards. Working conditions, gifts and bribery, safety, and environmental practices need explicit attention. The World Trade Organization began in 1995; its members negotiate trade rules and use it to administer agreements and address disputes. Regional agreements also shape cross-border activity.
Key Takeaways
- Choose an entry form that fits the need for investment, control, and local knowledge.
- Compare total landed cost, including inventory and coordination.
- Update price-linked duties when exchange rates change.
- Low wages can coexist with high labor cost per unit.
- Assess disruption, communication, quality, and knowledge risks.
- Apply legal requirements and supplier standards across borders.
5.2 Match global organization to two pressures
A firm can operate in many countries without using a “global strategy” in the framework's specific sense. The choice depends on two pressures: reducing cost through coordination and scale, and responding to differences between local markets.
Diagnose the pressures
Cost pressure is high when price competition is strong or large-scale production brings important savings. It favors common designs, fewer large facilities, and coordinated decisions. Local-responsiveness pressure is high when tastes, regulations, or delivery expectations differ. It favors adapting the offering and giving local units suitable decision authority.
| Strategy | Cost pressure | Local pressure | Typical organization |
|---|---|---|---|
| International | Low | Low | Home-designed offering exported or licensed with little adaptation |
| Multidomestic | Low | High | Country units adapt offerings and make many operating decisions |
| Global | High | Low | Standardized output from large efficient facilities; centralized decisions |
| Transnational | High | High | Shared scale and knowledge combined with local adaptation |
An international strategy uses existing home capabilities without extensive local redesign. A premium motorcycle maker building at home and selling through importers illustrates it. A multidomestic strategy puts greater authority in country operations; a franchise system adapting menus to local markets illustrates the local emphasis.
Connect the choice to operations
A global strategy fits standardized products sold into price-sensitive markets. A few efficient facilities can serve many countries with common designs. Industrial components can suit this approach when customers want the same specification across markets.
A transnational strategy combines scale with adaptation. Allocate activities where they work best, share knowledge across units, and adapt the parts of the offering that local needs require. The coordination is demanding: local units need room to respond while contributing to common processes and learning.
Work through two choices
An industrial-pump maker sells identical certified models worldwide and faces close price comparisons. Cost pressure is high and local pressure low. A global strategy supports standard designs and a few large plants. Country-by-country redesign would add complexity without meeting a stated local need.
A snack maker faces different tastes and food rules as well as strong price competition. Both pressures are high. A transnational approach can share core ingredients, equipment knowledge, and purchasing while adapting recipes and packaging. With weak cost pressure and strong local needs, a multidomestic approach would fit the grid instead.
Test whether the design matches
After naming the strategy, check location, capacity, supply arrangements, product design, and decision authority. Decentralizing every activity would sacrifice opportunities to share scale; centralizing every detail could prevent needed adaptation. The grid describes tendencies, and different product lines can face different combinations of pressure.
Key Takeaways
- Judge cost pressure and local-responsiveness pressure separately.
- International fits low–low; multidomestic fits low cost pressure and high local pressure.
- Global fits high cost pressure and low local pressure; transnational fits high–high.
- Check design, sites, supply, and decision authority against the chosen strategy.
Operations Strategy and Productivity examples
1Describe an operation before changing it
13 steps
- 1IntroductionFollow the work
Imagine you are asked to improve a bicycle repair center. Before choosing equipment or adding staff, trace what the operation does: a customer brings a faulty bicycle, technicians diagnose and repair it, and the customer receives a working bicycle and advice.
You will map the resources, examine which parts of the offering can be stored, and explain the workload using the four Vs.
- 2ExplanationSeparate what changes from what does the work
The bicycle is a transformed resource because its condition changes. Fault reports are information being processed too. Technicians, tools, diagnostic software, and workshop space are transforming resources: they carry out the work.
A customer can also be transformed, as when a transport service changes someone’s location. The distinction concerns the resource’s role in the process, not whether it is a person or an object.
- 3ExampleComplete the input–output map
For the repair center, inputs include faulty bicycles, customer information, parts, staff, and facilities. The transformation includes diagnosis, component replacement, and testing. Useful outputs include repaired bicycles and advice; unwanted outputs include worn components and packaging waste.
Feedback about repeat faults can change diagnostic routines. The model therefore explains both delivery and how the operation learns from its results.
- 4ChallengeFind the internal customer
The diagnosis team sends a fault report to the repair team. Repairs are delayed because the report omits the parts required. Who is the internal customer, and which level of analysis best exposes the problem?
---reveal---
The repair team is the internal customer because it uses diagnosis’s output. The process level exposes the handoff and its missing information. Looking only at total workshop output would not show why these jobs wait.
- 5ExplanationIdentify the offering’s mix
The repair center supplies tangible parts and an intangible repair service. Most offerings sit on a goods–services continuum, so calling the business only a goods producer would leave out important work.
Parts can be held as inventory. An unused technician appointment cannot be held for another day. Inventory and service capacity therefore need different planning, even though the customer buys one combined offering.
- 6ConnectionPlace contact where it helps
At reception, customers explain faults and discuss collection times: this is front-office work. Parts accounting and routine processing can happen in the back office, away from customer contact.
The front office needs listening and expectation-management skills. The back office can use more standardized routines. Service quality also needs recovery when a promise fails, such as a clear revised collection arrangement.
- 7ChallengeHandle a time-bound service
The workshop is quiet on Wednesday but fully booked on Saturday. A manager proposes “saving” Wednesday’s unused appointments for Saturday. Why will this fail, and what could help?
---reveal---
Unused technician time expires; it is not finished-goods inventory. Encourage flexible customers to book Wednesday or adjust staffing to the demand pattern. Stocking more spare parts may help repairs, but it does not move labor time between days.
- 8ExplanationDistinguish volume from variety
Volume is how much work is done. Repeated high-volume tasks support standard procedures, specialist roles, and dedicated equipment. Variety is the range of work offered. Handling many bicycle types and unusual faults needs broader skills and flexible coordination.
A workshop doing many identical tune-ups has a different process requirement from one doing a few complex custom restorations, even if both repair bicycles.
- 9ExampleDistinguish demand swings from customer contact
Variation concerns demand over time: weekend peaks and seasonal surges create capacity problems. Visibility concerns how much customers experience the process: watching repairs increases contact and the need to explain delays.
A busy month is not high variety, and an open workshop is not demand variation. Each V identifies a different reason why the process may need extra resources or a different organization.
- 10TipExplain the cost mechanism
Avoid treating the four Vs as a scorecard with one ideal profile. Explain the link from the profile to the work. A wider range creates more task changes; sharp peaks leave idle capacity in quiet periods; direct contact needs time and interpersonal skills.
Customers may value those features enough to pay for them. The relevant test is whether the process and price support the chosen market.
- 11ChallengeAssess the customization promise
A bicycle assembler offers many configurations from common frames, wheels, and accessories at high volume. What approach is this, and why do the common components matter?
---reveal---
It is mass customization. Common modules preserve repeated work while final combinations tailor output to customers. High volume alone does not make unlimited bespoke work inexpensive; the modular process design is what supports the combination.
- 12ChallengeConnect service design with the workload
The repair center proposes immediate walk-in repairs for every bicycle type, with customers watching each job. What combined operational needs should it plan for?
---reveal---
It must match time-bound technician capacity to arrivals, provide skills and coordination for high variety, and manage high customer visibility. Holding common parts can support the work, but it cannot replace flexible staffing or contact skills. The combined promise changes several process requirements.
- 13RecapUse a three-part diagnosis
For a new operation, make three linked notes: the transformation and resource roles; the goods and services that need different planning; and the four-V profile with its staffing, equipment, and cost consequences.
Use those notes to test a proposed change. A recommendation should address a specific feature of the work, such as the missing handoff information or the timing of service demand.
2Calculate and interpret a resource gain
15 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionAsk what changed relative to resources
- 2ExplanationChoose the denominator
- 3ExampleCalculate the old and new rates
- 4ExampleCalculate the percentage change
- 5ChallengeFind the gain without using output growth
- 6ExplanationPut inputs in a common unit
- 7ExampleAdd the first week’s inputs
- 8ExampleCompare the second week on the same basis
- 9TipKeep price movements out of the comparison
- 10ChallengeRemove an apparent improvement
- 11ExplanationCheck the goal behind the count
- 12ConnectionChoose a driver you can act on
- 13ChallengeInterpret a faster clinic
- 14ChallengeConnect the narrow and broad measures
- 15RecapMake the conclusion match the measure
3Choose the performance that wins business
14 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionStart from the buying decision
- 2ExplanationGive quality and speed a precise meaning
- 3ExampleSeparate fast from on time
- 4ConnectionName the change the customer needs
- 5ChallengeIdentify the flexibility
- 6ExampleCheck for dominance before accepting a trade-off
- 7Key InsightImprove the combination or change the balance
- 8ConnectionBuild later gains on earlier ones
- 9ChallengePrioritize a real gap
- 10ExplanationQualify before trying to win
- 11ExampleDifferentiate the segments
- 12ConnectionWatch criteria change over time
- 13ChallengeCombine the qualifier and the trade-off
- 14RecapTurn customer choice into an improvement plan
4Build a consistent operations strategy
17 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionFollow a custom maker’s strategic choices
- 2ExplanationConnect mission, strategy, and tactics
- 3ConnectionUse four sources of direction
- 4ChallengeRecognize a strategic contribution
- 5ExplanationSee assets and systems together
- 6ExampleCheck the ten areas for fit
- 7ChallengeRepair the conflict
- 8ExplanationSort the strategic evidence
- 9ExampleConnect requirements with capabilities
- 10TipMake measures and rewards agree
- 11ChallengeTurn a strength into implementation
- 12ExplanationSeparate who from where
- 13ExampleCalculate what buying really costs
- 14Key InsightCount the capability being surrendered
- 15ChallengeApply avoidable cost
- 16ChallengeIntegrate the cost and strategic decision
- 17RecapCheck the strategy as a connected system
5Choose a global operating arrangement
12 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionGo beyond the overseas quote
- 2ExplanationChoose the form of involvement
- 3ExampleBuild the landed cost
- 4ExampleUpdate the currency-sensitive lines
- 5ChallengeCompare labor per unit
- 6TipMatch a risk response to the exposure
- 7ExplanationRead the two pressures separately
- 8ExampleHigh cost pressure, limited local differences
- 9ConnectionCombine shared scale with local fit
- 10ChallengeChoose the position in the grid
- 11ChallengeConnect the market promise with sourcing
- 12RecapConnect the grid to real decisions
Operations Strategy and Productivity practice questions
Set 1: Apply priorities, strategy, and sourcing decisions10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Understand operations and compare performance10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Diagnose misleading measures and strategic conflicts10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Evaluate improvement, investment, and global choices10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Connect the full operations decision10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Activity map
Avoidable cost
B
Back office
Balanced performance measures
Bottom-up perspective
C
Capital input
Comparative advantage
Competitive priority
Constant prices
Core competency
Cost
Cost-reduction pressure
D
Delivery flexibility
Dependability
Dual sourcing
E
Effectiveness
Efficiency
Efficient frontier
Externally supportive operations
F
Feedback
Fit
Flexibility
Focused factory
Franchising
Front office
G
Global operations
Global strategy
Good
Goods–services continuum
I
Implementation
Infrastructural decision
Internal customer
Internal supplier
International strategy
J
Joint venture
K
Key success factor
L
Labor productivity
Labor-hour
Less important factor
Licensing
Local-responsiveness pressure
M
Maintenance
Market segment
Market-requirements perspective
Mass customization
Mission
Mix flexibility
Multidomestic strategy
Multifactor productivity
N
Nearshoring
O
Offshoring
Operations management
Operations strategy
Operations strategy matrix
Operations-resources perspective
Opportunity cost
Order qualifier
Order winner
Order-losing sensitive qualifier
Outsourcing
P
Polar diagram
Product life cycle
Productivity
Productivity change
Productivity driver
Q
Quality
R
Real output
Repositioning
Reshoring
S
Sand cone model
Service
Service recovery
Servitization
Single-factor productivity
Speed
Structural decision
SWOT analysis
T
Tactic
Top-down perspective
Total factor productivity
Total landed cost
Trade-off
Transformation process
Transformed resource
Transforming resource
Transnational strategy
Triple bottom line
U
Unit labor cost
V
Variation in demand
Variety
Visibility
Volume
Volume flexibility
W
World Trade Organization
- 1Operations Strategy and Productivity
- 2Demand Forecasting
- 3Process Design and Capacity
- 4Quality Management
- 5Facility Location and Layout
- 6Inventory Management
- 7Aggregate Planning
- 8Short-Term Scheduling
- 9Lean Operations
About this lesson
Make your own Study Materials
Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.