Operations Strategy and Productivity

Learn how operations turn inputs into the goods and services an organization sells, and how to measure how well they do it. Compare goods with services, use the four Vs to describe an operation, and calculate single-factor and multifactor productivity and its change over time. Then link operations to competition: the priorities of quality, speed, dependability, flexibility and cost, the trade-offs between them, and the order winners and qualifiers that decide what customers buy. Finally, build an operations strategy, decide what to outsource, and choose how to run operations across countries.

IntermediateLesson 1 of 9 in Operations Management Course

What you will learn

  1. Describe any organization's operations as the transformation of inputs into goods and services, compare goods with services, and explain how volume, variety, variation and visibility shape the way an operation works.
    • Describe operations as a transformation process
      Define operations management, identify the inputs, transformation and outputs of an operation, and place operations among the other functions of an organization.
    • Compare goods and services and what the difference means for operations
      Distinguish goods from services by their characteristics, place real offerings on the goods–services continuum, and explain how the difference affects capacity, quality, location and customer contact.
    • Explain how volume, variety, variation and visibility shape an operation
      Use the four Vs to describe how operations differ and to predict their costs and the way they are managed.
  2. Calculate single-factor and multifactor productivity, measure productivity change correctly, and interpret what the figures say about an operation and what drives them.
    • Calculate single-factor productivity and productivity change
      Compute productivity for one input such as labor, machine time or energy, express it in correct units, and calculate the percentage change between periods.
    • Calculate multifactor productivity with inputs valued in money
      Combine several inputs into one measure by converting them to money, calculate and compare multifactor productivity, and avoid the errors that distort it.
    • Interpret productivity figures and explain what drives them
      Distinguish productivity from efficiency and effectiveness, explain the labor, capital and management drivers of productivity, and recognize the special problems of measuring service productivity.
  3. Explain what quality, speed, dependability, flexibility and cost mean for an operation, analyze the trade-offs between them, and use order winners and qualifiers to decide which priorities matter most.
    • Explain the five competitive priorities of an operation
      Define quality, speed, dependability, flexibility and cost as performance objectives, show what each means in different operations, and explain their external and internal benefits.
    • Analyze the trade-offs between priorities
      Explain why improving one priority can cost another, read an efficient frontier, and distinguish repositioning along trade-offs from improving the whole operation.
    • Identify order winners and qualifiers
      Classify the criteria customers use into order winners, qualifiers and less important factors, and explain how they differ between segments and change over a product's life cycle.
  4. Connect mission and business strategy to operations, make the strategic operations decisions consistently, develop and implement an operations strategy, and decide which activities to keep in-house or outsource.
    • Link mission, business strategy and operations strategy
      Explain how operations strategy follows from the mission and business strategy, view it from four perspectives, and judge how much operations contributes to competitive advantage.
    • Make the strategic operations decisions consistently
      Name the main decision areas of operations, separate structural from infrastructural decisions, and check that all decisions support the same competitive priorities.
    • Develop and implement an operations strategy
      Use SWOT analysis, key success factors, core competencies and activity maps to build an operations strategy, then put it into practice and keep it current.
    • Decide what to make in-house and what to outsource
      Explain outsourcing and its forms, apply core competencies and comparative advantage to the decision, and compare total costs and risks before choosing.
  5. Explain why organizations globalize their operations and what risks they face, and choose between international, multidomestic, global and transnational operations strategies.
    • Explain why and how operations go global
      Describe the reasons, forms and risks of global operations, compare locations by total landed cost and unit labor cost, and recognize the cultural and ethical issues involved.
    • Select an international operations strategy
      Use the cost-reduction and local-responsiveness pressures to distinguish international, multidomestic, global and transnational strategies, and choose the one that fits a business.

Operations Strategy and Productivity study guide

5 chapters

1

Explain what operations do and how goods and services differ

Every organization creates value through operations, whether its output is a physical product, a service, or a mixture. Start by mapping what changes and which resources do the work. Then use the characteristics of goods and services and the four Vs to explain why operations need different staffing, equipment, and capacity choices. These descriptions give you a practical basis for comparing processes before judging their performance.

1.1 Map inputs, work, and outputs

A factory changes materials, a bank changes information, and a clinic changes a patient's health. Operations management organizes the resources and processes that create these goods and services. Production means creating goods and services; it includes much more than manufacturing.

Follow the transformation

The input–transformation–output model asks three questions: what enters, what happens to it, and what leaves? A transformation may change physical form, location, possession, storage, information, or a person's physical or psychological state. A retailer transfers possession; a warehouse stores goods; a publisher changes information into a usable form.

Separate two kinds of input. Transformed resources are the materials, information, or customers being changed. Transforming resources are the staff and facilities doing the work. Facilities include buildings, equipment, and technology. A passenger is a transformed resource in air travel because the operation changes the passenger's location. The pilot and aircraft are transforming resources.

Work through a restaurant

Start with ingredients, orders, bookings, and diners. These are transformed resources: ingredients become meals, information guides the order, and diners leave fed. The cooks, servers, ovens, refrigerators, kitchen, and dining room are transforming resources. They provide the people and facilities that carry out the work.

The outputs include both meals and a dining experience. Waste food, discarded packaging, and emissions also leave the operation. Mapping only the saleable meal would hide resources lost as waste. Feedback completes the model: complaints about cold food can lead to a change in collection times between kitchen and table.

Choose the level of analysis

At the supply-network level, examine the restaurant alongside growers, distributors, and customers. At the operation level, examine the restaurant as a whole. At the process level, follow a particular flow such as receiving ingredients or serving an order. The useful boundary depends on the problem: delayed ingredients may require a network view, while slow table service may require a process view.

Processes supply one another. The kitchen is an internal supplier to the servers, who are its internal customers. A clear handoff needs the right meal, order information, and timing. This way of thinking also applies to an accounting team that supplies cost information to operations.

Connect operations with other functions

Marketing understands customers and creates demand. Finance and accounting raise, allocate, and track money. Operations creates the offering. Human resources, IT, and engineering support these core functions, although the boundaries vary between organizations. Clinical work is part of a hospital's operations, even though doctors and nurses are professionals.

Operations decisions reach beyond routine work. Staffing, equipment, and methods shape cost, quality, and the customer's experience. Calling operations a factory department would miss the same decisions in a school, software company, or bank.

Key Takeaways

  • Transformed resources are what changes; transforming resources are the staff and facilities doing the work.
  • Map useful outputs, unwanted outputs, and feedback.
  • Choose supply network, operation, or process as the boundary for the problem.
  • Internal customers depend on the outputs of other processes.

1.2 Design for a mix of goods and services

A customer can store a chair, transport it, and sell it to someone else. A haircut is an activity the customer experiences. This difference changes how operations plans capacity, checks quality, and reaches customers.

Place the offering on a continuum

A good is a tangible product that can be owned. A service is an intangible activity or performance for a customer. Most offerings combine both: a car includes financing and a warranty, a restaurant supplies food and service, and a hotel provides a room with cleaning and reception.

Servitization means adding services to goods. An equipment maker may sell maintenance contracts or charge for machine use by the hour. Operations then has to support the installed equipment as well as build it. A successful sale creates a continuing service obligation.

Understand typical service features

Services are often produced and consumed together, cannot be stored, and vary with the customer and employee. Customers may participate in the process. Many services depend on expert knowledge, and many are spread across local sites near users. These features describe tendencies: streaming music can be standardized and delivered without personal contact.

An unused appointment today cannot be held as an appointment for tomorrow. That lost capacity makes timing central. A factory can build inventory before a demand peak; a service often needs appointments, reservations, staff schedules, queues, or lower prices at quiet times. A tax-preparation office hires temporary staff near the filing deadline because customer information arrives in a peak. It cannot finish returns before the relevant documents arrive.

Check quality where it occurs

Goods can often be inspected before delivery. Service quality is experienced during delivery, including courtesy, waiting time, and the setting. Training and clear procedures help employees deliver a consistent experience. Service recovery means putting a failure right quickly, such as correcting a booking and giving the customer a clear new arrival time.

Intangibility does not prevent measurement. A repair service can track repeat faults, waiting times, and satisfaction. A short wait is useful evidence, but it does not replace checking whether the repair actually worked.

Organize customer contact

Services that process customers usually need to be accessible to them. Factories have more freedom to locate away from customers and ship goods. A front office has high customer contact, such as hotel reception. A back office, such as hotel laundry, can standardize work away from the customer.

Consider a meal-kit business. Ingredients and packaging are goods; planning menus, designing recipes, delivering boxes, and answering questions are services. The operation must manage perishable inventory and delivery time windows together. Improving packing speed while making delivery unreliable would damage the whole offering.

Knowledge and technology matter in services as well as manufacturing. Hospitals, airlines, and data centers need skilled people and expensive equipment.

Key Takeaways

  • Most offerings bundle tangible goods with services.
  • Unused service capacity expires, so match capacity with the timing of demand.
  • Service quality depends on both the outcome and the delivery experience.
  • Front-office and back-office work can need different processes.
  • Servitization adds ongoing service responsibilities to a goods operation.

1.3 Use the four Vs to explain process choices

Two operations can sell similar things and still need very different ways of working. The four Vs describe the workload and the customer's contact with it: volume, variety, variation in demand, and visibility. Use the profile to explain staffing, equipment, coordination, and unit cost.

Read each dimension
DimensionMeaningOperational consequence
VolumeHow much is producedHigh volume supports repetition, specialization, and dedicated equipment.
VarietyHow many different offerings are producedHigh variety needs broader skills, flexible resources, and more coordination.
VariationHow demand changes over timePeaks need capacity responses; quiet times leave resources idle.
VisibilityHow much customers see and experienceHigh visibility needs contact skills and attention to perceived waiting and quality.

High volume spreads repeated work across many units and tends to lower unit cost. A large fast-food outlet can use dedicated equipment and standard procedures. A small café making each dish to order has less repetition and more varied tasks.

High variety raises the number of different requests the process must handle. A taxi adapts its route to each passenger; a bus follows a standard route and timetable. The taxi's flexibility requires a different cost structure. Variety concerns the range offered, while variation concerns demand over time. A business can offer one product yet face a sharp seasonal peak.

Follow demand and contact

A beach resort must handle a summer peak and idle winter capacity. More stable demand makes staff and facilities easier to use evenly. High variation creates a need for forecasting, flexible staffing, and decisions about how much spare capacity to carry.

At a hair salon customers experience the work as it happens. Staff must manage conversations, expectations, and waiting as well as technical work. An online retailer's warehouse has lower visibility: work can be scheduled and standardized without customers watching each step. A single business can combine high-visibility sales with low-visibility processing.

Compare two hotels

A budget chain has high volume and low variety: standard rooms, few extras, and repeated routines. Online booking and self check-in reduce visibility. Demand still varies, but the simplified process supports a lower cost per night.

A small luxury hotel has lower volume, more services on request, and constant staff interaction. Its broader skills and personal attention cost more. That profile makes sense when guests value the service and will pay for it. Visibility is a design choice with benefits and costs, not a score to minimize.

Look for a deliberate combination

High volume and low variety commonly go together. Mass customization combines high volume with tailored output by using special process designs, such as standard modules assembled to order. It does not remove the need to coordinate variety.

Key Takeaways

  • Volume is quantity; variety is range; variation is demand over time; visibility is customer exposure.
  • High volume tends to reduce unit cost through repetition and specialization.
  • Variety, demand swings, and customer contact create distinct management needs.
  • A four-V profile should fit the market and the price customers will pay.
  • Mass customization needs a process designed to combine scale with tailored output.
2

Measure productivity and use it to judge improvement

An increase in output can come from better methods or simply from using more resources. Productivity ratios let you separate those possibilities. Calculate single-factor and multifactor measures, keep their units and price bases consistent, and compare changes against the earlier period. Then examine quality and customer outcomes so that a favorable number leads to a sound judgment about the operation.

2.1 Calculate output per unit of input

Making more output does not tell you whether resources were used better. Productivity measures output relative to input. A larger operation may produce more while getting less from each labor-hour, machine-hour, kilogram of material, or kilowatt-hour of energy.

Build the ratio

Productivity = output ÷ input.

A single-factor, or partial, measure uses one input. Name both sides of the ratio: “brochures per labor-hour” is meaningful; “productivity is 15” leaves out what was counted. Choose the input that matches the question. For energy productivity, divide output by energy used, not by its money cost unless the measure explicitly asks for that.

For labor, add all hours worked. Five employees working eight hours contribute 5 × 8 = 40 labor-hours. Dividing by five employees would ignore their working time and give a different measure.

Work through the print shop

The shop makes 600 brochures in 40 labor-hours. Labor productivity is 600 ÷ 40 = 15 brochures per labor-hour. With new layout software it makes 720 brochures in the same 40 hours, so productivity becomes 720 ÷ 40 = 18 brochures per labor-hour.

Productivity change = (new productivity − old productivity) ÷ old productivity × 100%.

The increase is (18 − 15) ÷ 15 × 100% = 20%. The old value is the comparison base. Dividing by 18 answers a different question: how large the increase is relative to the new level.

Now suppose the 720 brochures require five employees to work nine hours each. Total labor is 45 hours, and productivity is 720 ÷ 45 = 16 brochures per labor-hour. Production rose 20%, but productivity rose only (16 − 15) ÷ 15 × 100%, about 6.7%. Extra output came partly from extra time.

Compare like with like

Plant X makes 2,000 units in 400 labor-hours; plant Y makes 2,250 units in 500 labor-hours. Both employ ten people. Per employee, Y looks better: 225 units against 200. Per labor-hour, X makes 5.0 units and Y makes 4.5. Hours reveal which plant gets more output from the measured labor input.

The same logic applies beyond manufacturing. Twelve call-center agents working 40 hours each handle 2,880 calls: 2,880 ÷ 480 = 6 calls per agent-hour. A greenhouse producing 9,000 kg of tomatoes with 15,000 kWh achieves 0.6 kg per kWh.

State the limit of the measure

A labor ratio leaves out equipment, materials, and energy. Replacing workers with machines can raise labor productivity while increasing other inputs. Also check that output definitions, quality, and period lengths match. Counting calls handled is useful only alongside evidence about the service those calls provided.

Key Takeaways

  • Calculate total labor-hours before dividing output by labor.
  • Keep output and input units attached to the result.
  • Calculate percentage change using the earlier productivity as the base.
  • Production growth can come from using more inputs.
  • A partial measure leaves other resources out of the comparison.

2.2 Combine inputs without mixing units

A new machine may save labor while using more capital and materials. Multifactor productivity brings several inputs into one denominator so that a gain in one resource does not hide extra use of another. The inputs first need a common unit.

Value the inputs

Multifactor productivity = output ÷ (labor + materials + energy + capital + miscellaneous inputs).

Hours, kilograms, and kilowatt-hours cannot be added directly. Multiply each quantity by its price or cost, then add the money values. Labor input might be hours × cost per hour; capital charges represent the equipment resources used during the period, including depreciation and financing.

Keep the input coverage consistent between comparisons. Leaving energy out of one week makes that week's denominator too small. When the measure covers all inputs, it is often called total factor productivity. Official economic measures also use the names multifactor and total factor productivity, with more detailed methods for combining input and output quantities.

Calculate the workshop's first week

The furniture workshop produces 375 chairs. Labor is 400 hours at $25 per hour, or $10,000. Add materials of $6,500, energy of $1,200, and capital charges of $2,300. Total input is $20,000.

375 ÷ 20,000 = 0.01875 chairs per dollar of input. Rescaling makes this easier to read: multiply by 1,000 to get 18.75 chairs per $1,000. Rescaling changes the reporting unit, not the underlying performance.

Compare the second week

Output rises to 420 chairs. Labor costs $9,600, materials $7,300, energy $1,100, and capital $3,000, totaling $21,000. Productivity is 420 ÷ 21,000 × 1,000 = 20 chairs per $1,000. Its increase from 18.75 is about 6.7%.

Labor productivity rose from 375 ÷ 400 = 0.9375 to 420 ÷ 384, about 1.094 chairs per labor-hour: roughly 16.7%. That larger gain leaves out the extra capital and material inputs. The multifactor measure shows the broader resource result.

Remove price changes from time comparisons

When products differ, output can be valued in money. Use constant prices: the same base-period prices for every period. Apply this rule to inputs too. Otherwise selling-price or input-price movements can look like changes in resource use.

A bakery's output worth $56,000 at base prices and inputs worth $40,000 gives 1.4 dollars of output per dollar of input. Raising selling prices by 10% makes current-price output $61,600 and the apparent ratio 1.54, even with no physical change. Likewise, a higher energy price can depress a current-price ratio while kWh and output stay fixed.

Key Takeaways

  • Convert unlike inputs to a common money unit before adding them.
  • Include the same input categories in both periods.
  • Use constant prices for input and output comparisons over time.
  • Report tiny ratios per a convenient amount, such as $1,000.
  • Labor and multifactor gains can differ because other inputs change.
  • A selling-price increase alone is not a physical productivity gain.

2.3 Judge what a productivity gain means

A ratio can rise while customers receive worse service. Interpreting productivity requires checking the output being counted, the inputs being used, and whether the operation is achieving the outcomes people value.

Separate three questions
MeasureQuestionExample
ProductivityHow much output comes from each unit of input?Resolved cases per labor-hour
EfficiencyHow does actual performance compare with a standard or planned rate?Output compared with the process's planned output
EffectivenessAre the right goals being achieved?Whether customer problems stay solved

A call center may end calls quickly and meet its handling-time standard while leaving customers' problems unresolved. It can look efficient on that measure yet be ineffective. Defining useful output helps prevent this conflict.

Find the driver

Three broad drivers are labor, capital, and management. Labor improvements include skills, training, health, and motivation. Capital includes equipment, technology, and infrastructure. Management organizes the resources through methods, layout, schedules, and the adoption of technology. A better sequence of tasks can reduce waiting without buying equipment.

Longer hours increase input as well as possible output. If output rises in the same proportion, output per hour stays unchanged. Fatigue can also increase errors. Better productivity mainly comes from better methods, skills, technology, and organization, not simply from more effort.

Examine the measurement

Quality changes can disappear inside a simple count. A phone can offer far more capability than an older model even though each counts as one phone. Weather, supplier disruption, and price movements can also change a measured result without a change in internal methods. Research and advice are especially hard to count as standard units.

Services add variation in customer needs and task complexity. A clinic's patients per hour leave out whether diagnoses are correct. Service improvements can come from self-service, standard procedures, technology, and staffing that matches demand, but the outcome still needs checking.

For example, bank branch A processes 12 loan applications per employee-day and branch B processes 9. Check complexity, errors, approval reversals, and customer satisfaction before ranking their performance. More simple applications are not equivalent to more difficult applications completed correctly.

Connect improvement to wider outcomes

At the economy level, labor productivity is real output, such as real GDP, per hour worked. Sustained growth allows higher wages and profits without relying on higher prices and supports higher living standards over time. Small annual differences compound: 2% growth roughly doubles output per hour in 35 years; 1% takes about 70 years.

Use productivity alongside quality, delivery, safety, and sustainability. Cutting inspections may raise short-term throughput but create defects and rework. Moving costs onto workers, customers, or the environment gives an incomplete account of improvement.

Key Takeaways

  • Productivity, efficiency, and effectiveness answer different questions.
  • Labor skills, capital, and management all affect output per input.
  • Check service complexity and quality before comparing counts.
  • Longer hours alone do not raise output per hour.
  • Sustained productivity growth compounds over time.
  • Judge resource gains alongside quality, delivery, safety, and sustainability.
3

Set competitive priorities and manage the trade-offs between them

Operations needs a clear meaning of success. Quality, speed, dependability, flexibility, and cost describe different aspects of performance, and customer priorities decide which matter most. Use order winners and qualifiers to identify the market requirement, then examine whether a performance conflict is a true trade-off or an opportunity to improve. This connects customer choice to the capabilities the operation should build.

3.1 Turn priorities into measures

“Better performance” needs a precise meaning. Competitive priorities, also called performance objectives, describe what an operation must deliver to compete. The five standard priorities are quality, speed, dependability, flexibility, and cost.

Define the five priorities
PriorityMeaningPossible measure
QualityConforming to requirements and being fit for purposeDefect or repeat-treatment rate
SpeedTime from request to receiptDelivery lead time
DependabilityDelivering when promisedOn-time delivery rate
FlexibilityChanging output, range, design, or timingTime needed to change the output mix
CostResources spent producing the offeringCost per order or treatment

Quality is doing things right, not adding luxury. A budget flight can deliver high quality when it is safe, clean, and matches its promise. Internally, fewer errors mean less scrap, rework, and complaint handling. This also makes work more dependable.

Speed concerns elapsed time. It matters to a customer waiting for an order and to an operation with inventory waiting between steps. Faster flow reduces work held in the process and exposure to obsolescence. Speed can also describe new-product development.

Dependability concerns the promise. If 470 of 500 orders arrive by their promised dates, the rate is 94%. A ten-day delivery that always arrives on day ten is slow but dependable. A two-day promise often met on day four is less dependable even if its actual delivery is shorter.

Name the flexibility needed

Product or service flexibility introduces new or changed designs. Mix flexibility changes the range or combination supplied. Volume flexibility changes output levels up or down. Delivery flexibility changes timing. A bakery introducing a new recipe, switching its daily assortment, adding output for a festival, and accepting an earlier collection request is exercising different forms of flexibility.

These abilities also help the operation cope with disrupted supplies or sudden demand. Their value depends on what customers need and what the process can change quickly.

Connect customer benefits with internal benefits

Cost includes staff, facilities, equipment, and materials. Low cost supports a competitive price and a workable margin. The other priorities can reduce cost internally: quality reduces waste, speed reduces waiting inventory, dependability reduces disruption, and flexibility reduces time lost switching work.

In a hospital, quality concerns correct and safe care, speed concerns waiting for treatment, and dependability concerns keeping appointment promises. In a car plant the same labels refer to defects, order lead time, and promised delivery dates. Define the measure in the actual operation before comparing scores.

Operations also affects workers, communities, and the environment. The triple bottom line considers people, planet, and profit. Measures of safety, energy, waste, and emissions make these effects visible alongside customer and cost performance. Some frameworks group speed, dependability, and flexibility under “response.”

Key Takeaways

  • Quality means meeting requirements and being fit for purpose.
  • Speed measures elapsed time; dependability measures keeping the promise.
  • Distinguish product, mix, volume, and delivery flexibility.
  • Better quality and flow can lower internal costs.
  • Define each priority with measures suited to the operation.
  • People, planet, and profit extend the view of performance.

3.2 Distinguish trade-offs from improvement

Fast delivery, a wide range, and low cost can pull a process in different directions. A trade-off means gaining on one objective at the expense of another with the current resources and methods. First ask whether the operation is already using those resources well.

Read the efficient frontier

An efficient frontier joins the best combinations currently achievable for the objectives being compared. On the frontier, moving toward one objective gives up some of another unless methods or technology change. Inside it, an operation can improve more than one objective by closing a performance gap.

Compare similar pump plants. A offers four variants at $40 each; B offers one variant at $32; C offers two variants at $41. A and B represent different frontier positions in this comparison: B is cheaper, while A has more range. A outperforms C on both cost and variety. C should investigate its process before accepting a trade-off as unavoidable.

If A reduces changeover times and supplies the same four variants at $35, it changes the best available combination. Improvement has pushed the frontier outward. Moving from A's original position toward B's sacrifices variety for lower cost; that is repositioning.

Use focus deliberately

Skinner's trade-off argument links manufacturing priorities to business strategy. His focused factory concentrates on a limited set of products, markets, and objectives. A plant within a plant separates focused units inside a larger facility. A custom-order unit and a standard-volume unit can use different schedules and processes without forcing every job through one compromise.

Focus does not excuse poor execution. A low-cost operation still needs adequate quality and dependable delivery. It chooses which capabilities to excel at once essential standards are met.

Build capabilities together

The sand cone model proposes cumulative layers: build quality, then dependability, then speed and flexibility, and finally cost efficiency. Continue strengthening the earlier layers as later ones grow. Fewer defects make flow more predictable; predictable work helps speed; less disruption and waste support lower cost. Evidence across plants is mixed, so the model is a useful improvement guide rather than a fixed sequence every operation must follow.

Identify the useful gap

A polar, or radar, diagram plots objectives on separate axes. Compare required and achieved performance on the same defined scale. If speed required is 8 and achieved is 5, the shortfall is 3. If cost performance required is 6 and achieved is 7, that target is already exceeded.

Customer importance is a separate judgment used to rank which gaps matter most. Do not subtract an importance score from a performance score: they measure different things.

Key Takeaways

  • A trade-off holds for the current resources, methods, and technology.
  • Inside the frontier, remove inefficiency before accepting a sacrifice.
  • Repositioning changes the mix of objectives; improvement can raise several together.
  • Focus gives different markets processes suited to their needs.
  • The sand cone model builds later capabilities on continuing earlier improvements.
  • Compare required and actual performance on the same scale.

3.3 Find what qualifies and what wins orders

Customers do not value every extra improvement equally. Some requirements decide whether a supplier is considered at all; others decide who gets the order. Order qualifiers and order winners help operations spend effort where it affects buying decisions.

Separate the roles
FactorRole in the purchaseOperations response
QualifierMinimum needed to enter considerationMeet the threshold reliably
Order winnerCriterion that wins against competitorsDevelop superior performance
Less important factorHas little effect on this segment's choiceAvoid unnecessary spending

A qualifier can be critical even when exceeding it wins little extra business. Required certification is a good example. A qualifier whose failure causes rapid, heavy order loss is order-losing sensitive. Food safety and fixed publication deadlines can have this role.

Analyze a segment

Start by dividing the market into groups with distinct needs. List the criteria each group actually uses, classify them, and check won and lost orders. Customers' stated preferences are useful evidence, but buying behavior can reveal a different priority.

A commercial printer serves annual-report clients and routine-flyer clients. Annual reports need faultless work and arrival by a fixed publication date as qualifiers. Exceptional print and finishing quality wins the order. For routine flyers, acceptable quality qualifies; low price and next-day delivery win. One factory may need separate units to serve both groups well.

Price is what the customer pays. Cost is what operations spends. Winning orders with a low price does not ensure a profit if the process still has high costs.

Revisit the classification over time

A feature that once won orders can become a minimum expectation when competitors catch up. Reliable, defect-free output may stop distinguishing a supplier but remain essential for qualification. Failing to maintain it loses consideration even if another feature is outstanding.

Priorities change over the product life cycle. At introduction, novelty, design, and performance matter; operations handles frequent changes and short runs. In growth, availability and sound quality push capacity expansion and reliability. At maturity, price and dependable supply push standardization and cost reduction. In decline, price pressure and excess capacity push tighter cost control.

Connect the market with process choices

Hill's framework links corporate objectives, marketing strategy, how products win orders, process choice, and supporting infrastructure. The order-winning step bridges the customer's decision and the operation's design. A promise of quick custom work requires flexible processes, suitable staff skills, and schedules that let small jobs move.

Key Takeaways

  • Meet qualifiers reliably before competing on order winners.
  • A qualifier can be vital even when extra performance earns little reward.
  • Classify factors separately for each market segment.
  • Order winners can become qualifiers as markets change.
  • Price is a buying criterion; cost determines whether that price is viable.
  • Use order criteria to guide process and infrastructure decisions.
4

Build an operations strategy that supports the business

A competitive promise becomes credible through a connected set of operations choices. Link the business direction to assets, people, processes, and measures, and check that these choices reinforce one another. The same reasoning guides implementation and decisions about outsourcing. Cost matters, but so do the capabilities the organization needs to keep and the risks it accepts when another firm performs the work.

4.1 Connect operations decisions to the business

An organization's purpose needs a practical way to deliver it. Operations strategy sets the long-term role, objectives, and resources of operations. It connects the business's chosen position with a consistent pattern of decisions about how work gets done.

Follow purpose into action

A mission states what the organization offers and whom it serves. Strategy sets the plan for achieving that purpose. Marketing, finance, and operations each need a functional strategy that supports it. Tactics are the shorter-term actions used to carry the strategy out.

Operations supports advantage through differentiation, low cost, and response. Differentiation creates something customers value as distinctive, including an experience. Low cost supports an attractive price. Response combines flexibility, dependability, and speed. The business chooses its competitive position; operations builds the ability to deliver it.

Use four perspectives
PerspectiveStarting question
Top-downWhat does the business strategy require?
Bottom-upWhat does operating experience reveal?
Market requirementsWhat do customers need and use to choose?
Operations resourcesWhat do capabilities, assets, and constraints allow?

These perspectives need to work together. A market may want rapid customization, while current equipment permits only long standard runs. The strategy must reconcile the requirement and the capability through investment, process changes, or a different promise. Useful improvements can also emerge from employees' daily experience and become part of the strategy.

Judge operations' contribution

Hayes and Wheelwright describe four stages. Stage 1, internally neutral, aims to stop operations holding the business back. Stage 2, externally neutral, matches competitors' standards. Stage 3, internally supportive, provides strong operations that support the business strategy. Stage 4, externally supportive, makes operations capabilities a foundation of competitive success and helps shape the business strategy itself.

The distinction between stages 3 and 4 concerns strategic contribution. At stage 3 operations delivers a chosen direction well. At stage 4 a distinctive capability opens directions the business can choose. Merely reaching a short-term output target does not establish stage 4.

Check a coherent example

A low-cost airline uses one aircraft type, quick gate turnarounds, point-to-point routes, lower-fee secondary airports, and online-only sales. Each choice supports the lowest-fare position through lower training, maintenance, selling, or facility costs and more flights per aircraft. Safety and punctuality remain qualifiers; price wins the target customer's order.

A full-service airline's lounges, connections, and onboard service support a different offering and bring different costs. Its operations must match that promise. Review the strategy as customers, competitors, and technology change; a daily roster is a tactic within it, not the whole strategy.

Key Takeaways

  • Operations strategy is a long-term pattern of decisions supporting the business.
  • Tactics carry the strategy into shorter-term action.
  • Reconcile top-down, bottom-up, market, and resource perspectives.
  • Stage 4 capabilities help shape business strategy, beyond supporting it.

4.2 Make the main decisions fit together

A strong location cannot rescue a process designed for the wrong customer promise. Strategic operations decisions depend on one another. Fit, or consistency, means that their combined effect supports the same competitive priorities.

Recognize the ten decision areas

The main areas are design of goods and services; managing quality; process and capacity design; location; layout; human resources and job design; supply chain management; inventory; scheduling; and maintenance. Each area turns a broad priority into practical choices.

For speed, product design might limit optional features, layout might shorten travel, and scheduling might protect urgent jobs. For dependable delivery, supplier selection, inventory availability, staff skills, and equipment maintenance all affect whether the promise can be kept.

Separate assets from operating systems
Decision typeWhat it shapesExamples
StructuralPhysical assets and the supply networkCapacity, facilities, location, process technology, in-house scope
InfrastructuralPeople and systems that run the assetsWorkforce, quality systems, planning, measurement, development

Structural decisions often require large investments, take time, and cost more to reverse. Infrastructural decisions are generally easier to change, but they matter just as much. A sophisticated machine with poor training and maintenance may perform badly.

The areas interact. Location fixes access to labor, transport times, and available space. Process technology shapes required skills and maintenance. The importance of each area varies: hotel performance depends heavily on location and staff, supermarket operations on supply and inventory, and a capital-intensive plant on process, capacity, and equipment reliability.

Trace a consistent system

A fast-casual food chain competes on speed and consistent quality. It uses a short menu with shared ingredients, counter assembly, a straight flow from ordering to collection, standard portions, and frequent fresh deliveries. Cross-trained staff shift between stations; schedules add staff at lunch peaks; preventive maintenance happens outside opening hours.

These choices reinforce one another. Shared ingredients simplify stocking and training. Cross-training helps clear a busy station. Equipment availability protects flow. Adding many unusual menu items would have consequences across design, supply, layout, and skills.

Find a conflict before investing

A furniture maker promises custom designs in two weeks but uses a long line and large standard batches. Process and scheduling serve low unit cost while the market promise needs flexibility and speed. A separate flexible cell could serve custom work, or the business could change its promise.

An operations strategy matrix puts decision areas on one axis and priorities on the other. In each cell, record how the decision supports the priority and where it creates a conflict. This connects later analytical tools—such as capacity, quality, inventory, and scheduling methods—to what the strategy needs them to achieve.

Key Takeaways

  • The ten areas cover offering design, assets, people, flow, and equipment care.
  • Structural decisions shape assets; infrastructural decisions shape systems and people.
  • Check interactions before making a hard-to-reverse investment.
  • A strategy matrix reveals how decisions support or conflict with priorities.
  • An efficient process can still be the wrong process for the customer promise.

4.3 Build, carry out, and review the strategy

Developing a strategy means choosing a workable set of activities, then giving people the resources and measures to carry them out. Analysis is useful only when it changes decisions about the operation.

Start with the position

A SWOT analysis separates internal strengths and weaknesses from external opportunities and threats. Skilled staff are an internal strength; a rise in market demand is an external opportunity. A competitor's new low-cost process is a threat, while your own unreliable equipment is a weakness.

Use the analysis to choose competitive priorities. Build on strengths, correct or work around weaknesses, take opportunities, and prepare for threats. A list of four headings without a decision leaves the strategy unfinished.

Connect success factors with capabilities

Key success factors are the few things a firm must do well to win in its market. A parcel carrier needs on-time delivery, accurate tracking, and network coverage. Core competencies are valuable capabilities the firm does especially well and competitors find hard to copy. The first asks what success requires; the second asks what the organization can do distinctively well.

An activity map links the competitive advantage to success factors and the activities supporting them. It tests whether activities reinforce one another and exposes activities with no strategic purpose. A whole system of linked activities is harder to imitate than one isolated practice.

Work through a bicycle maker

The maker has skilled frame builders and accurate custom sizing, but small scale and high unit costs. Demand for electric and fitted bicycles offers an opportunity; low-cost imports are a threat. Custom fit and quality suit its strengths better than a low-price promise.

Accurate fitting and delivery within three weeks are key success factors. Custom frame building is the core competency. Partner shops perform fittings; a flexible production cell builds one frame at a time; standard components are held ready so only the frame waits for customization. The activities connect the distinctive capability to the delivery promise.

Put the choices into practice

Organize the processes, hire and train for the required skills, integrate suppliers, and coordinate marketing and finance. Measures and rewards must support the same direction. If managers demand speed but reward only large batches and low immediate cost, staff have a reason to delay small custom jobs.

For the bicycle maker, reviewing fitting errors and delivery performance gives more useful strategic feedback than counting frames alone. The measures follow the promise and reveal whether supporting activities work.

Keep the strategy current

Monitor performance against market requirements. Competitors can copy a feature, customer priorities can shift, and a new technology can change what the operation can do. Product life-cycle changes may make an earlier order winner a qualifier.

Key Takeaways

  • SWOT separates internal capabilities from external conditions.
  • Key success factors describe market requirements; core competencies describe distinctive ability.
  • Activity maps show how practical choices reinforce the advantage.
  • Implementation needs aligned skills, suppliers, measures, and rewards.
  • Review the strategy when market requirements or capabilities change.

4.4 Compare making and buying the work

A supplier's quoted price is only one part of an outsourcing decision. The operation must compare the costs that change, the capabilities it needs to retain, and the risks of relying on another organization.

Separate ownership from geography

Outsourcing contracts an external supplier for work the organization could perform itself. Offshoring moves work to another country, either within the firm or to a supplier. Nearshoring moves it to a nearby country; reshoring brings it back home. A company-owned foreign factory is offshored but remains in-house. A local payroll contractor is outsourced without offshoring.

Reasons to outsource include specialist skills, technology, lower costs, easier volume changes, and freeing management attention and capital for core competencies. The important question is what the firm gives up as well as what it gains.

Compare relevant costs

Compare avoidable in-house costs with the full buying cost. Costs that continue under both choices do not create a saving. Add freight, contracting, coordination, monitoring, and quality checks to the supplier price.

Suppose in-house cost is $12 per component and all of it disappears if the activity stops. A supplier quotes $9.50, freight adds $0.80, and management and checks add $0.70. Buying costs $11, so the saving is $1, about 8.3% of the in-house cost.

Now suppose $2 of the $12 is factory overhead that continues. Only $10 is avoided. Buying at $11 adds $1 per unit, or costs $13 including the continuing overhead. Comparing $11 with the full $12 would claim a saving that does not occur.

Protect the capability that matters

Comparative advantage concerns lower opportunity cost: using resources for one activity means giving up their use elsewhere. At the firm level, a specialist may do support work relatively better while the firm concentrates on its distinctive strength. Being able to perform an activity internally does not by itself make that the best use of scarce people and equipment.

Keep core competencies and activities creating competitive advantage in-house. Losing the know-how can make future improvements or a return to internal production difficult. A supplier may also learn designs, become a competitor, or gain bargaining power when replacement is hard.

Weigh risks as well as costs

Risks include poor quality or delivery, hidden transaction costs, disrupted supply, intellectual-property leakage, and ethical or reputational damage. Assess the supplier's ability to meet the priorities before treating its capacity as a substitute for your own.

A weighted scoring method can combine cost, quality, delivery, strategic importance, and risk. Give each factor a weight, score the options on a consistent scale, multiply, and add. For example, let quality carry 70% of the weight and cost 30%, with higher scores better on both. An in-house option scoring 9 for quality and 6 for cost totals 0.7 × 9 + 0.3 × 6 = 8.1. A supplier scoring 7 and 8 totals 7.3. The better cost score does not outweigh the quality difference at these weights. A small projected saving is weak support for surrendering the capability customers choose you for.

Key Takeaways

  • Outsourcing concerns who does the work; offshoring concerns where it happens.
  • Compare full buying cost with the in-house costs that disappear.
  • Continuing overhead remains under both choices.
  • Consider opportunity cost and retain core competencies.
  • Check supplier quality, delivery, control, knowledge, and ethical risks.
  • Weighted scores organize evidence; their weights express strategic priorities.
5

Plan operations across national borders

Cross-border operations offer access to customers, suppliers, knowledge, and talent, while adding coordination and risk. Compare locations using full arrival costs and output per labor-hour, then examine how much control and resilience each arrangement provides. Finally, use cost pressure and local market differences to choose an international operations strategy and the organization of activities that supports it.

5.1 Compare global options by full cost and risk

Cross-border operations can reach markets, resources, skills, and knowledge that a domestic operation cannot access as easily. The decision needs more than a wage comparison. Distance changes cost, coordination, control, and exposure to disruption.

Choose how to operate abroad

Forms include exporting, licensing, franchising, contract manufacturing, joint ventures, and fully owned foreign facilities. A joint venture shares ownership with a local partner; a fully owned facility keeps ownership within the firm. Both require capital investment abroad. Licensing, franchising, and contract-manufacturing commitments depend on the agreement and scale.

Reasons include lower costs, supply-chain access, proximity to customers, faster delivery, local adaptation, learning about markets, sharing improvements, and attracting talent. Different motives point to different locations and levels of control.

Calculate the full arrival cost

Total landed cost is the full cost of getting a unit where it is needed. Include purchase or production cost, freight, duties, extra inventory, quality checks, and coordination.

A domestic part costs $20. An overseas quote is $14; freight is $2.50; duty is 5% of purchase price, or $0.70; extra inventory, checks, and coordination cost $1.60. Total landed cost is $18.80, saving $1.20 per part.

If the supplier's currency rises 15%, the purchase price becomes $16.10 and duty becomes $0.805. Holding the other stated costs fixed gives $16.10 + $2.50 + $0.805 + $1.60 = $21.005, about $21.01. The original saving has reversed. Update every cost tied to the changing price, not just the purchase line.

Compare labor per unit

Unit labor cost = hourly labor cost ÷ units produced per hour.

At $30 per hour and 20 units per hour, labor costs $1.50 per unit. At $6 per hour and 3 units per hour, it costs $2.00. The lower-wage site has the higher unit labor cost because its output per hour is much lower.

Examine exposure and responsibility

Exchange rates, political change, trade policy, regulation, time zones, language, remote quality control, and intellectual-property protection all affect global operations. Long, concentrated supply lines can turn one disruption into widespread shortages, as the COVID-19 pandemic and the 2021 Suez Canal blockage illustrated. Dual sourcing, nearshoring, safety stock, and mapping suppliers' suppliers can reduce particular exposures, with their own costs.

Apply a code of conduct, audit sites and suppliers, and meet local legal requirements and the firm's stricter standards. Working conditions, gifts and bribery, safety, and environmental practices need explicit attention. The World Trade Organization began in 1995; its members negotiate trade rules and use it to administer agreements and address disputes. Regional agreements also shape cross-border activity.

Key Takeaways

  • Choose an entry form that fits the need for investment, control, and local knowledge.
  • Compare total landed cost, including inventory and coordination.
  • Update price-linked duties when exchange rates change.
  • Low wages can coexist with high labor cost per unit.
  • Assess disruption, communication, quality, and knowledge risks.
  • Apply legal requirements and supplier standards across borders.

5.2 Match global organization to two pressures

A firm can operate in many countries without using a “global strategy” in the framework's specific sense. The choice depends on two pressures: reducing cost through coordination and scale, and responding to differences between local markets.

Diagnose the pressures

Cost pressure is high when price competition is strong or large-scale production brings important savings. It favors common designs, fewer large facilities, and coordinated decisions. Local-responsiveness pressure is high when tastes, regulations, or delivery expectations differ. It favors adapting the offering and giving local units suitable decision authority.

StrategyCost pressureLocal pressureTypical organization
InternationalLowLowHome-designed offering exported or licensed with little adaptation
MultidomesticLowHighCountry units adapt offerings and make many operating decisions
GlobalHighLowStandardized output from large efficient facilities; centralized decisions
TransnationalHighHighShared scale and knowledge combined with local adaptation

An international strategy uses existing home capabilities without extensive local redesign. A premium motorcycle maker building at home and selling through importers illustrates it. A multidomestic strategy puts greater authority in country operations; a franchise system adapting menus to local markets illustrates the local emphasis.

Connect the choice to operations

A global strategy fits standardized products sold into price-sensitive markets. A few efficient facilities can serve many countries with common designs. Industrial components can suit this approach when customers want the same specification across markets.

A transnational strategy combines scale with adaptation. Allocate activities where they work best, share knowledge across units, and adapt the parts of the offering that local needs require. The coordination is demanding: local units need room to respond while contributing to common processes and learning.

Work through two choices

An industrial-pump maker sells identical certified models worldwide and faces close price comparisons. Cost pressure is high and local pressure low. A global strategy supports standard designs and a few large plants. Country-by-country redesign would add complexity without meeting a stated local need.

A snack maker faces different tastes and food rules as well as strong price competition. Both pressures are high. A transnational approach can share core ingredients, equipment knowledge, and purchasing while adapting recipes and packaging. With weak cost pressure and strong local needs, a multidomestic approach would fit the grid instead.

Test whether the design matches

After naming the strategy, check location, capacity, supply arrangements, product design, and decision authority. Decentralizing every activity would sacrifice opportunities to share scale; centralizing every detail could prevent needed adaptation. The grid describes tendencies, and different product lines can face different combinations of pressure.

Key Takeaways

  • Judge cost pressure and local-responsiveness pressure separately.
  • International fits low–low; multidomestic fits low cost pressure and high local pressure.
  • Global fits high cost pressure and low local pressure; transnational fits high–high.
  • Check design, sites, supply, and decision authority against the chosen strategy.

Operations Strategy and Productivity examples

5 Walkthroughs

1

Describe an operation before changing it

13 steps
Map a service operation, identify the goods and service mix, and use the four Vs to explain its process design.
  1. 1
    IntroductionFollow the work

    Imagine you are asked to improve a bicycle repair center. Before choosing equipment or adding staff, trace what the operation does: a customer brings a faulty bicycle, technicians diagnose and repair it, and the customer receives a working bicycle and advice.

    You will map the resources, examine which parts of the offering can be stored, and explain the workload using the four Vs.

  2. 2
    ExplanationSeparate what changes from what does the work

    The bicycle is a transformed resource because its condition changes. Fault reports are information being processed too. Technicians, tools, diagnostic software, and workshop space are transforming resources: they carry out the work.

    A customer can also be transformed, as when a transport service changes someone’s location. The distinction concerns the resource’s role in the process, not whether it is a person or an object.

  3. 3
    ExampleComplete the input–output map

    For the repair center, inputs include faulty bicycles, customer information, parts, staff, and facilities. The transformation includes diagnosis, component replacement, and testing. Useful outputs include repaired bicycles and advice; unwanted outputs include worn components and packaging waste.

    Feedback about repeat faults can change diagnostic routines. The model therefore explains both delivery and how the operation learns from its results.

  4. 4
    ChallengeFind the internal customer

    The diagnosis team sends a fault report to the repair team. Repairs are delayed because the report omits the parts required. Who is the internal customer, and which level of analysis best exposes the problem?

    ---reveal---

    The repair team is the internal customer because it uses diagnosis’s output. The process level exposes the handoff and its missing information. Looking only at total workshop output would not show why these jobs wait.

  5. 5
    ExplanationIdentify the offering’s mix

    The repair center supplies tangible parts and an intangible repair service. Most offerings sit on a goods–services continuum, so calling the business only a goods producer would leave out important work.

    Parts can be held as inventory. An unused technician appointment cannot be held for another day. Inventory and service capacity therefore need different planning, even though the customer buys one combined offering.

  6. 6
    ConnectionPlace contact where it helps

    At reception, customers explain faults and discuss collection times: this is front-office work. Parts accounting and routine processing can happen in the back office, away from customer contact.

    The front office needs listening and expectation-management skills. The back office can use more standardized routines. Service quality also needs recovery when a promise fails, such as a clear revised collection arrangement.

  7. 7
    ChallengeHandle a time-bound service

    The workshop is quiet on Wednesday but fully booked on Saturday. A manager proposes “saving” Wednesday’s unused appointments for Saturday. Why will this fail, and what could help?

    ---reveal---

    Unused technician time expires; it is not finished-goods inventory. Encourage flexible customers to book Wednesday or adjust staffing to the demand pattern. Stocking more spare parts may help repairs, but it does not move labor time between days.

  8. 8
    ExplanationDistinguish volume from variety

    Volume is how much work is done. Repeated high-volume tasks support standard procedures, specialist roles, and dedicated equipment. Variety is the range of work offered. Handling many bicycle types and unusual faults needs broader skills and flexible coordination.

    A workshop doing many identical tune-ups has a different process requirement from one doing a few complex custom restorations, even if both repair bicycles.

  9. 9
    ExampleDistinguish demand swings from customer contact

    Variation concerns demand over time: weekend peaks and seasonal surges create capacity problems. Visibility concerns how much customers experience the process: watching repairs increases contact and the need to explain delays.

    A busy month is not high variety, and an open workshop is not demand variation. Each V identifies a different reason why the process may need extra resources or a different organization.

  10. 10
    TipExplain the cost mechanism

    Avoid treating the four Vs as a scorecard with one ideal profile. Explain the link from the profile to the work. A wider range creates more task changes; sharp peaks leave idle capacity in quiet periods; direct contact needs time and interpersonal skills.

    Customers may value those features enough to pay for them. The relevant test is whether the process and price support the chosen market.

  11. 11
    ChallengeAssess the customization promise

    A bicycle assembler offers many configurations from common frames, wheels, and accessories at high volume. What approach is this, and why do the common components matter?

    ---reveal---

    It is mass customization. Common modules preserve repeated work while final combinations tailor output to customers. High volume alone does not make unlimited bespoke work inexpensive; the modular process design is what supports the combination.

  12. 12
    ChallengeConnect service design with the workload

    The repair center proposes immediate walk-in repairs for every bicycle type, with customers watching each job. What combined operational needs should it plan for?

    ---reveal---

    It must match time-bound technician capacity to arrivals, provide skills and coordination for high variety, and manage high customer visibility. Holding common parts can support the work, but it cannot replace flexible staffing or contact skills. The combined promise changes several process requirements.

  13. 13
    RecapUse a three-part diagnosis

    For a new operation, make three linked notes: the transformation and resource roles; the goods and services that need different planning; and the four-V profile with its staffing, equipment, and cost consequences.

    Use those notes to test a proposed change. A recommendation should address a specific feature of the work, such as the missing handoff information or the timing of service demand.

2

Calculate and interpret a resource gain

15 steps
Work from labor productivity to a multifactor comparison, then test whether the gain represents a useful improvement.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionAsk what changed relative to resources
  2. 2
    ExplanationChoose the denominator
  3. 3
    ExampleCalculate the old and new rates
  4. 4
    ExampleCalculate the percentage change
  5. 5
    ChallengeFind the gain without using output growth
  6. 6
    ExplanationPut inputs in a common unit
  7. 7
    ExampleAdd the first week’s inputs
  8. 8
    ExampleCompare the second week on the same basis
  9. 9
    TipKeep price movements out of the comparison
  10. 10
    ChallengeRemove an apparent improvement
  11. 11
    ExplanationCheck the goal behind the count
  12. 12
    ConnectionChoose a driver you can act on
  13. 13
    ChallengeInterpret a faster clinic
  14. 14
    ChallengeConnect the narrow and broad measures
  15. 15
    RecapMake the conclusion match the measure
3

Choose the performance that wins business

14 steps
Use customer requirements to set priorities, read trade-offs, and distinguish qualifying performance from order-winning performance.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionStart from the buying decision
  2. 2
    ExplanationGive quality and speed a precise meaning
  3. 3
    ExampleSeparate fast from on time
  4. 4
    ConnectionName the change the customer needs
  5. 5
    ChallengeIdentify the flexibility
  6. 6
    ExampleCheck for dominance before accepting a trade-off
  7. 7
    Key InsightImprove the combination or change the balance
  8. 8
    ConnectionBuild later gains on earlier ones
  9. 9
    ChallengePrioritize a real gap
  10. 10
    ExplanationQualify before trying to win
  11. 11
    ExampleDifferentiate the segments
  12. 12
    ConnectionWatch criteria change over time
  13. 13
    ChallengeCombine the qualifier and the trade-off
  14. 14
    RecapTurn customer choice into an improvement plan
4

Build a consistent operations strategy

17 steps
Connect the business promise with resources, reinforcing decisions, implementation measures, and make-or-buy choices.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionFollow a custom maker’s strategic choices
  2. 2
    ExplanationConnect mission, strategy, and tactics
  3. 3
    ConnectionUse four sources of direction
  4. 4
    ChallengeRecognize a strategic contribution
  5. 5
    ExplanationSee assets and systems together
  6. 6
    ExampleCheck the ten areas for fit
  7. 7
    ChallengeRepair the conflict
  8. 8
    ExplanationSort the strategic evidence
  9. 9
    ExampleConnect requirements with capabilities
  10. 10
    TipMake measures and rewards agree
  11. 11
    ChallengeTurn a strength into implementation
  12. 12
    ExplanationSeparate who from where
  13. 13
    ExampleCalculate what buying really costs
  14. 14
    Key InsightCount the capability being surrendered
  15. 15
    ChallengeApply avoidable cost
  16. 16
    ChallengeIntegrate the cost and strategic decision
  17. 17
    RecapCheck the strategy as a connected system
5

Choose a global operating arrangement

12 steps
Compare landed cost and labor cost, assess cross-border exposure, and match international strategy to cost and local pressures.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionGo beyond the overseas quote
  2. 2
    ExplanationChoose the form of involvement
  3. 3
    ExampleBuild the landed cost
  4. 4
    ExampleUpdate the currency-sensitive lines
  5. 5
    ChallengeCompare labor per unit
  6. 6
    TipMatch a risk response to the exposure
  7. 7
    ExplanationRead the two pressures separately
  8. 8
    ExampleHigh cost pressure, limited local differences
  9. 9
    ConnectionCombine shared scale with local fit
  10. 10
    ChallengeChoose the position in the grid
  11. 11
    ChallengeConnect the market promise with sourcing
  12. 12
    RecapConnect the grid to real decisions

Operations Strategy and Productivity practice questions

50 Practice Questions in 5 sets

Set 1: Apply priorities, strategy, and sourcing decisions10 Practice Questions

Question 1 of 10

An operation’s output rises 20% while its labor-hours rise 25%. What is the change in labor productivity?
  1. A 4% increase
  2. A 5% decrease
  3. A 20% increase
  4. A 4% decrease
Show answerHide answer
Answer: D
The new output-per-hour ratio is 1.20 ÷ 1.25 = 0.96 of the old ratio, so productivity falls 4%. Subtracting the growth rates gives a five-percentage-point gap, not the percentage change in the ratio. Inputs grew faster than output, which is why the result falls.

Question 2 of 10

A swimming center offers one type of admission but gets far more visitors during school breaks. Which of the four Vs describes that change over time?
  1. Volume of the output
  2. Variation in demand
  3. Visibility of process
  4. Variety of offerings
Show answerHide answer
Answer: B
The visitor pattern is variation in demand because the amount requested changes over time. The center’s single admission type does not create high variety. Volume describes how much is produced, while the peak-versus-quiet pattern specifically concerns demand variation.

Question 3 of 10

A help desk meets its handling-time target but customers repeatedly return because their problems remain unsolved. What does this show?
  1. A proven rise in quality-adjusted productivity
  2. Efficiency on that measure with poor effectiveness
  3. A proven fall in total resource consumption
  4. Effectiveness with poor efficiency on that measure
Show answerHide answer
Answer: B
Meeting the handling-time benchmark shows efficiency on that measure, while unresolved problems show poor effectiveness. Short calls alone do not establish better useful output per input. Effectiveness concerns achieving the valued outcome, which here is solving the customer’s problem.

Question 4 of 10

A packaging operation can double output with an extra shift, but it cannot change its product range or designs. What kind of flexibility does the extra shift demonstrate?
  1. Volume flexibility from changed output
  2. Product flexibility from new designs
  3. Delivery flexibility from new due dates
  4. Mix flexibility from a wider range
Show answerHide answer
Answer: A
An extra shift changes the amount produced, so it demonstrates volume flexibility. No new range or design is described, so calling it mix flexibility would assign a capability the facts do not show. The classification follows what changes, not the staffing action used to achieve it.

Question 5 of 10

Comparable plants offer these combinations: R, three variants at $28 per unit; S, one variant at $24; T, two variants at $30. Which plant is clearly inside the observed cost–variety frontier?
  1. S, because its range is smaller than R’s
  2. R, because S has the lowest unit cost
  3. T, because R has more range and lower cost
  4. R, because its range is greater than S’s
Show answerHide answer
Answer: C
R offers more variants than T and costs less, so T is outperformed on both objectives. R and S present a trade-off: one has greater range and the other lower cost. Having the lowest cost alone does not establish dominance when variety is also an objective.

Question 6 of 10

A specialist toolmaker has unique design skills, high unit costs, rising demand for fitted tools, and new low-price imports. What strategy best follows from this SWOT?
  1. Treat high internal costs as a new opportunity in the market
  2. Expand standard batches and compete mainly on the lowest price
  3. Reduce custom design and imitate the imported standard range
  4. Use design skills for fitted tools and reliable custom delivery
Show answerHide answer
Answer: D
The firm can connect its design strength with the opportunity for fitted tools, then develop delivery activities to support that position. Competing mainly on price ignores the stated weakness in unit costs and the low-price threat. SWOT should guide a coherent choice, not just label factors.

Question 7 of 10

In-house cost is $18 per unit, including $5 that continues if production stops. A supplier charges $12, freight adds $1, and checks add $1. What is the unit-cost effect of outsourcing?
  1. A $6 saving because the quote is $12
  2. A $1 increase because buying costs $14
  3. A $4 saving because buying costs $14
  4. A $1 saving because $13 is avoided
Show answerHide answer
Answer: B
Only $18 − $5 = $13 is avoided, while full buying cost is $12 + $1 + $1 = $14. Outsourcing therefore adds $1 per unit. Comparing $14 with the full $18 incorrectly treats continuing overhead as a saving; it remains payable after outsourcing.

Question 8 of 10

Site L pays $28 per labor-hour and produces 14 units per hour. Site M pays $9 per labor-hour and produces 3 units per hour. Which has the lower unit labor cost?
  1. L at $0.50 per unit, compared with M at $0.33
  2. M at $9 per unit, compared with L at $28
  3. L at $2 per unit, compared with M at $3
  4. M at $3 per unit, compared with L at $2
Show answerHide answer
Answer: C
L costs $28 ÷ 14 = $2 of labor per unit, while M costs $9 ÷ 3 = $3. M’s lower hourly wage is outweighed by its lower hourly output. Comparing wages alone leaves out the productivity difference that determines how much labor cost each unit contains.

Question 9 of 10

A domestic item costs $26. An overseas quote is $18, freight is $3, duty is 10% of the quote, and other costs are $2. The supplier currency rises 10%; only the quote and its duty change. What is the new landed cost and sourcing saving?
  1. $26.60 landed cost and a $0.60 extra cost
  2. $25.00 landed cost and a $1.00 saving
  3. $24.80 landed cost and a $1.20 saving
  4. $26.78 landed cost and a $0.78 extra cost
Show answerHide answer
Answer: D
The quote becomes $19.80 and duty becomes $1.98, giving $19.80 + $3 + $1.98 + $2 = $26.78. That exceeds domestic cost by $0.78. A $26.60 total leaves duty at its old $1.80 and misses the tax base changing with the quote.

Question 10 of 10

A household-products firm faces sharp price competition and different local usage needs. Country units currently redesign both core processes and final variants independently. What change best fits these pressures?
  1. Share core processes and adapt final variants locally
  2. Centralize every detail and remove local variants
  3. Keep home designs unchanged and export through agents
  4. Give each country a separate unshared production system
Show answerHide answer
Answer: A
Both cost and local pressures are high, favoring transnational coordination: share scale and knowledge while retaining useful local adaptation. Independent country systems meet local needs but give up the cost and learning opportunities described. Full standardization would ignore the differing usage needs.
Set 2: Understand operations and compare performance10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A document service uses analysts and software to turn raw survey responses into reports. What is its main transformed resource?
  1. The survey responses
  2. The report software
  3. The survey analysts
  4. The office equipment
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

An appointment-only repair clinic has empty technician slots on Tuesday and a waiting list on Friday. What operational response best addresses this service-capacity problem?
  1. Offer Tuesday appointments to customers able to change days
  2. Inspect completed Friday repairs during the empty Tuesday slots
  3. Record empty Tuesday slots as capacity available on Friday
  4. Build finished repair inventory before devices are received
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

Six workers each work five hours and pack 540 identical cartons. What is labor productivity?
  1. 90 cartons per labor-hour
  2. 30 cartons per labor-hour
  3. 18 cartons per labor-hour
  4. 108 cartons per labor-hour
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A process made 800 units in 100 labor-hours last week and 990 units in 110 labor-hours this week. What happened to labor productivity?
  1. It rose 10%, matching labor-hour growth
  2. It fell 11.1%, from 9 to 8 units per hour
  3. It rose 12.5%, from 8 to 9 units per hour
  4. It rose 23.75%, matching output growth
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A ceramics operation produces 960 pieces using $8,000 of labor, $6,000 of materials, $1,000 of energy, and $1,000 of capital charges. What is multifactor productivity per $1,000 of input?
  1. 64 pieces per $1,000
  2. 6 pieces per $1,000
  3. 120 pieces per $1,000
  4. 60 pieces per $1,000
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

Supplier P promises delivery in 12 days and always meets it. Supplier Q promises 3 days and usually delivers in 5. How do their performance profiles compare?
  1. P is slower; Q is more dependable
  2. P is slower; Q is less dependable
  3. P is faster; Q is more dependable
  4. P is faster; Q is less dependable
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A laboratory buyer considers only certified suppliers and then chooses the lowest quoted price. What roles do certification and price play?
  1. Both certification and price win orders
  2. Certification qualifies; price wins orders
  3. Both certification and price qualify
  4. Certification wins orders; price qualifies
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A delivery firm changes next week’s roster to carry out its long-term rapid-service strategy. What is the roster change?
  1. A new business-level competitive position
  2. A mission defining the firm’s purpose
  3. A structural decision about facilities
  4. A tactic implementing the strategy
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A company buys a larger facility and introduces cross-training for the workforce. How should these decisions be classified?
  1. Facility is structural; training is infrastructural
  2. Facility is infrastructural; training is structural
  3. Both decisions are structural
  4. Both decisions are infrastructural
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A sensor maker faces intense price competition. Buyers worldwide use one common specification, but sales managers request separate national assembly plants to give each office full control. What operations arrangement best fits the stated market?
  1. Keep home production and downplay cost pressure
  2. Let national plants develop separate product designs
  3. Coordinate large shared plants using common designs
  4. Share production but require country-specific redesigns
Show answerHide answer

Save this lesson to see this answer.

Set 3: Diagnose misleading measures and strategic conflicts10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A school’s enrollment process supplies class lists to its teaching teams. Late lists cause room-allocation problems. At what level is this handoff best examined, and who receives the internal output?
  1. Whole operation; employers
  2. Process; the enrollment office
  3. Supply network; applicants
  4. Process; the teaching teams
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A pump maker begins selling maintenance contracts with its equipment. What is this change called?
  1. Servitization of the goods offering
  2. Standardization of the customer mix
  3. Inventory buffering of service capacity
  4. Offshoring of the production process
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A workshop makes 500 units with 100 labor-hours costing $2,000 and $3,000 of other inputs. Later it makes 600 units with 80 hours costing $1,600 and $4,400 of other inputs. Input prices and quality are unchanged. What do the two productivity measures show?
  1. Labor rises 50%; multifactor is unchanged
  2. Labor rises 50%; multifactor rises 20%
  3. Labor is unchanged; multifactor falls 20%
  4. Labor rises 20%; multifactor rises 20%
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

Two claims teams report 15 and 11 completed cases per worker-day. The faster-count team handles simpler cases and has more reopened claims. What conclusion is justified?
  1. The 11-case team must have lower multifactor productivity
  2. The counts establish efficiency because both teams use days
  3. The 15-case team has better useful productivity by 36.4%
  4. The counts need complexity and quality checks before ranking
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A plant is outperformed on both cost and delivery time by a comparable plant using the same available technology. Management proposes deliberately slowing delivery to cut cost. What should it investigate first?
  1. A new product market because existing methods cannot improve both
  2. Inefficiencies that may allow both cost and delivery to improve
  3. A shift along the frontier because its current point must be efficient
  4. A lower delivery target because cost reduction always needs sacrifice
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A supplier’s digital tracking once won orders. Rivals now offer equivalent tracking, and buyers reject any supplier without it but choose among qualifying firms on delivery reliability. How should tracking be classified now?
  1. A current order winner based on novelty
  2. An order qualifier that must be maintained
  3. A less important factor because rivals copied it
  4. An internal efficiency measure only
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A retailer learns from store teams that a new replenishment routine reduces stockouts, then makes that capability part of its long-term strategy. Which operations-strategy perspective is most directly shown?
  1. Bottom-up learning from operating experience
  2. Top-down direction from a corporate instruction
  3. Market requirements from a new customer survey
  4. Operations isolation from business strategy
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A laboratory promises varied urgent tests. It uses long fixed batches to minimize setup cost and rewards managers only for low cost per test. Qualified staff and equipment are already available. What change most directly repairs the misfit?
  1. Increase promotion of urgent tests without altering work rules
  2. Use priority small batches and reward timely accurate results
  3. Outsource staff training while keeping the same batch targets
  4. Expand the building while retaining fixed batches and rewards
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A custom-device firm’s hard-to-copy design method wins customers. A supplier can take over design at a small saving, but the firm would lose the team and could not readily rebuild it. What is the strongest strategic reason to retain design?
  1. Design becomes a nonstrategic activity when offered by suppliers
  2. The supplier’s lower cost cannot be compared with in-house costs
  3. The saving could erode the core competency supporting its advantage
  4. Every outsourced activity creates the same degree of knowledge loss
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A company opens a fully owned processing center abroad and transfers work there. How is the move classified?
  1. Outsourcing without offshoring
  2. Neither outsourcing nor offshoring
  3. Offshoring without outsourcing
  4. Both outsourcing and offshoring
Show answerHide answer

Save this lesson to see this answer.

Set 4: Evaluate improvement, investment, and global choices10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A meal producer introduces many menu variants while keeping demand stable and customers away from the production area. What management need follows most directly?
  1. More peak staffing because demand variation has risen
  2. More customer-contact training because visibility has risen
  3. More dedicated repetition because menu volume must have risen
  4. More flexible skills and coordination because variety has risen
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

Line A makes 1,440 units using eight staff for six hours each. Line B makes 1,680 using seven staff for eight hours each. B then cuts total labor-hours by 10% without changing output. How does B’s new labor productivity compare with A’s?
  1. It remains equal to A’s
  2. It is about 11.1% higher
  3. It is about 16.7% higher
  4. It is 10% higher
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

An operation reports a 20% rise in current-price output value and a 10% rise in current-price input cost. Output prices rose 20%; every input price rose 10%. Product mix and quality stayed fixed. What happened to real multifactor productivity?
  1. It rose 10% after subtracting the price changes
  2. It fell about 8.3% because input prices rose
  3. It rose about 9.1% as the reported ratio suggests
  4. It stayed unchanged because quantities stayed fixed
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

Of 800 orders, 744 arrive on or before the promised date. What is the on-time delivery rate?
  1. 74.4%
  2. 7%
  3. 93%
  4. 107.5%
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A plant offers the same range at lower cost after reducing changeover losses. Its new combination exceeds the previous best observed performance. How should this be described?
  1. Improvement that pushes the frontier outward
  2. A sacrifice of flexibility for lower unit cost
  3. Repositioning toward cost along the old frontier
  4. A new qualifier replacing an order winner
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

An operation consistently executes its business’s chosen strategy extremely well. A rival’s distinctive operating capability instead opens new markets and shapes its business direction. What best distinguishes these contributions?
  1. Both match stage 2 because each serves customers
  2. The first matches stage 4; the rival matches stage 3
  3. Both match stage 1 because both perform operating work
  4. The first matches stage 3; the rival matches stage 4
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A delivery company promises reliable timed arrivals. It has strong routing expertise, but teams are rewarded for parcels per trip and routinely postpone small timed orders. What implementation package best supports the strategy?
  1. Use routing expertise and tracking, but keep parcels-per-trip rewards
  2. Reward on-time service, but postpone small orders until loads are full
  3. Use routing expertise, protect timed orders, and reward on-time service
  4. Protect timed orders in routing, but reward only maximum load density
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A firm pays $22 per unit internally, including $6 continuing overhead. Buying costs $15 plus $2 for transport and checks. Outsourcing also frees equipment for confirmed work contributing $4 per unit of the original volume. What is the net economic benefit per original unit?
  1. A $3 benefit
  2. A $1 loss
  3. A $7 benefit
  4. A $5 benefit
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

One distant supplier offers landed cost of $19, while a qualified nearby supplier costs $20. The distant source has frequent long outages that halt production; dependable supply is an order qualifier. What recommendation best fits the evidence?
  1. Treat outages as irrelevant because the supplier has passed quality checks
  2. Choose the distant source alone because its landed cost is lower
  3. Use the nearby source or a qualified dual-source plan to protect supply
  4. Choose the nearby source because nearshoring eliminates supply risk
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A care-service group faces different local expectations and rules, but weak price competition and few scale savings. Country managers need to adapt service delivery. What strategy fits the grid?
  1. Global
  2. Multidomestic
  3. International
  4. Transnational
Show answerHide answer

Save this lesson to see this answer.

Set 5: Connect the full operations decision10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A clinic maps a records process: staff use document scanners to turn paper patient records into digital case files, which treatment teams receive. What are the roles of the paper records, scanners, and treatment teams?
  1. Transformed resource; transformed resource; external customer
  2. Transforming resource; transformed resource; internal supplier
  3. Transformed resource; transforming resource; internal customer
  4. Transforming resource; transforming resource; external supplier
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A bicycle subscription includes a bicycle, local handover, scheduled repairs, and remote billing. Which design best handles the mix of goods and services?
  1. Store unused repair appointments as finished service inventory
  2. Centralize every customer interaction because bicycles can be transported
  3. Judge all quality before handover and omit recovery during use
  4. Coordinate bike inventory, local repair slots, and standardized billing
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A high-volume maker offers configurable desks from standard modules. It plans fully bespoke components for every customer and live consultations during every production step, while promising the same price with no process change. What assessment best fits the four Vs?
  1. Visibility rises but variety stays fixed; volume protects unit cost
  2. Variety rises but visibility stays fixed; modules protect the old cost
  3. Variety and visibility rise; keeping cost needs a process redesign
  4. Variety and visibility rise; unchanged volume preserves unit cost
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

Team A closes 200 service cases in 100 hours, but 20 cases reopen and remain unresolved. Team B closes 170 in 100 hours, with 5 reopening and remaining unresolved. Cases are equally complex and all others stay resolved. Using lasting resolutions as output, what does the comparison show?
  1. Both have equal productivity because each uses 100 hours
  2. A is 9.1% more productive but has more reopened cases
  3. B is more productive because its reopening share is lower
  4. A is 17.6% more productive because it closes 200 against 170
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A buyer requires defect rates no higher than 1% and at least 95% on-time delivery, then selects the lowest price. P: 0.8%, 96%, $42; Q: 0.6%, 94%, $39; R: 1.1%, 98%, $38; S: 0.9%, 97%, $44. Which supplier wins under these rules?
  1. P, because it qualifies and underprices S
  2. Q, because its price is below P’s
  3. S, because it has the best qualifying delivery
  4. R, because it has the lowest price
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A medical-equipment service wins on dependable next-day repairs and must keep repair quality high. It has enough total weekly capacity but demand peaks on certain days. Which coordinated design best supports its promise?
  1. Cross-train staff, hold common spares, and schedule preventive maintenance
  2. Add weekly capacity, remove quality checks, and retain fixed daily staffing
  3. Centralize distant repairs, reduce spares, and reward maximum batch size
  4. Use fixed daily staffing, maximize weekly batch sizes, and defer maintenance
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A custom-instrument maker has rare fitting expertise but late deliveries. Customers increasingly value fit, while standardized imports are cheaper. Which strategy and implementation combination best fits this position?
  1. Compete on lowest price; cut fitting work and copy importers’ batches
  2. Compete on custom fit; retain fitting skills and improve delivery
  3. Compete on widest range; add requested designs and leave delivery as is
  4. Compete on custom fit; outsource fitting expertise and reward output only
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

At base prices, last period produced 400 units valued at $50 each using $10,000 of inputs. This period produces 440 units sold at $60 each; its inputs cost $12,100 after every input price rose 10%. Mix and quality are unchanged. What is the real multifactor productivity change?
  1. A 20% increase
  2. A 10% increase
  3. A 9.1% decrease
  4. No change
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

On a common performance scale, required/actual scores are speed 9/6, dependability 8/6, and cost 6/7. Customer research ranks dependability as the most important of these. How should the gaps be read?
  1. Dependability gap: its importance minus its achieved performance
  2. Cost is furthest below target because actual exceeds required
  3. Speed gap: 3; dependability gap: 2, which may take priority
  4. Speed must be first because its numerical gap is the largest
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A firm faces low cost-reduction pressure and little need for local adaptation. Which strategy occupies that position in the four-strategy grid?
  1. International
  2. Global
  3. Multidomestic
  4. Transnational
Show answerHide answer

Save this lesson to see this answer.

Stuck on your own question? Homework Help

Key Terms

94 Key Terms, each with its definition

A

Activity map
An activity map links competitive advantage to key success factors and the practical activities that support and reinforce them.
A custom maker links fitting services, flexible production, and stocked components in its activity map.
Avoidable cost
An avoidable cost disappears when an activity stops or an option changes, so it belongs in the cost comparison for that decision.
Materials no longer purchased after outsourcing are avoidable costs, while continuing building rent is not.

B

Back office
A back office is the part of an operation with little or no direct customer contact, allowing work to be organized away from the customer.
A hotel’s laundry is back-office work that can use standard batches and routines behind the scenes.
Balanced performance measures
Balanced performance measures assess productivity alongside outcomes such as quality, delivery, safety, and environmental effects.
A clinic reviews visits per hour together with diagnostic quality and patient waiting times.
Bottom-up perspective
The bottom-up perspective develops operations strategy from learning, improvement, and experience in day-to-day work.
A team’s successful changeover method becomes a capability used in the firm’s wider strategy.

C

Capital input
Capital input is the contribution of equipment, buildings, and technology used in production, represented by period charges in a simple measure.
A workshop includes depreciation and financing charges for its cutting equipment in its input total.
Comparative advantage
Comparative advantage is the ability to produce at a lower opportunity cost, meaning less of another valued activity must be given up.
A specialist handles support work while a firm uses its scarce designers for the products customers choose it for.
Competitive priority
A competitive priority is a dimension of operating performance, such as quality or cost, that helps the offering compete in its market.
A parcel service treats dependable delivery as a competitive priority for customers with fixed receiving times.
Constant prices
Constant prices value quantities in each period using the same base-period prices, keeping price movements out of the comparison.
A bakery values this year’s output at last year’s prices to separate higher production from higher selling prices.
Core competency
A core competency is a valuable capability the firm performs especially well and competitors find difficult to copy.
Expert custom frame building is a bicycle maker’s core competency when customers value its fit and quality.
Cost
Cost is the value of resources spent producing a good or service, including staff, facilities, equipment, and materials.
A supplier needs low operating cost to sustain an attractive price without sacrificing its profit margin.
Cost-reduction pressure
Cost-reduction pressure is the need to lower operating costs, often driven by price competition or major economies from larger-scale production.
Strong price comparisons push a component maker toward common designs and efficient high-volume facilities.

D

Delivery flexibility
Delivery flexibility is the ability to change when goods or services are supplied in response to a change in customer needs.
A component supplier shows delivery flexibility when it brings an agreed delivery forward for a customer.
Dependability
Dependability is the ability to deliver at the promised time, measured by how consistently the operation keeps its timing commitments.
A supplier that always arrives on its agreed weekly date is dependable even if its lead time is long.
Dual sourcing
Dual sourcing uses two sources for a requirement, reducing reliance on one supplier while adding coordination and possible cost.
A component buyer keeps a second qualified source so one supplier’s outage need not stop all deliveries.

E

Effectiveness
Effectiveness is the extent to which an operation achieves the goals that customers and the organization actually value.
A help desk improves effectiveness when more customer problems stay solved after the first contact.
Efficiency
Efficiency compares actual performance with a standard or planned rate, showing how well the process meets a defined operating benchmark.
A center compares its actual daily output with the output its process is planned to achieve.
Efficient frontier
An efficient frontier represents the best combinations of performance objectives currently achievable with the available capabilities.
A cost–variety frontier shows where gaining more range requires a cost sacrifice unless capability improves.
Externally supportive operations
Externally supportive operations is Hayes and Wheelwright’s fourth stage, where operations capabilities help create and shape competitive strategy.
A distinctive fast-customization capability allows a manufacturer to enter a new market successfully.

F

Feedback
Feedback is information about process performance or customer reactions that helps an operation adjust its inputs or methods.
Reports of damaged parcels give a distribution center feedback about handling and packaging quality.
Fit
Fit is the consistency among operations decisions that makes activities reinforce the same competitive priorities and customer promise.
A short menu, shared ingredients, and assembly flow fit a restaurant’s promise of fast consistent service.
Flexibility
Flexibility is the ability to change an operation’s designs, product mix, output volume, or delivery timing when requirements change.
A packaging plant needs flexibility when customers alter designs, order quantities, or collection dates.
Focused factory
A focused factory concentrates on a limited set of products, markets, and objectives so its process choices serve a clear purpose.
A facility separates standard-volume orders from custom jobs so each focused unit can use a suitable process.
Franchising
Franchising allows an independent operator to use a firm’s business model and brand under an agreement specifying operating requirements.
A service chain expands through franchise operators who follow the agreed format in local markets.
Front office
A front office is the part of a service operation with substantial customer contact, where customers experience the process directly.
A clinic’s reception is front-office work because staff interact with patients as they arrive.

G

Global operations
Global operations design, source, produce, or deliver goods and services across national borders to serve markets and use resources.
A firm designs in one country, sources components in another, and serves customers through regional centers.
Global strategy
A global strategy fits high cost and low local-response pressures, using standardized offerings and coordinated efficient production.
A component maker supplies the same specification worldwide from a few large plants under centralized decisions.
Good
A good is a tangible product that can be owned, stored, and transported, often as part of an offering that also contains services.
A water filter is a good, while the installation and maintenance sold with it are services.
Goods–services continuum
The goods–services continuum places offerings along a range from mostly physical products to mostly activities or experiences.
A bag of cement sits closer to the goods end than a hotel stay, which combines facilities and services.

I

Implementation
Implementation turns strategic choices into operating practice through staffing, training, organization, supplier integration, and aligned measures.
A rapid-service plan needs implementation through suitable shift schedules, staff skills, and response-time measures.
Infrastructural decision
An infrastructural decision shapes the systems and people that run operations, including quality, workforce, planning, and measurement.
Cross-training a service team is an infrastructural choice that helps it handle changing demand.
Internal customer
An internal customer is a process or person within an organization that receives and uses another internal process’s output.
The packing team is an internal customer of the assembly team because it needs correctly finished items.
Internal supplier
An internal supplier is a process or person that provides an output to another process or person in the same organization.
The laboratory acts as an internal supplier when it sends test results to a clinic’s treatment team.
International strategy
An international strategy fits low cost and low local-response pressures, relying mainly on home capabilities with limited foreign adaptation.
A premium maker exports its home-designed product through importers without creating many local variants.

J

Joint venture
A joint venture is an operation owned with a partner, requiring shared investment and arrangements for control and coordination.
A manufacturer creates a jointly owned facility with a local partner to serve a foreign market.

K

Key success factor
A key success factor is an activity or condition a firm must perform well to win in its chosen market, such as accurate tracking or prompt supply.
A parcel carrier treats on-time delivery and network coverage as key success factors.

L

Labor productivity
Labor productivity is output per unit of labor input, commonly per labor-hour so differences in working time are included.
A site producing 900 units in 150 labor-hours has labor productivity of six units per labor-hour.
Labor-hour
A labor-hour is one hour of work supplied by one person; total labor-hours add the working time of everyone included in the measure.
Four technicians working six hours each supply 24 labor-hours to a maintenance operation.
Less important factor
A less important factor has relatively little influence on customers’ choice in the segment compared with qualifiers and order winners.
An industrial customer may place little weight on decorative packaging when selecting a component supplier.
Licensing
Licensing allows another firm to produce or use an offering or capability under agreed rights and terms without shared ownership being required.
A producer licenses a foreign firm to make its product under an agreement defining how the rights may be used.
Local-responsiveness pressure
Local-responsiveness pressure is the need to adapt offerings or operations to differences in tastes, rules, or delivery expectations across markets.
Different product requirements across countries create local-responsiveness pressure for a food producer.

M

Maintenance
Maintenance comprises the care and servicing of equipment needed to preserve its operating condition and availability.
Preventive servicing outside operating hours helps a food outlet avoid equipment interruptions at lunch.
Market segment
A market segment is a group of customers with distinct needs or buying criteria, requiring its own order-winner and qualifier analysis.
A printer separates premium reports from routine promotional flyers because their buyers choose differently.
Market-requirements perspective
The market-requirements perspective starts from customer needs and buying criteria to identify the performance operations must deliver.
Research on lost orders leads a supplier to strengthen delivery dependability for its target segment.
Mass customization
Mass customization combines high-volume production with tailored output through process designs such as common modules assembled to order.
A desk maker combines standard tops and frames to supply many customer configurations at scale.
Mission
A mission states an organization’s purpose by describing what it offers and whom it serves, giving strategy an overall direction.
A training provider’s mission may center on helping adults gain practical workplace skills.
Mix flexibility
Mix flexibility is the ability to offer or change the range and combination of different products or services supplied by an operation.
A café shows mix flexibility when it changes the balance of drinks and meals it serves during the day.
Multidomestic strategy
A multidomestic strategy fits high local-response and low cost pressures, giving country operations authority to adapt offerings.
A service business lets country units design local offerings when tastes differ and scale savings matter less.
Multifactor productivity
Multifactor productivity compares output with several inputs combined in a common unit, usually money in an operations calculation.
A plant includes labor, materials, energy, and capital charges when comparing its weekly multifactor productivity.

N

Nearshoring
Nearshoring moves an activity to a nearby foreign country, potentially shortening supply lines and simplifying some coordination.
A firm nearshores component production to a neighboring market to reduce transport distance.

O

Offshoring
Offshoring locates an activity in another country, either within a company-owned operation or through an external supplier.
Opening a fully owned overseas processing center is offshoring even though no supplier takes over the work.
Operations management
Operations management organizes the activities and resources that transform inputs into goods and services and create value for customers.
A repair center uses operations management to coordinate technicians, parts, equipment, and completed repairs.
Operations strategy
Operations strategy is the long-term pattern of decisions about operations’ role, objectives, and resources in support of the business.
A provider chooses staff skills, facilities, and delivery methods that support its promise of flexible training.
Operations strategy matrix
An operations strategy matrix crosses decision areas with performance priorities to examine support, gaps, and conflicts between choices.
A manager checks how inventory and scheduling decisions support both speed and dependable delivery.
Operations-resources perspective
The operations-resources perspective starts from existing capabilities, assets, and constraints to judge and develop strategic options.
A specialist team’s design expertise gives a firm an opportunity to offer valuable custom products.
Opportunity cost
Opportunity cost is the value of the best alternative use of a resource that is given up when choosing an activity.
Using specialist staff on routine support can have an opportunity cost if it displaces valuable design work.
Order qualifier
An order qualifier is a minimum standard an offering must meet before customers in a particular segment will consider buying it.
A buyer requires a supplier certification before evaluating price or delivery proposals.
Order winner
An order winner is a criterion that causes customers in a segment to choose an offering over competing suppliers.
For urgent repair customers, a dependable same-day completion may be the order winner.
Order-losing sensitive qualifier
An order-losing sensitive qualifier is a minimum requirement whose failure causes a rapid and substantial loss of business.
Missing a fixed publication deadline can eliminate a printer even when its finishing quality is excellent.
Outsourcing
Outsourcing contracts an external supplier to perform an activity that an organization could otherwise perform within its own operation.
A local firm outsources payroll to a specialist while retaining product design and production in-house.

P

Polar diagram
A polar diagram plots performance objectives on axes from one center, allowing required and achieved performance to be compared on the same scale.
A manager plots required speed at eight and actual speed at five to show a three-point performance gap.
Product life cycle
The product life cycle describes introduction, growth, maturity, and decline, during which demand and common order-winning criteria change.
As a product matures, an operation may shift attention from frequent design changes toward cost and dependability.
Productivity
Productivity is output divided by input, showing how much is produced from each unit of resource used during a defined period.
A warehouse tracks correctly shipped orders per labor-hour to relate its output to the team’s time.
Productivity change
Productivity change is the difference between new and old productivity divided by old productivity, usually expressed as a percentage.
Rising from ten to twelve orders per labor-hour gives a productivity increase of 20% from the earlier level.
Productivity driver
A productivity driver is a feature of labor, capital, or management that changes how much useful output comes from resources.
Better training is a labor-related productivity driver when it lets staff complete accurate work with less rework.

Q

Quality
Quality is the degree to which a good or service meets its requirements and is fit for purpose without errors or failures.
A basic bicycle can have high quality when it is safe, reliable, and built to its promised specification.

R

Real output
Real output measures production with price changes removed, allowing comparisons of the goods and services produced over time.
Economy-wide labor productivity uses real output per hour so inflation does not look like extra production.
Repositioning
Repositioning changes the balance of objectives along an existing efficient frontier, gaining on one objective while sacrificing another.
A plant cuts its product range to lower unit cost without changing the underlying production method.
Reshoring
Reshoring brings an activity previously located abroad back to the organization’s home country, whether in-house or through suppliers.
A manufacturer reshores assembly after deciding that shorter supply lines better support its delivery promise.

S

Sand cone model
The sand cone model proposes building quality, dependability, speed/flexibility, and cost capabilities cumulatively while maintaining earlier gains.
A manufacturer first reduces defects, then uses more stable work to improve delivery and flow.
Service
A service is an intangible activity or performance provided for a customer, often involving participation during its delivery.
A language lesson is a service whose quality depends partly on the interaction between tutor and learner.
Service recovery
Service recovery is the prompt action an operation takes to put a service failure right and restore the customer’s experience.
A hotel uses service recovery when it resolves a booking error and arranges a suitable room quickly.
Servitization
Servitization is the addition of services to a goods offering, such as maintenance support or payment based on equipment use.
A machine maker practices servitization when it offers an ongoing maintenance contract with each machine.
Single-factor productivity
Single-factor productivity, also called partial productivity, compares output with one input, such as labor, machine time, or energy.
A ceramics plant measures fired pieces per kWh as a single-factor view of energy use.
Speed
Speed is the time between a customer’s request and receipt of the good or service, commonly measured as delivery lead time.
A repair service measures speed by the time from accepting a device to returning it to the customer.
Structural decision
A structural decision shapes physical assets or the supply network, often involving substantial investment and a costly reversal.
Building a large centralized plant is a structural choice that commits the firm to capacity and location.
SWOT analysis
A SWOT analysis organizes internal strengths and weaknesses and external opportunities and threats to inform strategic choices.
A bicycle maker compares skilled frame building with low-cost import competition when planning its position.

T

Tactic
A tactic is a shorter-term action that carries out a strategy, such as changing a staff schedule to support an operating priority.
Adding trained staff to the busy evening shift is a tactic supporting a rapid-service strategy.
Top-down perspective
The top-down perspective develops operations direction from the business strategy and the requirements it places on the function.
A low-price business asks operations to design processes that can sustain the required low cost.
Total factor productivity
Total factor productivity is another name used for combined-input productivity, especially in economic statistics comparing real output and inputs.
An economic report uses total factor productivity to examine output growth beyond growth in measured resources.
Total landed cost
Total landed cost is the full cost of getting a unit to its required destination, including purchase, transport, duties, and related operating costs.
A buyer adds freight, inventory, checks, and coordination before comparing an overseas quote with domestic supply.
Trade-off
A trade-off occurs when improving one performance objective requires worse performance on another with current resources and methods.
A service may need more spare capacity, and therefore higher cost, to guarantee a shorter delivery time.
Transformation process
A transformation process changes materials, information, or customers into an output by altering form, location, possession, or condition.
A passenger transport service changes customers’ location using vehicles, drivers, and a planned route.
Transformed resource
A transformed resource is a material, information item, or customer that the operation changes during its work.
In a publishing operation, an unfinished manuscript is a transformed resource that becomes a finished publication.
Transforming resource
A transforming resource is a member of staff or a facility, including equipment and technology, that carries out the transformation.
An oven is a transforming resource because it helps turn a bakery’s dough into bread for sale.
Transnational strategy
A transnational strategy addresses high cost and high local-response pressures by combining shared scale and knowledge with local adaptation.
A food group shares core ingredients and process knowledge while country units adapt flavors and packaging.
Triple bottom line
The triple bottom line assesses social, environmental, and economic performance, often described as people, planet, and profit.
A factory reviews worker safety, energy use, and operating returns when applying the triple bottom line.

U

Unit labor cost
Unit labor cost is hourly labor cost divided by output per hour, showing the labor cost contained in each unit produced.
A higher-wage plant can have lower unit labor cost when it produces many more units per hour.

V

Variation in demand
Variation in demand is the change in the amount of work requested over time, creating peaks, quiet periods, and capacity challenges.
A winter equipment rental service faces demand variation when bookings rise sharply during the cold season.
Variety
Variety is the range of different goods or services an operation offers, with greater variety requiring more flexible resources.
A repair shop serving many device models needs skills and parts that match its high variety of work.
Visibility
Visibility is how much customers see and experience an operation’s process, affecting contact skills and perceptions of waiting and quality.
An open kitchen increases visibility because diners can watch the food preparation as it happens.
Volume
Volume is the quantity an operation produces, with high volume supporting repeated tasks, specialization, and dedicated resources.
A beverage plant filling many identical bottles has a higher-volume process than a custom furniture workshop.
Volume flexibility
Volume flexibility is the ability to raise or lower the amount produced as demand or operating requirements change.
A distribution team uses volume flexibility when it adds shifts to handle a seasonal rise in orders.

W

World Trade Organization
The World Trade Organization is the international organization through which members negotiate trade rules, administer agreements, and address disputes.
A cross-border operations team studies the trade agreements relevant to its goods without assuming all markets have identical rules.

About this lesson

By StudeliReport a mistake

Make your own Study Materials

Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.

Get Started