Lean Operations

Learn how lean operations deliver what customers value with less waste of time, materials and effort. Trace lean from the Toyota Production System, spot the eight wastes in factories and services, and map a value stream with takt time, lead time and flow efficiency. Then design just-in-time pull with kanban, quick changeovers and leveled schedules, organize work with 5S, visual management, standard work and error-proofing, and lead continuous improvement with kaizen in both manufacturing and service operations.

IntermediateLesson 9 of 9 in Operations Management Course

What you will learn

  1. Describe how the Toyota Production System grew into lean thinking, and use the five lean principles to separate work that creates value from work that does not.
    • Trace lean back to the Toyota Production System
      Explain why Toyota built a different production system from mass production, name its two pillars and its foundation, and describe how the word lean spread.
    • Apply the five lean principles and classify activities by value
      Define value from the customer's point of view, use the five lean principles in order, and sort activities into value-adding, necessary and pure waste.
  2. Recognize the eight wastes in factories, offices and services, and trace them back to unevenness, overburden and the problems that inventory hides.
    • Spot the eight wastes in factories and services
      Name and recognize each of the eight wastes in manufacturing and service settings, and tell apart wastes that are easily confused.
    • Trace waste back to unevenness, overburden and hidden problems
      Explain how unevenness and overburden cause waste, why inventory hides problems, and how reducing inventory shortens lead time.
  3. Draw a current-state value stream map, calculate takt time, lead time and flow efficiency from it, and design a future state that flows to customer demand.
    • Draw a current-state value stream map
      Choose a product family, walk its material and information flows, and record them with standard symbols and data boxes.
    • Calculate takt time, lead time and flow efficiency
      Compute takt time, inventory in days, value-adding time, process cycle efficiency and staffing for a value stream, and interpret what the numbers show.
    • Design the future state of a value stream
      Use the future-state questions to link processes by flow and pull, choose a pacemaker, level the work and plan the improvements needed.
  4. Explain just-in-time and pull, cut setup times so small lots pay off, level the production schedule and size a kanban system that controls inventory.
    • Explain just-in-time and the difference between push and pull
      Describe just-in-time production, contrast push and pull control, and identify what a just-in-time system needs from suppliers, layout and people.
    • Cut setup times so small lots pay off
      Explain why lean wants small lots, how setup cost drives lot size, and how the SMED method shortens changeovers.
    • Level production with heijunka
      Level the volume and mix of production over time, build a mixed-model sequence from daily demand, and explain what leveling requires.
    • Size and run a kanban system
      Describe how kanban signals control production and movement, apply the rules of kanban, and calculate how many kanbans a loop needs.
  5. Organize workplaces with 5S and visual management, and build quality in through standard work, jidoka and poka-yoke.
    • Organize the workplace with 5S and visual management
      Apply the five steps of 5S to a workshop or office and use visual controls that show at a glance whether work is normal.
    • Build quality in with standard work, jidoka and poka-yoke
      Write standard work as the baseline for improvement, stop at abnormalities with jidoka and andon, and prevent errors from becoming defects with poka-yoke.
  6. Lead improvement with kaizen, adapt lean tools to service operations and judge where lean works well and where it needs adjusting.
    • Run kaizen with PDCA, the five whys and kaizen events
      Use the PDCA cycle and the five whys to solve problems at their root, and plan a kaizen event and daily improvement in a team.
    • Apply lean in service operations
      Adapt lean principles and tools to services such as banks, hospitals and restaurants, and allow for the customer's role in the process.
    • Judge where lean works and where it needs adapting
      Assess whether lean fits an operation, weigh its supply risks and environmental effects, and measure progress toward a lean operation.

Lean Operations study guide

6 chapters

1

Where lean comes from and how value flows

Lean connects customer value, smooth flow and the people who improve the work. Start with the conditions that led Toyota to develop its production system, then use the five principles to examine a process. A customer visit and a small production line show how much time can pass without value being added. You will learn to distinguish useful transformation, necessary support and waste before choosing an improvement.

1.1 How Toyota shaped lean operations

Lean operations aim to deliver what customers value with less waste of time, materials, effort and space. The tools work together: small lots depend on fast changeovers, pull depends on reliable replenishment, and improvement depends on people who can raise problems.

Why Toyota needed a different system

Henry Ford's moving assembly line of 1913 made mass production famous. Long runs of a standard product spread costs over many units. Specialized machines and stocks between steps helped keep each department busy. After the Second World War, Toyota faced a smaller home market with demand for many models in low volumes. Capital and space were scarce. Long runs of one model would tie up resources in vehicles customers did not yet want.

Toyota developed a way to make small quantities of different models efficiently. Sakichi Toyoda's 1896 power loom stopped when a thread broke; his Type G automatic loom followed in 1924. Stopping at a problem became jidoka, building quality into the process. Kiichiro Toyoda promoted making parts just in time. From the late 1940s, Taiichi Ohno developed the production system on the shop floor with Eiji Toyoda's support.

The TPS house

The Toyota Production System, or TPS, is often shown as a house. Its roof is the goal: high quality, low cost and short lead time. Two pillars hold it up:

  • Just-in-time means making what is needed, when it is needed, in the amount needed.
  • Jidoka means detecting an abnormality, stopping and dealing with it before defects spread.

The foundation is stable, leveled production, standardized work and continuous improvement. A pull signal cannot keep deliveries on time if machines repeatedly fail. A standard cannot improve if nobody is allowed to question it. These connections explain why copying a tool in isolation often disappoints.

People make the system improve

Toyota's management approach links continuous improvement with respect for people. Employees help improve their own work, and suppliers participate in long-term relationships. An operator who reports an awkward fixture contributes knowledge that a distant manager may miss. Using productivity gains to threaten jobs damages the trust needed to keep finding problems.

John Krafcik used the word lean in his 1988 article, “Triumph of the Lean Production System,” from MIT's auto-industry research. Womack, Jones and Roos brought it to a wider audience in The Machine That Changed the World in 1990. Womack and Jones extended its application in Lean Thinking in 1996.

See the system in a daily schedule

A plant may switch from one monthly run of each of three models to making some of every model each day. Short changeovers make that possible. Smaller lots reduce waiting inventory and reveal quality problems sooner. Workers need training and authority to respond when those problems appear. Lean reaches beyond car plants to hospitals, banks and public offices; each setting starts with its own customer's needs.

Key Takeaways

  • TPS links just-in-time with quality built into the process.
  • Stable work, leveling and continuous improvement support both pillars.
  • Toyota developed small-lot production to serve varied demand with scarce resources.
  • Respect for people supports the reporting and solving of problems.
  • Lean improvements change how the whole operation works.

1.2 Value, flow and the five lean principles

A process can keep everyone busy while making the customer wait. Lean begins by defining what the customer wants from the product or service, then examining every action needed to deliver it.

Start with value

Value comes from the customer's point of view: what they are willing to pay for, at the right time and price. A patient values a sound diagnosis and effective treatment. Waiting for a room does not create either. Adding a feature that customers never use consumes resources without meeting a need.

Apply the five lean principles in order:

  1. Specify value: understand the customer's need.
  2. Identify the value stream: follow all the actions needed to meet it.
  3. Make value flow: reduce stops between those actions.
  4. Let the customer pull: let real use authorize more work.
  5. Pursue perfection: repeat the improvement cycle as new waste becomes visible.
Classify the work

An activity is value-adding only when the customer is willing to pay for it, it changes the product or service in form, fit or function, and it is done right the first time. Reworking a faulty weld consumes effort but fails the third test.

Necessary non-value-adding work adds no customer value but cannot yet be removed because of law, current technology or policy. Invoicing and a required inspection are examples. Reduce the effort involved while preserving what is required. Pure waste, such as searching or avoidable waiting, has no necessary purpose and should be removed.

Work through a customer visit

At a tire service center, a visit includes 10 minutes at the counter, 4 entering details, 25 waiting for a bay, 3 lifting the car, 12 removing and fitting the tire, 5 balancing, 2 checking torque and 4 paying. Total time is 65 minutes. Fitting and balancing add value, totaling 17 minutes. Lifting enables the work but does not itself change what the customer buys, so it is necessary non-value-adding work.

The value-adding share is:

1765×100≈26%

The 35 minutes of waiting are a much larger opportunity than trying to rush the fitting work. The classification directs attention to what delays the customer.

Why smaller transfers improve flow

Consider 10 parts passing through three staffed steps, each taking 1 minute per part. If a whole batch must finish a step before moving, the first finished part emerges after 21 minutes; all 10 finish after 30. With one-piece transfers, the first part finishes after 3 minutes and the tenth after 12. The processing tasks have not become faster. Parts spend less time waiting for their batch.

Pull connects this flow to actual need: a downstream step signals what it has used, and the upstream step replaces it. Producing more to keep an already faster machine busy creates inventory for the next step. Judge the change by customer delivery and total flow, not by the apparent busyness of one department.

Key Takeaways

  • Value-adding work must meet all three tests, including being right the first time.
  • Shrink necessary non-value-adding work and remove pure waste.
  • The five principles run from customer value through repeated improvement.
  • Small transfers shorten waiting even when task times stay unchanged.
  • Pull lets actual need authorize production.
  • Local busyness can create waste elsewhere.
2

Find waste and its causes

Waste appears in travel, queues, duplicate work and errors, but its causes often lie elsewhere. Learn to name what you see, measure the loss and follow it back to uneven work or unreliable processes. The eight wastes provide a practical observation checklist. The three Ms and Little’s law then explain how load, inventory and lead time connect, so a team can remove causes while maintaining dependable delivery.

2.1 Recognizing the eight wastes

Waste uses resources without adding value for the customer. Taiichi Ohno identified seven wastes; many lean approaches add unused human talent as an eighth. The mnemonic TIMWOODS helps you scan work systematically.

Follow the item and the person

Transport is unnecessary movement of materials, products or information. Sending a file through several departments or moving a pallet through a temporary storage area adds handling without changing the output.

Inventory is stock beyond the next step's need: raw material, work in progress, finished goods or uncompleted service cases. It occupies space, ties up resources and can become obsolete. An application backlog is inventory even when no physical product exists.

Motion is unnecessary movement by people, including walking, bending, reaching and searching. A technician fetching a tool 30 m away 12 times walks 360 m outward and another 360 m back. Moving the tool to its point of use removes 720 m of travel per shift. Distinguish the person moving from the item being transported.

Waiting is delay when people, machines or work items cannot proceed. Missing information can leave a case waiting just as missing parts can stop an assembly line. Inventory describes how much work is held; waiting describes its delay. A queue can show both.

Look for work made too soon or done twice

Overproduction means making more, earlier or faster than needed. It generates other waste: the excess must be stored, moved and counted, and defects may stay hidden in it. Printing unread reports is overproduction in a service setting.

Overprocessing means doing more work or using more precision or complexity than the requirement needs. Polishing a hidden surface, reentering the same customer details and requiring redundant approvals are examples. Overproduction concerns unwanted output; overprocessing concerns unnecessary work on an output.

Defects are failures to meet requirements, bringing scrap, correction, rework and inspection effort. A wrong invoice and an incorrectly assembled part both create extra work. Finding a defect late also wastes the work added since the defect arose.

Skills, or unused talent, means failing to use people's knowledge and ability. Operators may know why parts jam but never be asked. Skilled nurses may spend hours repeating clerical entries. This waste also weakens the team's ability to remove the others.

Diagnose a work area

In a warehouse, fast-moving items stored at the far end make pickers walk unnecessarily: motion. Moving pallets from receiving to a buffer and then to racks adds transport. Orders held for two hours create waiting, and the stack of held orders is inventory. A supervisor repeating a check already completed reliably by a scanner adds overprocessing.

Name the waste precisely enough to choose a useful change. Moving the pallets fewer times addresses transport. Releasing work in smaller, steadier amounts addresses the order queue. Asking pickers to design storage locations draws on their knowledge as well as reducing motion. A single observation may reveal several linked wastes, so record the quantity or time lost alongside each one.

Key Takeaways

  • TIMWOODS names transport, inventory, motion, waiting, overproduction, overprocessing, defects and unused skills.
  • Motion concerns people; transport concerns items or information.
  • A queue is inventory whose time in the queue is waiting.
  • Overproduction creates stock and further handling.
  • Unused talent limits improvement across the other wastes.

2.2 Uneven work, hidden problems and lead time

Visible waste often has an upstream cause. Work may arrive in large peaks, equipment may be unreliable, or a buffer may hide a recurring failure. Removing the visible pile without understanding its cause can interrupt deliveries.

Connect the three Ms

Waste, or muda, consumes resources without adding value. Unevenness, or mura, means swings in volume or product mix. Overburden, or muri, pushes people or equipment beyond what they can sustain safely and reliably.

Unevenness can create both other problems. A peak brings overtime, rushed handling and overloaded machines. A trough leaves the same resources waiting. A packing team releases 2,000 weekly orders as 700 on Monday, 300 on each of Tuesday through Thursday and 400 on Friday. Releasing 400 a day gives the same weekly total with a steadier load, where customer timing allows that release pattern.

Variability also comes from breakdowns, missing staff, poor supplies and unclear requirements. Operations absorb it through extra inventory, spare capacity or extra time. Reducing the cause makes less protection necessary. Simply demanding higher output leaves the variability in place.

Lower the water and remove the rocks

In the rocks and water analogy, inventory is the water in a river and problems are submerged rocks. High water lets the boat pass over breakdowns, long setups and late deliveries. Lower water reveals those problems.

Inventory should come down in controlled steps while the team removes each exposed cause. If a machine frequently fails, maintain it and improve reliability as the buffer shrinks. Removing the whole buffer first can leave the next process with no work. Conversely, adding stock every time the failure returns protects today's output but leaves tomorrow's failure likely.

Use Little's law to see the effect

For a stable flow, Little's law relates averages:

average lead time=average work in progressaverage throughput rate

A process holds 600 units and finishes 120 per working day. Its average lead time is 5 working days. If work in progress falls to 300 while throughput stays at 120 per day, lead time becomes 2.5 days. The units spend less time waiting; no task needs to be performed twice as fast.

Keep the rate and time units aligned. Dividing units by units per day gives days. Use average values over a representative period, so a one-time inventory count does not stand in for an unstable month.

Remove the cause and hold the gain

Go to the work, identify the waste and measure it. Investigate why it occurs, try a change that removes the cause, and make the successful method standard. A rework station may clear faulty output but does not prevent the original defect. Likewise, speeding a machine that already outruns its downstream neighbor builds a larger queue without raising the value stream's output. Check the whole flow when deciding whether an improvement helped.

Key Takeaways

  • Unevenness can produce both overload and idle time.
  • Reduce the causes of variability as buffers come down.
  • Little’s law links average work in progress, throughput and lead time.
  • Faster nonbottleneck work can increase queues without increasing output.
3

Map and improve the value stream

A value stream map brings customer demand, process performance, inventory and scheduling onto one page. First record the current work and its information flow. Then calculate the required pace, the delays and the staffing lower bound. Use those findings to design a future state with continuous flow, controlled pull links and one scheduled pacemaker, supported by an improvement plan with clear ownership.

3.1 Reading the current value stream

A value stream map follows a product family or a service case from request or receipt to customer delivery. It shows both material flow and the information that tells each process what to do. This wider view reveals delays that a detailed map of one department can miss.

Choose and observe a family

A product family follows similar steps through shared equipment. Map one family at a time, initially from receiving to shipping. Mixing every product on one map makes different routes and requirements hard to see. Assign an owner for the whole value stream because its delays cross departmental boundaries.

Walk the actual route. Start at shipping and work upstream toward receiving, asking what each step needs from its supplier. Count inventory, time work and check actual delivery frequency. Planning-system times are useful background, but direct observation shows how work is running now. Mike Rother and John Shook presented this method in Learning to See in 1998.

Put flow and control on the page

Use customer and supplier icons at the top corners. Draw a process box for an area where material flows continuously; start another where flow stops and stock builds. Under each process, add a data box with observed cycle time, changeover time, uptime, staffing, shifts, net available time, batch size and scrap rate.

Changeover time measures the switch between products. Uptime is the percentage of planned time when the equipment is available to run.

An inventory triangle, marked “I,” records a counted quantity. Striped push arrows show material sent onward without a downstream pull signal. Truck icons show deliveries and their frequency. A timeline along the bottom separates waiting from processing.

Across the top, trace information from customer orders and forecasts through production control to the processes. Straight narrow arrows represent manual messages; zigzag arrows represent electronic messages. Independent schedules sent to every department explain why one process can keep building while the next has no room.

Keep four clocks separate

Cycle time is the observed interval between units leaving a process. Value-adding time measures the time spent changing the product or service in ways the customer values. Lead time measures one unit's complete journey, including waiting. Takt time is net available working time divided by demand: the completion interval required by the customer.

Suppose a process releases one unit every 50 seconds, while each unit waits two days before the next process. The 50 seconds describes cycle time, not the unit's two-day delay. Nor does a fast machine set takt: customer demand does that.

Let the map reveal the next decision

A map with large triangles and short processing times points toward waiting and inventory. A map with many separate schedules points toward push control. A long changeover may explain why a process releases large batches. Record these relationships before selecting tools.

Key Takeaways

  • Map one product family and both material and information flows.
  • Observe actual times and quantities where work happens.
  • Data boxes explain the performance behind the flow symbols.
  • Cycle time, value-adding time, lead time and takt answer different questions.
  • Use the current map to locate causes and design the future state.

3.2 Calculating the pace and delays of a value stream

A map's numbers connect customer demand to the work and inventory needed to meet it. Begin with one consistent period and keep time units aligned. Then distinguish the pace required from the performance actually observed.

Find takt and compare capacity
takt time=net available working timecustomer demand in the same period

A bracket plant runs two shifts of 450 net minutes each. Daily time is 54,000 seconds; daily demand is 900 brackets. Takt is 60 seconds per bracket. Net time excludes planned breaks and meetings. Unplanned downtime is assessed separately, so it is not silently removed to make the demand pace easier.

A cycle longer than 60 seconds cannot sustain this demand. A 54-second machine appears fast enough, but at 85 percent uptime its effective interval over planned time is:

54/0.85≈63.5 seconds per bracket

That process needs better availability or more capacity. Faster nominal operation alone has not solved the shortfall.

Turn stock into time
days of inventory=inventory quantitydaily customer demand

At 900 brackets per day, raw stock for 9,000 brackets represents 10 days. Stocks of 4,500 before welding, 1,800 before assembly and 2,700 finished brackets represent 5, 2 and 3 days. Their total waiting is 20 working days. Production lead time also includes processing, though a few seconds add little at this scale.

Stamping, welding and assembly add 2, 48 and 54 seconds of value-adding time, totaling 104 seconds. To compare this with lead time, convert the 20 working days using 54,000 available seconds per day:

process cycle efficiency=value-adding timetotal lead time 10420×54,000×100≈0.0096%

This is about 0.01 percent. The calculation uses working-time units throughout. Most elapsed production time is waiting, so shaving a few seconds from assembly has much less effect on lead time than removing days of stock.

Staff and release work to demand

The theoretical operator requirement is total operator work content per unit divided by takt, rounded up. Include loading, walking and unloading; unattended machine time is not operator work. A 150-second work content at 60-second takt gives 2.5, so three operators are needed if the work can be balanced. Removing 30 seconds of waste reduces the requirement to two.

Pitch gives the release interval for a container:

pitch=takt time×pack quantity

A pack of 20 at 60-second takt gives 1,200 seconds, or 20 minutes. This lets production control release and collect a small increment of work regularly. Halving the 4,500-part queue saves 2.5 days at unchanged demand; compare that gain with the 10 seconds saved by cutting assembly from 54 to 44 seconds.

Key Takeaways

  • Calculate takt from customer demand and net planned working time.
  • Check uptime before deciding that cycle time meets takt.
  • Convert inventories into days and add processing for total lead time.
  • Flow efficiency uses value-adding time and lead time in matching units.
  • Staffing uses operator work content, with whole people rounded up.
  • Pitch sets a container-sized work interval.
  • Reduce the largest delays when the aim is shorter lead time.

3.3 Designing flow, pull and the pacemaker

A future-state map describes a better flow that the team can reach within a defined period, often a year. Design it from customer demand and the current process data. Each production link should support continuous flow or respond to a downstream need.

Work through the design questions

Find takt first. Decide whether to ship directly or from a finished-goods supermarket. Identify where continuous flow can work and where a pull link is needed. Choose the single scheduled process, then decide how to level its product mix and release work at a regular pitch. Finally, name the process improvements that make the design possible.

Use continuous flow between reliable processes with compatible cycles. A cell combining welding and assembly can pass one bracket at a time. Where direct flow is impractical, a supermarket holds a controlled stock of standard parts. Downstream withdrawal authorizes replacement upstream.

A distant supplier, a shared press or a process with long changeovers may need that separation. For custom work, a FIFO lane can hold a fixed maximum quantity in first-in, first-out order. The supplying process stops when the lane is full. Do not place stock between processes that could flow together.

Schedule one point

The pacemaker receives the production schedule and sets the pace for the value stream. It is usually near the customer end. Work downstream flows toward shipping; upstream processes replenish what the pacemaker consumes. Separate schedules at every process can conflict and rebuild push between departments.

The pacemaker is a control choice, while a bottleneck is a capacity constraint. Identify the actual capacity problems as well as deciding where to schedule.

Build a practical future state

In the bracket plant with 60-second takt, combine welding and assembly. Measured operator work content is 110 seconds per bracket, including handling and walking but excluding unattended machine running. The staffing lower bound is:

110/60≈1.83

Round up to two operators and check that the sequence can be balanced so each can finish within takt. A total below two takt intervals does not by itself establish a workable split.

Plan a one-day finished-goods supermarket, 1.5 days of stamped parts and two days of raw material supplied daily. Waiting falls from 20 days to approximately 4.5 days. To support the smaller stamped-parts stock, reduce stamping changeovers from 60 minutes to under 10 so each part can be made daily.

Turn the drawing into work

Mark required improvements as kaizen bursts, such as the changeover reduction or an uptime repair. Divide implementation into loops, starting at the pacemaker. Give each loop an owner, a measurable target and a date, and review progress across departments. A stock target needs a replenishment method that can maintain it. Once the future state is working, it becomes the current state for the next round of improvement.

Key Takeaways

  • Use continuous flow where the processes can support it.
  • Use controlled supermarkets or FIFO where direct flow is impractical.
  • Schedule the pacemaker to coordinate the value stream.
  • Check work balance after calculating a staffing lower bound.
  • Give every required improvement an owner, target and date.
4

Make small-lot pull production work

Just-in-time becomes workable through a connected set of decisions. Pull signals control releases, quick changeovers make small lots economical, and leveling gives upstream processes a steadier load. Kanban translates that design into quantities and replenishment rules. You will connect the control logic to setup economics, a mixed-model sequence and a container calculation that includes the full time needed to replenish.

4.1 Just-in-time and downstream pull

Just-in-time, or JIT, makes and delivers what is needed, at the time and in the quantity needed. It also tackles the problems that make extra stock seem necessary. Pull control is one way to connect that aim to daily decisions.

What authorizes the work?

In push, a process makes its scheduled quantity and sends it onward whether the next process is ready or not. Each department may meet its own plan while work accumulates between them.

In pull, actual downstream use authorizes production or delivery upstream. A card, an empty container, a marked space or an electronic message can carry that authorization. If downstream slows, fewer signals return, so upstream production slows too. The number of circulating signals limits how much work can enter the loop.

For example, a plant shipping 250 units per day with 2,000 units of average work in progress has an eight-day average lead time. If it can sustain the same throughput while limiting work in progress to 500 units, Little's law gives two days. Pull controls releases; process reliability makes the lower limit workable.

Two forms of pull

Replenishment pull replaces standard items after they are used. A supermarket can contain goods before the final customer orders; their withdrawal triggers replacement. Pull therefore does not mean that every part must be produced from scratch after a final order arrives.

Sequential pull serves made-to-order work through bounded FIFO lanes. A custom cake should follow its order, not replenish a shelf of identical cakes. An operation can combine replenishment for frequent standard parts with sequential flow for rare or custom items.

Build the conditions for JIT

Small, frequent deliveries require dependable suppliers and consistent quality. Long-term supplier partnerships help solve delivery and quality problems across the whole route. Simply forcing a supplier to hold the old stock moves the burden without improving the value stream.

Inside the operation, cells shorten travel and help cross-trained employees manage several steps. Fast setups make small lots practical. Leveled schedules give suppliers a steadier load. Preventive maintenance reduces failures, and employees need authority to stop when an abnormality occurs. These conditions support one another: smaller buffers expose failures quickly, while better reliability makes those smaller buffers sustainable.

Judge the outcome across the flow

Lower inventory can free floor space, shorten lead time and reveal defects before many units are made. Small lots can also make it easier to change product mix as demand changes. These gains depend on stable replenishment, not on deleting every buffer at once.

Watch what happens when a downstream process stops. If upstream keeps producing because its schedule says so, the operation is still pushing across that link. A lean response is to follow the pull limit, resolve the problem and restore flow. Keeping a machine busy is a poor reason to make goods the next process cannot yet use.

Key Takeaways

  • JIT joins demand-based production with removal of the causes of excess stock.
  • Push follows an independent plan; pull responds to downstream use.
  • Replenishment pull can hold a controlled stock of standard goods.
  • Sequential pull fits custom work through bounded FIFO links.
  • Reliable equipment, suppliers and schedules support small buffers.
  • Assess suppliers and internal processes as one value stream.

4.2 Quick changeovers and economical small lots

Small lots spend less time waiting and let an operation make each product more often. Long setups make those benefits expensive: every switch consumes machine time and setup effort. Lean reduces that cost so that small lots become practical.

See the lot-size trade-off

For a lot used evenly under steady demand, average cycle stock is half the lot size. A lot of 1,000 gives average stock of 500; a lot of 200 gives 100. This describes stock created by the lot, not any extra safety stock.

The economic order quantity model recalls the trade-off between setup and holding costs:

Q∗=2DSH

Here demand per year is D, cost per setup is S and holding cost per unit per year is H. With demand of 12,000, setup cost of $150 and holding cost of $4, the model gives about 949 units. Instead of accepting this lot as fixed, lean asks how to lower the setup cost.

For a target lot of 300, rearrange the relationship:

S=HQ22D=4×30022×12,000=$15

The lot falls to about one third while setup cost falls to one tenth. Lot size depends on the square root of setup cost, so halving setup cost does not halve the economic lot.

Separate stopped work from preparation

Single-minute exchange of die, or SMED, aims for a changeover below 10 minutes. Shigeo Shingo developed the method around two kinds of work. Internal setup requires the machine to stop. External setup can happen while it runs.

Observe the full changeover and record each element. Separate the two kinds of work, then convert suitable internal tasks to external tasks: fetch tools, prepare paperwork and preheat the next die before stopping. Streamline the remaining stopped work with locating pins, quick clamps, preset heights and safe parallel tasks. Improve external work too, using carts and fixed storage, then write the new method into standard work.

Follow the saved minutes

A press stops for 80 minutes per changeover. Preparing tools, paperwork and the die takes 35 minutes that can occur while the press runs. Moving it outside the stop leaves 45 minutes. Better clamps, preset heights and fewer trial adjustments cut the remaining stop to 9 minutes, about an 89 percent reduction overall.

With 120 minutes available for changeovers each day, the old method allows 1.5 changes on average; the new one allows about 13.3. The team can make smaller lots and return to each product more often. If the press is a bottleneck and output is short, some saved time can instead produce additional units.

Reducing lot size before shortening setup multiplies the number of long stops. Check the available production time and the need for flexibility before changing the schedule. A faster stop is also only part of the gain: inefficient external preparation still consumes people's time and should be improved.

Key Takeaways

  • Average cycle stock is half the lot under steady, even use.
  • Lower setup cost makes smaller economic lots possible.
  • SMED aims for single-digit changeover minutes.
  • Move suitable preparation outside the machine stop, then streamline both kinds of work.
  • Use saved bottleneck time for flexibility or output according to the need.

4.3 Leveling volume and product mix

A plant can meet weekly totals while giving suppliers and customers an uneven daily experience. Production leveling, or heijunka, spreads volume and product mix over time. Smaller, regular releases reduce the peaks passed upstream.

Level the mix

Suppose a factory makes only model A on Monday and model B on Tuesday. A's parts are needed in a large wave, then not at all. A customer ordering B just after its run may wait until the next cycle. Making some of each model frequently reduces those gaps.

Daily demand is 240 A, 120 B and 60 C, totaling 420 units. With 420 net minutes, takt is one minute per unit. Reduce the demand ratio:

240:120:60=4:2:1

A repeating seven-unit cycle must contain four A units, two B units and one C unit. The sequence “A B A C A B A” meets that mix and spreads the models through the cycle. Repeating it 60 times makes the daily quantities exactly. A short sequence is useful only if changeovers are short enough to support the switches.

Level the volume

Volume leveling produces at the average demand rate while a planned finished-goods buffer absorbs short swings. If orders vary between 380 and 460 around a 420 daily average, producing 420 daily gives a steadier load. On a 460-order day, stock supplies the difference; on a 380-order day, stock can recover.

The plan must follow the real average. A sustained increase is a reason to reset the level, not to keep building at an outdated rate. Buffer size and replenishment need to support the actual variation. Leveling smooths the production response without changing what customers ordered.

Release work at regular intervals

A heijunka box has rows for products and columns for pitch intervals. Cards in its slots show what the pacemaker should make in each interval. A material handler takes one pitch of cards at a time, so a daily plan becomes small, regular work releases.

For a 20-minute pitch, the board gives the team a clear checkpoint every 20 minutes. It also makes an empty slot or missed interval visible. The aim is a steady pattern of production and withdrawal, which upstream processes can replenish predictably.

Protect the workable sequence

Leveling depends on fast changeovers, reliable work and a short frozen schedule period. Continually replacing the next slot with an urgent request sends instability back to suppliers. A frozen period protects the immediate sequence while later slots can be revised as demand changes.

Do not confuse an equal mix with a leveled mix. Making A, B and C in equal quantities would miss the 4:2:1 demand. Leveling keeps the required proportions and spreads them across time. Volume and mix must both be considered: a daily total can be smooth while large model batches still create parts shortages and long waits.

Key Takeaways

  • Heijunka levels both volume and product mix.
  • A repeating sequence must preserve demand proportions.
  • A planned buffer can absorb short demand swings around the level rate.
  • Fast setups and a short frozen period support a stable sequence.

4.4 Signals and container counts in a kanban loop

A kanban is a signal authorizing a fixed quantity of a particular item to be made or moved. A card is common, but an empty container, marked space or electronic message can perform the same control function.

Follow one replenishment loop

A downstream process takes a full container from a supermarket. The returned production signal tells upstream to replace exactly that quantity. The full replacement returns with its identification. A production kanban authorizes making; a withdrawal kanban authorizes moving goods. In a two-card system, withdrawing a container returns its production card while a withdrawal card travels with the goods. A signal kanban triggers a batch when stock reaches a set level at a process with long changeovers.

A two-bin system is a simple loop: consume the first bin, use its empty state to trigger replenishment, and work from the second bin while the first is refilled. Replenishment must finish before the covering stock is used up.

Keep authorization disciplined

Downstream withdraws only the specified item and quantity. Upstream makes only the authorized item, quantity and sequence. Nothing is produced or moved without its signal. Goods retain their kanban identification, and defects or incorrect quantities do not pass downstream. Reduce the number of signals carefully as the process improves.

Extra production to keep a machine busy breaks the limit. A lost card can cause a shortage because it removes authorization from circulation. Adding cards to cover every recurring delay increases inventory without removing the delay.

Size the loop

Use the full replenishment lead time: signal travel, waiting, production or delivery, and the return of the full container.

N=demand during replenishment lead time+safety stockcontainer size

Round up to a whole container. At 480 units per day and two days' replenishment, demand during lead time is 960 units. Half a day's safety stock adds 240. With 60 per container, the loop needs 20 kanbans.

The safety-factor form gives the same result:

N=DL(1+α)C

Here D is demand per day, L is full replenishment time in days, and C is units per container. The safety factor is α=240/960=0.25. The factor is a fraction of demand during lead time, not necessarily a fraction of one day's demand. Keep the demand rate and lead-time units consistent.

Interpret the ceiling

If containers hold 70 instead, the required count is about 17.1, so use 18. The authorized container capacity is 1,260 units. Rounding down to 17 would provide only 1,190, below the planned 1,200 units of cover.

Use replenishment loops for fairly steady, repeating demand. Rare custom items can accumulate unused stock in such a loop and may fit made-to-order FIFO better. Recalculate counts when demand, lead time or container size changes. Shorter, more reliable replenishment can support fewer cards; remove them gradually while checking shortages and delivery.

Key Takeaways

  • Production and withdrawal kanbans authorize different actions.
  • Actual use triggers fixed-quantity replenishment.
  • Size the loop using full replenishment time plus safety stock.
  • Round container counts up and multiply by container size to find the ceiling.
  • Maintain the signal rules when work slows or problems occur.
  • Recalculate the loop when its demand or replenishment conditions change.
5

Make normal work visible and build quality in

A stable operation makes the right method easy to follow and problems easy to notice. Begin with 5S and visual controls that reduce searching and trigger action when conditions depart from normal. Then connect standard work to takt and use jidoka, andon and error-proofing to protect quality. The examples show the difference between inspecting a defect early and preventing the error that creates it.

5.1 Keeping an orderly workplace and visible controls

A missing tool or unclear stock location interrupts work every time it is needed. 5S creates an orderly workplace where people can follow a standard and see abnormalities quickly. It works in a supply room or shared drive as well as on a factory floor.

Work through the five steps

Sort, or seiri, removes what the current work does not need. Red-tagging puts doubtful items in a holding area for a defined review period. This avoids keeping everything “just in case” while allowing a decision before disposal.

Set in order, or seiton, assigns a labeled place to what remains. Put frequent-use items close to where they are used. A shadow board shows where each tool belongs; an empty outline makes a missing tool visible. Arrange for easy return as well as easy retrieval.

Shine, or seiso, combines cleaning with inspection. Wiping equipment can reveal a leak, loose bolt or worn part early. Cleaning that only improves appearance misses this purpose.

Standardize, or seiketsu, makes the first three steps routine. Photos of the correct state, assigned responsibilities, cleaning schedules and short checklists show what should happen and who does it. Sustain, or shitsuke, keeps the routine through habits, audits and leaders who follow up and support it. Some workplaces add safety as a sixth S, called 6S.

Measure what changed

A maintenance technician searches 15 times per shift, averaging 6 minutes each time: 90 minutes. Sorting equipment, using shadow boards and labeling drawers reduce each search to one minute. Search time becomes 15 minutes, freeing 75 minutes for maintenance.

In an office, delete outdated shared files, agree on folder names and place current templates where staff can find them. Assign someone to maintain the structure and review it. The tools differ, but the problem is the same: people lose time looking for the right resource.

Make the abnormal easy to see

Visual management shows the state of work at a glance. Labels and floor markings show locations; minimum and maximum stock lines show limits; a production board compares actual output with plan.

A visual display communicates information, such as a poster. A visual control makes a departure from normal visible and calls for action. Stock below its minimum line needs replenishment. An empty kanban slot or an andon signal needs a defined response. A board nobody updates or acts on has little control value.

Choose the normal condition, the signal and the response together. Staff should know what the minimum line means, who replenishes and when. An isolated cleanup before a visitor arrives will not maintain that system. Involve the people doing the work when setting locations and standards, and use follow-up to solve what makes the routine hard to maintain.

Key Takeaways

  • 5S makes resources easy to find and problems easy to see.
  • Shine includes inspection for equipment problems.
  • Standardize and sustain keep the first three steps working.
  • A visual control shows an abnormal condition and prompts a response.
  • Design workplace standards with the people who use them.

5.2 Standard work and quality at the source

Reliable flow needs work that can be repeated and a way to respond when it goes wrong. Standard work establishes the current best method. Jidoka and error-proofing help prevent a problem from traveling through the value stream.

Establish a baseline for improvement

Standard work has three elements: takt time, the operator's work sequence and standard in-process stock, the minimum stock needed to run the sequence smoothly. Write it with the people who do the task and revise it when a better method is verified.

At 60-second takt, a sequence contains loading 8 seconds, bracket assembly 12, walking 4, fastening 15, testing 10, and unloading and walking back 7. The total is 56 seconds, leaving 4 seconds within takt. A 66-second sequence would fall behind and need waste removal or rebalancing. Include handling and walking; counting only transformation time understates the operator's load.

Without a stable method, a team cannot tell whether a changed result came from an improvement or from people working differently.

Detect, stop and solve

Jidoka builds in the ability to detect an abnormality and stop. Its sequence is to detect, stop, fix the immediate problem and remove its root cause. Automatic detection also frees people from continuously watching a machine that can stop itself.

An andon is a cord, button, light or board used to call for help. A team leader responds. On many Toyota-style lines, unresolved problems cause a stop at a fixed point. The temporary output loss prevents the same fault from being repeated or passed onward. A signal without a prompt response leaves the operator carrying the problem alone.

Prevent errors from becoming defects

An error is a mistaken action or condition, such as loading a part backward. A defect is the resulting failure to meet a requirement. Poka-yoke, or error-proofing, was promoted by Shigeo Shingo. Its devices prevent an error or make it immediately visible. A control device blocks operation until the part is correctly seated. A warning device signals the problem but depends on someone responding.

Source inspection checks conditions before or during processing. A fixture that cannot clamp a reversed part prevents that loading error from producing a defect. Self-inspection checks output immediately after a step; it finds a defect early but after it has been created. End inspection finds it later still.

If 2 percent of 1,000 daily units lack a clip, 20 need repair. Repair at the station takes one minute each; after final assembly it takes 25. Early detection saves:

20×(25−1)=480 minutes per day

A sensor that prevents release until the clip is present goes further by stopping the incomplete unit before it moves on. Investigate the process that allowed the omission; telling an operator to remember more carefully leaves the same error opportunity in place.

Key Takeaways

  • Standard work records takt, sequence and minimum in-process stock.
  • Operators help write and improve the standard.
  • Jidoka detects abnormalities, stops and drives root-cause action.
  • Andon signals need a prompt support response.
  • An error is a mistaken action or condition; a defect is failed output.
  • Control devices block the error; warning devices call attention to it.
  • Source inspection checks conditions, while self-inspection checks the completed step.
6

Keep improving and adapt lean to the operation

Lean develops through repeated problem-solving, not a single redesign. Learn how a team tests changes, verifies causes and holds gains through daily kaizen. Then apply the same thinking to service queues and customer variation. Finally, assess supply risk, environmental effects and performance measures so that shorter lead times and lower inventory support reliable delivery, quality and safe work.

6.1 Running daily kaizen and focused improvements

Kaizen means continuous improvement through small changes by everyone. Each successful change becomes the new standard, which gives the next improvement a stable starting point. Large, radical redesign is often called kaikaku.

Use PDCA to learn from a change

The Plan–Do–Check–Act cycle grew from Walter Shewhart's work and was popularized by W. Edwards Deming.

  • Plan: define the problem, observe the current condition, investigate causes, choose a countermeasure and set a target.
  • Do: test the change, preferably on a small scale.
  • Check: compare the measured result with the target.
  • Act: adopt and share a successful method as standard work, or use what the test taught you to plan again.

“Check” needs a comparison, not simply a report that the team completed its tasks. “Act” must hold a verified gain; rolling out a change before checking it can spread a new problem.

Investigate where the work happens

The gemba is the place where work is done. A gemba walk lets managers and teams see the actual conditions instead of relying entirely on reports. Ask the people doing the job and verify the explanation against what happens.

The five whys follows causes until the team reaches a process condition it can change. Five is a guide, not a required count. Orders ship late because packing lacks boxes. Boxes ran out because nobody noticed the stock falling. Reordering depends on someone seeing an empty shelf. There is no reorder signal because packaging was omitted from the kanban design. A two-bin loop for each box size addresses that cause.

Stopping at “someone forgot” does not explain why the process allowed a missed action to interrupt delivery. Check each causal link; some problems have several contributing causes and need more than one chain of investigation.

Combine events with daily improvement

A kaizen event brings a cross-functional team together for a few days, often three to five, to improve one process. A five-day pattern is to observe and learn, analyze waste, test changes, refine and document them, then report results and assign follow-up. The event needs owners who complete the remaining actions afterward.

Daily improvement uses short team meetings, problem boards, suggestions and coaching. An A3 report, on a 297 × 420 mm sheet, structures the background, current condition, target, cause analysis, countermeasures, plan and follow-up. Its purpose is clear PDCA thinking, not a crowded page of charts.

Make participation worthwhile

People need to trust that removing waste will not threaten their employment. Many lean organizations move freed capacity to other useful work and commit that productivity improvements will not cost employment. Leaders support participation by acting on ideas, recognizing useful contributions and helping teams check results. Measures such as lead time, defects and inventory show whether the change improved the customer's flow.

Key Takeaways

  • PDCA tests a countermeasure and makes a successful result standard.
  • Investigate causes at the gemba and verify each why.
  • Five whys can branch and need not stop at exactly five questions.
  • Kaizen events need follow-up; daily kaizen keeps improvement active.
  • Trust and timely action on ideas support employee participation.
  • An A3 report organizes problem-solving on one page.

6.2 Improving services around the customer

Lean service follows a customer or case from request to completion. Its aim is the same as in manufacturing: deliver what the customer values with less waste. In services, much of the work and waiting is hidden in information systems.

Adapt the view of flow

Customers may be present and take part in the process. Arrivals, requests, ability to complete a form, effort and preferences can all vary. Unused service capacity today often cannot be stored for tomorrow. A vacant appointment disappears, even while a backlog may remain elsewhere.

Map one customer or case across departments and include the customer's own time. A queue of claims is inventory, time awaiting approval is waiting, and reentering details is overprocessing. Correcting an erroneous form is defect-related work. Unread reports are overproduction, while ignoring staff suggestions wastes talent.

Bowen and Youngdahl introduced the term “lean service” in 1998. The application requires attention to these service conditions, not simply a copy of a factory layout.

Choose tools that fit the work

Use 5S in supply rooms and shared drives, visual controls for case status, two-bin systems for supplies and leveled appointments for routine demand. Checklists can support reliable sequences; forms that refuse invalid entries can prevent errors. Virginia Mason adopted its production system in 2002, including patient safety alerts that apply the andon idea by stopping a process when a risk is seen.

Standardize the parts where unwanted variation creates errors, while keeping judgment where customers need it. Clear form instructions reduce avoidable variation. Staff trained to handle unusual requests accommodate variation the customer values. A rigid script can obstruct care or problem-solving.

Work through a loan service

A bank's loan approval takes 12 working days of eight hours, or 5,760 working minutes. Hands-on work totals 90 minutes: data entry 10, credit check 15, underwriting 40, approval sign-off 5 and documents 20. In the bank's value analysis, underwriting and document preparation create the 60 minutes of customer value; the other steps are necessary non-value-adding work.

process cycle efficiency=605,760×100≈1.04%

A redesigned process reduces approval queues and limits cases held at each desk. Lead time falls to three working days, or 1,440 minutes, while value-adding work stays at 60 minutes. Efficiency rises to about 4.17 percent. Counting all 90 hands-on minutes as value-adding would ignore the value classification.

Leave room to respond

Chasing 100 percent staff utilization is risky when arrivals and service times vary: queues grow as utilization approaches full capacity. Cutting staff can therefore increase customer waiting even if each employee appears busier. Assess end-to-end lead time, quality and customer experience alongside resource use. Some spare capacity lets the service respond to the variation that remains.

Key Takeaways

  • Include customer time and invisible information queues in a service map.
  • Adapt visual controls, checklists, 5S and pull to the service process.
  • Reduce variation customers do not value and accommodate variation they do value.
  • Hands-on time and value-adding time can differ.
  • Variable arrivals require spare capacity to keep waiting manageable.

6.3 Adapting lean and measuring the result

Lean fits stable, repetitive demand and reliable processes especially well. Customized work, strong seasonality and fragile supply routes need adaptations. Choose buffers, capacity and control methods to match the actual risks and customer needs.

Match flow to demand and supply

Standard items with dependable replenishment can use frequent small lots and supermarkets. Custom items may fit sequential pull through bounded FIFO lanes. Leveled production can meet changing daily demand through a planned finished-goods buffer, provided the level follows the real average.

Agility is the ability to respond quickly to volatile demand. A supply chain can combine lean upstream production, where demand is aggregated and steadier, with responsive capacity or stock near the customer. The two aims can support different parts of the same chain.

Low inventory increases exposure when supply fails. After the 2011 Great East Japan Earthquake, Toyota mapped suppliers more deeply and arranged several months of stock of certain critical semiconductors. Reporting in 2021 described how that protection helped production during the chip shortage. Place protection against an identified risk and review the risk as conditions change.

Check environmental effects

Reducing scrap, overproduction, unnecessary movement and occupied space often saves materials and energy. Frequent small deliveries can, however, increase transport emissions if vehicles carry little. A milk run consolidates collections from several suppliers on a regular route. Evaluate the whole delivery pattern, not just the reduction in inventory inside one building.

Measure flow, quality and safety

Use a small set of measures: lead time, inventory, process cycle efficiency, on-time delivery, first-pass yield and safety. First-pass yield tracks output that meets requirements without rework. A shorter queue is not a successful gain if defects or injuries rise.

Inventory turns compare a cost flow with inventory valued on the same basis:

inventory turns=annual cost of goods soldaverage inventory

With annual cost of goods sold of $12 million and average inventory of $2 million, turns are six per year. Reducing average inventory to $1 million at the same cost flow gives 12 turns, roughly a month of average stock instead of two. Check delivery and supply reliability as stock falls.

Keep improvement from fading

Tools alone do not sustain lean. Leaders need to observe the work, coach people and maintain standards after the first project. Using improvements to cut jobs undermines participation. Lean emphasizes flow and waste removal; Six Sigma emphasizes variation and defects through statistical methods. They can complement each other. Start by identifying the main loss: waiting across a flow, or inconsistent output requiring a different depth of analysis.

Key Takeaways

  • Adapt pull and buffers to the pattern of demand and supply risk.
  • Agility adds responsiveness where demand is volatile.
  • Evaluate transport emissions as well as material and inventory savings.
  • Inventory turns use cost of goods sold and average inventory on matching valuation bases.
  • Check delivery, first-pass yield and safety alongside flow gains.
  • Leadership, standards and employee involvement sustain the gains.

Lean Operations examples

6 Walkthroughs

1

Follow a product from customer need to delivery

11 steps
Connect Toyota’s production system to customer value, flow and pull.
  1. 1
    IntroductionStart with the customer

    A customer wants a working product delivered on time. The operation may spend much of the delivery period moving it, holding it or correcting it.

    Lean examines that whole journey. We will connect Toyota's production system to five principles, then compare two ways to move a small batch through three steps.

  2. 2
    ExplanationWhy small lots mattered

    Ford's moving assembly line of 1913 made long runs of standard products economical. Postwar Toyota faced a smaller market wanting a varied model mix, with little capital or space.

    Small quantities of several models fit that demand, but only if switching products and dealing with problems became efficient. This need shaped a connected production system.

  3. 3
    ConnectionTwo pillars support the same goal

    TPS combines just-in-time, producing the needed amount at the needed time, with jidoka, detecting abnormalities and stopping to build quality in.

    Stable, leveled work and continuous improvement support both. Sakichi Toyoda's self-stopping looms supplied jidoka's roots; Kiichiro Toyoda promoted just-in-time, and Taiichi Ohno developed the system with Eiji Toyoda's support.

  4. 4
    ChallengeA signal without reliable work

    A factory introduces pull cards, but machines frequently fail and operators are discouraged from reporting problems. Why will the cards alone struggle to improve delivery?

    ---reveal---

    Pull depends on reliable replenishment. Failures interrupt it, and discouraged reporting leaves their causes unresolved. TPS also needs stable work and employees who can identify and solve problems.

  5. 5
    ExplanationFollow the five principles

    Begin by specifying value from the customer's view. Then identify the value stream, including the steps that add no value.

    Make value flow through fewer stops. Let the customer pull by authorizing work through actual need. Pursue perfection by repeating the cycle as improvements expose the next loss. The order keeps tools connected to a customer purpose.

  6. 6
    ExampleClassify a service visit

    A tire visit takes 65 minutes. Fitting takes 12 minutes and balancing 5, giving 17 value-adding minutes. Waiting at the counter and for a bay takes 35 minutes.

    Lifting the car takes another 3 minutes. It enables the repair but does not itself change what the customer buys, so it is necessary non-value-adding work. It belongs in the total time, not the value-adding total.

  7. 7
    ChallengeRework changes the product too

    A frame has an incorrect weld. Repairing it changes the frame into the required shape. Does that make the repair value-adding?

    ---reveal---

    No. Value-adding work must be wanted by the customer, change form, fit or function, and be done right the first time. The repair fails the last test. It consumes resources to correct a defect that should not have occurred.

  8. 8
    ExampleMove the whole batch

    Ten parts pass through three staffed steps taking one minute per part. Each step holds the batch until all 10 are complete.

    Step 1 releases the batch at minute 10. Step 2 releases it at minute 20. Step 3 finishes the first part at minute 21 and the tenth at minute 30. Much of each part's journey is waiting for the rest of its batch.

  9. 9
    ExampleMove one part at a time

    Keep the same three steps and processing times, but transfer each part as soon as it is ready.

    The first part finishes step 1 at minute 1, step 2 at minute 2 and step 3 at minute 3. The next finished part follows each minute, so the tenth finishes at minute 12. Task speed stays the same; smaller transfers remove batch waiting.

  10. 10
    ChallengeConnect efficiency to customer need

    The first step now keeps making extra parts after downstream demand is met. Why can that decision undermine the benefit of one-piece flow?

    ---reveal---

    Extra parts create inventory and waiting even if the machine looks productive. Flow needs pull as well as small transfers: upstream work must respond to downstream need. The customer gains from reliable delivery, not from an unused pile of parts.

  11. 11
    RecapRead the whole operation

    Use the customer need to define value, trace the full value stream and examine what interrupts flow. Pull limits releases, while jidoka protects the work as it happens.

    When judging a proposed improvement, ask what it changes for the customer's journey and what stable work, employee support and problem-solving it requires.

2

Find the cause behind the queue

11 steps
Identify waste, distinguish its forms and use Little’s law to interpret a change.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionObserve before selecting a tool
  2. 2
    ExplanationUse TIMWOODS as a scan
  3. 3
    ExampleOne queue, two observations
  4. 4
    ChallengeToo much output or too much work?
  5. 5
    ExplanationConnect peaks to overload
  6. 6
    ExampleKeep the weekly total, smooth the release
  7. 7
    AnalogyLower the water carefully
  8. 8
    ExampleCalculate the current average delay
  9. 9
    ChallengeA smaller pile with the same output
  10. 10
    ChallengeA busy upstream machine
  11. 11
    RecapTurn an observation into an improvement
3

Calculate and redesign a bracket value stream

15 steps
Build a current-state view, interpret its numbers and choose a workable future state.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionConnect demand to the whole route
  2. 2
    ExplanationMap one family by observation
  3. 3
    ExampleRecord the stops and the control
  4. 4
    ChallengeA fast cycle and a slow journey
  5. 5
    ExampleStep 1: find the customer pace
  6. 6
    ExampleStep 2: include uptime
  7. 7
    ExampleStep 3: turn stock into days
  8. 8
    ExampleStep 4: calculate flow efficiency
  9. 9
    ChallengeWhere does a lead-time gain come from?
  10. 10
    ExplanationStep 5: connect compatible processes
  11. 11
    ExampleStep 6: check the people needed
  12. 12
    ConnectionStep 7: release work by container
  13. 13
    ExampleStep 8: attach conditions to stock targets
  14. 14
    ChallengeOne schedule, several replenishment links
  15. 15
    RecapUse the numbers to choose the links
4

Build a small-lot pull system

18 steps
Connect pull authorization, quick setups, leveling and the kanban container count.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionMake replenishment workable
  2. 2
    ExplanationRead the authorization
  3. 3
    ChallengeStock before the final order
  4. 4
    ConnectionSupport the signal with reliability
  5. 5
    ExplanationWhy long setups favor large lots
  6. 6
    ExampleStep 1: see the economic relationship
  7. 7
    ExampleStep 2: work backward from a target lot
  8. 8
    ExplanationSeparate preparation from the stop
  9. 9
    ChallengeWhat happened to the stopped time?
  10. 10
    ExplanationLevel the demanded mix
  11. 11
    ChallengeLevel volume without ignoring demand
  12. 12
    TipProtect the next release
  13. 13
    ExplanationFollow a container through the loop
  14. 14
    ExampleStep 1: calculate the required cover
  15. 15
    ExampleStep 2: translate cover into containers
  16. 16
    ChallengeA shorter production task
  17. 17
    ChallengeA useful setup gain
  18. 18
    RecapCheck the connected design
5

Make the right work easy and errors visible

13 steps
Apply 5S, define a visible response and connect standard work to built-in quality.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionSee normal work clearly
  2. 2
    ExplanationSort and arrange for use
  3. 3
    ConnectionClean, inspect and maintain
  4. 4
    ExampleMeasure the search time
  5. 5
    ChallengeA poster or a control?
  6. 6
    ExplanationSet the current best method
  7. 7
    ExampleCheck the work against takt
  8. 8
    ExplanationStop and call for support
  9. 9
    ExplanationCheck conditions before defects form
  10. 10
    ChallengeWarning or prevention?
  11. 11
    ExampleCompare early and late repair
  12. 12
    ChallengeKeep the improvement working
  13. 13
    RecapLink the device to the work
6

Improve a process and judge the wider result

14 steps
Use PDCA, adapt lean to service work and assess flow, quality and risk together.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionA change needs evidence
  2. 2
    ExplanationPlan a test, then learn from it
  3. 3
    ExampleFind the missing replenishment rule
  4. 4
    ChallengeWhat belongs in Act?
  5. 5
    TipKeep the event connected to daily work
  6. 6
    ExplanationFollow a service case
  7. 7
    ExampleSeparate touch time from value time
  8. 8
    ExampleRemove waiting without rushing the decision
  9. 9
    ChallengeWhy keep some spare service capacity?
  10. 10
    ExplanationChoose protection for a specific risk
  11. 11
    ExampleCheck inventory turns on a cost basis
  12. 12
    ChallengeA stock gain with a transport cost
  13. 13
    ChallengeA faster service with more corrections
  14. 14
    RecapHold gains across several measures

Lean Operations practice questions

50 Practice Questions in 5 sets

Set 1: Read the map and control replenishment10 Practice Questions

Question 1 of 10

A manager introduces employee suggestions but removes positions whenever suggestions free time. Why might further improvement ideas decline?
  1. Pull requires employees to specialize more narrowly
  2. Leveled output eliminates the need for suggestions
  3. Small lots prevent teams from seeing recurring faults
  4. Staff may see improvements as a threat to employment
Show answerHide answer
Answer: D
Improvement relies on people sharing their knowledge of the work. If ideas are followed by job losses, employees may reasonably hesitate to contribute more. Small lots can reveal problems sooner; they do not remove the need for trust and participation in solving those problems.

Question 2 of 10

A team knows that a fixture repeatedly jams, but leaders never ask operators for their observations or ideas. What waste does this show most directly?
  1. Excess stock of finished products
  2. Unused employee knowledge and skills
  3. More transport between workstations
  4. Overproduction ahead of actual demand
Show answerHide answer
Answer: B
The operation is failing to use the operators’ knowledge, an example of unused talent. The repeated jam may cause waiting or defects too, but excluding the people who know the work is the loss described here. Adding inventory could hide the jam without drawing on that knowledge to remove its cause.

Question 3 of 10

A station has 420 net minutes daily, demand of 560 units, a running cycle of 42 seconds and uptime of 90 percent. What does its capacity imply?
  1. Takt is 45 seconds; effective capacity is too low
  2. Takt is 42 seconds; the station just meets demand
  3. Takt is 46.7 seconds; the station meets demand
  4. Takt is 45 seconds; the station has spare capacity
Show answerHide answer
Answer: A

Demand gives takt of 45 seconds because 420 minutes equal 25,200 seconds. The effective cycle is:

42/0.90≈46.7 seconds

It exceeds takt, so the station cannot sustain demand. Comparing the 42-second running cycle alone ignores downtime and incorrectly suggests spare capacity.

Question 4 of 10

A value stream has one final assembly cell and several upstream supermarkets. How should routine production scheduling be arranged to support pull?
  1. Send separate output schedules to every process
  2. Schedule each process to maximize its utilization
  3. Schedule suppliers; let assembly build without limits
  4. Schedule the cell; replenish upstream by signals
Show answerHide answer
Answer: D
The assembly cell can serve as the pacemaker, with upstream processes replenishing actual withdrawals. This gives one coordinated schedule across the flow. Independent schedules for every process can authorize work before it is needed and rebuild the push queues that the supermarkets were designed to control.

Question 5 of 10

Daily demand is 150 units of A, 100 of B and 50 of C. What composition should the smallest repeating mixed-model cycle have?
  1. Two A units, two B units and two C units
  2. Three A units, one B unit and two C units
  3. Three A units, two B units and one C unit
  4. Four A units, two B units and one C unit
Show answerHide answer
Answer: C
Divide all three daily quantities by 50 to obtain a 3:2:1 ratio. A six-unit cycle with that composition preserves the required mix and can be spread through the day. Equal numbers of each model would smooth the sequence but underproduce A and overproduce C relative to customer demand.

Question 6 of 10

A loop uses 360 units daily. Full replenishment takes 1.5 days, safety stock is 90 units and a container holds 50. How many kanbans are needed?
  1. 11 kanbans
  2. 12 kanbans
  3. 13 kanbans
  4. 15 kanbans
Show answerHide answer
Answer: C

Lead-time demand is 540 units, and adding 90 safety units gives 630. The container requirement is:

630/50=12.6

Round up to 13. Twelve containers hold only 600 units, below planned cover. Safety stock is added to lead-time demand before dividing by the container quantity.

Question 7 of 10

A fixture will not close when a component is inserted backward, preventing processing in that position. What quality approach does it illustrate?
  1. Final inspection of completed output
  2. Control error-proofing at the source
  3. Self-inspection after the machining step
  4. Warning-only error-proofing after assembly
Show answerHide answer
Answer: B
The fixture checks the loading condition and physically prevents the incorrect setup from proceeding. That is a control poka-yoke and source inspection. Self-inspection would check the result after a step, finding a defect that already exists; this design acts before the wrong position produces that defect.

Question 8 of 10

A permit service has 80 hands-on minutes per case, but only 50 are classified as value-adding. Lead time falls from five to two eight-hour working days. What happens to process cycle efficiency?
  1. It rises from about 2.08 percent to 5.21 percent
  2. It rises from about 3.33 percent to 8.33 percent
  3. It rises from about 2.08 percent to 3.33 percent
  4. It rises from about 5.21 percent to 8.33 percent
Show answerHide answer
Answer: A
Five working days equal 2,400 minutes and two equal 960. Using the 50 value-adding minutes gives about 2.08 percent before and 5.21 percent after. The 80 hands-on minutes include necessary non-value-adding work; using them would give 3.33 and 8.33 percent and overstate flow efficiency.

Question 9 of 10

Annual cost of goods sold remains at $8 million while average inventory falls from $2 million to $1.6 million. How do annual inventory turns change?
  1. They fall from five turns to four turns
  2. They stay at four turns in both cases
  3. They rise from four turns to five turns
  4. They rise from four turns to eight turns
Show answerHide answer
Answer: C
Use annual cost of goods sold divided by average inventory on the same valuation basis. The two ratios are four and five turns per year. A 20 percent stock reduction raises turns to five, not eight; doubling turns would require halving the inventory if the annual cost flow stayed unchanged.

Question 10 of 10

A machine repeatedly fails, but a large stock buffer keeps downstream working. What sequence best follows lean problem-solving?
  1. Remove the buffer immediately and retain current maintenance
  2. Improve reliability and lower the buffer in controlled steps
  3. Reduce the buffer to zero before investigating the failures
  4. Retain the buffer permanently and increase upstream output
Show answerHide answer
Answer: B
The buffer hides the reliability problem but currently protects downstream flow. Improve the cause and lower stock in controlled steps, checking delivery as the problem becomes visible. Removing it all before addressing the failures simply converts a hidden problem into stoppages without making the machine more reliable.
Set 2: See value, waste and the pace of demand10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A machine detects a broken feed and stops before making more faulty parts. What TPS principle does this illustrate?
  1. Heijunka: leveling the production mix
  2. Jidoka: stopping at an abnormality
  3. Just-in-time: replenishing after use
  4. Kaizen: testing a process change
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A repair center must record a mandatory safety result. The entry does not change the repaired item, and staff enter it twice because two screens are unlinked. How should lean treat the recording work?
  1. Classify both entries as value-adding work
  2. Remove both entries as avoidable waste
  3. Keep both entries as necessary support
  4. Keep the required record; remove duplication
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

Pallets are moved through an extra warehouse solely because the receiving and storage areas are poorly arranged. What waste is most directly shown?
  1. Unnecessary transport
  2. Unnecessary motion
  3. Excessive processing
  4. Excess production
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A stable process changes from average WIP of 720 units and throughput of 180 per day to WIP of 360 and throughput of 90 per day. How has average lead time changed?
  1. It fell from four to two days
  2. It rose from four to eight days
  3. It stayed at four working days
  4. It fell from eight to four days
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A value stream map shows machines and inventories but omits how departments receive orders and schedules. What important flow is missing?
  1. The path of material through storage
  2. The information directing production
  3. The route of physical customer returns
  4. The sequence of equipment maintenance
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A line is scheduled for 480 minutes a day, including 40 minutes of planned breaks and meetings. Demand is 550 units per day. What is takt time?
  1. 48 seconds per unit
  2. 52.4 seconds per unit
  3. 75 seconds per unit
  4. 80 seconds per unit
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A supply room replaces a standard item only after a department withdraws it from controlled stock. What form of production control is operating?
  1. Forecast push into finished stock
  2. Sequential pull for custom items
  3. Batch release from a fixed forecast
  4. Replenishment pull after actual use
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A case spends 15 working hours in a process, of which 36 minutes are value-adding. What is its process cycle efficiency?
  1. 2.4 percent
  2. 24 percent
  3. 4 percent
  4. 40 percent
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A team wants to see a supply shortage immediately and trigger replenishment. What arrangement most directly serves that purpose?
  1. A poster reminding staff to conserve stock
  2. A minimum line linked to a refill response
  3. A monthly report listing all stock purchases
  4. A shelf label giving the supplier address
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A team trials a new handoff method and records the results. What should it do next in PDCA before deciding to roll the method out?
  1. Compare measured results with the target
  2. Write the method into every work standard
  3. Repeat the same trial without reviewing it
  4. Expand the change to all service locations
Show answerHide answer

Save this lesson to see this answer.

Set 3: Use setup, staffing and quality evidence10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A team wants to begin lean by buying faster machines, but it has not established what customers need. What should its first decision establish?
  1. The maximum output of the busiest machine
  2. The value customers need the operation to deliver
  3. The largest batch size each department can store
  4. The weekly utilization target for every department
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A component is produced to the required tolerance, then polished further even though the extra finish has no functional or customer requirement. What waste is this?
  1. Overproduction of finished components
  2. Transport between process departments
  3. Overprocessing beyond the requirement
  4. Inventory caused by variable demand
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A planner groups two products on one value stream map because they share a sales category. They use different process routes and equipment. What should guide regrouping them?
  1. Similar routes through shared processing equipment
  2. Similar revenue totals in the annual sales report
  3. Matching package colors and customer descriptions
  4. Equal finished-goods prices and order quantities
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A bottleneck has 400 minutes available daily. Required processing takes 340 minutes. Demand needs six product runs, requiring five changeovers. Current stopped changeovers take 18 minutes each; a proposed method takes 10. What does the proposal enable?
  1. It frees 40 minutes but still leaves a 30-minute shortfall
  2. It creates 50 spare minutes beyond the required daily work
  3. It removes all setup time while leaving processing unchanged
  4. It makes the required runs feasible with 10 minutes spare
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

Annual demand is 20,000 units and annual holding cost is $5 per unit. Setup cost is $100. What setup cost makes an economic lot of 400 units possible under the basic EOQ model?
  1. $10 per setup
  2. $40 per setup
  3. $20 per setup
  4. $50 per setup
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A loop needs 840 units of planned cover, and containers hold 65 units. After rounding the container count correctly, what is its maximum authorized container capacity?
  1. 780 units in 12 containers
  2. 845 units in 13 containers
  3. 840 units in 13 containers
  4. 910 units in 14 containers
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A workplace is sorted and cleaned for a visit, but nobody owns the routines and tools gradually return to random locations. What 5S work is most directly missing?
  1. Standardize routines and sustain their use
  2. Sort useful tools into a temporary holding area
  3. Shine the same surfaces more often before visits
  4. Move labels from the tools to a monthly report
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A station produces 800 units daily, with a 1.5 percent defect rate. Repair takes 3 minutes immediately or 18 minutes after final assembly. If every defect is caught at the station, how much repair time is saved each day?
  1. 144 minutes per day
  2. 216 minutes per day
  3. 252 minutes per day
  4. 180 minutes per day
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

In improvement work, what does the term gemba mean?
  1. The report summarizing last month’s performance
  2. The target level used to judge the experiment
  3. The actual place where the work is performed
  4. The meeting where managers approve new equipment
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A supplier route changes from large deliveries to many lightly loaded trips. Inventory falls, but delivery reliability is unchanged and transport emissions rise. What improvement best addresses the trade-off while preserving small replenishments?
  1. Schedule consolidated collections from several suppliers
  2. Judge success solely by the lower inventory valuation
  3. Add trips to reduce every individual delivery quantity
  4. Increase final inspection without changing the delivery route
Show answerHide answer

Save this lesson to see this answer.

Set 4: Judge a lean design under changing conditions10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A factory copies pull cards but continues large monthly model runs, final-only inspection and separate departmental targets. Why is the change unlikely to reproduce the benefits of TPS?
  1. Its cards should authorize a larger maximum stock
  2. Its workers should focus on narrower individual tasks
  3. Its schedules should give each department more autonomy
  4. Its tools remain disconnected from flow and built-in quality
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A plant has a stable throughput of 150 units per day and average WIP of 900. It proposes a 40 percent WIP reduction, but expected throughput would fall to 120. What lead time would result, and how does it compare with keeping throughput at 150?
  1. 4.5 days; 0.9 day longer than maintaining throughput
  2. 3.6 days; 0.9 day shorter than maintaining throughput
  3. 4.5 days; the same as maintaining throughput
  4. 5.0 days; 1.4 days longer than maintaining throughput
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A custom-order workshop has varied products that rarely repeat. Two processes cannot be joined in continuous flow, but items must retain their order and upstream releases must stop when downstream space is full. What link best fits?
  1. A supermarket stocked with every possible custom product
  2. A bounded FIFO lane carrying the ordered items
  3. Independent weekly schedules for both processes
  4. An unbounded buffer sorted by upstream machine convenience
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A process starts with 200 finished units for assembly. Assembly uses 300 units during the shift and returns one authorization per 25 units used. Every returned signal can be replenished that shift, and no others are pending. The forecast plan calls for 600 units. What end-of-shift stocks result under pull and under forecast push?
  1. Pull leaves 0 units; push leaves 300 units
  2. Pull leaves 200 units; push leaves 800 units
  3. Pull leaves 200 units; push leaves 500 units
  4. Pull leaves 300 units; push leaves 600 units
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A plant produces 100 finished units each day, available for that day’s orders. Orders over four days are 80, 120, 110 and 90 units. What is the smallest initial finished stock that covers each day’s orders?
  1. Zero units
  2. Twenty units
  3. Thirty units
  4. Ten units
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

Daily demand is 240 units, replenishment takes 1.5 days and safety stock equals half a day’s demand. Containers hold 40 units. What safety factor and kanban count fit the loop?
  1. Factor 0.50 with 14 kanbans
  2. Factor one third with 12 kanbans
  3. Factor one third with 9 kanbans
  4. Factor 0.50 with 12 kanbans
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

In 5S, a team wipes down equipment and uses the activity to find leaks and worn parts. What step is it carrying out?
  1. Sort
  2. Set in order
  3. Shine
  4. Sustain
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A team’s five-whys analysis ends at “the clerk forgot the check.” Records show interruptions and no prompt at the point of entry. What should the team do before choosing a permanent countermeasure?
  1. Verify how those process conditions lead to omissions
  2. Close the analysis after exactly five questions
  3. Retrain the clerk without examining the process
  4. Adopt a checklist without testing its effect on omissions
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A service has variable arrivals and frequent rework from incomplete submissions. A proposed change removes entry checks and raises staff utilization to nearly 100 percent. Why could completion time worsen despite shorter intake?
  1. Every standardized step necessarily reduces customer value
  2. Rework can grow while little spare capacity remains for peaks
  3. A shorter intake always increases the required takt time
  4. All customer variation should be absorbed by larger backlogs
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

An operation relies on one critical part with a known disruption risk that cannot currently be removed. Why can a deliberately sized buffer fit its lean design?
  1. Every purchased item should carry the same months of stock
  2. Higher inventory removes the need to examine supply risk
  3. Any inventory increase is automatically an improvement
  4. The buffer protects delivery against a specific remaining risk
Show answerHide answer

Save this lesson to see this answer.

Set 5: Combine flow, capacity and improvement choices10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

Six items pass through three staffed stages, each taking two minutes per item. Initially, each full batch of six must finish a stage before moving. With one-item transfers and no other delays, by how much does completion of all six items improve?
  1. It improves by 10 minutes
  2. It improves by 12 minutes
  3. It improves by 20 minutes
  4. It improves by 30 minutes
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A manager removes an unread report and the double entry needed to prepare it. What wastes are directly reduced by those two changes?
  1. Transport and inventory
  2. Overproduction and overprocessing
  3. Motion and equipment overburden
  4. Waiting and insufficient capacity
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

While mapping one family, the team counts work held between two areas of continuous processing. What standard map symbol records that stock?
  1. A process data box
  2. A manual information arrow
  3. A striped production push arrow
  4. An inventory triangle with a quantity
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A cell has 390 net minutes daily and demand of 520 units. Operator work is 116 seconds per unit, including handling. A redesign removes 29 seconds without changing demand or machine capacity. What happens to its theoretical staffing lower bound?
  1. It falls from three operators to two
  2. It falls from four operators to three
  3. It stays at three operators in both cases
  4. It falls from three operators to one
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A proposed cell has a 50-second takt and two operators. At one work position, an indivisible task takes 58 seconds of one operator’s attention per unit, with room for only one unit at a time. Other operator work totals 32 seconds per unit. What must change for the cell to meet demand?
  1. Redesign the 58-second task or add suitable parallel work capacity
  2. Move part of the 32-second workload from one operator to the other
  3. Split the 32 seconds of other work equally between both operators
  4. Add a one-unit FIFO space after the existing 58-second position
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A stable flow ships 180 units daily. Average WIP is 720 units at the buyer and 360 equivalent units at its supplier. A redesign cuts buyer WIP to 360 while raising supplier WIP to 720; throughput stays unchanged. How do the buyer’s local and the combined stock-based lead-time estimates change?
  1. Local falls from four to two days; combined falls from six to four
  2. Local falls from four to two days; combined falls from six to three
  3. Local falls from four to two days; combined stays at six days
  4. Local stays at four days; combined falls from six to four days
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

With steady demand and unchanged holding cost, a setup improvement reduces cost per setup from $144 to $36. How does the basic economic lot size change?
  1. It becomes one quarter of its former size
  2. It becomes one half of its former size
  3. It becomes three quarters of its former size
  4. It becomes twice its former size
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

Daily demand is 150 A, 50 B and 100 C. A proposed six-unit cycle is “A A A B C C.” Changeovers are short enough for more frequent model changes. How can the team improve mix leveling while preserving the required cycle quantities?
  1. Repeat “A A A C C B” as one clustered cycle
  2. Run all A daily before moving on to all B and C
  3. Repeat “A C B C A B” to spread the models
  4. Repeat “A C A B A C” to spread the models
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A cell has 60-second takt and 54 seconds of operator work per unit. Loading errors create faulty parts. No additional operator capacity is available. What change both fits takt and physically prevents processing an incorrectly loaded part?
  1. Add a 4-second check of each part after the processing step
  2. Add an 8-second fixture check that blocks incorrect loading
  3. Add a 4-second fixture check that blocks incorrect loading
  4. Add a 4-second warning that permits processing after an alarm
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A clinic wants shorter customer visits. Records show duplicate registration fields, uneven appointments and longer visits for patients needing language support. What design best distinguishes avoidable variation from needs the service should accommodate?
  1. Remove duplicate fields, smooth appointments and retain flexible support
  2. Remove duplicate fields, smooth appointments and fix equal visit lengths
  3. Keep duplicate fields as extra checks, smooth appointments and offer support
  4. Remove duplicate fields, group arrivals at one time and offer flexible support
Show answerHide answer

Save this lesson to see this answer.

Stuck on your own question? Homework Help

Key Terms

94 Key Terms, each with its definition

A

A3 report
An A3 report organizes problem-solving on one sheet through background, current condition, target, causes, countermeasures and follow-up.
The team uses one page to connect the evidence for a shortage problem to its test and implementation plan.
Agility
Agility is the ability to respond quickly to volatile demand through flexible capacity, stock or other responsive arrangements.
A supply chain uses stable upstream production and flexible finishing capacity close to changing customer orders.
Andon
An andon is a visible or audible signal that calls for immediate help with an abnormality, supporting prompt response and built-in quality.
An operator presses a button when a fastening problem occurs, and the team leader comes to the station.

C

Changeover
A changeover is the work needed to switch a process from making one product to another, consuming time that affects flexibility and capacity.
A press with a long stopped changeover makes each model infrequently to avoid repeated setup losses.
Continuous flow
Continuous flow moves work directly through connected steps with little or no waiting, supported by compatible cycles and reliable processes.
Reliable assembly tasks are placed together so each part proceeds immediately to the next operator.
Customer value
Customer value is what a customer is willing to pay for in a product or service that meets a need at the right time and price.
A patient values an accurate diagnosis and effective treatment, while waiting for an available room adds delay.
Customer-introduced variability
Customer-introduced variability comes from differences in arrivals, requests, abilities, effort and preferences that shape the service process.
An appointment system smooths arrivals while staff retain flexibility for customers who need additional help.
Cycle time
Cycle time is the observed interval between units leaving a process, describing its output pace while keeping waiting time distinct.
An assembly station completes one unit every 45 seconds, while units wait much longer before reaching it.

D

Defect
A defect is a product or service that fails a requirement, causing a need for correction, rework, replacement or scrap.
An incorrect invoice is returned for correction, adding work for the provider and delay for the customer.

E

Economic lot size
The economic lot size balances setup and holding costs; in the basic model it rises with the square root of the setup cost.
Lower setup cost lets the plant make smaller lots economically while keeping demand and holding cost unchanged.
Error
An error is a mistaken action or process condition that can produce a defect if it is not prevented or corrected before affecting the output.
Loading a component backward is the error; the incorrectly processed component is the resulting defective output.
External setup
External setup is preparation or follow-up that can be performed while the machine runs, reducing the time it must remain stopped.
Tools and paperwork for the next model are brought to the press before the current run finishes.

F

FIFO lane
A FIFO lane is a fixed-capacity link that moves items first in, first out and stops upstream production when the lane is full.
Custom jobs retain their order between two processes without creating a stock of every possible product.
First-pass yield
First-pass yield is the share of output that meets requirements without rework, showing how reliably the process produces acceptable results initially.
A shorter lead time is assessed alongside the proportion of cases completed correctly without being returned.
Five whys
The five whys is a cause-investigation method that repeatedly asks why until evidence leads to an actionable process cause or causal branches.
The team traces late shipments from missing boxes to the absence of a clear replenishment signal.
Frozen schedule period
A frozen schedule period is a short interval in which the immediate production sequence is held stable so people and suppliers can execute it.
Urgent requests are assessed without continually replacing the next slot in the leveled production sequence.
Future-state map
A future-state map describes a reachable improved value stream linking work through flow and pull at the pace required by demand.
A planned map joins two processes in a cell and identifies a setup improvement needed upstream.

G

Gemba
The gemba is the actual place where work happens, where direct observation helps teams understand current conditions and verify causes.
Managers visit the packing station to see why boxes run out instead of relying only on the monthly report.

H

Heijunka
Heijunka is production leveling that spreads volume and product mix across time, creating a steadier load for upstream processes and suppliers.
A plant makes some of each model every hour instead of running one model for an entire day.
Heijunka box
A heijunka box is a scheduling board with product rows and pitch-interval columns that releases leveled work in small, regular increments.
A material handler takes the next interval’s cards to the pacemaker instead of releasing a whole day at once.

I

Information flow
Information flow is the movement of orders, schedules and signals that tells processes what to make, move or deliver and when.
A value stream map traces a customer order to production control and then to the assembly cell that receives the schedule.
Internal setup
Internal setup is changeover work that can only be performed while the machine is stopped, such as replacing a die inside the press.
Removing the installed die remains internal until a different technical method changes what requires a stop.
Inventory turns
Inventory turns measure cost of goods sold over a period divided by average inventory valued on the same cost basis, indicating stock circulation.
Annual cost flow of $6 million and average stock of $1 million correspond to six inventory turns per year.
Inventory waste
Inventory waste is raw material, unfinished work or finished output beyond the next process’s need, consuming resources and hiding problems.
A backlog of unprocessed claims ties up effort just as a pile of unfinished products occupies factory space.

J

Jidoka
Jidoka builds quality into work by detecting abnormalities, stopping the process and driving correction and root-cause removal.
A machine stops when it detects a faulty feed, allowing an operator to respond before more defects are made.
Just-in-time
Just-in-time produces and delivers the needed items at the needed time and quantity while solving the problems that drive excess stock.
Frequent replenishment works because the supplier delivers reliably and the receiving process uses small lots.

K

Kaikaku
Kaikaku is radical, large-scale change to an operation, contrasting with the small, repeated steps of daily continuous improvement.
An organization redesigns an entire production system while continuing daily kaizen within the new arrangement.
Kaizen
Kaizen is continuous improvement through small changes made by people throughout the operation, with gains held in updated standard work.
A team tries a better tool position, checks the effect and keeps the new arrangement as its normal method.
Kaizen burst
A kaizen burst is a mark on a future-state map identifying an improvement that must be completed to make the proposed flow workable.
A burst beside stamping identifies the shorter changeover needed before its supermarket can hold less stock.
Kaizen event
A kaizen event is a focused improvement project over a few days, bringing different functions together to observe, test and improve one process.
A short workshop redesigns a handoff and assigns owners to finish and sustain the changes afterward.
Kanban
A kanban is a signal authorizing production or movement of a specified quantity of a particular item within a controlled replenishment loop.
The upstream process makes one container only after its signal returns from actual downstream use.

L

Lead time
Lead time is the total time one item or case spends passing through the defined value stream, including processing and waiting.
A claim needs 40 minutes of work but takes four working days to pass through the approval process.
Lean operations
Lean operations deliver customer value through smooth flow, demand-based production and continuous improvement that removes waste.
A factory improves delivery by reducing queues and defects while involving operators in redesigning work.
Lean service
Lean service adapts customer value, flow and waste removal to service processes, including information queues and the customer’s own time.
A bank follows a loan request across departments and removes repeated entry and avoidable approval delays.
Lean Six Sigma
Lean Six Sigma combines lean work on flow and waste with statistical methods for reducing variation and defects in process output.
A team addresses long queues through lean while a separate quality analysis investigates inconsistent dimensions.
Little’s law
Little’s law relates averages in a stable flow: work in progress equals throughput rate multiplied by average lead time.
Holding 500 cases while completing 100 per day corresponds to an average of five days in the process.

M

Mass production
Mass production makes large quantities of standardized products through specialized resources and long runs that spread production costs.
A plant runs one model for weeks, holding stock between departments to keep its specialized machines working.
Milk run
A milk run is a scheduled route that collects from several suppliers or locations, consolidating transport while supporting regular replenishment.
One truck visits several suppliers instead of each sending a lightly loaded vehicle to the same plant.
Mixed-model sequence
A mixed-model sequence is a repeating order of different products that preserves the demanded proportions while spreading them through time.
A cycle containing three A units, two B and one C repeats to serve daily demand in that ratio.
Motion waste
Motion waste is unnecessary movement by people, such as walking, reaching, bending or searching while carrying out their work.
A mechanic repeatedly crosses the workshop because frequently used tools are stored far from the bench.

N

Necessary non-value-adding activity
A necessary non-value-adding activity creates no customer value but must currently be retained because of a requirement or process limit.
A required safety record remains in the repair process, while the team simplifies how staff create it.
Net available working time
Net available working time is scheduled working time after planned breaks and meetings are excluded; unplanned downtime is assessed separately.
A 480-minute shift with 30 minutes of planned breaks provides 450 minutes for the takt calculation.

O

One-piece flow
One-piece flow moves each item directly to the next step when ready, reducing the waiting caused by transferring complete batches.
Three staffed processes pass each finished item onward immediately instead of holding it for nine others.
Operator work content
Operator work content is the labor time required per unit, including handling and walking but excluding unattended machine running.
A cell’s staffing calculation includes loading and unloading even though those actions do not transform the part.
Overburden (muri)
Overburden is a load on people or equipment beyond what can be sustained safely and reliably, often caused by uneven work.
A sudden order release forces a team to rush handling and pushes machines beyond their sustainable pace.
Overprocessing
Overprocessing is effort, precision or complexity beyond what is needed to meet the customer’s requirement or a necessary process condition.
Staff type the same details into two unlinked systems even though one reliable record would meet the need.
Overproduction
Overproduction is making output earlier, faster or in a greater quantity than the customer or next process currently needs.
A kitchen prepares meals during a quiet period without orders and later has to store or discard them.

P

Pacemaker
The pacemaker is the single scheduled process that sets the value stream’s production rhythm and coordinates flow and upstream replenishment.
Final assembly receives the schedule while upstream areas replace the components that assembly consumes.
PDCA
PDCA is a learning cycle that plans a countermeasure, tests it, checks the result against a target and acts by standardizing or planning again.
A team measures shortages before and after a refill trial before deciding whether to adopt the method.
Pitch
Pitch is takt time multiplied by pack quantity, setting the interval for releasing and collecting one container-sized work increment.
A 30-second takt and a pack of 20 units give a ten-minute interval for material handling.
Poka-yoke
Poka-yoke is error-proofing through a simple device or design that prevents a mistake or makes it immediately obvious during the work.
A connector fits in only the correct orientation, preventing reversed installation during assembly.
Process cycle efficiency
Process cycle efficiency is value-adding time divided by total lead time in the same unit, often expressed as a percentage.
Reducing approval queues increases the value-adding share of the journey without rushing the actual decision.
Process data box
A process data box records observed performance beneath a process symbol, including cycle time, changeover, uptime and staffing.
On a value stream map, the box below a welding process shows a fast running cycle but low uptime, drawing attention to lost capacity.
Product family
A product family is a group of products that follow similar processing steps and shared equipment, allowing their flow to be mapped together.
Several bracket sizes share stamping, welding and assembly, so the team studies them as one family.
Production kanban
A production kanban tells an upstream process which item and quantity to make, authorizing replacement of stock consumed downstream.
A card returned from the supermarket tells machining to replenish one standard container of the named part.
Pull production
Pull production lets actual downstream use authorize upstream production or delivery, limiting the work released into the system.
A returned container signal permits replacement of the parts that assembly has just consumed.
Pure waste
Pure waste is resource use that adds no customer value and serves no necessary purpose, making it a target for elimination.
Searching through disorganized drawers delays a repair without helping the customer receive a better result.
Push production
Push production makes and sends output according to a forecast or schedule without requiring authorization from actual downstream use.
An upstream machine keeps making its daily quota even after the next department stops accepting work.

R

Replenishment lead time
Replenishment lead time is the full interval from a replenishment signal to usable replacement stock, including waiting, making and movement.
A loop’s stock covers signal collection and delivery travel as well as the minutes spent machining the part.
Replenishment pull
Replenishment pull replaces standard items withdrawn from controlled stock, allowing repeated demand to be served without separate local schedules.
A supply room refills a standard item after departments take containers, keeping the agreed stock limit.
Respect for people
Respect for people is a management approach that treats employees and partners as contributors to problem-solving and improvement.
Leaders ask technicians to redesign an awkward task and provide support to test and maintain their ideas.
Risk buffer
A risk buffer is deliberately placed stock, capacity or time that protects delivery against an identified uncertainty in the operation or supply chain.
A critical component receives targeted stock protection because an unresolved disruption would stop all output.

S

Self-inspection
Self-inspection checks output immediately after the step that made it, finding a defect before further work adds to the eventual repair effort.
An operator checks the fitted clip before the unit travels to final assembly, where repair would take longer.
Sequential pull
Sequential pull makes items to order and passes them through controlled FIFO links, avoiding stocks of every possible custom item.
A custom order moves through bounded lanes in its required sequence instead of replenishing a finished-goods shelf.
Service backlog
A service backlog is accumulated uncompleted requests or cases waiting for action, functioning as inventory in an information-based process.
A claims department has a large stock of work even though the pending cases are stored digitally.
Service utilization
Service utilization is the share of available capacity in use; with variable demand, near-full utilization leaves little room to absorb peaks.
Keeping every adviser occupied continuously can lengthen waits when several customers arrive together.
Set in order
Set in order gives needed items fixed, labeled places arranged for convenient use and return, with frequent-use items near the work.
A mechanic can retrieve and return a commonly used gauge without walking across the workshop.
Shine
Shine is the 5S step that cleans the workplace and equipment while inspecting for emerging problems such as leaks, looseness and wear.
Cleaning reveals a small oil leak before it develops into a breakdown that interrupts production.
Signal kanban
A signal kanban triggers batch production when stock falls to a set level, often serving a process with significant changeover requirements.
A stamping operation starts a replenishment batch when the signal shows its stock has reached the trigger.
SMED
SMED is a setup-reduction method aiming for single-digit changeover minutes by separating, converting and streamlining setup work.
The team prepares the next die during running, then uses preset positions to shorten the remaining stop.
Sort
Sort is the 5S step that removes items not needed for current work, separating uncertain items for a defined review before disposal.
Obsolete fixtures leave the workbench while doubtful items are tagged and held for a time-limited decision.
Source inspection
Source inspection checks the conditions required for good work before or during processing so an error can be stopped before it creates a defect.
A fixture refuses to clamp a reversed part, blocking the incorrect condition before machining starts.
Standard in-process stock
Standard in-process stock is the minimum amount of work held within a standard sequence that allows the process to operate smoothly.
A cell retains the small quantity needed for its sequence instead of treating every interstage pile as necessary.
Standard work
Standard work records the current best method through takt time, operator sequence and minimum in-process stock, providing a baseline for improvement.
Operators test a simpler loading sequence and update the shared method after verifying the gain.
Standardize
Standardize makes the first three 5S steps routine through agreed methods, visible examples, assigned responsibilities and schedules.
Photos show the correct storage state and the daily checklist assigns each area to a named role.
Supermarket
A supermarket is controlled stock of standard items from which downstream withdraws what it needs and upstream replaces only what was taken.
A shared press replenishes the parts withdrawn by several assembly cells instead of producing to independent plans.
Sustain
Sustain maintains agreed 5S routines through habits, regular review, audits and leader support so initial improvements remain useful.
A team follows up on missing tools each week and resolves the reasons people cannot return them reliably.

T

Takt time
Takt time is net available working time divided by customer demand for the same period, giving the completion interval needed to meet demand.
With 300 net minutes and demand for 600 units, a line needs to complete one unit every 30 seconds.
Toyota Production System
The Toyota Production System is an integrated production approach built on just-in-time, jidoka and a stable basis for improvement.
A team links pull replenishment with standard work and automatic fault detection instead of copying one tool.
Transport waste
Transport waste is unnecessary movement of materials, products or information between locations without adding customer value.
A pallet goes through a temporary holding area before storage, adding a move that the layout could avoid.
Two-bin system
A two-bin system uses the empty first bin as a replenishment signal while the second supplies consumption during the refill period.
Maintenance starts using its second bin of fasteners while the empty first bin is sent for replenishment.

U

Unevenness (mura)
Unevenness is variation in work volume or mix over time that creates peaks and troughs for people, equipment and suppliers.
A warehouse receives most of its weekly work on Monday, creating overtime followed by quieter shifts.
Unused talent
Unused talent is the failure to use people’s knowledge, ideas and abilities to perform suitable work and improve the process.
Operators see a recurring cause of jams, but the improvement meeting proceeds without asking for their input.
Uptime
Uptime is the percentage of planned time when equipment is available to run, allowing capacity analysis to include availability losses.
A fast running cycle still misses demand when frequent failures reduce the machine’s available production time.

V

Value stream
A value stream is the set of value-adding and non-value-adding actions, with their information flows, that deliver a product or service.
Following one order from request to delivery reveals waits between departments that each local team misses.
Value stream mapping
Value stream mapping draws material and information flows together to reveal how work is controlled and where value stops flowing.
A map shows that separate departmental schedules keep feeding a queue before final assembly.
Value-adding activity
A value-adding activity changes form, fit or function, is wanted by the customer and is completed correctly the first time.
Fitting a correct replacement part creates value; repairing an earlier fitting error is rework.
Value-adding time
Value-adding time is time spent changing a product or service in ways the customer values, with the work done correctly the first time.
A map separates the time spent shaping a part from the much longer time it waits in storage.
Variability
Variability is deviation from predictable process conditions, such as changing arrivals, unreliable supplies or equipment failures.
Late deliveries force a line to carry extra stock or leave time available to recover from interruptions.
Visual control
A visual control reveals a departure from an agreed normal condition and prompts action, connecting visible information to process control.
Stock below the marked minimum line signals the assigned handler to replenish rather than wait for a shortage.
Visual management
Visual management makes work conditions understandable at a glance, helping people recognize whether the operation is normal or abnormal.
An hourly board compares planned and actual completions so a developing shortfall is visible to the team.

W

Waiting waste
Waiting waste is delay when people, equipment or work items cannot proceed because the next required resource or condition is unavailable.
An application remains untouched for two days while staff wait for information needed to complete it.
Withdrawal kanban
A withdrawal kanban authorizes moving a specified quantity from an upstream stock location to the consuming process that needs it.
The handler uses a withdrawal signal to move a full container from the supermarket to assembly.

#

5S
5S organizes and maintains the workplace through sort, set in order, shine, standardize and sustain, making work and problems easier to see.
A maintenance team connects labeled tool locations and routine checks to less searching and fewer interruptions.

About this lesson

By StudeliReport a mistake

Make your own Study Materials

Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.