Facility Location and Layout Decisions
IntermediateLesson 5 of 9 in Operations Management Course
What you will learn
- Describe why location is a long-term strategic choice, which cost, risk and market factors shape it, and how the logic changes when a site must attract customers rather than keep costs down.
- Explain why location decisions matter and how they are madeDescribe the strategic weight of a location choice, the options a firm has, and the funnel from country to region to site.
- Weigh the factors that make a location attractiveAnalyze costs, labor productivity, exchange rates, political and cultural risk, and closeness to markets, suppliers and competitors.
- Choose locations for service businessesExplain why service locations follow customers and revenue, and use traffic counts, demographic and purchasing-power analysis, regression and geographic information systems to judge a site.
- Explain why location decisions matter and how they are made
- Use the factor-rating method, locational cost-volume analysis and the center-of-gravity method, interpret their results, and combine them into a reasoned recommendation.
- Score sites with the factor-rating methodWeight the important factors, score each site, and compare the weighted totals.
- Compare sites with locational cost-volume analysisUse fixed and variable costs to find the volume ranges in which each site has the lowest total cost.
- Locate a distribution point with the center-of-gravity methodCalculate the shipment-weighted center of the destinations a facility serves and interpret it as a starting point for site search.
- Combine the methods and recommend a locationTest how sensitive a choice is to weights and volumes, combine quantitative and qualitative evidence, and write a justified recommendation.
- Score sites with the factor-rating method
- Match the layout type to the operation's volume and variety, and arrange departments and work cells to reduce handling cost and match output to demand.
- Match the layout type to the operationDescribe the objectives of a good layout and the fixed-position, process, cellular, product and mixed layouts, and choose among them by volume and variety.
- Arrange departments in a process layoutUse flows between departments and the load-distance cost to compare and improve department arrangements.
- Design work cells that match demandExplain the requirements and benefits of work cells and use takt time to set the number of workers in a cell.
- Match the layout type to the operation
- Explain when an assembly line pays off, assign tasks to workstations with a cycle time and precedence diagram, and measure and improve the balance.
- Set up the inputs for an assembly lineDescribe when a product layout works, and build the precedence diagram and cycle time that line balancing needs.
- Assign tasks to workstationsCompute the theoretical minimum number of stations and assign tasks with a heuristic rule that respects precedence and the cycle time.
- Measure and improve the line's balanceCalculate efficiency, idle time and balance delay, and choose actions when the balance or the demand changes.
- Set up the inputs for an assembly line
- Apply layout principles to the special aims of offices (information flow), retail stores (customer exposure and spending) and warehouses (space versus handling cost).
- Design office layoutsArrange people and spaces for communication, focus and flexibility, using relationship charts and an understanding of open and enclosed workspaces.
- Plan retail layouts and servicescapesArrange a store to maximize customer exposure and profit per square meter, and shape the physical environment customers experience.
- Design warehouse and storage layoutsBalance storage space against handling cost, place goods by activity, and use cross-docking, random stocking and customizing where they fit.
- Design office layouts
Facility Location and Layout study guide
1Decide what a location must deliver
A facility ties an organization to a place for years. Its location shapes costs, customer access, and the resources available to do the work. Start by defining what the operation needs, then narrow the search from countries to regions to sites. Compare wages with productivity, assess risks and nearby markets, and use customer evidence to judge service locations. A cheap building and a promising business location can be very different choices.
1.1 Location as a long-term business choice
A location decision chooses where to place a factory, store, warehouse, office, or service center. It commits money to land, buildings, equipment, and local relationships. Moving later can mean interrupting production, training new staff, and losing customers, so location is a strategic choice.
Connect location with profit
A place shapes both revenue and cost. Labor, energy, taxes, transport, and premises costs vary between locations. For a customer-facing service, access and visibility also shape how many people buy. Efficient daily work cannot easily overcome a location customers cannot reach.
Most goods producers have a cost focus: they seek low total cost while meeting operating needs. Most retail and professional services have a revenue focus: they need a place that attracts enough suitable customers. The objective in both cases is the greatest long-run benefit, which requires looking beyond one attractive cost.
Compare the real options
A location review may follow demand growth, entry into a new market, a lease ending, changing costs or regulations, or duplicate facilities after a merger. The choice is broader than selecting a new plot.
| Option | What management considers |
|---|---|
| Expand the current facility | Can the existing land, utilities, and labor support more capacity? |
| Add a facility | Does serving another area justify running both sites? |
| Close and relocate | Do the gains cover relocation and disruption? |
| Keep the current setup | Are the benefits of changing large enough to justify the cost? |
Keeping the current setup gives a meaningful comparison. Without it, a proposal may look attractive simply because every alternative assumes a move.
Narrow the search in stages
The usual funnel has three levels. At the country level, compare political conditions, currency, culture, and labor productivity. Within a country, compare regions or communities on skills, labor supply, incentives, utilities, and quality of life. At the site level, check land price and size, zoning, environmental conditions, transport access, and room to expand.
An electronics company planning an assembly plant first shortlists two countries with stable governments and useful port links. It then compares three regions in the preferred country for wages, skills, and incentives. Finally, it compares two industrial plots for price, road access, and expansion space. Detailed plot comparisons become useful after the broader operating conditions fit.
Start with the planned operation
Capacity and process type define site requirements. A large automated plant needs different power, land, and skills from a small repair workshop. Expected output also changes which cost structure is attractive. A low-wage site with unreliable power or scarce technical skills can be expensive per finished unit. Compare total costs, revenues, and risks over the facility's life before recommending a location.
Key Takeaways
- Location commits resources for years and shapes both cost and revenue.
- Compare expansion, addition, relocation, and keeping the current setup.
- Narrow large searches through country, region, and site decisions.
- Use process and capacity needs to define site requirements.
1.2 Compare costs, productivity, proximity, and risk
Location factors are conditions that differ between places and influence a facility's success. Their importance depends on the work. A semiconductor plant needs skills, reliable power, and clean water; a call center needs language skills and telecom links; a cement plant gives heavy weight to transport because its inputs and outputs are bulky.
Measure what each place really costs
Tangible costs can be measured in money: premises, wages, utilities, taxes, insurance, and transport. Intangible costs are harder to price, including training quality, community attitudes, quality of life, and stable local rules. Leaving an intangible factor out gives it no weight even when it affects performance.
Wages must be considered with productivity:
At Site A, a worker earns $120 per day and makes 40 units: labor cost is $3.00 per unit. At Site B, a worker earns $45 and makes 12 units: labor cost is $3.75 per unit. The lower daily wage produces the higher unit labor cost.
Exchange rates can change a foreign site's cost after investment. A monthly invoice of 500,000 local currency units costs $25,000 at 20 local units per dollar. If the local currency strengthens to 18 per dollar, it costs about $27,778, an increase of about 11.1%. The invoice stayed fixed locally; each dollar now buys fewer local units.
Assess operating conditions over time
Political risk is the possibility that government action harms the operation. Changes to tariffs, taxes, contracts, or ownership rules can alter an investment's value. Instability, corruption, intellectual-property protection, environmental rules, and labor rules also matter. Check whether the firm can uphold its ethical standards in the proposed operating conditions.
Culture and community affect language use, teamwork, authority, punctuality, unions, and acceptance of the industry. Evaluate these conditions with local evidence. A temporary grant or tax reduction can help a project, but a benefit lasting a few years should not determine a decision lasting decades.
Ask what the operation needs nearby
| Proximity | Why it can help |
|---|---|
| Markets | Shorter journeys for visiting customers or bulky, perishable, or costly-to-ship products |
| Suppliers | Easier movement of heavy or perishable inputs and support for small, frequent deliveries |
| Competitors | Shared skills, specialist suppliers, research links, or customer traffic |
The last pattern is clustering. Technology businesses may share a skilled labor pool; neighboring car dealers can attract customers who want to compare offers. Competition can therefore create a location advantage as well as a challenge.
A further distinction separates supply-side factors, which affect production costs, from demand-side factors, which affect customer value and service. Labor, land, energy, and transport are supply-side examples; convenience, location image, suitable skills, and site suitability can strengthen demand. A factor's role follows the business problem. Choose factors and weights for the facility being planned, because one standard checklist cannot capture every operation's priorities.
Key Takeaways
- Compare labor cost per unit by dividing wages by output.
- Currency movements can change foreign costs even when local prices stay fixed.
- Include intangible conditions and long-term risks alongside measurable costs.
- Market, supplier, and competitor proximity offer different benefits.
- Supply-side factors affect cost; demand-side factors affect customer value and service.
1.3 Find the customers a service location can reach
For many services, customers travel to the facility. Nearby sites can have similar costs yet very different sales. Service location therefore usually emphasizes revenue: who can reach the business, who wants its offer, and how much those customers are likely to spend.
Define the drawing area
The customer-drawing area is the area from which a service attracts customers. Its population and income shape purchasing power. Demographic analysis looks at age, household size, education, income, and other customer characteristics. Purchasing-power analysis estimates spending on the type of service offered. A large population is useful only if enough people need and can afford that service.
A site's image should fit its target customers. Nearby competitors, the quality of neighboring businesses, the building, parking, visibility, and access all influence sales. Opening hours, operating policies, and management also affect performance, so even a strong site needs a suitable service operation.
Interpret traffic counts
A traffic count records people or vehicles passing during a defined period. It helps businesses that depend on passing trade, such as coffee shops, fuel stations, and convenience stores. Count at times relevant to the business and consider whether the passing traffic can become customers.
A highway carrying 8,000 vehicles a day may offer fewer usable visits than a slow street carrying 3,000 if highway drivers cannot easily stop. The difference is access, not simply the number of vehicles. A busy route used mainly by people outside the target group may also produce little useful demand.
Estimate sales from existing outlets
Regression analysis links revenue at existing outlets to measured site characteristics. Suppose a chain estimates:
The result is in dollars per year. At 8,000 vehicles per day, the traffic contribution is $96,000; adding $50,000 gives estimated annual revenue of $146,000. The coefficient connects a daily traffic measure to annual sales; it is not a price paid by each passing driver.
The estimate depends on the outlets used to fit the relationship. A site with very different access, customers, or traffic levels may lie outside that experience. Treat its estimate as less reliable and seek more evidence.
Combine the evidence on a map
A geographic information system (GIS) stores map layers such as roads, population, income, competitors, and customer addresses. It can identify households within a travel-time boundary and show areas already served by competitors. A straight-line radius can miss the effects of a river or limited crossing points; travel access helps define the useful market.
Finally, compare estimated revenue with total operating costs. Occupancy costs cover the premises: rent, property taxes, insurance, and maintenance. Add staffing and other running costs before judging profit. A high-rent, high-traffic site can lose money. The revenue focus is a general tendency: a back-office service center with no visiting customers may emphasize cost, while a factory serving local customers may earn more through faster delivery.
Key Takeaways
- Service sites usually need suitable customer access and spending power.
- Traffic counts need to reflect customers who can and will stop.
- Regression estimates are less reliable for sites unlike the data used to fit the model.
- GIS combines location evidence in map layers.
- Compare revenue with occupancy, staffing, and other operating costs.
- A service without customer visits may have a cost focus.
2Compare sites and test the recommendation
Different location methods answer different questions. Factor rating combines priorities that use different measures; cost-volume analysis shows how output changes the cost ranking; center of gravity points toward a useful distribution area. Work through each calculation, then test the inputs that could change the decision. The final recommendation connects the numbers with site feasibility, business needs, and the risks management will accept.
2.1 Build a fair weighted site comparison
The factor-rating method combines different location factors into one score for each site. It can bring measurable costs together with judgments about skills, community, or quality of life. The total expresses the priorities and evidence entered into the model.
Screen before scoring
Start with must-have conditions, such as a required permit or minimum electrical supply. Remove sites that fail them. Strong scores elsewhere cannot compensate for an operation that cannot legally or physically run.
Next list the factors that distinguish the feasible sites. Assign each a weight reflecting its importance; weights must total 1 or 100%. Choose a common scoring scale, such as 0–100. Define what high and low scores mean before scoring the sites so judgments remain comparable.
For every factor, higher must mean better. If the factor is land cost, the cheaper site receives the higher attractiveness score. Entering raw costs beside high-is-good quality scores would reward expensive land.
Calculate the weighted totals
Multiply each score by its weight, then add the products:
Here, the site total combines factor weights and site scores. Consider three sites:
| Factor | Weight | A | B | C |
|---|---|---|---|---|
| Labor availability | 0.30 | 80 | 65 | 90 |
| Customer proximity | 0.25 | 70 | 90 | 60 |
| Land and building cost | 0.20 | 60 | 80 | 70 |
| Transportation access | 0.15 | 90 | 70 | 80 |
| Community | 0.10 | 75 | 85 | 60 |
For A, the weighted contributions are 24.0, 17.5, 12.0, 13.5, and 7.5, totaling 74.5. B contributes 19.5, 22.5, 16.0, 10.5, and 8.5, totaling 77.0. C contributes 27.0, 15.0, 14.0, 12.0, and 6.0, totaling 74.0.
B is preferred on this model. C leads on labor availability, the most heavily weighted factor, but the complete set of contributions favors B. The largest individual score cannot replace the weighted total.
Check what the total hides
Weights and scores involve judgment. Ask whether the scoring evidence is current and whether managers have a shared understanding of the scale. A small score gap may reflect uncertain judgments as much as a meaningful advantage.
Related factors also need care. Road access and transportation cost may reward the same feature twice. Keeping both can be justified if they capture distinct benefits, but their combined weight should reflect the importance of that advantage.
Test a close result by varying plausible weights or scores while keeping the weights normalized. If a modest change reverses the ranking, gather better evidence on that input. A recommendation can then explain both which site leads and which management priorities support that lead.
Key Takeaways
- Screen out sites that fail must-have conditions before scoring.
- Weights total 1, and every scale points toward higher-is-better.
- Multiply scores by weights and compare the complete totals.
- Check related factors for double counting.
- Test close rankings against plausible changes in judgments.
2.2 Find the output ranges where each site is cheapest
Locational cost-volume analysis, also called locational break-even analysis, compares the annual cost of producing at different sites. A site with a low initial commitment may suit low output, while a site with higher fixed cost can become cheaper when its lower unit cost applies to many units.
Write comparable cost lines
For each site:
Fixed cost is the annual cost that stays unchanged within the planned range. It includes rent for land and buildings, insurance, property taxes, core staff, and depreciation of buildings and equipment. Land itself is not depreciated. Variable cost per unit covers costs that change with output, such as materials, direct labor, production energy, and unit transportation.
Use a common year, currency, output measure, and product mix. Plot volume horizontally and total annual cost vertically. The intercept is fixed cost; the slope is variable cost per unit.
Calculate the crossovers
| Site | Annual fixed cost | Variable cost per unit |
|---|---|---|
| 1 | $300,000 | $60 |
| 2 | $500,000 | $40 |
| 3 | $800,000 | $25 |
Set two total-cost lines equal and solve for volume:
Sites 1 and 2 cross at 10,000 units; Sites 2 and 3 cross at 20,000; Sites 1 and 3 cross at about 14,286. With three sites, each pairwise crossing must be checked against the third site.
At 15,000 units, variable costs are $900,000, $600,000, and $375,000. Adding fixed costs gives totals of $1,200,000, $1,100,000, and $1,175,000. Site 2 is cheapest. The crossing of Sites 1 and 3 near 14,286 does not change the best site because Site 2 is below both cost lines there.
Read the lowest cost line
Site 1 is cheapest below 10,000 units. Site 2 is cheapest between 10,000 and 20,000 units. Site 3 is cheapest above 20,000. At each boundary, the neighboring best sites tie. A comparison at only one forecast volume hides how demand could change the recommendation.
If price and volume are the same at every site, lowest cost also means highest profit. At a price of $100 and 15,000 units, revenue is $1,500,000 at each site; profits are $300,000, $400,000, and $325,000. When sites have different selling prices or customer demand, calculate each site's revenue and subtract its total cost.
Keep the model within its range
The method assumes constant fixed cost over the relevant range, a constant variable cost per unit, an estimable volume, and one product or a fixed mix. A capacity expansion can change fixed cost, so an existing line should not be extended beyond the range it describes. Compare plausible demand scenarios and include costs such as relocation, training, and start-up losses in the decision.
Key Takeaways
- Write each cost line as fixed cost plus variable cost per unit times volume.
- A pairwise crossover matters only if those sites are on the lowest cost line.
- With equal revenue, the cheapest site is also the most profitable.
- Compare profit when site revenues differ.
- Use consistent periods and test plausible output ranges.
- Land is not depreciated.
2.3 Calculate a shipment-weighted location
The center-of-gravity method suggests an area for a single distribution facility serving several destinations. It uses shipment quantities to give busy destinations greater influence. The output is a coordinate pair from which to begin searching for real sites.
Put destinations on a common grid
Use one origin and one scale for both coordinates, such as kilometers east and north of a reference point. Record each destination's horizontal coordinate, vertical coordinate, and shipment quantity for the same period. If transportation effort depends on tonnes, use tonnes as the weight; a count of deliveries would describe a different pattern.
The weighted coordinates are:
Multiply each coordinate by that destination's quantity, add the products, and divide by total quantity. Calculate the two axes separately. If all quantities are equal, these become ordinary coordinate averages.
Work through four stores
| Store | East, km | North, km | Tonnes per month |
|---|---|---|---|
| A | 20 | 60 | 400 |
| B | 50 | 80 | 250 |
| C | 70 | 30 | 300 |
| D | 90 | 70 | 150 |
The total quantity is 1,100 tonnes. For the east coordinate, the products are 8,000, 12,500, 21,000, and 13,500, totaling 55,000. Dividing by 1,100 gives 50.0 km.
For the north coordinate, the products are 24,000, 20,000, 9,000, and 10,500, totaling 63,500. Dividing by 1,100 gives about 57.7 km. The suggested point is near (50.0, 57.7).
The ordinary average of the four locations is (57.5, 60.0). The weighted point is farther west because western Store A receives the largest shipment quantity. Ignoring quantities gives every store equal influence even when their transport needs differ.
Interpret the result accurately
The weighted average minimizes the sum of quantity-weighted squared straight-line distances. It does not generally minimize total tonne-kilometers. For these stores, the point minimizing plain weighted distance lies near (45.0, 62.0). Its total is about 33,740 tonne-kilometers per month, compared with about 34,135 at the center of gravity, roughly 1% lower.
The transport setting assumes a single facility and costs tied to quantity and straight-line distance at a common rate in every direction. Real roads, rivers, borders, tolls, and land availability can make a nearby point much more useful than the calculated coordinate. A mathematical point could even fall in water or protected land. Inspect practical sites nearby, estimate their actual journeys, and compare their other costs and operating conditions before choosing one.
Key Takeaways
- Use a common coordinate grid and shipment period.
- Weight each coordinate by shipment quantity and divide by total quantity.
- Equal shipment weights reduce the calculation to ordinary averages.
- The weighted center minimizes weighted squared distance, not total tonne-kilometers.
- Check real sites, routes, and constraints near the computed point.
2.4 Turn calculations into a defensible recommendation
A location recommendation brings several kinds of evidence together. Factor rating describes how sites meet priorities, cost-volume analysis compares cost structures, and center of gravity suggests a distribution area. Each leaves part of the business question unanswered.
Give each method a clear job
| Method | Useful contribution | What still needs checking |
|---|---|---|
| Factor rating | Combines measurable and judgmental factors | Evidence quality, weights, and overlapping factors |
| Cost-volume analysis | Shows cost rankings across output levels | Unpriced factors and site-specific revenues |
| Center of gravity | Identifies a shipment-weighted search area | Feasible land, labor, risk, and actual routes |
A practical sequence starts by screening must-have conditions. For distribution, identify promising areas with center of gravity; for services, use market analysis. Shortlist sites with factor rating, compare their costs or profits across likely volumes, and examine the remaining qualitative risks.
Test the assumptions that matter
Sensitivity analysis asks how much an input must change before the recommendation changes. A robust choice survives reasonable changes. A close or unstable result identifies where more evidence could be valuable.
In the factor-rating example, B starts at 77.0, A at 74.5, and C at 74.0. Move 0.05 of weight from customer proximity to labor availability, keeping total weight at 1. B falls to 75.75, C rises to 75.5, and A rises to 75.0. B still leads, but narrowly.
Move 0.10 instead and C reaches 77.0, A 75.5, and B 74.5. B and C tie when about 0.055 of weight is transferred. This exposes a judgment management must settle: how much does labor availability matter compared with customer proximity? Changing a weight without reducing another would change the total and spoil the comparison.
Test the demand range
In the cost-volume example, Site 2 is cheapest at 15,000 units and remains cheapest between 10,000 and 20,000. If annual demand could reach 25,000 units, Site 3 costs $1,425,000, compared with $1,500,000 at Site 2. A recommendation for Site 2 needs to identify the growth level at which the cost ranking changes.
Use plausible scenarios, with the same time period and output definition for every site. Include one-time differences such as relocation, training, and start-up losses. A recurring annual-cost advantage may take years to recover a large initial expense.
Write a recommendation management can use
Name the preferred site and the evidence supporting it. State expected volume, key cost estimates, and scoring priorities. Give the sensitivity result and the main unresolved risks, such as exchange rates, political changes, or an incentive ending. Finally, identify what would change the choice. Avoid presenting a decimal score as if its inputs were exact measurements: the useful precision lies in explaining the trade-off and its decision boundary.
Key Takeaways
- Use each method for the question it can answer.
- Screen feasibility before comparing attractiveness.
- Sensitivity analysis identifies changes that reverse a ranking.
- Keep weights normalized when transferring importance.
- State the choice, evidence, assumptions, risks, and decision-changing conditions.
3Match the layout to the work
The arrangement inside a facility determines how far work travels and how easily people respond to changing demand. Match the layout to product volume and variety before drawing departments or workstations. Use movement data to improve a process layout, then examine how work cells bring related operations together. Staffing calculations set a useful lower bound, but the work sequence and time available determine whether that bound can be achieved.
3.1 Choose the arrangement that fits volume and variety
A layout arranges departments, workstations, equipment, storage, and aisles inside a facility. It follows the chosen process and capacity. Good layouts use resources well, shorten movement, support customer contact, provide safe and pleasant work, and allow adaptation. These objectives can conflict: packing equipment tightly may save floor space but block movement or expansion.
Compare the main layout types
| Type | Arrangement and fit | Main trade-off |
|---|---|---|
| Fixed-position | The product stays still; resources come to it. Suits one-off or very low-volume work. | Space and deliveries must be coordinated around the product. |
| Process, or functional | Similar activities share departments; each job follows its own route. Suits low volume and high variety. | Flexible routes bring travel, waiting, and difficult scheduling. |
| Cellular | People and equipment serve a family of similar products. Suits moderate volume and variety. | Smooth flow depends on having a suitable product family. |
| Product, or line | Workstations follow the operation sequence. Suits high volume and low variety. | Low unit cost comes with limited flexibility and linked stoppages. |
A fixed-position layout suits ships, buildings, large machines, aircraft final assembly, and surgery. Moving the main product would be difficult or undesirable. Materials needed at the site change as work progresses. Producing modules elsewhere and timing deliveries can relieve congestion.
In a process layout, a machine shop might put all drilling machines in one department and all grinding machines in another. Different jobs visit different combinations. A hospital similarly groups specialized functions. Sharing specialist resources supports variety, but jobs may wait and travel between departments.
A work cell brings the resources for one product family close together. A part can pass through the cell from start to finish instead of returning repeatedly to distant departments. The cell combines some routing flexibility with more direct flow.
A product layout arranges operations in their common sequence, as in bottling, car assembly, or a cafeteria line. High, steady volume spreads investment over many units. If one essential station stops, the linked flow can stop too.
Recognize mixed layouts
A mixed or hybrid layout combines arrangements within one facility. A hospital can have functional departments, a cell-like emergency unit, and fixed-position operating rooms. Choose at the level of the work being arranged; an entire building need not use one pattern.
Offices emphasize information flow, stores customer exposure, and warehouses the balance between space and handling. These purposes adapt the basic layout ideas to different flows.
The volume-variety position is a starting guide. A dedicated line may look efficient yet remain idle if demand is low or products need very different routes. Check whether the intended output and variety can keep its specialized resources productively occupied before accepting its apparent unit-cost advantage.
Key Takeaways
- Match layout to process, capacity, volume, and variety.
- Fixed-position layouts bring resources to a stationary product.
- Process layouts share similar resources across varied jobs.
- Cells organize resources around product families.
- Product layouts favor high-volume, standardized flow.
- Mixed layouts combine arrangements within one facility.
3.2 Place heavily connected departments close together
A process layout groups similar work into departments. The design problem is where each department should go. Shortening a heavily used route usually saves more handling than shortening a rarely used route by the same distance.
Build the flow and space picture
Create a flow matrix, or from-to chart, showing the number of loads moved between departments per period. A load can be a pallet, patient, document, or group of people. Establish department space needs and fixed constraints, including loading docks, plumbing, and heavy equipment. Sketch a feasible arrangement before calculating its movement cost.
The load-distance cost is:
The flow is the number of loads between departments; the movement cost per load often equals distance times a rate per load-meter. With a common rate, compare total load-meters first, then multiply by that rate. A directional chart counts each journey once. If pair totals already combine both directions, do not add them again.
Compare two arrangements
Four equal departments occupy a row with neighboring positions 15 m apart. Weekly pair flows are A–B 50, A–C 100, A–D 20, B–C 30, B–D 80, and C–D 10 loads.
| Pair | Distance in A-B-C-D | Load-meters |
|---|---|---|
| A–B | 15 m | 750 |
| A–C | 30 m | 3,000 |
| A–D | 45 m | 900 |
| B–C | 15 m | 450 |
| B–D | 30 m | 2,400 |
| C–D | 15 m | 150 |
The total is 7,650 load-meters per week. Both heavy pairs, A–C and B–D, travel 30 m. Try C-A-B-D so both become neighbors.
In that order, the six pair contributions are 750, 1,500, 600, 900, 1,200, and 450 load-meters, totaling 5,400. At $0.50 per load-meter, weekly handling cost falls from $3,825 to $2,700. Checking all 24 possible orders confirms that 5,400 is the minimum for this row; D-B-A-C gives the same result in reverse.
Improve without assuming perfection
There are factorially many arrangements: ten departments in ten positions already give 3,628,800 possibilities. Larger problems use heuristics, often swapping pairs and retaining improvements. CRAFT is a classic example. Such searches can find good arrangements without proving they are globally best.
Where movements are hard to count, use closeness ratings and record the reason: A absolutely necessary, E especially important, I important, O ordinary closeness, U unimportant, X undesirable. Shared staff may justify A; noise may justify X. Bring A pairs together and separate X pairs.
Handling cost is one objective. Reject an arrangement that blocks safe movement, breaks a fixed physical constraint, or removes needed expansion space, even if its calculated handling cost is lower.
Key Takeaways
- Weight distances by the flows that travel along them.
- Count directional movements or combined pair totals once.
- Check space needs and fixed constraints before swapping departments.
- Heuristics improve large layouts without guaranteeing the best possible arrangement.
- Closeness ratings capture relationships that movement counts miss.
3.3 Build and staff a work cell
A work cell groups people and machines around a family of products with similar processing steps. Equipment that once sat in separate departments now supports a short flow through one area. A U shape can reduce walking, let workers tend nearby machines, and make staffing easier to adjust as demand changes.
Establish a suitable product family
Group technology classifies parts by features such as shape and processing needs. This helps identify product families that can share a cell. Workers need training and flexibility, engineers or support staff help establish the cell, and testing or mistake-proofing at each station catches defects promptly.
Cells can reduce work-in-process, raw-material and finished-goods inventory, floor space, direct labor cost, and equipment investment. They can also raise equipment use and employee involvement. The family must support continuing demand; equipment dedicated to a disappearing family can stand idle.
A focused work center applies the idea to a larger area within a facility. A focused factory dedicates a whole facility or separate building to a product family or customer segment.
Turn customer demand into a time allowance
Takt time is the production pace needed to meet demand:
Use the same period for both quantities and subtract planned breaks and stops. For 600 units in an 8-hour shift with 30 minutes of breaks, available time is 450 minutes, or 27,000 seconds. Dividing by 600 gives 45 seconds per unit.
If operations take 20, 25, 40, 30, and 35 seconds in sequence, total work content is 150 seconds per unit. The theoretical staffing minimum is:
Three workers provide only 135 seconds of work per takt cycle, so rounding down would leave a shortfall.
Prove that the assignment fits
| Worker | Operations assigned | Workload |
|---|---|---|
| 1 | First and second | 45 s |
| 2 | Third | 40 s |
| 3 | Fourth | 30 s |
| 4 | Fifth | 35 s |
All workloads fit 45 seconds while preserving the sequence. Include any necessary walking when checking an actual cell; spare time can support small improvements.
The rounded minimum is a lower bound, not an assignment. If the same tasks occurred in the order 25, 40, 30, 20, and 35 seconds, every pair of neighbors would exceed 45 seconds. No grouping into four neighboring workloads would fit. That arrangement needs five workers unless work is shortened, split, or rearranged. Total work content alone cannot reveal this restriction; the sequence must be tested.
Key Takeaways
- A cell needs a stable product family, flexible workers, and quality checks.
- Takt time uses net available time divided by demand for the same period.
- Round total work content divided by takt upward for the staffing lower bound.
- Confirm staffing with feasible workloads in the required sequence.
- Include walking and other assigned work in each worker’s load.
- Focused work centers and focused factories extend the cell idea.
4Build and improve a balanced line
A product line must give each station enough time to complete its work while maintaining the required sequence. Demand sets the time allowance, and task times set a lower bound on staffing. Build the precedence relationships, assign eligible tasks, and compare the resulting station loads. Efficiency and idle time help judge a balance, while changes in demand or normal task-time variation can require a different arrangement or more capacity.
4.1 Set the sequence and pace for an assembly line
A product layout works well when high volume keeps specialized equipment busy, demand supports the investment, and the product and its supplies are standardized. Reliable parts of consistent quality help the linked stations maintain their flow.
Understand what the line promises
A fabrication line builds components, often through a sequence of machines. An assembly line joins components at workstations. Both can offer low variable cost, little handling, low work-in-process, simple training and supervision, and fast throughput.
The investment needs enough volume to pay for it. Product variety and changes in production rate are harder to accommodate, a stopped station can halt the line, and repetitive work can reduce motivation. These costs belong in the choice of process as well as the later station design.
Assembly-line balancing assigns tasks to as few workstations as possible while respecting two constraints: the required task order and the time allowance at each station. Similar station workloads reduce idle time.
Build the precedence diagram
A precedence diagram represents tasks as nodes labeled with times. An arrow points from a task to a successor that depends on its completion. A task becomes eligible only after all its predecessors have been assigned in a valid order.
Use this running example:
| Task | Time | Immediate predecessors |
|---|---|---|
| A | 25 s | None |
| B | 10 s | A |
| C | 35 s | A |
| D | 20 s | B |
| E | 45 s | C |
| F | 25 s | C |
| G | 15 s | D and E |
| H | 35 s | F and G |
The branches are A to B to D, and A to C to E or F. D and E meet at G; F and G meet at H. Seeing one predecessor completed is insufficient at either merge. Total work content is 210 seconds.
Calculate the required cycle time
Here, cycle time means the maximum station time allowed per unit to meet output:
An 8-hour day with no planned stops provides 28,800 seconds. For 400 units, the required cycle time is 72 seconds. This allowance plays the same demand-setting role as takt time. In other usage, cycle time can mean the observed interval between completed units; distinguish the demand allowance from measured performance.
Check the longest task
With indivisible tasks and no parallel duplication, the cycle cannot be shorter than the longest task. Task E takes 45 seconds, so the line's maximum possible daily output under this restriction is 640 units, from 28,800 seconds divided by 45. This bound still leaves the problem of grouping all the other tasks into feasible stations. A target cycle below 45 seconds requires changing the work or duplicating its capacity.
Key Takeaways
- Product lines need sufficient volume, standardization, and reliable supplies.
- Precedence arrows show which tasks must finish before others start.
- Cycle time is available production time divided by required output.
- Every predecessor must be satisfied at a merge.
- The longest indivisible task limits the shortest feasible cycle.
4.2 Assign eligible tasks within the station time
Line balancing starts with a lower bound, then builds a feasible assignment. Dividing total work content by the required cycle time and rounding upward gives the theoretical minimum number of stations:
For 210 seconds of work and a 72-second cycle, the quotient is about 2.92, so at least three stations are needed. Precedence and task sizes may force more.
Use a repeatable assignment rule
Open a station and identify tasks whose predecessors have been assigned and whose times fit the remaining allowance. Choose among those tasks using a priority rule, subtract the time, and update eligibility. Continue until no eligible task fits, then open another station. Predecessors may be earlier in the same station if the work is done in that order.
Common heuristics include longest task time, shortest task time, most or fewest following tasks, and ranked positional weight. Positional weight adds a task's own time to the times of all its followers; count each follower once even when branches merge. Fix a tie-break rule in advance, such as choosing the longer task first.
Apply longest task time
Using the running eight-task example:
- Station 1: A takes 25 seconds, leaving 47. B and C are eligible; C is longer at 35 seconds, leaving 12. B then fits at 10 seconds. Total: 70 seconds.
- Station 2: D, E, and F are eligible. E takes 45 seconds, leaving 27. F takes 25 and is longer than D, so assign F next. Total: 70 seconds.
- Station 3: Assign D for 20 seconds. G is now eligible because D and E are complete; it takes 15 seconds. H follows because F and G are complete and adds 35 seconds. Total: 70 seconds.
Every station fits 72 seconds, and three stations reach the lower bound.
Compare another heuristic
Most-following-tasks gives the same first station, A-C-B. At Station 2, E and D each have two followers; choosing the longer E first, then D, gives 65 seconds. Station 3 receives F and G, totaling 40 seconds. Adding H would raise that total to 75, so H needs a fourth station by itself. Ranked positional weight also gives four stations here.
No priority rule wins on every problem. Try several and retain the best feasible assignment. Before accepting it, verify every task is assigned once, all predecessors are respected, and no station exceeds the cycle allowance. Test normal task-time variation before expecting the planned output in operation.
Key Takeaways
- The rounded theoretical minimum is a lower bound.
- Choose only tasks that satisfy precedence and fit the remaining time.
- Update task eligibility after every assignment.
- A heuristic’s priority never overrides feasibility.
- Try several heuristics because their results can differ.
- Reaching the station lower bound proves the station count cannot be reduced.
4.3 Measure idle time and respond to demand changes
Two feasible balances can meet the same output with different resource use. Efficiency measures how much of the available station time contains assigned work. Idle time measures the unused seconds per cycle; balance delay expresses that unused share as a percentage.
Use the same cycle-time basis
Use the number of stations actually assigned, and state the cycle time used for the balance. For three stations, 210 seconds of work, and a 72-second cycle, available station time is 216 seconds. Efficiency is about 97.2%, idle time is 6 seconds, and balance delay is about 2.8%. Each 70-second workload leaves two seconds unused.
For the four-station most-following-tasks balance, available station time is 288 seconds. Efficiency is about 72.9%, idle time 78 seconds, and balance delay about 27.1%. The extra station requires another station and worker to produce the same required output.
Distinguish required pace from actual loading
The longest station in the three-station balance contains 70 seconds of work. If the line is paced at 70 seconds, calculated output becomes about 411 units per day, and efficiency on that basis is 100%. At the required 72-second pace, it remains 97.2%. These figures answer different pacing questions; reporting the denominator makes them interpretable.
A station filled to its allowance leaves little room for normal variation. Small delays can spread along a tightly coupled line. A slightly lower planned efficiency can support more reliable output and better working conditions.
Rebalance when demand rises
If demand rises from 400 to 450 units per day, 28,800 available seconds give a 64-second cycle. Total work divided by 64 is about 3.28, so the station lower bound becomes four.
With longest-task-time priority, the assignments are A-C, B-E, F-D-G, and H. Their workloads are 60, 55, 60, and 35 seconds. The third station completes F and D before G; E is already finished at Station 2. Efficiency is about 82.0%, from 210 divided by 256 available station-seconds. The former 70-second station loads cannot meet the new allowance.
Choose an improvement that addresses the limit
Trying another heuristic can reduce idle time without changing the tasks. A long task may need splitting, better tools, or more skilled work. A parallel station can duplicate bottleneck capacity, while flexible staff can share work between neighboring stations. Overtime or extra shifts increase the available production time and relax the required pace. Check the cause of the shortfall before choosing an action: adding time elsewhere will not shorten an unchanged bottleneck task.
Key Takeaways
- Efficiency divides work content by actual station count times the balancing cycle.
- Idle time is unused station-seconds per cycle; balance delay is the unused share.
- State the cycle-time basis when comparing efficiency figures.
- Higher demand shortens the allowed cycle and can require more stations.
- Improve the limiting work, assignment, or available time.
- Allow for normal variation and repetitive-work effects when judging a balance.
5Arrange spaces for information, customers, and goods
Office, retail, and warehouse layouts serve different flows. Office design supports communication and focused work; store design shapes what customers see and how they shop; warehouse design trades storage density against travel and handling. Use each setting’s purpose to judge the arrangement. The same square meter can save rent, enable useful contact, expose a profitable product, or shorten a picking route, depending on how the operation uses it.
5.1 Support communication and focused work in offices
An office layout arranges people, equipment, and spaces to support information flow. Electronic communication changes what needs to be nearby, but face-to-face handovers, shared equipment, confidential work, and organizational culture still make physical arrangements important.
Map relationships before placing desks
A relationship chart gives each pair of teams, departments, or rooms a closeness rating and a reason. Use A for absolutely necessary, E for especially important, I for important, O for ordinary closeness, U for unimportant, and X for undesirable. Reasons may include frequent contact, shared staff, noise, confidentiality, and security.
In a small firm, Sales and Customer Service receive A because they hand over customer cases throughout the day. Finance and Human Resources receive E because they share payroll data. Reception and the server room receive X for security, while Sales and the server room receive U. Put the frequent handover teams together and protect the server room from public access. An X relationship can reflect a need for separation even when two areas have little direct workflow.
Match the setting to the task
| Setting | Useful feature | Planning concern |
|---|---|---|
| Open-plan office | Shared space with few physical barriers and lower floor-space use | Noise, interruptions, and limited privacy |
| Enclosed office | Privacy and fewer distractions for focused or confidential work | More space per worker |
| Activity-based working | Choice of settings for different tasks | Enough of each setting, plus booking and storage arrangements |
Removing walls does not reliably increase face-to-face communication. In two field studies by Bernstein and Turban, face-to-face interaction fell by about 70% after firms moved to open-plan offices, while email and messaging increased as staff sought privacy. This result gives a reason to examine actual work patterns before assuming physical openness will produce more collaboration.
A mixed office can provide quiet rooms, meeting rooms, and shared areas. Activity-based working lets staff choose a focus booth, team table, or meeting room instead of assigning every person a desk. When many people work elsewhere for part of the week, this can improve space use. It also requires sufficient space for the tasks people need to do at the same time.
Evaluate the whole work experience
Ergonomics includes adjustable furniture and suitable lighting. Clear escape routes and access for people with disabilities must be part of the arrangement. Movable partitions and modular furniture make regrouping teams easier without rebuilding.
Floor-space savings are only one part of cost. Closely packed desks may increase interruptions and make focused analysis difficult. Include the effects on concentration, turnover, and service when comparing layouts. The relationship chart helps identify useful proximity; the type of workspace determines whether people can do their work effectively once they are there.
Key Takeaways
- Use relationship charts to connect closeness decisions with reasons.
- Match quiet, shared, and confidential spaces to the work.
- Open-plan space does not reliably increase face-to-face contact.
- Activity-based working needs enough suitable settings and practical support.
- Include ergonomics, access, safety, and future regrouping in the plan.
5.2 Use retail space to support shopping and profit
A retail layout aims to maximize profit per square meter. Product exposure helps create sales, so stores arrange routes and displays to bring customers into contact with useful merchandise, especially high-margin and impulse items. The arrangement should also fit how customers choose, move, and pay.
Place products for useful exposure
Five supermarket layout ideas work together:
- Place high-draw items, such as milk, bread, or fresh produce, around the edges so customers pass other goods.
- Give high-impulse and high-margin items prominent positions.
- Spread power items, which can dominate a shopping trip, across the store and on both sides of aisles.
- Use end-aisle displays, or end caps, for highly visible promotions.
- Let the lead-off department, the first department entered, communicate the store's mission, such as freshness or low prices.
These choices use destination products to bring people into the store and exposure to make additional purchases possible. Crowding every attractive product near the entrance would reduce exposure to the rest of the floor.
Match the floor pattern to shopping behavior
| Pattern | Arrangement | Typical fit |
|---|---|---|
| Grid | Parallel aisles | Efficient, routine grocery shopping |
| Loop or racetrack | A main route around the store | Exposure across several departments |
| Free-form | Irregular displays and routes | Browsing, often in fashion retail |
Copying a pattern from another kind of store can make shopping harder. A routine shopper's need to find familiar items differs from a browser's interest in discovering displays.
Compare what the space earns
Space productivity divides annual sales or gross margin by floor area. One category earns $120,000 on 40 m², or $3,000 in sales per m². Another earns $90,000 on 60 m², or $1,500 per m². The first has twice the sales density, but the figures do not yet establish which space change raises profit. Check gross margins and whether the second category draws customers who buy other goods.
A slotting fee is a payment suppliers make for shelf placement or prime space. It reflects scarce shelf capacity and the cost and risk of introducing products. Such fees can make customer access harder for small suppliers.
Design the servicescape
The servicescape is the physical service environment and its effect on customers and employees. Its three elements are ambient conditions; spatial layout and functionality; and signs, symbols, and artifacts.
Ambient conditions include lighting, temperature, noise, music, and scent. Layout and functionality cover the placement and usefulness of furniture, displays, and equipment. Signs, décor, style, and objects communicate purpose and quality.
A quick-service restaurant uses clear queues, bright lighting, and durable seating to support quick turnover. Fine dining uses softer light, quieter music, and more space between tables to support longer visits. Choose environmental features that help the service deliver its intended experience.
Key Takeaways
- Retail layout targets profit per square meter through customer exposure.
- Use destination items, prominent displays, end caps, and the lead-off department deliberately.
- Match grid, loop, or free-form patterns to shopping behavior.
- Compare margin and customer-drawing effects before reallocating floor space.
- Slotting fees price scarce shelf access and can disadvantage small suppliers.
- Servicescapes combine ambient conditions, functional layout, and signs or artifacts.
5.3 Trade warehouse space against handling effort
A warehouse layout balances storage-space cost against handling cost. Using the full building height can reduce the floor area needed, but tall, dense storage can require more expensive equipment and make goods slower to reach. The best layout considers travel, storage volume, access, and work areas together.
Plan the direction of flow
Handling depends on trips, distance per trip, and the equipment used. Decide where receiving and shipping docks go, how aisles run, how wide they need to be, what racks to use, and where goods will be stored.
| Pattern | Dock arrangement | Main benefit |
|---|---|---|
| U-flow | Receiving and shipping on the same side | Shared docks and flexible door use |
| Through-flow | Receiving and shipping on opposite sides | Separate inbound and outbound flow for high, steady volumes |
The building and traffic pattern influence which arrangement is practical. Short routes also need enough space for the work performed along them.
Put activity close to the starting point
Fast-moving goods should be close to the docks or picking start point. Suppose X is picked 200 times daily, Y 20 times, and slots are 10 m and 40 m from the dock one way. Each trip goes out and back, so the travel distances are 20 m and 80 m.
With X near and Y far, daily travel is 5,600 m: X accounts for 4,000 m and Y for 1,600 m. Reverse the slots and travel becomes 16,400 m: X accounts for 16,000 m and Y for 400 m. The same storage capacity produces very different handling effort because frequent trips get the shorter route in the first arrangement.
The cube-per-order index also accounts for storage size:
P requires 2.0 m³ and receives 400 orders monthly, giving 0.005. R requires 1.0 m³ for 80 orders, giving 0.0125. Q requires 6.0 m³ for 300 orders, giving 0.02. Assign the closest suitable slots in the order P, R, Q. A low index identifies much order activity relative to the space occupied.
Make room for the operating method
Cross-docking transfers goods from incoming to outgoing vehicles with little or no storage. It reduces inventory, space, and handling, but requires synchronized arrivals and departures and accurate identification, commonly with barcodes or RFID.
Random stocking puts goods in any open location instead of reserving a fixed home slot. It improves space use because empty slots are available to other items. An accurate information system must record each location and support efficient picking routes.
Customizing adds work such as labeling, kitting, packaging, simple assembly, or repair near the customer. Its work areas need space alongside storage. A floor plan that fills every available area with racks can leave too little room to perform these value-added services.
Key Takeaways
- Balance space density against travel, equipment, and handling costs.
- U-flow shares one dock side; through-flow separates receiving and shipping sides.
- Place fast-moving goods near the docks or picking start.
- Lower cube-per-order indexes receive the closest suitable space.
- Cross-docking depends on synchronization and accurate identification.
- Random stocking depends on accurate location records.
- Customizing requires work areas as well as storage.
Facility Location and Layout examples
1Choose What a Location Must Offer
12 steps
- 1IntroductionA place becomes part of the operation
A site commits the organization to local resources, routes, and customers for years. A low rent can look attractive while hiding difficult deliveries or a poor labor fit.
Build the decision around what the facility must do. Then compare locations in stages, measure operating costs, and test whether the people passing a service site are customers it can actually serve.
- 2ExplanationStart with the business objective
Most goods producers emphasize low total operating cost. Customer-facing services usually emphasize revenue because access changes who visits and spends. Both seek the greatest long-run benefit.
Capacity and process needs give this objective physical meaning: the facility needs enough land, power, labor, and transport access to carry out its planned work. These requirements come before a favorite site.
- 3ExampleNarrow the search
An electronics firm needs an assembly plant. It first compares countries for stable operating conditions and useful port links. It then compares regions for wages, technical skills, utilities, and incentives.
Only after that does it compare available industrial plots for price, road access, and expansion space. The country–region–site funnel keeps detailed land choices tied to broader operating needs.
- 4ChallengeDoes a lease ending force a move?
A distributor’s lease is ending, but its current building still supports demand. Management compares only new buildings. What important option is missing?
---reveal---
Keeping the current setup, through a renewed lease, should also be compared. Lease expiry triggers a location review; it does not establish that moving creates value. Staying may avoid relocation, training, and disruption costs.
- 5ExampleCompare output as well as wages
A worker at A earns $120 per day and makes 40 units; at B, a worker earns $45 and makes 12. Divide each wage by its matching output.
A costs $3.00 per unit and B $3.75. The cheaper daily wage produces the more expensive unit. Use the same time period for both figures, then compare the other location costs before judging the whole site.
- 6ExampleTrack the currency denominator
A supplier bills 500,000 local units monthly. At 20 local units per dollar, the invoice costs $25,000. At 18 per dollar, the same invoice costs about $27,778.
The local currency has strengthened: each dollar buys fewer local units. The dollar cost rises about 11.1%, even though the supplier’s local price has not changed. This is a continuing exposure after the location is chosen.
- 7ConnectionProximity can solve different problems
A plant using heavy inputs may benefit from being near suppliers. A service customers visit benefits from being near its market. Firms near competitors may share skilled labor, specialist suppliers, or customer traffic: this is clustering.
The operation determines the priority. A cement plant, call center, and specialist store need different mixes of transport, skills, infrastructure, and access.
- 8ChallengeJudge a short-lived incentive
Two sites meet a plant’s needs. One offers a large grant for three years but has higher ongoing transport costs. What should management compare before choosing it?
---reveal---
Compare the grant with total costs and benefits over the facility’s life, including the years after it ends. A temporary benefit may help, but transport costs continue. The decision also needs the sites’ skills, infrastructure, and risks.
- 9ExplanationAsk who can become a customer
Service location analysis combines demographics, spending power, competitors, visibility, building quality, and access. A traffic count is useful when the passing people match the target customers and can reach the business.
A highway with 8,000 vehicles daily can be less useful than a slow street with 3,000 if highway drivers cannot stop easily. Count relevant opportunities for visits, not traffic alone.
- 10ExampleEstimate and map reachable demand
A chain’s model estimates annual revenue as $50,000 plus $12 times daily traffic. At 8,000 vehicles, the traffic contribution is $96,000, giving $146,000 in estimated annual sales.
Check that the candidate resembles the existing outlets behind the model. GIS adds map layers for roads, households, income, and competitors, helping identify customers within a practical travel time.
- 11ChallengeBring access and total cost together
A service site has strong pedestrian traffic. Estimated annual revenue is $260,000; premises cost is $65,000 and staffing plus other running costs total $205,000. Is traffic enough to recommend this site?
---reveal---
No. Total operating cost is $270,000, leaving an estimated $10,000 loss. Traffic helps explain revenue, but the location still needs suitable access and enough sales to cover all operating costs.
- 12RecapUse a complete location comparison
Define the facility’s purpose and capacity needs, compare the real options, and narrow the search from country to region to site.
Measure labor cost per unit, include currency and operating risks, and choose proximity factors that fit the work. For services, connect reachable customers with revenue and then total operating cost.
2Score Sites and Test the Winning Choice
16 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionGive each method a job
- 2ExplanationBuild a consistent scoring system
- 3ExampleAdd the weighted contributions
- 4ChallengeScreen or compensate?
- 5ExplanationRead the annual cost lines
- 6ExampleFind the boundaries between winners
- 7ChallengeCheck a third site at the crossing
- 8Key InsightKnow when profit replaces cost
- 9ExplanationPrepare the shipment data
- 10ExampleCalculate the east coordinate
- 11ExampleCalculate north and interpret the point
- 12ChallengeIs the weighted point an exact transport optimum?
- 13ExampleMove weight without changing the total
- 14TipUse the demand forecast as a range
- 15ChallengeWrite the decision-changing condition
- 16RecapFrom models to a site decision
3Choose a Layout and Staff a Cell
13 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionDesign around the flow of work
- 2ExplanationFollow volume and variety
- 3ExampleA facility can combine layout types
- 4ChallengeWould a line fit these orders?
- 5ExplanationMultiply distance by movement
- 6ExampleShorten the heavy routes
- 7ChallengeCheck a promising swap
- 8ExplanationBring a product family into one area
- 9ExampleTurn demand into takt
- 10ExampleCheck the minimum with actual workloads
- 11ChallengeSame total, different feasibility
- 12ChallengeConnect the cell with its neighbors
- 13RecapFit, movement, and staffing
4Balance an Assembly Line Step by Step
15 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionEvery station must keep the pace
- 2ExplanationRead the task network
- 3ExampleCalculate the time allowance
- 4ChallengeWait for every incoming branch
- 5ExplanationFind a bound before assigning
- 6ExampleFill Station 1
- 7ExampleFill Station 2
- 8ExampleComplete Station 3
- 9ChallengeCan a priority rule overrule a time limit?
- 10Key InsightCompare another rule’s result
- 11ExampleMeasure the three-station balance
- 12ChallengeInterpret a different denominator
- 13ExampleRecalculate for higher demand
- 14ChallengeChoose a response to the actual limit
- 15RecapKeep precedence, pace, and performance aligned
5Lay Out Offices, Stores, and Warehouses
14 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionOne floor area, different purposes
- 2ExplanationPlace teams using relationship reasons
- 3Key InsightChoose settings for actual tasks
- 4ChallengeCheck a space-saving proposal
- 5ExplanationUse destination products to create exposure
- 6ExampleFit the route to shopping behavior
- 7ExampleSeparate sales density from profit
- 8ChallengeChange the environment to fit the service
- 9ExplanationBalance density with access
- 10ExampleGive frequent picks the short trip
- 11ExampleInclude size in placement priorities
- 12ConnectionPlan space for more than storage
- 13ChallengeMatch the layout to a new service
- 14RecapUse the measure that matches the space
Facility Location and Layout practice questions
Set 1: Use Location and Layout Evidence10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Costs, Customers, and Workstation Basics10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Compare Alternatives and Check Feasibility10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Test Priorities, Constraints, and Changing Demand10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Make Integrated Operating Decisions10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Activity-based working
Assembly line
Assembly-line balancing
Attractiveness score
B
Balance delay
C
Cellular layout
Center-of-gravity method
Closeness rating
Clustering
Coordinate grid
Cost focus
CRAFT
Cross-docking
Crossover volume
Cube-per-order index
Customer-drawing area
Customizing
Cycle time
D
Demand-side factor
Demographic analysis
Double counting
E
Eligible task
Enclosed office
End-cap display
Ergonomics
F
Fabrication line
Factor weight
Factor-rating method
Fixed cost
Fixed-position layout
Flow matrix
Focused factory
Focused work center
G
Geographic information system
Group technology
H
Heuristic
High-draw item
I
Idle time
Intangible cost
L
Labor cost per unit
Layout
Lead-off department
Line efficiency
Load-distance cost
Location decision
Locational cost-volume analysis
Longest-task-time rule
Loop layout
M
Mixed layout
Must-have condition
O
Occupancy cost
Open-plan office
P
Parallel station
Political risk
Power item
Precedence diagram
Predecessor
Process layout
Product family
Product layout
Purchasing-power analysis
R
Random stocking
Ranked positional weight
Rebalancing
Regression analysis
Relationship chart
Relevant range
Revenue focus
Robust recommendation
S
Scenario
Sensitivity analysis
Servicescape
Shipment weight
Site
Slotting fee
Space productivity
Start-up loss
Supply-side factor
T
Takt time
Tangible cost
Theoretical minimum station count
Through-flow
Tonne-kilometer
Traffic count
U
U-flow
V
Variable cost per unit
W
Work cell
Work content