The Scrum Framework

Learn how Scrum works as defined in the 2020 Scrum Guide. Explore the theory and values behind it, the accountabilities of the Product Owner, the Scrum Master and the Developers, and the five events of a Sprint. See how the Product Backlog, the Sprint Backlog and the Increment, with the Product Goal, the Sprint Goal and the Definition of Done, keep work transparent. Follow one Sprint from planning to retrospective and learn to tell Scrum's rules apart from common add-on practices and myths.

BeginnerLesson 2 of 6 in Agile and Scrum Course

What you will learn

  1. Describe Scrum as a lightweight framework for complex work, explain how empiricism and lean thinking shape it through transparency, inspection and adaptation, and show how the five Scrum values make those ideas work in a team.
    • Describe Scrum as a lightweight framework
      Define Scrum, describe the kind of work it suits, outline how its parts fit together in one cycle and recognize the Scrum Guide as the source that defines it.
    • Apply empiricism through transparency, inspection and adaptation
      Explain empiricism and lean thinking as the theory behind Scrum and use the three pillars of transparency, inspection and adaptation to analyze real team situations.
    • Recognize the five Scrum values in daily teamwork
      Describe commitment, focus, openness, respect and courage, explain how they build trust and make the pillars work, and recognize behavior that lives or breaks each value.
  2. Describe the Scrum Team as one self-managing, cross-functional unit and explain the separate accountabilities of the Developers, the Product Owner and the Scrum Master, including what each does not do.
    • Describe the Scrum Team as a whole
      Explain the size, makeup and characteristics of a Scrum Team: one team with three accountabilities, no sub-teams or hierarchy, cross-functional and self-managing.
    • Describe the Developers' accountabilities
      Explain who the Developers are and what they are accountable for: the Sprint plan, quality through the Definition of Done, daily adaptation toward the Sprint Goal and holding each other accountable.
    • Describe the Product Owner's accountability
      Explain how the Product Owner maximizes the value of the product through effective Product Backlog management, why the Product Owner is one person, and how stakeholders influence the product through them.
    • Explain how the Scrum Master serves the team, the Product Owner and the organization
      Describe the Scrum Master's accountability for establishing Scrum and for the team's effectiveness, and the ways the Scrum Master serves the Scrum Team, the Product Owner and the wider organization.
  3. Explain the purpose, participants, inputs, outcomes and timeboxes of the Sprint and the four events inside it, and recognize what turns each event into something it is not.
    • Explain the Sprint as the container for all work
      Describe the Sprint's length, purpose and rules, what may and may not change during it, how progress can be forecast, and when and by whom it can be cancelled.
    • Plan a Sprint and set its Sprint Goal
      Run Sprint Planning around its three topics (why, what and how), use the right inputs, and produce a Sprint Goal, the selected Product Backlog items and a plan for delivering them.
    • Hold an effective Daily Scrum
      Explain the purpose, participants and timebox of the Daily Scrum, and distinguish it from a status meeting.
    • Inspect the outcome with stakeholders in the Sprint Review
      Explain the purpose, participants, content and timebox of the Sprint Review and why it is a working session rather than a demo or a release gate.
    • Improve the way of working in the Sprint Retrospective
      Explain the purpose, content and timebox of the Sprint Retrospective and how the team turns its findings into concrete improvements.
  4. Explain the Product Backlog, the Sprint Backlog and the Increment, and the commitment that gives each one focus: the Product Goal, the Sprint Goal and the Definition of Done.
    • Manage the Product Backlog toward a Product Goal
      Describe the Product Backlog as an emergent, ordered list, explain refinement and readiness, and use the Product Goal as its long-term target.
    • Use the Sprint Backlog and the Sprint Goal to steer a Sprint
      Describe the Sprint Backlog as the Developers' plan, explain the Sprint Goal as its commitment, and handle changes during the Sprint without losing the goal.
    • Deliver a usable Increment that meets the Definition of Done
      Explain what an Increment is, how the Definition of Done decides what counts as part of it, who creates the Definition of Done, and what happens to work that does not meet it.
  5. Trace one Sprint from start to finish to show how accountabilities, events, artifacts and commitments connect, and tell the rules of the Scrum Guide apart from practices that teams commonly add.
    • Trace one Sprint from planning to retrospective
      Follow a Sprint step by step and connect each event to the artifact it inspects, the commitment it uses and the accountability that leads it.
    • Tell the Scrum Guide's rules apart from common practices and myths
      Distinguish what the 2020 Scrum Guide requires from popular practices that teams add, recognize outdated terms and myths, and answer certificate-style questions from the Scrum Guide.

Scrum Framework study guide

5 chapters

1

How Scrum supports learning

Complex work brings questions that a detailed starting plan cannot settle. Scrum gives people a small, repeatable structure for making progress and learning from results. Its theory explains why visible work, frequent inspection, and prompt adjustment matter. Its values explain the behavior that lets a team report problems honestly, make difficult decisions, and keep working toward shared goals when the original plan needs to change.

1.1 A small framework for complex work

Scrum helps a team create value when it cannot know the whole solution in advance. A new appointment app, for example, involves uncertainty about what clinic staff need, what clients will use, and which technical choices will work. The team makes a usable result, learns from it, and adjusts its next choices.

What the framework provides

Scrum is a lightweight framework for adaptive solutions to complex problems. It defines accountabilities, events, artifacts, and rules. It deliberately leaves room for the team to choose its tools and techniques. A task board or a way of writing requirements can help a particular team without becoming a Scrum requirement.

Its three accountabilities are Product Owner, Scrum Master, and Developers. Its five events are the Sprint, Sprint Planning, the Daily Scrum, the Sprint Review, and the Sprint Retrospective. Its three artifacts are the Product Backlog, Sprint Backlog, and Increment. Each artifact has a commitment: Product Goal, Sprint Goal, and Definition of Done, respectively.

Follow the basic cycle

The Product Owner orders possible improvements in the Product Backlog. In Sprint Planning, the Scrum Team agrees on a Sprint Goal, and the Developers select work and make a plan. During the Sprint, they build and verify a usable Increment. The team and stakeholders inspect the results, and the team improves its way of working before the cycle repeats.

A Sprint has a fixed length of one month or less. Scrum is iterative because this cycle repeats. It is incremental because the product grows through usable additions. Repeating meetings alone does not make work incremental: the team needs a result people can use, with the required quality.

For the veterinary appointment app, one Sprint might add a working way to cancel a booking. Clinic staff can try it and reveal a need the team missed. In a service-design team, the Increment could be a usable improvement to an appointment service. Scrum is used in software, education, marketing, research, and other complex work.

Where Scrum is defined

Ken Schwaber and Jeff Sutherland define Scrum in the Scrum Guide. The current edition was published in November 2020. It is free and about 13 pages long. The name draws on a 1986 Harvard Business Review article by Hirotaka Takeuchi and Ikujiro Nonaka, which used a rugby comparison for overlapping product-development work. Schwaber and Sutherland presented Scrum together in 1995; the first Scrum Guide followed in 2010.

Calling Scrum a complete methodology can create the expectation that it supplies every step and template. It does not. At the same time, its core elements are not a menu: each has a purpose in the framework. Removing the Sprint Retrospective removes the formal chance to improve how the team works.

Key Takeaways

  • Scrum provides a small structure for adapting to complex problems.
  • Each Sprint creates a usable addition and a chance to learn.
  • The 2020 Scrum Guide defines the framework.
  • Teams choose practices inside Scrum while preserving its core elements.

1.2 Make work visible, learn, and adjust

A plan for complex work starts with gaps in knowledge. Scrum makes those gaps manageable by grounding decisions in what the team can observe. Empiricism means learning from experience and making decisions from observation. Lean thinking means reducing waste and concentrating on what is essential.

The three pillars

Transparency gives people a shared, accurate view of the work and process. The people doing the work and receiving its results need to understand the true state of the artifacts. A green status marker is little help if one person reads it as "coded" and another reads it as "ready to use."

Inspection means checking the artifacts and progress toward goals often and carefully enough to find unwanted differences or problems. Inspecting real results can reveal a mistaken assumption. Looking only at a planned finish date may hide that the product still cannot do what users need.

Adaptation means changing the product or process when inspection reveals an unacceptable result or a process outside acceptable limits. Make the adjustment as soon as possible. A useful observation loses value when nobody has the authority or willingness to act on it.

The pillars depend on one another. Without transparency, people inspect a misleading picture. Without adaptation, inspection produces observations without improvement. Self-management helps the people closest to the work respond quickly.

Diagnose a misleading result

Suppose the veterinary-app team's board shows four features as "done." All four still need testing required by the Definition of Done. Clinic managers see the board and plan to use the features.

  1. Identify the transparency problem: the board's label hides unfinished work.
  2. Restore an honest picture: mark the features as unfinished and use the Definition of Done consistently.
  3. Inspect what is actually usable and how that affects progress toward the goal.
  4. Adapt the plan to complete the necessary quality work and revise expectations.

Holding a longer Review without correcting the labels would still leave people inspecting the wrong picture. More inspection cannot repair inaccurate information by itself.

Use the events as a rhythm

Sprint Planning creates a plan using the team's current understanding. The Daily Scrum inspects progress toward the Sprint Goal and adapts the Sprint Backlog. The Sprint Review inspects the Sprint's outcome and helps adapt the product's future direction. The Sprint Retrospective inspects the team's way of working, including its Definition of Done.

These events guarantee regular opportunities to inspect and adapt inside the Sprint. They do not require the team to wait. If a Developer discovers today that a planned approach cannot work, the Developers can replan today and collaborate with the Product Owner if scope needs to change. Waiting until the next event would allow the problem to grow.

Key Takeaways

  • Empiricism bases decisions on experience and observation.
  • Lean thinking reduces waste and keeps attention on essentials.
  • Transparency enables useful inspection; inspection enables adaptation.
  • Adjust promptly when a problem is found, including during a Sprint.
  • The Scrum events provide a regular rhythm for inspection and adaptation.

1.3 Put the five values into action

Scrum depends on how people behave when plans become difficult. The five values—commitment, focus, openness, respect, and courage—guide decisions that make honest inspection and useful adaptation possible. They become visible in actions, especially when a comfortable choice would hide a problem.

Commitment and focus

Commitment means pursuing goals and supporting one another. The Developers commit to the Sprint Goal. This allows them to change the exact work as they learn while staying directed toward the same objective. Promising every selected item regardless of new information confuses a forecast of work with the commitment to a goal.

For example, the veterinary-app team aims to let clients pay for booked appointments. A receipt design proves harder than expected. The Developers and Product Owner agree on a simpler receipt that still supports the goal. The team stays committed while adapting the work.

Focus directs the team's attention to the Sprint's work and the best possible progress toward its goals. An unrelated side project can divide that attention even if it sounds valuable. The Developers can bring the request to the Product Owner for Product Backlog consideration instead of quietly starting a second initiative.

Openness and respect

Openness means being honest about the work and its challenges with the team and stakeholders. Saying, "The payment connection is harder than expected, and we may miss part of our plan," gives others time to respond. Hiding the difficulty until the final day makes the artifacts less trustworthy and narrows the team's choices.

Respect means recognizing others as capable, independent people. Team members can question an idea while listening seriously to the person offering it. A manager who allows Developers to decide how to build a feature respects their professional judgment and self-management. Respect does not require agreement with every suggestion.

Courage when the decision is difficult

Courage means doing the right thing and tackling tough problems. A Product Owner may need to explain to a senior stakeholder why a requested feature has less value than other work. A Developer may need to say that a seemingly finished feature fails the Definition of Done. A Scrum Master may need to raise an organizational barrier that people prefer to ignore.

One action can express several values. Reporting an integration risk early shows openness; raising it despite pressure to look successful can also show courage. Values are not exclusive labels attached to isolated behaviors. What matters is whether the behavior helps the team work honestly toward its goals.

When people practice the values, they build trust. Openness supports transparency, courage supports honest inspection, and respect helps people adapt together.

Key Takeaways

  • The five values are commitment, focus, openness, respect, and courage.
  • Commitment to the Sprint Goal allows the exact work to change.
  • Openness makes challenges visible while there is time to respond.
  • Respect supports professional judgment and self-management.
  • Courage includes raising difficult problems and defending sound decisions.
  • Living the values builds trust that supports the three pillars.
2

Work together with clear accountabilities

A Scrum Team shares responsibility for a valuable, useful result, while its three accountabilities give different decisions a clear home. The Product Owner directs product value, Developers organize delivery, and the Scrum Master enables effective Scrum. Understanding those boundaries helps people collaborate without turning product authority into task assignment or service into supervision. Team size, combined skills, and self-management make that collaboration workable.

2.1 One self-managing Scrum Team

A Scrum Team brings the people needed to create a valuable, useful Increment into one cohesive unit. It has one Product Owner, one Scrum Master, and Developers. These are accountabilities within Scrum, so a person's workplace job title may use different words.

Small enough to work together

The team is typically 10 or fewer people, including the Product Owner and Scrum Master. It needs to be small enough to respond quickly and large enough to complete significant work within a Sprint. This is guidance about a useful team size, not a rule that every team must have exactly 10 members.

The veterinary-app team has seven people: a Product Owner, a Scrum Master, and five Developers. The Developers include people specializing in app development, back-end work, testing, and design. The specialties differ, but the group works as one team toward one Product Goal.

There are no sub-teams or internal hierarchies in the Scrum Team. The Product Owner's authority over Product Backlog ordering does not make that person the Developers' supervisor. The Scrum Master's leadership does not create authority to assign their tasks.

Cross-functional and self-managing

Cross-functional means the members collectively have the skills needed to create value each Sprint. It does not require every person to master every specialty. A team with designers and testers can be cross-functional while individuals retain different strengths. A group that must routinely hand work to a separate testing team to make it usable is missing a needed capability.

Self-managing means the team decides internally who does what, when, and how. Within that team, Developers choose how to turn selected work into a usable Increment. An outside manager assigning each Developer a daily task replaces an internal decision that belongs to the team.

These two qualities solve different problems. Cross-functionality provides the capability to complete the work; self-management provides the authority to organize it. A skilled team still lacks self-management if it waits for outside task assignments. An empowered team still lacks a needed capability if nobody can verify its product.

Responsibility spans the product

The Scrum Team's work includes stakeholder collaboration, research, experimentation, development, verification, maintenance, and operation. It is not limited to making new features. The entire Scrum Team is accountable for a valuable, useful Increment every Sprint, while each accountability carries its own specific duties.

If a team becomes too large, it should reorganize into multiple cohesive Scrum Teams focused on the same product. Those teams share the same Product Goal, Product Backlog, and Product Owner. Splitting the people does not mean splitting the product's direction into competing backlogs. The older term "Development Team" can suggest a team inside the team; the 2020 Scrum Guide uses "Developers" to emphasize one Scrum Team.

Key Takeaways

  • A Scrum Team has one Product Owner, one Scrum Master, and Developers.
  • A typical Scrum Team has 10 or fewer people in total.
  • Cross-functionality concerns combined skills; self-management concerns internal decisions.
  • The Scrum Team has no sub-teams or internal hierarchy.
  • The whole team is accountable for a valuable, useful Increment every Sprint.

2.2 Developers plan, build, and adapt

In Scrum, Developers are the people committed to creating any aspect of a usable Increment each Sprint. The name describes their accountability, not a requirement to write software. Designers, testers, analysts, and programmers can all be Developers. In a marketing product, the Developers could include writers and data analysts.

Four continuing accountabilities

The Developers are accountable for:

  • Creating the plan for the Sprint: the Sprint Backlog.
  • Building quality into the work by following the Definition of Done.
  • Adapting their plan each day toward the Sprint Goal.
  • Holding one another accountable as professionals.

The last point supports self-management. Team members make commitments to one another and address problems together; they do not need the Scrum Master to become their line manager.

Choose the work and its approach

In Sprint Planning, the Developers discuss possible work with the Product Owner and select Product Backlog items. They decide how much they can take on using their understanding of the work, past performance, upcoming capacity, and the Definition of Done. They then decide how to create the usable Increment. The Product Owner helps explain value and trade-offs but does not assign individual tasks.

The Developers who will do the work also size Product Backlog items. A Product Owner can clarify a requirement or explain a trade-off that changes the Developers' understanding. That influence differs from setting the estimate or approving a size as a command.

For example, a payment feature could support several payment methods or one initial method. The Product Owner explains which would provide useful value first. The Developers assess the work involved and make their own sizing judgment. Scrum does not require them to use story points or a particular sizing technique.

Adapt the plan together

Suppose a Developer on the clinic-app team becomes ill during the Sprint. At the Daily Scrum, the remaining Developers inspect progress toward the Sprint Goal. They rearrange the remaining work and update the Sprint Backlog. If achieving the goal requires changing the selected scope, they collaborate with the Product Owner to negotiate that change.

The Developers own the Daily Scrum and choose its structure. It is their chance to inspect progress and adjust upcoming work. They can also have detailed discussions and replan during the day; adaptation is not limited to those 15 minutes.

The Product Owner or Scrum Master may also actively work on Sprint Backlog items. When doing so, that person participates in the Daily Scrum as a Developer. Their other accountability does not turn the event into a report to management. A Scrum Master who helps test a feature is contributing to the Increment, not acquiring the right to distribute everyone's tasks.

Key Takeaways

  • Developers include every specialty that helps create the usable Increment.
  • They create the Sprint Backlog, uphold quality, adapt daily, and hold each other accountable.
  • Developers select work in discussion with the Product Owner and decide how to do it.
  • The Developers doing the work are responsible for sizing it.
  • The Daily Scrum belongs to the Developers.

2.3 The Product Owner directs product value

The Product Owner is accountable for maximizing the product's value resulting from the Scrum Team's work. This requires making choices about what matters most. Recording every stakeholder request without resolving competing needs does not fulfill that accountability.

Make product direction clear

Effective Product Backlog management has four parts. The Product Owner develops and explicitly communicates the Product Goal, creates and clearly communicates Product Backlog items, orders those items, and ensures that the backlog is transparent, visible, and understood.

A clear Product Goal gives the team a future state to plan toward. Ordering turns competing ideas into one sequence. Visibility and understanding let the team and stakeholders inspect the actual direction instead of relying on private lists or assumptions.

The Product Owner may delegate the work of backlog management. Developers might draft items, or another colleague might help gather information. Delegation changes who carries out an activity; it does not transfer the Product Owner's accountability for the result.

One person, many stakeholders

The Product Owner is one person, not a committee. Many people can contribute knowledge and make a case for change. Customers may explain their problems, a sponsor may raise a business need, and Developers may identify technical risk. The Product Owner makes the final decisions about Product Backlog content and order.

For the veterinary app, the head of sales requests loyalty points while clinic managers need reliable online payment. The Developers direct the request to the Product Owner. The Product Owner considers the needs, decides that payment has more value now, and orders loyalty points lower in the Product Backlog.

The organization must respect these decisions. A stakeholder can try to persuade the Product Owner to change the backlog. Going around that person to give Developers a conflicting work list would undermine a single, transparent product direction.

Work with the team through the Sprint

At Sprint Planning, the Product Owner proposes how the product could become more valuable and helps discuss the most important items. The whole Scrum Team defines the Sprint Goal. The Developers choose the amount of work they can take on and decide how to do it.

During the Sprint, the Product Owner collaborates with Developers when selected scope needs to be clarified or renegotiated. At the Sprint Review, the Product Owner works with the team and stakeholders to inspect results and consider what comes next. The Product Owner also participates in the Sprint Retrospective as a Scrum Team member.

Only the Product Owner has authority to cancel a Sprint, and cancellation applies when the Sprint Goal becomes obsolete. A difficult forecast alone does not make the goal obsolete.

Key Takeaways

  • The Product Owner is accountable for maximizing product value.
  • Product Backlog management includes the Product Goal, clear items, ordering, and transparency.
  • Delegating backlog work leaves accountability with the Product Owner.
  • One Product Owner represents many stakeholder needs and makes backlog decisions.
  • The Product Owner collaborates on scope without directing how Developers work.
  • Only the Product Owner can cancel a Sprint whose goal has become obsolete.

2.4 The Scrum Master enables effective Scrum

The Scrum Master is accountable for establishing Scrum as the Scrum Guide defines it and for the Scrum Team's effectiveness. This person helps others understand Scrum theory and practice and enables improvements within the framework. The work extends beyond arranging meetings.

Serve the Scrum Team

The Scrum Master coaches people in self-management and cross-functionality. That can mean helping the team make its own planning decisions or understand a capability it needs to create a usable Increment. The aim is to strengthen the team's ability to act, not to create dependence on a supervisor.

The Scrum Master helps the team focus on high-value Increments that meet the Definition of Done, causes impediments to be removed, and ensures that all Scrum events happen and are positive, productive, and within their timeboxes. Ensuring an event happens does not mean personally chairing it. The Developers run their own Daily Scrum.

An impediment blocks or seriously slows progress. "Causing removal" allows several forms of help: coaching the team to solve a problem, connecting people with the right expertise, or working with organizational leaders to remove a barrier. The Scrum Master need not personally perform every repair.

Serve the Product Owner

The Product Owner may need help finding effective approaches to Product Goal definition and Product Backlog management. The Scrum Master helps the team understand the need for clear, concise backlog items and helps establish empirical product planning. When needed or requested, the Scrum Master also facilitates stakeholder collaboration.

This support leaves product decisions with the Product Owner. Helping stakeholders discuss a priority does not give the Scrum Master the final decision about Product Backlog order.

Serve the organization

Scrum adoption requires understanding outside the team too. The Scrum Master leads, trains, and coaches the organization in Scrum, advises on implementations, helps people use an empirical approach for complex work, and removes barriers between stakeholders and Scrum Teams.

Suppose another department repeatedly pulls the veterinary-app Developers into unrelated support calls. The Scrum Master makes the interruption visible and works with that department to change how requests reach the team. Developers and the Product Owner can then discuss what work serves the product and how interruptions affect the Sprint Goal. The team can also inspect the pattern in its Retrospective.

A Scrum Master who merely reassigns everyone's remaining tasks would address the immediate schedule by weakening self-management. A more useful response helps remove the source of the disruption while enabling the team to organize its own work.

Key Takeaways

  • The Scrum Master establishes Scrum and enables team effectiveness.
  • Service includes coaching, useful events, quality, and impediment removal.
  • The Scrum Master helps the Product Owner without taking over product decisions.
  • Organizational service includes coaching adoption and removing collaboration barriers.
  • Causing an impediment to be removed does not mean solving it alone.
3

Use the Scrum events

Scrum events give the team a reliable rhythm for learning. The Sprint contains the work, Planning sets direction, and the Daily Scrum keeps the delivery plan current. The Review brings stakeholder knowledge into product decisions, while the Retrospective improves how the team works. Each event has a distinct purpose and timebox. Knowing what people inspect and what they can change is more useful than remembering a calendar of meetings.

3.1 The Sprint contains the work

A Sprint is the fixed-length event in which ideas become value. It lasts one month or less and contains all the work needed to achieve the Product Goal, including the other four Scrum events. The next Sprint starts immediately after the previous one ends.

A fixed period for learning

A short cycle ensures that progress toward the Product Goal is inspected and adapted at least every calendar month. Over a longer period, a goal can become outdated, uncertainty can grow, and more effort can be placed at risk before people see a usable result. Shorter Sprints provide more frequent learning cycles.

The Sprint keeps its fixed length even if the work finishes early or some selected items remain unfinished. Extending it to complete an extra feature changes the learning rhythm and hides the problem in the forecast. Unfinished work returns to the Product Backlog for future consideration.

Rules during the Sprint

No change may endanger the Sprint Goal, and quality does not decrease. The team refines the Product Backlog as needed. As people learn more, scope can be clarified and renegotiated with the Product Owner. These rules protect a stable objective while allowing an adaptable plan.

For example, a newly discovered integration issue may require a simpler receipt design. Developers can discuss that scope change with the Product Owner if the payment goal remains intact. Replacing payment with an unrelated staff-scheduling feature would endanger the goal.

Timeboxes inside the Sprint

A timebox sets a maximum duration. For a one-month Sprint, the limits are:

EventMaximum duration
Sprint Planning8 hours
Daily Scrum15 minutes
Sprint Review4 hours
Sprint Retrospective3 hours

For shorter Sprints, Planning, Review, and Retrospective are usually shorter. The Daily Scrum remains a 15-minute event. Halving the longer timeboxes for a two-week Sprint is a common team choice, not a proportional rule required by Scrum. Ten working days with one 15-minute Daily Scrum each give 150 minutes of Daily Scrums.

Planning, Daily Scrum, Review, and Retrospective can finish once they achieve their purposes within their timeboxes. The Sprint itself retains its fixed duration unless the Product Owner cancels it.

Cancellation and forecasting

A Sprint may be canceled when its Sprint Goal becomes obsolete. Only the Product Owner has authority to cancel it. If the organization abandons the payment service entirely, continuing to pursue that Sprint Goal may no longer make sense. A late item or a difficult day does not by itself make the goal obsolete.

Teams may use burn-down charts, burn-up charts, or cumulative flow diagrams to help forecast progress. Such practices do not replace empirical judgment: a projection must still be informed by what has happened and by what the team now understands about the work.

Key Takeaways

  • A Sprint has a fixed length of one month or less and contains all Scrum work.
  • The next Sprint begins immediately after the previous one.
  • Protect the Sprint Goal and quality while negotiating scope as learning occurs.
  • The one-month event limits are 8 hours, 15 minutes, 4 hours, and 3 hours.
  • Only the Product Owner can cancel a Sprint when its goal becomes obsolete.
  • Shorter Sprints create more frequent learning and limit effort at risk.

3.2 Plan why, what, and how

Sprint Planning starts the Sprint by creating its plan. The whole Scrum Team participates and may invite others to provide advice. The Product Owner ensures people are ready to discuss important Product Backlog items and their connection to the Product Goal.

Why is this Sprint valuable?

The Product Owner proposes how the product could increase its value and usefulness. The whole Scrum Team then defines a Sprint Goal that explains why the Sprint matters to stakeholders. That goal must be finalized before Planning ends.

For the veterinary app, "Clients can pay for a booked appointment by card in the app" expresses a useful outcome. "Finish items 12, 15, and 18" only lists work. A clear objective helps the team make choices later if its initial plan needs to change.

What can be Done?

Through discussion with the Product Owner, the Developers select Product Backlog items. They can refine items during the discussion to improve understanding. Selecting how much work fits is a forecast, informed by past performance, upcoming capacity, and the Definition of Done.

Suppose two Developers will be away for part of the coming Sprint. The Developers select the card-entry screen, payment-provider connection, and receipt email. They leave two less important ideas in the Product Backlog. The Product Owner helps clarify value, but does not order the Developers to take a larger amount than they judge they can complete.

Quality matters to this forecast. If an item needs review, tests, and accessible help text to be Done, those activities belong in the planned work. Counting only the time to build a first draft would give an incomplete picture of capacity.

How will the work get done?

The Developers decide how to turn selected items into an Increment that meets the Definition of Done. They often break work into smaller pieces of one day or less, such as "build card form" or "test declined-card handling." The method of planning is their choice.

Planning topicResult
WhyA Sprint Goal that explains the value
WhatSelected Product Backlog items
HowAn actionable plan for delivery

Together, these form the Sprint Backlog. A selected list without a goal or a delivery plan is incomplete. The plan needs enough detail to begin and support inspection; it can evolve as the Developers learn during the Sprint.

Sprint Planning lasts at most eight hours for a one-month Sprint and is usually shorter for shorter Sprints.

Key Takeaways

  • Sprint Planning starts the Sprint and involves the whole Scrum Team.
  • The Scrum Team finalizes the Sprint Goal during Planning.
  • Developers forecast and select work through discussion with the Product Owner.
  • Developers decide how to deliver selected work to the Definition of Done.
  • The Sprint Backlog combines why, what, and how.

3.3 Inspect progress at the Daily Scrum

The Daily Scrum helps Developers inspect progress toward the Sprint Goal and adapt the Sprint Backlog. It produces an actionable plan for the next day of work. The point is to improve the shared plan, so individual activity reports are useful only when they help that decision.

The Developers' 15 minutes

This is a 15-minute event held at the same time and place every working day of the Sprint. Consistency reduces the effort of coordinating it. It belongs to the Developers; they choose the structure and techniques that keep attention on the Sprint Goal and upcoming work.

The Product Owner and Scrum Master participate as Developers if they are actively working on Sprint Backlog items. Their other accountabilities do not make them required recipients of a status report. The Scrum Master ensures the event happens and remains productive within its timebox, but need not run or attend it.

Turn an observation into a plan

On day 6 of the veterinary-app Sprint, the payment provider's test account is still inactive. Two planned tasks are blocked. At the Daily Scrum, the Developers connect this obstacle to the Sprint Goal: without testing payment, they cannot produce the intended usable result.

They agree that one Developer will contact the provider after the event. Others will work on the receipt email while access is resolved. They update the Sprint Backlog to show the changed work. The event has produced a practical response and a visible plan.

A detailed technical conversation about every possible provider setting could overrun the event and involve people who do not need to take part. The Developers can arrange that discussion immediately afterward with the people needed. Keeping the Daily Scrum short does not mean ignoring the problem.

Structure is a choice

The 2017 Scrum Guide offered three questions about yesterday, today, and impediments as an example. They were never mandatory, and the 2020 Guide removed the example. Developers may still use them if they support inspection and an actionable plan.

Another possible structure is to walk through a task board, starting with work closest to Done and asking what needs to happen next. Scrum requires the purpose and timebox, not a particular script. Merely answering three questions without examining progress toward the Sprint Goal misses the event's purpose.

Developers can also inspect and adjust their plan at other times during the day. If the provider enables the account shortly after the Daily Scrum, the Developers can respond then. They do not wait for tomorrow's event to resume the blocked work. Regular inspection and prompt adaptation work together.

Key Takeaways

  • The Daily Scrum inspects progress toward the Sprint Goal and adapts the Sprint Backlog.
  • It is a 15-minute event for Developers every working day.
  • Developers choose its format and leave with an actionable plan.
  • Detailed discussions and further replanning can happen afterward.

3.4 Inspect the outcome with stakeholders

At the Sprint Review, the Scrum Team and key stakeholders inspect the Sprint's outcome and decide how to adapt the product's future direction. Progress toward the Product Goal is discussed alongside what changed in the surrounding environment. The event is at most four hours for a one-month Sprint and usually shorter for shorter Sprints.

A working session

The team presents its results, and stakeholders contribute knowledge about users, needs, and opportunities. Together they discuss what to do next. This may lead to changes in the Product Backlog. A demonstration can support the conversation, but a one-way presentation leaves out the collaboration the Review is designed to create.

For example, the veterinary-app team lets clinic managers try a usable card-payment feature. One manager explains that many clients want to pay at the clinic after the appointment. The group discusses how this affects the next useful improvement, and the Product Owner raises a "pay later" option in the Product Backlog. The Product Goal can stay the same while the route toward it changes.

The feedback concerns the product and its future. If the team also wants to discuss why test accounts took so long to obtain, that is a way-of-working issue for the Retrospective. The two events inspect different things, even when a single Sprint reveals both kinds of issue.

Show an honest Increment

The Increment includes only work that meets the Definition of Done. A feature that is coded but lacks required testing is not a finished result. Work that fails the Definition of Done cannot be released or presented at the Review; it returns to the Product Backlog for future consideration.

The team can be transparent about unfinished work without presenting it as an Increment. For example, it can explain that an item remains incomplete and how that affects progress. Calling it "nearly Done" does not give it the same status as usable, verified work.

Release does not wait for the Review

The Review is not a release gate or a formal approval ceremony. An Increment can be delivered to stakeholders before the Sprint ends, and several Increments can be created and released within one Sprint. The sum of the Increments is still presented at the Review for inspection and discussion.

If a usable payment improvement is released on day 8, the Review can still examine what was produced, what users experienced, and what should change next. An earlier release provides more evidence; it does not remove the need for the Review. Likewise, waiting for a stakeholder to sign off at the Review does not determine whether an item meets the Definition of Done. That shared quality standard determines which work belongs in the Increment.

Key Takeaways

  • The Sprint Review inspects the outcome and progress toward the Product Goal with stakeholders.
  • It is a collaborative working session that can change the Product Backlog.
  • Only Done work belongs in the Increment; unfinished items return to the Product Backlog.
  • Usable Increments can be delivered before the Review.
  • The one-month Sprint Review has a maximum duration of four hours.

3.5 Turn reflection into improvements

The Sprint Retrospective plans ways to increase quality and effectiveness. It follows the Sprint Review and concludes the Sprint. The whole Scrum Team participates: Developers, Product Owner, and Scrum Master. Its maximum duration is three hours for a one-month Sprint, and it is usually shorter for shorter Sprints.

Inspect how the Sprint went

The team considers individuals, interactions, processes, tools, and the Definition of Done. It discusses what went well, what problems appeared, and how those problems were or were not resolved. It also identifies assumptions that led it astray and explores where they came from.

For example, Developers may have assumed that a payment provider would activate a test account immediately. That assumption could explain why work stalled even though the feature itself looked small. Understanding the cause helps the team choose an improvement that addresses the actual delay.

The Product Owner belongs in this discussion. Unclear backlog items, slow answers about product value, or difficult stakeholder collaboration can affect the team's work just as much as technical tools. Excluding the Product Owner would leave part of the team's way of working unexamined.

Choose a concrete change

The veterinary-app team notices that payment work waited two days for the test account. It decides to request required external accounts during Sprint Planning. One Developer will take responsibility for that request in the next Sprint, and the task is placed in the next Sprint Backlog.

This turns a finding into an action. Writing "communicate better" on a list would leave the team unsure what should change. Naming the needed request and when it should happen gives the Developers a change they can put into practice and inspect later.

The most helpful improvements are addressed as soon as possible. They may be added to the next Sprint Backlog, but that is a possible way to act, not a requirement to defer every improvement. A tool setting that can be fixed immediately need not wait for a new Sprint.

Improve quality too

The Definition of Done is part of the inspection. If defects repeatedly reach users, the team can strengthen it. For the clinic app, the team might add testing on the three most common phone models. Developers must then include that work when planning and producing future Increments.

EventMain inspection focus
Sprint ReviewProduct outcome and future direction with stakeholders
Sprint RetrospectiveTeam's way of working and improvements in quality and effectiveness

A busy Sprint does not remove the need for the Retrospective. Skipping it removes the formal opportunity to examine how the team works.

Key Takeaways

  • The Retrospective concludes the Sprint and includes the whole Scrum Team.
  • It inspects people, interactions, processes, tools, assumptions, and the Definition of Done.
  • Its purpose is to plan improvements in quality and effectiveness.
  • Address the most impactful changes promptly; they may enter the next Sprint Backlog.
4

Make work and value transparent

Visible work needs shared meaning. Scrum’s three artifacts show product direction, the current Sprint plan, and the usable result. Each has a commitment that makes inspection more focused: a future product state, a single Sprint objective, or a shared quality standard. These distinctions let a team change a plan without losing its goal, and let stakeholders tell completed work from work that still needs verification.

4.1 One ordered backlog, one Product Goal

The Product Backlog is an ordered, emerging list of what the product needs in order to improve. It is the single source of work undertaken by the Scrum Team. New information changes its content and order, so it is never a complete requirements list frozen at the start.

Give work a product direction

A product is a way of delivering value with a clear boundary, known stakeholders, and defined users or customers. It can be a service, a physical object, or something more abstract. The Product Backlog belongs to that product, including needed fixes and improvements as well as new features.

The Product Goal is the commitment for the Product Backlog. It describes a future product state that the Scrum Team can plan toward. It sits in the Product Backlog; the remaining backlog emerges to describe what will fulfill it. The team fulfills or abandons one Product Goal before taking on the next.

For the veterinary app, the Product Goal is "Clients can book, change, and pay for clinic appointments without calling the clinic." This gives the team a longer-term target while leaving room to learn which improvements will help most.

Ordering is a real sequence

The Product Owner is accountable for effective Product Backlog management and decides the order. Value, risk, dependencies, and learning can all inform that decision. Merely marking every request "high priority" would leave the next choice unclear. An ordered list gives each item a place in one sequence.

A defect that blocks booking and a proposed new reminder feature belong in the same product-level source of work. Separate competing backlogs for bugs and features would obscure the trade-off about which work should come first. People can view different parts of the backlog without creating rival sources of direction.

Refine as understanding grows

Refinement is the ongoing work of breaking down and further defining Product Backlog items into smaller, more precise items. Details such as description, order, and size become clearer. The Developers who will do the work are responsible for sizing; the Product Owner can help them understand trade-offs.

An item is ready for selection in Sprint Planning when the Scrum Team can complete it to Done within one Sprint. Refinement usually makes it transparent enough for that decision. This does not create a required "Definition of Ready" or an extra Scrum event.

At the top of the clinic-app backlog, "Clients can cancel an appointment up to 24 hours ahead" can be a small, understood item. Lower down, "video consultations" can remain broad until the team has reason to explore it. Refining every distant idea in full would spend effort on details that might change. Refinement continues throughout the Sprint as needed; it has no Scrum-prescribed event timebox.

Key Takeaways

  • The Product Backlog is the product’s single ordered, emerging source of work.
  • The Product Goal describes a future product state and commits the Product Backlog.
  • Fulfill or abandon one Product Goal before taking on the next.
  • The Product Owner decides backlog order.
  • Refinement makes items smaller and clearer and is an ongoing activity.
  • An item ready for selection can be completed to Done within one Sprint.

4.2 A flexible plan around a stable Sprint Goal

The Sprint Backlog brings together the Sprint Goal, selected Product Backlog items, and an actionable delivery plan. These answer three questions: why the Sprint matters, what the Developers expect to create, and how they intend to create it.

A plan by and for Developers

Developers create and update the Sprint Backlog. It is a highly visible, current picture of the work they plan to do to achieve the Sprint Goal. It has enough detail to let them inspect progress at the Daily Scrum and changes as they learn.

A task board can display this information, but the board itself is an optional technique. A list of tasks without a Sprint Goal does not communicate the full Sprint Backlog. Likewise, an initial plan kept unchanged after a major discovery would stop representing the Developers' actual intentions.

The Sprint Goal is the Sprint Backlog's commitment. The whole Scrum Team creates it during Sprint Planning and adds it to the Sprint Backlog. It is one objective that gives the work coherence and encourages people to collaborate instead of pursuing unrelated initiatives.

Keep the objective, adjust the work

The Developers commit to the Sprint Goal while retaining flexibility in the exact work. The selected items are a forecast. When work differs from expectations, Developers collaborate with the Product Owner to negotiate scope without affecting the Sprint Goal.

Consider the goal "Clients can pay for a booked appointment by card in the app." The plan includes a detailed receipt email. During the Sprint, the Developers discover that the intended design requires a new mail service.

  1. Identify the goal's essential outcome: the client can complete card payment.
  2. Discuss with the Product Owner whether a simpler receipt still supports that outcome.
  3. Agree to use the simple receipt and return the designed version to the Product Backlog.
  4. Update the Sprint Backlog to show the work the Developers now plan to do.
Recognize a change that endangers the goal

A manager may ask the same team to drop payment and build staff scheduling. That would replace the objective, so it cannot simply be inserted as a plan update. The Product Owner can consider scheduling in the Product Backlog for a later Sprint. If the payment goal has become obsolete, the Product Owner has authority to cancel the Sprint.

Any item that is not Done returns to the Product Backlog for future consideration; it does not become part of the Increment through a favorable progress report.

Key Takeaways

  • The Sprint Backlog combines the Sprint Goal, selected items, and delivery plan.
  • Developers maintain it as a visible, current plan.
  • The Sprint Goal is one objective and the Sprint Backlog’s commitment.
  • Developers negotiate scope with the Product Owner while protecting the goal.

4.3 Usable work and the Definition of Done

An Increment is a concrete step toward the Product Goal. It adds to previous Increments and is thoroughly verified so that the additions work together. It must be usable to provide value. A collection of separate drafts that cannot work together does not meet that description.

A shared quality boundary

The Definition of Done is the Increment's commitment. It formally describes the quality state required for the product. When a Product Backlog item meets that definition, an Increment is created. This gives everyone a shared basis for understanding which work is complete.

For the veterinary app, the definition could require review by another Developer, passing automated tests, testing on iPhone and Android, screen-reader accessibility, deployment to a test environment, and updated user help. If Android testing is missing, the item is not Done even if it works on another device.

There is no separate "done-done" status that permits incomplete work to count as finished. Quality does not decrease during a Sprint. Lowering a required test standard to make the board look complete would damage transparency as well as quality.

Who sets the standard?

If the organization's Definition of Done is a standard, every Scrum Team follows it as a minimum. If there is no organizational standard, the Scrum Team creates a Definition of Done appropriate for its product. Developers are required to follow it. Several Scrum Teams working together on one product mutually define and comply with the same Definition of Done.

The team can strengthen the definition as it learns. It might add a relevant test after a recurring defect. The resulting quality work needs to be reflected in future plans; it is part of producing the Increment.

Done, item conditions, and release
ConceptWhat it tells you
Definition of DoneThe shared quality state needed for the Increment
Acceptance criteriaConditions specific to an individual Product Backlog item
ReleaseDelivery of a usable Increment to stakeholders

An item might require "a client can cancel up to 24 hours before an appointment." That condition describes its particular behavior. The Definition of Done supplies the quality measures that apply across items in the Increment. Satisfying the behavior alone is not enough if required quality checks are missing.

Work failing the Definition of Done cannot be part of an Increment, released, or presented at the Sprint Review. It returns to the Product Backlog for future consideration. Done work can be delivered before the Sprint ends; the Review is not a gate. Several Increments may be created during one Sprint, and their sum is presented at the Review.

Key Takeaways

  • An Increment is usable, verified, and additive to prior Increments.
  • The Definition of Done is the quality commitment for the Increment.
  • An item enters an Increment only when it meets the full Definition of Done.
  • Organizational quality standards form a minimum; Developers must comply.
  • Teams on one product share a Definition of Done.
  • Acceptance criteria are item-specific; the Definition of Done applies across the Increment.
  • Unfinished work returns to the Product Backlog and cannot be released or presented at the Review.
5

Connect the whole Sprint

The parts of Scrum become clearer when followed through a complete Sprint. A product objective informs a Sprint Goal, Developers adapt a delivery plan, and usable results bring evidence for the next product decision. Improvements to teamwork feed the next cycle too. This connected view helps separate essential Scrum rules from optional techniques and makes it easier to judge certificate-style statements that resemble familiar workplace habits.

5.1 Follow the feedback through one Sprint

Scrum's elements form a connected cycle. The artifacts make work and value visible, the commitments provide targets, and the events create regular chances to inspect and adapt. Following one Sprint shows how decisions move between these elements.

Begin with product direction

The veterinary-app team's Product Goal is to let clients manage appointments without calling. The Product Owner keeps one ordered Product Backlog toward that future state. Seven people—one Product Owner, one Scrum Master, and five Developers—work in two-week Sprints.

Sprint Planning starts the Sprint. The whole Scrum Team agrees on the Sprint Goal "Clients can pay for a booked appointment by card in the app." Developers select the card-entry screen, provider connection, and receipt email, then plan how to deliver them. The Sprint Goal, selected items, and plan form the Sprint Backlog.

Inspect and adapt during delivery

Every working day at 9:30, Developers hold their 15-minute Daily Scrum. They inspect progress toward the payment goal and update the plan. On day 6, a missing test account blocks work. Developers change task order and arrange for access to be pursued.

On day 8, receipt design proves more complex than expected. Developers and the Product Owner agree on a simpler receipt. This changes the work while protecting the Sprint Goal. Refinement also continues during the Sprint so future Product Backlog items become clearer.

As items meet the Definition of Done, they form usable Increments. Required testing and other quality work are part of delivery, not a separate phase after the Sprint. A usable Increment may be released before the Sprint Review.

Inspect the product, then the way of working

At the Sprint Review, the team and clinic managers inspect the Sprint's outcome and discuss progress toward the Product Goal. Feedback favors a "pay later at the clinic" option. The Product Owner adjusts the Product Backlog to reflect that learning.

At the following Sprint Retrospective, the whole team examines the delay in obtaining the test account. It agrees to request external access earlier and makes that improvement actionable for the next Sprint. The Retrospective concludes the Sprint; the next Sprint follows immediately, without a separate working period for testing or cleanup.

Keep the three commitments straight
ArtifactCommitmentHow it guides inspection
Product BacklogProduct GoalWhere the product is heading
Sprint BacklogSprint GoalWhat this Sprint is trying to achieve
IncrementDefinition of DoneWhether completed work meets required quality

The Product Owner is accountable for Product Backlog management; Developers maintain the Sprint plan and follow the Definition of Done. The entire team is accountable for a valuable, useful Increment, and the Scrum Master enables effective Scrum.

Key Takeaways

  • Planning creates the Sprint Backlog from Product Backlog work.
  • Daily Scrums inspect progress toward the Sprint Goal and adapt the plan.
  • Done work forms Increments that can be delivered during the Sprint.
  • The Review informs product adaptation; the Retrospective improves teamwork.
  • Artifacts, commitments, accountabilities, and events support one connected feedback cycle.

5.2 Separate Scrum rules from team habits

A workplace may use helpful practices that Scrum does not require. Distinguishing those choices from the Scrum Guide's rules makes it easier to assess a team arrangement or answer a certificate question. A familiar habit is not evidence that the framework requires it.

Optional practices and older terms

Scrum does not prescribe user stories, story points, velocity, planning poker, task boards, or a Definition of Ready. Teams can choose these inside the framework. The Guide names burn-down charts, burn-up charts, and cumulative flow diagrams as possible forecasting practices, not replacements for empiricism.

The 2020 edition changed several terms and structures. "Development Team" became "Developers," "roles" became "accountabilities," and "self-organizing" became "self-managing." It introduced the Product Goal and a commitment for each artifact, added the "why" topic to Planning, and removed the example three Daily Scrum questions. Those questions had been an optional example, not a compulsory script.

Check common claims
ClaimScrum rule
Start with Sprint 0 and test in a hardening SprintEvery Sprint aims to create a valuable, useful Done Increment; Scrum defines no special Sprint types
The Scrum Master assigns tasksDevelopers self-manage their work
The Product Owner approves estimatesDevelopers doing the work are responsible for sizing
Refinement is a sixth eventRefinement is ongoing activity within Sprints
A team can remove events and still use Scrum unchangedThe framework's core elements work together and must remain intact

Adding a technique differs from removing a core element. A team can choose a digital task board and still preserve Scrum. A team that drops its Retrospective loses a required event, even if it continues to work in two-week periods.

Know the certificate formats

As published in October 2026, Scrum.org's Professional Scrum Master I (PSM I) has 80 questions in 60 minutes and an 85% pass mark: 68 correct answers. Scrum Alliance's Certified ScrumMaster (CSM) requires a course with a Certified Scrum Trainer, followed by 50 questions in 60 minutes with a 74% pass mark: 37 correct answers.

Read the actual requirement

For "Who must attend the Daily Scrum?", the required participants are the Developers. A Product Owner or Scrum Master working actively on Sprint Backlog items participates as a Developer. Otherwise their attendance is not required by the Guide. Do not turn that absence of a requirement into a rule banning attendance.

Words such as "must," "only," and "all" change a claim. Check the accountability, purpose, and condition in the rule. "Only the Product Owner can cancel a Sprint" is correct; "the Product Owner can cancel whenever selected work looks late" drops the condition that the Sprint Goal has become obsolete.

Key Takeaways

  • Optional techniques can support Scrum without becoming Scrum requirements.
  • Use Developers, accountabilities, and self-managing for the 2020 framework.
  • Every Sprint aims at a valuable, useful Done Increment; Scrum has no special testing Sprint.
  • Refinement is ongoing work, and the Daily Scrum has no required three-question script.
  • Read conditions and absolute words carefully in certificate-style claims.
  • PSM I has 80 questions, 60 minutes, and an 85% pass mark; CSM has 50, 60 minutes, and 74% after the required course.

Scrum Framework examples

5 Walkthroughs

1

See how Scrum supports learning

12 steps
Connect a lightweight framework, the three pillars, and the values through a small product example.
  1. 1
    IntroductionSee how Scrum supports learning

    A team is creating a new appointment app. It can describe a useful direction, but it cannot know every user need or delivery problem in advance.

    Scrum gives the team short cycles for creating usable results and learning from them. Follow how its structure, theory, and values let people make better decisions as their understanding changes.

  2. 2
    ExplanationStart with a framework

    Scrum specifies accountabilities, events, artifacts, and rules. It deliberately leaves working techniques open. The team can choose how to write requirements or display tasks.

    That small structure helps the team address complex problems without claiming that a complete solution can be planned at the start. The official definition is the Scrum Guide by Ken Schwaber and Jeff Sutherland, currently the November 2020 edition.

  3. 3
    ExampleRepeat a cycle and add something usable

    The appointment team creates a usable cancellation feature during a Sprint. Clinic staff try it and reveal an overlooked need. The next Sprint uses that learning to improve the product.

    The repeated cycle is iterative. The usable addition is incremental. A Sprint has a fixed length of one month or less; it is not just a deadline for producing separate drafts that nobody can use.

  4. 4
    ChallengeDoes repeating a cycle create an Increment?

    A service team holds a Review every two weeks but produces only disconnected drafts that cannot be used. What is missing from its incremental work?

    ---reveal---

    It needs a usable addition that builds on prior results. Repeating the cycle provides iteration, but a meeting rhythm alone does not make drafts an Increment. The team must turn work into a verified, usable result.

  5. 5
    ExplanationUse three connected pillars

    Transparency makes the actual work and process visible and understood. Inspection checks artifacts and progress toward goals. Adaptation changes the product or process when findings require it.

    This is empirical work: decisions come from observation and experience. Lean thinking adds attention to reducing waste and focusing on essentials. Without an accurate picture, careful inspection can still produce a poor decision.

  6. 6
    ExampleRepair the picture before inspecting it

    The team’s board says four features are "done," but all still need required tests. Clinic managers assume they are ready to use.

    First, correct the visible status using the Definition of Done. Then inspect what is actually usable and what that means for the goal. Finally, adapt the plan to include the missing quality work. Holding a longer Review would not fix the misleading labels by itself.

  7. 7
    ChallengeWhere does the learning cycle stop?

    A team shows its real results and carefully examines a failed trial. It can change the process but chooses to repeat the same unsuitable approach. Which pillar needs action?

    ---reveal---

    Adaptation is missing. Transparency and inspection have made the problem visible and examined it, but the team has not acted on the finding. Scrum calls for adjustment as soon as needed, including between scheduled events.

  8. 8
    ExplanationNotice values in choices

    The five values are commitment, focus, openness, respect, and courage. They guide behavior when the plan becomes difficult.

    Commitment keeps people pursuing goals and supporting one another. Focus protects attention to Sprint work. Openness makes problems visible, respect recognizes capable independent people, and courage helps people do the right thing and tackle tough problems.

  9. 9
    ExampleShare unwelcome news early

    A Developer says, "The provider connection is harder than expected. We may need to change our plan." The team can now inspect the difficulty while choices remain.

    That is openness. Speaking despite pressure to look successful can also require courage. The action supports transparency; the values need not be exclusive labels assigned to separate behaviors.

  10. 10
    ChallengeIs adapting scope a failure of commitment?

    The Developers and Product Owner agree on a simpler receipt while keeping the goal that clients can pay by card. Has commitment been abandoned?

    ---reveal---

    No. Developers commit to the Sprint Goal, while exact work can change as they learn. Simplifying the receipt can preserve the valuable objective. Commitment does not require completing every initially selected detail regardless of new information.

  11. 11
    ChallengeConnect honesty to a useful decision

    A team fears that admitting unfinished work will look bad. It marks the work complete and holds an extra inspection meeting. Why is the meeting unlikely to solve the problem?

    ---reveal---

    Inspection is working from a misleading picture. The team needs openness and courage to restore transparency, then inspect the actual state and adapt. More meetings do not repair a false completion status.

  12. 12
    RecapConnect structure, evidence, and behavior

    Scrum provides a small framework for complex work, with usable additions created in repeated Sprints.

    The three pillars connect an honest picture to observation and adjustment. The five values support the behavior needed to keep that picture trustworthy, discuss difficult findings, and act together when the plan needs to change.

2

Place decisions with the right people

15 steps
Distinguish product direction, delivery choices, and service to the team and organization.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionPlace decisions with the right people
  2. 2
    ExplanationBring capability and authority together
  3. 3
    AnalogyDifferent strengths, one usable result
  4. 4
    ChallengeFind the missing team characteristic
  5. 5
    ExplanationDevelopers cover the work the product needs
  6. 6
    ExamplePlan delivery without task assignment
  7. 7
    ChallengeWho sizes a changed item?
  8. 8
    ExplanationProduct value needs one decision-maker
  9. 9
    ExampleHandle competing requests in one backlog
  10. 10
    ChallengeDoes delegation move accountability?
  11. 11
    ExplanationLead by enabling others
  12. 12
    ExampleRemove a barrier without becoming the boss
  13. 13
    ChallengeDoes ensuring an event mean chairing it?
  14. 14
    ChallengeKeep the accountabilities connected
  15. 15
    RecapKeep one team and clear decision boundaries
3

Make each event serve its purpose

18 steps
Follow the Sprint rhythm and decide what belongs in Planning, Daily Scrum, Review, and Retrospective.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionMake each event serve its purpose
  2. 2
    ExplanationKeep a fixed Sprint
  3. 3
    TipRead timeboxes as maximums
  4. 4
    ChallengeWould you extend the Sprint?
  5. 5
    ExplanationStart Planning with why
  6. 6
    ExampleSelect what and plan how
  7. 7
    ChallengeIs an item list enough?
  8. 8
    ExplanationInspect progress, then decide what to do
  9. 9
    ExampleRespond to blocked access
  10. 10
    ChallengeCan the Developers change the format?
  11. 11
    ExplanationUse the Review as a working session
  12. 12
    ExampleLet user knowledge shape future work
  13. 13
    ChallengeMust a release wait for the Review?
  14. 14
    ExplanationFinish by improving the way of working
  15. 15
    ExampleTurn a delay into an action
  16. 16
    ChallengeHas a complaint list achieved the purpose?
  17. 17
    ChallengePut two findings in the right events
  18. 18
    RecapFollow the inspection rhythm
4

Use artifacts to judge progress honestly

13 steps
Match each artifact to its commitment and handle changing scope and incomplete quality work.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionUse artifacts to judge progress honestly
  2. 2
    ExplanationGive the backlog a long-term target
  3. 3
    ExampleRefine what is becoming useful
  4. 4
    ChallengeCan bug work have a competing order?
  5. 5
    ExplanationSee why, what, and how together
  6. 6
    ExampleSimplify scope without replacing the goal
  7. 7
    ChallengeWould this change preserve the Sprint Goal?
  8. 8
    ExplanationMake completion mean the same thing
  9. 9
    ExampleApply every required quality measure
  10. 10
    ChallengeWhat happens to an unfinished item?
  11. 11
    ConnectionShare one quality boundary on one product
  12. 12
    ChallengeMatch three questions to three commitments
  13. 13
    RecapKeep direction, plan, and completion distinct
5

Trace a Sprint and check the rules

11 steps
Connect the entire cycle and separate Scrum requirements from optional practices.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionTrace a Sprint and check the rules
  2. 2
    ExampleStep 1: Turn direction into a Sprint plan
  3. 3
    ExampleStep 2: Adapt while protecting the objective
  4. 4
    ExampleStep 3: Inspect the outcome and the process
  5. 5
    ChallengeFind the broken connection
  6. 6
    ExplanationChoose practices inside the framework
  7. 7
    ChallengeIs a setup-only Sprint a Scrum exception?
  8. 8
    TipSeparate a requirement from a prohibition
  9. 9
    ConnectionRecognize the two certificate formats
  10. 10
    ChallengeRepair a disconnected Sprint
  11. 11
    RecapUse the loop to assess a claim

Scrum Framework practice questions

50 Practice Questions in 5 sets

Set 1: Understand the framework and team10 Practice Questions

Question 1 of 10

What does cross-functional mean for a Scrum Team?
  1. Its members collectively have the skills to create value each Sprint.
  2. Every member must independently perform every skill needed for delivery.
  3. The team keeps design and verification in separate specialist sub-teams.
  4. The team relies on specialist departments to complete each usable result.
Show answerHide answer
Answer: A
Cross-functionality concerns the combined skills of the team. People can keep different specialties while together creating a usable Increment. Requiring every person to perform every specialty confuses collective capability with identical individual skills.

Question 2 of 10

A skilled Scrum Team waits each morning for an outside manager to assign individual tasks. Which team characteristic is being undermined?
  1. Cross-functionality.
  2. Product ownership.
  3. Self-management.
  4. Incremental delivery.
Show answerHide answer
Answer: C
Self-management means deciding internally who does what, when, and how. Outside assignment takes that decision away from the team even when the members have all needed skills. Cross-functionality concerns those skills, so the task-assignment problem does not establish a skills gap.

Question 3 of 10

What does it mean that Scrum is deliberately incomplete?
  1. Teams select whichever events suit their available time.
  2. Teams add working techniques inside its defined structure.
  3. Teams follow its complete sequence of delivery instructions.
  4. Teams replace its accountabilities with local job descriptions.
Show answerHide answer
Answer: B
Scrum defines a small framework and leaves working techniques to the team. A task board or a requirements format can be added without changing its core structure. Treating required events as optional removes elements that serve specific purposes in the framework.

Question 4 of 10

A research team repeats a two-week cycle but produces only separate, unusable drafts. What is missing from the incremental aspect of Scrum?
  1. A longer cycle that allows every research question to be settled.
  2. A standard task board shared by the team and its sponsors.
  3. A usable addition that builds on the existing product.
  4. A fixed list of requirements approved before the first cycle.
Show answerHide answer
Answer: C
Incremental work creates usable additions that work with prior results. Repeating a two-week cycle shows iteration, but repetition alone does not make drafts an Increment. A standard board can help visibility, yet it cannot supply the missing usable result.

Question 5 of 10

A team discovers that its progress report counts unverified work as complete. Which pillar needs attention first?
  1. Transparency.
  2. Inspection.
  3. Adaptation.
  4. Lean thinking.
Show answerHide answer
Answer: A
Transparency requires an accurate, shared view of the work. Counting unverified work as complete gives people a misleading basis for decisions. More frequent inspection would still inspect the same false picture until the team corrects how it represents completion.

Question 6 of 10

A service team openly inspects a failed trial but keeps the same unsuitable process despite being able to change it. Which pillar is missing?
  1. Transparency.
  2. Inspection.
  3. Cross-functionality.
  4. Adaptation.
Show answerHide answer
Answer: D
Adaptation turns findings into a change when the result or process is unacceptable. The team has already made the failure visible and inspected it. Repeating that inspection without changing the unsuitable process leaves the identified problem in place.

Question 7 of 10

A Developer tells colleagues early that an important integration may be delayed. Which value most directly describes sharing that difficulty?
  1. Focus.
  2. Respect.
  3. Commitment.
  4. Openness.
Show answerHide answer
Answer: D
Openness means being honest about work and challenges. Early reporting gives the team time to inspect the problem and adapt. Commitment concerns pursuing goals and supporting others; it does not require someone to hide risk in order to sound confident.

Question 8 of 10

A team protects its Sprint Goal while agreeing with the Product Owner to simplify selected work. How does this fit commitment?
  1. It breaks commitment because every selected item must stay fixed.
  2. It preserves commitment to the objective while adapting scope.
  3. It transfers the Developers’ commitment to the Product Owner.
  4. It replaces the Sprint Goal with the current Product Backlog order.
Show answerHide answer
Answer: B
Developers commit to the Sprint Goal, while the exact work may change as they learn. Negotiating scope can preserve that objective. Treating the initial item list as an unchangeable promise would remove flexibility that the Sprint Goal is designed to provide.

Question 9 of 10

A designer creates part of a usable learning service in a Scrum Team. How does Scrum classify this contribution?
  1. The designer becomes a design Product Owner.
  2. The designer contributes as a Developer.
  3. The designer works outside the Scrum Team.
  4. The designer serves as the Scrum Master.
Show answerHide answer
Answer: B
Developers create any aspect of a usable Increment, including design work. The term is broader than programmer and applies beyond software. Expertise in a specific type of work does not by itself make someone the Product Owner, whose accountability concerns product value.

Question 10 of 10

A Product Owner asks a colleague to draft backlog items. A stakeholder then asks that colleague to move one item above all others. Who remains accountable for the backlog decision?
  1. The Product Owner, even though drafting was delegated.
  2. The drafting colleague, once delegation has occurred.
  3. The Developers, because they will size the new item.
  4. The Scrum Master, who handles conflicting requests.
Show answerHide answer
Answer: A
The Product Owner can delegate backlog activities while retaining accountability for effective management and ordering. The stakeholder can make a case to the Product Owner. Drafting an item does not give the colleague final product-ordering authority, and sizing is a separate Developer responsibility.
Set 2: Make decisions during a Sprint10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

Who is accountable for establishing Scrum and enabling the Scrum Team’s effectiveness?
  1. The Product Owner.
  2. The Developers alone.
  3. The key stakeholders.
  4. The Scrum Master.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

An approval process outside the team repeatedly blocks delivery. How can the Scrum Master serve the team?
  1. Work with the relevant people to remove the barrier.
  2. Assign all delayed tasks personally until the next Review.
  3. Take final authority over the Product Backlog order.
  4. Require the team to extend each Sprint until approval arrives.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

The Product Owner explains a trade-off that reduces an item’s scope. Who is responsible for sizing the resulting work?
  1. The Product Owner who set the trade-off.
  2. The Developers who will do the work.
  3. The Scrum Master who supports planning.
  4. The stakeholder who requested it.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

Two departments want conflicting product changes. How should they influence Product Backlog order?
  1. Give Developers separate ordered lists.
  2. Ask the Scrum Master to decide the order.
  3. Present their needs to the Product Owner.
  4. Vote to override the Product Owner’s order.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

What is the maximum length of a Sprint?
  1. Two months.
  2. One month.
  3. Six weeks.
  4. One quarter.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A three-week Sprint ends tomorrow with a useful goal still relevant but one item unfinished. What should happen to the Sprint duration?
  1. Keep its fixed end; reconsider unfinished work in the Product Backlog.
  2. Extend it until the remaining item reaches the Definition of Done.
  3. Cancel it because the original selected scope was not completed.
  4. Shorten the following Sprint to recover time used by an extension.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

During Planning, a team lists items and tasks but cannot explain the useful outcome of the Sprint. What is missing?
  1. A mandatory estimate in story points for each task.
  2. A release approval signed by the key stakeholders.
  3. A fully refined plan for every future Product Backlog item.
  4. A Sprint Goal expressing why the Sprint is valuable.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A team has lower upcoming capacity and a stronger Definition of Done. A stakeholder asks it to select the same item count as last Sprint. How should the forecast be made?
  1. Product Owner repeats the last count to preserve product commitment.
  2. Scrum Master chooses the count and distributes work to compensate.
  3. Developers consider capacity, past performance, and required quality.
  4. Developers keep the count and defer the new quality measures.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

What is the purpose of the Daily Scrum?
  1. Report individual completion percentages to the Scrum Master.
  2. Reorder the entire Product Backlog with all key stakeholders.
  3. Approve finished work before it can become an Increment.
  4. Inspect progress toward the Sprint Goal and adapt the plan.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A Scrum Master actively builds a Sprint Backlog item. The Developers choose a board-based Daily Scrum instead of three questions. What participation and format fit Scrum?
  1. The Scrum Master joins as chair and uses the required three-question script.
  2. The Scrum Master stays away despite actively doing selected delivery work.
  3. The Scrum Master joins as a Developer, using the Developers’ chosen format.
  4. The Scrum Master joins as a Developer but must keep the three-question format.
Show answerHide answer

Save this lesson to see this answer.

Set 3: Inspect results and maintain quality10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

What three elements make up the Sprint Backlog?
  1. Sprint Goal, selected Product Backlog items, and delivery plan.
  2. Product Goal, all future requirements, and release calendar.
  3. Definition of Done, stakeholder approvals, and team assignments.
  4. Sprint Goal, completed Increments, and Product Backlog order.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

Who collaborates at the Sprint Review to inspect the outcome and consider what to do next?
  1. The Scrum Team and key stakeholders.
  2. Only the Developers and Scrum Master.
  3. Only the Product Owner and managers.
  4. The stakeholders without the Scrum Team.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A usable Increment meets the Definition of Done on day 7. The Review is on day 10. What does Scrum allow?
  1. Hold it until the Review grants permission to release it to stakeholders.
  2. Replace the Review with a message because completed work is already usable.
  3. Deliver it before the Review and still inspect the Sprint outcome there.
  4. Present it at the Review but delay all delivery until the next Sprint starts.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A team’s Retrospective lists recurring access delays but ends without deciding what to change. What outcome is missing?
  1. Stakeholder approval of the next Product Backlog order.
  2. An automatic extension of the following Sprint timebox.
  3. A new individual performance ranking for the Developers.
  4. A plan for a helpful improvement in quality or effectiveness.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

Which event concludes the Sprint?
  1. The Sprint Review.
  2. The Sprint Retrospective.
  3. The final Daily Scrum.
  4. The next Sprint Planning.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A team keeps a feature backlog and a separate bug backlog with competing orders for the same product. What change would improve alignment with Scrum?
  1. Let each Developer choose between the competing orders daily.
  2. Use one ordered Product Backlog as the source of work.
  3. Assign the Scrum Master final authority over the bug backlog.
  4. Move all bugs to a hardening Sprint after the feature Sprints.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A service team’s Product Goal is still active. A sponsor proposes a second, unrelated long-term objective and asks the team to pursue both. What should guide the decision?
  1. Keep both Product Goals if each has its own clearly ordered work items.
  2. Pursue the second goal once the next Sprint begins, even if the first stays active.
  3. Fulfill or abandon the current Product Goal before taking on the next.
  4. Delegate the second goal to a specialty while the rest of the team pursues the first.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A Sprint Goal remains useful, but a newly discovered dependency makes one planned feature unnecessary. Developers and the Product Owner agree a smaller solution still achieves the goal. What should they do?
  1. Update the plan only after the Sprint Review, keeping all selected items for now.
  2. Ask the Product Owner to cancel the Sprint before changing any selected work.
  3. Let Developers change the selected scope without further Product Owner collaboration.
  4. Update the scope and Sprint Backlog while preserving the Sprint Goal.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

An item meets its specific behavior conditions but misses a required accessibility check in the Definition of Done. What is its status?
  1. It is Done because its item conditions are met.
  2. It is unfinished and is not part of an Increment.
  3. It is an Increment awaiting stakeholder approval.
  4. It is Done once the Product Owner waives the check.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

Two Scrum Teams work together on one product. One team proposes a weaker Definition of Done than the other, though an organizational minimum applies. What must be true of their standard?
  1. They mutually define and follow one Definition of Done meeting that minimum.
  2. Each team may keep its own definition if both satisfy the organizational minimum.
  3. Teams need a common definition only for the work selected for joint release.
  4. Teams may agree a shared definition that temporarily waives the organizational minimum.
Show answerHide answer

Save this lesson to see this answer.

Set 4: Connect goals, plans, and usable results10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

What commitment belongs with the Product Backlog?
  1. The Sprint Goal.
  2. The Product Goal.
  3. The Definition of Done.
  4. The release forecast.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

Several usable, verified additions are created in one Sprint. How does this fit Scrum?
  1. Exactly one may count as an Increment; the others wait for the next Sprint.
  2. Only the last addition counts, because earlier ones cannot be released.
  3. Each addition requires a separate Sprint and Sprint Retrospective.
  4. Multiple Increments may be created, and their sum is inspected at the Review.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

Users at the Review reveal a valuable need that changes what should come next. Which artifact is likely to be adapted for future product work?
  1. The Product Backlog.
  2. The past Sprint Goal.
  3. The finished Increment.
  4. The Scrum Master’s plan.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A usable feature was released mid-Sprint. At the Review, users identify a new opportunity; at the Retrospective, the team finds slow internal handoffs. How should the learning be used?
  1. Adapt future product work and plan a way-of-working improvement.
  2. Update product work but delay process changes until the goal is met.
  3. Improve the process but defer product opportunities until the goal ends.
  4. Treat both findings as optional since the result was released.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A team chooses planning poker for sizing. What kind of Scrum requirement is this?
  1. It is a required sizing method for every Scrum Team.
  2. It is a required approval method for the Product Owner.
  3. It is an optional technique the team has chosen.
  4. It is a required format for Product Backlog refinement.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A course uses the term “Development Team.” What term does the 2020 Scrum Guide use for that accountability?
  1. The Scrum Team.
  2. Developers.
  3. The Delivery Team.
  4. All team members.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A new service team plans a one-week “Sprint 0” only for tool setup. It will show unfinished drafts for feedback and verify work in a later hardening Sprint. How should the plan change to fit Scrum?
  1. Keep verification later if the first Sprint remains shorter than one month.
  2. Show drafts at the Review and let stakeholder approval establish the initial quality standard.
  3. Keep the setup-only Sprint but add a Sprint Goal and reserve quality work for the next cycle.
  4. Aim for a usable Done Increment in the first Sprint, including required verification.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A Scrum Master is actively building a selected Sprint Backlog item. A manager bars this person from the Daily Scrum because Scrum Master attendance is not normally required. What correction follows from Scrum’s participation rule?
  1. The person remains optional because the Scrum Master accountability overrides delivery work.
  2. The person must attend as Scrum Master and take over the Developers’ chosen format.
  3. The person participates as a Developer; an absent general requirement is not a ban.
  4. The person may contribute to delivery but must report progress separately from the Developers.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

Using the October 2026 PSM I format, how many correct answers meet its 85% pass mark out of 80 questions?
  1. 60 correct answers.
  2. 68 correct answers.
  3. 64 correct answers.
  4. 74 correct answers.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A team proposes a week between Sprints to finish testing, followed by Review and Retrospective. Why does this break the connected Scrum cycle?
  1. Only required testing belongs in the Sprint; the closing events can follow.
  2. Only the Review belongs in the Sprint; testing and Retrospective can follow.
  3. A gap is allowed for required testing once the Sprint Goal is met.
  4. Required quality work and the concluding events belong inside the Sprint.
Show answerHide answer

Save this lesson to see this answer.

Set 5: Judge unfamiliar team arrangements10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A training-service team publishes accurate trial results, but every process adjustment requires distant approval that arrives after the next trial. What most directly limits its empirical learning cycle?
  1. The accuracy of its reporting on each trial’s results.
  2. The frequency of inspecting its trial results.
  3. Its ability to adapt promptly to inspected evidence.
  4. The stability of its initial plan across all trials.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A seven-person team decides its own tasks, but each usable result must wait for a separate group to perform all required verification. What capability should it examine?
  1. Its internal authority to decide tasks and organize daily work.
  2. Its members’ individual ability to verify every type of work.
  3. Its product-ordering authority, which the verification group should hold.
  4. Its collective skills to complete a usable Increment within the team.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A rule change removes the user need behind a Sprint Goal. Developers still have unfinished items, and a sponsor requests immediate cancellation. Who has authority, and on what basis?
  1. The Product Owner can cancel because the Sprint Goal has become obsolete.
  2. The sponsor can cancel because the sponsor first identified the rule change.
  3. The Scrum Master can cancel because unfinished items are an impediment.
  4. The Developers can cancel whenever selected items are likely to remain late.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A team completes its Daily Scrum plan, then receives important new information an hour later. When may Developers adjust the plan again?
  1. Only at tomorrow’s Daily Scrum.
  2. As soon as needed during the day.
  3. Only once the Scrum Master approves.
  4. Only at the Review with stakeholders.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A physical-product team has completed required verification for one usable addition. Another addition lacks a quality check and the Sprint ends today. How should it represent the results?
  1. Count both additions in the Increment if the unfinished check is booked for tomorrow.
  2. Count neither addition until the Product Owner gives release approval at the Review.
  3. Count both as Done but mark the second addition as awaiting a hardening Sprint.
  4. Count only the Done addition in the Increment; return the unfinished item to the backlog.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

How many Scrum events does the framework define, counting the Sprint itself?
  1. Four.
  2. Five.
  3. Six.
  4. Three.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A service team spends the entire Review presenting slides and accepts no stakeholder discussion. What change would better serve the event’s purpose?
  1. Collaborate with stakeholders about outcomes and what to adapt next.
  2. Move all stakeholder feedback to the team-only Retrospective.
  3. Ask stakeholders only to approve each Developer’s time record.
  4. Replace product discussion with individual progress reports to the Scrum Master.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A Sprint Backlog shows a goal and selected items, but its task plan still describes an approach abandoned three days ago. Why does this matter even if people know the new plan informally?
  1. Selected scope is fixed, so task changes must wait for the next Sprint Planning.
  2. The written tasks can be ignored since informal agreement gives full transparency.
  3. The artifact no longer gives a visible, current basis for inspecting progress.
  4. A task-plan change requires replacing the Sprint Goal before any update.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A Scrum Master teaches stakeholders why interruptions damage a team’s ability to pursue its Sprint Goal. Which service area does this illustrate?
  1. Helping the organization understand and use Scrum effectively.
  2. Taking over the Product Owner’s final ordering decisions.
  3. Replacing the Developers’ responsibility for daily adaptation.
  4. Acting as a supervisor who approves each team member’s work.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

Using the October 2026 CSM format, a candidate answers 36 of 50 questions correctly after the required course. How does that compare with the 74% pass mark?
  1. It meets the threshold because only 36 answers are required.
  2. It is two correct answers above the required 34.
  3. It is four correct answers below the required 40.
  4. It is one correct answer below the required 37.
Show answerHide answer

Save this lesson to see this answer.

Stuck on your own question? Homework Help

Key Terms

70 Key Terms, each with its definition

A

Acceptance criteria
Acceptance criteria are conditions for one specific Product Backlog item, distinct from the shared quality standard in the Definition of Done.
A cancellation item's acceptance criteria describe a 24-hour cancellation limit, while required quality checks still apply.
Accountability
An accountability is a defined area of responsibility in Scrum, expressed through Product Owner, Scrum Master, and Developers.
A workplace job title can differ from the Scrum accountability held by someone contributing to the product.
Actionable plan
An actionable plan identifies work that people can carry out, so the Daily Scrum leads to useful decisions about the next day of work.
An actionable plan names who will pursue access that is blocked and what useful work others can do in the meantime.
Adaptation
Adaptation is changing a product or process promptly when inspection shows an unacceptable result or a process outside acceptable limits.
Adaptation changes an unsuitable trial process while the team's findings are still useful for the next decision.
Artifact
An artifact represents work or value in Scrum and makes key information transparent enough for shared inspection and adaptation.
Each artifact makes a different aspect visible: product direction, the Sprint plan, or the completed usable result.
Assumption
An assumption is something treated as true when planning or working; the Retrospective can examine assumptions that led the team astray.
The team examines its assumption that an external test account would be activated instantly without a request.

C

Capacity
Capacity is the team's upcoming availability to do work, one input Developers use when forecasting what can be Done in a Sprint.
Planned absences reduce capacity, so Developers consider them before selecting work for the coming Sprint.
Coaching
Coaching helps people develop their ability to understand Scrum and make effective decisions, including organizing their own work.
Coaching helps Developers solve a planning problem without the Scrum Master taking over task assignment.
Commitment
Commitment means pursuing goals and supporting one another, including the Developers' commitment to the Sprint Goal as exact work evolves.
Commitment keeps Developers pursuing their Sprint Goal for payments while they negotiate a simpler receipt design.
Commitment of an artifact
An artifact's commitment supplies focus and a target for measuring progress or quality when people inspect that artifact.
The Sprint Goal is the commitment of an artifact that helps Developers inspect their current Sprint plan.
Complex work
Complex work involves uncertainty that prevents a full, reliable plan in advance and calls for learning through real results.
Developing a new booking service is complex work because user needs and possible solutions are uncertain.
Courage
Courage means doing the right thing and addressing tough problems, including speaking honestly when the news is difficult.
Courage helps the Scrum Master raise an organizational barrier despite the difficult conversation it requires.
Cross-functionality
Cross-functionality means the team collectively has all the skills needed to create value each Sprint, without everyone having every skill.
Cross-functionality combines designers' and testers' different strengths so the team can complete usable work.
CSM
CSM is Scrum Alliance's Certified ScrumMaster certificate, requiring a trainer course and a 50-question test with a 74% pass mark as of October 2026.
After the required course, a CSM candidate needs 37 correct answers in the published 60-minute test.

D

Daily Scrum
The Daily Scrum is a 15-minute event for Developers to inspect progress toward the Sprint Goal and adapt their upcoming work.
At the Daily Scrum, Developers inspect progress and decide which changes their shared Sprint plan needs today.
Definition of Done
The Definition of Done formally describes the required quality state of an Increment and creates a shared understanding of completed work.
A feature missing required accessibility testing does not meet the Definition of Done and remains unfinished.
Delegation
Delegation assigns an activity to another person while leaving the original accountability in place, as with Product Owner backlog work.
Delegation lets a colleague draft backlog items while the Product Owner remains accountable for their management.
Delivery plan
A delivery plan describes how Developers intend to turn selected work into a usable Increment that meets the Definition of Done.
A delivery plan for a payment feature includes practical tasks and all the checks needed for a usable, Done result.
Developers
Developers are the people in a Scrum Team committed to creating any aspect of a usable Increment, including specialties beyond programming.
A tester and a designer both contribute as Developers while helping create the team's usable product result.

E

Empiricism
Empiricism is learning from experience and making decisions based on observation, using real results to guide the next choice.
Empiricism guides a team to revise its plan after observing how people use a trial version of a payment feature.

F

Feedback loop
A feedback loop connects observed results to future decisions, as Scrum events use learning to adapt plans, products, and working practices.
The feedback loop carries user findings into product decisions and team reflection into the next way of working.
Focus
Focus directs the Scrum Team's attention to the Sprint's work and the best possible progress toward its goals.
Focus helps the team route an unrelated feature request to the Product Owner instead of starting a side project.
Forecast
A forecast is an informed view of likely future progress based on available evidence, including past results and upcoming capacity.
The Developers' forecast uses evidence from past work alongside their reduced availability in the coming Sprint.

H

Hardening Sprint
A hardening Sprint is a separate testing or stabilization period used by some teams; Scrum defines no special Sprint type that defers required quality.
A team cannot defer required quality checks to a hardening Sprint and count the unfinished work as an Increment now.

I

Impediment
An impediment is a barrier that blocks or seriously slows the team's progress and needs to be addressed for work to move forward.
An external access restriction is an impediment when it prevents Developers from completing required verification.
Improvement
An improvement is a helpful change to the team's way of working, identified through inspection and addressed as soon as possible.
An improvement changes how access is requested so Developers obtain a test account earlier in the delivery cycle.
Increment
An Increment is a usable, verified addition toward the Product Goal that works with prior Increments and meets the Definition of Done.
An Increment that adds payment works with existing booking features and meets every required quality measure.
Incremental delivery
Incremental delivery grows a product through usable additions that build on prior results instead of only creating separate drafts.
Incremental delivery lets clients use a cancellation feature before the team adds payment functionality.
Inspection
Inspection is the careful, frequent examination of artifacts and progress toward goals to detect unwanted differences or problems.
Inspection of progress toward the Sprint Goal helps Developers decide how to adjust their upcoming work.
Internal hierarchy
An internal hierarchy places people above others in a team; Scrum defines no such hierarchy within the Scrum Team.
Giving the Product Owner task-assignment authority would introduce an internal hierarchy into the Scrum Team.
Iteration
An iteration is a repeated cycle of work and learning, allowing the team to inspect results and adjust its next decisions.
Each iteration lets the team inspect a usable result and adjust its choices for the following cycle.

L

Lean thinking
Lean thinking reduces waste and focuses effort on what is essential, helping people concentrate on work that supports value.
Lean thinking helps the team avoid detailing distant ideas that may change before they become useful.

O

Openness
Openness means being honest with the team and stakeholders about the work and its challenges so problems can be inspected.
Openness appears when a Developer reports a likely delay early enough for colleagues to change the plan.
Optional practice
An optional practice is a technique a team may choose inside Scrum that the framework does not require, such as planning poker or a task board.
A task board is an optional practice that helps visibility without becoming a requirement of the Scrum framework.
Organizational standard
An organizational standard for the Definition of Done is a minimum quality baseline that all Scrum Teams in the organization must follow.
An organizational standard requires a quality measure that the team cannot drop from its Definition of Done.

P

Product
A product is a vehicle for delivering value with a clear boundary, known stakeholders, and defined users or customers.
An appointment service is a product even when delivering its value requires work beyond the software interface.
Product adaptation
Product adaptation changes the product's future direction or work in response to inspected outcomes and new information.
Product adaptation raises a pay-later option after clinic staff explain a need the team had not understood.
Product Backlog
The Product Backlog is the single, ordered, emerging list of work needed to improve a product, changing as people learn.
Needed fixes and new features appear in one Product Backlog so the Product Owner's trade-offs stay visible.
Product Backlog refinement
Product Backlog refinement is ongoing activity that breaks down and further defines items into smaller, more precise pieces of work.
Product Backlog refinement turns a broad consultation idea into smaller work as its possible value becomes clearer.
Product Goal
The Product Goal describes a future product state that guides the Scrum Team's planning and commits the Product Backlog.
The Product Goal of enabling appointments without phone calls gives the team a longer-term direction for planning.
Product Owner
The Product Owner is the one person accountable for maximizing product value and for effective management of the Product Backlog.
The Product Owner weighs competing clinic requests and decides which Product Backlog work should come first.
Product value
Product value is the benefit the product delivers, which the Product Owner is accountable for maximizing through the team's work.
The Product Owner considers product value when comparing payment access with a proposed loyalty feature.
Professional accountability
Professional accountability means Developers hold one another responsible for their work as peers within a self-managing team.
Professional accountability appears when Developers discuss their work agreements together as responsible peers.
PSM I
PSM I is Scrum.org's entry-level Professional Scrum Master certificate, with 80 questions, 60 minutes, and an 85% pass mark as of October 2026.
A candidate needs 68 correct answers out of 80 to meet the published PSM I passing threshold.

Q

Quality
Quality is the required state of the product expressed through the Definition of Done, which Developers must follow in creating an Increment.
The team preserves quality by keeping required verification in the work even when selected items may remain late.

R

Readiness for selection
Readiness for selection means an item is understood well enough that the Scrum Team can complete it to Done within one Sprint.
A small cancellation item reaches readiness for selection when the team understands how to complete it within a Sprint.
Release
A release delivers a usable Increment to stakeholders and can take place before the end of a Sprint, without waiting for the Review.
A release on day eight gives users a verified payment improvement before the Sprint Review takes place.
Respect
Respect means treating Scrum Team members as capable, independent people and taking their professional judgment seriously.
Respect allows the Product Owner to discuss value while trusting Developers to choose how to do the work.

S

Scope
Scope is the exact work selected for a Sprint, which Developers can clarify and renegotiate with the Product Owner while protecting the Sprint Goal.
Developers negotiate scope with the Product Owner when a simpler receipt can still meet the Sprint Goal.
Scrum
Scrum is a lightweight framework that helps people create value through adaptive solutions to complex problems.
A service-design team uses Scrum to learn from usable improvements as customer needs become clearer.
Scrum adoption
Scrum adoption is establishing an understanding and use of the Scrum framework within the team and the wider organization.
The Scrum Master supports Scrum adoption by helping managers understand empirical work and self-management.
Scrum Guide
The Scrum Guide is the official definition of Scrum by Ken Schwaber and Jeff Sutherland, currently in its November 2020 edition.
When a workplace habit conflicts with Scrum's rules, the team checks the Scrum Guide for the requirement.
Scrum Master
The Scrum Master is accountable for establishing Scrum as defined in the Scrum Guide and enabling the Scrum Team's effectiveness.
The Scrum Master coaches team members and stakeholders to understand Scrum and improve their work within it.
Scrum Team
A Scrum Team is one cohesive unit of one Product Owner, one Scrum Master, and Developers, accountable for a valuable, useful Increment each Sprint.
A seven-person Scrum Team building a clinic app brings different skills to one shared product objective.
Selected work
Selected work is the set of Product Backlog items Developers choose through discussion with the Product Owner for the coming Sprint.
For a Sprint about payments, the selected work includes card entry and payment connection while a less valuable item stays in the Product Backlog.
Self-management
Self-management means a Scrum Team decides internally who does what, when, and how instead of receiving individual assignments from outside.
Self-management lets Developers reorganize delivery together when a colleague becomes unavailable.
Sizing
Sizing is assessing the amount of work in a Product Backlog item, a responsibility of the Developers who will do that work.
Sizing remains with Developers when the Product Owner explains a trade-off that makes an item smaller.
Sprint
A Sprint is a fixed-length event of one month or less that contains the work and other Scrum events needed to turn ideas into value.
A two-week Sprint contains Planning, product work, daily inspection, Review, and Retrospective within its fixed length.
Sprint 0
Sprint 0 is a label some teams use for setup, but Scrum defines no special first Sprint exempt from creating a valuable, useful Done Increment.
Calling a setup-only cycle Sprint 0 does not remove the expectation of a usable, Done result in every Sprint.
Sprint Backlog
The Sprint Backlog is the Developers' current plan, combining the Sprint Goal, selected Product Backlog items, and an actionable delivery approach.
For a Sprint about payments, the Sprint Backlog shows the payment objective, selected features, and the current plan for creating them.
Sprint cancellation
Sprint cancellation ends a Sprint because its Sprint Goal has become obsolete; only the Product Owner has authority to cancel it.
The Product Owner considers Sprint cancellation when the product is abandoned and the Sprint Goal becomes obsolete.
Sprint Goal
The Sprint Goal is the Sprint's single objective and the commitment for the Sprint Backlog, allowing flexibility in the exact work.
Developers simplify a payment receipt while preserving a Sprint Goal that clients can pay for booked appointments.
Sprint outcome
A Sprint outcome is the result inspected at the Review, considered with progress toward the Product Goal and changes in the environment.
The team and clinic managers inspect the Sprint outcome before discussing the next valuable product change.
Sprint Planning
Sprint Planning is the event that starts the Sprint and creates its Sprint Goal, selected work, and actionable delivery plan.
In Sprint Planning, the whole Scrum Team discusses why a payment feature matters before Developers select and plan delivery.
Sprint Retrospective
The Sprint Retrospective is the concluding Sprint event where the whole Scrum Team plans improvements in quality and effectiveness.
At the Sprint Retrospective, the team examines a recurring access delay and agrees on a concrete preventive action.
Sprint Review
The Sprint Review is a working session where the Scrum Team and key stakeholders inspect the outcome and collaborate on future adaptation.
Feedback from clinic staff at a Sprint Review changes the Product Backlog after these stakeholders try the Sprint's usable result.
Stakeholder
A stakeholder is someone with an interest in the product, such as a user, customer, manager, or sponsor who can contribute needs and feedback.
A clinic manager is a stakeholder who explains client needs and helps the team consider its next product improvement.

T

Three-question format
The three-question format is an optional Daily Scrum structure about past work, upcoming work, and impediments, not a Scrum requirement.
The Developers replace their three-question format with a board discussion that better supports the Sprint Goal.
Timebox
A timebox is a maximum event duration that limits time spent while keeping attention on achieving the event's purpose.
Planning's eight-hour timebox for a one-month Sprint is a maximum, so the event can finish sooner.
Transparency
Transparency makes the true state of work and process visible and understood by the people doing and receiving the work.
Transparency lets stakeholders distinguish features meeting the quality standard from unfinished work.

About this lesson

By StudeliReport a mistake

Make your own Study Materials