Kanban and Flow
BeginnerLesson 5 of 6 in Agile and Scrum Course
What you will learn
- Describe Kanban as a strategy for improving the flow of work, and explain the principles and practices that the main Kanban guides set out.
- Describe Kanban as a way to manage the flow of workDefine Kanban, flow and pull, explain where Kanban comes from and what it aims for, and tell a Kanban system apart from a simple task board.
- Apply Kanban's principles and core practicesExplain the change and service principles of the Kanban Method, its six general practices, the three practices of the Kanban Guide and the feedback meetings that keep a Kanban system improving.
- Describe Kanban as a way to manage the flow of work
- Design a board that shows the real workflow, show work items, blockers and urgency clearly, and write down the policies that govern how work moves.
- Map a real workflow onto a Kanban boardTurn the steps work actually goes through into board columns, mark where work starts and finishes, and show waiting as well as active work.
- Show work items, blockers and urgency on the boardDecide what counts as a work item, show the information a card needs, and use swimlanes, classes of service and blocker markers to make risk and urgency visible.
- Make workflow policies explicit in a Definition of WorkflowWrite down the shared rules for how work moves, using the six elements the Kanban Guide requires in a Definition of Workflow.
- Map a real workflow onto a Kanban board
- Explain why fewer items in progress means faster delivery, set and use WIP limits, manage items day to day, and improve the workflow through experiments.
- Explain why limiting work in progress speeds up deliveryShow with examples how starting less and finishing more shortens the time each item takes and makes problems visible.
- Set and use WIP limitsChoose where to place WIP limits, set first values from current data, follow them when the board is full, and adjust them based on evidence.
- Actively manage items in progressKeep work moving day to day by focusing on blocked and aging items, handling bottlenecks, and choosing carefully what to start next.
- Improve the workflow with feedback and experimentsUse flow data and feedback meetings to find improvements, test them as experiments, and keep or reverse the changes based on evidence.
- Explain why limiting work in progress speeds up delivery
- Calculate the four flow metrics, relate them with Little's Law, and read the charts Kanban teams use to understand their workflow.
- Calculate the four flow metricsDefine and calculate WIP, throughput, cycle time and work item age from a team's data, and tell cycle time apart from lead time and flow efficiency.
- Use Little's Law to relate WIP, cycle time and throughputState Little's Law, use it to calculate one flow metric from the other two, and explain the conditions under which it holds.
- Read a cumulative flow diagramBuild and interpret a cumulative flow diagram to read WIP, approximate cycle time and throughput, and recognize the patterns that signal flow problems.
- Read cycle time, throughput and aging chartsInterpret cycle time scatterplots with percentile lines, throughput run charts and aging work item charts, and use percentiles instead of averages.
- Calculate the four flow metrics
- Turn past cycle times into a service level expectation for single items, and use past throughput to forecast how much work will be done by when.
- Set and use a service level expectationCalculate a service level expectation from historical cycle times, show it on the board, and use it to plan, right-size and manage work.
- Forecast how much work will be done and by whenUse past throughput, including a simple Monte Carlo simulation, to forecast multiple items with a stated probability instead of a single date.
- Set and use a service level expectation
- Add Kanban practices to the work of a Scrum Team, and compare Kanban and Scrum to choose what fits a team's work.
- Add Kanban practices to a Scrum Team's workExplain how the Kanban Guide for Scrum Teams adds visualization, WIP limits, active management and flow metrics to Scrum without changing the Scrum framework.
- Compare Kanban and Scrum and choose what fitsCompare how Kanban and Scrum handle cadence, roles, change and measurement, and decide which approach, or which combination, suits a given situation.
- Add Kanban practices to a Scrum Team's work
Kanban and Flow study guide
1Explain what Kanban is and the ideas behind it
Kanban helps a team see how work moves from a request to something useful. This chapter connects that purpose to pull, capacity, and the principles behind the main Kanban guides. You will distinguish a working Kanban system from a board that only shows task status, then see how teams use visible rules and feedback to improve the process they already have.
1.1 Describe Kanban as a way to manage the flow of work
Kanban is a strategy for improving how value flows through a process. A Kanban system is the way a group combines the practices for its own work. A completed request, a published article, or a usable software change can deliver value; a large pile of started work does not yet do that.
Follow the work
Flow means the movement of value through the process. A team asks how smoothly items move, how long they take, and how reliably it can forecast delivery. Someone can be busy all day while an item spends most of its time waiting for review. Looking only at individual activity misses that delay.
The Kanban Guide describes three qualities to balance:
- Effectiveness: deliver what stakeholders need when they need it.
- Efficiency: use time, people, and money well to deliver value.
- Predictability: forecast delivery with a useful level of uncertainty.
Finishing many unwanted changes is inefficient use of capacity, even if the board moves quickly. A useful system considers the value of the work as well as its speed.
Start work when capacity is available
| Push | Pull |
|---|---|
| Work starts because it is requested or scheduled. | Work starts when there is capacity under the agreed control. |
| New requests can add to an already full workflow. | A free slot signals that another item may enter. |
A support team limits open escalations to 4. Under pull, a new escalation waits until one of those 4 is resolved. The team still selects and prioritizes future requests; waiting to start them protects its ability to finish current work. Starting every request at once would hide the difference between demand and available capacity.
Where the ideas came from
The Japanese word kanban means roughly “signboard” or “visual card.” Toyota used cards to signal a need for parts in the production system developed under Taiichi Ohno from the late 1940s onward. From the mid-2000s, David J. Anderson and others adapted these ideas to knowledge work, where a card stands for a request or task.
Three guides explain related approaches. The Kanban Guide, associated with Daniel Vacanti, John Coleman, and contributors, gives a minimum set of practices, workflow agreements, and metrics. Kanban University’s Official Guide to the Kanban Method adds principles, six general practices, and feedback meetings called cadences. The Kanban Guide for Scrum Teams explains how the practices support Scrum. Check the endpoints when these guides use timing terms such as lead time.
Recognize a system beyond its board
A “To Do → Doing → Done” board shows status. A Kanban system also defines its items, its started and finished points, how WIP is controlled, its flow policies, and how it measures and improves delivery. Kanban prescribes no new roles, fixed iterations, or compulsory meeting schedule. Teams can apply it to support, recruiting, marketing, or Scrum development.
Planning continues through decisions about what to start next, known as replenishment. Teams can plan at an agreed rhythm or when capacity frees up, including within Sprints. They make commitments at a defined point and use evidence to discuss likely delivery.
Key Takeaways
- Kanban improves the flow of value through the whole process.
- Pull starts work when capacity is available under the agreed WIP control.
- A board needs explicit workflow agreements, flow management, and improvement to support a Kanban system.
- Effectiveness, efficiency, and predictability must be balanced.
- Kanban can support an existing way of working, including Scrum.
1.2 Apply Kanban's principles and core practices
Kanban starts with how people actually work and gives them a way to improve it together. The Kanban Method describes principles for change and service delivery, alongside practices that make those principles useful day to day.
Change the current system together
The Method’s three change management principles are to start with what you do now, agree to pursue evolutionary improvement, and encourage leadership at every level. First understand the actual process and respect existing roles and job titles. Then agree on deliberate changes. A reviewer who notices a recurring delay can lead an improvement just as a manager can.
Evolutionary change means taking small, testable steps. A design team first puts its work on a board. Two weeks later it limits review to 3 items. After four more weeks, it examines waiting times before deciding what to change next. The Kanban Guide also permits larger changes when the situation calls for them; it does not require every improvement to be small.
The three service delivery principles are to understand customer needs, manage the work while people self-organize around it, and regularly review the network of services and its policies. A service can deliver to an external customer or to another department. A hiring team, for example, serves applicants and the departments filling vacancies.
Connect the practice lists
The Method has six general practices. The Kanban Guide organizes closely related ideas into three broader practices:
| Kanban Method practices | Kanban Guide practice |
|---|---|
| Visualize; make policies explicit | Define and visualize the workflow |
| Limit WIP; manage flow | Actively manage items in the workflow |
| Implement feedback loops; improve collaboratively and evolve experimentally | Improve the workflow |
To visualize, show both the items and their route. To limit WIP, control how much has started without finishing. To manage flow, attend to queues, age, and blockers. To make policies explicit, write down how work moves. Feedback loops turn observations into decisions, and experimental improvement checks whether a change helps. These practices work together: a visible queue is useful because the team can act on it.
Make feedback lead to action
Kanban University calls regular feedback meetings cadences. A Team Kanban Meeting, often daily, examines flow and immediate decisions. Replenishment, weekly or as needed, selects the next work to start. A Team Retrospective, perhaps every two weeks or monthly, examines how to improve the system. Larger organizations can add service delivery, operations, risk, and strategy reviews.
Teams choose frequencies and names that fit their work. An existing meeting can serve a cadence’s purpose. Collecting a dashboard and never making a decision leaves the feedback loop incomplete.
Read measures as system information
“Manage the work, not the workers” means looking at how items move through shared policies, queues, and handoffs. Throughput and cycle time describe that system. Ranking individuals with these measures encourages people to choose easy work or hide delays. If review is slow, examine the review rules, available help, and waiting queue with the people doing the work.
Key Takeaways
- Start with the current process, improve it deliberately, and encourage leadership at every level.
- Service delivery begins with customer needs and the flow of work across services.
- The Method’s six practices align with the Kanban Guide’s three broader practices.
- A feedback loop includes action; cadence names and frequencies fit the team.
- Flow metrics describe a system and support shared improvement, not individual rankings.
2Visualize the workflow on a Kanban board
A useful board makes the real journey of work visible, including the places where it waits. This chapter shows how to choose columns, mark the boundaries of work in progress, and give cards enough information to guide decisions. You will also connect urgency and blockers to clear policies, so the board helps people decide what happens next.
2.1 Map a real workflow onto a Kanban board
A Kanban board shows work items and the states they pass through. Cards usually move left to right, with WIP controls and policies visible nearby. A wall and sticky notes can work as well as a digital board if they make the workflow clear.
Build columns from real items
Choose the type of work to model. Follow several recently finished items and list where they were active and where they waited. Put those states in order, then mark the started and finished points. Add the controls and policies that govern movement.
Use state names such as “Drafting” and “Approval.” Columns named after people make it harder to see which part of the process holds up work. Combine states that never hold items for long, but keep a meaningful queue visible even when no one is actively working there.
A content team maps this route:
Ideas → Ready → Drafting → Editing → Approval → Published
It divides Editing into “In progress” and “Done.” The latter means editing has finished and the article is waiting for approval. It does not mean the article is published. This small split reveals a handoff that a single “Editing” column could hide.
Set the measurement boundaries
The team defines started as the moment a writer pulls an article from Ready into Drafting. It defines finished as publication. Every card between those points counts as WIP, including articles waiting for approval. Forty cards in Ideas contribute nothing to this delivery workflow’s WIP because they have not crossed its started point.
Kanban University calls the decision to deliver an item the commitment point, and the point where the customer receives it the delivery point. In this example, selection into Ready is a commitment even though the chosen started point is Drafting. Write both meanings clearly; commitment and first activity need not be the same event.
Upstream work explores options before commitment. Options can be discarded without breaking a delivery promise. A team actively analyzing those options can define a separate upstream workflow with its own boundaries and WIP. Counting depends on the workflow being measured, not on whether the card appears toward the left of a board.
Show work and waiting
An activity state means work is being done, such as Testing. A queue state means an item is waiting, such as Ready for test. Both can lie inside WIP. Hiding queues makes it look as though the only way to speed up delivery is to work faster, when a shorter wait may matter more.
Kanban University’s STATIK, the Systems Thinking Approach To Introducing Kanban, helps people design the system together. It examines dissatisfaction, demand, current capability, the workflow, classes of service, and the overall system design. New findings can send the group back to an earlier question; the steps are iterative.
A team board can track requests, a portfolio board larger features or projects, and a personal board one person’s tasks. At each scale, the board should reveal the actual route and the policies governing it. An undefined “Done” column leaves people unable to tell whether delivery has occurred.
Key Takeaways
- Model real states, including queues and handoffs.
- Started and finished points determine which items count as WIP.
- A commitment point can differ from the first active-work state.
- A step’s “Done” area can still be a queue inside the workflow.
- STATIK develops the system with the people involved and revisits earlier decisions.
2.2 Show work items, blockers and urgency on the board
A card represents a work item, a unit of value that moves through the workflow. Examples include a defect fix, a customer request, an article, and a job opening. Agree on what counts as an item so that the board and the metrics use the same unit.
Make the card useful for decisions
Show a short title, item type, start date, and who is working on it. Add a due date for date-driven work and the reason and date of any blocker. The start date lets the team calculate age without relying on memory. Colors, shapes, and icons can show different work types, but they need a clear legend.
Keep items small enough to finish within the team’s usual time frame. A card called “Replace the whole platform” and a card called “Fix one broken link” can each count as one, but that count says little about the effort or delivery risk. Defining and right-sizing items makes comparisons more useful.
Swimlanes are horizontal rows across the board. They can separate products, customers, item types, or classes of service. An IT team has a whole-workflow limit of 6 and allows planned changes to occupy at most 2 slots, reserving at least 4 for incidents. Rows organize the work; the policies determine how much capacity each row may use.
Match treatment to the cost of delay
Cost of delay is the value lost or cost incurred for each period delivery is delayed. It joins urgency with impact. If a feature is expected to earn 5,000 dollars a week, delaying it two weeks costs about 10,000 dollars in expected revenue under that estimate.
A class of service defines how an item is treated. Four common archetypes are:
| Class | Delay pattern and typical treatment |
|---|---|
| Expedite | Delay is costly immediately; give priority, often with a limit of one. |
| Fixed date | Cost rises sharply after a known date; plan to meet that date. |
| Standard | Cost rises steadily; usually pull in first-in, first-out order. |
| Intangible | Little immediate cost, but value grows over time; reserve attention for it. |
A production outage can justify expedite treatment. Calling every request “urgent” removes the distinction and makes normal work repeatedly wait. The policy should state who can classify an item and how many expedite items may exist.
Keep blockers visible
A blocker stops an item from progressing: missing access, an unanswered decision, or another system’s defect. Flag the card and record the cause and date. Give someone a clear follow-up action. A blocked item stays in WIP until it reaches the defined finished point; moving it aside visually does not finish it.
For recurring problems, use blocker clustering. Group past blockers by cause and compare their frequency or cost. If 9 of 14 blockers were waits for a test environment, improving that access can help many items. Side work must also appear on the board when it uses team capacity; otherwise the visible workload understates the real demand.
Key Takeaways
- Define the unit counted as a work item and show its type and start date.
- Swimlanes separate work; capacity policies govern the lanes.
- Classes of service connect delay costs to treatment and pull order.
- Blocked and side work must remain visible; unfinished items remain WIP.
- Group past blockers by cause to choose improvements.
2.3 Make workflow policies explicit in a Definition of Workflow
An explicit policy is a visible agreement about how work is handled. It can say when a card may enter a state, what must be true before it leaves, or how the team treats urgent work. A short written rule gives people the same basis for a decision.
Define the whole workflow
The Definition of Workflow (DoW) brings the agreements together. The Kanban Guide requires at least six elements:
- The work items that move through the process.
- The points where they count as started and finished.
- The states between those points.
- How WIP is controlled from started to finished.
- Explicit policies for movement through each state.
- A service level expectation (SLE): a forecast of elapsed time with a probability.
Teams can add working agreements and can have more than one DoW. The six elements give the board shared meaning. A visible limit without a clear started point still leaves people unsure which cards to count.
Write rules people can apply
A four-person web team defines user stories and defects as its work items. An item starts when pulled from Ready into Build and finishes when live in production. Its states are Build, Code review, Test, and Deploy, with a whole-workflow WIP limit of 8.
It writes two movement policies: “Code review needs one reviewer who did not write the code” and “Pull the oldest Ready item unless an expedite item is waiting.” Its SLE is “85% of items finish within 9 days.” An item awaiting deployment is still WIP because the finished point is production, even if coding and testing are complete.
Different rules answer different questions. Entry or pull criteria say what must be ready before work enters a state. Exit criteria say what completion of that state requires. Replenishment criteria govern who selects upcoming work and when. Class-of-service policies govern priority and exceptions. Each rule belongs where people need it, such as at a column header or on a short linked page.
Agree, observe, and update
The people doing the work agree on their policies and improve them together. Within Scrum, the Scrum Team creates and adapts its DoW, with members acting within their accountabilities. Outside stakeholders can describe needs and constraints, but do not prescribe the team’s workflow.
Keep policies short enough to use during real decisions. If people repeatedly ignore a rule, discuss the mismatch openly. The rule may need to change, or the team may need help following it. Quietly maintaining an ideal process beside a different real process makes the board misleading.
Policies are changeable. After defects escape, the team might add a specific exit check. If recent cycle times shift, it may revise the SLE using the new evidence. Record what changed and when so later measurements can be interpreted. The team can adapt its DoW when needed; a regular feedback meeting is a useful opportunity, not a required waiting period.
Key Takeaways
- A DoW defines items, boundaries, states, WIP control, flow policies, and an SLE.
- Entry, exit, replenishment, and service policies answer different movement questions.
- The people doing the work agree on and adapt the policies.
- Keep rules visible and record changes so their effects can be examined.
3Limit work in progress and manage the flow of work
A full board is a reason to help work finish. This chapter explains why starting fewer items can shorten delivery times, then shows how to set limits and respond when a column has no space. You will use age, blockers, and queues to decide where help is needed, and turn recurring problems into changes that the team can test with evidence.
3.1 Explain why limiting work in progress speeds up delivery
Work in progress (WIP) is the measured number of items started but unfinished. A WIP limit is the agreed maximum for a state, several states, or the whole workflow. A limit of 6 allows a measured WIP of 4; it does not require the team to start two more items.
Compare two ways to do the same work
One person has three tasks, each needing 3 days of focused effort. All are available on day 1. Assume no switching cost and use inclusive days for cycle time.
Working sequentially, the person starts the first task on day 1 and finishes on day 3. The second runs from day 4 to day 6, and the third from day 7 to day 9. Each task has a cycle time of 3 days. Delivery happens on days 3, 6, and 9, averaging day 6 relative to their common availability.
Now start all three on day 1 and divide attention equally. Each receives one third of a workday per day. All finish around day 9, giving each a cycle time of about 9 days. The total effort has not changed, but the first delivery is much later.
| Approach | Each task’s cycle time | Delivery days |
|---|---|---|
| One at a time | 3 days | 3, 6, 9 |
| All together | About 9 days | About 9, 9, 9 |
Waiting before the defined start is different from time inside the workflow. That is why the sequential example has a 3-day cycle time for each task even though the third task is delivered on day 9.
Understand why excess WIP adds delay
Every open item competes for attention and capacity. Context switching adds the effort of remembering where work stopped, reopening tools, and rebuilding concentration. The equal-sharing calculation leaves this cost out; actual switching can make completion slower still.
Queues also form when every person is kept fully occupied. A small surprise has nowhere to go, so work waits. Some slack, or spare capacity, lets people help each other and respond to urgent needs. A brief pause in one person’s tasks can help the whole system finish sooner.
At the same average throughput, more average WIP means longer average cycle time. Little’s Law expresses this relationship. Reducing WIP is therefore an early response when items take too long, while the team watches whether delivery rate stays healthy.
Let a full column expose the problem
A WIP limit stops more work entering a full area. That pressure reveals a slow review, a difficult handoff, or a blocker that would otherwise hide in a growing queue. People can help finish, review, or unblock work instead of opening another card.
A persistent idle period needs investigation. A downstream bottleneck or weak incoming demand can leave people waiting even when the limit is sensible. Raising the limit in front of a bottleneck adds to its queue. Check the cause before adjusting the control; judge the change by finished work and cycle time.
Key Takeaways
- WIP is a measured count; a WIP limit is a maximum, not a target.
- Starting the same tasks together can delay the first delivery and lengthen their cycle times.
- Context switching and queues consume capacity and time.
- Spare capacity helps a team respond and collaborate.
- A full column reveals where work needs help.
- Investigate sustained idle time before raising a limit.
3.2 Set and use WIP limits
WIP limits control how much unfinished work enters an area. A team can place them on a column, a group of columns, a swimlane, a class of service, or the whole workflow. A whole-workflow limit is sometimes called CONWIP, for constant work in progress.
Choose and display a first limit
Start by counting current WIP in each state. A first limit can be at or slightly below that count, or based on a simple rule such as the number of people working there. Treat the number as a starting policy to review with evidence. A five-person team holding 14 items might choose a whole-workflow limit of 10 and review it after a month.
Write a column’s limit in its header, such as “Test (3).” If the column contains “In progress” and “Done” areas, the limit normally covers both. A card waiting in Build: done is still unfinished work for the overall system.
Respond to a full board
Build has a limit of 3 and holds 3 cards. Test has a limit of 2 and holds 2. A developer finishes building one card:
- The card moves into Build: done. Build still holds 3 cards.
- Test is full, so the waiting card cannot enter it.
- Build has no free slot, so the developer does not pull another Build item.
- The developer helps test an existing item.
- When that item leaves Test, Test pulls the waiting Build card. Build now has room.
The newly free slot is a pull signal. Capacity downstream draws work forward. Increasing Build’s limit at step 3 would add unfinished work without resolving the full Test column.
State exceptions openly
Some work needs exceptional treatment. A team might agree, “One expedite item may enter a full column; finish it before pulling other new work.” Put that exception in the DoW and keep its use visible. The policy explains why a limit can be exceeded in a particular case; it does not make silent exceptions acceptable.
Per-person limits can reduce task switching, but alone they can leave large queues between people. Follow the route of work when choosing controls, including waiting states. A maximum for the whole workflow can complement the local limits.
Adjust from observed effects
A limit that is never reached currently constrains nothing. Check whether demand is low, another stage is holding work, or the limit is simply high. A lower value can be a useful experiment, but reaching every limit is not the goal.
If people frequently wait and have nothing useful to help with, examine whether the limit itself is starving the workflow. Raise it slightly only when the evidence supports that explanation. If the bottleneck is downstream, more upstream WIP adds waiting.
Change one limit at a time and observe cycle time and throughput over several weeks. A useful control supports finishing and makes problems visible. Filling every free slot, raising a limit whenever it is reached, or hiding excess cards removes the very signal the team needs.
Key Takeaways
- Limits can govern local states or the whole workflow.
- Count waiting cards inside a split column’s shared limit.
- When a state is full, help existing work finish before pulling more.
- Document any permitted exception in the DoW.
- Adjust one limit using evidence about cycle time, throughput, and the cause of waiting.
3.3 Actively manage items in progress
A Kanban system needs active attention to the items already inside it. The daily questions are practical: What can finish? What is blocked? What is getting old? Where is capacity available? The board provides evidence for deciding what to do next.
Walk from delivery toward the start
A common Kanban meeting walks the board right to left, starting with the items closest to finished. For each card, ask what prevents it from moving and who can help. This keeps attention on delivery and on shared obstacles.
An item in Deploy may need one approval. Resolving it can release value and free a workflow slot. A person-by-person report of yesterday’s activity could miss that decision entirely. The meeting’s purpose is to manage flow; an activity report is useful only when it helps decide how an item moves.
Use age before an item is late
Work item age is the time since an unfinished item started. Compare it with the team’s SLE, which forecasts a completion time and probability for similar work. The comparison helps the team act while it can still influence the outcome.
Suppose the SLE is “85% within 8 days.” An item in Test is 6 days old and waiting for an environment. It needs attention today: someone can follow up on the environment, find another way to test, or examine whether the item needs splitting. Waiting until day 12 would turn an early warning into a past delay. Low age also leaves room to check blockers and remaining work; it is not a complete picture of risk.
Mark each blocker’s cause and date and agree who will follow up. An item described as “almost done” can still wait for days. Its place on the board and age deserve the same attention as an obviously difficult item.
Help the constraint
A bottleneck limits the throughput of the whole workflow. Work commonly accumulates before it, while later stages wait for input. If Test cannot keep up, faster coding alone sends it more work without increasing finished output.
Help can include pairing on tests, removing a recurring environment problem, reducing handoffs, or stopping excess work entering the queue. Look for evidence across states before naming the constraint; a single old card can have a special cause.
Choose new work deliberately
Replenishment selects which upstream options become committed work. A team may meet for 20 minutes each Monday to fill Ready up to its limit of 5. Another may replenish whenever capacity opens. The DoW states the commitment point and the selection rules.
Pull order is a policy. Deal with expedite and fixed-date items according to their agreed treatment; otherwise an oldest-first rule often suits standard work. Consider cost of delay, capacity, and the items closest to finished. Choosing only easy or favorite cards leaves more important work aging. Over time, pull new work at about the rate completed work leaves so the system avoids a steadily growing workload.
Key Takeaways
- Walk the board from right to left to find actions that help items finish.
- Use age and the SLE to act before delays grow.
- Assign a follow-up action for blockers.
- Support the bottleneck to improve whole-workflow delivery.
- Replenishment and pull order follow explicit priority and capacity policies.
3.4 Improve the workflow with feedback and experiments
Improvement changes the workflow so it delivers value more effectively, efficiently, or predictably. Flow data helps the team choose a problem and examine whether a proposed change actually helps. Customer and team feedback add context that a number alone can miss.
Turn an observation into an experiment
Use a clear sequence:
- Observe a problem in the board, metrics, or feedback.
- State a hypothesis linking a change to an expected effect.
- Change one policy so its effect can be examined.
- Measure over an agreed period.
- Keep, adjust, or reverse the change using the results.
A useful hypothesis is specific enough to check. “Improve collaboration” gives little guidance. “If developers review before starting new work, the review queue’s waiting time will fall” identifies an action and an outcome.
Work through a review delay
A team finds that items wait an average of 3 days in Ready for review and that cycle times have increased. It tries a review limit of 2 instead of 4, paired with a rule that developers help review before pulling new work. This is one review policy experiment with a stated mechanism: less incoming review work and more help finishing the existing queue.
After four weeks, average review waiting is 1 day and throughput is unchanged. The results support keeping the policy. The team still checks that the period contains comparable work and that other circumstances did not explain the result. It has reduced a delay without reducing its rate of finishing items.
If waiting had fallen but throughput also fell sharply, the team would examine that trade-off before deciding. Measures serve a delivery purpose, not a contest to make every number smaller.
Choose a cause worth removing
Common targets include long queue waits, oversized items, frequent blockers, unnecessary handoffs, and failure demand. Failure demand is work generated by earlier poor-quality work, such as correcting an avoidable defect. Preventing those defects can release capacity for work customers wanted in the first place.
Group past blockers by cause and examine the board’s queues. A recurring access problem suggests a different experiment from an oversized work item. Ask the people doing the work what creates the pattern before choosing a solution.
Compare fairly and make the change visible
Use the same item types, counting rules, and measurement boundaries before and after the change. Observe for a long enough period, usually several weeks, to avoid treating an unusually easy or difficult week as the whole story. Changing several independent policies at once makes it harder to tell which helped.
A retrospective or flow review gives improvement a rhythm, but the DoW can change whenever needed. Record the policy and its change date. Use metrics to learn about queues, handoffs, and quality. Turning cycle time into an individual performance target can encourage artificial splitting or skipped checks, making the metric look better while service becomes worse.
Key Takeaways
- An experiment links an observed problem, a policy change, and a measurable expected effect.
- Compare similar work over a useful period with consistent measurements.
- Reduce waiting, blockers, handoffs, oversized work, or failure demand.
- Keep, adjust, or reverse a change based on evidence.
4Measure flow with metrics and charts
Flow measures turn the movement of work into information a team can act on. This chapter starts with counts and dates, then connects the measures through Little’s Law. You will learn to read the different questions answered by cumulative flow, cycle time, throughput, and aging charts, including the limits of what each chart can tell you.
4.1 Calculate the four flow metrics
The four required flow metrics describe unfinished work, finished output, elapsed completion time, and the age of current items. Use the started and finished points in the DoW for all four. Decide whether to count calendar or working days and keep that choice consistent.
Know which items each metric measures
| Metric | Meaning |
|---|---|
| WIP | Number of started but unfinished items at a point in time |
| Throughput | Number of finished items per unit of time |
| Cycle time | Time from started to finished, measured after completion |
| Work item age | Time from started to now, for unfinished items |
Throughput counts items, not hours or story points. Similar, manageable item sizes make the count more useful. Very large items can be split so they flow within the team’s usual time frame.
Calculate from dates
For this example, count both the start and finish day: cycle time is finish day minus start day plus 1. The same inclusive rule applies to age, using today in place of the finish day. A same-day item therefore takes 1 day.
| Item | Started | Finished | Cycle time |
|---|---|---|---|
| A | Day 1 | Day 3 | 3 days |
| B | Day 1 | Day 6 | 6 days |
| C | Day 2 | Day 4 | 3 days |
| D | Day 3 | Day 9 | 7 days |
| E | Day 4 | Day 5 | 2 days |
| F | Day 5 | Day 10 | 6 days |
| G | Day 6 | Unfinished | — |
| H | Day 8 | Unfinished | — |
Six items finished during the 10-day period, so throughput is 6 items in 10 days, or 0.6 items per day. The completed cycle times total 27 days. Their average is:
Average cycle time is 4.5 days. At the end of day 10, WIP is 2. G’s age is 5 days and H’s is 3 days. G and H do not enter the completed cycle-time average; their final completion times are still unknown.
Separate useful timing terms
Age is a leading indicator: it can prompt action while an item remains unfinished. Cycle time is a lagging indicator: it describes items that already finished.
Lead time needs named endpoints. Kanban University measures it from commitment to delivery, and customer lead time from request to delivery. Many agile and project management materials use lead time for request to delivery and cycle time for work start to completion. The Kanban Guide uses the team’s defined started and finished points for cycle time. Check those points before comparing figures.
Flow efficiency is the share of cycle time spent actively working on the item:
An item worked on for 2 of its 10 days has 20% flow efficiency. The other time was waiting. That directs attention toward queues and handoffs. Compare a team with its own relevant history; another team’s throughput can reflect very different item types and sizes.
Key Takeaways
- The four metrics are WIP, throughput, cycle time, and work item age.
- Throughput counts finished items per time period.
- Calculate completed cycle times separately from unfinished items’ ages.
- State time units, counting rules, and workflow boundaries.
- Name lead time’s endpoints before interpreting or comparing it.
- Flow efficiency compares active time with total cycle time.
4.2 Use Little's Law to relate WIP, cycle time and throughput
Little’s Law connects three averages for a workflow: WIP, throughput, and cycle time. John D. C. Little proved the general queueing relationship in 1961. It helps a team understand the effect of how much work it carries at a given delivery rate.
Use the relationship between averages
The same relationship can find either of the other measures:
A team averages 12 items in progress and finishes 3 items per week. Dividing 12 by 3 gives an average cycle time of 4 weeks. If average WIP falls to 6 while throughput remains 3 per week, average cycle time is 2 weeks. This comparison keeps throughput fixed; the equation alone gives no claim that lower WIP increases throughput.
A support team finishes 2 requests per day and wants an average cycle time of 5 days. Multiplying the rate by the time gives an average WIP of 10 requests. A limit around that level can be a first policy choice, followed by observation of what the team actually carries.
Keep units and quantities aligned
Throughput and cycle time must use the same time unit. Suppose a team finishes 15 items per five-day working week and averages 9 items in progress. That rate is 3 items per working day:
The result is 3 working days. Dividing 9 by the weekly rate of 15 instead gives 0.6 working weeks, the same duration. Reading that answer as 0.6 days would mix units.
The formula uses actual average WIP, not the maximum allowed by policy. If the limit is 10 but measured WIP averages 7, use 7. A snapshot of today’s board also differs from the average across the observation period.
Check the workflow’s stability
The relationship is most useful over a suitable period of steady work. Check that:
- Average arrivals and departures are about equal.
- Every started item eventually finishes; items are not silently removed.
- WIP is about the same at the beginning and end.
- Average work item age is not steadily increasing or decreasing.
A rapidly growing queue breaks the steady-work picture. A short observation period can also contain many starts whose completions lie outside it. Use averages measured for the same workflow and period, with a consistent definition of each item.
Choose a forecasting method
Use the relationship for a capacity discussion or a WIP experiment. A particular request can take more or less than that average. For a single-item forecast, examine the cycle-time distribution and its SLE; for a collection of items, examine throughput history.
Key Takeaways
- Little’s Law relates average cycle time, average WIP, and average throughput.
- Use measured averages for the same workflow and period.
- Keep throughput and cycle time in compatible time units.
- Check stable arrivals, departures, WIP, and age.
- The relationship concerns averages, not an individual item’s completion date.
4.3 Read a cumulative flow diagram
A cumulative flow diagram (CFD) shows how counts of work change over time. Time runs horizontally, and cumulative item counts run vertically. Each boundary records how many items have ever reached a particular state. The finished area sits at the bottom, with earlier states above it.
Build the bands from cumulative counts
Consider In progress → Testing → Done. Each evening, record how many items have ever entered each state:
| Day | Entered In progress | Entered Testing | Reached Done |
|---|---|---|---|
| 1 | 3 | 1 | 0 |
| 2 | 5 | 2 | 1 |
| 3 | 6 | 4 | 2 |
| 4 | 8 | 5 | 4 |
| 5 | 10 | 6 | 4 |
| 6 | 12 | 7 | 5 |
Plot these as boundaries. The area below Done is finished work. The gap from Done to Testing is current Testing work. The gap from Testing to In progress is current In progress work. Each boundary rises or stays flat because a count of items that have ever reached a state cannot decrease.
Read vertical distance as WIP
On day 6, In progress holds 12 minus 7, or 5 items. Testing holds 7 minus 5, or 2. Total WIP is 12 minus 5, or 7. The Done count itself is 5 completed items; it is not part of WIP.
A band that widens over several days shows accumulation in that state. In this example, arrivals continue faster than completions and total WIP grows from 3 on day 1 to 7 on day 6. The team should inspect the queue and downstream capacity.
Read slope and horizontal distance
The slope of Done shows throughput: the steeper the rise, the more items finish per time unit. During the six recorded days, 5 items finish, giving about 0.83 items per day. A flat stretch means no completions; a staircase suggests batch delivery.
A horizontal gap between the arrival and Done boundaries gives an approximate average cycle time. The arrival boundary reaches 5 items on day 2. Done reaches 5 on day 6, about 4 days later. This comparison tracks cumulative levels, not a named item. Items may finish in a different order from the one in which they started, so the gap is not an exact cycle time for every card.
Recognize patterns and check the data
Roughly parallel boundaries and stable band widths suggest balanced flow. A widening band suggests a bottleneck in that state or farther downstream. An arrival boundary rising faster than Done signals growing WIP and longer times if the pattern continues. Use the board to find the cause before deciding what to change.
If a cumulative boundary dips, investigate deleted items, backward moves, or a changed reporting definition. Correct the data before using it to judge flow. A CFD differs from a burn-up chart, which compares completed work with total scope. Here, the bands reveal the unfinished work between states.
Key Takeaways
- A CFD plots cumulative state-entry counts over time.
- Vertical gaps show WIP; the Done boundary’s slope shows throughput.
- Horizontal gaps give approximate average cycle time, not exact item timings.
- Widening bands reveal accumulation that needs investigation.
- A falling cumulative boundary needs a data check.
4.4 Read cycle time, throughput and aging charts
Different flow charts answer different questions. A cycle time chart describes completed work, a throughput chart describes output over periods, and an aging chart shows the items the team can still help. Choose the view that fits the decision.
Read completed-item times
A cycle time scatterplot has one dot per finished item. Its horizontal position is the completion date; its height is cycle time. High dots show slower completions. A rising pattern across several weeks can signal a change in the system or in the work type.
A percentile describes the share of observed items completed within a duration. An 85th-percentile line at 11 days means at least 85% of the plotted items took 11 days or less; at most 15% took longer. It does not say that each item took 11 days.
Take 20 sorted cycle times: 2, 3, 3, 4, 4, 5, 5, 5, 6, 6, 7, 7, 8, 8, 9, 10, 11, 12, 15, and 21 days. Their mean is 7.55 days, while 12 of the 20 values are below that mean. The few long times pull the mean upward. Percentile lines at the 50th, 70th, 85th, or 95th levels help show the spread that a single average hides.
Read delivery counts
A throughput run chart plots the number finished in each day or week. Look for trends, unusually low periods, and delivery in batches. Use equal time periods so a long week is not compared with a single day.
A throughput histogram groups periods by their finished count. For example, it can show that 3 items occurred in two weeks, 5 in four weeks, and 7 in one week. The run chart preserves time order; the histogram makes the frequency of different outcomes easier to see.
Inspect current work with age
An aging work item chart places unfinished items by workflow state horizontally and current age vertically. Historical cycle-time percentile lines give reference levels. Age grows while a card waits, so an item can become risky even when nobody changes its state.
With reference lines at 6 days for the 50th percentile, 8 for the 70th, and 11 for the 85th:
- A Build item aged 3 days has no age warning yet. Check blockers and remaining work before judging its likely finish.
- A Test item aged 10 days lies above the 70th line and below the 85th. It needs attention before crossing the SLE.
- A Deploy item aged 14 days already exceeds the time taken by 85% of past items. Investigate what is holding it up.
Ask about causes, not just dots
Variation is normal. An outlier may reflect a blocker, a large item, or a new type of demand. A sustained shift may follow a policy change. Read the item’s details alongside the chart, compare similar work, and use the result to decide where help or an experiment is needed.
Key Takeaways
- Scatterplots show cycle times of completed items; percentile lines describe their spread.
- Run charts preserve delivery over time; histograms show how frequently counts occurred.
- Aging charts show unfinished items that can still receive help.
- Use age with blockers and remaining work, not as the sole risk judgment.
- Investigate outliers and sustained trends in their work context.
5Set service level expectations and forecast delivery
Stakeholders need useful answers about both one request and a collection of work. This chapter separates those two forecasting problems. You will turn past cycle times into a service level expectation and use throughput history to explore delivery outcomes, paying attention to the probability, the work being compared, and the changes that make a forecast need updating.
5.1 Set and use a service level expectation
A service level expectation (SLE) forecasts how long a single item should take from started to finished. It contains a duration and a probability, such as “85% of items finish in 11 days or less.” The team makes it visible in its Definition of Workflow.
Calculate a percentile from recent work
Collect cycle times for recently finished items of the same type, sort them, and choose a probability. Using the nearest-rank method, multiply the number of observations by the probability and round the rank up if needed. Then take the value at that position in the sorted list, counting the first as position 1.
For 20 values, an 85% probability gives rank 17. The sorted history is:
2, 3, 3, 4, 4, 5, 5, 5, 6, 6, 7, 7, 8, 8, 9, 10, 11, 12, 15, 21 days.
The 17th value is 11. Seventeen of the 20 observations finished within 11 days, so a useful SLE is “85% of items finish in 11 days or less.” The 50th-percentile value is position 10, or 6 days. The 95th-percentile value is position 19, or 15 days.
The chosen probability changes the time. A higher probability usually needs a longer duration. The 50th percentile is a middle-of-the-distribution reference, so teams commonly choose a higher level such as 85% for stakeholder planning. Repeated durations can make several percentile ranks return the same time.
Keep the comparison relevant
Separate work types or classes of service when their cycle times differ substantially. A small defect fix and a major feature may need different SLEs. Define the same started and finished points for the history and the items being forecast, and keep the day-counting rule consistent.
When no history exists, begin with a best guess and replace it with a calculated SLE when enough relevant observations are available. Update it as the workflow changes. Simply increasing the duration can make a forecast fit current performance, but the team should still investigate why delivery has slowed.
Use it before and during work
Before pulling an item, ask whether it can probably finish within the SLE. Right-sizing means making the item small enough for the usual flow; splitting an oversized item can reduce risk. Once work starts, compare age with the SLE and act before the expected time is exceeded. In stakeholder discussions, give both the time and probability.
An SLE of 85% anticipates that some comparable work will take longer. A breach calls for investigation of the card and system, including blockers and remaining effort. It is not a reason to blame the person working on that item.
An SLA, or service level agreement, is a customer commitment, often contractual and with consequences for missing it. The SLE is an evidence-based forecast. It can inform an SLA negotiation, but using the same number in a conversation does not erase the difference in purpose.
Key Takeaways
- An SLE forecasts one item with a time and a probability.
- Nearest-rank percentiles select a position in sorted cycle times; round fractional ranks up.
- Use comparable recent work and consistent boundaries and counting rules.
- Use the SLE to right-size work, inspect age, and discuss delivery.
- An SLA is a customer agreement; an SLE is a forecast.
- Investigate items that exceed the SLE and update the forecast as evidence changes.
5.2 Forecast how much work will be done and by when
For one work item, use an SLE based on cycle times. For a collection of items, use throughput history to ask how much can finish by a date or when a given amount is likely to finish. These questions need a probability as well as a count or time.
Start with the average, then inspect the spread
A team’s last six weekly counts were 6, 4, 7, 5, 8, and 3. The total is 33 items, giving an average of 5.5 per week. For 30 remaining items:
About 5.5 weeks is a simple average-based estimate. The division attaches no probability to that time. The weekly counts vary, so describing it as an 85% forecast would add information the calculation never supplied.
Simulate possible delivery outcomes
A Monte Carlo simulation repeatedly samples past outcomes to build possible futures. Suppose recent daily throughput is 1, 0, 2, 1, 0, 1, 3, 1, 0, and 1. To model the next 10 working days:
- Pick a historical daily count at random for each future day, allowing repeated picks.
- Add the 10 picks to form one trial’s total.
- Repeat for many trials.
- Count the share of trials meeting a proposed amount.
One trial draws 1, 2, 3, 1, 0, 0, 0, 1, 1, and 1, totaling 10. Zero-output days stay in the history because they are part of the observed delivery pattern. Tools commonly run thousands of trials; a small hand example helps explain the method.
Consider these 20 trial totals:
4, 7, 7, 8, 9, 9, 9, 9, 10, 10, 10, 11, 11, 11, 12, 13, 14, 14, 15, 16.
Seventeen trials reach at least 8, giving 85% simulated confidence in at least 8 items over the 10 days. Only 12 reach at least 10, or 60%. The average of the input history is 1 item per day, but its average-based total of 10 is not the 85% lower forecast.
Read confidence in the right direction
For how many by a date, greater confidence means accepting a smaller minimum count. More trials can reach at least 8 than at least 10. For when an amount will finish, greater confidence means allowing a later date. More trials have had time to complete the required work.
The simulation’s probabilities describe the modeled outcomes. Their usefulness depends on the near future resembling the recent past: similar work types and sizes, team capacity, and workflow. A changed team or a shift in demand calls for a fresh look at the history.
Account for scope growth too. If large cards normally split into several deliverable items, forecasting only the current card count understates the remaining work. Update forecasts as new data arrives, often weekly, and explain the current probability and scope to stakeholders.
Key Takeaways
- Use throughput history to forecast collections of work.
- An average-based division supplies no confidence level.
- Monte Carlo simulation resamples history and counts the share of trials meeting an outcome.
- Higher confidence means a smaller minimum count by a date or a later date for a fixed count.
- Keep history relevant and refresh the forecast when capacity, work, or scope changes.
6Combine Kanban with Scrum and choose an approach
Kanban practices can improve the movement of work inside Scrum while the team keeps its Sprint Goal and Scrum accountabilities. This chapter shows where flow information helps the existing events and how releases can happen during a Sprint. You will then compare the two approaches and choose a combination that fits the arrival pattern and purpose of a team’s work.
6.1 Add Kanban practices to a Scrum Team's work
The Kanban Guide for Scrum Teams explains how flow practices complement Scrum. First published in 2018 and revised in January 2021, it keeps Scrum’s Sprint, events, accountabilities, and artifacts. Kanban adds attention to how work moves through that existing framework.
Add four practices to the team’s workflow
The guide describes visualizing the workflow, limiting WIP, actively managing items in progress, and inspecting and adapting the DoW. The same four flow metrics apply: WIP, cycle time, work item age, and throughput.
The Scrum Team creates and adapts its DoW, with people acting within their Scrum accountabilities. It defines the items, usually Product Backlog items; started and finished points; workflow states; WIP limits; policies; and the SLE. Its scope may include work inside or outside the Sprint. External stakeholders can describe needs, while the team decides how its work flows.
Finishing items sooner creates earlier opportunities for feedback. That supports empiricism: making work transparent, inspecting the results, and adapting. Flow metrics are useful because they help the team ask the right questions while a decision can still make a difference.
Bring evidence into the existing events
| Scrum event | Useful flow question |
|---|---|
| Sprint Planning | What does past throughput suggest about a realistic selection of work? |
| Daily Scrum | Which blocked, queued, or aging items threaten progress toward the Sprint Goal? |
| Sprint Review | What does throughput suggest about likely future delivery? |
| Sprint Retrospective | What pattern in flow suggests a workflow policy to improve? |
Sprint Planning establishes the Sprint’s plan and goal. Historical counts inform the discussion; they do not mechanically decide the next Sprint Backlog. At the Daily Scrum, Developers inspect progress toward the Sprint Goal and adapt their plan. A board view helps them choose an action, such as pairing to finish an old Test item.
The Sprint Review inspects the outcome with stakeholders and informs future adaptation. A throughput forecast helps the Product Owner discuss likely delivery. At the Retrospective, the team can investigate a widening CFD band and change the workflow.
Work through a Sprint example
A team finished 7, 9, 8, and 10 items over its last four two-week Sprints. In Planning it selects about 8 right-sized items around a Sprint Goal. Its workflow limit is 4, and its SLE is “85% within 6 days.” During the Sprint, Developers attend to aging and blocked items. At the Retrospective, they add a Waiting for review state after flow data reveals a hidden queue.
Selecting 8 items does not mean starting all 8. The WIP limit controls how many are started at once. Nor must finished work wait for the Sprint’s end to be released: usable Increments can be delivered throughout the Sprint, with at least one usable Increment each Sprint. Kanban adds no new Scrum events and does not remove the Sprint.
Key Takeaways
- Kanban complements Scrum while all Scrum elements remain.
- The Scrum Team owns its DoW within the Scrum accountabilities.
- Flow data supports Planning, the Daily Scrum, Review, and Retrospective.
- Sprint selection differs from a limit on items started simultaneously.
- Items can finish and be released during the Sprint.
6.2 Compare Kanban and Scrum and choose what fits
Choose a way of working by looking at how demand arrives and how the team needs to learn. Kanban and Scrum can work together, but they make different requirements. A board’s appearance alone does not identify which approach a team follows.
Compare the main requirements
| Aspect | Kanban | Scrum |
|---|---|---|
| Cadence | No required iterations; choose replenishment and review rhythms | Sprints of one month or less, each with a Sprint Goal |
| Roles | Keeps existing roles and job titles | Product Owner, Scrum Master, and Developers accountabilities |
| WIP | Explicit control of started, unfinished items | No prescribed numerical limit on simultaneous starts |
| Change | Pull according to capacity and explicit policies | Keep the Sprint Goal; renegotiate Sprint Backlog scope as needed |
| Measures | WIP, throughput, cycle time, and age; SLE for forecasting | Flow metrics may be added; velocity is optional |
The Product Owner is accountable for maximizing product value, the Scrum Master for establishing Scrum and the team’s effectiveness, and Developers for creating a usable Increment each Sprint. Kanban does not replace those accountabilities when applied within Scrum.
During a Sprint, Developers can renegotiate scope with the Product Owner as they learn. The Sprint Goal remains the focus. A numerical WIP limit adds control over how much of that work is started at once; selecting a Sprint Backlog by itself does not provide this control.
Distinguish throughput and velocity
Throughput counts finished items per time period. Velocity, a common optional Scrum practice, sums the estimates of finished work, often in story points per Sprint. Finishing four items totaling 18 points means throughput of 4 items and velocity of 18 points for that Sprint. The units answer different questions. Scrum’s definition requires neither velocity nor story points.
Match the approach to the work
An internal IT service receives 30 to 50 requests weekly, ranging from access requests to urgent outages. Daily changes in priority make continuous pull, service policies, WIP limits, and SLEs useful. Kanban can handle this demand without requiring a fixed iteration plan.
A team developing a mobile app may benefit from a shared Sprint Goal, a regular time box, and stakeholder reviews. Scrum provides that structure; adding Kanban practices helps items move within it. The team can keep both the learning cadence and explicit WIP controls.
Boards also help in projects that combine agile and plan-based work. A phase team can make tasks and bottlenecks visible without claiming the whole project follows Scrum.
Describe the combination clearly
Scrumban is a common name for mixtures of Scrum and Kanban elements, with no single official definition. A team using that label should say which events, accountabilities, limits, and policies it follows. If it claims to use Scrum with Kanban, Scrum’s required elements remain. Kanban’s flexibility still demands discipline in following explicit policies and managing flow.
Key Takeaways
- Scrum requires Sprints and three accountabilities; Kanban prescribes neither.
- Scrum keeps the Sprint Goal while scope can be renegotiated.
- Throughput counts items; velocity sums finished estimates.
- Match the approach to demand, learning needs, and delivery context.
- A team using “Scrumban” should state the actual elements it follows.
Kanban and Flow examples
1See how Kanban changes the movement of work
9 steps
- 1IntroductionLook beyond a busy team
A support team starts many requests but completes few. The question is where the requests wait and what would help them reach customers.
You will use this flow perspective to distinguish pull from push, recognize a Kanban system, and connect its visible rules to feedback and improvement.
- 2ExplanationFollow value from start to finish
Flow is the movement of value through a process. Kanban improves that movement by balancing effectiveness, efficiency, and predictability.
A fast report that nobody needs fails the effectiveness test. A useful report that waits unpredictably for approval creates a different problem. The team needs to inspect the whole journey, including waiting, to understand which part of delivery needs attention.
- 3ExampleLet a free slot signal a start
The support team allows 4 open escalations. All four slots are occupied when a new request arrives. Under pull, it selects the next request but waits to start it until a current escalation finishes.
Under push, the arrival itself triggers a start, even with no capacity. Pull still needs planning and priority decisions; it separates deciding what matters from admitting more unfinished work.
- 4ChallengeWhat is missing from the board?
A recruiting team has cards in To Do, Doing, and Done. It starts every vacancy request immediately and has no shared start/finish rules or flow measurements. Does the board alone make this a Kanban system?
---reveal---
No. It is a visual task list. A Kanban system also needs explicit workflow agreements, control of WIP, active management, and improvement using flow information. The cards show status but do not yet control how work flows.
- 5ConnectionPlace the three guides
The Kanban Guide gives a minimum structure: workflow agreements, three practices, and four flow metrics. Kanban University’s Kanban Method adds principles, six practices, and cadences. Scrum.org’s guide applies flow practices within Scrum.
They share core ideas but may use timing terms differently. For example, interpret lead time by checking the two points it measures before comparing it with cycle time.
- 6ExplanationImprove the system people already use
The Method’s change principles start with the current process, pursue evolutionary improvement, and encourage leadership at every level. Service principles begin with customer needs, let people organize around the work, and review services and policies.
A reviewer can propose a change to a handoff without receiving a new job title. The group tests the change together and looks at its effect on service.
- 7Key InsightConnect six practices to three
The practice lists group closely related work:
- Visualize and make policies explicit: define and visualize the workflow.
- Limit WIP and manage flow: actively manage items.
- Implement feedback loops and improve experimentally: improve the workflow.
A visible queue helps because people can control arrivals, help existing work, and test a better policy. The practices reinforce one another.
- 8ChallengeTurn observation into feedback
The support team posts a weekly chart showing a growing approval queue. Its lead proposes ranking agents by completed tickets. What would better connect the chart to Kanban’s principles?
---reveal---
Discuss the approval policy with the people doing the work and test a change that helps requests move. The chart describes a shared system. Ranking agents can encourage easy-ticket selection while leaving the approval delay untouched.
- 9RecapUse the picture to guide action
Pull admits work when capacity is available. Workflow rules give a board shared meaning, and feedback turns observations into improvements.
When a team looks busy but delivers slowly, inspect unfinished items, queues, and policies. A daily flow discussion, replenishment decision, or retrospective can each close a different part of that feedback loop.
2Design a board people can use
12 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionMake the work visible enough to decide
- 2ExampleTrace one article’s route
- 3ExplanationMark start, commitment, and finish
- 4ChallengeCount a waiting item
- 5ExplanationGive cards useful information
- 6ExampleConnect urgency with service treatment
- 7ChallengeRead cost of delay
- 8TipKeep blockers inside the picture
- 9ExplanationBuild the Definition of Workflow
- 10ExampleWrite an actionable movement rule
- 11ChallengeComplete the board’s agreements
- 12RecapCheck the board against real decisions
3Finish work before starting more
15 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionRespond to a full board
- 2ExampleFinish three tasks one at a time
- 3ExampleShare the same effort across all three
- 4ChallengeSeparate effort from waiting
- 5ExplanationApply the limit to the whole area
- 6ExampleHelp the next state release capacity
- 7ChallengeUse an explicit exception
- 8TipChoose and adjust limits from evidence
- 9ExplanationWalk toward the cause of delay
- 10ChallengeAct before the SLE is crossed
- 11ConnectionSelect what comes next
- 12ExampleTest a review policy
- 13Key InsightLook for avoidable demand
- 14ChallengeJudge a change across the system
- 15RecapUse pressure as information
4Read counts, times, and flow charts
20 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionAsk the right question of the data
- 2ExplanationSeparate the four measures
- 3ExampleCalculate completed cycle times
- 4ExampleCount output and unfinished age
- 5ChallengeChoose the population to average
- 6ConnectionRead timing boundaries and waiting
- 7ExplanationUse Little’s Law for averages
- 8ExampleAlign days and weeks
- 9ChallengeCheck the relationship and its conditions
- 10TipCheck steady-workflow evidence
- 11ExampleBuild a cumulative picture
- 12ExampleRead the gaps and the slope
- 13Key InsightRead a horizontal gap with care
- 14ChallengeDiagnose a widening band
- 15ExplanationRead completed-item variation
- 16ExampleCompare output views
- 17ExampleFind current items that need help
- 18ChallengeChoose a chart for today’s decision
- 19ChallengeConnect accumulation with current risk
- 20RecapKeep counts, time, and decisions connected
5Build a forecast with a probability
12 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionSeparate two delivery questions
- 2ExplanationGive an SLE both parts
- 3ExampleFind the percentile rank
- 4ChallengeCalculate a fresh SLE
- 5TipUse the forecast while work can change
- 6ExampleSee what an average leaves out
- 7ExplanationResample delivery history
- 8ExampleTurn trial counts into confidence
- 9ChallengeRead a lower delivery count
- 10Key InsightReverse the direction for finish dates
- 11ChallengeChoose relevant evidence after a change
- 12RecapSay the outcome, time, and probability
6Add flow to Scrum and choose a fit
10 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionKeep the goal and improve the flow
- 2ExplanationAdd four flow practices
- 3ExampleUse evidence in Planning and daily work
- 4ExampleConnect Review and Retrospective to flow
- 5ChallengeDeliver without waiting for the Review
- 6ExplanationCompare the structures
- 7Key InsightKeep item counts and estimates distinct
- 8ChallengeMatch the approach to demand
- 9ChallengeDescribe a useful combination
- 10RecapChoose from the work’s needs
Kanban and Flow practice questions
Set 1: Use policies and respond to delays10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Read the board and measure work10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Connect flow measures to decisions10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Test changes and delivery forecasts10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Make decisions across the workflow10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Activity state
Aging work item chart
Average WIP
B
Batch delivery
Blocker
Bottleneck
C
Cadence
Class of service
Commitment point
Comparable work
Context switching
CONWIP
Cost of delay
Cumulative count
Cumulative flow diagram
Customer lead time
Cycle time
Cycle time scatterplot
D
Definition of Done
Definition of Workflow
Delivery point
E
Effectiveness
Empiricism
Entry criteria
Evolutionary change
Exit criteria
Expedite
Explicit policy
F
Failure demand
Feedback loop
First in, first out
Fixed date
Flow
Flow efficiency
H
Hypothesis
I
Improvement experiment
Increment
Intangible
K
Kanban
Kanban board
Kanban system
L
Lead time
Leadership at all levels
Little’s Law
M
Monte Carlo simulation
N
Nearest-rank method
P
Percentile
Probabilistic forecast
Pull signal
Pull system
Push system
Q
Queue state
R
Replenishment
Right-sizing
S
Scrumban
Service delivery
Service level agreement
Service level expectation
Simulation trial
Slack
Sprint
Sprint Goal
Stable workflow
Standard
STATIK
Swimlane
T
Throughput
Throughput histogram
Throughput run chart
V
Velocity
W
WIP exception policy
WIP limit
Work in progress
Work item
Work item age