Kanban and Flow

Learn how Kanban helps a team deliver work smoothly and predictably. Map your real workflow on a Kanban board, make its policies explicit and limit work in progress so that work finishes sooner. Measure flow with WIP, throughput, cycle time and work item age, read cumulative flow diagrams and other flow charts, and use Little's Law. Set service level expectations, forecast delivery from throughput data, and see how Kanban practices work inside Scrum and when Kanban on its own fits better.

BeginnerLesson 5 of 6 in Agile and Scrum Course

What you will learn

  1. Describe Kanban as a strategy for improving the flow of work, and explain the principles and practices that the main Kanban guides set out.
    • Describe Kanban as a way to manage the flow of work
      Define Kanban, flow and pull, explain where Kanban comes from and what it aims for, and tell a Kanban system apart from a simple task board.
    • Apply Kanban's principles and core practices
      Explain the change and service principles of the Kanban Method, its six general practices, the three practices of the Kanban Guide and the feedback meetings that keep a Kanban system improving.
  2. Design a board that shows the real workflow, show work items, blockers and urgency clearly, and write down the policies that govern how work moves.
    • Map a real workflow onto a Kanban board
      Turn the steps work actually goes through into board columns, mark where work starts and finishes, and show waiting as well as active work.
    • Show work items, blockers and urgency on the board
      Decide what counts as a work item, show the information a card needs, and use swimlanes, classes of service and blocker markers to make risk and urgency visible.
    • Make workflow policies explicit in a Definition of Workflow
      Write down the shared rules for how work moves, using the six elements the Kanban Guide requires in a Definition of Workflow.
  3. Explain why fewer items in progress means faster delivery, set and use WIP limits, manage items day to day, and improve the workflow through experiments.
    • Explain why limiting work in progress speeds up delivery
      Show with examples how starting less and finishing more shortens the time each item takes and makes problems visible.
    • Set and use WIP limits
      Choose where to place WIP limits, set first values from current data, follow them when the board is full, and adjust them based on evidence.
    • Actively manage items in progress
      Keep work moving day to day by focusing on blocked and aging items, handling bottlenecks, and choosing carefully what to start next.
    • Improve the workflow with feedback and experiments
      Use flow data and feedback meetings to find improvements, test them as experiments, and keep or reverse the changes based on evidence.
  4. Calculate the four flow metrics, relate them with Little's Law, and read the charts Kanban teams use to understand their workflow.
    • Calculate the four flow metrics
      Define and calculate WIP, throughput, cycle time and work item age from a team's data, and tell cycle time apart from lead time and flow efficiency.
    • Use Little's Law to relate WIP, cycle time and throughput
      State Little's Law, use it to calculate one flow metric from the other two, and explain the conditions under which it holds.
    • Read a cumulative flow diagram
      Build and interpret a cumulative flow diagram to read WIP, approximate cycle time and throughput, and recognize the patterns that signal flow problems.
    • Read cycle time, throughput and aging charts
      Interpret cycle time scatterplots with percentile lines, throughput run charts and aging work item charts, and use percentiles instead of averages.
  5. Turn past cycle times into a service level expectation for single items, and use past throughput to forecast how much work will be done by when.
    • Set and use a service level expectation
      Calculate a service level expectation from historical cycle times, show it on the board, and use it to plan, right-size and manage work.
    • Forecast how much work will be done and by when
      Use past throughput, including a simple Monte Carlo simulation, to forecast multiple items with a stated probability instead of a single date.
  6. Add Kanban practices to the work of a Scrum Team, and compare Kanban and Scrum to choose what fits a team's work.
    • Add Kanban practices to a Scrum Team's work
      Explain how the Kanban Guide for Scrum Teams adds visualization, WIP limits, active management and flow metrics to Scrum without changing the Scrum framework.
    • Compare Kanban and Scrum and choose what fits
      Compare how Kanban and Scrum handle cadence, roles, change and measurement, and decide which approach, or which combination, suits a given situation.

Kanban and Flow study guide

6 chapters

1

Explain what Kanban is and the ideas behind it

Kanban helps a team see how work moves from a request to something useful. This chapter connects that purpose to pull, capacity, and the principles behind the main Kanban guides. You will distinguish a working Kanban system from a board that only shows task status, then see how teams use visible rules and feedback to improve the process they already have.

1.1 Describe Kanban as a way to manage the flow of work

Kanban is a strategy for improving how value flows through a process. A Kanban system is the way a group combines the practices for its own work. A completed request, a published article, or a usable software change can deliver value; a large pile of started work does not yet do that.

Follow the work

Flow means the movement of value through the process. A team asks how smoothly items move, how long they take, and how reliably it can forecast delivery. Someone can be busy all day while an item spends most of its time waiting for review. Looking only at individual activity misses that delay.

The Kanban Guide describes three qualities to balance:

  • Effectiveness: deliver what stakeholders need when they need it.
  • Efficiency: use time, people, and money well to deliver value.
  • Predictability: forecast delivery with a useful level of uncertainty.

Finishing many unwanted changes is inefficient use of capacity, even if the board moves quickly. A useful system considers the value of the work as well as its speed.

Start work when capacity is available
PushPull
Work starts because it is requested or scheduled.Work starts when there is capacity under the agreed control.
New requests can add to an already full workflow.A free slot signals that another item may enter.

A support team limits open escalations to 4. Under pull, a new escalation waits until one of those 4 is resolved. The team still selects and prioritizes future requests; waiting to start them protects its ability to finish current work. Starting every request at once would hide the difference between demand and available capacity.

Where the ideas came from

The Japanese word kanban means roughly “signboard” or “visual card.” Toyota used cards to signal a need for parts in the production system developed under Taiichi Ohno from the late 1940s onward. From the mid-2000s, David J. Anderson and others adapted these ideas to knowledge work, where a card stands for a request or task.

Three guides explain related approaches. The Kanban Guide, associated with Daniel Vacanti, John Coleman, and contributors, gives a minimum set of practices, workflow agreements, and metrics. Kanban University’s Official Guide to the Kanban Method adds principles, six general practices, and feedback meetings called cadences. The Kanban Guide for Scrum Teams explains how the practices support Scrum. Check the endpoints when these guides use timing terms such as lead time.

Recognize a system beyond its board

A “To Do → Doing → Done” board shows status. A Kanban system also defines its items, its started and finished points, how WIP is controlled, its flow policies, and how it measures and improves delivery. Kanban prescribes no new roles, fixed iterations, or compulsory meeting schedule. Teams can apply it to support, recruiting, marketing, or Scrum development.

Planning continues through decisions about what to start next, known as replenishment. Teams can plan at an agreed rhythm or when capacity frees up, including within Sprints. They make commitments at a defined point and use evidence to discuss likely delivery.

Key Takeaways

  • Kanban improves the flow of value through the whole process.
  • Pull starts work when capacity is available under the agreed WIP control.
  • A board needs explicit workflow agreements, flow management, and improvement to support a Kanban system.
  • Effectiveness, efficiency, and predictability must be balanced.
  • Kanban can support an existing way of working, including Scrum.

1.2 Apply Kanban's principles and core practices

Kanban starts with how people actually work and gives them a way to improve it together. The Kanban Method describes principles for change and service delivery, alongside practices that make those principles useful day to day.

Change the current system together

The Method’s three change management principles are to start with what you do now, agree to pursue evolutionary improvement, and encourage leadership at every level. First understand the actual process and respect existing roles and job titles. Then agree on deliberate changes. A reviewer who notices a recurring delay can lead an improvement just as a manager can.

Evolutionary change means taking small, testable steps. A design team first puts its work on a board. Two weeks later it limits review to 3 items. After four more weeks, it examines waiting times before deciding what to change next. The Kanban Guide also permits larger changes when the situation calls for them; it does not require every improvement to be small.

The three service delivery principles are to understand customer needs, manage the work while people self-organize around it, and regularly review the network of services and its policies. A service can deliver to an external customer or to another department. A hiring team, for example, serves applicants and the departments filling vacancies.

Connect the practice lists

The Method has six general practices. The Kanban Guide organizes closely related ideas into three broader practices:

Kanban Method practicesKanban Guide practice
Visualize; make policies explicitDefine and visualize the workflow
Limit WIP; manage flowActively manage items in the workflow
Implement feedback loops; improve collaboratively and evolve experimentallyImprove the workflow

To visualize, show both the items and their route. To limit WIP, control how much has started without finishing. To manage flow, attend to queues, age, and blockers. To make policies explicit, write down how work moves. Feedback loops turn observations into decisions, and experimental improvement checks whether a change helps. These practices work together: a visible queue is useful because the team can act on it.

Make feedback lead to action

Kanban University calls regular feedback meetings cadences. A Team Kanban Meeting, often daily, examines flow and immediate decisions. Replenishment, weekly or as needed, selects the next work to start. A Team Retrospective, perhaps every two weeks or monthly, examines how to improve the system. Larger organizations can add service delivery, operations, risk, and strategy reviews.

Teams choose frequencies and names that fit their work. An existing meeting can serve a cadence’s purpose. Collecting a dashboard and never making a decision leaves the feedback loop incomplete.

Read measures as system information

“Manage the work, not the workers” means looking at how items move through shared policies, queues, and handoffs. Throughput and cycle time describe that system. Ranking individuals with these measures encourages people to choose easy work or hide delays. If review is slow, examine the review rules, available help, and waiting queue with the people doing the work.

Key Takeaways

  • Start with the current process, improve it deliberately, and encourage leadership at every level.
  • Service delivery begins with customer needs and the flow of work across services.
  • The Method’s six practices align with the Kanban Guide’s three broader practices.
  • A feedback loop includes action; cadence names and frequencies fit the team.
  • Flow metrics describe a system and support shared improvement, not individual rankings.
2

Visualize the workflow on a Kanban board

A useful board makes the real journey of work visible, including the places where it waits. This chapter shows how to choose columns, mark the boundaries of work in progress, and give cards enough information to guide decisions. You will also connect urgency and blockers to clear policies, so the board helps people decide what happens next.

2.1 Map a real workflow onto a Kanban board

A Kanban board shows work items and the states they pass through. Cards usually move left to right, with WIP controls and policies visible nearby. A wall and sticky notes can work as well as a digital board if they make the workflow clear.

Build columns from real items

Choose the type of work to model. Follow several recently finished items and list where they were active and where they waited. Put those states in order, then mark the started and finished points. Add the controls and policies that govern movement.

Use state names such as “Drafting” and “Approval.” Columns named after people make it harder to see which part of the process holds up work. Combine states that never hold items for long, but keep a meaningful queue visible even when no one is actively working there.

A content team maps this route:

Ideas → Ready → Drafting → Editing → Approval → Published

It divides Editing into “In progress” and “Done.” The latter means editing has finished and the article is waiting for approval. It does not mean the article is published. This small split reveals a handoff that a single “Editing” column could hide.

Set the measurement boundaries

The team defines started as the moment a writer pulls an article from Ready into Drafting. It defines finished as publication. Every card between those points counts as WIP, including articles waiting for approval. Forty cards in Ideas contribute nothing to this delivery workflow’s WIP because they have not crossed its started point.

Kanban University calls the decision to deliver an item the commitment point, and the point where the customer receives it the delivery point. In this example, selection into Ready is a commitment even though the chosen started point is Drafting. Write both meanings clearly; commitment and first activity need not be the same event.

Upstream work explores options before commitment. Options can be discarded without breaking a delivery promise. A team actively analyzing those options can define a separate upstream workflow with its own boundaries and WIP. Counting depends on the workflow being measured, not on whether the card appears toward the left of a board.

Show work and waiting

An activity state means work is being done, such as Testing. A queue state means an item is waiting, such as Ready for test. Both can lie inside WIP. Hiding queues makes it look as though the only way to speed up delivery is to work faster, when a shorter wait may matter more.

Kanban University’s STATIK, the Systems Thinking Approach To Introducing Kanban, helps people design the system together. It examines dissatisfaction, demand, current capability, the workflow, classes of service, and the overall system design. New findings can send the group back to an earlier question; the steps are iterative.

A team board can track requests, a portfolio board larger features or projects, and a personal board one person’s tasks. At each scale, the board should reveal the actual route and the policies governing it. An undefined “Done” column leaves people unable to tell whether delivery has occurred.

Key Takeaways

  • Model real states, including queues and handoffs.
  • Started and finished points determine which items count as WIP.
  • A commitment point can differ from the first active-work state.
  • A step’s “Done” area can still be a queue inside the workflow.
  • STATIK develops the system with the people involved and revisits earlier decisions.

2.2 Show work items, blockers and urgency on the board

A card represents a work item, a unit of value that moves through the workflow. Examples include a defect fix, a customer request, an article, and a job opening. Agree on what counts as an item so that the board and the metrics use the same unit.

Make the card useful for decisions

Show a short title, item type, start date, and who is working on it. Add a due date for date-driven work and the reason and date of any blocker. The start date lets the team calculate age without relying on memory. Colors, shapes, and icons can show different work types, but they need a clear legend.

Keep items small enough to finish within the team’s usual time frame. A card called “Replace the whole platform” and a card called “Fix one broken link” can each count as one, but that count says little about the effort or delivery risk. Defining and right-sizing items makes comparisons more useful.

Swimlanes are horizontal rows across the board. They can separate products, customers, item types, or classes of service. An IT team has a whole-workflow limit of 6 and allows planned changes to occupy at most 2 slots, reserving at least 4 for incidents. Rows organize the work; the policies determine how much capacity each row may use.

Match treatment to the cost of delay

Cost of delay is the value lost or cost incurred for each period delivery is delayed. It joins urgency with impact. If a feature is expected to earn 5,000 dollars a week, delaying it two weeks costs about 10,000 dollars in expected revenue under that estimate.

A class of service defines how an item is treated. Four common archetypes are:

ClassDelay pattern and typical treatment
ExpediteDelay is costly immediately; give priority, often with a limit of one.
Fixed dateCost rises sharply after a known date; plan to meet that date.
StandardCost rises steadily; usually pull in first-in, first-out order.
IntangibleLittle immediate cost, but value grows over time; reserve attention for it.

A production outage can justify expedite treatment. Calling every request “urgent” removes the distinction and makes normal work repeatedly wait. The policy should state who can classify an item and how many expedite items may exist.

Keep blockers visible

A blocker stops an item from progressing: missing access, an unanswered decision, or another system’s defect. Flag the card and record the cause and date. Give someone a clear follow-up action. A blocked item stays in WIP until it reaches the defined finished point; moving it aside visually does not finish it.

For recurring problems, use blocker clustering. Group past blockers by cause and compare their frequency or cost. If 9 of 14 blockers were waits for a test environment, improving that access can help many items. Side work must also appear on the board when it uses team capacity; otherwise the visible workload understates the real demand.

Key Takeaways

  • Define the unit counted as a work item and show its type and start date.
  • Swimlanes separate work; capacity policies govern the lanes.
  • Classes of service connect delay costs to treatment and pull order.
  • Blocked and side work must remain visible; unfinished items remain WIP.
  • Group past blockers by cause to choose improvements.

2.3 Make workflow policies explicit in a Definition of Workflow

An explicit policy is a visible agreement about how work is handled. It can say when a card may enter a state, what must be true before it leaves, or how the team treats urgent work. A short written rule gives people the same basis for a decision.

Define the whole workflow

The Definition of Workflow (DoW) brings the agreements together. The Kanban Guide requires at least six elements:

  1. The work items that move through the process.
  2. The points where they count as started and finished.
  3. The states between those points.
  4. How WIP is controlled from started to finished.
  5. Explicit policies for movement through each state.
  6. A service level expectation (SLE): a forecast of elapsed time with a probability.

Teams can add working agreements and can have more than one DoW. The six elements give the board shared meaning. A visible limit without a clear started point still leaves people unsure which cards to count.

Write rules people can apply

A four-person web team defines user stories and defects as its work items. An item starts when pulled from Ready into Build and finishes when live in production. Its states are Build, Code review, Test, and Deploy, with a whole-workflow WIP limit of 8.

It writes two movement policies: “Code review needs one reviewer who did not write the code” and “Pull the oldest Ready item unless an expedite item is waiting.” Its SLE is “85% of items finish within 9 days.” An item awaiting deployment is still WIP because the finished point is production, even if coding and testing are complete.

Different rules answer different questions. Entry or pull criteria say what must be ready before work enters a state. Exit criteria say what completion of that state requires. Replenishment criteria govern who selects upcoming work and when. Class-of-service policies govern priority and exceptions. Each rule belongs where people need it, such as at a column header or on a short linked page.

Agree, observe, and update

The people doing the work agree on their policies and improve them together. Within Scrum, the Scrum Team creates and adapts its DoW, with members acting within their accountabilities. Outside stakeholders can describe needs and constraints, but do not prescribe the team’s workflow.

Keep policies short enough to use during real decisions. If people repeatedly ignore a rule, discuss the mismatch openly. The rule may need to change, or the team may need help following it. Quietly maintaining an ideal process beside a different real process makes the board misleading.

Policies are changeable. After defects escape, the team might add a specific exit check. If recent cycle times shift, it may revise the SLE using the new evidence. Record what changed and when so later measurements can be interpreted. The team can adapt its DoW when needed; a regular feedback meeting is a useful opportunity, not a required waiting period.

Key Takeaways

  • A DoW defines items, boundaries, states, WIP control, flow policies, and an SLE.
  • Entry, exit, replenishment, and service policies answer different movement questions.
  • The people doing the work agree on and adapt the policies.
  • Keep rules visible and record changes so their effects can be examined.
3

Limit work in progress and manage the flow of work

A full board is a reason to help work finish. This chapter explains why starting fewer items can shorten delivery times, then shows how to set limits and respond when a column has no space. You will use age, blockers, and queues to decide where help is needed, and turn recurring problems into changes that the team can test with evidence.

3.1 Explain why limiting work in progress speeds up delivery

Work in progress (WIP) is the measured number of items started but unfinished. A WIP limit is the agreed maximum for a state, several states, or the whole workflow. A limit of 6 allows a measured WIP of 4; it does not require the team to start two more items.

Compare two ways to do the same work

One person has three tasks, each needing 3 days of focused effort. All are available on day 1. Assume no switching cost and use inclusive days for cycle time.

Working sequentially, the person starts the first task on day 1 and finishes on day 3. The second runs from day 4 to day 6, and the third from day 7 to day 9. Each task has a cycle time of 3 days. Delivery happens on days 3, 6, and 9, averaging day 6 relative to their common availability.

Now start all three on day 1 and divide attention equally. Each receives one third of a workday per day. All finish around day 9, giving each a cycle time of about 9 days. The total effort has not changed, but the first delivery is much later.

ApproachEach task’s cycle timeDelivery days
One at a time3 days3, 6, 9
All togetherAbout 9 daysAbout 9, 9, 9

Waiting before the defined start is different from time inside the workflow. That is why the sequential example has a 3-day cycle time for each task even though the third task is delivered on day 9.

Understand why excess WIP adds delay

Every open item competes for attention and capacity. Context switching adds the effort of remembering where work stopped, reopening tools, and rebuilding concentration. The equal-sharing calculation leaves this cost out; actual switching can make completion slower still.

Queues also form when every person is kept fully occupied. A small surprise has nowhere to go, so work waits. Some slack, or spare capacity, lets people help each other and respond to urgent needs. A brief pause in one person’s tasks can help the whole system finish sooner.

At the same average throughput, more average WIP means longer average cycle time. Little’s Law expresses this relationship. Reducing WIP is therefore an early response when items take too long, while the team watches whether delivery rate stays healthy.

Let a full column expose the problem

A WIP limit stops more work entering a full area. That pressure reveals a slow review, a difficult handoff, or a blocker that would otherwise hide in a growing queue. People can help finish, review, or unblock work instead of opening another card.

A persistent idle period needs investigation. A downstream bottleneck or weak incoming demand can leave people waiting even when the limit is sensible. Raising the limit in front of a bottleneck adds to its queue. Check the cause before adjusting the control; judge the change by finished work and cycle time.

Key Takeaways

  • WIP is a measured count; a WIP limit is a maximum, not a target.
  • Starting the same tasks together can delay the first delivery and lengthen their cycle times.
  • Context switching and queues consume capacity and time.
  • Spare capacity helps a team respond and collaborate.
  • A full column reveals where work needs help.
  • Investigate sustained idle time before raising a limit.

3.2 Set and use WIP limits

WIP limits control how much unfinished work enters an area. A team can place them on a column, a group of columns, a swimlane, a class of service, or the whole workflow. A whole-workflow limit is sometimes called CONWIP, for constant work in progress.

Choose and display a first limit

Start by counting current WIP in each state. A first limit can be at or slightly below that count, or based on a simple rule such as the number of people working there. Treat the number as a starting policy to review with evidence. A five-person team holding 14 items might choose a whole-workflow limit of 10 and review it after a month.

Write a column’s limit in its header, such as “Test (3).” If the column contains “In progress” and “Done” areas, the limit normally covers both. A card waiting in Build: done is still unfinished work for the overall system.

Respond to a full board

Build has a limit of 3 and holds 3 cards. Test has a limit of 2 and holds 2. A developer finishes building one card:

  1. The card moves into Build: done. Build still holds 3 cards.
  2. Test is full, so the waiting card cannot enter it.
  3. Build has no free slot, so the developer does not pull another Build item.
  4. The developer helps test an existing item.
  5. When that item leaves Test, Test pulls the waiting Build card. Build now has room.

The newly free slot is a pull signal. Capacity downstream draws work forward. Increasing Build’s limit at step 3 would add unfinished work without resolving the full Test column.

State exceptions openly

Some work needs exceptional treatment. A team might agree, “One expedite item may enter a full column; finish it before pulling other new work.” Put that exception in the DoW and keep its use visible. The policy explains why a limit can be exceeded in a particular case; it does not make silent exceptions acceptable.

Per-person limits can reduce task switching, but alone they can leave large queues between people. Follow the route of work when choosing controls, including waiting states. A maximum for the whole workflow can complement the local limits.

Adjust from observed effects

A limit that is never reached currently constrains nothing. Check whether demand is low, another stage is holding work, or the limit is simply high. A lower value can be a useful experiment, but reaching every limit is not the goal.

If people frequently wait and have nothing useful to help with, examine whether the limit itself is starving the workflow. Raise it slightly only when the evidence supports that explanation. If the bottleneck is downstream, more upstream WIP adds waiting.

Change one limit at a time and observe cycle time and throughput over several weeks. A useful control supports finishing and makes problems visible. Filling every free slot, raising a limit whenever it is reached, or hiding excess cards removes the very signal the team needs.

Key Takeaways

  • Limits can govern local states or the whole workflow.
  • Count waiting cards inside a split column’s shared limit.
  • When a state is full, help existing work finish before pulling more.
  • Document any permitted exception in the DoW.
  • Adjust one limit using evidence about cycle time, throughput, and the cause of waiting.

3.3 Actively manage items in progress

A Kanban system needs active attention to the items already inside it. The daily questions are practical: What can finish? What is blocked? What is getting old? Where is capacity available? The board provides evidence for deciding what to do next.

Walk from delivery toward the start

A common Kanban meeting walks the board right to left, starting with the items closest to finished. For each card, ask what prevents it from moving and who can help. This keeps attention on delivery and on shared obstacles.

An item in Deploy may need one approval. Resolving it can release value and free a workflow slot. A person-by-person report of yesterday’s activity could miss that decision entirely. The meeting’s purpose is to manage flow; an activity report is useful only when it helps decide how an item moves.

Use age before an item is late

Work item age is the time since an unfinished item started. Compare it with the team’s SLE, which forecasts a completion time and probability for similar work. The comparison helps the team act while it can still influence the outcome.

Suppose the SLE is “85% within 8 days.” An item in Test is 6 days old and waiting for an environment. It needs attention today: someone can follow up on the environment, find another way to test, or examine whether the item needs splitting. Waiting until day 12 would turn an early warning into a past delay. Low age also leaves room to check blockers and remaining work; it is not a complete picture of risk.

Mark each blocker’s cause and date and agree who will follow up. An item described as “almost done” can still wait for days. Its place on the board and age deserve the same attention as an obviously difficult item.

Help the constraint

A bottleneck limits the throughput of the whole workflow. Work commonly accumulates before it, while later stages wait for input. If Test cannot keep up, faster coding alone sends it more work without increasing finished output.

Help can include pairing on tests, removing a recurring environment problem, reducing handoffs, or stopping excess work entering the queue. Look for evidence across states before naming the constraint; a single old card can have a special cause.

Choose new work deliberately

Replenishment selects which upstream options become committed work. A team may meet for 20 minutes each Monday to fill Ready up to its limit of 5. Another may replenish whenever capacity opens. The DoW states the commitment point and the selection rules.

Pull order is a policy. Deal with expedite and fixed-date items according to their agreed treatment; otherwise an oldest-first rule often suits standard work. Consider cost of delay, capacity, and the items closest to finished. Choosing only easy or favorite cards leaves more important work aging. Over time, pull new work at about the rate completed work leaves so the system avoids a steadily growing workload.

Key Takeaways

  • Walk the board from right to left to find actions that help items finish.
  • Use age and the SLE to act before delays grow.
  • Assign a follow-up action for blockers.
  • Support the bottleneck to improve whole-workflow delivery.
  • Replenishment and pull order follow explicit priority and capacity policies.

3.4 Improve the workflow with feedback and experiments

Improvement changes the workflow so it delivers value more effectively, efficiently, or predictably. Flow data helps the team choose a problem and examine whether a proposed change actually helps. Customer and team feedback add context that a number alone can miss.

Turn an observation into an experiment

Use a clear sequence:

  1. Observe a problem in the board, metrics, or feedback.
  2. State a hypothesis linking a change to an expected effect.
  3. Change one policy so its effect can be examined.
  4. Measure over an agreed period.
  5. Keep, adjust, or reverse the change using the results.

A useful hypothesis is specific enough to check. “Improve collaboration” gives little guidance. “If developers review before starting new work, the review queue’s waiting time will fall” identifies an action and an outcome.

Work through a review delay

A team finds that items wait an average of 3 days in Ready for review and that cycle times have increased. It tries a review limit of 2 instead of 4, paired with a rule that developers help review before pulling new work. This is one review policy experiment with a stated mechanism: less incoming review work and more help finishing the existing queue.

After four weeks, average review waiting is 1 day and throughput is unchanged. The results support keeping the policy. The team still checks that the period contains comparable work and that other circumstances did not explain the result. It has reduced a delay without reducing its rate of finishing items.

If waiting had fallen but throughput also fell sharply, the team would examine that trade-off before deciding. Measures serve a delivery purpose, not a contest to make every number smaller.

Choose a cause worth removing

Common targets include long queue waits, oversized items, frequent blockers, unnecessary handoffs, and failure demand. Failure demand is work generated by earlier poor-quality work, such as correcting an avoidable defect. Preventing those defects can release capacity for work customers wanted in the first place.

Group past blockers by cause and examine the board’s queues. A recurring access problem suggests a different experiment from an oversized work item. Ask the people doing the work what creates the pattern before choosing a solution.

Compare fairly and make the change visible

Use the same item types, counting rules, and measurement boundaries before and after the change. Observe for a long enough period, usually several weeks, to avoid treating an unusually easy or difficult week as the whole story. Changing several independent policies at once makes it harder to tell which helped.

A retrospective or flow review gives improvement a rhythm, but the DoW can change whenever needed. Record the policy and its change date. Use metrics to learn about queues, handoffs, and quality. Turning cycle time into an individual performance target can encourage artificial splitting or skipped checks, making the metric look better while service becomes worse.

Key Takeaways

  • An experiment links an observed problem, a policy change, and a measurable expected effect.
  • Compare similar work over a useful period with consistent measurements.
  • Reduce waiting, blockers, handoffs, oversized work, or failure demand.
  • Keep, adjust, or reverse a change based on evidence.
4

Measure flow with metrics and charts

Flow measures turn the movement of work into information a team can act on. This chapter starts with counts and dates, then connects the measures through Little’s Law. You will learn to read the different questions answered by cumulative flow, cycle time, throughput, and aging charts, including the limits of what each chart can tell you.

4.1 Calculate the four flow metrics

The four required flow metrics describe unfinished work, finished output, elapsed completion time, and the age of current items. Use the started and finished points in the DoW for all four. Decide whether to count calendar or working days and keep that choice consistent.

Know which items each metric measures
MetricMeaning
WIPNumber of started but unfinished items at a point in time
ThroughputNumber of finished items per unit of time
Cycle timeTime from started to finished, measured after completion
Work item ageTime from started to now, for unfinished items

Throughput counts items, not hours or story points. Similar, manageable item sizes make the count more useful. Very large items can be split so they flow within the team’s usual time frame.

Calculate from dates

For this example, count both the start and finish day: cycle time is finish day minus start day plus 1. The same inclusive rule applies to age, using today in place of the finish day. A same-day item therefore takes 1 day.

ItemStartedFinishedCycle time
ADay 1Day 33 days
BDay 1Day 66 days
CDay 2Day 43 days
DDay 3Day 97 days
EDay 4Day 52 days
FDay 5Day 106 days
GDay 6Unfinished—
HDay 8Unfinished—

Six items finished during the 10-day period, so throughput is 6 items in 10 days, or 0.6 items per day. The completed cycle times total 27 days. Their average is:

27/6=4.5

Average cycle time is 4.5 days. At the end of day 10, WIP is 2. G’s age is 5 days and H’s is 3 days. G and H do not enter the completed cycle-time average; their final completion times are still unknown.

Separate useful timing terms

Age is a leading indicator: it can prompt action while an item remains unfinished. Cycle time is a lagging indicator: it describes items that already finished.

Lead time needs named endpoints. Kanban University measures it from commitment to delivery, and customer lead time from request to delivery. Many agile and project management materials use lead time for request to delivery and cycle time for work start to completion. The Kanban Guide uses the team’s defined started and finished points for cycle time. Check those points before comparing figures.

Flow efficiency is the share of cycle time spent actively working on the item:

Flow efficiency=Active work timeCycle time×100%

An item worked on for 2 of its 10 days has 20% flow efficiency. The other time was waiting. That directs attention toward queues and handoffs. Compare a team with its own relevant history; another team’s throughput can reflect very different item types and sizes.

Key Takeaways

  • The four metrics are WIP, throughput, cycle time, and work item age.
  • Throughput counts finished items per time period.
  • Calculate completed cycle times separately from unfinished items’ ages.
  • State time units, counting rules, and workflow boundaries.
  • Name lead time’s endpoints before interpreting or comparing it.
  • Flow efficiency compares active time with total cycle time.

4.2 Use Little's Law to relate WIP, cycle time and throughput

Little’s Law connects three averages for a workflow: WIP, throughput, and cycle time. John D. C. Little proved the general queueing relationship in 1961. It helps a team understand the effect of how much work it carries at a given delivery rate.

Use the relationship between averages
Average cycle time=Average WIPAverage throughput

The same relationship can find either of the other measures:

Average WIP=Average throughput×Average cycle time Average throughput=Average WIPAverage cycle time

A team averages 12 items in progress and finishes 3 items per week. Dividing 12 by 3 gives an average cycle time of 4 weeks. If average WIP falls to 6 while throughput remains 3 per week, average cycle time is 2 weeks. This comparison keeps throughput fixed; the equation alone gives no claim that lower WIP increases throughput.

A support team finishes 2 requests per day and wants an average cycle time of 5 days. Multiplying the rate by the time gives an average WIP of 10 requests. A limit around that level can be a first policy choice, followed by observation of what the team actually carries.

Keep units and quantities aligned

Throughput and cycle time must use the same time unit. Suppose a team finishes 15 items per five-day working week and averages 9 items in progress. That rate is 3 items per working day:

9/3=3

The result is 3 working days. Dividing 9 by the weekly rate of 15 instead gives 0.6 working weeks, the same duration. Reading that answer as 0.6 days would mix units.

The formula uses actual average WIP, not the maximum allowed by policy. If the limit is 10 but measured WIP averages 7, use 7. A snapshot of today’s board also differs from the average across the observation period.

Check the workflow’s stability

The relationship is most useful over a suitable period of steady work. Check that:

  • Average arrivals and departures are about equal.
  • Every started item eventually finishes; items are not silently removed.
  • WIP is about the same at the beginning and end.
  • Average work item age is not steadily increasing or decreasing.

A rapidly growing queue breaks the steady-work picture. A short observation period can also contain many starts whose completions lie outside it. Use averages measured for the same workflow and period, with a consistent definition of each item.

Choose a forecasting method

Use the relationship for a capacity discussion or a WIP experiment. A particular request can take more or less than that average. For a single-item forecast, examine the cycle-time distribution and its SLE; for a collection of items, examine throughput history.

Key Takeaways

  • Little’s Law relates average cycle time, average WIP, and average throughput.
  • Use measured averages for the same workflow and period.
  • Keep throughput and cycle time in compatible time units.
  • Check stable arrivals, departures, WIP, and age.
  • The relationship concerns averages, not an individual item’s completion date.

4.3 Read a cumulative flow diagram

A cumulative flow diagram (CFD) shows how counts of work change over time. Time runs horizontally, and cumulative item counts run vertically. Each boundary records how many items have ever reached a particular state. The finished area sits at the bottom, with earlier states above it.

Build the bands from cumulative counts

Consider In progress → Testing → Done. Each evening, record how many items have ever entered each state:

DayEntered In progressEntered TestingReached Done
1310
2521
3642
4854
51064
61275

Plot these as boundaries. The area below Done is finished work. The gap from Done to Testing is current Testing work. The gap from Testing to In progress is current In progress work. Each boundary rises or stays flat because a count of items that have ever reached a state cannot decrease.

Read vertical distance as WIP

On day 6, In progress holds 12 minus 7, or 5 items. Testing holds 7 minus 5, or 2. Total WIP is 12 minus 5, or 7. The Done count itself is 5 completed items; it is not part of WIP.

A band that widens over several days shows accumulation in that state. In this example, arrivals continue faster than completions and total WIP grows from 3 on day 1 to 7 on day 6. The team should inspect the queue and downstream capacity.

Read slope and horizontal distance

The slope of Done shows throughput: the steeper the rise, the more items finish per time unit. During the six recorded days, 5 items finish, giving about 0.83 items per day. A flat stretch means no completions; a staircase suggests batch delivery.

A horizontal gap between the arrival and Done boundaries gives an approximate average cycle time. The arrival boundary reaches 5 items on day 2. Done reaches 5 on day 6, about 4 days later. This comparison tracks cumulative levels, not a named item. Items may finish in a different order from the one in which they started, so the gap is not an exact cycle time for every card.

Recognize patterns and check the data

Roughly parallel boundaries and stable band widths suggest balanced flow. A widening band suggests a bottleneck in that state or farther downstream. An arrival boundary rising faster than Done signals growing WIP and longer times if the pattern continues. Use the board to find the cause before deciding what to change.

If a cumulative boundary dips, investigate deleted items, backward moves, or a changed reporting definition. Correct the data before using it to judge flow. A CFD differs from a burn-up chart, which compares completed work with total scope. Here, the bands reveal the unfinished work between states.

Key Takeaways

  • A CFD plots cumulative state-entry counts over time.
  • Vertical gaps show WIP; the Done boundary’s slope shows throughput.
  • Horizontal gaps give approximate average cycle time, not exact item timings.
  • Widening bands reveal accumulation that needs investigation.
  • A falling cumulative boundary needs a data check.

4.4 Read cycle time, throughput and aging charts

Different flow charts answer different questions. A cycle time chart describes completed work, a throughput chart describes output over periods, and an aging chart shows the items the team can still help. Choose the view that fits the decision.

Read completed-item times

A cycle time scatterplot has one dot per finished item. Its horizontal position is the completion date; its height is cycle time. High dots show slower completions. A rising pattern across several weeks can signal a change in the system or in the work type.

A percentile describes the share of observed items completed within a duration. An 85th-percentile line at 11 days means at least 85% of the plotted items took 11 days or less; at most 15% took longer. It does not say that each item took 11 days.

Take 20 sorted cycle times: 2, 3, 3, 4, 4, 5, 5, 5, 6, 6, 7, 7, 8, 8, 9, 10, 11, 12, 15, and 21 days. Their mean is 7.55 days, while 12 of the 20 values are below that mean. The few long times pull the mean upward. Percentile lines at the 50th, 70th, 85th, or 95th levels help show the spread that a single average hides.

Read delivery counts

A throughput run chart plots the number finished in each day or week. Look for trends, unusually low periods, and delivery in batches. Use equal time periods so a long week is not compared with a single day.

A throughput histogram groups periods by their finished count. For example, it can show that 3 items occurred in two weeks, 5 in four weeks, and 7 in one week. The run chart preserves time order; the histogram makes the frequency of different outcomes easier to see.

Inspect current work with age

An aging work item chart places unfinished items by workflow state horizontally and current age vertically. Historical cycle-time percentile lines give reference levels. Age grows while a card waits, so an item can become risky even when nobody changes its state.

With reference lines at 6 days for the 50th percentile, 8 for the 70th, and 11 for the 85th:

  • A Build item aged 3 days has no age warning yet. Check blockers and remaining work before judging its likely finish.
  • A Test item aged 10 days lies above the 70th line and below the 85th. It needs attention before crossing the SLE.
  • A Deploy item aged 14 days already exceeds the time taken by 85% of past items. Investigate what is holding it up.
Ask about causes, not just dots

Variation is normal. An outlier may reflect a blocker, a large item, or a new type of demand. A sustained shift may follow a policy change. Read the item’s details alongside the chart, compare similar work, and use the result to decide where help or an experiment is needed.

Key Takeaways

  • Scatterplots show cycle times of completed items; percentile lines describe their spread.
  • Run charts preserve delivery over time; histograms show how frequently counts occurred.
  • Aging charts show unfinished items that can still receive help.
  • Use age with blockers and remaining work, not as the sole risk judgment.
  • Investigate outliers and sustained trends in their work context.
5

Set service level expectations and forecast delivery

Stakeholders need useful answers about both one request and a collection of work. This chapter separates those two forecasting problems. You will turn past cycle times into a service level expectation and use throughput history to explore delivery outcomes, paying attention to the probability, the work being compared, and the changes that make a forecast need updating.

5.1 Set and use a service level expectation

A service level expectation (SLE) forecasts how long a single item should take from started to finished. It contains a duration and a probability, such as “85% of items finish in 11 days or less.” The team makes it visible in its Definition of Workflow.

Calculate a percentile from recent work

Collect cycle times for recently finished items of the same type, sort them, and choose a probability. Using the nearest-rank method, multiply the number of observations by the probability and round the rank up if needed. Then take the value at that position in the sorted list, counting the first as position 1.

For 20 values, an 85% probability gives rank 17. The sorted history is:

2, 3, 3, 4, 4, 5, 5, 5, 6, 6, 7, 7, 8, 8, 9, 10, 11, 12, 15, 21 days.

The 17th value is 11. Seventeen of the 20 observations finished within 11 days, so a useful SLE is “85% of items finish in 11 days or less.” The 50th-percentile value is position 10, or 6 days. The 95th-percentile value is position 19, or 15 days.

The chosen probability changes the time. A higher probability usually needs a longer duration. The 50th percentile is a middle-of-the-distribution reference, so teams commonly choose a higher level such as 85% for stakeholder planning. Repeated durations can make several percentile ranks return the same time.

Keep the comparison relevant

Separate work types or classes of service when their cycle times differ substantially. A small defect fix and a major feature may need different SLEs. Define the same started and finished points for the history and the items being forecast, and keep the day-counting rule consistent.

When no history exists, begin with a best guess and replace it with a calculated SLE when enough relevant observations are available. Update it as the workflow changes. Simply increasing the duration can make a forecast fit current performance, but the team should still investigate why delivery has slowed.

Use it before and during work

Before pulling an item, ask whether it can probably finish within the SLE. Right-sizing means making the item small enough for the usual flow; splitting an oversized item can reduce risk. Once work starts, compare age with the SLE and act before the expected time is exceeded. In stakeholder discussions, give both the time and probability.

An SLE of 85% anticipates that some comparable work will take longer. A breach calls for investigation of the card and system, including blockers and remaining effort. It is not a reason to blame the person working on that item.

An SLA, or service level agreement, is a customer commitment, often contractual and with consequences for missing it. The SLE is an evidence-based forecast. It can inform an SLA negotiation, but using the same number in a conversation does not erase the difference in purpose.

Key Takeaways

  • An SLE forecasts one item with a time and a probability.
  • Nearest-rank percentiles select a position in sorted cycle times; round fractional ranks up.
  • Use comparable recent work and consistent boundaries and counting rules.
  • Use the SLE to right-size work, inspect age, and discuss delivery.
  • An SLA is a customer agreement; an SLE is a forecast.
  • Investigate items that exceed the SLE and update the forecast as evidence changes.

5.2 Forecast how much work will be done and by when

For one work item, use an SLE based on cycle times. For a collection of items, use throughput history to ask how much can finish by a date or when a given amount is likely to finish. These questions need a probability as well as a count or time.

Start with the average, then inspect the spread

A team’s last six weekly counts were 6, 4, 7, 5, 8, and 3. The total is 33 items, giving an average of 5.5 per week. For 30 remaining items:

30/5.5≈5.45

About 5.5 weeks is a simple average-based estimate. The division attaches no probability to that time. The weekly counts vary, so describing it as an 85% forecast would add information the calculation never supplied.

Simulate possible delivery outcomes

A Monte Carlo simulation repeatedly samples past outcomes to build possible futures. Suppose recent daily throughput is 1, 0, 2, 1, 0, 1, 3, 1, 0, and 1. To model the next 10 working days:

  1. Pick a historical daily count at random for each future day, allowing repeated picks.
  2. Add the 10 picks to form one trial’s total.
  3. Repeat for many trials.
  4. Count the share of trials meeting a proposed amount.

One trial draws 1, 2, 3, 1, 0, 0, 0, 1, 1, and 1, totaling 10. Zero-output days stay in the history because they are part of the observed delivery pattern. Tools commonly run thousands of trials; a small hand example helps explain the method.

Consider these 20 trial totals:

4, 7, 7, 8, 9, 9, 9, 9, 10, 10, 10, 11, 11, 11, 12, 13, 14, 14, 15, 16.

Seventeen trials reach at least 8, giving 85% simulated confidence in at least 8 items over the 10 days. Only 12 reach at least 10, or 60%. The average of the input history is 1 item per day, but its average-based total of 10 is not the 85% lower forecast.

Read confidence in the right direction

For how many by a date, greater confidence means accepting a smaller minimum count. More trials can reach at least 8 than at least 10. For when an amount will finish, greater confidence means allowing a later date. More trials have had time to complete the required work.

The simulation’s probabilities describe the modeled outcomes. Their usefulness depends on the near future resembling the recent past: similar work types and sizes, team capacity, and workflow. A changed team or a shift in demand calls for a fresh look at the history.

Account for scope growth too. If large cards normally split into several deliverable items, forecasting only the current card count understates the remaining work. Update forecasts as new data arrives, often weekly, and explain the current probability and scope to stakeholders.

Key Takeaways

  • Use throughput history to forecast collections of work.
  • An average-based division supplies no confidence level.
  • Monte Carlo simulation resamples history and counts the share of trials meeting an outcome.
  • Higher confidence means a smaller minimum count by a date or a later date for a fixed count.
  • Keep history relevant and refresh the forecast when capacity, work, or scope changes.
6

Combine Kanban with Scrum and choose an approach

Kanban practices can improve the movement of work inside Scrum while the team keeps its Sprint Goal and Scrum accountabilities. This chapter shows where flow information helps the existing events and how releases can happen during a Sprint. You will then compare the two approaches and choose a combination that fits the arrival pattern and purpose of a team’s work.

6.1 Add Kanban practices to a Scrum Team's work

The Kanban Guide for Scrum Teams explains how flow practices complement Scrum. First published in 2018 and revised in January 2021, it keeps Scrum’s Sprint, events, accountabilities, and artifacts. Kanban adds attention to how work moves through that existing framework.

Add four practices to the team’s workflow

The guide describes visualizing the workflow, limiting WIP, actively managing items in progress, and inspecting and adapting the DoW. The same four flow metrics apply: WIP, cycle time, work item age, and throughput.

The Scrum Team creates and adapts its DoW, with people acting within their Scrum accountabilities. It defines the items, usually Product Backlog items; started and finished points; workflow states; WIP limits; policies; and the SLE. Its scope may include work inside or outside the Sprint. External stakeholders can describe needs, while the team decides how its work flows.

Finishing items sooner creates earlier opportunities for feedback. That supports empiricism: making work transparent, inspecting the results, and adapting. Flow metrics are useful because they help the team ask the right questions while a decision can still make a difference.

Bring evidence into the existing events
Scrum eventUseful flow question
Sprint PlanningWhat does past throughput suggest about a realistic selection of work?
Daily ScrumWhich blocked, queued, or aging items threaten progress toward the Sprint Goal?
Sprint ReviewWhat does throughput suggest about likely future delivery?
Sprint RetrospectiveWhat pattern in flow suggests a workflow policy to improve?

Sprint Planning establishes the Sprint’s plan and goal. Historical counts inform the discussion; they do not mechanically decide the next Sprint Backlog. At the Daily Scrum, Developers inspect progress toward the Sprint Goal and adapt their plan. A board view helps them choose an action, such as pairing to finish an old Test item.

The Sprint Review inspects the outcome with stakeholders and informs future adaptation. A throughput forecast helps the Product Owner discuss likely delivery. At the Retrospective, the team can investigate a widening CFD band and change the workflow.

Work through a Sprint example

A team finished 7, 9, 8, and 10 items over its last four two-week Sprints. In Planning it selects about 8 right-sized items around a Sprint Goal. Its workflow limit is 4, and its SLE is “85% within 6 days.” During the Sprint, Developers attend to aging and blocked items. At the Retrospective, they add a Waiting for review state after flow data reveals a hidden queue.

Selecting 8 items does not mean starting all 8. The WIP limit controls how many are started at once. Nor must finished work wait for the Sprint’s end to be released: usable Increments can be delivered throughout the Sprint, with at least one usable Increment each Sprint. Kanban adds no new Scrum events and does not remove the Sprint.

Key Takeaways

  • Kanban complements Scrum while all Scrum elements remain.
  • The Scrum Team owns its DoW within the Scrum accountabilities.
  • Flow data supports Planning, the Daily Scrum, Review, and Retrospective.
  • Sprint selection differs from a limit on items started simultaneously.
  • Items can finish and be released during the Sprint.

6.2 Compare Kanban and Scrum and choose what fits

Choose a way of working by looking at how demand arrives and how the team needs to learn. Kanban and Scrum can work together, but they make different requirements. A board’s appearance alone does not identify which approach a team follows.

Compare the main requirements
AspectKanbanScrum
CadenceNo required iterations; choose replenishment and review rhythmsSprints of one month or less, each with a Sprint Goal
RolesKeeps existing roles and job titlesProduct Owner, Scrum Master, and Developers accountabilities
WIPExplicit control of started, unfinished itemsNo prescribed numerical limit on simultaneous starts
ChangePull according to capacity and explicit policiesKeep the Sprint Goal; renegotiate Sprint Backlog scope as needed
MeasuresWIP, throughput, cycle time, and age; SLE for forecastingFlow metrics may be added; velocity is optional

The Product Owner is accountable for maximizing product value, the Scrum Master for establishing Scrum and the team’s effectiveness, and Developers for creating a usable Increment each Sprint. Kanban does not replace those accountabilities when applied within Scrum.

During a Sprint, Developers can renegotiate scope with the Product Owner as they learn. The Sprint Goal remains the focus. A numerical WIP limit adds control over how much of that work is started at once; selecting a Sprint Backlog by itself does not provide this control.

Distinguish throughput and velocity

Throughput counts finished items per time period. Velocity, a common optional Scrum practice, sums the estimates of finished work, often in story points per Sprint. Finishing four items totaling 18 points means throughput of 4 items and velocity of 18 points for that Sprint. The units answer different questions. Scrum’s definition requires neither velocity nor story points.

Match the approach to the work

An internal IT service receives 30 to 50 requests weekly, ranging from access requests to urgent outages. Daily changes in priority make continuous pull, service policies, WIP limits, and SLEs useful. Kanban can handle this demand without requiring a fixed iteration plan.

A team developing a mobile app may benefit from a shared Sprint Goal, a regular time box, and stakeholder reviews. Scrum provides that structure; adding Kanban practices helps items move within it. The team can keep both the learning cadence and explicit WIP controls.

Boards also help in projects that combine agile and plan-based work. A phase team can make tasks and bottlenecks visible without claiming the whole project follows Scrum.

Describe the combination clearly

Scrumban is a common name for mixtures of Scrum and Kanban elements, with no single official definition. A team using that label should say which events, accountabilities, limits, and policies it follows. If it claims to use Scrum with Kanban, Scrum’s required elements remain. Kanban’s flexibility still demands discipline in following explicit policies and managing flow.

Key Takeaways

  • Scrum requires Sprints and three accountabilities; Kanban prescribes neither.
  • Scrum keeps the Sprint Goal while scope can be renegotiated.
  • Throughput counts items; velocity sums finished estimates.
  • Match the approach to demand, learning needs, and delivery context.
  • A team using “Scrumban” should state the actual elements it follows.

Kanban and Flow examples

6 Walkthroughs

1

See how Kanban changes the movement of work

9 steps
Connect pull and value delivery to the principles and practices that make a Kanban system work.
  1. 1
    IntroductionLook beyond a busy team

    A support team starts many requests but completes few. The question is where the requests wait and what would help them reach customers.

    You will use this flow perspective to distinguish pull from push, recognize a Kanban system, and connect its visible rules to feedback and improvement.

  2. 2
    ExplanationFollow value from start to finish

    Flow is the movement of value through a process. Kanban improves that movement by balancing effectiveness, efficiency, and predictability.

    A fast report that nobody needs fails the effectiveness test. A useful report that waits unpredictably for approval creates a different problem. The team needs to inspect the whole journey, including waiting, to understand which part of delivery needs attention.

  3. 3
    ExampleLet a free slot signal a start

    The support team allows 4 open escalations. All four slots are occupied when a new request arrives. Under pull, it selects the next request but waits to start it until a current escalation finishes.

    Under push, the arrival itself triggers a start, even with no capacity. Pull still needs planning and priority decisions; it separates deciding what matters from admitting more unfinished work.

  4. 4
    ChallengeWhat is missing from the board?

    A recruiting team has cards in To Do, Doing, and Done. It starts every vacancy request immediately and has no shared start/finish rules or flow measurements. Does the board alone make this a Kanban system?

    ---reveal---

    No. It is a visual task list. A Kanban system also needs explicit workflow agreements, control of WIP, active management, and improvement using flow information. The cards show status but do not yet control how work flows.

  5. 5
    ConnectionPlace the three guides

    The Kanban Guide gives a minimum structure: workflow agreements, three practices, and four flow metrics. Kanban University’s Kanban Method adds principles, six practices, and cadences. Scrum.org’s guide applies flow practices within Scrum.

    They share core ideas but may use timing terms differently. For example, interpret lead time by checking the two points it measures before comparing it with cycle time.

  6. 6
    ExplanationImprove the system people already use

    The Method’s change principles start with the current process, pursue evolutionary improvement, and encourage leadership at every level. Service principles begin with customer needs, let people organize around the work, and review services and policies.

    A reviewer can propose a change to a handoff without receiving a new job title. The group tests the change together and looks at its effect on service.

  7. 7
    Key InsightConnect six practices to three

    The practice lists group closely related work:

    • Visualize and make policies explicit: define and visualize the workflow.
    • Limit WIP and manage flow: actively manage items.
    • Implement feedback loops and improve experimentally: improve the workflow.

    A visible queue helps because people can control arrivals, help existing work, and test a better policy. The practices reinforce one another.

  8. 8
    ChallengeTurn observation into feedback

    The support team posts a weekly chart showing a growing approval queue. Its lead proposes ranking agents by completed tickets. What would better connect the chart to Kanban’s principles?

    ---reveal---

    Discuss the approval policy with the people doing the work and test a change that helps requests move. The chart describes a shared system. Ranking agents can encourage easy-ticket selection while leaving the approval delay untouched.

  9. 9
    RecapUse the picture to guide action

    Pull admits work when capacity is available. Workflow rules give a board shared meaning, and feedback turns observations into improvements.

    When a team looks busy but delivers slowly, inspect unfinished items, queues, and policies. A daily flow discussion, replenishment decision, or retrospective can each close a different part of that feedback loop.

2

Design a board people can use

12 steps
Map real states, mark WIP boundaries, show risk on cards, and write a usable Definition of Workflow.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionMake the work visible enough to decide
  2. 2
    ExampleTrace one article’s route
  3. 3
    ExplanationMark start, commitment, and finish
  4. 4
    ChallengeCount a waiting item
  5. 5
    ExplanationGive cards useful information
  6. 6
    ExampleConnect urgency with service treatment
  7. 7
    ChallengeRead cost of delay
  8. 8
    TipKeep blockers inside the picture
  9. 9
    ExplanationBuild the Definition of Workflow
  10. 10
    ExampleWrite an actionable movement rule
  11. 11
    ChallengeComplete the board’s agreements
  12. 12
    RecapCheck the board against real decisions
3

Finish work before starting more

15 steps
Use WIP limits, age, blockers, and small experiments to improve delivery across the workflow.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionRespond to a full board
  2. 2
    ExampleFinish three tasks one at a time
  3. 3
    ExampleShare the same effort across all three
  4. 4
    ChallengeSeparate effort from waiting
  5. 5
    ExplanationApply the limit to the whole area
  6. 6
    ExampleHelp the next state release capacity
  7. 7
    ChallengeUse an explicit exception
  8. 8
    TipChoose and adjust limits from evidence
  9. 9
    ExplanationWalk toward the cause of delay
  10. 10
    ChallengeAct before the SLE is crossed
  11. 11
    ConnectionSelect what comes next
  12. 12
    ExampleTest a review policy
  13. 13
    Key InsightLook for avoidable demand
  14. 14
    ChallengeJudge a change across the system
  15. 15
    RecapUse pressure as information
4

Read counts, times, and flow charts

20 steps
Calculate flow metrics and use each chart for the decision it can support.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionAsk the right question of the data
  2. 2
    ExplanationSeparate the four measures
  3. 3
    ExampleCalculate completed cycle times
  4. 4
    ExampleCount output and unfinished age
  5. 5
    ChallengeChoose the population to average
  6. 6
    ConnectionRead timing boundaries and waiting
  7. 7
    ExplanationUse Little’s Law for averages
  8. 8
    ExampleAlign days and weeks
  9. 9
    ChallengeCheck the relationship and its conditions
  10. 10
    TipCheck steady-workflow evidence
  11. 11
    ExampleBuild a cumulative picture
  12. 12
    ExampleRead the gaps and the slope
  13. 13
    Key InsightRead a horizontal gap with care
  14. 14
    ChallengeDiagnose a widening band
  15. 15
    ExplanationRead completed-item variation
  16. 16
    ExampleCompare output views
  17. 17
    ExampleFind current items that need help
  18. 18
    ChallengeChoose a chart for today’s decision
  19. 19
    ChallengeConnect accumulation with current risk
  20. 20
    RecapKeep counts, time, and decisions connected
5

Build a forecast with a probability

12 steps
Set a single-item SLE, then use throughput trials to forecast a collection of work.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionSeparate two delivery questions
  2. 2
    ExplanationGive an SLE both parts
  3. 3
    ExampleFind the percentile rank
  4. 4
    ChallengeCalculate a fresh SLE
  5. 5
    TipUse the forecast while work can change
  6. 6
    ExampleSee what an average leaves out
  7. 7
    ExplanationResample delivery history
  8. 8
    ExampleTurn trial counts into confidence
  9. 9
    ChallengeRead a lower delivery count
  10. 10
    Key InsightReverse the direction for finish dates
  11. 11
    ChallengeChoose relevant evidence after a change
  12. 12
    RecapSay the outcome, time, and probability
6

Add flow to Scrum and choose a fit

10 steps
Use flow in existing Scrum events and compare approaches for product and service work.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionKeep the goal and improve the flow
  2. 2
    ExplanationAdd four flow practices
  3. 3
    ExampleUse evidence in Planning and daily work
  4. 4
    ExampleConnect Review and Retrospective to flow
  5. 5
    ChallengeDeliver without waiting for the Review
  6. 6
    ExplanationCompare the structures
  7. 7
    Key InsightKeep item counts and estimates distinct
  8. 8
    ChallengeMatch the approach to demand
  9. 9
    ChallengeDescribe a useful combination
  10. 10
    RecapChoose from the work’s needs

Kanban and Flow practice questions

50 Practice Questions in 5 sets

Set 1: Use policies and respond to delays10 Practice Questions

Question 1 of 10

A team posts weekly flow data but never makes a decision from it. What is missing for this to function as a feedback loop?
  1. A fixed two-week reporting cycle
  2. An individual productivity ranking
  3. A new name for the weekly meeting
  4. Action based on the information
Show answerHide answer
Answer: D
A feedback loop links information about the system to action. Posting figures without using them leaves that loop incomplete. A different meeting name or a fixed reporting interval cannot replace a decision about what the team should keep or change.

Question 2 of 10

A team’s workflow agreement defines items, boundaries, states, WIP control, and movement policies. What sixth required element completes the Kanban Guide’s minimum DoW?
  1. An individual capacity report
  2. A fixed-length iteration plan
  3. A service level expectation
  4. A story-point estimation scale
Show answerHide answer
Answer: C
The minimum DoW also needs an SLE, a time-and-probability forecast from started to finished. Story points and fixed iterations are not required Kanban elements. A list of states and limits alone leaves the delivery expectation undefined.

Question 3 of 10

A team spends its daily meeting hearing what each person did yesterday. Old blocked items receive no action. How should it change the discussion?
  1. Discuss only new arrivals and leave old cards for later.
  2. Walk items toward completion and assign unblocking actions.
  3. Increase each person’s allocation of simultaneous tasks.
  4. Collect longer activity reports and compare individual output.
Show answerHide answer
Answer: B
Walking the board from the finished end helps the team identify what each item needs next. Naming a follow-up action makes blockers actionable. More detailed personal reports could still leave the same old work waiting without changing flow.

Question 4 of 10

At one CFD snapshot, 28 items have entered Build, 19 have entered Test, and 13 have reached Done. What is total WIP between Build and Done?
  1. 6 items
  2. 9 items
  3. 28 items
  4. 15 items
Show answerHide answer
Answer: D
Total WIP is cumulative starts minus cumulative finishes: 28 minus 13 gives 15. The 6-item gap between Test and Done counts only Test, while 9 counts Build alone. Adding the two unfinished bands gives the same total of 15.

Question 5 of 10

The sorted cycle times of 10 comparable items are 1, 2, 2, 3, 4, 4, 5, 7, 9, and 14 working days. Using nearest rank, what time belongs in an 80% SLE?
  1. 7 working days
  2. 4 working days
  3. 8 working days
  4. 9 working days
Show answerHide answer
Answer: A
Multiply 10 observations by 0.80 to get rank 8. The eighth sorted value is 7 working days, so use that duration. The rank number is a position, not the forecast time; reporting 8 days confuses the two.

Question 6 of 10

A Scrum Team completes 6 items totaling 23 story points in one Sprint. How should it report throughput and velocity for that Sprint?
  1. Throughput: 6 points; velocity: 23 items.
  2. Throughput: 23 items; velocity: 6 points.
  3. Throughput: 23 points; velocity: 6 items.
  4. Throughput: 6 items; velocity: 23 points.
Show answerHide answer
Answer: D
Throughput counts finished items, so it is 6 for the Sprint. Velocity sums the finished estimates, giving 23 story points. Swapping these quantities confuses a count with an estimate total; velocity is an optional practice, not a required Scrum measure.

Question 7 of 10

A research team’s total WIP limit is 8. Policy reserves at least 5 slots for urgent customer work by allowing at most 3 routine studies. Current WIP is 2 urgent and 3 routine items. Another routine study is ready. How many more routine studies may start under this policy?
  1. 0 studies
  2. 1 study
  3. 3 studies
  4. 5 studies
Show answerHide answer
Answer: A
Routine studies already occupy their 3 permitted slots. The unused workflow capacity is reserved for urgent work, so no additional routine study may start. Looking only at the total WIP of 5 out of 8 would ignore the lane-specific capacity rule.

Question 8 of 10

A team reduces its review limit and sees lower cycle times for one week. That week contains mostly quick fixes; the earlier month contained large features. How should it evaluate the change?
  1. Gather comparable work over a longer period.
  2. Keep the change because the mean is lower.
  3. Reverse the change because work types differ.
  4. Judge each reviewer by that week’s cycle times.
Show answerHide answer
Answer: A
The observed difference mixes the policy with a change in work type and a short period. Compare similar items over a useful span before attributing the result to the limit. Lower times alone do not establish which change caused the improvement.

Question 9 of 10

A request starts on working day 4 and finishes on working day 9. Counting both start and finish days, what is its cycle time?
  1. 13 working days
  2. 5 working days
  3. 6 working days
  4. 9 working days
Show answerHide answer
Answer: C
Inclusive counting gives finish minus start plus 1: 9 minus 4 plus 1 is 6 working days. Five days would omit one endpoint under the stated rule. The finish-day label alone is not a duration because the request did not start on day 1.

Question 10 of 10

An unfinished item is 9 days old. Historical cycle-time lines are 6 days at the 50th percentile and 10 at the 85th. It is blocked awaiting access. What action best follows from these facts?
  1. Predict one more day because its age is 9 days.
  2. Address access now and inspect the remaining work.
  3. Record 9 days as its completed cycle time now.
  4. Wait until day 11 because it is below the 85th line.
Show answerHide answer
Answer: B
The item is near the 85th-percentile time and already has a known blocker, so the team should act now. Being below the line does not justify waiting or reveal remaining duration. Its 9 days measure current age, not completed cycle time.
Set 2: Read the board and measure work10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A board has a whole-workflow limit of 7 and currently holds 5 started, unfinished items. What is its measured WIP?
  1. 12 items
  2. 2 items
  3. 5 items
  4. 7 items
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A service team finishes 18 requests over 6 working days. What is its average daily throughput?
  1. 3 requests per working day
  2. 6 requests per working day
  3. 0.33 requests per working day
  4. 18 requests per working day
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A translation team starts every new request immediately, even when all reviewers are occupied. What kind of work system does this describe?
  1. A push system
  2. A pull system
  3. A WIP-controlled system
  4. A capacity-triggered system
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A workflow starts in Drafting and finishes at publication. One article is being edited and another is waiting for approval. How many of these two articles count as WIP?
  1. Only the article actively edited
  2. 2 articles
  3. 1 article
  4. 0 articles
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A team writes its SLE as “90% of requests finish within 7 working days.” What should it tell a stakeholder about a comparable new request?
  1. The forecast is 90% within 7 working days.
  2. The request needs 7 days of active effort.
  3. The remaining 10% must finish on day 8.
  4. Every request is due after 7 working days.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A Scrum Team wants to add Kanban using Scrum.org’s guide. What happens to its Sprint and existing Scrum events?
  1. They end when continuous delivery begins.
  2. They remain part of the team’s Scrum process.
  3. They become optional once WIP is limited.
  4. They are replaced by Kanban cadences.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

An analytics request loses most of its value immediately after a scheduled conference. Which class of service best matches that delay pattern?
  1. Expedite
  2. Standard
  3. Fixed date
  4. Intangible
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

Review has a shared limit of 3 across its “In progress” and “Done” areas. It holds 2 active cards and 1 waiting card. What should happen before another card enters Review?
  1. The next card must get a reviewer.
  2. One active card must become waiting.
  3. One card must shift to Review: done.
  4. A current card must leave Review.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

Over a stable period, an editorial service averages 8 items in progress and finishes 10 per five-day working week. What average cycle time does Little’s Law give in working days?
  1. 2 working days
  2. 4 working days
  3. 0.8 working days
  4. 5 working days
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

In 40 simulated four-week trials, 36 finish at least 12 items and 24 finish at least 15. What minimum count has 90% simulated confidence for those four weeks?
  1. Exactly 12 items
  2. At least 15 items
  3. At most 12 items
  4. At least 12 items
Show answerHide answer

Save this lesson to see this answer.

Set 3: Connect flow measures to decisions10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A service finishes requests quickly but often delivers reports that customers do not need. Which Kanban aim most directly needs attention?
  1. Predictability
  2. Effectiveness
  3. Capacity utilization
  4. Efficiency
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A consulting team commits to a request in Selected, defines started at entering Analysis, and finishes at delivery. Six requests are in Selected and four in Analysis. What is this delivery workflow’s WIP?
  1. 6 requests
  2. 10 requests
  3. 2 requests
  4. 4 requests
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A workflow averages 16 unfinished items and 4 completions per week. Later it averages 8 unfinished items at the same delivery rate under stable conditions. How does its average cycle time change?
  1. It stays at 4 weeks in both periods.
  2. It falls from 4 weeks to 1 week.
  3. It rises from 2 weeks to 4 weeks.
  4. It falls from 4 weeks to 2 weeks.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A team has a WIP limit of 12, measured average WIP of 9, and average throughput of 3 items per working day. Which WIP value belongs in Little’s Law?
  1. 12 items
  2. 3 items
  3. 21 items
  4. 9 items
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A throughput model gives 70% confidence in at least 22 items by a date and 90% confidence in at least 18. A stakeholder wants the higher-confidence lower-count forecast. What should the team report?
  1. At least 18 items at 90% confidence.
  2. At most 18 items at 90% confidence.
  3. Exactly 22 items at 70% confidence.
  4. At least 22 items at 90% confidence.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

During a Sprint, an item meets the Definition of Done and is usable. The team wants to release it immediately. How does using Scrum with Kanban affect that choice?
  1. Release during the Sprint is permitted.
  2. Release ends the current Sprint early.
  3. Release requires dropping the Sprint Goal.
  4. Release must wait for the Sprint Review.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

Build is full and Test’s queue has grown for a month while downstream deployment often lacks input. What should the team investigate before raising Build’s limit?
  1. Build’s limit as the only possible cause.
  2. Deployment speed as the proven constraint.
  3. Test capacity and the causes of its queue.
  4. Build capacity as evidence of insufficient demand.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A team’s SLE is “85% within 12 days.” A 10-day-old standard item is blocked by an unanswered decision, and several young cards are easy to start. What immediate plan best supports flow?
  1. Assign decision follow-up and help the old item move.
  2. Remove the old card from WIP until the answer arrives.
  3. Start the easy cards and inspect the old one on day 13.
  4. Raise the SLE to 15 days and keep the blocker unchanged.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A CFD’s Done boundary stays flat for four working days while the arrival boundary rises. What does this show about that interval?
  1. No items start while WIP decreases.
  2. Cycle time is zero while demand grows.
  3. No items finish while WIP increases.
  4. Throughput rises while WIP stays fixed.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A histogram shows that a team finished 4 items in three weeks and 8 items in three weeks. What additional view is needed to tell whether the 8-item weeks came later?
  1. A current WIP snapshot
  2. A throughput run chart
  3. A sorted throughput list
  4. A cycle-time percentile line
Show answerHide answer

Save this lesson to see this answer.

Set 4: Test changes and delivery forecasts10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A coordinator notices that items wait for sign-off and proposes a small policy experiment with the people doing the work. Which Kanban change principle does this most directly demonstrate?
  1. Leadership at all levels
  2. Keeping all policies fixed
  3. Central approval of changes
  4. Replacing all job titles
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A team says a card may enter Testing only after its build is available and its acceptance criteria are clear. What type of workflow policy is this?
  1. Exit criteria for Testing
  2. A forecast for Testing
  3. A throughput measure for Testing
  4. Entry criteria for Testing
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A team’s wait falls from 5 to 2 days after a policy experiment, but throughput also falls from 14 to 8 items per week. Work type and counting rules are unchanged. What should it do before keeping the policy?
  1. Keep it because the wait metric improved by itself.
  2. Investigate the delivery-rate trade-off over more evidence.
  3. Raise its WIP limit until both old averages return.
  4. Reject it because any lower throughput proves failure.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

By the end of working day 12, completed items have cycle times of 2, 4, 6, and 8 days. Two other items started on days 7 and 10 and remain unfinished. Using inclusive counting, what are average completed cycle time and current WIP?
  1. 4 working days; WIP 4
  2. 6 working days; WIP 2
  3. 5 working days; WIP 6
  4. 5 working days; WIP 2
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A team with an 85% SLE of 10 days finds a 13-day-old item and a recent shift toward much larger requests. What response best uses the SLE?
  1. Delete long cycle times before recalculating the same SLE.
  2. Change every request’s commitment into a 10-day guarantee.
  3. Investigate the item and reassess the comparable history.
  4. Mark the item as a personal failure and retain the old mix.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A service receives unpredictable repair requests and changes priorities daily. It wants explicit WIP limits and evidence-based response forecasts but sees little value in a shared fixed-period product goal. What approach best fits these stated needs?
  1. Scrum with a new Sprint Goal after every urgent arrival.
  2. Kanban with every incoming request started immediately.
  3. Kanban with chosen replenishment and review rhythms.
  4. Scrum with all work held until each Sprint Review.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A card has started but cannot proceed because a required account is missing. What should the board show?
  1. A new unstarted card replacing the old one.
  2. A hidden card until access is restored.
  3. A visible blocker with its cause and date.
  4. A finished card because no work can occur.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A team’s delivery work varies and urgent requests sometimes arrive. Why can planned spare capacity help flow?
  1. It removes the need to prioritize incoming requests.
  2. It makes average throughput equal the WIP limit.
  3. It guarantees that every urgent request finishes at once.
  4. It gives room to respond and help work finish.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

Over one month, arrivals greatly exceed completions and average age rises each week. A manager divides average WIP by throughput and calls the result a reliable steady-workflow cycle time. What should the team question?
  1. The need for compatible time units in the rate.
  2. The stability conditions behind the calculation.
  3. The requirement to use actual average WIP.
  4. The existence of a relationship between averages.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A CFD shows a widening Review band, a nearly flat Done boundary, and one cumulative state boundary dipping yesterday. What should the team do before attributing all of the pattern to a bottleneck?
  1. Check the dip’s data, then inspect Review and downstream flow.
  2. Use the horizontal gap as every card’s exact cycle time.
  3. Raise Review’s limit and treat the dip as improvement.
  4. Read the widening band as an increase in throughput.
Show answerHide answer

Save this lesson to see this answer.

Set 5: Make decisions across the workflow10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A team’s official process has no waiting stage, but finished cases show repeated waits between analysis and review. How should it design the first board?
  1. Show that real queue between analysis and review.
  2. Use one column per analyst to avoid queue definitions.
  3. Count the queue as finished because analysis has ended.
  4. Follow the official states and omit the observed wait.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A research workflow has a WIP limit of 9, actual average WIP of 3, and stable throughput of 1 item per working day. Demand is low with no waiting backlog. A manager uses the limit to report 9 days of average cycle time and proposes cutting it to 3 because slots are unused. How should the team judge both claims?
  1. Use 3 days; low demand alone does not require a limit cut.
  2. Use 9 days; cutting the limit will necessarily lower that average.
  3. Use 3 days; raise the limit so demand can fill the unused slots.
  4. Use 9 days; keep the limit because it exceeds current demand.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

An editing service speeds up drafting, but review capacity stays fixed. The review queue grows and publication throughput stays flat. The team wants to shorten customer waits while keeping “published” as its finished point. What combination of action and measurement best addresses the constraint?
  1. Increase drafting speed and the review limit; track publication throughput and waiting.
  2. Help drafting and track its output as delivery; keep the review process unchanged.
  3. Help review but admit all new drafts immediately; track the number of started articles.
  4. Help review and control new starts; track publication throughput and waiting.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A request spends 3 working days in active work and has a total cycle time of 12 working days. What is its flow efficiency?
  1. 75%
  2. 400%
  3. 33%
  4. 25%
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A forecast used stable six-person throughput history for 8 remaining cards. Two people leave, and 3 of those cards now each split into 3 deliverable items. What count and evidence should the updated forecast use?
  1. Forecast 8 items with history relevant to the changed capacity.
  2. Forecast 14 items with the unchanged six-person delivery rate.
  3. Forecast 14 items with history relevant to the changed capacity.
  4. Forecast 11 items after scaling the old rate by staff numbers.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A Scrum Team selects 11 items around a Sprint Goal and limits WIP to 4. Four items have started, including one blocked item. No WIP exception is defined. A new item would support the Sprint Goal. What should Developers do before starting it?
  1. Exclude the blocked item from WIP; pull the goal-supporting item into the free slot.
  2. Keep the blocked item in WIP; finish or unblock current work to free capacity.
  3. Keep the blocked item in WIP; start the new item because the Goal overrides the limit.
  4. Count all 11 selected items as WIP; raise the limit to match Sprint selection.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A team adopts an individual “under 4 days” target and begins counting tiny fragments as items. The fragments are not useful alone. Measured cycle time falls, but customers still wait just as long for usable results. What change would let the team assess and improve delivery?
  1. Keep the new fragments and compare their mean directly with the old larger-item mean.
  2. Keep the individual target and set a higher fragment-throughput goal to reduce waiting.
  3. Keep usable-item boundaries but rank people by the new fragment completion times.
  4. Define useful items consistently and inspect end-to-end time and waiting.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

Under Little’s Law, what average WIP corresponds to 4 finished items per working day and an average cycle time of 6 working days?
  1. 1.5 items
  2. 0.67 items
  3. 24 items
  4. 10 items
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

An unfinished Review item is 4 days old and blocked awaiting access, with substantial work remaining. Historical completed-item lines are 6 days at the 50th percentile and 10 at the 85th. What can the team infer and do from this combination?
  1. Its age is below the median; resolve access and inspect remaining work now.
  2. Its age is below the median; forecast 2 days remaining from the 6-day reference.
  3. Its age is below the median; defer help until it crosses the 10-day reference.
  4. Its age is below the median; pause its age clock until the access blocker clears.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A team’s DoW permits one expedite item to enter a full column and requires it to finish before other new pulls. No expedite item is active. A qualifying outage arrives while the column is full. What does the policy permit?
  1. Raise the permanent limit before any response.
  2. Admit the outage under the documented exception.
  3. Admit all waiting urgent requests at the same time.
  4. Remove a blocked card to conceal the extra WIP.
Show answerHide answer

Save this lesson to see this answer.

Stuck on your own question? Homework Help

Key Terms

75 Key Terms, each with its definition

A

Activity state
An activity state is a workflow state in which someone is actively working on an item, such as drafting, building, or testing.
Testing is an activity state while a tester is checking a change against its acceptance criteria.
Aging work item chart
An aging work item chart shows unfinished items by workflow state and current age, often against historical cycle-time percentile lines.
The team uses the chart to spot an old blocked card before it exceeds the service level expectation.
Average WIP
Average WIP is the measured mean number of started, unfinished items carried over an observation period, distinct from a policy limit.
Although a workflow permits ten items, its measured average WIP is seven, so flow calculations use seven.

B

Batch delivery
Batch delivery is the completion or release of several items together, often visible as a staircase pattern in a CFD’s Done boundary.
A flat Done boundary followed by a large jump suggests items are finishing together instead of steadily.
Blocker
A blocker is an obstacle that prevents an unfinished work item from progressing, such as missing access or an unanswered decision.
When a missing account stops a card, the team flags it on the card and assigns someone to follow up on access today.
Bottleneck
A bottleneck is a state or constraint that limits the throughput of the whole workflow, often causing work to accumulate before it.
Helping the overloaded review state can improve delivery more than making already-fast drafting even faster.

C

Cadence
A cadence is a recurring feedback meeting or review whose purpose, timing, and name are chosen to fit the service and organization.
The team uses its existing weekly planning meeting as its replenishment cadence instead of adding a meeting.
Class of service
A class of service is a set of policies for treating work items according to factors such as urgency, risk, value, or cost of delay.
A launch-dependent task receives fixed-date treatment while ordinary updates follow the standard queue.
Commitment point
A commitment point is the point where the decision is made to deliver a work item, creating a promise beyond exploring an option.
Selecting an article into Ready commits it, even when a team starts its cycle-time clock later, in Drafting.
Comparable work
Comparable work consists of items similar enough in type, size, and treatment to support a useful comparison of flow performance.
The team compares routine fixes before and after a policy change instead of comparing fixes with large features.
Context switching
Context switching is moving attention between tasks, including the time and effort needed to recover information and concentration.
Opening another half-finished task requires the analyst to reconstruct the reasoning left from yesterday.
CONWIP
CONWIP is a constant-work-in-progress control applied across the whole defined workflow, potentially alongside local column limits.
A whole-workflow limit of nine covers all started cards from analysis through delivery, including queues.
Cost of delay
Cost of delay is the value lost or cost incurred for each period that delivery is delayed, combining the effects of urgency and impact.
Expected lost revenue per week helps the product team compare the consequences of delaying two features.
Cumulative count
A cumulative count records how many items have reached a defined point over time, so it can rise or stay flat but should not fall.
A dip in cumulative starts leads the analyst to check deleted items and changes in reporting rules.
Cumulative flow diagram
A cumulative flow diagram plots cumulative state-entry counts over time, forming bands whose gaps show unfinished work between states.
A widening Review band prompts the team to inspect review work and the capacity of downstream states.
Customer lead time
Customer lead time is the elapsed duration from the customer’s request to delivery, including any waiting before the team begins work.
A request waits a week before commitment, making its customer lead time longer than its commitment-to-delivery time.
Cycle time
Cycle time is the elapsed duration from an item’s defined started point to its defined finished point, known after completion.
An item that starts Monday and finishes Wednesday takes three working days under inclusive day counting.
Cycle time scatterplot
A cycle time scatterplot shows one dot per finished item, with completion date horizontally and its started-to-finished duration vertically.
Several high dots lead the team to inspect the unusually slow items for blockers or larger scope.

D

Definition of Done
The Definition of Done is Scrum’s shared description of the quality state an Increment must meet to be considered complete and usable.
A finished code change that fails the team’s quality requirements cannot be treated as a usable Increment.
Definition of Workflow
A Definition of Workflow is the shared agreement defining work items, boundaries, states, WIP control, movement policies, and an SLE.
The web team’s DoW makes clear that a tested change still counts as unfinished until it is live.
Delivery point
A delivery point is the point where a work item reaches its customer, used with the commitment point in Kanban University’s lead time.
For a content service, publication is the delivery point because that is when readers can finally use an article.

E

Effectiveness
Effectiveness is the ability to deliver what stakeholders need when they need it, so that finished work provides useful value.
Publishing ten irrelevant reports quickly would not make the reporting service effective for customers.
Empiricism
Empiricism is learning and adapting through transparent observations and inspection, supported when completed work produces timely feedback.
Earlier completion lets the Scrum Team and stakeholders inspect usable results and adjust their plans sooner.
Entry criteria
Entry criteria are the agreed conditions that must hold before an item may enter a workflow state, also called pull criteria.
A card can enter Build only after its acceptance criteria are clear enough for the team to use.
Evolutionary change
Evolutionary change is improvement through deliberate, testable steps that build on the current way of working and existing roles.
The design team first visualizes its work, then tests a review limit before changing another policy.
Exit criteria
Exit criteria are the agreed conditions that determine when an item has completed a particular workflow state and can move onward.
The Test exit criteria require the acceptance checks to pass before the item becomes ready for deployment.
Expedite
Expedite is a class of service for work whose delay is costly immediately, usually with strict limits and priority treatment.
A live service outage qualifies for the team’s single expedite slot under its written emergency policy.
Explicit policy
An explicit policy is a visible written agreement about how work is selected, handled, moved, or completed in the workflow.
The review column displays the rule that one reviewer must be someone who did not write the change.

F

Failure demand
Failure demand is work generated by earlier poor-quality delivery or avoidable problems, such as correcting defects and repeating work.
Repeated fixes to the same release defect use capacity that could otherwise serve new customer needs.
Feedback loop
A feedback loop connects information about a system with action that helps maintain or improve its performance and outcomes.
A weekly flow review becomes a feedback loop when the team uses its findings to change a queue policy.
First in, first out
First in, first out is a pull-order policy that handles eligible items in arrival order, often used for standard-class work.
With no expedite or fixed-date exception, the service pulls the oldest standard request next.
Fixed date
Fixed date is a class of service for work whose cost of delay increases sharply at a known date, requiring suitable timing policies.
The team plans a conference registration change so it is delivered before registration opens.
Flow
Flow is the movement of value through a process, examined through how smoothly, quickly, and predictably work reaches completion.
An article’s flow includes the time it waits for an editor as well as the time spent writing it.
Flow efficiency
Flow efficiency is the share of an item’s cycle time spent in active work, calculated as active time divided by cycle time times 100%.
Three active days within a twelve-day cycle give 25% flow efficiency and reveal substantial waiting.

H

Hypothesis
A hypothesis is a testable statement connecting a proposed change with an expected outcome, allowing evidence to support or challenge it.
“Reviewing before new starts will shorten review waits” connects a practical action to a measurable effect.

I

Improvement experiment
An improvement experiment is a deliberate workflow change with an expected effect that the team checks using observations and measures.
The team tests a smaller review queue and compares waiting and throughput over several weeks.
Increment
An Increment is a usable addition to the product in Scrum that meets the Definition of Done and can be delivered during the Sprint.
The team releases a usable Increment mid-Sprint instead of holding it until the Sprint Review.
Intangible
Intangible is a class of service for valuable work with little immediate or readily visible delay cost, often important over time.
A tool upgrade can need reserved attention even though delaying it causes no obvious immediate revenue loss.

K

Kanban
Kanban is a strategy for improving the flow of value through a process by defining, managing, and improving its workflow.
A marketing team applies Kanban to reduce the time its campaigns spend waiting for approval.
Kanban board
A Kanban board is a visual display of work items and workflow states, with visible policies and controls that help people manage flow.
The publishing board shows Drafting, Editing, Approval, and Published so the team can locate waiting articles.
Kanban system
A Kanban system is the combination of Kanban practices and explicit workflow agreements applied to a particular group’s work.
The board, limits, movement policies, metrics, and improvement decisions form the support team’s system.

L

Lead time
Lead time is a delivery duration whose endpoints must be stated; Kanban University uses commitment to delivery for this measure.
Two reports cannot be compared fairly if one lead time begins at commitment and the other at the request.
Leadership at all levels
Leadership at all levels means that anyone involved can propose and help lead an improvement, regardless of job title or rank.
A tester leads an experiment after noticing that environment waits repeatedly delay completed builds.
Little’s Law
Little’s Law relates workflow averages: average cycle time equals average WIP divided by average throughput, with compatible units.
At three items per day, average WIP of twelve corresponds to four days of average cycle time in stable flow.

M

Monte Carlo simulation
A Monte Carlo simulation repeatedly samples possible outcomes to build a forecast distribution, such as by resampling past throughput counts.
Thousands of modeled delivery periods show how often the service reaches at least twenty completed requests.

N

Nearest-rank method
The nearest-rank method selects a percentile from sorted data using probability times observation count, rounding the rank upward if needed.
For 80% of fifteen observations, the team selects the twelfth value and reads its duration.

P

Percentile
A percentile is a boundary in ordered observations, used to describe the share at or below a duration in cycle-time analysis.
An 85th-percentile time of ten days means at least 85% of observed items took ten days or less.
Probabilistic forecast
A probabilistic forecast states an outcome with a time and probability, showing uncertainty instead of presenting a single certain result.
The forecast reports a 90% modeled chance of at least eighteen items by the end of the month.
Pull signal
A pull signal is clear evidence of available capacity that permits eligible new work to enter under the workflow’s WIP policies.
A card leaving Review creates one free slot that can pull the next ready item from Build.
Pull system
A pull system starts work when there is a clear capacity signal under the workflow’s agreed control of work in progress.
After an escalation finishes, a free WIP slot lets the support team pull its next eligible request.
Push system
A push system starts work when it is requested or scheduled, even when the workflow has no available capacity to handle it.
Assigning every incoming request immediately can create a growing queue of started, unfinished work.

Q

Queue state
A queue state is a workflow state in which an item waits for further work or a handoff, often while still counting as WIP.
Ready for review reveals finished drafts that cannot yet receive an editor’s attention.

R

Replenishment
Replenishment is the decision about which upcoming work to select and commit to next, guided by priorities, service policies, and capacity.
On Monday the team selects eligible requests for Ready without exceeding its agreed capacity controls.
Right-sizing
Right-sizing is making work items small enough to flow within the team’s usual expected duration, often by splitting oversized work.
Before pulling a large feature, the team identifies smaller useful items likely to fit its SLE.

S

Scrumban
Scrumban is a common name for ways of working that mix Scrum and Kanban elements, with no single official definition of the combination.
The team explains which Scrum events and Kanban policies it follows instead of relying on the Scrumban label alone.
Service delivery
Service delivery is the work of providing a useful outcome to a customer, including a customer inside the same organization.
The hiring team delivers a service to the departments that need vacancies filled and to applicants.
Service level agreement
A service level agreement is a commitment to a customer about service performance, often contractual and with consequences for a breach.
The team uses its delivery history as evidence when discussing a proposed response-time agreement.
Service level expectation
A service level expectation is a forecast combining a duration and probability for one item to move from its defined start to finish.
The service tells stakeholders that 85% of comparable requests are expected to finish within eight days.
Simulation trial
A simulation trial is one modeled future outcome, built by sampling historical throughput for each future period and adding those counts.
One ten-day trial includes zero-output days and totals nine items; later trials produce different totals.
Slack
Slack is spare capacity that allows a team to absorb variation, respond to urgent needs, and help existing work move toward completion.
A reviewer with some spare capacity can help clear a sudden test queue before waiting grows.
Sprint
A Sprint is Scrum’s fixed-length period of one month or less, providing a regular setting for work toward a Sprint Goal and feedback.
The product team keeps two-week Sprints while adding a WIP limit to its development workflow.
Sprint Goal
A Sprint Goal is the single objective for a Scrum Sprint that guides the team while Developers can renegotiate the work’s scope.
The team changes its chosen tasks with the Product Owner while preserving the Sprint’s shared objective.
Stable workflow
A stable workflow has broadly balanced arrivals and departures, similar beginning and ending WIP, and no sustained average-age trend.
A growing queue and rising average age make the team question a steady-workflow estimate from its averages.
Standard
Standard is a class of service for work with a steadily rising cost of delay, commonly handled in first-in, first-out order.
Routine customer requests follow the standard lane’s oldest-first policy when a WIP slot becomes free.
STATIK
STATIK is a collaborative, iterative approach to designing a Kanban system through demand, capability, workflow, and service analysis.
A workshop revisits demand patterns after mapping the workflow reveals a second type of customer request.
Swimlane
A swimlane is a horizontal row across a Kanban board that separates work by a useful distinction such as type, product, or service class.
Separate incident and planned-change lanes help the IT team apply different capacity policies visibly.

T

Throughput
Throughput is the number of work items finished per unit of time, measured as an item count with a clear observation period.
Fifteen resolved requests over five working days give average throughput of three requests per day.
Throughput histogram
A throughput histogram shows how frequently different completion counts occurred, grouping outcomes without preserving their time order.
When a histogram shows that six-item weeks were common, another chart is needed to see when those weeks occurred.
Throughput run chart
A throughput run chart plots completion counts in time order for equal periods, making delivery trends and unusual periods visible.
A weekly run chart shows whether a team’s high-output weeks occurred before or after a policy change.

V

Velocity
Velocity is a common optional measure that sums the estimates of finished work per Sprint, often in story points instead of item counts.
Four completed items worth a total of nineteen points give velocity of nineteen points and throughput of four items.

W

WIP exception policy
A WIP exception policy defines a permitted departure from normal capacity controls and the conditions that keep that exception visible.
The DoW allows one outage fix into a full state and stops further normal pulls until it finishes.
WIP limit
A WIP limit is a policy setting the maximum number of started, unfinished items allowed in a state, group of states, or workflow.
A Test limit of three stops a fourth card entering until one of the current cards leaves.
Work in progress
Work in progress is the measured number of items that have crossed the workflow’s started point but have not reached its finished point.
Three active requests and two blocked requests give WIP of five when all are inside the defined boundaries.
Work item
A work item is a defined unit of value that moves through a workflow and is counted consistently, such as a request or defect fix.
The service defines one resolved customer request as an item, keeping its board and throughput counts aligned.
Work item age
Work item age is the elapsed time from an unfinished item’s defined started point to now, used as an early signal of delay risk.
A card’s age continues increasing while it waits for approval, even when nobody is actively working on it.

About this lesson

By StudeliReport a mistake

Make your own Study Materials

Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.

Get Started