Running Sprints in Practice

Learn how a Scrum Team turns the Scrum framework into good Sprints, day after day. Facilitate Sprint Planning and Sprint Retrospectives, keep the Daily Scrum focused on the Sprint Goal, make progress visible with task boards and burndown charts, and handle impediments without taking over. Use the Definition of Done to decide what is really finished, coach the team as a Scrum Master while protecting its self-management, and make all of this work when team members are spread across locations and time zones.

BeginnerLesson 4 of 6 in Agile and Scrum Course

What you will learn

  1. Prepare and guide Sprint Planning so the Scrum Team leaves with a clear Sprint Goal, a realistic selection of work and a plan the Developers own.
    • Prepare the inputs for Sprint Planning
      Gather what the team needs before the event starts: a refined Product Backlog, the Product Goal, the Definition of Done, the team's capacity and its past performance.
    • Agree on a Sprint Goal and select the work
      Guide the Scrum Team through why, what and how, write a Sprint Goal that gives the Sprint focus, and let the Developers decide how much work they take on.
    • Build a Sprint Backlog the Developers own
      Turn the selected items into an actionable plan, break the work into small pieces, and avoid planning habits that undermine the team's self-management.
  2. Use a task board and burndown and burnup charts to show the state of the Sprint honestly, read the patterns they reveal and avoid using them to judge people.
    • Run the Sprint from a task board
      Lay out the Sprint Backlog on a physical or digital board, keep it current, and read it to spot stuck work, too much work in progress and hidden risks.
    • Draw and interpret burndown and burnup charts
      Plot a Sprint burndown, compare it with the ideal line, recognize common patterns, and know when a burnup chart or a product-level chart tells the story better.
  3. Run a focused Daily Scrum, recognize and correct its common anti-patterns, and handle impediments so the team keeps moving toward the Sprint Goal.
    • Run a Daily Scrum that serves the Sprint Goal
      Hold a short daily inspection in which the Developers check progress toward the Sprint Goal and adapt their plan for the next day of work.
    • Spot and correct Daily Scrum anti-patterns
      Recognize the habits that turn the Daily Scrum into a status meeting or a ritual, and apply a practical correction for each.
    • Handle impediments without taking over
      Make impediments visible, sort out who can resolve them, escalate the ones beyond the team's reach and learn from recurring causes, while leaving the team in charge of its own problems.
  4. Use the Definition of Done to decide what is truly finished, inspect Done work with stakeholders at the Sprint Review, and run Sprint Retrospectives that lead to real improvement.
    • Write a Definition of Done that fits the product
      Explain what the Definition of Done is and who sets it, write checkable criteria for a real product, and tell the Definition of Done apart from acceptance criteria.
    • Apply the Definition of Done and inspect Done work at the Sprint Review
      Use the Definition of Done to decide which items are finished, deal correctly with undone work, and facilitate a Sprint Review that works as a working session with stakeholders.
    • Facilitate a Sprint Retrospective
      Plan and run a Sprint Retrospective with a clear structure and suitable activities, so the whole Scrum Team inspects how the Sprint went and finds what to improve.
    • Turn Retrospective insights into lasting improvements
      Choose a few specific improvements, give them a place in the next Sprint, follow them up, and use them to strengthen the Definition of Done over time.
  5. Serve the Scrum Team, the Product Owner and the organization by choosing the right stance for each situation, coaching with questions and protecting the team's self-management.
    • Choose the right Scrum Master stance
      Describe whom the Scrum Master serves and how, and switch between teaching, mentoring, coaching and facilitating as the situation and the team's experience require.
    • Coach with questions rather than answers
      Use open questions, active listening and a simple conversation structure to help individuals and the team reach their own decisions, and recognize when teaching is the better choice.
    • Protect and grow the team's self-management
      Shield the team from disruption without becoming a gatekeeper, help it make and keep its own decisions and agreements, and step back as the team grows.
  6. Set up a team whose members work in different places or time zones so it can collaborate well, and facilitate every Scrum event remotely without losing its purpose.
    • Set up a distributed Scrum team to collaborate
      Plan around time zones and working hours, agree on how the team communicates and which tools it uses, and avoid set-ups that split the team into separate sites.
    • Facilitate Scrum events remotely
      Adapt Sprint Planning, the Daily Scrum, the Sprint Review and the Sprint Retrospective for online and cross-time-zone work while keeping each event's purpose and timebox.

Running Sprints in Practice study guide

6 chapters

1

Plan a Sprint the team can deliver

Sprint Planning connects a useful product outcome with the work the Developers believe they can finish. Preparation gives the conversation a sound starting point; the event then turns that information into a shared objective and an actionable plan. Learn how to bring capacity and past performance into the discussion, guide the three planning topics, and leave room for the Developers to adapt their work as they learn.

1.1 Bring the right information to Sprint Planning

Sprint Planning begins the Sprint. The whole Scrum Team creates the plan together, with advice from invited specialists when useful. For a one-month Sprint, the event lasts at most eight hours; shorter Sprints usually need less time.

Prepare the product conversation

Bring the ordered Product Backlog, the Product Goal, the latest Increment, and the Definition of Done. The Product Owner checks that likely items are clear enough to discuss and proposes how the product could gain value this Sprint. A proposal starts a conversation: the whole Scrum Team will define the Sprint Goal.

Refinement is ongoing work. It makes the next likely items understandable without attempting to specify the entire future product. Items may still be clarified, created, or sized during Sprint Planning. Leaving every open question until that event, however, can turn planning into a long requirements workshop. A short refinement conversation earlier in the Sprint can expose a dependency while there is still time to investigate it.

Estimate available capacity

Capacity is the time the Developers actually have for Sprint work. Start with their working days, then subtract leave, holidays, training, support duties, and other known commitments. Keep the units clear: one person available for one working day contributes one person-day.

Five Developers in a 10-working-day Sprint have 50 person-days before absences. One holiday affects all five people, and one Developer takes two additional days of leave:

5×10=50 50−5−2=43

Available capacity is 43 person-days. Check whose skills are available as well as the total. Losing two days from the only person familiar with a payment system can affect the selection differently from losing two days spread across routine work. Capacity is an input to judgment, not a demand to fill every available hour.

Use past performance as a reality check

Suppose the last three Sprints each had the full 50 person-days and finished 21, 24, and 27 story points of Done work. Their average is 24 points. A rough adjustment gives:

24×43÷50=20.64

That suggests about 20 to 21 points as a starting forecast. The Developers still inspect the actual items, uncertainty, dependencies, and skills before choosing. The calculation does not convert story points into fixed hours or guarantee an output.

Count only work that met the Definition of Done. Including partially finished items would inflate the record that the next forecast depends on. A team's past performance, sometimes called “yesterday's weather,” belongs to that team; another team's point scale is different, so velocity cannot rank teams fairly.

Make the event ready to use

The Scrum Master prepares the setting: a usable room or call, a shared board, accessible backlog items, a visible timebox, and an agenda covering why, what, and how. If a database specialist is needed to explain a dependency, invite that person for advice. Preparation supports the team's decisions; it does not preselect their answer.

Key Takeaways

  • Bring product direction, current work, quality standards, capacity, and past performance.
  • Subtract known absences and duties before forecasting.
  • Use only Done work in the performance record.
  • Adjust the forecast for the work and skills available.
  • Refine throughout the Sprint; further refinement can still happen in Sprint Planning.

1.2 Choose an outcome and a realistic selection

Sprint Planning answers three connected questions: why is this Sprint valuable, what can be Done, and how will the work get done? The discussion can move between them as the team discovers what is feasible.

Start with why

The Product Owner proposes how the product could increase its value. The whole Scrum Team then defines a Sprint Goal, the single objective for the Sprint. It must be finalized before Sprint Planning ends and becomes part of the Sprint Backlog. The Developers commit to that objective.

A goal gives the team a reason to make choices. For an online grocery product, “Returning customers can reorder a previous basket in under a minute” describes an outcome. “Finish stories 112, 115, 118, and 121” lists work but gives little help when a story proves harder than expected. A useful question is, “If we achieve one thing this Sprint, what should it be?”

The outcome should be understandable to stakeholders. A list of technical components may help plan implementation, but it does not explain the value those components deliver together.

Let the Developers select what

Through discussion with the Product Owner, the Developers select Product Backlog items they believe they can finish. They consider capacity, past performance, the Definition of Done, and the particular work. The Product Owner explains value and order and answers questions; the Developers decide the amount.

If candidate work exceeds capacity, explore a smaller slice, defer a lower-value item, or narrow the proposed goal before finalizing it. Do not make overtime the hidden assumption that makes an overloaded plan appear possible. Some room for unexpected work, collaboration, and learning helps keep the goal achievable.

For a booking service, the team might aim to let customers cancel an eligible reservation themselves. Cancellation and confirmation are essential to that outcome. A redesigned reservation history page might wait. Asking which items the outcome needs makes the trade-off visible without treating all candidate items as equally urgent.

Work through how

The Developers plan how the selected items will become an Increment that meets the Definition of Done. This may reveal missing testing, specialist input, or a larger task than expected. Bring that learning back into the selection before closing the event. Why, what, and how need to fit together.

The facilitator can keep the goal visible and ask, “What could stop us from reaching it?” Give each Developer a chance to raise concerns. A fist-of-five confidence check is one optional technique: everyone shows one to five fingers, and low scores prompt discussion. A vote helps expose concerns; it cannot replace the Developers' judgment about their own plan.

Keep flexibility attached to the objective

The Sprint Goal creates focus without freezing every item. As more is learned, the Developers and Product Owner may clarify or renegotiate selected work while preserving the goal. A checklist masquerading as a goal makes that adaptation harder: dropping any task then looks like abandoning the objective, even when the customer outcome remains achievable.

Key Takeaways

  • Use why, what, and how to connect value, selection, and delivery.
  • Finalize one Sprint Goal before Sprint Planning ends.
  • The Developers decide how much work to select.
  • Clarify or renegotiate selected work with the Product Owner while protecting the Sprint Goal.

1.3 Make the Sprint Backlog actionable

The Sprint Backlog combines the Sprint Goal, selected Product Backlog items, and an actionable plan for delivering the Increment. These are its why, what, and how. The plan belongs to the Developers, who update it as the Sprint unfolds.

Break work into visible pieces

Developers often split selected items into work of one day or less. For a reorder feature, tasks might include adding a button, building the service that copies a basket, testing out-of-stock behavior, and updating help text. Small pieces let the team see progress and discover misunderstandings early.

A task describes an activity; a Product Backlog item describes a piece of product work that must meet the Definition of Done. Completing the button task does not make the reorder item Done while its tests are missing. Keep those two levels visible so task movement does not hide unfinished product work.

If the Developers cannot explain the work well enough to begin, investigate the uncertainty. They can refine the item with the Product Owner, select a thinner slice, or choose different work that still serves the Sprint Goal. Turning an unclear item into many vague task names does not make it actionable.

Plan quality work from the start

The plan must account for everything the Definition of Done requires. Include review, testing, documentation, security checks, and deployment activities that apply to the product. Omitting these activities makes the initial selection look smaller than the real effort needed to finish it.

For example, a notification item might have a completed message template but still need a delivery test and an accessibility check. Putting those activities on the plan before implementation starts allows the Developers to arrange help and suitable test data. Discovering them on the last afternoon leaves little room to adapt.

Decide ownership inside the team

Developers decide who does what, when, and how. They may pull tasks as they become free or agree on initial owners during planning. Both can support self-management when the choices remain theirs and can change as needed.

Watch for personal queues: one person has several waiting reviews while others begin less important work. The Developers can pair or swarm, bringing several people together to finish a high-priority item. The question is what helps the shared goal, not whether everyone keeps the task assigned on day one. A manager or Scrum Master who allocates every task takes that decision away from the Developers.

Update the plan as knowledge grows

Sprint Planning does not require a complete task list for the entire Sprint. Developers can plan the first few days in detail and describe later work more broadly, then add detail when they know more. The Sprint Backlog should remain a current picture, not a record nobody is allowed to change.

The board displays this plan, and a burndown can measure its remaining work. At the Daily Scrum, the Developers inspect it and agree on the next day's plan. Unfinished items do not automatically become next Sprint's work: they return to the Product Backlog for ordering and possible selection at the next Sprint Planning.

Key Takeaways

  • The Sprint Backlog contains the goal, selected items, and delivery plan.
  • Small tasks expose progress and uncertainty.
  • Plan the activities needed to satisfy the Definition of Done.
  • Developers choose and adapt task allocation.
  • The plan grows and changes during the Sprint.
  • Unfinished items return to the Product Backlog for future consideration.
2

See what is happening in the Sprint

A visible plan helps the team notice trouble while there is still time to act. A task board shows where work is waiting or moving; a chart shows how the amount of work changes over time. Learn to read both views together, check what their measures mean, and use the evidence to guide a conversation about the Sprint Goal. Honest updates matter more than making a line or a column look reassuring to someone outside the team.

2.1 Read and maintain a useful task board

A task board, also called a Sprint board or Scrum board, makes the Sprint Backlog visible. A physical wall or a digital tool can work. Scrum requires transparency of the Sprint Backlog; it does not prescribe a board or a particular set of columns.

Show the path to Done

A simple board places the Sprint Goal above the work. One row, or swimlane, represents each selected Product Backlog item, ordered by importance. Columns might be “To do,” “In progress,” and “Done.” Add “In review” or “Testing” when these are actual stages that people need to see.

Make the meaning of Done clear at both levels. A task moves to Done when that task is finished. The parent item is Done only when it meets the Definition of Done. If all listed tasks are complete but the item still needs a security check, the plan has missed work. Add the missing activity and show the item's true state.

Developers update the board as they work. Waiting for the Scrum Master to reconstruct changes after a meeting leaves the team making decisions from old information. On a shared digital board, a person working elsewhere should see the same state as someone in the office.

Read toward completion

Read from right to left to notice work closest to Done, and from top to bottom to notice the work most important for the Sprint Goal. Ask what would finish an item before starting something new. This is a useful team habit, not a required Scrum procedure.

Look for these signals:

  • Many items have started but few are finished.
  • A task remains in the same column for several days.
  • A blocked flag has no visible next action.
  • Every task is complete but the item is still not Done.

These are prompts to investigate. A waiting task might need help, a decision, or an update; its position alone does not prove which cause applies. Mark a blockage with a flag and the date so its age and impact stay visible.

Work through a board decision

On day 6 of a 10-day Sprint, item A is central to the Sprint Goal. One of its four tasks is done and three have not started. Item B has four of five tasks in progress, each with a different person. Item C is Done.

The team sees two risks: B has many separate pieces in motion, while the essential A has barely begun. It agrees that two people will finish B together while two others start A. The response changes how the team works on the shared objective. Simply asking each person to move a card would not address the risk.

A team may choose an in-progress limit, such as no more than two items at once, to encourage finishing. Set and revisit that agreement based on the actual work. The board must not become an individual scorecard: counting cards per person rewards easy tasks and discourages helping with difficult work that another person started.

Key Takeaways

  • A board is an optional way to make the Sprint Backlog transparent.
  • Distinguish a finished task from a Done Product Backlog item.
  • Developers keep the board current as they work.
  • Inspect waiting work and finish valuable items before opening more.
  • Use board evidence to support the team, not rank individuals.

2.2 Interpret burndown and burnup charts

A Sprint burndown plots remaining work on the vertical axis against Sprint days on the horizontal axis. Its units may be task hours, task counts, or points of unfinished items. Check the measure before interpreting a line: remaining task hours and completed story points tell different stories.

Compare with a reference line

The ideal line joins the starting amount to zero on the last day. It shows an even rate for comparison. It is not a schedule that the team must follow exactly, and actual work rarely falls at an even rate.

A 10-day Sprint starts with 80 task hours. The ideal daily decrease is:

80÷10=8

At the end of day 5, the ideal remaining work is 40 hours. Actual values for days 1 to 5 are 78, 74, 72, 64, and 52 hours, so the team is 12 hours above that reference:

52−40=12

So far, remaining work has fallen by 28 hours, averaging 5.6 hours per day. Finishing the remaining 52 hours in five days would require 10.4 hours per day:

80−52=28,28÷5=5.6 52÷5=10.4

That is a reason to inspect the board and discuss the Sprint Goal. Which items are stuck? Can the Developers and Product Owner reduce or simplify scope without endangering the objective? The chart alone cannot answer those questions.

Read patterns without guessing causes

A flat line can mean a blocker, unfinished work, or missing updates. A rising line can mean added work or a larger estimate of remaining work. An early line far below the ideal might reflect a small initial selection or generous estimates. A final-day cliff can reveal batch completion, often with testing left late. Investigate the work behind the shape before deciding what caused it.

A points burndown drops only when an entire item meets the Definition of Done. Its steps are normal. A long flat period followed by one large drop can prompt the team to split items and test earlier; it does not justify giving partial points to make the line smoother.

Separate scope from completion

A burnup draws total scope and completed work separately. Suppose 30 of 40 points are complete, then scope rises to 50 while no more work is finished. Remaining work rises from 10 to 20 points. A burndown shows that jump, but a burnup makes its source clear: scope steps from 40 to 50 and completed work stays at 30.

Product-level burndowns or burnups span several Sprints and help the Product Owner forecast progress toward a larger goal. The Scrum Guide recognizes such forecasting practices, including cumulative flow diagrams, but the forecasts must keep responding to observed results.

Update Sprint charts each working day, manually or through the tool. Do not pressure a team to match the ideal line or compare teams by their points. That encourages premature Done labels and data gaming. Read the chart with the board: one reveals the trend; the other helps locate the work behind it.

Key Takeaways

  • Check the chart units and update remaining work daily.
  • The ideal line is a comparison reference.
  • A chart pattern is a signal to investigate, not proof of one cause.
  • Points fall only when whole items are Done.
  • A burnup separates changes in total scope from completion.
  • Use observed results to revise forecasts.
  • Read charts with the board to choose an action.
3

Inspect and adapt the plan each day

A Sprint plan becomes useful through daily decisions. The Daily Scrum gives the Developers a regular opportunity to inspect progress toward the Sprint Goal and coordinate their next steps. Between events, they keep talking and raise blockers promptly. Learn to recognize meetings that produce reports without decisions, restore a useful focus, and get impediments resolved by the people best placed to act without taking ownership away from the team.

3.1 Turn the Daily Scrum into a plan for today

The Daily Scrum is a 15-minute event for the Developers to inspect progress toward the Sprint Goal and adapt the Sprint Backlog. It takes place at the same time and place every working day of the Sprint. This regular arrangement reduces the effort of coordinating the event.

Let the Developers conduct it

The Developers choose the structure and techniques. The 2020 Scrum Guide does not require the three questions about yesterday, today, and impediments that appeared as examples in earlier versions. A team can use them if they help it inspect and adapt; answering them is not itself the purpose.

The Scrum Master ensures the event takes place and helps the team learn to use it well. The Scrum Master need not lead or attend it. A Product Owner or Scrum Master actively working on Sprint Backlog items participates as a Developer. Other attendees must not turn the event into task assignment or status reporting.

The output is an actionable plan for the next day of work, based on the current progress and coordination needed to reach the Sprint Goal.

Walk the work together

Walking the board is a common technique. Begin with an important item or work closest to Done and ask, “What do we need to finish this?” Discuss how the work connects, including help or decisions needed. Keep the Sprint Goal visible so the conversation has a shared reference.

For a document-sharing product, a Developer might say, “The permission check is ready. I'll pair with Noor on the link flow so we can test sharing today.” Another might say, “The test service is unavailable. I'll contact the service owner after this call.” These contributions explain what changes in the plan, not just what each person did.

Detailed design debate belongs in a follow-up with the people who need it. Put the topic on a visible parking-lot list and agree who will join. Capturing it protects the timebox without losing an issue that matters.

Adapt during the day as well

The Daily Scrum is a regular inspection, not a queue for communication. Raise a blocker when it appears. Developers can update the Sprint Backlog, arrange help, and coordinate throughout the day.

If new learning threatens the Sprint Goal, the Developers and Product Owner discuss scope. They may clarify selected items, reduce an optional part, or choose a different way to achieve the objective. No change may endanger the Sprint Goal, and quality does not decrease during the Sprint.

A hard Sprint is different from an obsolete goal. If a market or strategy change makes the goal no longer useful, the Product Owner can cancel the Sprint. Only the Product Owner has that authority. A team being behind its forecast is a reason to inspect and adapt the work, not automatically a reason to cancel.

Key Takeaways

  • The Daily Scrum is a 15-minute inspection and adaptation event for Developers.
  • The Developers choose its structure and conduct it.
  • Produce an actionable plan for the next day of work.
  • Raise blockers immediately and keep coordinating between events.
  • Renegotiate scope with the Product Owner while protecting goal and quality.
  • Only the Product Owner can cancel a Sprint whose goal becomes obsolete.

3.2 Correct Daily Scrum habits that waste the timebox

An anti-pattern is a familiar-looking practice that undermines its own purpose. For a Daily Scrum, ask whether the Developers leave knowing their progress toward the Sprint Goal and their plan for today. A punctual round of reports can still fail that test.

Redirect status reports toward the work

Notice who people face and address. If everyone reports to the Scrum Master or manager, the event has become a reporting line. The Scrum Master can move out of the center or stay away, and the Developers can face the board and speak to one another.

Walking the board helps connect work that individual updates leave separate. A person may be “busy with tests” while another has started an item that needs those same tests. Discussing each important item reveals that coordination need. The correction is a shared plan, not a new script recited to a different chairperson.

Separate coordination from detailed problem solving

A technical question may deserve an hour, but it should not consume the Daily Scrum. When two people begin a long design debate, record the topic and arrange a follow-up immediately after the event with those needed. Keep the 15-minute timebox visible.

Do not postpone a blocker just to preserve the agenda. State enough to understand its impact and who will act; move the detailed investigation to the follow-up. This lets the team adapt without making everyone sit through a conversation that only two people need.

Break the ritual of unchanged updates

Repeated “same task, no impediments” updates deserve a look at the work. Has anything changed? Is the board current? Is an important item waiting? A plan may stay the same for a sound reason, but it should follow inspection. A useful outcome might be pairing on a stuck item or finishing a review before starting another item.

Blockers must not wait for tomorrow's event. Agree on a way to raise them immediately, such as the team chat. The next Daily Scrum can inspect the response already under way instead of discovering a day-old problem for the first time.

Handle interference and unstable routines

A manager assigning tasks takes the plan away from the Developers. A Product Owner adding work without discussion bypasses their forecast. New requests go through the Product Owner; changes to Sprint work are negotiated with the Developers in light of the Sprint Goal.

Hold the event at its agreed time and place and start on time. Quiet days still need the brief inspection; repeatedly moving or skipping it makes coordination less reliable.

Consider nine Developers whose event takes 35 minutes: everyone reports to the Scrum Master, and two people debate database design. The Scrum Master raises those observations at the Retrospective and asks what the team needs from the 15 minutes. The Developers agree to walk the board, park detailed topics, and rotate a timekeeper weekly. They then check whether their chosen changes produce a clear daily plan within the timebox.

Key Takeaways

  • Judge the Daily Scrum by its inspection and daily plan.
  • Redirect person-by-person reporting toward shared work.
  • Park detailed discussions and follow up with the people needed.
  • Raise blockers promptly and preserve the Developers’ ownership of the plan.

3.3 Make impediments visible and get them resolved

An impediment blocks or slows progress toward the team's goals. Examples include missing access, a failing build, another team's dependency, or a slow approval. Here the term covers obstacles broadly; practitioners sometimes reserve it for obstacles outside the team's ability to remove.

Match the response to the obstacle

Developers resolve problems within their capabilities as part of managing their work. A broken test setup or an internal design disagreement does not automatically need escalation. The Scrum Master is accountable for causing the removal of impediments to the team's progress. That can mean coaching the team, connecting it with help, or working with organizational decision-makers.

Causing removal does not mean doing every fix personally. Before stepping in, ask, “What have you tried?”, “Who could help?”, and “What do you need from me?” The answers show whether intervention is useful and leave the team room to develop its own ability.

Follow an impediment through to action
  1. Make it visible with a dated flag on the board and an entry in an impediment list.
  2. Clarify what is blocked and its effect on the Sprint Goal.
  3. Agree who acts: Developers for problems they can solve, Scrum Master support or escalation where needed.
  4. Follow up until the blockage is resolved.
  5. Examine the cause so the same problem is less likely to return.

A visible entry needs an action and follow-up. Without them, the list becomes a record of complaints that people stop trusting.

Work through an access delay

On day 2, a Developer requests test-database access but tells nobody about the blockage. It becomes visible at the Daily Scrum on day 4. The team flags the affected item and continues other work that supports the Sprint Goal. The Scrum Master contacts the infrastructure lead, explains the impact, and follows up; access arrives on day 5.

The immediate problem is solved, but the delay also reveals a process issue. At the Retrospective the team agrees to raise blockers within the hour and asks the infrastructure team how far ahead requests should be made. Earlier visibility and known lead times can prevent another late surprise.

Investigate recurring causes

The “five whys” technique asks why repeatedly until an actionable cause emerges. Tests failed late because the environment arrived on day 8. It arrived late because it was requested on day 6. The request was late because nobody knew the two-day lead time. That lead time was not recorded. Publishing it addresses a cause that another team can encounter again. Five is a useful name for the technique, not a required stopping point.

Organizational causes may outlast a Sprint. Keep them visible and ordered by impact, with evidence such as days lost or delayed items. Bring that evidence to people who can change the system. If the current goal is threatened while a fix is pending, the Developers adapt their plan and discuss scope with the Product Owner. Escalation provides transparency and help; it does not transfer the Sprint plan to a manager.

Key Takeaways

  • Make the blockage, date, goal impact, and next action visible.
  • Developers resolve what is within their capabilities.
  • The Scrum Master causes removal where support or organizational action is needed.
  • Follow up and investigate recurring causes.
  • Adapt Sprint work with the Product Owner if the goal is threatened.
4

Build quality and learn from each Sprint

Quality makes progress trustworthy, and improvement makes later Sprints more effective. A shared Definition of Done tells everyone which work is usable. The Sprint Review brings that work into a conversation with stakeholders, while the Retrospective examines how the Scrum Team worked. Learn to apply the quality standard consistently, facilitate both conversations, and turn a few well-chosen insights into changes the team can try and check.

4.1 Write a quality standard people can check

The Definition of Done describes the state of an Increment when it meets the quality measures required for the product. It is the Increment's commitment. When a Product Backlog item meets it, an Increment is born. Developers must conform to this shared standard.

Decide the standard together

An organizational Definition of Done is a minimum for every Scrum Team it applies to. A team may add stronger criteria. If no organizational standard exists, the Scrum Team creates an appropriate Definition of Done. Several Scrum Teams working on the same product must define and comply with the same standard together.

This prevents private meanings of “finished.” Without a shared standard, one person might mean “written,” another “tested,” and a stakeholder “ready to use.” Decisions about progress would then rest on different states of work.

Make each criterion checkable

“Good quality” and “tested enough” leave room for hidden disagreement. A useful criterion has a clear yes-or-no check. For a web application, criteria could include:

  • Code reviewed by at least one other Developer.
  • Automated unit and integration tests passing.
  • Acceptance criteria verified by automated or recorded tests.
  • No known critical or high-severity defects.
  • Accessibility checks passed for changed screens.
  • Deployment to staging completed and smoke-tested.
  • User help updated where behavior changed.

Choose criteria because they protect the product's quality and usability. For example, “test coverage of new code is at least 80 percent” can be checked, but the team still needs tests that meaningfully examine the behavior. A measurable criterion gives a clear check; its relevance to quality gives it a reason to exist.

The same approach works outside software. A marketing product might require a second person's proofreading, a completed legal check, tested links and tracking, and publication on all planned channels. Done describes usable work without hidden finishing activities.

Separate shared quality from item behavior
QuestionDefinition of DoneAcceptance criteria
What does it describe?The shared quality state of the IncrementThe expected behavior of one item
Where does it apply?Across product workTo its particular Product Backlog item
What might it say?Changed screens pass accessibility checksAn unavailable basket item shows a warning

An item must satisfy its acceptance criteria and the Definition of Done. Passing its behavior checks does not excuse a missing quality check. Conversely, a technically clean implementation that fails the intended behavior is not a completed item.

Some teams use a Definition of Ready to remind them what helps an item enter planning. It is a complementary practice, not a Scrum requirement. Used as a rigid gate, it can block the very conversations that clarify work.

Keep the Definition of Done visible and use it when planning and checking items. A checklist on the wall that nobody applies provides little transparency. Quietly skipping a criterion near the Sprint's end hides work and can build technical debt: quality problems that make later changes harder.

Key Takeaways

  • The Definition of Done is the shared quality commitment for the Increment.
  • Follow an organizational standard as a minimum.
  • Teams on one product share one Definition of Done.
  • Write criteria that can be checked and protect usability or quality.
  • Acceptance criteria describe an item’s behavior; they do not replace shared quality.
  • A Definition of Ready is optional.

4.2 Use Done work in a productive Sprint Review

An item is Done only when it meets the Definition of Done. Developers plan the required quality activities and check the criteria before showing an item as Done. “Almost done” is still unfinished, even when most of the effort has already been spent.

Count completed work honestly

A team selects items sized 5, 3, 8, and 2 points, totaling 18. The 5-, 3-, and 2-point items meet the Definition of Done. The 8-point item is coded but untested. Completed work is:

5+3+2=10

The team completed 10 points. It cannot count all 18, or invent partial credit for the untested item. That item returns to the Product Backlog, where the Product Owner orders it for future consideration. It is not automatically selected next Sprint.

An item that misses the Definition of Done cannot be released or presented at the Sprint Review. Make the unfinished state transparent when discussing progress and problems, but do not demonstrate the item as part of the Increment. A convincing demonstration cannot substitute for its missing tests.

Inspect results with stakeholders

The Sprint Review inspects the Sprint's outcome and determines future adaptations. The Scrum Team and key stakeholders examine what was accomplished, what changed in their environment, and progress toward the Product Goal. The Product Backlog may change as new opportunities become clear.

For a one-month Sprint, the Review lasts at most four hours; shorter Sprints usually need less time. The whole Scrum Team contributes. A Product Owner presenting alone while Developers are absent loses direct discussion with the people who built the product and understand its trade-offs.

Treat the event as a working session. Let stakeholders try the Increment, ask what surprised them, and discuss what to change next. Consider relevant changes in market conditions, budget, or timing. Close with a visible picture of how the Product Backlog responds to what was learned.

For example, stakeholders testing a Done appointment reminder discover that customers now need to reschedule more often. The conversation can reveal a valuable next item and change the backlog order. Replaying a slide deck without inviting that discussion would miss the adaptation the event exists to enable.

Keep delivery independent of the event

The Sprint Review is not a release gate or stakeholder acceptance ceremony. Usable Increments can reach users before the Sprint ends, and a Sprint can create several Increments. Meeting the Definition of Done makes the quality state transparent; the Review supplies inspection and feedback about the product's direction.

If checks repeatedly uncover unfinished testing, bring that pattern to the Retrospective. The Review asks what the product results mean for future work. The Retrospective asks how the team can improve the way it creates those results. Neither event can turn an untested item into Done by agreement.

Key Takeaways

  • Count only items that meet the Definition of Done as completed.
  • Undone items return to the Product Backlog and are not released or presented at the Review.
  • The Scrum Team and stakeholders inspect results and adapt future work.
  • Use the Review as a working session; delivery can happen before it.

4.3 Guide a Retrospective from facts to choices

The Sprint Retrospective plans ways to increase quality and effectiveness. The whole Scrum Team inspects the last Sprint, including people, interactions, processes, tools, and the Definition of Done. It concludes the Sprint and lasts at most three hours for a one-month Sprint.

Give the conversation a useful shape

A widely used approach from Esther Derby and Diana Larsen has five phases. It is a facilitation practice, not a required Scrum agenda.

  1. Set the stage. State the focus and invite everyone to speak early.
  2. Gather data. Build a shared account of what happened before choosing explanations.
  3. Generate insights. Look for patterns and causes in those observations.
  4. Decide what to do. Choose a small number of concrete improvements.
  5. Close. Confirm actions and finish the conversation clearly.

For a two-week Sprint, a 60-minute session could use 5 minutes to set the stage, 15 to gather data, 15 for insights, 15 for decisions, and 10 to close. The total is 60 minutes. Use the time where the work needs it; the framework helps prevent a rush from one complaint straight to a solution.

Choose an activity that fits the issue

Start, Stop, Continue asks what to begin, end, and keep. Mad, Sad, Glad gathers reactions to events. The 4 Ls organize what people liked, learned, lacked, and longed for. A Sailboat uses wind for helpful forces, anchors for obstacles, rocks for risks, and an island for the destination.

If several people describe the same access delay differently, a Sprint timeline can help establish when the request, blockage, escalation, and resolution happened. If the team has a clear shared picture already, spend more time investigating causes and deciding what to try. Varying activities can keep the conversation useful, but novelty is not a substitute for a clear purpose.

Ground the discussion in evidence

Bring board history, chart patterns, impediment dates, items that missed Done, and Review feedback. Combine facts with people's experience. “Testing started on day 8” is a useful observation; “the testers never help” is an accusation that hides the process the team could change.

Facilitators often use Norm Kerth's Prime Directive to encourage a charitable starting point: understand people's actions in light of what they knew, their skills, resources, and circumstances. This supports investigation without pretending the results were satisfactory.

Silent writing before discussion gives everyone time to think. Turn-taking helps quieter people contribute before a confident speaker sets the explanation for the whole group. Keep attention on changes the team or organization can make.

The Scrum Master often facilitates but is also part of the team being inspected. Another Scrum Master or a Developer can facilitate occasionally so the Scrum Master can participate fully. Do not skip a Retrospective because the Sprint went well: useful practices may need protecting, and the team can still inspect how to improve them.

Key Takeaways

  • Include the whole Scrum Team in inspecting quality and effectiveness.
  • Gather observations before drawing conclusions or choosing actions.
  • Choose a format that serves the issue.
  • Use evidence, silent writing, and turn-taking to support a fair discussion.
  • Keep the focus on causes and workable changes.

4.4 Turn an improvement into a checked experiment

A Retrospective produces value when the team changes something and learns whether it helps. “Communicate better” sounds positive but does not say what to do, who will drive it, or how to check its effect.

Choose a small number of actions

A useful action is specific, has someone to drive it, and can be checked. For example: “From next Sprint, review each item before it moves to testing. Sam will coordinate the experiment and bring the defect count from the Sprint Review to the next Retrospective.” The team can see both the new behavior and how it will examine the result.

Pick one to three improvements per Sprint. Finishing a few changes makes their effects easier to inspect than carrying ten unfinished actions. The most impactful improvements should be addressed as soon as possible; a team can improve its work in the middle of a Sprint without waiting for the next Retrospective.

Dot voting can help choose a focus. Six people with three dots each have 18 dots. Their votes might be 7 for an unstable test environment, 5 for too many meetings, 4 for unclear stories, and 2 for keeping successful pairing. This suggests investigating the environment first and possibly meetings second. Voting helps prioritize attention; the team must still choose a concrete response.

Reserve time and follow through

Make a chosen action visible. It may be added to the next Sprint Backlog so the Developers can account for its capacity and inspect it on the board. Work that relies on spare time is easy to postpone when delivery becomes busy.

Frame the action as an experiment: state the expected change, try it for a Sprint, and inspect the result at the next Retrospective. Keep, adjust, or stop the practice based on what happened. Open the next Retrospective by checking earlier actions so they do not disappear under new ideas.

Suppose a team expects a daily early review window to reduce items waiting overnight. A Developer coordinates the trial, and the team records whether review requests still wait into the next day. If waiting persists, inspect why before declaring the idea a success or failure. Perhaps the window conflicts with the reviewer's support duty, which the next version of the experiment can address.

Strengthen shared quality as capability grows

Better tools and skills can support a stronger Definition of Done, such as performance checks at expected peak load or production deployment where the product needs it. Plan the extra effort openly; the team may initially select less product work.

Quality must not decrease during a Sprint. A change to the Definition of Done must remain transparent, preserve product usability, and respect any organizational minimum. An end-of-Sprint deadline does not permit skipping a required check.

Some improvements need organizational help. A shared environment owned by another department may need an agreement beyond the team's control. Record the impediment and its impact, and involve the Scrum Master in reaching the people who can change it. The team can keep adapting what is within its own control while that work continues.

Key Takeaways

  • Choose one to three specific improvements with a driver and a check.
  • Make room for the action, including in the Sprint Backlog when useful.
  • Try, inspect, and revise improvements as experiments.
  • Stronger quality standards need visible capacity planning.
  • Quality cannot decrease during a Sprint; organizational minimums still apply.
  • Escalate improvement barriers that need organizational action.
5

Help the team grow its own capability

A Scrum Master helps people make Scrum work and improve the team’s effectiveness. The useful response changes with the situation: explaining an unfamiliar rule, facilitating a decision, sharing experience, or helping someone think through a problem. Learn to choose that response deliberately, listen without steering people toward a hidden answer, and support self-management while still addressing obstacles and ineffective practices.

5.1 Choose how to help as a Scrum Master

The Scrum Master is accountable for establishing Scrum as defined in the Scrum Guide and for the Scrum Team's effectiveness. The 2020 Guide describes Scrum Masters as true leaders who serve. Earlier wording used “servant-leader,” a term still common in practitioner writing.

Serve three connected groups

For the Scrum Team, service means coaching self-management and cross-functionality, helping people focus on high-value Done Increments, causing impediments to be removed, and ensuring useful events within their timeboxes.

For the Product Owner, it includes finding effective Product Goal and backlog techniques, helping make items clear and concise, supporting empirical planning, and facilitating stakeholder collaboration. This helps the Product Owner fulfill the accountability; it does not transfer backlog ordering to the Scrum Master.

For the organization, service includes training and coaching Scrum adoption, advising on implementation, explaining how decisions can respond to observed results, and removing barriers between stakeholders and teams. An approval policy that repeatedly blocks usable work may need organizational discussion as well as team-level adaptation.

Match the stance to the need

Barry Overeem's practitioner model describes eight Scrum Master stances: servant leader, facilitator, coach, manager, mentor, teacher, impediment remover, and change agent. “Manager” here concerns impediments, boundaries, and process, not managing people. The model offers ways of helping; it does not add Scrum accountabilities.

Four stances are especially useful to distinguish:

StanceWhat the Scrum Master contributesExample
TeacherKnowledge and explanationExplain the Daily Scrum's purpose and timebox
MentorRelevant personal experience and adviceDescribe a technique used with an earlier team
CoachQuestions, listening, and reflectionHelp the team explore why coordination is poor
FacilitatorA neutral process for discussion or decisionsGuide the team through comparing options

A new team running long Daily Scrums may first need teaching. If the same issue returns, the Scrum Master might facilitate a Retrospective discussion. With an experienced team, coaching could begin with, “What does this event give you, and what would make its 15 minutes useful?”

Change the support as learning grows

Shu-Ha-Ri is a learning model borrowed from Japanese martial arts: follow the rules, adapt with understanding, then go beyond the learned forms. In Scrum coaching it can help explain why beginners often need more teaching and experienced teams more coaching. It is not permission to discard Scrum's essential elements while still calling the result Scrum.

Watch for roles that create dependence: writing every note, managing every calendar, policing rules without explaining purpose, assigning work as a boss, collecting daily status, or rescuing every problem. Administrative help can be useful, but it must not become the Scrum Master's identity while team effectiveness receives little attention.

Key Takeaways

  • The Scrum Master is accountable for establishing Scrum and team effectiveness.
  • Serve the team, Product Owner, and organization in distinct ways.
  • Teach knowledge, mentor from experience, coach thinking, and facilitate a process.
  • Choose and adjust the stance to the situation and the team’s experience.
  • Avoid patterns that make the team dependent on a boss or rescuer.

5.2 Use questions and listening to support a decision

Coaching helps someone reach an insight and decision through questions, listening, and reflection. The people doing the work often understand their situation best. Exploring their own options can build more ownership than carrying out a solution handed to them.

Ask without hiding an answer

Open questions invite exploration: “What options do you see?” or “What have you already tried?” Closed questions confirm a fact or agreement: “Have you discussed this with the Product Owner?” Both can be useful. A leading question such as “Shouldn't you just split the story?” suggests that the coach has already decided.

Ask one question, then listen. Allow silence so the other person can think. Summarize what you heard and check it: “So the concern is that the item changes after planning. Have I understood?” The check matters because an inaccurate summary can steer the rest of the conversation toward the wrong problem.

“What” and “how” questions often invite a fuller account with less defensiveness than “Why did you do that?” A stream of open questions can still feel like interrogation if the person has no space to answer or sees no purpose in the conversation.

Structure the conversation with GROW

The GROW model, associated with John Whitmore's coaching work, offers four prompts:

  • Goal: What do you want to achieve?
  • Reality: What is happening now?
  • Options: What could you do?
  • Will, or Way forward: What will you do, and when?

Use the structure to support thinking, not to force a rigid sequence when new information changes the issue.

A Developer asks the Scrum Master to tell the Product Owner that items are unclear. First clarify the goal: “What would a clear item let you do?” Explore reality: “Which two items caused difficulty, and what was missing?” Explore options: “How could you raise those examples with the Product Owner?” Then agree a way forward: “What will you try before the next refinement?”

The Developer might choose to bring two examples to refinement and propose clearer acceptance criteria. The decision and conversation remain with the person who needs them. If organizational access or authority prevents action, the Scrum Master can help with that barrier without automatically taking over the whole problem.

Know when to give information directly

Coaching assumes there is something useful for the person to explore. A team that does not know the purpose of the Sprint Review needs teaching, not a guessing game. A Scrum Master who has relevant information should share it openly.

A serious imminent risk also needs a direct statement. If a planned release would expose customer data, name the concern and help the team respond. Do not withhold essential information to create a learning experience. Over several Sprints, watch the effect of your support: whether people make clearer decisions and increasingly handle the work themselves.

Key Takeaways

  • Open questions explore; closed questions confirm; leading questions steer.
  • Listen, leave thinking time, and check your understanding.
  • GROW connects a goal, present reality, options, and a chosen next step.
  • Use teaching when knowledge is missing and speak directly about serious risks.

5.3 Support self-management without becoming a gatekeeper

A self-managing Scrum Team decides internally who does what, when, and how. It is also cross-functional: together, members have the skills needed to create value each Sprint. These capabilities work within the Scrum framework, the Product Goal, the Definition of Done, and organizational constraints.

Protect ownership of the plan

The Scrum Master supports the Developers' right to plan and allocate their work. Assigning their tasks, setting their estimates, deciding technical approaches, or settling disagreements by decree takes those decisions away. Facilitate a way for the team to decide and make concerns visible instead.

For a new mid-Sprint request, connect the requester with the Product Owner. The Developers and Product Owner discuss any change to Sprint work in light of the Sprint Goal. This protects focus while keeping a path for valuable information.

Protection must not make the Scrum Master a gatekeeper for every conversation. Stakeholders and Developers can speak directly, including during refinement and at the Sprint Review. Product understanding suffers when every question has to pass through one person.

Agree how to decide

A clear decision rule helps people know what agreement means before discussion begins. A team might use consent, where no one has a serious objection; a majority vote; a fist-of-five check; or a designated person who decides after consultation. Choose a rule suited to the decision.

For a fist-of-five check, the team can agree that three to five fingers indicate support and one or two call for discussion of the concern. The value is making reservations visible. Treating a silent person as automatically agreeing would defeat that purpose.

Working agreements make the team's chosen habits visible. Examples include “Daily Scrum starts at 9:30,” “reviews within one working day,” or “core hours are 10:00 to 15:00.” The Scrum Master can facilitate writing them; the team owns and revisits them at Retrospectives.

Make progress transparent at team level

A manager asks for weekly hours per Developer. First ask what the manager needs to understand. If the concern is product progress, discuss the Increment, backlog, board, and forecasts and invite participation in the Sprint Review. Individual hours do not show whether the team is creating usable value.

If an individual report remains an organizational requirement, raise the tension openly and work with those who can address it. Quietly turning the Scrum Master into an individual performance reporter undermines trust and can encourage people to optimize personal numbers.

Step back without abandoning the accountability

As Developers run their own Daily Scrum, resolve more obstacles, and sometimes facilitate Retrospectives, the Scrum Master can reduce direct involvement. Success shows in the team's growing ability to act.

Stepping back still includes noticing ineffective patterns. If the team ignores its Sprint Goal or quality standard, make the observation visible and help it decide how to respond. Self-management needs room for ownership and clear feedback about the results of its choices.

Key Takeaways

  • The team decides who does what, when, and how within shared boundaries.
  • Protect focus and planning ownership while keeping direct collaboration possible.
  • Agree decision rules and working agreements together.
  • Make team progress transparent without turning it into individual scoring.
  • Step back as capability grows and keep ineffective patterns visible.
6

Collaborate across locations and time zones

A distributed team needs the same shared decisions and usable results as a team in one room. Distance makes access, timing, and participation more deliberate. Plan when everyone can collaborate, keep one visible record of work and decisions, and adapt event facilitation so people can contribute from every location. Hybrid teams need particular care when an office conversation could leave remote members outside the decision.

6.1 Create shared working conditions across locations

A distributed team works in different locations; a hybrid team combines people in an office with remote members. Scrum's accountabilities, events, artifacts, and commitments remain the same. The practical arrangements must give everyone access to the work and the decisions.

Find the real overlap

Suppose Amsterdam and New York members each work 9:00 to 17:00 local time. In January, Amsterdam is UTC+1 and New York UTC−5, so Amsterdam is six hours ahead. New York's 9:00 is Amsterdam's 15:00. Their overlap is 9:00–11:00 in New York and 15:00–17:00 in Amsterdam: two hours.

Place events that need everyone inside that overlap. Keep calendar invitations tied to named city time zones so the calendar can adjust for clock changes. A statement such as “the call is at 9:15” is incomplete for people in different places.

Under current rules, the United States changes clocks on the second Sunday in March and the first Sunday in November. The European Union changes on the last Sunday in March and October. The Amsterdam–New York gap is therefore five hours during the intervening weeks. A Daily Scrum at 9:15 New York then occurs at 14:15 Amsterdam, compared with 15:15 when the gap is six hours. Recheck the schedule around these transitions.

Write agreements people can use

Agree core hours, expected response times, urgent channels, camera use, and where decisions are recorded. A practical arrangement could put quick questions in chat, current work status on the board, and urgent or sensitive discussions on a call. Record local holidays so an apparent delay is not mistaken for a missed commitment.

Use one shared digital board and backlog, plus suitable calls, chat, and an online whiteboard. A physical office board with a separate remote copy creates a reconciliation problem: people may inspect different states of work. Everyone needs the same current picture.

If an occasional event must fall outside someone's working hours, rotate the inconvenience. A routine that always makes one location join late makes equal participation harder even if the meeting link works.

Collaborate on the same items

Avoid designing the work around location-based handoffs, such as building in one country and testing in another. Those handoffs add waiting and can conceal problems until the next location starts work. People across sites can pair, review, and test the same items so the team works toward shared Done results.

Hybrid events need explicit attention. People around a table may hear side comments that remote members miss, and hallway decisions may never reach the board. Having everyone join from their own device can put participation on a more equal footing; arrange the audio so this does not create echo. Record decisions in the shared place the team agreed to use.

Key Takeaways

  • Find overlap from named city time zones and real working hours.
  • Check daylight-saving transitions and share inconvenient meeting times fairly.
  • Keep one shared board, backlog, and decision record.
  • Collaborate across sites on the same items instead of separating work by location.
  • Give remote members equal access to discussion and decisions.

6.2 Facilitate useful remote Scrum events

Remote Scrum events keep their purposes and timeboxes. Good tools help people participate, but a recording or a page of updates cannot perform an interactive decision on their behalf. Prepare the meeting around the work the participants must do together.

Prepare people and technology

Test access, sound, and shared tools before the event. Show the agenda and timer, and use short blocks with breaks when needed. A timebox is a maximum; there is no benefit in filling unused minutes after the event has achieved its purpose.

Agree how people ask to speak, such as a raised hand or a speaking order. Watch the chat as well as the call. Invite contributions from locations that have been quiet and leave time for someone to unmute or formulate a response. A written decision record helps people act afterward, but does not replace their participation.

Plan together on the shared board

For remote Sprint Planning, send candidate items a day ahead for individual reading. During the event, keep the draft Sprint Goal visible and build the plan on the shared board. Check agreement explicitly, for example by hearing from each person or using a fist-of-five check. Silence may reflect a connection delay, uncertainty, or disagreement.

Hold the Daily Scrum at the same time each working day inside the overlap. Walk the board and move detailed issues to a follow-up call. Written updates let others catch up, but the Developers still need to inspect progress and agree on the day's plan together. A list of independent updates can leave a dependency unresolved even when everyone has posted on time.

Make product feedback active

At a remote Sprint Review, give stakeholders a way to try the Done Increment during the session. With many participants, breakout discussions can gather more specific feedback than one long presentation. Collect observations in a shared document and show how the Product Backlog responds. Confirm access to the product before the session so time is spent inspecting it.

Create space for reflection

An online whiteboard can support the Retrospective. Begin with silent writing so people can contribute before a dominant speaker frames the issue. Anonymous input can help when trust is still growing. Invite people in turn, group observations, investigate causes, and choose actions the whole team can see.

A Scrum Master who facilitates should monitor both the chat and who has not spoken. If that person also wants to explore their own conduct, another facilitator can help them participate without managing the discussion at the same time.

Inspect the remote arrangement

Frequent late starts, multitasking, or one location dominating are evidence for a working-agreement discussion. Camera use should support participation under the team's agreement; an unseen face alone does not establish disengagement. Finish events with a short record of decisions and actions, and inspect later whether people could actually follow through from each location.

Key Takeaways

  • Keep each event’s purpose and timebox when working remotely.
  • Prepare shared access and check agreement explicitly.
  • Written updates support the Daily Scrum but do not replace joint inspection and planning.
  • Let stakeholders interact with Done work at the Review.
  • Use silent input and deliberate turn-taking in remote Retrospectives.
  • Inspect participation problems through the team’s working agreements.

Running Sprints in Practice examples

6 Walkthroughs

1

Build a realistic Sprint plan

13 steps
Move from planning inputs through a shared goal to a delivery plan the Developers can adapt.
  1. 1
    IntroductionStart with value and available effort

    A useful Sprint plan connects an outcome with work the Developers can finish to the required quality. Follow a team preparing a two-week Sprint, then make planning choices in new situations.

    The planning conversation has three topics: why the Sprint is valuable, what can be Done, and how to deliver it. Capacity and evidence make those choices informed; they do not make the choices for the team.

  2. 2
    ExplanationMake the inputs available

    Bring the ordered Product Backlog, Product Goal, latest Increment, Definition of Done, projected capacity, and past performance. The whole Scrum Team creates the plan, with invited specialists advising where useful.

    The Product Owner proposes value and prepares likely items. The Scrum Master prepares access, the setting, and the agenda. Planning is at most eight hours for a one-month Sprint, usually shorter for a shorter Sprint.

  3. 3
    ExampleCalculate the available person-days

    Five Developers each have 10 working days before absences. A holiday affects all five, and one Developer also takes two days of leave.

    5×10=50 50−5−2=43

    The team has 43 person-days available. The holiday removes five person-days because it affects five people. The two leave days are additional, so they are subtracted once. Next, compare that capacity with a genuinely comparable performance record.

  4. 4
    ExampleUse a comparable record

    The previous three Sprints each had 50 person-days and completed 21, 24, and 27 points of Done work. Their average is 24. A rough capacity adjustment gives:

    24×43÷50=20.64

    About 20 to 21 points is a starting forecast. Developers must still check the specific work and available skills. A point total cannot show whether the only person who knows an essential system is on leave.

  5. 5
    ChallengeCheck the forecast input

    Four Developers have 10 working days each, with 4 person-days of known absences. Earlier comparable Sprints had 40 person-days and averaged 20 Done points. What rough adjusted forecast follows?

    ---reveal---

    Capacity is 36 person-days. The proportional forecast is:

    20×36÷40=18

    Use 18 points as a starting judgment, then check items, skills, and uncertainty. Selecting 20 without review would ignore the lower capacity.

  6. 6
    ExplanationAgree on why the Sprint matters

    The Product Owner proposes how the product could gain value. The whole Scrum Team defines one Sprint Goal, finalized before Sprint Planning ends. It is the Developers’ commitment and gives the Sprint focus.

    “Returning customers can reorder a basket in under a minute” states an outcome. A story-number checklist names work but gives less direction when the implementation must change.

  7. 7
    ExampleChoose what supports the outcome

    For the reorder outcome, copying a past basket and handling unavailable products may be essential. A redesigned history page may be optional. Ask which items the objective actually needs.

    The Developers select the amount of work through discussion with the Product Owner. When it exceeds their forecast, they can split a usable slice, defer lower-value work, or narrow the proposed goal before finalizing it.

  8. 8
    ChallengeMake a planning trade-off

    A planning proposal lets members pause a subscription themselves. The Developers can finish the pause flow and confirmation this Sprint, but cannot also finish an optional animation. What should the team discuss?

    ---reveal---

    Discuss leaving the animation out of the selected slice while keeping the pause outcome. The Developers own the amount selected; the Product Owner helps judge value. Hidden overtime would make the forecast less realistic.

  9. 9
    ExplanationTurn selection into an actionable plan

    The Sprint Backlog joins the goal, selected items, and delivery plan: why, what, and how. The Developers own and update all the planning detail needed to deliver the Increment.

    Work often breaks into tasks of one day or less. Include required review, tests, documentation, and deployment work. A list of coding tasks alone understates what must happen before an item can be Done.

  10. 10
    TipLet detail grow with knowledge

    The plan must be actionable, but every later task need not be known at the end of planning. Detail the near work and add tasks as learning grows.

    If the Developers cannot describe how to begin an item, investigate it with the Product Owner. Refine or split it, or select another item that serves the goal. Vague task names will not resolve the missing understanding.

  11. 11
    ChallengeDeal with a personal queue

    Developers agreed initial task owners. Now one person has three reviews waiting while another is available. Must the original owners remain fixed?

    ---reveal---

    No. The Developers can adapt allocation, pair, or swarm to finish important items. Initial owners were their choice, and changing them can also be their choice. Having the Scrum Master hand out new assignments would move ownership outside the Developers.

  12. 12
    ChallengeConnect goal, scope, and quality

    A goal-critical item is larger than expected. Developers could deliver a smaller usable slice within capacity, but only if they remove an optional behavior. Required tests still fit. What should they do with the Product Owner?

    ---reveal---

    Discuss the smaller slice against the Sprint Goal and update the selected work and plan if it preserves that objective. Keep the required tests. Scope flexibility helps protect a useful, Done result without pretending the original selection is fixed.

  13. 13
    RecapLeave with a plan that can guide decisions

    Before closing planning, check three things together: is the value clear, does the selected work fit the Developers’ informed forecast, and is there enough delivery detail to begin?

    Make concerns explicit while the team can still change the proposal. During the Sprint, new knowledge goes into the Developers’ current plan. Unfinished items later return to the Product Backlog for ordering, not automatic carryover.

2

Read the board and the charts together

11 steps
Locate waiting work, interpret a chart, and choose a response grounded in the Sprint Goal.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionTwo views of the same work
  2. 2
    ExplanationShow the real work states
  3. 3
    ExampleNotice a shared priority
  4. 4
    ChallengeRead toward completion
  5. 5
    ExplanationCheck the axes and units
  6. 6
    ExampleFind the midpoint gap
  7. 7
    ExampleCompare the rates required
  8. 8
    Key InsightSeparate scope from completion
  9. 9
    ChallengeInterpret a new chart change
  10. 10
    ChallengeCombine the trend with the board
  11. 11
    RecapTurn a signal into an investigation
3

Recover a useful daily rhythm

14 steps
Restore a focused Daily Scrum and follow an impediment from visibility to prevention.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionMake daily coordination useful
  2. 2
    ExplanationInspect the goal in 15 minutes
  3. 3
    ExampleConnect contributions into a plan
  4. 4
    ChallengeChoose an outcome for today
  5. 5
    ExplanationRecognize reporting and debate
  6. 6
    TipPark detail without losing it
  7. 7
    ChallengeCorrect the cause of a long event
  8. 8
    ExampleExpose an access delay
  9. 9
    ExplanationAgree who can act
  10. 10
    ExamplePrevent the same delay next time
  11. 11
    ChallengeChoose the level of response
  12. 12
    Key InsightSeparate difficult work from an obsolete goal
  13. 13
    ChallengeAct before the next meeting
  14. 14
    RecapKeep the loop moving
4

Follow quality into feedback and improvement

18 steps
Apply the quality standard, run a useful Review, and turn a Retrospective insight into an experiment.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionUse quality to make learning trustworthy
  2. 2
    ExplanationSet one shared quality standard
  3. 3
    ExampleMake the standard checkable
  4. 4
    Key InsightSeparate behavior from shared quality
  5. 5
    ChallengeApply both kinds of criteria
  6. 6
    ExampleCount only completed items
  7. 7
    ExplanationMake the Review a working session
  8. 8
    ChallengeKeep delivery and Review distinct
  9. 9
    ConnectionChange the question at the Retrospective
  10. 10
    ExplanationMove from observations to insight
  11. 11
    TipGive everyone a way to contribute
  12. 12
    ChallengeDelay the solution until the evidence is shared
  13. 13
    ExampleTurn a theme into a specific trial
  14. 14
    ExplanationUse voting to focus attention
  15. 15
    ChallengeClose the experiment loop
  16. 16
    Key InsightPlan for stronger quality
  17. 17
    ChallengeConnect Done work with the improvement choice
  18. 18
    RecapKeep the product and process learning connected
5

Choose support that builds ownership

13 steps
Select a Scrum Master stance, work through a coaching conversation, and protect self-management.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionHelp without taking over
  2. 2
    ExplanationRecognize the accountability
  3. 3
    ExplanationMatch the stance to the need
  4. 4
    ChallengeChoose a first response
  5. 5
    ExplanationAsk and listen without a hidden solution
  6. 6
    ExampleClarify the goal and present reality
  7. 7
    ExampleExplore options and choose a next step
  8. 8
    ChallengeKnow when questions are insufficient
  9. 9
    ExplanationProtect decisions and collaboration
  10. 10
    TipMake the way of deciding explicit
  11. 11
    ChallengeSupport an effective boundary
  12. 12
    ChallengeRespond to a progress request
  13. 13
    RecapChoose support deliberately
6

Make remote collaboration work

11 steps
Plan shared availability and facilitate events so every location can contribute to decisions.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionBuild one shared working environment
  2. 2
    ExampleFind the January overlap
  3. 3
    TipRecheck clock transitions
  4. 4
    ExplanationAgree the shared record and habits
  5. 5
    ChallengeChoose a shared slot
  6. 6
    ExplanationPrepare remote Planning
  7. 7
    ChallengeConnect written updates to daily planning
  8. 8
    ExampleGive stakeholders something to inspect
  9. 9
    TipOpen the remote Retrospective to every voice
  10. 10
    ChallengePrepare a constrained remote Review
  11. 11
    RecapInspect access as well as attendance

Running Sprints in Practice practice questions

50 Practice Questions in 5 sets

Set 1: Plan, inspect, and finish useful work10 Practice Questions

Question 1 of 10

Three Developers each have eight working days available before two person-days of training are deducted. What capacity remains?
  1. 24 person-days
  2. 18 person-days
  3. 22 person-days
  4. 26 person-days
Show answerHide answer
Answer: C
The starting capacity is 24 person-days, and the two person-days of training leave 22 for Sprint work. Subtract the training once because it is already stated as a team total; subtracting two days from every Developer would incorrectly leave 18.

Question 2 of 10

A team is planning account recovery. It needs a Sprint Goal that will help it choose what to simplify if the work is larger than expected. What goal would give that direction?
  1. Users can recover access without contacting support.
  2. Complete all selected recovery stories before Friday.
  3. Finish the recovery form, email service, and tests.
  4. Raise the number of completed account-service points.
Show answerHide answer
Answer: A
A customer outcome gives the team a shared objective while leaving choices about implementation. Completing a list of components may be necessary work, but the list alone does not say what customer result must survive when scope is simplified.

Question 3 of 10

A team completed 16, 20, and 18 Done points in three Sprints with 30 person-days each. The next Sprint has 25 person-days. What rough capacity-adjusted forecast follows from that record?
  1. 18 points before checking the particular work.
  2. 21.6 points before checking the particular work.
  3. 25 points before checking the particular work.
  4. 15 points before checking the particular work.
Show answerHide answer
Answer: D
The average completed work is 18 points at 30 person-days; scaling by 25 divided by 30 gives 15. Keeping 18 ignores the lower capacity. The result remains a starting forecast that Developers must check against skills, uncertainty, and the actual selected work.

Question 4 of 10

A board shows implementation tasks complete, but a required accessibility check is not yet done. What should the Developers do with the parent item?
  1. Move it to Done and add a reminder for next Sprint.
  2. Keep it unfinished and show the missing check.
  3. Count it Done because every listed task is complete.
  4. Move it to Done once the Product Owner sees it.
Show answerHide answer
Answer: B
The parent item must meet the Definition of Done, including the required accessibility check. Completed task cards do not establish product completion when the plan omitted an activity; make that activity visible and finish it before marking the item Done.

Question 5 of 10

A burndown starts with 72 task hours in a nine-day Sprint. At the end of day 3, 56 hours remain. How far is the actual amount above the ideal line?
  1. 16 task hours
  2. 24 task hours
  3. 48 task hours
  4. 8 task hours
Show answerHide answer
Answer: D
The ideal falls by 8 hours per day, leaving 48 hours at the end of day 3. Actual remaining work is 56, which is 8 above the ideal. The 16-hour decrease from the starting amount is actual burn so far, not the gap from the reference line.

Question 6 of 10

What result should Developers leave the Daily Scrum with?
  1. A record of each person’s hours for the Scrum Master to review.
  2. A plan for the next day based on progress toward the Sprint Goal.
  3. A fully detailed task schedule fixed through the end of the Sprint.
  4. A fresh estimate for every selected item in the Sprint Backlog.
Show answerHide answer
Answer: B
The event inspects progress toward the Sprint Goal and adapts the plan for the next day of work. Individual reports may provide information, but they do not fulfill the purpose unless the Developers connect that information and coordinate what to do next.

Question 7 of 10

A Developer has identified a faulty local test setup and knows how to repair it. No external permission or help is needed. How should the team handle the obstacle?
  1. The Developers organize the repair themselves.
  2. The Scrum Master takes ownership of every repair.
  3. The Product Owner authorizes a technical repair plan.
  4. The department manager assigns the repair work.
Show answerHide answer
Answer: A
Developers resolve obstacles within their own capabilities as part of managing their work. The Scrum Master causes impediment removal, but that accountability does not mean taking over a fix the team can make; support should build capability instead of dependence.

Question 8 of 10

Two Scrum Teams work on the same product. One uses a stricter Definition of Done than the other. What must they establish?
  1. Separate standards that each team publishes for comparison.
  2. One standard only for items that cross between the teams.
  3. One Definition of Done they define and follow together.
  4. Separate standards until the next joint Sprint Review.
Show answerHide answer
Answer: C
Teams working on the same product must define and comply with the same Definition of Done together. Publishing separate standards would reveal their disagreement, but it would still leave different meanings of completed quality within the same product.

Question 9 of 10

A new team thinks the Scrum Master must assign every task. Members have never learned how Scrum allocates that decision. What first response best addresses the cause while preserving ownership?
  1. Ask discovery questions until Developers guess the allocation rule.
  2. Teach self-management, then let Developers choose allocation.
  3. Assign initial tasks, then transfer allocation after several Sprints.
  4. Ask the Product Owner to demonstrate allocation for the first Sprint.
Show answerHide answer
Answer: B
The team lacks knowledge, so teaching the decision boundary directly fits the need. The Developers can then organize their own work. Assigning tasks temporarily may look helpful, but it models the same dependency that caused the misunderstanding.

Question 10 of 10

In January, Amsterdam is six hours ahead of New York. Amsterdam members work 8:00–16:00 and New York members 9:00–17:00, locally. What one-hour slot fits both groups?
  1. 14:00–15:00 Amsterdam; 8:00–9:00 New York.
  2. 16:00–17:00 Amsterdam; 10:00–11:00 New York.
  3. 15:00–16:00 Amsterdam; 9:00–10:00 New York.
  4. 9:00–10:00 Amsterdam; 15:00–16:00 New York.
Show answerHide answer
Answer: C
New York’s 9:00 is Amsterdam’s 15:00, and Amsterdam’s working day ends at 16:00. Their shared hour is therefore 15:00–16:00 Amsterdam. The usual two-hour overlap for two 9:00–17:00 groups does not apply to the earlier Amsterdam finish here.
Set 2: Coordinate the team and improve its work10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

Who decides whether two Developers should pair on a task in the Sprint Backlog?
  1. The Product Owner ordering product value.
  2. The Scrum Master coordinating team events.
  3. The manager checking specialist availability.
  4. The Developers managing their own plan.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

Candidate work exceeds the Developers’ forecast. One item has an optional reporting view that is unnecessary for the proposed Sprint Goal. How should the Scrum Team respond during planning?
  1. Retain the whole item and assume extra working hours.
  2. Discuss a smaller slice without the optional view.
  3. Require the Developers to match the initial selection.
  4. Replace the forecast with the Product Owner’s target.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A team uses a digital board during the Sprint. When should Developers update it?
  1. As the work changes during the day.
  2. Only before the Daily Scrum begins.
  3. After the Scrum Master checks the cards.
  4. At the end of each working afternoon.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

Two Developers begin a detailed design debate during the Daily Scrum. The issue needs discussion, but the event is nearing 15 minutes. What should they do?
  1. Extend the Daily Scrum until every design issue is settled.
  2. Ask the Scrum Master to choose the design immediately.
  3. Record it and continue with needed people afterward.
  4. Leave it unresolved until the end-of-Sprint Retrospective.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

Items worth 3, 5, 8, and 1 points were selected. Only the 8-point item misses the Definition of Done. How many points count as completed?
  1. 17 points
  2. 13 points
  3. 9 points
  4. 8 points
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

At a Retrospective, one member immediately proposes replacing the test tool. Others have different accounts of the delays. What should the facilitator do next?
  1. Build a shared timeline of what happened.
  2. Vote on replacing the test tool right away.
  3. Let the most senior member pick a tool.
  4. Close the topic since the accounts conflict.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A team chooses “reduce review delays” as its improvement theme. What next step makes it an experiment the team can inspect?
  1. Publish the theme and ask everyone to be more responsive.
  2. Add every suggested review improvement to the same trial.
  3. Wait until review delays disappear before checking the theme.
  4. Name a driver, a trial change, and a result to check next Sprint.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A Developer says, “Refinement is not helping us.” What question best opens exploration before deciding what to change?
  1. “Shouldn’t you ask for acceptance criteria?”
  2. “What has been happening in refinement?”
  3. “Wouldn’t longer refinement solve this?”
  4. “Can you start using our old checklist?”
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A manager asks the Scrum Master to send weekly hours by Developer because she wants to understand delivery progress. What response best supports transparency and self-management?
  1. Explore the need and inspect team results with the manager.
  2. Send the hours and keep product results for the Sprint Review.
  3. Stop all direct contact between the manager and Developers.
  4. Ask Developers to estimate each other’s contribution in points.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

Every remote Developer posts a daily update, but two people repeatedly discover too late that they need each other’s work. How should the Developers improve their daily coordination?
  1. Require longer written updates before anyone starts work.
  2. Have the Scrum Master combine posts into individual orders.
  3. Replace the shared board with one status document per person.
  4. Inspect the shared board together and agree the day’s plan.
Show answerHide answer

Save this lesson to see this answer.

Set 3: Read evidence and adapt the Sprint10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

During Sprint Planning, Developers can describe the first days’ tasks but not every later task. They understand the selected items well enough to begin. What plan is appropriate?
  1. Delay the Sprint until every task has an owner and an estimate.
  2. Start with an actionable plan and add detail as learning grows.
  3. Let the Scrum Master supply all later tasks to finish the plan.
  4. Freeze only the first days’ tasks and refuse later additions.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A burnup shows 26 points complete out of 38. Scope then rises to 46 while completion stays at 26. What change would a matching remaining-work line show, and what caused it?
  1. A rise from 12 to 20 because completed work decreased.
  2. A fall from 38 to 26 because remaining work was completed.
  3. A rise from 26 to 46 because all scope counts as remaining.
  4. A rise from 12 to 20 because total scope increased.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A Product Owner is actively implementing a selected item this Sprint. How does that affect participation in the Daily Scrum?
  1. The Product Owner participates as a Developer.
  2. The Product Owner replaces the Scrum Master as chair.
  3. The Product Owner attends only to collect status.
  4. The Product Owner must avoid the event despite the work.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A Daily Scrum fits 15 minutes, but Developers report to a manager who assigns their next tasks. The team then struggles to coordinate a goal-critical item. What change addresses the underlying problem?
  1. Keep assignments but ask the manager to shorten each report.
  2. Replace the manager with the Scrum Master as task assigner.
  3. Restore Developers’ planning, using the shared goal and work.
  4. Move the same reporting routine to a written daily thread.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A Developer becomes blocked by a missing permission at 14:00. The next Daily Scrum is tomorrow at 9:00. What is the appropriate next step?
  1. Wait until 9:00 so the whole team hears it together.
  2. Raise the blocker now through the agreed channel.
  3. Record it privately and continue waiting for access.
  4. Defer the issue to the end-of-Sprint Retrospective.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

An export item meets its acceptance criteria, but a mandatory integration test fails. How should its completion be judged?
  1. It is Done because the item’s specific behavior was verified.
  2. It is Done if the Product Owner agrees to defer the failure.
  3. It is partly Done and earns the same fraction of its points.
  4. It remains unfinished until the required quality check passes.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A Done Increment was delivered on day 4. At the Sprint Review, stakeholders reveal a new operational need. A manager argues that early delivery removed the Review’s purpose. How should the team respond?
  1. Inspect the outcome and new need, then adapt future work.
  2. Cancel the Review because release already confirmed the value.
  3. Repeat release approval before hearing the operational need.
  4. Hold all later Increments until a stakeholder signs the Review.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

The team can work around this week’s approval delay, but the same organizational policy has blocked three Sprints. What response addresses both current delivery and recurrence?
  1. Leave the list unchanged because the workaround protects this Sprint.
  2. Ask the Scrum Master to perform all approvals for future Sprints.
  3. Adapt today’s plan and escalate the pattern with impact evidence.
  4. Cancel the Sprint and wait for the entire policy to be replaced.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A Scrum Master shares an approach that worked with a previous team and offers it as advice. What stance is this?
  1. Facilitating
  2. Coaching
  3. Mentoring
  4. Impediment removal
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A hybrid team has an office board and a digital copy for remote members. The two frequently disagree. What change best improves transparency?
  1. Email remote members a daily board photo.
  2. Use one shared digital board for everyone.
  3. Have the Scrum Master sync both boards daily.
  4. Let each location keep its preferred board.
Show answerHide answer

Save this lesson to see this answer.

Set 4: Resolve competing demands without hiding risk10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A team’s capacity-adjusted forecast is 23 points. Its likely items depend on a specialist who will miss half the Sprint. What should Developers do before selecting work?
  1. Check item dependencies and skills, then revise their forecast.
  2. Select 23 points because capacity scaling already settles the risk.
  3. Increase the estimate of every item until 23 points seems safe.
  4. Let the Product Owner assign tasks to replace the missing skill.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A Sprint Goal remains valuable. New learning makes one selected implementation much larger, but a smaller usable approach could achieve the same outcome. What should Developers and the Product Owner do?
  1. Replace the Sprint Goal so the original selection stays fixed.
  2. Cancel the Sprint because the initial forecast has changed.
  3. Renegotiate selected work while keeping the Sprint Goal.
  4. Keep the whole selection and remove required quality checks.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

The team already understands several decision options but talks over one another and cannot compare them. Which Scrum Master stance best meets this immediate need?
  1. Teach the Scrum event timeboxes again before discussion.
  2. Mentor by naming the option the Scrum Master prefers.
  3. Manage people by assigning the decision to a Developer.
  4. Facilitate a fair comparison and decision process.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A task-hour burndown is flat for three days, while several Developers say they are busy. What conclusion and next action are justified?
  1. The team is not working enough; require extra daily hours.
  2. The cause is unclear; inspect current work and updates.
  3. Testing is definitely late; add a separate testing Sprint.
  4. The initial estimate was too low; increase every task estimate.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

An early-testing experiment ran for one Sprint, but its expected reduction in late defects did not occur. What should the team do at the next Retrospective?
  1. Keep it unchanged until the expected result finally appears.
  2. Adopt all remaining suggestions before evaluating this trial.
  3. Inspect what happened and adjust or stop the experiment.
  4. Mark it successful because the planned activity took place.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

An organization requires a baseline security check for its product teams. Can a team omit that criterion from its Definition of Done?
  1. No; the organizational standard is a minimum.
  2. Yes; self-management lets each team remove it.
  3. Yes; acceptance criteria replace shared standards.
  4. No; only stakeholders at the Review may remove it.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A Scrum Master wants to contribute observations about their own conduct at the Retrospective but finds it hard to do so while facilitating. What practical change would help?
  1. Skip the Scrum Master’s observations to keep the process neutral.
  2. Ask the Product Owner to decide which observations are valid.
  3. Replace the Retrospective with anonymous voting on performance.
  4. Invite another facilitator and participate as a team member.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

While coaching, a Scrum Master learns that a release planned for today will expose customer data. The team does not know this. What should the Scrum Master do?
  1. Keep asking open questions until they find the risk.
  2. State the risk directly and help the team respond.
  3. Wait and discuss the outcome at the Retrospective.
  4. Say nothing so the team keeps full ownership.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A stakeholder wants to clarify an item with the Developers during refinement. The Scrum Master insists every question pass through them first. What should change?
  1. Keep the filter but ask stakeholders to submit shorter questions.
  2. Allow direct collaboration while preserving clear work decisions.
  3. Route every clarification through a weekly management report.
  4. Ask the Product Owner to prevent any Developer contact.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

Remote Sprint Planning ends with no objections in chat, but several Developers have not spoken. What should the facilitator do before concluding?
  1. Interpret silence as consent and publish the final plan.
  2. Ask the most senior Developer to confirm for everyone.
  3. Check each person’s concerns and support explicitly.
  4. Let the Scrum Master assign unresolved work afterward.
Show answerHide answer

Save this lesson to see this answer.

Set 5: Connect quality, coaching, and adaptation10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

The Sprint plan assigned each task to an initial owner by Developer agreement. Mid-Sprint, one owner has a queue of reviews while another Developer is free. What response best preserves self-management and the goal?
  1. Scrum Master reallocates the queue to enforce equal task counts.
  2. Developers preserve the original assignments until the next Sprint.
  3. Product Owner estimates the reviews and assigns them by priority.
  4. Developers adapt allocation and collaborate to clear important reviews.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

The board has two near-Done items and three newly started items. One near-Done item is central to the Sprint Goal and waits for a review that available Developers can do. What should the Developers prioritize?
  1. Finish the goal-critical review before opening more work.
  2. Start the highest-point untouched item to maximize visible activity.
  3. Keep every original owner busy on a separate new task.
  4. Move the waiting item to Done and review it after the Sprint.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

Mid-Sprint, a lower-value optional report expands unexpectedly. The Sprint Goal remains useful and can be achieved without the report. What daily decision best fits Scrum?
  1. Developers replace the Sprint Goal with completing the expanded report.
  2. Developers and Product Owner discuss dropping the report to protect the goal.
  3. Product Owner cancels because any selected-item change ends the forecast.
  4. Scrum Master reduces Done criteria to keep the original selected scope.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

Developers give the same brief updates daily, and the board has not changed in several days. What is a useful first correction?
  1. Have each person give a longer account of yesterday.
  2. Rotate who collects status but keep the same focus.
  3. Inspect the current work and agree what to do next.
  4. Skip the event until the board visibly changes.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A team selected items of 13, 8, 5, and 3 points. The 13-point item still lacks a required check; the others are Done. What completion should its forecast record use?
  1. 29 points
  2. 16 points
  3. 26 points
  4. 13 points
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A remote Retrospective jumps from one outspoken member’s complaint to five proposed actions. Quiet members have not contributed and event facts are disputed. What facilitation change best addresses the sequence of problems?
  1. Vote on the five actions, then invite reactions to the winning solution.
  2. Let the outspoken member summarize the facts and select the smallest action.
  3. Replace the discussion with a manager’s list of changes for next Sprint.
  4. Gather silent observations, reconcile facts, then examine causes and choose.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A Retrospective ends with “Improve handoffs.” What essential next step is missing?
  1. Choose a specific change, its driver, and a check.
  2. Select a more positive phrase for the same theme.
  3. Record the theme without assigning further work.
  4. Ask everyone to promise to try harder next Sprint.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A Developer asks the Scrum Master to confront the Product Owner about unclear items. The Developer knows the problem and can speak with the Product Owner. What coaching approach best builds ownership?
  1. Use questions to lead the Developer to the Scrum Master’s fixed solution.
  2. Take over the conversation and send the Developer a summary afterward.
  3. Explore examples and options, then let the Developer choose a next step.
  4. Ask only whether the Developer agrees with a prepared escalation message.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A capable team runs its own events, but required quality checks are now being skipped. The Scrum Master says intervention would violate self-management. What response fits the accountability?
  1. Continue stepping back because the team owns every quality decision.
  2. Make the quality gap visible and help the team decide how to restore compliance.
  3. Take over all technical checks until the team asks for control again.
  4. Ask stakeholders to accept the gaps at the next Sprint Review.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A remote Sprint Review consists of slides about completed features, with no chance for stakeholders to try the product or discuss changed needs. What should the team change?
  1. Add a longer feature presentation before collecting approval signatures.
  2. Replace stakeholder participation with a recording sent after the event.
  3. Move all product feedback into a Developers-only Retrospective.
  4. Add hands-on inspection and discuss resulting backlog adaptations.
Show answerHide answer

Save this lesson to see this answer.

Stuck on your own question? Homework Help

Key Terms

80 Key Terms, each with its definition

A

Acceptance criteria
Acceptance criteria are the conditions describing the expected behavior of a particular Product Backlog item, alongside the shared quality standard.
The criteria for an export item specify that a user can choose which records appear in the downloaded file.
Action driver
An action driver is the person who coordinates an agreed improvement and helps bring its result back for inspection by the team.
A team member who arranges an agreed tool trial brings the observed result to the next Retrospective.
Actionable plan
An actionable plan makes the next work clear enough to begin, including the coordination needed to move toward the Sprint Goal.
The team agrees to pair on a blocked test setup before opening another feature item.
Active listening
Active listening gives full attention, allows thinking time, and checks a summary of what was heard before moving to another question.
The Scrum Master checks whether “unclear items” means missing behavior details or changing priorities.
Anti-pattern
An anti-pattern is a recurring practice that appears reasonable but undermines the purpose it is meant to support in its actual context.
A punctual Daily Scrum still has an anti-pattern if it collects reports without coordinating work.
Asynchronous update
An asynchronous update is a written report people can read at different times, useful for context but insufficient by itself for joint daily planning.
Written progress notes help a colleague catch up before Developers inspect the Sprint Goal together.

B

Blocked marker
A blocked marker is a visible board signal that work cannot proceed, often carrying the date the obstacle began so the team can follow up.
A dated flag makes a two-day access delay visible to people joining from another location.
Burndown chart
A burndown chart plots remaining work against time, showing how the amount still to finish changes during a Sprint or a longer period.
A rise in remaining task hours prompts the team to check for newly discovered work or changed estimates.
Burnup chart
A burnup chart plots completed work and total scope as separate lines, making scope changes visible independently of completion.
The scope line rises while completed work stays level when a new item is added but nothing finishes.

C

Capacity
Capacity is the Developers’ available time for Sprint work after known absences and other duties have been taken into account.
A training day reduces available capacity even though every Developer is employed full time.
Coaching
Coaching helps a person or team reach its own insight and decision through questions, listening, and reflection on the situation.
The Scrum Master asks what a Developer has tried before suggesting any way to raise an issue they face.
Consent
Consent is a decision rule in which a proposal can proceed when no participant has a serious objection that needs to be addressed.
A Developer raises a significant support conflict before the team adopts its proposed core hours.
Core hours
Core hours are agreed times when team members are reachable for collaboration, planned around actual availability across locations.
The team writes its shared availability beside each member’s city time zone in its working agreement.
Cross-functionality
Cross-functionality means the team’s members collectively have the skills needed to create value each Sprint without a separate specialist sub-team.
Developers combine implementation, testing, and accessibility skills to complete the same product item.

D

Daily Scrum
The Daily Scrum is a 15-minute event for Developers to inspect progress toward the Sprint Goal and adapt their plan for the next day.
Developers leave the Daily Scrum knowing who will collaborate on the most important unfinished item.
Decision record
A decision record is a shared written account of an agreed choice and its actions, making the outcome accessible across locations.
A Developer returning from a local holiday can find the agreed experiment and who will coordinate it.
Definition of Done
The Definition of Done is the formal description of the quality state required for the Increment, creating a shared understanding of finished work.
An item cannot be Done while a required accessibility check is still waiting, even if its main behavior works.
Definition of Ready
A Definition of Ready is an optional team checklist about useful preparation before selection; it is not a requirement in the Scrum Guide.
The team uses its checklist to open a clarification conversation, not to refuse all imperfectly described items.
Distributed team
A distributed team has members working in different locations, sometimes across time zones, while collaborating as one Scrum Team.
Developers in two cities pair on the same item using the shared board and a call.
Dot voting
Dot voting is a prioritization technique where participants place a limited number of votes on options to show which issues deserve attention.
Six members use three dots each to choose which of several improvement themes to investigate first.

E

Escalation
Escalation is bringing an obstacle and its impact to people with the authority or capability to help resolve it beyond the team’s reach.
The Scrum Master brings repeated access delays to the department that controls the approval policy.

F

Facilitation
Facilitation guides a group’s discussion or decision process while remaining neutral on its content so participants can reach their own result.
The facilitator sets a speaking order and comparison process without selecting the team’s answer.
Fist-of-five check
A fist-of-five check is a visible confidence or support signal using one to five fingers, with low scores prompting discussion of concerns.
The team hears from people showing one or two fingers before it closes the planning decision.
Five whys
Five whys is a technique of asking why repeatedly to move from a problem’s immediate symptom toward a cause people can act on.
The team follows a late-test problem back to missing information about the environment request process.
Follow-up
Follow-up is checking whether an agreed action happened and what it changed, so an improvement can be kept, adjusted, or stopped.
The next Retrospective opens by inspecting the action chosen in the previous Sprint.

G

Gather data
Gathering data is building a shared picture of what happened before interpreting causes or choosing improvements in a Retrospective.
The team places access requests, blocked days, and completed checks on one timeline.
Generate insights
Generating insights is examining shared observations for patterns and causes that can guide useful choices about improvement.
The team connects repeated late tests with the same missing preparation step.
GROW
GROW is a coaching structure covering Goal, Reality, Options, and Will or Way forward to move from a desired outcome to a chosen action.
After considering options, the Developer chooses which conversation to start and by when.

H

Hybrid team
A hybrid team combines members working together in an office with others participating remotely, requiring deliberate access to shared decisions.
Office members join from individual devices so remote colleagues can contribute to the event.

I

Ideal line
An ideal line is the straight reference on a burndown from starting work to zero at the end, representing an even rate of completion.
A brief gap above the ideal line leads to inspection, not a demand that someone improve the chart.
Impediment
An impediment is an obstacle that blocks or slows progress toward team goals; some practitioners reserve the term for obstacles beyond the team.
A missing approval blocks testing, while a broken local setup is a problem the Developers can fix.
Impediment list
An impediment list is a visible record of obstacles, their impact, and follow-up, used to keep action and organizational barriers in view.
The Scrum Master checks the next action on an unresolved environment request instead of merely logging it.
Improvement experiment
An improvement experiment is a specific change tried with an expected effect and a later evidence check to decide whether to keep or revise it.
The team tries an early review window for one Sprint and checks whether items still wait overnight.
Increment
An Increment is a usable addition to the product that meets the Definition of Done and works with the other completed product work.
Several completed items can create usable Increments before the Sprint reaches its final day.

L

Leading question
A leading question suggests the questioner’s preferred answer, reducing the freedom of the person being asked to explore a different response.
“Shouldn’t you just split the item?” points to a solution before the Developer has explored the problem.

M

Mentoring
Mentoring shares relevant personal experience and advice for another person to consider when deciding how to handle a situation.
A Scrum Master describes a review approach an earlier team tried and invites the team to assess its fit.

O

Open question
An open question invites a fuller account or exploration of possibilities, instead of limiting the response to a short confirmation.
“What would make this conversation useful?” lets the Developer describe the outcome they want.
Organizational minimum
An organizational minimum is a required quality standard that applicable Scrum Teams must meet, while remaining free to add stronger criteria.
A team adds product-specific load checks without dropping the organization’s mandatory security tests.
Overlap hours
Overlap hours are the working hours shared by people in different locations, providing a common window for live collaboration and events.
Two shared hours are reserved for discussions that need everyone, with preparation done beforehand.

P

Parking-lot list
A parking-lot list records topics that need a separate discussion so the current event can keep its purpose and timebox without losing them.
The team records a design issue and agrees which three people will discuss it after the Daily Scrum.
Past performance
Past performance is the team’s record of Done work in earlier Sprints, used as evidence when forming a forecast for new work.
The Developers check whether earlier Sprints had comparable capacity before using their output record.
Person-day
A person-day is the availability of one person for one working day, used here to estimate the total time available to Developers.
Four Developers available for eight working days contribute 32 person-days before other duties.
Personal queue
A personal queue is work waiting for one assigned person, which can delay a shared result even while other team members are available.
Several review tasks wait for one Developer while teammates begin less important items.
Product-level forecast
A product-level forecast estimates progress toward a larger product objective across Sprints, using observed results and current scope.
The Product Owner revises the release outlook after several Sprints reveal different completion rates.

R

Remote facilitation
Remote facilitation guides online participation and decisions through shared tools, explicit speaking processes, and visible actions.
The facilitator checks chat and invites people from whichever location has spoken least before confirming agreement.
Retrospective Prime Directive
The Retrospective Prime Directive is a charitable starting view of people’s actions in light of their knowledge, skills, resources, and circumstances.
The facilitator asks what conditions shaped a late decision before the team assigns blame.
Root cause
A root cause is an underlying, actionable reason a problem occurs, identified so a change can reduce the chance of repeated symptoms.
An undocumented lead time explains why environment requests repeatedly arrive too late.

S

Scope negotiation
Scope negotiation is discussion between Developers and the Product Owner to clarify or change selected work while preserving the Sprint Goal.
The team removes an optional display feature while keeping the customer outcome achievable.
Scrum Master
The Scrum Master is accountable for establishing Scrum and enabling the Scrum Team’s effectiveness through improved practices within the framework.
The Scrum Master helps a department remove an approval barrier that repeatedly blocks the team.
Self-management
Self-management is a Scrum Team’s ability to decide internally who does what, when, and how within its shared framework and constraints.
The Developers choose to change task allocation when an important item needs several people.
Set the stage
Setting the stage is opening a Retrospective by establishing its focus and helping people begin participating in the shared conversation.
Each member gives a short observation before the team starts building its Sprint timeline.
Shu-Ha-Ri
Shu-Ha-Ri is a learning model moving from following rules through informed adaptation to going beyond learned forms, used here to discuss support.
A beginner team needs more explanation while an experienced team may need space to examine its choices.
Silent writing
Silent writing lets participants record observations individually before discussing them, giving everyone a chance to form an initial contribution.
A remote Retrospective begins with notes on the whiteboard before anyone explains their preferred cause.
Single source of truth
A single source of truth is one shared, current record everyone relies on, reducing conflicting versions of work status or decisions.
A shared digital board replaces a separately maintained office board and remote copy.
Sprint Backlog
The Sprint Backlog is the Developers’ current plan containing the Sprint Goal, selected Product Backlog items, and how to deliver them.
The Developers add a newly discovered test task to the Sprint Backlog during the Sprint.
Sprint cancellation
Sprint cancellation is the Product Owner’s decision to end a Sprint when its Sprint Goal becomes obsolete, instead of pursuing lost value.
A strategy change removes the need for the planned outcome, so the Product Owner cancels the Sprint.
Sprint forecast
A Sprint forecast is the Developers’ judgment about the work they can finish, informed by capacity, past results, and required quality.
The forecast changes when the Developers learn that an essential specialist will be unavailable.
Sprint Goal
The Sprint Goal is the single objective for the Sprint, agreed by the Scrum Team and committed to by the Developers in their Sprint Backlog.
“Customers can pause a subscription themselves” helps the team judge which changes matter most.
Sprint Planning
Sprint Planning is the event in which the whole Scrum Team starts the Sprint by agreeing its value, selected work, and delivery plan.
The team invites a security specialist to clarify a dependency before completing Sprint Planning.
Sprint Retrospective
The Sprint Retrospective is the concluding Sprint event in which the Scrum Team inspects how it worked and plans quality and effectiveness improvements.
The Product Owner joins Developers and the Scrum Master to examine recurring delays in clarification.
Sprint Review
The Sprint Review is a working event where the Scrum Team and stakeholders inspect the Sprint outcome and determine future adaptations.
Stakeholders try the new search behavior and discuss what the Product Backlog should address next.
Stakeholder feedback
Stakeholder feedback is information from people affected by the product that helps the Scrum Team inspect results and adapt future work.
A support representative explains how a new screen changes the questions customers ask.
Stance
A stance is a way of helping chosen to fit the situation, such as teaching unfamiliar knowledge or coaching someone through a decision.
The Scrum Master switches from explanation to facilitation once the team understands the event’s purpose.
Start, Stop, Continue
Start, Stop, Continue is a Retrospective activity that groups ideas into practices to begin, practices to end, and practices to keep.
The team puts cross-location pairing under Continue after it helped expose defects earlier.
Status reporting
Status reporting is providing progress information to a recipient; it becomes a Daily Scrum problem when it displaces Developers’ planning.
Each person addresses a manager, but nobody discusses how their separate tasks connect to the goal.
Swarming
Swarming is several team members working together on an important item to help finish it, instead of maintaining separate personal queues.
Two Developers join a difficult test effort so a goal-critical item can reach Done sooner.
Swimlane
A swimlane is a row on a board that groups related work, such as the tasks belonging to one selected Product Backlog item.
The team checks the top swimlane first because its item is central to the Sprint Goal.

T

Task
A task is a small piece of work in the Developers’ delivery plan; finishing it does not by itself make its parent product item Done.
A completed design task leaves the item unfinished while implementation and quality checks remain.
Task board
A task board is a physical or digital view of Sprint work organized by its current state, helping make the Sprint Backlog transparent.
The board shows a tested item ready for review and another item waiting for database access.
Teaching
Teaching supplies needed knowledge and explanation so people can understand and use an unfamiliar concept or practice.
The Scrum Master explains why untested work cannot be counted in the Increment.
Technical debt
Technical debt is hidden or deferred quality work that can make later product changes harder, often exposed by inconsistent finishing practices.
Repeatedly skipping reviews leaves defects and cleanup work that slow the next Sprint.
Thin slice
A thin slice is a smaller, usable part of a product feature that can be completed and inspected without waiting for the whole larger feature.
The team starts with cancellation for one reservation type before adding more complicated cases.
Timebox
A timebox is the maximum time allowed for an event, helping participants focus while leaving them free to finish when its purpose is met.
The Daily Scrum ends within 15 minutes and a detailed design discussion continues afterward.
Total scope
Total scope is the whole amount of work included in a chart’s forecast or selection, measured in the same units as completed work.
A product burnup shows total scope growing after the Product Owner adds newly understood requirements.
Transparency
Transparency is a shared, accurate understanding of the work and its state, allowing inspection and decisions to rest on the same reality.
Marking untested work Done would reduce transparency even if the board looked more reassuring.

U

Undone work
Undone work is product work that misses the Definition of Done and therefore cannot count as part of a usable Increment.
An implemented but untested item returns to the Product Backlog without earning partial completion points.

V

Velocity
Velocity is a team’s record of completed work per Sprint in its own relative units, often story points, used to support forecasting.
A team revises its forecast from its own velocity without ranking it against another team’s points.

W

Walking the board
Walking the board is discussing Sprint work item by item to inspect progress, identify needed help, and coordinate the next steps.
The Developers begin with an item near Done and decide how to complete its remaining checks.
Work in progress
Work in progress is work that has started but is not finished; many simultaneous items can hide waiting and delay completion.
The Developers finish an open item before starting a third one under their team agreement.
Working agreement
A working agreement is a team-owned rule about collaboration, made visible and revisited when experience shows that it should change.
The team agrees to answer review requests within one working day and checks whether that works.