Agile Values and Principles
BeginnerLesson 1 of 6 in Agile and Scrum Course
What you will learn
- Describe where the Agile Manifesto came from, what “agile” means, and how its four value statements guide everyday choices at work.
- Describe where agile came from and what it meansExplain who wrote the Agile Manifesto and why, and how agile relates to a mindset, values, principles, practices and frameworks.
- Interpret the four values and how they are weighedState the four value statements, explain each one in plain words, and read the “over” structure correctly.
- Use the values to judge real decisionsApply the four values to workplace situations, including cases where an external constraint or a second value also matters.
- Describe where agile came from and what it means
- Explain what each of the twelve principles asks for, group them by theme, and use them to judge whether a way of working is agile.
- Deliver value early and welcome changeExplain the principles on early and continuous delivery, welcoming change, frequent delivery and working results as the measure of progress (principles 1, 2, 3 and 7).
- Build teams on collaboration, trust and self-organizationExplain the principles on daily collaboration, motivated individuals, direct conversation and self-organizing teams (principles 4, 5, 6 and 11).
- Sustain pace, quality, simplicity and improvementExplain the principles on sustainable pace, technical excellence, simplicity and regular reflection (principles 8, 9, 10 and 12).
- Deliver value early and welcome change
- Recognize complex work, contrast defined and empirical process control, and use transparency, inspection and adaptation in short feedback loops.
- Recognize complexity in work and decisionsUse an uncertainty model based on the Stacey matrix and the Cynefin framework to tell simple, complicated, complex and chaotic situations apart.
- Contrast defined and empirical process controlExplain when a fixed, defined process works and why complex work is controlled empirically, through observation and adjustment.
- Apply transparency, inspection and adaptationExplain the three pillars of empiricism, how they depend on each other and how to use them in a concrete work situation.
- Shorten feedback loops to learn fasterExplain why shorter feedback loops reduce risk and waste, and calculate how much work is at risk between feedback points.
- Recognize complexity in work and decisions
- Tell iterative and incremental development apart, slice work into valuable pieces, and show why frequent delivery creates value sooner and lowers risk.
- Distinguish iterative, incremental and agile life cyclesDefine iterative and incremental development, compare them with a predictive life cycle, and explain why agile combines both.
- Slice work into small, valuable incrementsSplit a product into vertical slices that deliver usable value, choose what to build first, and understand the minimum viable product.
- Show how frequent delivery adds value and reduces riskCompare the value and risk of one large final delivery with frequent small deliveries, using simple calculations.
- Distinguish iterative, incremental and agile life cycles
- Judge whether an adaptive, predictive or hybrid approach suits a piece of work, and correct common myths and misuses of agile.
- Choose between adaptive, predictive and hybrid approachesUse the nature of the work, the team and the organization to decide where an adaptive approach fits better than a plan-driven one.
- Correct common myths about agileRecognize widespread false beliefs about agile and replace each with an accurate statement.
- Recognize and fix misuse of agileIdentify ways organizations adopt agile in name only, explain why each fails, and propose a correction based on the values and principles.
- Choose between adaptive, predictive and hybrid approaches
Agile Values and Principles study guide
1The Agile Manifesto and everyday choices
Agile starts with choices about people, useful results, customers, and change. Its four values help a team decide what deserves priority when useful things compete. Understanding where the values came from also explains why a meeting schedule or a new tracking tool cannot make a team agile on its own. You will connect the values to the principles and practices, then use them to judge decisions with real constraints.
1.1 Where agile came from
Agile describes a way of working that creates and responds to change. A team learns from actual results and uses that learning to choose its next steps. The word describes behavior; it is not the name of one required method.
A shared statement in 2001
Seventeen software practitioners met at Snowbird in Utah on February 11–13, 2001. They wrote and signed the Manifesto for Agile Software Development, and the group named itself the Agile Alliance. Kent Beck, associated with Extreme Programming (XP), and Scrum co-creators Ken Schwaber and Jeff Sutherland were among the signers.
They brought experience with approaches known as lightweight methods, including XP, Scrum, DSDM, Crystal, Feature-Driven Development, and Adaptive Software Development. Some practices were already years or decades old. The Manifesto expressed what those approaches shared; it did not invent all their practices.
The problem they challenged was a long wait for usable results. In heavyweight, document-driven processes, detailed requirements were fixed early and work passed through large sequential phases. Customers might see working software only near the end. By then, a misunderstanding could affect months of completed work, and changing direction could be slow and expensive.
Mindset, values, principles, and practices
A model used in PMI's Agile Practice Guide, inspired by Ahmed Sidky, connects the layers of agile thinking:
| Layer | What it contributes | Example |
|---|---|---|
| Mindset | The general way of thinking | Learn and respond as understanding grows. |
| Values | Priorities when useful things compete | Give responding to change priority over following a plan. |
| Principles | Guidance for putting values into action | Welcome changing requirements, even late in development. |
| Practices | Specific things people do | Give users a working result every two weeks. |
| Framework | A structure with rules for organizing work | Scrum provides one such structure. |
The four values define the mindset, the twelve principles guide it, and practices express it. A framework helps organize practice. Teams choose practices that fit their situation while keeping the values and principles.
Agile is an umbrella
Scrum, XP, Kanban, Crystal, DSDM, and Feature-Driven Development are examples under the agile umbrella. Scrum is one framework within it. Agile and lean thinking overlap in their attention to customer value, small batches, and removing wasted work. Lean thinking asks what is essential and what can be removed without losing value.
The Manifesto began in software, but its ideas also apply to work such as marketing, product design, research, and internal employee services. In those settings, the practical equivalent of working software is a working, usable result. A marketing team might try a small campaign, observe the response, and improve the next campaign.
A practice needs a purpose
Imagine a team that meets every morning but refuses to reconsider any requirement. Its meeting is a practice; its decisions still prevent adaptation. Buying a board or attending training does not change that. The Manifesto prescribes no particular roles, meetings, boards, or tools. Those choices belong to frameworks and teams, and they help only when the resulting behavior supports the values.
Key Takeaways
- Agile describes how people create and respond to change.
- The 2001 Manifesto drew together ideas from existing lightweight methods.
- Values guide priorities; principles guide action; practices express them.
- Scrum is one framework under the agile umbrella.
- A practice supports agility only when the team uses it to collaborate, learn, and adapt.
1.2 How to read the four values
Each Agile Manifesto value puts two useful things in order of preference. The word over means the item on the left has greater value when the two compete. It does not remove the item on the right.
The four value statements
The Agile Manifesto states:
“Individuals and interactions over processes and tools”
“Working software over comprehensive documentation”
“Customer collaboration over contract negotiation”
“Responding to change over following a plan”
Its closing sentence explains the balance:
“That is, while there is value in the items on the right, we value the items on the left more.”
People and useful results
Individuals and interactions give people room to ask questions, share knowledge, and solve problems together. A developer and tester can settle an unclear requirement in a five-minute conversation. Sending a ticket back and forth for three days follows a process but delays understanding. The tracking tool can then preserve the decision for others who need it.
Working software gives people something they can try. This makes it strong evidence of progress and a useful basis for feedback. A detailed specification can describe an intended result without showing that it actually works. Documentation still has a purpose: user instructions, required records, and design decisions can be essential to using or maintaining the result. A medical-device team keeps the records its regulators require.
Customers and changing plans
Customer collaboration means working with the customer throughout delivery to understand value. The customer supplies knowledge about needs; the team supplies knowledge about feasibility and effort. A contract still establishes rights and responsibilities. An agreement that fixes time and budget while allowing agreed changes in scope can support collaboration as understanding grows.
Responding to change means updating a plan when evidence points to a better course. Teams still plan. They make near-term work detailed enough to act on and keep later plans less detailed because later needs are less certain. Replanning uses new information; repeatedly rewriting a plan without evidence adds little.
Follow the preference through a decision
Suppose a team discovers that its instruction manual describes a feature people cannot successfully use. The useful response is to fix the result and update the instructions that users need. Removing every document would leave users without help; polishing the manual while leaving the feature broken would give the right-hand item priority.
The principles develop these preferences. Working software as the primary measure of progress develops the second value. Daily collaboration and self-organizing teams develop the first. Welcoming changing requirements develops the fourth. A value names the priority; a principle helps explain the behavior that follows.
Key Takeaways
- “Over” gives the left-hand item priority while retaining the value of the right.
- Processes and tools support people solving problems together.
- Working results provide evidence; useful documentation remains.
- Customers and teams collaborate throughout delivery.
- Plans change as evidence and understanding change.
- Legal and safety requirements still have to be met.
1.3 Make a decision using the values
A value becomes useful when it changes a concrete decision. Begin with the choice people actually face, then identify the priority and the constraints. A decision may involve more than one value.
Four questions to ask
- What decision needs to be made?
- Which value pair does it involve?
- What would the left-hand item gain, and what useful purpose does the right-hand item still serve?
- What choice favors the left-hand item while keeping the necessary support and constraints?
This method avoids treating a value as a slogan. It asks what people will do differently and which useful records, agreements, or plans they must still keep.
Let conversation solve the problem
A team lead requires every question between teammates to be entered in a tracking tool before anyone can answer. The decision is whether the tool must be the gateway for all communication. The value is individuals and interactions over processes and tools.
Allow teammates to talk directly so they can resolve the question quickly. Then record decisions that other people will need later. This gives the conversation priority and retains the tool's useful memory. Simply deleting the tracking system would also lose information about work and decisions.
Reconsider scope with the customer
Three months into a six-month contract, a customer requests a new feature. A feature in the original specification now matters less. The team first discusses why the new feature matters and what would have to move. If the contract permits it, they agree to swap scope within the existing budget and date.
Customer collaboration guides the discussion, and responding to change guides the revised plan. A blanket refusal based on the old specification misses the new information. Agreeing to add all the work for no extra time or budget ignores the cost of the decision. Where the contract does not permit a swap, the parties must agree a valid change.
Get evidence before writing every detail
An internal booking-app team proposes six weeks of work on a 120-page specification. A small working version in two weeks would let users test the most important booking path sooner. Start with a shared outline of the goal and constraints, build the small version, and use feedback to refine the next work. Keep documents as needed when decisions become clearer.
The priority is working software over comprehensive documentation. Testing belongs in the work: a feature that has not been checked may fail at the very task users need it for. Quoting this value to justify skipping tests reverses its meaning.
Work within a fixed constraint
Suppose a payroll system must apply a new tax rule from January 1. The legal start date stays fixed. The team can still adapt the order of work, its design, and which optional features it includes before that date. An external constraint limits the choice without removing the value of responding to new information.
These choices also involve managers, customers, sponsors, and purchasing teams. A delivery team cannot collaborate on changing needs if every purchasing agreement forbids changes. How the organization funds work and reports progress can support or block the same values.
Key Takeaways
- Name the decision and identify the value pair before choosing an action.
- Keep the useful purpose of tools, documents, plans, and agreements.
- Several values can guide one scope decision.
- Adapt the work within real legal, budget, and date constraints.
2The twelve principles in practice
The twelve principles turn broad values into guidance for delivering work and supporting the people doing it. Some concern customers and usable results; others concern collaboration, quality, pace, and improvement. They work together: feedback helps little when the team cannot act on it, and repeated delivery becomes hard when quality deteriorates. The examples show how to recognize the behavior behind each principle.
2.1 Deliver value and use change
Customers gain value when they can use a result to do something that matters. Four principles connect that value to early delivery, frequent feedback, and changing needs: principles 1, 2, 3, and 7.
Start delivering useful results early
Principle 1 makes customer satisfaction through early and continuing delivery of valuable software the highest priority. Early delivery means something usable reaches customers before the whole product is finished. Continuing delivery means useful results keep arriving afterward. A completed technical component that customers cannot use does not yet supply that benefit.
Principle 3 calls for frequent delivery of working software, from a couple of weeks to a couple of months, with a preference for the shorter interval. Each delivery gives users another chance to discover whether the team understood their needs. A pilot group can receive and use the result even when a wider release is not ready. A demonstration gives evidence about progress, but watching a demonstration alone is not receiving something to use.
Welcome changes that improve value
Principle 2 welcomes changing requirements, including late changes, because new information can help the customer compete. A retailer may learn that shoppers now expect a faster checkout after a competitor introduces one. Finishing the old feature order without reconsidering checkout would ignore information that affects the product's value.
Welcoming a request means taking it seriously and weighing its value and urgency. Most changes affect upcoming work. An urgent, valuable change can also adjust current work while the team protects the current cycle's goal. Some low-value requests wait or are never built. Immediate switching for every request can leave many items started and few usable.
Measure what works
Principle 7 makes working software the primary measure of progress. Hours worked, tasks closed, or documents approved describe activity. They do not show how much useful behavior the product can perform. Working results show what is possible now and give users a basis for specific feedback.
At the end of month 2, Team A reports, “Design document approved; coding 60% complete.” Team B reports, “Customers can register and log in, and 40 test users have given feedback.” Team B has demonstrated working capability. Team A's percentage leaves important questions open: has testing happened, can users complete a task, and do the pieces work together?
How the principles reinforce one another
Frequent delivery makes early and continuing delivery possible. It also creates more points where the team can respond to change. The working result supplies evidence for deciding which change matters. Without that evidence, a team can deliver frequently while repeatedly solving the wrong problem.
For a nonsoftware service, use the same test of usable value. If an employee-support team introduces a working request process that staff can try, it can learn from actual requests. A presentation about a future process can attract comments, but it cannot reveal all the difficulties of using that process.
Key Takeaways
- Principle 1 prioritizes customer satisfaction through early and continuing value.
- Principle 2 welcomes changes and weighs their value and urgency.
- Principle 3 favors frequent delivery at shorter intervals.
- Principle 7 measures progress primarily through working results.
- A pilot release supports real use; a demonstration alone is not delivery.
2.2 Collaborate, support people, and trust the team
A team needs both business knowledge and the skills to turn that knowledge into a working result. Principles 4, 5, 6, and 11 explain how collaboration and trust help those people make good decisions.
Bring business and delivery knowledge together
Principle 4 asks business people and developers to work together daily throughout the project. Business people understand needs and value. Developers understand how a solution can work and what it will take to build. Daily access lets them resolve questions while the work is happening.
A product manager who emails requirements once a month creates a long wait whenever a question arises. If a business expert joins the team's daily discussions, the team can resolve an unclear rule the same day. This also allows the expert to discover technical limits before committing to an unsuitable solution.
Give people support and responsibility
Principle 5 asks organizations to build around motivated individuals, provide the environment and support they need, and trust them to do the work. Support can mean access to users, reliable tools, time to test, or help removing an approval delay. Managers provide direction and remove obstacles without directing every individual task.
Trust goes with accountability. A team can choose how to reach a goal while showing honest progress and accepting responsibility for its results. Requiring permission for every small decision slows learning; leaving the team without goals or support also undermines the principle.
Use rich two-way communication
Principle 6 identifies face-to-face conversation as the most effective and efficient way to convey information within a development team. People can ask follow-up questions immediately and notice misunderstanding through responses and tone.
The principle was written in 2001, when shared offices were more common. Distributed teams apply its intent with video calls, shared screens, and direct messages when clarification is needed. Lasting decisions and user guidance still need suitable written records. A short conversation can resolve a question, and a brief decision note can make the result available to someone in another time zone.
Let designs grow from team learning
Principle 11 says that the best architectures, requirements, and designs emerge from self-organizing teams. Architecture is the overall structure of a solution. Requirements describe what it needs to do, and design describes how the parts will work.
Self-organization means the team decides how to do its work within goals and constraints. As it builds, tests, and learns together, its design can improve. This is how a design emerges from experience. It does not require the absence of leadership or an initial design.
The 2020 Scrum Guide uses the related term self-managing: the team also decides who does what and when. A manager can support this by helping obtain missing expertise while leaving the team to organize the work. A team that owns the method but cannot obtain necessary information has only part of the support it needs.
Key Takeaways
- Principle 4 calls for daily business and developer collaboration.
- Principle 5 combines motivation, support, and trust.
- Principle 6 favors rich conversation, supported by lasting records where useful.
- Principle 11 places the growth of designs and requirements in self-organizing teams.
- Self-organization operates within goals, constraints, and accountability.
- Self-management also concerns who does the work and when.
2.3 Keep pace and quality while improving the work
Frequent delivery must be repeatable. Principles 8, 9, 10, and 12 connect a sustainable pace to technical quality, simplicity, and deliberate improvement of the way a team works.
A pace people can keep
Principle 8 calls for a pace that sponsors, developers, and users can maintain indefinitely. A team that needs 60-hour weeks at the end of every cycle is borrowing effort from its future capacity. Fatigue increases mistakes, and those mistakes create more work. A steady pace helps the team make more reliable forecasts because its normal output is a more useful guide.
Look at repeated patterns, not one successful deadline. If every cycle needs emergency overtime, the amount of work being planned or the process used to complete it needs to change.
Make future change affordable
Principle 9 connects agility to continuous attention to technical excellence and good design. Tested, well-structured work is easier to change safely. Cutting tests may make today's task appear faster while increasing the cost of the next change.
Technical debt is extra future effort caused by limitations in current code or design. It can result from a deliberate shortcut or from later learning that shows an earlier reasonable design no longer fits. Its “interest” is the additional effort required whenever the affected part changes. Improving the design or code reduces that burden.
Do the useful work well
Principle 10 treats simplicity as maximizing work that does not need to be done. Users asking for a weekly sales report may need one exportable table, not a configurable dashboard with 15 chart types. A short conversation can reveal the smaller useful result before the team commits to building every possibility.
This removes unused features and unnecessary polish, often called gold-plating. It can also remove process waste, such as a weekly report nobody reads. Testing stays because it helps make the result usable. Reducing scope and reducing quality have different consequences: the first can concentrate value, while the second can make even a small result unreliable.
Change the process, then check the effect
Principle 12 asks the team to reflect regularly on how to become more effective and then adjust its behavior. Reflection needs an action and a later check. Discussing the same complaint every cycle without changing anything leaves the problem in place.
For example, testing has been squeezed into the final day for two cycles. The team decides to test each item as soon as it is built. At the next reflection, it checks whether the final-day bottleneck has shrunk. It keeps the change if it helps, adjusts it if needed, or tries something else if the problem remains.
These principles connect through causes and consequences. Sustainable pace leaves attention for quality. Good design makes changes cheaper. Simplicity reduces unnecessary work, and reflection reveals where the team is losing time or creating avoidable rework. The useful improvement is specific enough that people can observe whether it changed the result.
Key Takeaways
- Principle 8 calls for a sustainable pace across repeated cycles.
- Principle 9 makes technical excellence part of responding to change.
- Technical debt increases future effort in the affected work.
- Principle 10 removes work that adds no value, while keeping necessary quality work.
- Principle 12 joins regular reflection to a behavior change and a check of its effect.
3Learn from evidence when work is uncertain
Some work can follow a reliable procedure; other work changes as people learn what is needed. The difference affects how you plan, check progress, and respond to problems. Complexity models help identify the kind of uncertainty involved. Empirical control then makes learning practical through visible work, careful inspection, and prompt adaptation. Short feedback loops limit how much effort can depend on a mistaken assumption.
3.1 Recognize the kind of uncertainty
A task can be difficult without being complex. The useful question is how well people can understand cause and effect and predict the result of an action. Two models help organize that judgment.
Requirements and technical uncertainty
A grid in PMI's Agile Practice Guide, inspired by Ralph Stacey's agreement–certainty matrix, considers two uncertainties:
- Requirements uncertainty: how well people agree on and understand what is needed.
- Technical uncertainty: how sure they are about how to build it.
Low uncertainty on both axes gives simple work. As uncertainty rises, work becomes complicated and then complex. When both are extremely uncertain, the grid describes chaotic work. Reduce uncertainty enough to make reliable progress, perhaps by choosing proven technology while exploring what users need. Iterative and incremental approaches are useful in the complicated-to-complex region, where enough is known to begin but small tested steps help resolve the unknowns.
Cynefin: choose a response that fits
Dave Snowden created Cynefin, widely introduced through his 2007 article with Mary Boone. It distinguishes clear, complicated, complex, chaotic, and confusion. Clear was formerly called simple and then obvious; confusion was formerly called disorder.
| Domain | Cause and effect | Response |
|---|---|---|
| Clear | Obvious and repeatable | Sense, categorize, respond using a known best practice. |
| Complicated | Discoverable through analysis or expertise | Sense, analyze, respond using a suitable good practice. |
| Complex | Understood through patterns that emerge in hindsight | Probe, sense, respond with small safe-to-fail experiments. |
| Chaotic | Effective controls have broken down; useful cause and effect cannot be established in time | Act, sense, respond to stabilize, then reassess. |
| Confusion | The applicable domain is unclear | Break the situation into parts and assess each part. |
Clear and complicated work belong to order: analysis and reliable constraints make prediction possible. Complex work calls for learning through probes. Chaotic work needs stabilization first. The uncertainty grid and Cynefin are related aids to judgment, not interchangeable classification systems.
Classify by predictability
A documented password reset is clear. Diagnosing a slow database through specialist analysis is complicated. Discovering how people will respond to a new product is complex. A payment outage becomes chaotic when normal controls fail and nobody can establish what is happening quickly enough; switching to a backup may restore stability.
Severity alone does not make an outage chaotic. A serious but familiar failure with a known recovery procedure may be clear or complicated. Size is also a poor guide: a large highway-resurfacing job with proven methods can be predictable, while one small feature can produce an uncertain market response.
Different parts of a project can belong to different domains. A payment-service connection may be analyzable, while the choice of features users will value needs experiments. Classify those parts separately before choosing how to manage them.
Key Takeaways
- Requirements uncertainty concerns what is needed; technical uncertainty concerns how to build it.
- Complicated work can be analyzed; complex work needs experiments and observation.
- Chaotic work needs stabilization before the next approach is chosen.
- Confusion calls for separating the situation into parts.
- Classify by predictability and conditions, not by size or severity.
- One project can contain work in several domains.
3.2 Defined and empirical control
Process control is how people keep work producing acceptable results. A reliable repeatable process can be defined in detail. Work with uncertain outcomes needs observation and adjustment while it proceeds.
Match control to predictability
| Control model | Basis for decisions | Example |
|---|---|---|
| Defined | Known steps reliably turn similar inputs into similar outputs. | A commercial bakery follows its standard loaf process. |
| Empirical | Observed results guide the next action because the outcome cannot be fully predicted. | A team tests which learning-app features people actually use. |
Defined process control works when the process is well understood. People can specify the steps, repeat them, and check for deviations from a standard. An assembly line or a routine monthly payroll run fits this pattern. Monitoring is still useful: defined control does not mean ignoring results.
Empirical process control fits work that cannot be fully specified in advance or whose results are not predictable. Empiricism means that knowledge comes from experience and decisions rest on observation. The team acts, checks the actual result, and adjusts its next choice.
Why detailed plans lose accuracy
In complex work, users often understand their needs better once they try a result. Technology can behave unexpectedly, and people respond to each other's actions. A detailed long-range feature plan therefore contains assumptions about needs and behavior. Treat it as a hypothesis to test: a possible account of what will work, subject to evidence.
Ken Schwaber brought the defined-versus-empirical distinction from industrial process-control engineering into his thinking about software development. The Scrum Guide 2020 identifies empiricism and lean thinking as Scrum's foundations. Lean thinking concentrates on essentials and reduces waste.
Compare two decisions
A bakery makes 2,000 standard loaves each day. It knows the recipe and process and checks batches against an established standard. When a batch deviates, it restores the process conditions that normally give the expected result.
A team creating a language-learning app has a different unknown: which features will learners use? A small working version built in two weeks lets people try the experience. The team observes actual use and decides which feature to improve or add next. Repeating the initial feature plan more faithfully would not answer the question about users.
Planning remains useful
An empirical team still needs a goal, a near-term plan, and boundaries such as budget and quality. It plans in shorter horizons and revises that plan when observations change its understanding. Three pillars support that learning: transparency, inspection, and adaptation.
Demanding that a new-product team meet every detail of a twelve-month feature plan can reward delivery of an unwanted product. Applying experiments to a standard expense claim has the opposite problem: it adds exploration where a reliable procedure already works. The control model follows the predictability of the work.
Key Takeaways
- Defined control relies on a known, repeatable process.
- Empirical control relies on observing results and adjusting decisions.
- A plan for complex work is a hypothesis that evidence can change.
- Empirical teams still plan toward goals within constraints.
3.3 Make inspection lead to change
Empirical control depends on three linked pillars: transparency, inspection, and adaptation. Together they let people see the real situation, judge it, and respond before more work drifts off course.
Transparency: share the real state
Transparency means that the work, process, and actual progress are visible to the people doing and receiving the work. The words used to describe that progress must have a shared meaning. A board full of green labels can mislead people if “done” means something different to each group.
Useful transparency includes blocked work and unresolved quality problems. If inspection is used to blame individuals, people have an incentive to hide those problems. Treating an early problem report as useful information protects the evidence the team needs.
Inspection: check against a goal or standard
Inspection means checking the work and progress often enough to detect unwanted differences early. It asks what actually works, whether the result meets users' needs, and whether progress supports the goal. Inspection needs accurate information; a carefully analyzed but misleading report can still produce the wrong decision.
Teams inspect three related things: the product, the plan and progress, and the process used to do the work. Principle 12 applies this learning specifically to the process.
Adaptation: act on what was learned
Adaptation is an adjustment when inspection reveals unacceptable results, harmful drift, or a result that will not meet the need. Make the adjustment as soon as possible to limit further drift.
People also need authority to act. If every adjustment waits weeks for approval, useful observations cannot quickly improve the work. Trust and self-organization support adaptation by putting decisions close to the people who understand the problem.
Work through a misleading progress report
Developers mark 8 of 10 items “done,” meaning coded. Stakeholders read “done” as tested and usable. A demonstration shows that 3 of those 8 items cannot be used because they were never tested.
- Identify the transparency failure. The same label carried two meanings, so the board hid the actual state from stakeholders.
- Use the inspection result. Only 5 items are currently usable: 8 reported done minus 3 that fail the shared need.
- Adapt the standard and work. Agree that done includes required testing, report 5 of 10 as usable, and finish the remaining 3 coded items before starting new work.
Changing only the label without completing the unfinished work would leave the delivery problem unresolved.
Regular inspect-and-adapt points make this cycle dependable. Honest reports based on working results avoid “watermelon” reporting: a green outer status hiding serious problems inside.
Key Takeaways
- Transparency requires visible facts and shared meanings.
- Inspection compares actual work and progress with goals and standards.
- Adaptation changes the work or process promptly when inspection shows a need.
- Learning weakens if reporting is misleading, inspection produces no action, or the team lacks authority.
- Inspect the product, plan and progress, and process.
3.4 Short feedback loops and work at risk
A feedback loop connects an action to its result, learning, and an adjustment. Its length is the time between doing something and finding out whether it was right. The delay matters because more work can accumulate on top of an untested assumption.
Match the loop to the question
Different loops answer different questions. Automated tests can reveal a defect in seconds or minutes. Pair work can expose misunderstanding while work is being done. Integration and daily coordination can reveal conflicts within hours or a day. A usable increment tried over weeks can reveal whether people can complete their tasks. Market results over months can show whether the product creates the expected value.
A fast technical test cannot tell you whether customers want the feature. A customer review of screen colors cannot test whether a payment calculation is accurate. The feedback must actually reach the assumption being tested.
Calculate the effort exposed
A team has 5 people, each working 40 hours per week. Weekly effort is:
That is 200 person-hours of work each week. If an assumption goes untested across a 26-week project, the effort that may depend on it is:
If a two-week feedback point tests and exposes the wrong assumption, the work accumulated in that interval is at most:
The longer interval exposes 13 times as much effort, because . These are possible amounts of work resting on an assumption, not a prediction that every exposed hour will be wasted. The bound applies only if that next feedback point detects the error.
Turn a feature into a test
A team proposes, “If we remind shoppers about abandoned carts, at least 5% of those carts will be completed within a month.” This is a testable hypothesis: it names an expected effect, a measure, and a time window.
Build the smallest version that can test it, measure the result, and decide whether to keep, change, or drop the feature. A feedback loop ends with a decision. Collecting the number and leaving the plan untouched misses the adaptation step.
Improve through small trials
The plan-do-check-act cycle, or PDCA, expresses the same learning pattern. It is also called the Shewhart or Deming cycle. Plan a change, try it on a small scale, check the result, and act by adopting, adjusting, or abandoning it.
Choose the shortest interval that can produce meaningful evidence. Reviewing work so often that nothing usable is available creates meetings without learning. Waiting much longer than needed allows more dependent work to accumulate and can make a later correction more expensive.
Key Takeaways
- A feedback loop includes learning and an adjustment after observing a result.
- Choose feedback that tests the product, technical, or process assumption in question.
- Effort exposed equals people × hours per person per week × weeks until relevant feedback.
- A shorter interval limits exposure only when the feedback detects the mistaken assumption.
- PDCA means plan, do, check, act.
- The shortest useful loop must still produce meaningful evidence.
4Deliver useful pieces and learn from them
Repeating work and delivering pieces solve different problems. Repetition improves the solution; usable pieces bring value into use sooner. Agile delivery combines both, using feedback to improve the next useful result. You will compare these patterns, split work into small complete paths for users, and calculate how timing changes benefits. The calculations also show why earlier value and less total work are different claims.
4.1 Iteration, increments, and delivery patterns
An iteration revisits work to improve it. An increment adds a finished, usable piece to a product. A team can repeat work without delivering it, or deliver pieces without making much use of feedback. Agile combines both kinds of learning and delivery.
Compare four life cycles
A life cycle describes how work moves from an idea to a delivered result. PMI's Agile Practice Guide uses the following simplified comparison:
| Life cycle | Requirements and activities | Delivery pattern | Main emphasis |
|---|---|---|---|
| Predictive | Requirements are fixed early; activities are planned for the whole project. | Usually one final delivery. | Manage cost against the plan. |
| Iterative | Requirements develop; activities repeat to refine the solution. | Can remain a single delivery. | Get the solution right. |
| Incremental | Requirements can develop; work is completed per increment. | Frequent smaller deliveries. | Put usable results into use sooner. |
| Agile | Requirements develop; refinement and delivery occur together. | Frequent small deliveries with feedback. | Customer value and adaptation. |
Think of two dimensions: how much the work changes and how often a result is delivered. Predictive work is low on both. Iterative work emphasizes change through refinement but may deliver only once. Incremental work emphasizes delivery frequency with less refinement. Agile is high on both. Every pattern includes planning; the timing and depth of planning differ.
Separate improving from adding
A designer shows a rough sketch, then a clickable prototype, then a refined design. Feedback improves the same solution: this is iterative. If nothing is yet in use, the team has not delivered a usable product increment.
An online shop launches browsing and checkout, then adds reviews and wish lists in later deliveries. Each addition expands what users can do: this is incremental. If the team also changes those capabilities in response to actual use, it is working iteratively as well.
Start with a usable means to an end
Henrik Kniberg's transport illustration begins with a customer's need to get from A to B. A wheel, chassis, and body do not meet that need separately. A skateboard, then a scooter, bicycle, motorcycle, and car each offers a usable result, with feedback influencing what comes next. The point is to learn about the underlying need through use. It is a product-development analogy, not a manufacturing sequence.
Keep the cycle meaningful
A timebox has a fixed duration, such as two weeks. When the work does not fit, reduce scope while keeping the end date. Teams inspect the result at the boundary. Some agile approaches, including Kanban, organize delivery through continuous flow instead of fixed cycles.
Two-week cycles filled with untested half-features can simply repeat a small waterfall. The calendar alone supplies no usable increment. Completing a database layer first and all screens last has the same weakness: the components may be real technical progress, but users still cannot complete the task.
Key Takeaways
- Iterative work refines a solution through repeated feedback.
- Incremental work delivers usable additions.
- Agile combines iterative learning and incremental delivery.
- Predictive work plans most detail early for relatively stable work.
- A timebox keeps its end date; scope changes to fit.
- A repeated cycle is useful only when its result supports inspection and use.
4.2 Choose small slices that users can try
A small increment needs a complete purpose. A vertical slice crosses all the layers required for one limited user task. A horizontal slice completes a technical layer that users cannot yet use on its own.
Follow one path from start to finish
A food-delivery app needs a screen, business rules, and stored data to complete an order. A horizontal plan finishes the database in month 1, the back-end logic in month 2, and the screens in month 3. Users wait three months to try the service.
A vertical first slice lets a customer order a dish from one restaurant and pay by card. It includes the necessary screen, rules, storage, and testing for that limited path. Later slices can add more restaurants, delivery tracking, and saved favorite orders. Each addition expands an experience people can already use.
The first slice is narrower than the full service, but the path works. A visible “Pay” button with no working payment is too thin: it cannot show whether users can actually complete payment.
Ways to split a larger result
Choose a boundary that preserves a meaningful task:
- Workflow: support ordering first, then later tasks such as tracking.
- User type: serve customers before adding a restaurant-owner interface.
- Rule variation: support card payments before other payment methods.
- Data range: serve one city before expanding to more cities.
- Simple case: support the ordinary path before adding uncommon exceptions.
- Performance: first make the task work, then improve its speed where needed.
A workflow step is a good slice only when it delivers usable value in context. Splitting steps into isolated buttons or unfinished screens loses that purpose. Necessary exceptions and quality checks still have to be handled for the limited users and conditions included in the slice.
Use an MVP to test an assumption
Eric Ries popularized the minimum viable product, or MVP, in The Lean Startup in 2011. It is the smallest version that lets the team test an important assumption with real users and learn from the result. Its purpose is learning.
For example, a simple web page can test whether people sign up for a proposed service before the full service is built. That page tests interest; it does not test every detail of using the future service. Choose the assumption first so the small version produces relevant evidence.
Minimal scope is different from low quality. What the MVP contains must work well enough to give honest feedback. A broken signup form would confuse lack of demand with a failure to submit.
Decide what comes first
Order slices by both value and risk. Delivering a valuable capability early gives benefits sooner. Testing a risky assumption early can prevent later work from depending on a false belief. Put low-value work later; learning may show that some of it is unnecessary.
A useful increment is small enough to finish within the cycle, valuable to someone, usable or testable by real users, and built to the agreed quality standard.
Key Takeaways
- A vertical slice completes one limited user path across the layers it needs.
- A horizontal technical layer may not give users anything usable.
- An MVP tests an important assumption with real users.
- Minimal scope still needs enough quality for honest feedback.
- Order work to bring value and test risky assumptions early.
4.3 Calculate the value of earlier delivery
Delivery timing changes how long people receive a benefit. Frequent release can create value and feedback before the whole product is finished, even when the total build effort stays similar.
Count the months of real use
A team builds four independently usable features, one per month. Each creates $2,000 of benefit per month once in use. Compare the first six months, with releases at month-end and benefits beginning the next month. Assume release costs are small.
| Plan | Months of use within the six-month window | Total benefit |
|---|---|---|
| Release all four at the end of month 4 | Each feature: months 5 and 6 | 4 × 2 × $2,000 = $16,000 |
| Release each at the end of its build month | Features: 5, 4, 3, and 2 months | (5 + 4 + 3 + 2) × $2,000 = $28,000 |
For the frequent plan, the feature-month subtotal is . The benefit is dollars. The earlier deliveries add $12,000 within the same period. The comparison depends on each feature being useful separately.
Order changes the total too
Two features each take a month. X produces $3,000 per month in use; Y produces $1,000. Across four months, with benefits starting after month-end release:
- X first: X earns for 3 months, giving $9,000. Y earns for 2 months, giving $2,000. Total: $11,000.
- Y first: Y earns for 3 months, giving $3,000. X earns for 2 months, giving $6,000. Total: $9,000.
Putting the higher-value feature first adds $2,000. Cost of delay is the benefit lost by waiting. With a steady benefit of $2,000 per month, a one-month delay loses $2,000 of benefit. Compare that loss with release effort, dependencies, and risks when ordering real work.
Earlier use gives earlier evidence
If users reject the first feature, monthly release reveals that through real use after the first month. Waiting for the four-feature release reveals it through use only after month 4, when later work may share the mistaken assumption. A single final release can still use prototypes, demonstrations, and other checks earlier; what it postpones is the benefit and feedback from actual delivered use.
Usable increments also leave options open. After three valuable increments, the organization can stop if the next adds too little value and use the remaining budget elsewhere. In a single-delivery plan, stopping early may leave no usable result.
Check whether the benefit can arrive in pieces
A bridge has limited transport value until it spans the river. Its design may improve iteratively, but opening an unusable portion cannot create the same benefit as a working crossing. Frequent delivery helps most when users can use pieces and respond in time.
Repeated integration and release work can add effort. Earlier benefits and lower risk of building the wrong product are the gains being evaluated; finishing the entire project sooner is a separate question.
Key Takeaways
- Count benefit only from the point a delivered feature is in use.
- Earlier delivery and higher-value ordering can increase benefit within a fixed time window.
- Cost of delay is the benefit lost while waiting.
- Real use tests assumptions and can support a decision to stop.
- Frequent release depends on usable pieces and timely feedback.
- Earlier value does not guarantee less total effort.
5Choose an approach and spot misuse
An approach fits when its way of learning and controlling work matches the situation. Uncertain needs, usable slices, and access to customers can favor adaptive work; stable requirements and expensive irreversible changes can favor a predictive plan. Team authority and organizational habits matter too. You will use these conditions to make a choice, then diagnose claims and practices that prevent useful learning despite an agile label.
5.1 Choose adaptive, predictive, or hybrid work
Choosing an approach means matching how work is planned and controlled to what is known, what can change, and how people can learn. Industry labels alone are not enough.
Compare the options
| Approach | How the work is controlled | Conditions that favor it |
|---|---|---|
| Adaptive | Scope evolves through short cycles, usable increments, and feedback. | Uncertain needs or technology, frequent change, and accessible users. |
| Predictive | Scope, schedule, and cost are planned in detail early; changes are controlled. | Stable needs, proven methods, and expensive changes to completed work. |
| Hybrid | Different parts combine adaptive and predictive elements. | Discovery benefits from feedback while another part needs a defined sequence. |
Adaptive work needs enough knowledge to start and a practical way to get timely evidence. Research, new domains, and products whose final shape is hard to describe can benefit. Predictive work fits a known result that is difficult to deliver in parts or costly to redo, such as concrete foundations.
Check the organization as well as the product
PMI's Agile Practice Guide groups nine suitability attributes into three areas:
- Culture: buy-in, trust in the team, and decision-making power.
- Team: size, experience, and access to customers or business representatives.
- Project: likelihood of change, criticality, and whether incremental delivery is possible.
Its filter scores the attributes and plots them on a radar chart. Scores near the center suggest an agile fit; outer scores suggest predictive work; intermediate patterns suggest a hybrid. The most favorable team-size score is for a core team of 1–9 people. The filter supports discussion of the actual conditions; a score is not a substitute for understanding a serious weakness.
Criticality concerns the consequences of failure, from inconvenience to loss of life. High criticality increases the need for verification and records. It can be handled within agile work or through a hybrid structure, so it does not rule agile out by itself.
Apply the fit test
A bank team of 7 is building a mobile budgeting feature. Needs are uncertain, a beta group can try small releases, and management trusts the team. Uncertainty, incremental value, customer access, and authority point toward adaptive work.
Replacing a factory fire-suppression system follows a fixed building-code specification. The result is useful only when complete and certified, and failure could endanger people. Stable requirements, whole-system value, and criticality point toward predictive control.
Medical-device software may benefit from short development and test cycles, while validation, submission, and hospital rollout follow a planned sequence. A hybrid combines the learning needs of development with the defined rollout.
Do not choose agile because the label sounds modern or promises speed. If users are unavailable or the team cannot act on findings, address those conditions in the choice. Different parts of one project can need different control models.
Key Takeaways
- Adaptive work favors uncertainty, usable increments, timely feedback, and team authority.
- Predictive work favors stable requirements, proven methods, and costly changes.
- Hybrid work combines approaches where the parts have different needs.
- Assess culture, team, and project conditions together.
- High criticality calls for verification and records, not an automatic ban on agile.
5.2 Correct common claims about agile
Agile changes how teams plan and learn. Several common claims confuse flexibility with an absence of discipline or treat one framework as the whole approach.
Planning and commitments remain
Agile teams plan at several levels, from long-term direction to the coming days. Near-term plans are detailed enough for action; later plans develop as learning grows. “No planning” would remove the basis for deciding what to try or checking whether work serves the goal.
Dates and budgets can remain fixed while scope changes. For a March 1 launch, the team builds the most important features first. Less valuable work can be left out if it does not fit. Adding every new request without changing anything else would make that commitment unreliable.
Change is considered by value and urgency. Most requests affect upcoming work, while an urgent request can justify adjusting current work in a way that protects its goal. Constant interruption is not the intended meaning of welcoming change.
Useful records and leadership remain
Working software has priority over comprehensive documentation, but records with a purpose remain. Compliance evidence, user help, and decisions needed by future teammates are examples. “Just enough, just in time” means matching the record to its need and updating it when useful; it does not justify leaving essential information unavailable.
Leadership also remains. Leaders provide clear goals, remove obstacles, and create a supportive environment. This is often called servant leadership. A self-organizing team has responsibility for how it works, along with accountability for results. Supportive leadership is different from either directing every task or abandoning the team.
Separate the approach from a framework
| Claim | Accurate understanding |
|---|---|
| Agile and Scrum are the same. | Scrum is one framework; XP, Kanban, Crystal, and DSDM are other examples under the umbrella. |
| Agile is only for software. | It can fit other work with uncertainty, usable pieces, and timely feedback. |
| Agile guarantees faster, cheaper completion. | It aims for earlier value and learning; total effort and cost can still be high. |
| Agile permits less discipline. | Frequent working results require testing, technical quality, and honest progress information. |
Explain the actual trade-off
Suppose a team can deliver a useful employee service in three stages instead of one final launch. The benefit may begin sooner, and feedback may prevent unnecessary later features. Three releases can also require more coordination than one. The case for agile rests on the value of earlier use and learning, not on an unsupported promise about total cost.
When someone uses an agile claim to justify a decision, connect it to the affected value or principle. Skipping tests conflicts with working results and technical excellence. Removing every plan conflicts with the need to choose and inspect purposeful work. The correction should name the useful practice the team needs to keep.
Key Takeaways
- Agile planning is repeated and refined as learning grows.
- A fixed date and budget can be met by adjusting scope.
- Useful documentation and supportive leadership remain necessary.
- Scrum is one agile framework.
- Agile seeks earlier value and learning without guaranteeing lower total cost.
5.3 Diagnose agile in name only
An agile label can hide decisions that block collaboration, quality, or adaptation. Diagnose the behavior, explain its effect, and propose a change tied to the values and principles.
Rituals without learning
Cargo-cult agile copies visible practices such as task boards, daily meetings, or two-week cycles while keeping decisions that prevent learning. Ask whether each practice helps people inspect real results and adapt. Renaming roles or phases leaves the old behavior intact if authority and feedback do not change.
Water-Scrum-Fall, a name Dave West used in 2011, describes fixed upfront requirements, short development cycles, and a large final batch of testing and release. Cycles cannot change the requirements, and users receive value late. Involve users during the work, allow needs to be reconsidered, and deliver tested usable increments more often.
Quality that cannot support change
Martin Fowler's 2009 term Flaccid Scrum describes adopting agile planning practices while neglecting technical quality. Code becomes harder to change, so progress slows. Automated tests, regular code improvement, and frequent integration help restore the technical excellence required by principle 9.
More meetings will not repair a codebase that resists every change. The corrective action must address the cause: the effort and uncertainty created by poor internal quality.
Measures that distort the work
Ranking teams by tasks closed or estimate points completed can encourage people to inflate estimates or split work into artificial tasks. This illustrates Goodhart's law: targeting a measure can weaken its usefulness as a measure. A higher reported number can occur without more customer value.
Use measures to learn about outcomes, quality, and the time from request to delivery. Discuss why a result changed. Making an output number into a league table encourages different behavior from using it to understand a problem.
Pressure that prevents sustainable work
Ron Jeffries calls oppressive misuse Dark Scrum. Repeated overtime and daily meetings turned into reports to a controlling manager undermine trust and sustainable pace. Let the team plan to its real capacity, show progress honestly, and use leadership to remove obstacles.
Diagnose several causes together
Company X fixes a twelve-month requirements document, develops in two-week cycles, and delays testing and release until month 12. Managers rank teams by tasks closed, and overtime ends each cycle.
- The fixed requirements and late release show Water-Scrum-Fall. Introduce usable pilot deliveries and review needs with users.
- The task ranking creates a gaming incentive. Look at delivered outcomes and quality instead.
- Recurring overtime conflicts with principle 8. Plan work to sustainable capacity and address the bottleneck.
A single new meeting cannot fix all three. Long approval chains, budgets tied to fixed scope, and individual output targets can preserve the same problems across teams. Changing decision-making and culture gives the practical improvements room to work.
Key Takeaways
- Judge practices by whether they produce evidence, collaboration, and adaptation.
- Water-Scrum-Fall keeps fixed requirements and late release around short development cycles.
- Flaccid Scrum neglects the technical quality needed for change.
- Performance targets can encourage gaming of output measures.
- Dark Scrum uses pressure and control that undermine trust and sustainable pace.
- Corrections must address the cause, including organizational decisions.
Agile Values and Principles examples
1Use values to choose the next action
11 steps
- 1IntroductionBegin with the choice
An employee-support team wants people to receive help sooner. It has bought a tracking tool, but requests still wait while teammates exchange long messages.
Agile values help judge the choices behind this delay. Follow the team from its working habits to a specific decision about communication, useful results, and a fixed opening date.
- 2ExplanationA mindset has visible consequences
Agile describes how people create and respond to change. Its values establish priorities, its principles guide behavior, and practices put the ideas into action.
A tracking board is a practice or tool choice. Whether it helps people discover problems and adjust the work is a question about the mindset. Buying the board cannot answer that question by itself.
- 3ConnectionOne framework within a broader idea
The Agile Manifesto came from seventeen practitioners who met at Snowbird in 2001. They shared experience with lightweight approaches, including Scrum and XP.
Their shared values could guide several approaches. Scrum therefore belongs under the agile umbrella; choosing its framework does not replace the need to make decisions consistent with those values.
- 4ChallengeCheck what the new board changed
The support team logs every request but still refuses to change its process after users report delays. Has the board established an agile way of working?
---reveal---
No. It makes requests visible, but the team is copying a practice without responding to evidence. The useful change is to use the reported delays to reconsider how requests move through the service.
- 5ExplanationRead a preference, not a ban
Each Manifesto value gives a left-hand item priority over a right-hand item that still has value. The priorities are people and interactions, working software, customer collaboration, and responding to change.
Processes, documents, contracts, and plans remain useful. The decision is how they support the priority when the two compete.
- 6ExampleResolve the unclear request
A request is waiting because two teammates read a rule differently. The tool requires a new comment before either can answer.
The value of individuals and interactions favors a direct conversation to resolve the meaning. Afterward, a short note in the tool preserves the decision for other teammates. The note supports the conversation’s result.
- 7ChallengeChoose the useful record
The team wants to remove a short user guide because working results have priority over documents. New users rely on that guide to submit requests. What should happen?
---reveal---
Keep and update the useful guide. The value gives working results priority over comprehensive documentation; it does not remove information people need to use the result successfully.
- 8TipApply four questions
Start with a decision people actually face. Name its value pair, identify what the preferred side gains, and ask what useful support the other side still provides.
Then choose the action that favors the priority within the real constraints. This turns a general value into a choice the team can carry out and explain.
- 9ExampleA fixed date with changing scope
The service must open in four weeks. A complete path for one request type is feasible, but the team has planned six types. Feedback shows that one type covers the most urgent need.
Keep the date, build that working path with its required checks, and agree which other types come later. The plan changes in response to evidence without losing the opening-date constraint.
- 10ChallengeConnect collaboration with adaptation
Users now prefer request tracking to an optional export. Both take equal effort, and the agreement permits swaps. What should the team discuss and change?
---reveal---
Discuss the users’ value and agree whether tracking should replace the export. Then update the scope and plan. Collaboration establishes the trade-off; responding to change puts the new understanding into the work.
- 11RecapKeep the decision method
When a choice becomes difficult, identify the value pair and the constraint separately. Give the preferred item priority, then retain the tools, records, agreements, and planning the work actually needs.
A useful way to check your reasoning is to name the behavior that changes. A value applied to work produces a different decision, not just a different label.
2Build a service the principles can support
14 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionA result people can use repeatedly
- 2ExplanationBegin with one useful booking path
- 3Key InsightEvidence of working progress
- 4ChallengeHandle the new need
- 5ExampleAnswer business questions during the work
- 6TipUse conversation and preserve decisions
- 7ExplanationTrust needs a supported environment
- 8ChallengeRepair the support gap
- 9ExplanationRecognize a pace that will fail
- 10ConnectionKeep changes affordable
- 11ExampleRemove unused scope
- 12ChallengeTry one process improvement
- 13ChallengeConnect value, support, and quality
- 14RecapRead the principles as connected behavior
3Trace evidence from uncertainty to a decision
18 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionChoose what evidence you need
- 2ExplanationSeparate two uncertainties
- 3ExampleComplicated and complex need different work
- 4TipStabilize when control has broken down
- 5ChallengeClassify the actual problem
- 6ExplanationRepeat known work or learn from results
- 7Key InsightTreat a plan as a testable proposal
- 8ChallengeChoose a control model
- 9ExampleMake the report understandable
- 10ExampleInspect the actual capability
- 11ExampleUse the finding promptly
- 12ChallengeIdentify the broken link
- 13ExplanationSet up the exposure calculation
- 14ExampleCompare relevant feedback intervals
- 15Key InsightChoose an observation that can answer
- 16ChallengeComplete PDCA
- 17ChallengeConnect transparency with relevant feedback
- 18RecapCarry the chain into the next decision
4Build small useful slices and compare release plans
16 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionBegin with a useful task
- 2ExplanationImprove the same solution
- 3ExplanationAdd capability people can use
- 4ChallengeProtect the timebox
- 5ExampleCross every needed layer
- 6ExampleChoose the assumption first
- 7TipKeep the test honest
- 8ChallengeFind a useful reduction
- 9ExplanationFix the comparison window
- 10ExampleCalculate the final-only plan
- 11ExampleCalculate the frequent plan
- 12ConnectionInterpret cost of delay
- 13ChallengeTry a value calculation
- 14Key InsightRetain the option to stop
- 15ChallengeConnect slicing and learning
- 16RecapUse both timing and learning
5Choose a fit and repair the causes
13 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionStart with conditions you can observe
- 2ExplanationFind the adaptive conditions
- 3ExampleIdentify the predictable part
- 4TipInspect more than the product
- 5ChallengeResolve an incomplete fit
- 6ExplanationKeep real commitments
- 7ChallengeExamine the speed claim
- 8ExampleCheck where feedback can change work
- 9ConnectionRepair technical quality
- 10ExampleNotice the incentive behind the measure
- 11TipProtect trust and pace
- 12ChallengeChoose a cause-based correction
- 13RecapMake the recommendation specific
Agile Values and Principles practice questions
Set 1: Agile foundations in context10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Apply values and evidence10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Compare approaches and delivery10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Diagnose trade-offs and team practices10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Integrate value, risk, and constraints10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Accountability
Accumulated benefit
Adaptation
Adaptive approach
Agile
Agile Manifesto
Architecture
B
Big-bang delivery
C
Cargo-cult agile
Chaotic domain
Clear domain
Commitment
Complex domain
Complicated domain
Confusion
Constraint
Continuous flow
Cost of delay
Criticality
Customer collaboration
Customer value
Cynefin
D
Dark Scrum
Defined process control
Delivery
E
Effort exposed
Empirical process control
Empiricism
F
Feedback loop
Flaccid Scrum
Framework
G
Gold-plating
Goodhart’s law
H
Horizontal slice
Hybrid approach
Hypothesis
I
Increment
Incremental development
Inspection
Iterative development
J
Just enough, just in time
L
Lean thinking
Life cycle
M
Measure of progress
Mindset
Minimum viable product
O
Outcome
P
PDCA
Person-hour
Pilot release
Practice
Predictive approach
R
Reflection
Requirement
Requirements uncertainty
Responding to change
Risky assumption
S
Scope
Self-management
Self-organization
Servant leadership
Simplicity
Suitability filter
Sustainable pace
T
Technical debt
Technical excellence
Technical uncertainty
Timebox
Trade-off
Transparency
V
Value pair
Vertical slice
W
Water-Scrum-Fall
Watermelon reporting
Working software
- 1Agile Values and Principles
- 2Scrum Framework
- 3Product Backlog and User Stories
- 4Running Sprints in Practice
- 5Kanban and Flow
- 6Scaling Agile
About this lesson