Relevant Costs and Short-Term Decisions
BeginnerLesson 10 of 11 in Introduction to Management Accounting Course
What you will learn
- Separate the future cash flows that change with a decision from the costs that stay the same, and value each resource at what using it really costs the business.
- Compare alternatives using relevant costs and revenuesApply the relevance test and contribution margin thinking to compare the alternatives in a short-term decision.
- Leave out sunk, committed and other irrelevant costsRecognize past costs, costs already committed, non-cash charges and allocated overheads, and explain why they do not change a decision.
- Include opportunity costsIdentify the benefit given up when a resource is used one way instead of in its best alternative use, and count it as a cost of the chosen option.
- Value materials and labor at their relevant costApply the standard rules for the relevant cost of materials held in inventory or bought in, and of labor with idle time, overtime or other work to do.
- Compare alternatives using relevant costs and revenues
- Use relevant costs to decide whether to accept a one-off order at a special price and whether to produce a component or service in-house or buy it from a supplier.
- Accept or reject a special order when there is spare capacityEvaluate a one-off order by its incremental revenue and costs, and find the lowest price worth accepting.
- Evaluate a special order when capacity is fullCount the contribution margin lost on regular sales when an order needs capacity that is not spare, and compare other ways to fill all or part of it.
- Decide whether to make or buyCompare the relevant cost of producing an item in-house with the cost of buying it, including avoidable fixed costs, the use of freed capacity and non-financial factors.
- Accept or reject a special order when there is spare capacity
- Judge whether closing a product line, department or branch would raise profit, and whether processing a product further adds more revenue than it costs.
- Decide whether to keep or drop a segmentCompare the contribution margin a segment would lose with the fixed costs that closing it would avoid, and separate avoidable costs from allocated common costs.
- Look beyond the segment before closing itAccount for the effect on other segments, other uses of the freed resources and the non-financial consequences of a closure.
- Decide whether to sell a product as it is or process it furtherCompare the extra revenue from further processing with the extra cost, treating joint costs incurred before the split-off point as irrelevant.
- Decide whether to keep or drop a segment
- Find the factor that limits output and plan production to earn the greatest total contribution margin from it, then use its value in other decisions.
- Identify the limiting factorCheck each resource against what the maximum sales demand requires and recognize which one, if any, stops the business from meeting demand.
- Rank products by contribution margin per unit of the limiting factorRank products by the contribution margin each unit of the scarce resource earns, allocate the resource in that order up to demand, and work out the resulting profit.
- Use the limiting factor in other decisionsValue the scarce resource in special orders and make-or-buy choices, and judge what extra units of the resource are worth.
- Identify the limiting factor
- Combine relevant-cost calculations with non-financial factors and the limits of the method to give a clear, justified recommendation.
- Recognize the limits of relevant costing and weigh non-financial factorsExplain the assumptions behind short-term relevant cost decisions and the qualitative factors that can change a recommendation.
- Prepare a full relevant cost statement and recommendationBring the rules together in one statement that values every item, explains what is left out and ends with a justified recommendation.
- Recognize the limits of relevant costing and weigh non-financial factors
Relevant Costs study guide
1Identify the costs and revenues that matter for a decision
A cost report records what a business has spent and how costs were assigned. A decision needs a different view: what will change if one option is chosen? Learn to separate those cash effects from past spending and unchanged charges, then put a value on the opportunities sacrificed. Materials and employee time need particular care because the same recorded cost can lead to different relevant amounts depending on how the resource would otherwise be used.
1.1 Compare what changes
A business decision starts with alternatives. A bakery might keep its current opening days or add Saturdays. The useful question is how choosing Saturdays changes future profit and cash.
Apply the relevance test
A relevant cost or revenue is a future cash flow whose amount differs between alternatives. Ask three questions: Is it in the future? Does it involve money paid or received? Does the choice change it? A cost must pass all three. A future rent payment fails the last test if it continues either way. A depreciation charge fails the cash test.
Variable costs often change when output changes. Most fixed costs stay the same over a short period, when the business still has the same buildings, machines and permanent staff. But the labels alone cannot decide relevance. A fixed setup fee caused by a new order is relevant; a variable cost incurred under both alternatives cancels out.
Use contribution margin
Contribution margin is revenue minus variable costs. When fixed costs stay unchanged, an increase in total contribution margin increases profit by the same amount. Absorption cost can hide this relationship because it charges each unit a share of fixed overhead.
Suppose a unit has variable cost of $17 and absorbed fixed overhead of $8. Its full cost is $25. An extra sale for $20 brings $3 more revenue than variable cost. If the fixed total stays the same, profit rises by $3. The $5 loss suggested by comparing price with full cost is not the change in business profit.
UK courses often use the terms "contribution," "stock," "redundancy pay" and "key factor" for contribution margin, inventory, severance pay and limiting factor.
Work from differences or full totals
Opening the bakery on Saturdays adds monthly sales of $9,600. It adds ingredients of $3,600, wages of $2,400 and utilities of $400. Monthly rent of $6,000 continues either way. The differential approach, also called incremental analysis, keeps just the changes. In dollars:
Monthly profit rises by $3,200. Including rent in both alternatives would give the same difference; deducting it only from Saturdays would give a false result.
The total approach prepares both full profit statements:
| Monthly amount | Current days | With Saturdays |
|---|---|---|
| Revenue | $40,000 | $49,600 |
| Variable and added costs | $15,000 | $21,400 |
| Existing fixed costs | $18,000 | $18,000 |
| Profit | $7,000 | $10,200 |
The $18,000 includes the unchanged rent. The profit difference is again $3,200. Use the total approach when a full statement helps explain the situation; use differences when unchanged items would obscure the decision.
For a recommendation, first name the alternatives, then identify each changing cash flow and total its effect. Finally check the non-financial effects, such as whether the bakery can staff Saturdays reliably.
Key Takeaways
- Relevant items are future cash flows that differ between alternatives.
- Check relevance from the decision, not just from the fixed or variable label.
- With unchanged fixed costs, extra contribution margin equals extra profit.
- Total and differential approaches give the same change in profit.
- Absorbed fixed overhead can make a profitable extra sale appear unprofitable.
1.2 Separate past spending from future choices
A cost can appear in a report without belonging in the decision. The key distinction is whether today's choice changes a future cash flow.
Sunk costs cannot be changed
A sunk cost has already been incurred and cannot be recovered through a later choice. A business that paid $12,000 for market research cannot undo that payment by canceling the launch. The launch decision compares the future results of launching and not launching.
The sunk cost fallacy is continuing because too much has already been spent. If completing a project costs another $30,000 and brings in $25,000, completing it makes the business $5,000 worse off. An earlier large investment can make stopping feel wasteful, but it does not change that future difference.
Committed costs are future but unchanged
A committed cost comes from an earlier obligation and will be paid whichever alternative is chosen now. A noncancelable lease of $2,000 a month for the next 12 months is a future cash outflow, but closing the activity does not save it.
Check cancellation terms before calling a payment unavoidable. If the lease can instead be ended for a $5,000 penalty, cancellation saves $24,000 of payments and creates a $5,000 payment. In dollars:
The relevant saving is $19,000. The penalty is included because it arises from canceling; it is not added to the keep alternative.
Book amounts and sale proceeds serve different purposes
Depreciation spreads an asset's past cost across accounting periods. It does not itself pay anyone. Book value is the unallocated part of that past cost, so neither depreciation nor book value measures the cost of using an old asset for a new job.
A machine originally cost $50,000, now has a book value of $20,000 and could be sold today for $8,000. Using it instead of selling it gives up $8,000. Add any extra running costs of the job. Do not add its original cost or book value as well: those amounts cannot be changed by today's choice.
An allocation is not a saving
Head-office overhead may be spread across departments to report full costs. If closing one department leaves total head-office spending unchanged, its allocation simply moves to the other departments. The business saves nothing from that reallocation. If a closure actually removes an administrative job, that cash saving is relevant.
| Reported item | Treatment in a decision |
|---|---|
| Past research payment | Exclude: sunk |
| Lease paid under either choice | Exclude: unchanged |
| Extra machine setup fee | Include: caused by the choice |
| Head-office allocation | Include only a real change in spending |
A notional cost is an internal charge without a cash payment, such as internal rent on an owned building. Exclude the charge itself. If the building could actually be rented to someone else, include the rent forgone as an opportunity cost. The internal charge and the real rental opportunity need not be equal.
Key Takeaways
- Sunk spending cannot be recovered by a future choice.
- A committed payment is irrelevant while it remains unchanged.
- Cancellation savings and penalties are relevant cash differences.
- Book value and depreciation do not measure an asset’s opportunity cost.
- An overhead allocation saves cash only if total spending falls.
- A notional charge may point to a real opportunity that must be valued separately.
1.3 Count the best opportunity given up
Using a resource can cost the business money even when nobody sends an invoice. The cost is the benefit that resource could have earned elsewhere.
Identify the next best use
An opportunity cost is the benefit forgone from the best alternative use of a resource. It is relevant because choosing one use prevents the business from receiving that alternative benefit. It often does not appear in accounting records.
Space, machines, materials and employee time can all have alternative uses. A workshop currently rented to another business earns $1,500 a month. Taking it back for production gives up that rent. The production decision therefore includes $1,500 a month for the space even though the owner pays no new rent.
The best alternative is the most valuable feasible use that is actually given up. If the workshop could earn $1,500 in rent or save $1,200 in storage fees, use $1,500. Adding both would charge the new product for two benefits that could never be obtained together from the same space.
Value displaced work at contribution margin
When a new order takes capacity from regular products, it loses sales but also avoids their variable costs. The opportunity cost is the contribution margin lost.
Suppose 200 displaced units would sell for $40 each and cost $25 each in variable costs. Their contribution margin per unit is $15. In dollars:
The opportunity cost is $3,000. Charging all $8,000 of lost sales ignores the $5,000 of variable costs saved when those units are not produced and sold. Conversely, ignoring the displaced sales altogether overstates the new order's gain.
Add costs that arise together
An opportunity cost can occur alongside an additional cash payment. A machine is needed for 100 hours. Running it for the new job adds $6 an hour, and the other work it displaces would earn $40 of contribution margin per hour after its own running costs.
| Cost of the new use | Dollars |
|---|---|
| Extra running cash cost: 100 hours at $6 | $600 |
| Contribution margin forgone: 100 hours at $40 | $4,000 |
| Total relevant cost | $4,600 |
The running cost belongs to the new work. The lost contribution belongs to the displaced work. Both effects occur, so both belong in the comparison. Check how contribution has been calculated before adding a cost already deducted in it.
Capacity changes the answer
A resource with no other use has zero opportunity cost. Idle machine hours that cannot be sold, rented or used for profitable work give up no benefit. The same machine can have a substantial opportunity cost in a busy month.
This explains why an order may be attractive during a quiet period and unattractive during peak demand. A price that covers the new order's own costs can still fail to cover the profit sacrificed on regular work. Capacity must be checked for the period when the work will actually be done.
Key Takeaways
- Opportunity cost is the best feasible benefit given up.
- Count one best alternative use, not mutually exclusive benefits added together.
- Displaced sales cost their lost contribution margin, after saved variable costs.
- Add a new cash payment and a forgone benefit when both arise.
- Idle resources with no alternative use have zero opportunity cost.
1.4 Value materials and employee time
The normal cost in the accounts may be the wrong amount for a new job. Follow what using each resource will change, including what the business must replace and what other work it gives up.
Materials: start with their next use
| Situation | Relevant amount |
|---|---|
| Materials must be bought | Current purchase price |
| Inventory is used regularly and will be replaced | Current replacement cost |
| Inventory will not be replaced | Higher of resale value and best alternative-use saving |
| Inventory has no resale value or other use | Zero |
The historical purchase price of inventory is sunk. Regularly used material costs its replacement amount because consuming it makes a later purchase necessary. Nonregular inventory is valued at the benefit lost by using it, not at a replacement purchase the business will never make.
A job needs 500 kg of M. There are 300 kg in inventory, originally bought for $4 per kg. M is not used regularly. Those 300 kg could be sold for $2.50 per kg or substitute for another material and save $3 per kg. The current purchase price is $5 per kg.
- Value the 300 kg held at $3 per kg, the better alternative: $900.
- Buy the remaining 200 kg at $5 per kg: $1,000.
- Add the two amounts: the relevant cost is $1,900.
If M were regularly used and replaced, all 500 kg would cost $5 per kg for this decision, or $2,500. The original $4 price is irrelevant in both cases.
Labor: find the cheapest way to obtain the hours
Employees with paid idle time already receive their wages. A job using that idle time adds no wages and displaces no work, so the relevant labor cost is zero. Overtime or temporary staff create extra pay and are valued at that extra rate.
A job needs 100 hours. Forty hours are paid idle time; 60 require overtime at $30 an hour. In dollars:
Include variable overhead, such as power, for all the hours that cause it, even when some labor hours have no extra wage cost.
Busy employees require careful treatment
Moving fully occupied workers to a job can sacrifice other output. Suppose their wage is $20 per hour and the displaced work earns $15 of contribution margin per hour after deducting that wage. The relevant rate is $35 per hour: the $20 labor cost plus $15 of lost contribution margin.
If the wage is paid under either alternative, the same result can be explained without treating it as an extra payment. The old work loses contribution before the unchanged wage: $15 plus $20, or $35. Adding the wage to a contribution figure already measured before labor would count it twice.
If equally suitable temporary workers can do the job for $30 an hour, use that cheaper way of obtaining the hours. It costs less than sacrificing $35 per hour on existing work.
Absorbed fixed overhead per labor or machine hour is not an extra cash payment. Include it only when total fixed spending changes; include additional variable overhead that the job actually causes.
Key Takeaways
- Regularly used inventory is valued at current replacement cost.
- Nonregular inventory costs its best resale or alternative-use benefit forgone.
- Paid idle labor has zero extra wage cost.
- Overtime and temporary labor cost the extra pay required.
- For busy labor, check whether lost contribution is before or after wages.
- Choose the cheapest feasible source of labor hours.
- Include extra variable overhead; exclude unchanged absorbed fixed overhead.
2Decide on special orders and make-or-buy
A lower selling price or a lower supplier quotation does not settle a decision. Capacity, avoided costs and alternative uses of resources can change which choice earns more profit. Work through a one-time order, see how the result changes when regular sales are displaced, and compare internal production with outside supply. The calculations lead to useful price thresholds, while customer relationships and reliable delivery help turn the figures into a decision.
2.1 Price a one-time order with spare capacity
A special order is a one-time sale outside the normal flow of business, often at a lower price. Its financial value is the change it makes to total profit.
Check room for the order first
Spare capacity means the business can fill the order without displacing normal sales. Check the order's actual production needs against available capacity for the same period. An annual capacity figure is not enough if all the work must fit into one busy month.
With adequate spare capacity, include the order's own incremental revenue, variable costs and order-specific fixed costs. Adjust the normal variable cost to reflect the order's terms. A direct sale may avoid commission but need extra packaging or a logo.
Work through a backpack order
Backpacks normally sell for $45. Each uses $14 of materials, $8 of labor and $3 of variable overhead. Normal sales also incur $2 commission. Fixed manufacturing overhead of $180,000 is absorbed over 20,000 units at $9 per unit. Full manufacturing cost is $34 per backpack; the commission is a separate selling cost.
Capacity is 25,000 units and normal sales are 20,000, leaving 5,000 units spare. A school supplier offers $30 each for 3,000 backpacks. The order needs a $1 logo on each backpack and $2,000 of printing screens. No commission is paid.
The order fits the spare capacity. Its variable cost per unit, in dollars, is:
The relevant statement is:
| Change from accepting | Dollars |
|---|---|
| Revenue: 3,000 units at $30 | $90,000 |
| Variable costs: 3,000 units at $26 | −$78,000 |
| Printing screens | −$2,000 |
| Increase in profit | $10,000 |
The price is below the $34 full manufacturing cost, but accepting increases profit by $10,000. The existing $180,000 overhead does not rise. The screen cost is fixed for the order and does rise, so it belongs in the statement.
Find the break-even price for this order
The minimum acceptable price covers all relevant costs of the order. Divide total relevant cost by the quantity. In dollars per backpack:
The minimum is about $26.67 per unit, rounded to cents. The exact break-even amount is $80,000 for the order; a quote of $26.67 produces a small gain because of rounding. A price above the exact threshold adds profit.
Check the effect beyond this sale
A special price can affect regular customers' expectations, the brand and future negotiations. The order might open a useful market or lead to repeat work. Check applicable selling and competition requirements before agreeing commercial terms.
Unchanged fixed costs are irrelevant because accepting does not change them. They need not already be covered by regular sales for the order to improve profit. Even a business currently making a loss gains from positive incremental profit. Over time, however, sales must also provide enough contribution to cover fixed costs; a one-time threshold is not a price policy for every sale.
Key Takeaways
- Confirm spare capacity before using the spare-capacity decision rule.
- Adjust variable costs for commission, packaging and other order terms.
- Include order-specific fixed costs such as setup fees.
- Minimum order price equals total relevant cost divided by order units.
- Assess customer reactions, repeat business and brand effects.
2.2 Allow for regular work displaced
An order that earns a positive contribution of its own can still reduce profit. If the business cannot make it alongside normal work, the order gives up some existing contribution margin.
Measure the shortage
Compare the order's resource requirement with unused capacity. If units use different production times, do this in machine hours or labor hours. Only the portion beyond spare capacity displaces regular work.
For backpacks, capacity remains 25,000 units but normal sales rise to 24,000. Only 1,000 units of capacity remain. The special order still asks for 3,000, so completing it in full displaces 2,000 regular units.
Each regular unit sells for $45 and has total variable costs of $27, including commission. Its contribution margin is $18. The special order would earn $10,000 after its own variable costs and $2,000 setup, before allowing for lost regular work.
Deduct the opportunity cost
The lost contribution margin is $36,000. In dollars, the full effect of accepting is:
Profit falls by $26,000, so reject the full order on these figures. Using the $45 selling price for lost sales would overstate the sacrifice, because the business also saves the variable costs of the regular backpacks it does not sell.
The minimum price must now cover the order's $80,000 relevant production and setup costs plus $36,000 of forgone contribution margin. In dollars per backpack:
That is about $38.67 per unit, rounded. The higher threshold reflects the value of busy capacity, not a change in the order's own variable cost.
Compare ways to fill the order
A customer willing to take only 1,000 backpacks could be served entirely within spare capacity. Revenue would be $30,000, variable cost $26,000 and setup $2,000. The smaller order adds $2,000. Do not scale the $2,000 setup down: it is paid once for either order size.
Extra capacity may avoid displacement. Suppose an extra shift makes the 2,000 units beyond spare capacity for an overtime premium of $4 per unit plus a $4,000 supervisor cost. The added capacity costs $12,000, less than the $36,000 lost contribution.
| Full-order method | Extra capacity or displacement cost | Change in profit |
|---|---|---|
| Displace normal sales | $36,000 | −$26,000 |
| Buy the extra shift | $12,000 | −$2,000 |
The shift improves the full-order result but still does not make it profitable at $30. If the smaller order is available, its $2,000 gain is better than either full-order method.
Also consider what turning regular customers away would do to future demand. The calculated lost contribution covers the displaced sales for the period; it may not capture the lasting loss of customers.
Key Takeaways
- Value only the capacity shortfall at the contribution margin displaced.
- Lost revenue overstates opportunity cost when variable costs are saved.
- Full-capacity minimum price includes opportunity cost.
- Compare partial acceptance and extra capacity with the full-order choices.
- Keep one-time setup costs intact when evaluating a smaller order.
- Regular customer relationships can make displacement more costly over time.
2.3 Compare making with buying
A make-or-buy decision compares two ways to obtain the same component or service. Buying work previously done inside the business is also called outsourcing. Compare the costs the business can actually change.
Build a fair comparison
The relevant cost of making includes variable production costs, fixed costs that buying would avoid, and the opportunity cost of the capacity used. The relevant cost of buying includes the supplier's price and extra delivery, inspection or ordering costs.
Unavoidable overhead can be left out of both alternatives. It is still paid by the business, but it does not help choose between them. The fact that a cost is directly traced to the component does not establish that it will stop.
Work through bicycle seats
A bicycle maker needs 10,000 seats a year. Each seat uses $9 of materials, $6 of labor and $3 of variable overhead. A $7 fixed-overhead charge gives a full unit cost of $25. Total factory fixed overhead is $70,000.
A supplier offers $21 per seat. Buying removes a supervisor position costing $20,000 annually; the remaining $50,000 of overhead continues. The relevant annual costs are:
| Item | Make | Buy |
|---|---|---|
| Variable production: 10,000 units at $18 | $180,000 | $0 |
| Avoidable supervisor cost | $20,000 | $0 |
| Purchase: 10,000 units at $21 | $0 | $210,000 |
| Relevant total | $200,000 | $210,000 |
Making saves $10,000 a year. Comparing the $21 quote with the $25 full unit cost would incorrectly suggest buying, because $5 per seat of allocated overhead continues under either choice.
Give freed space its value
Now suppose buying allows the seat-production area to be rented out for $15,000 a year. Keeping production inside gives up that rent. Add $15,000 to the relevant make total, giving $215,000. Buying for $210,000 now improves annual profit by $5,000.
An equivalent comparison deducts the rental benefit from buying: $210,000 less $15,000 gives a net buy cost of $195,000, compared with $200,000 for making. Both approaches show the same $5,000 benefit. Use one treatment of the rent; counting it on both sides would double the benefit.
Find the supplier-price ceiling
Without another use for the space, the highest purchase price matching the cost of making is $20 per seat. With the rental opportunity it is $21.50. Extra buying costs reduce the amount available to pay the supplier.
Quality and reliable delivery may outweigh a small cost saving. Consider later price increases, dependence on one supplier, employee effects, lost skills and control over confidential processes. If scarce capacity forces a mix of making and buying, prioritize the components with the largest saving per unit of the scarce resource.
Key Takeaways
- Compare avoidable production costs with the complete cost of buying.
- Exclude overhead that continues under both alternatives.
- Include the value earned from a feasible alternative use of freed capacity.
- Count a freed-capacity benefit once.
- The supplier-price ceiling is the relevant make cost per unit, adjusted for extra buying costs.
- Quality, delivery and supplier dependence can outweigh a small saving.
3Decide whether to keep a segment and whether to process further
A loss-making store can still help pay the business’s common costs, and a higher-value processed product can still be the worse choice. Follow what closing or processing actually changes. Separate contribution from overhead allocations, trace the effect of a closure on other sales, and compare the extra sales value from processing with its extra cost. Each calculation looks at the business’s total result, with attention to the alternatives it gives up.
3.1 Check what a segment contributes
A segment is a separately reported part of a business, such as a store, product line or department. A reported loss may suggest closing it, but closure changes only some of the costs in its report.
Separate contribution from common costs
Closing loses the segment's revenue and saves its variable costs. The net loss is therefore its contribution margin. Closing also saves fixed costs that actually stop. A share of head-office costs is not saved if head-office spending continues.
For a simple closure with no other effects, compare avoidable fixed costs with contribution margin lost. Closure improves profit when the avoided costs are larger. The segment's segment margin is contribution margin less its traceable fixed costs. A positive segment margin supports keeping it when all those traceable costs are avoidable.
Look at a three-store retailer
| Annual amount | North | Center | South |
|---|---|---|---|
| Sales | $400,000 | $300,000 | $200,000 |
| Variable costs | $240,000 | $180,000 | $130,000 |
| Contribution margin | $160,000 | $120,000 | $70,000 |
| Avoidable fixed costs | $90,000 | $70,000 | $50,000 |
| Head-office allocation | $50,000 | $40,000 | $30,000 |
| Reported profit or loss | $20,000 | $10,000 | −$10,000 |
South shows a $10,000 loss, but it earns $70,000 toward costs and has only $50,000 of avoidable fixed costs. Closing South therefore changes annual profit, in dollars, by:
Total business profit falls from $20,000 to zero. The $30,000 head-office allocation does not disappear: North and Center must carry it. Keeping South leaves $20,000 more toward the retailer's common costs.
Traceable does not always mean avoidable
A lease can belong entirely to South but still continue after the store closes. If $15,000 of the $50,000 fixed costs must continue for three more years, only $35,000 is saved now. The closure then loses $70,000 of contribution while saving $35,000: annual profit falls by $35,000.
The decision period matters. A lease that is unavoidable this year may be avoidable when it expires. A segment report and a closure statement therefore need not use the same fixed-cost amount.
Add the cash effects of closing
A closure can require severance payments and contract penalties, and it can bring in proceeds from selling equipment or inventory. Include those cash flows in the period when they arise. A small recurring saving can be outweighed by a large payment in the first year.
The profit of the remaining segments may look worse after closure because they receive more common overhead. That change in their reported results does not mean their operations became less efficient. Evaluate the total business result and the costs actually removed.
Key Takeaways
- A reported loss after allocated overhead does not establish that closure helps.
- Closing loses contribution margin and saves avoidable fixed costs.
- Traceable fixed costs can still be committed for the decision period.
- Common costs that continue move to the remaining segments.
- Include closure payments and sale proceeds in their own periods.
3.2 Include the effects of closure elsewhere
A segment can affect the profit of other parts of the business. Its own report may miss the customers it attracts, the sales it supports and the value of the space it occupies.
Calculate linked sales effects
If closing a segment makes customers buy less elsewhere, include the contribution margin lost elsewhere. Lost revenue alone overstates the effect when fewer sales also save variable costs.
A bookstore café earns annual contribution margin of $30,000 and has avoidable fixed costs of $36,000. Considered alone, closing it saves $6,000 a year. But book sales are expected to fall by 5% without the café. Books currently earn $200,000 of annual contribution margin. With the same contribution rate, the knock-on contribution loss is $10,000.
The overall annual effect of closure, in dollars, is:
Keep the café on these figures. A $6,000 saving within the café is outweighed by the effect on books. The percentage applies to the contribution that falls with those sales, not to an unrelated cost total.
Value another use of the space
Suppose the café space could instead display more books, adding $8,000 contribution margin a year after the costs of those extra sales. This is a benefit of closure. The full annual effect becomes:
Closing and using the space for books now raises profit by $4,000. The lost book sales and the new display sales are separate effects: the forecast must reflect both. Do not assume that all sales lost with the café return simply because the freed space remains in the same business.
Compare the available choices
Closing and keeping the café unchanged may not be the only options. A smaller café might preserve much of its customer appeal with lower staffing costs. A new operator might rent the space. A change in hours, product range or location may improve its results.
| Possible effect of closure | Direction in the closure statement |
|---|---|
| Salaries that stop | Benefit |
| Contribution lost in other departments | Cost |
| Income from a new use of space | Benefit |
| One-time closure payment | Cost |
Each effect needs its own basis and period. Avoid combining an annual rental benefit with several years of lost contribution in one total.
Weigh people and longer-term effects
Closure can mean job losses, reduced morale and disruption for suppliers. Customers may value a full range, and competitors may attract them if a segment disappears. A growing market might justify improving a weak segment instead of leaving it.
Review the decision when contracts expire or demand changes. More fixed costs may become avoidable later. A recommendation can therefore favor keeping a segment now while identifying a later review point, with the relevant lease or demand forecast named.
Key Takeaways
- Include contribution lost elsewhere because a segment closes.
- Add income from a feasible new use of freed resources.
- Compare closure with realistic changes to the segment.
- Use a common period for all cash effects.
- Apply employee, customer and competitive effects to the actual situation.
3.3 Compare selling now with processing further
A product may be saleable before all possible processing is complete. The decision is whether the extra work adds enough sales value to pay for the extra costs and any opportunities lost.
Start at the split-off point
Joint products emerge from one common process, such as cream and skim milk from milk. The split-off point is where the products become separately identifiable. Costs up to that point are joint costs.
For the sell-or-process-further decision, those joint costs have already been incurred and are the same whichever form is sold. Their allocation to products can affect reported profit, but it cannot change the benefit of further processing.
Compare the sales value after processing with the sales value available now. The difference is incremental revenue. Process further when it exceeds further processing costs, including any opportunity cost of processing capacity.
Follow two dairy products
The dairy has 4,000 liters of cream that can sell at split-off for $3 per liter, or $12,000. Further processing into butter costs $5,000 and produces sales of $18,000. In dollars:
The $6,000 extra revenue exceeds the $5,000 extra cost, so making butter increases profit by $1,000.
The same joint process produces 16,000 liters of skim milk worth $0.80 a liter, or $12,800. Making yogurt costs $9,000 and brings sales of $20,000. Its incremental revenue is only $7,200, so further processing reduces profit by $1,800.
| Product | Extra revenue | Extra processing cost | Profit effect |
|---|---|---|---|
| Cream into butter | $6,000 | $5,000 | +$1,000 |
| Skim milk into yogurt | $7,200 | $9,000 | −$1,800 |
Comparing the yogurt's $20,000 sales with its $9,000 processing cost ignores the $12,800 available from selling the skim milk now. That forgone sale is the main reason the apparent gain is misleading.
Apply the rule to reworking goods
The same logic applies without joint products. Two hundred damaged units originally cost $50 each. They can be sold now for $10 each, or reworked for $8 each and sold for $22. Reworking adds $12 revenue per unit and costs $8, adding $4 contribution per unit, or $800 in total. The original $50 cost is sunk.
Keep the decision boundary clear
Whether to run the joint process at all is a different decision. Before running it, joint costs are future costs. Compare total revenue from all outputs, each sold in its best form, with joint costs and the chosen further processing costs.
Also check demand for the processed product and available processing capacity. If the butter equipment could instead earn contribution on other work, include the contribution forgone.
Key Takeaways
- Incremental revenue is processed sales value minus the sales value available now.
- Process further only when the incremental benefit exceeds all relevant processing costs.
- Joint costs are irrelevant to the decision made at split-off.
- The same rule applies to finishing or reworking a single product.
- Joint costs matter when deciding whether to run the joint process.
- Include lost contribution from alternative processing work.
4Make the best use of a scarce resource
When there is too little of one resource to meet all demand, products compete for that resource. Identify the real shortage, then compare what each scarce hour or kilogram earns. Build a plan that respects demand and contractual commitments, calculate its contribution and profit, and check whole-unit quantities. The same value of scarce capacity also helps judge special orders, the purchase of extra hours and which components to make or buy.
4.1 Find the resource that limits output
A business cannot always make everything customers want. It may be short of machine time, skilled labor, material, space or cash. A limiting factor is whatever prevents activity and profit from increasing.
Compare needs with availability
A resource becomes a production limit when meeting maximum demand requires more of it than is available. Work out the requirement for every resource, using the same period throughout:
- Multiply each product's maximum demand by the resource used per unit.
- Add the requirements across products.
- Compare the total with the available amount.
A small available number is not enough to identify the limit. A business with 100 specialist hours and 1,000 general hours might have enough specialist time but too little general time. The requirements determine which supply is scarce.
Check the production data
A company has 5,200 machine hours and 4,000 labor hours for its production period.
| Product | Price | Variable cost | Machine hours per unit | Labor hours per unit | Maximum demand |
|---|---|---|---|---|---|
| Alpha | $60 | $36 | 2 | 1 | 1,000 |
| Beta | $50 | $34 | 1 | 0.5 | 2,000 |
| Gamma | $80 | $50 | 3 | 1.5 | 800 |
To meet all demand, machine requirements are 2,000 hours for Alpha, 2,000 for Beta and 2,400 for Gamma. In hours:
Only 5,200 machine hours are available, leaving a shortage of 1,200. Labor requirements are 1,000, 1,000 and 1,200 hours. Their total is 3,200 hours, below the available 4,000. Machine hours are the single production limiting factor; labor is sufficient.
Distinguish a production limit from a sales limit
If every production resource is sufficient, demand limits output. Producing unsold units does not earn contribution margin simply because machines are available. Production should therefore stop at what can be sold.
If the company's demand fell enough to need fewer than 5,200 machine hours, machine supply would no longer constrain production. A limiting factor is tied to a particular plan and period; it is not a permanent property of a machine or department.
Check whether one ranking can solve the problem
When exactly one production resource is short, products can be compared by the contribution margin they earn per unit of that resource. The comparison tells the business where each scarce hour does the most financial work.
If several resources are short, a plan built around one may require too much of another. It needs a method that handles the constraints together. Checking every resource first prevents an attractive-looking ranking from producing a plan the factory cannot carry out.
Key Takeaways
- Compare the resources needed for maximum demand with the resources available.
- Use the same period and units on both sides of the comparison.
- A resource is limiting only when its requirement exceeds its supply.
- Demand limits production when all production resources are sufficient.
- Check that there is one production shortage before using one-resource ranking.
4.2 Rank products and build a production plan
With one scarce resource, each product competes for the same limited supply. The best unrestricted mix earns the most contribution margin from that supply while staying within demand.
Measure the return on a scarce hour
First subtract variable cost from selling price. Then divide contribution margin per product unit by the scarce resource used by that unit. For Alpha, Beta and Gamma, machine hours are scarce:
| Product | Contribution per unit | Machine hours per unit | Contribution per machine hour | Rank |
|---|---|---|---|---|
| Alpha | $24 | 2 | $12 | 2 |
| Beta | $16 | 1 | $16 | 1 |
| Gamma | $30 | 3 | $10 | 3 |
Gamma has the largest unit contribution, but each unit consumes three machine hours. Beta earns more per scarce hour and gets first call on capacity. Selling price per hour is also unsuitable because it ignores variable costs.
Allocate hours in order
There are 5,200 machine hours. Make each product up to its maximum demand before moving to the next rank:
- Make 2,000 Beta, using 2,000 hours. Remaining hours: 3,200.
- Make 1,000 Alpha, using 2,000 hours. Remaining hours: 1,200.
- Make 400 Gamma, using 1,200 hours. No machine hours remain.
Total contribution margin, in dollars, is:
Subtract fixed costs of $45,000 once to find profit of $23,000. Fixed costs are unchanged by the mix, so maximizing contribution also maximizes profit.
Ranking by unit contribution would make Gamma, then Alpha, then Beta. It produces only $60,800 contribution, losing $7,200. Absorbed profit per unit is no better: allocated fixed overhead does not measure the value of a machine hour.
Meet contracts before allocating free capacity
A contract requiring 500 Gamma reserves 1,500 hours. From the remaining 3,700 hours, make 2,000 Beta and then 850 Alpha. Contribution is $15,000 from Gamma, $32,000 from Beta and $20,400 from Alpha, totaling $67,400. Meeting the contract reduces contribution by $600 against the unrestricted plan.
Check assumptions and whole units
The ranking uses constant prices, variable costs and resource use, with sales possible up to the demand limits and fixed costs unchanged. A price discount, batch cost or demand link can change the comparison.
For whole units, rounding down creates a feasible plan but may leave capacity that a different combination could use. With 5,201 hours, the first plan leaves one hour unused. Replacing one Alpha with one Gamma uses the extra hour and adds $6 contribution: 999 Alpha, 2,000 Beta and 401 Gamma earn $68,006. Check nearby combinations before naming a whole-unit plan best.
Customers may also buy several products together. Cutting the lowest-ranked product can affect other sales or the business's place in its market; consider those effects in the recommendation.
Key Takeaways
- Rank by contribution margin per unit of the single scarce resource.
- Allocate in rank order, stopping each product at its demand limit.
- Subtract total fixed costs once to move from contribution to profit.
- Satisfy contractual minimums before allocating remaining capacity.
- Check whole-unit combinations when rounding leaves resource unused.
- Constant prices, costs and resource use underpin the ranking.
- Consider customer links across products.
4.3 Value scarce capacity in another decision
A production plan shows what each scarce hour currently earns. That information helps value a new order, extra machine time or a choice between making and buying components.
Find the work displaced at the margin
In the Alpha, Beta and Gamma plan, the final 1,200 machine hours make Gamma. It earns $10 contribution margin per machine hour. A new order needing 300 hours displaces 100 Gamma units, losing $3,000 contribution.
Add this opportunity cost to the new order's own relevant costs. Do not use Beta's $16 rate simply because it is the highest. Beta remains fully supplied while the lower-ranked Gamma output is reduced.
The rate can change within a large order. The first 1,200 hours displace Gamma at $10 per hour. Further hours displace Alpha at $12 per hour, then Beta at $16. Calculate each block separately instead of applying the first rate to every hour.
Decide what extra hours are worth
Extra machine time allows more Gamma to be made, until Gamma reaches demand of 800 units. Starting from 400 units, another 400 units need 1,200 hours. Each added hour earns $10 of contribution margin over that range.
An extra rental charge below $10 an hour increases profit, provided the variable production costs included in contribution stay unchanged. At $10 the gain is exactly used up by the rental charge. Beyond the remaining demand, another hour no longer earns that same contribution. Whole-unit requirements also affect whether a small purchase of hours can be used.
Rank savings when making competes with buying
A component bought externally avoids using internal machine time. To decide which components to make, divide the saving from making each unit by its machine time.
The firm needs 4,000 P and 3,000 Q. There are 3,500 machine hours.
| Component | Variable make cost | Buy price | Hours per unit | Saving per unit | Saving per hour |
|---|---|---|---|---|---|
| P | $10 | $14 | 0.5 | $4 | $8 |
| Q | $15 | $21 | 1 | $6 | $6 |
Making everything would need 5,000 hours. Make P first: all 4,000 units use 2,000 hours. Use the remaining 1,500 hours for 1,500 Q and buy the other 1,500 Q.
The total cost, in dollars, is:
Q saves more per component, but P saves more per scarce hour. Making Q first costs $97,000 in total, $3,000 more. The economic use of capacity depends on what its use saves or earns, expressed per scarce unit.
This ranking compares variable making costs with buying prices because those are the changing amounts in this example. Add any fixed costs that change with the actual make-or-buy plan before recommending it.
Key Takeaways
- New work first displaces the lowest-ranked output currently made.
- Opportunity cost rises in blocks if a large order displaces higher-ranked products.
- Extra resource is worth the contribution it adds within remaining demand.
- Rank components by making savings per scarce resource unit.
- Include fixed costs that change with the final plan.
5Weigh the evidence and recommend a decision
A recommendation must explain what the numbers show and why the choice makes sense for the business. Examine the assumptions behind a short-term comparison, find how far an estimate can change before the answer reverses, and connect wider effects to the particular decision. Bring these judgments together in a relevant-cost statement with clear quantities, reasons for exclusions and a recommendation that addresses both the gain and the practical consequences.
5.1 Judge the forecasts and wider effects
A relevant-cost result measures a choice's short-term financial effect. A useful recommendation also asks whether the forecasts are dependable and what the choice means for employees, customers and future operations.
Know the conditions behind the numbers
Short-term analysis usually holds capacity and most fixed costs unchanged. It uses selling prices, variable costs and resource requirements that stay constant across the activity considered. These are forecasts, so check what would happen if a key estimate changed.
For example, making 10,000 seats costs $200,000 a year and buying costs $210,000 at $21 each. Making has a $10,000 advantage. Buying becomes cheaper if its price falls below $20 per seat, or if the relevant cost of making rises above $210,000. At equality, the financial comparison is tied.
A small advantage deserves closer attention to uncertain estimates than a large one. This sensitivity check identifies the change needed to reverse the ranking. It does not assign a probability to that change; managers still need evidence about supplier quotations, usage rates and likely demand.
Match the analysis to the time horizon
An extra order can be worthwhile when its price covers its relevant costs and adds contribution toward unchanged fixed costs. But all sales together must cover all costs in the long run. Repeating a low one-time price across every sale can leave too little to pay for the business's capacity.
More costs become avoidable over a longer period as leases end, staff arrangements change and equipment can be sold. Recalculate when the decision period changes. If substantial cash flows extend over several years, their timing also matters: receiving money later is different from receiving it now. A simple short-term total does not account for that timing.
Choose the factors that fit the case
Qualitative factors matter even when they are hard to measure in money. Apply them to the actual decision:
| Decision | Questions beyond the calculation |
|---|---|
| Special order | Will regular customers expect the same price? Could it bring repeat business? |
| Make or buy | Can the supplier meet quality and delivery needs? Will skills or control be lost? |
| Close a segment | What happens to jobs, linked sales and customers wanting a full range? |
| Process further | Can the processed output be sold at the forecast price? |
| Allocate scarce capacity | Will reducing one product damage relationships or sales of others? |
Legal and ethical duties, environmental effects and strategic fit can also determine whether a financially attractive option is acceptable. Name the particular issue and how the choice changes it.
Make a reasoned judgment
Start with the financial direction and amount. Add the two or three factors most likely to affect the choice, and explain whether they support the result or outweigh it. "Buying saves $4,000" is a calculation. "Buying saves $4,000, but the only supplier cannot meet the required delivery dates" connects the figure to a decision. A generic list of risks without a link to the case gives little basis for choosing.
Key Takeaways
- Treat future prices, costs and demand as estimates to evaluate.
- Find how far an important estimate can change before the decision reverses.
- Longer decision periods make more costs avoidable.
- All costs must be covered over the long run.
- Apply a few relevant qualitative factors to the situation.
- State whether the wider evidence supports or outweighs the financial result.
5.2 Build and explain a relevant-cost statement
A relevant-cost statement makes the reasoning visible. Each included amount needs a basis, and each excluded amount needs a reason. Finish by answering the business's decision, with both the financial result and the wider effects.
Set out the alternatives and period
A furniture workshop is offered $400 each for 50 hotel tables, giving revenue of $20,000. It can accept or reject the one-time order. The job needs 500 kg of oak, fittings costing $12 per table, 400 labor hours, a hired jig costing $700 and variable overhead of $5 per labor hour.
A designer has already received $800 for drawings. Fixed overhead is absorbed at $15 per labor hour. The workshop holds 300 kg of oak bought for $8 per kg; oak is used regularly and now costs $10 per kg. Workers earn $20 an hour and have 150 paid idle hours. The remaining 250 hours require overtime at $30 per hour.
Value each resource
All 500 kg of regularly used oak are valued at current replacement cost, including the quantity already held. Fittings are bought for the order. Idle hours add no pay; overtime adds the full overtime rate. Variable overhead applies to all 400 job hours.
| Relevant cost | Basis | Amount |
|---|---|---|
| Oak | 500 kg at $10 | $5,000 |
| Fittings | 50 tables at $12 | $600 |
| Idle labor | 150 hours, pay unchanged | $0 |
| Overtime | 250 hours at $30 | $7,500 |
| Variable overhead | 400 hours at $5 | $2,000 |
| Jig hire | Required for this order | $700 |
| Total | $15,800 |
The $800 design payment is sunk. Absorbed fixed overhead of $6,000 is excluded because total fixed spending does not change. Neither amount becomes relevant just because it can be assigned to the hotel order.
Calculate the gain and threshold
In dollars, the order's profit effect is:
The break-even order price is $15,800, equivalent to $316 per table. The offered $400 price is $84 above that minimum. All three figures describe the same $4,200 advantage.
A full-cost calculation would instead use historical oak cost of $4,400, normal wages of $8,000, absorbed fixed overhead of $6,000, past design cost of $800 and $3,300 for fittings, variable overhead and jig. Its $22,500 total suggests a $2,500 loss. That total mixes costs unaffected by the choice with rates that do not measure the job's actual cash effects.
Write the recommendation
"Accept the order: it adds $4,200 to profit, and the price exceeds the $316 minimum by $84 per table. It could lead to repeat hotel business. Check that the 250 overtime hours can be worked without reducing quality or delaying regular customers' orders."
Before submitting the statement, check that all quantities use a common period, every opportunity sacrificed has been counted, and no item appears twice. In particular, paid idle time should not also carry a lost-contribution charge when no work is displaced.
Key Takeaways
- Show alternatives, period, relevant amounts and reasons for exclusions.
- Value regularly used material at replacement cost even when held in inventory.
- Separate paid idle hours from overtime.
- Check the total gain against the per-unit price margin.
- Finish with a recommendation tied to the case’s financial and wider effects.
Relevant Costs examples
1Follow the cash effects of a choice
18 steps
- 1IntroductionBegin with two alternatives
A bakery can keep its current opening days or add Saturdays. Both options use the same building, but Saturdays bring more sales and require ingredients, wages and power.
Follow the difference between those two futures. Only future cash that differs is relevant. Some recorded costs stay unchanged (a sunk cost is one already paid); some resources carry a cost because using them gives up another benefit (an opportunity cost). You will build the comparison before moving on to materials and labor.
- 2ExplanationTest each item for relevance
A relevant cost or revenue is a future cash flow that differs between alternatives. An item must satisfy all three parts of that definition.
A payment already made fails the future test. Depreciation fails the cash test. Rent paid either way fails the difference test. A new fixed setup fee can pass all three, even though it is fixed. Check the cash effect before relying on a fixed or variable label.
- 3ExampleCalculate the bakery’s extra profit
Saturday opening adds $9,600 monthly sales. Extra ingredients cost $3,600, wages $2,400 and utilities $400. The existing rent stays unchanged.
In dollars:
Profit rises by $3,200 a month. A full profit statement for each alternative would give the same difference because the existing rent appears in both. Differential analysis saves space by leaving that unchanged payment out.
- 4ChallengeWould an extra sale help?
A product sells for $23 on an extra order. Its variable cost is $19 and its absorbed fixed overhead is $7 per unit. There is spare capacity and total fixed spending stays unchanged. Does this sale raise or reduce profit, and by how much?
---reveal---
It raises profit by $4 per unit: the $23 receipt exceeds the $19 extra variable cost. The $7 overhead allocation is paid either way. Comparing the price with a $26 full cost would miss the sale’s positive cash difference.
- 5ExplanationPast spending cannot justify continuing
A sunk cost has already been incurred and cannot be recovered by a later choice. Continuing because "we have spent too much to stop" is the sunk cost fallacy.
A project that needs another $30,000 to earn $25,000 loses $5,000 by continuing. Whatever was spent earlier, that future loss is still avoidable. The decision compares finishing with stopping from this point forward.
- 6ExampleCheck whether a contract can be ended
A lease requires $2,000 a month for another 12 months. If it cannot be canceled, the $24,000 future payment continues under either option and is irrelevant.
If it can be ended for a $5,000 penalty, cancellation changes the payments. In dollars:
Canceling saves $19,000. The contract’s actual terms determine the difference; calling a payment "committed" does not replace checking those terms.
- 7ChallengeChoose the relevant machine value
An old machine cost $38,000, has a $14,000 book value and could be sold today for $6,000. A job uses it instead of selling it and adds $900 of running costs. No other future cash flows differ. What is the relevant cost of using it?
---reveal---
It is $6,900: $6,000 sale proceeds forgone plus $900 running payments. Original cost and book value reflect past spending. The machine’s sale opportunity is different: using it now prevents a future receipt.
- 8Key InsightAn allocation does not remove a payment
Closing a department may remove its head-office charge from that department’s report. If head-office spending stays unchanged, the same cost is assigned elsewhere.
Likewise, an internal rent charge on an owned building is not itself a payment. It matters only through a real cash difference or opportunity, such as outside rent that could actually be earned. Follow the business’s total cash effects through the report.
- 9ExplanationValue the best use sacrificed
An opportunity cost is the benefit given up from a resource’s best alternative use. A workshop could earn $1,500 monthly rent or save $1,200 monthly storage fees.
Using it for production sacrifices the better alternative, $1,500. Adding the rent and storage saving would count two uses that cannot happen together. If a resource would otherwise be idle and has no other use or sale value, its opportunity cost is zero.
- 10ExampleLost sales also save variable costs
A new job displaces 200 regular units. Each regular unit sells for $40 and costs $25 in variable costs. Each therefore earns $15 contribution margin.
In dollars, the opportunity cost is:
The lost sales revenue is $8,000, but not making those units also saves $5,000. Charging the job for the full lost revenue would overstate the benefit sacrificed.
- 11ChallengeAdd the two different sacrifices
A job needs 80 machine hours. It adds $5 running cost per hour and displaces other work earning $26 contribution per hour after that other work’s costs. What is the total relevant cost of these machine hours?
---reveal---
Extra running payments are $400, and forgone contribution is $2,080. Total relevant cost is $2,480. These are separate effects: the first pays to run the new job, while the second is the net benefit lost from work no longer done.
- 12ExplanationAsk whether material will be replaced
Material bought for a job costs its current purchase price. Material already held and regularly used costs its current replacement price, because using it creates a later replacement need.
Nonregular inventory that will not be replaced instead costs the best benefit given up: the higher of resale proceeds and savings from another use. Its original price is sunk. With no resale or alternative use, its relevant amount is zero.
- 13ExampleSplit inventory from the extra purchase
A job needs 500 kg of nonregular M. The 300 kg held could sell for $2.50 per kg or replace another material and save $3 per kg. Buying more costs $5 per kg.
- Value held material at its better use: 300 kg at $3 gives $900.
- Buy the missing 200 kg at $5, costing $1,000.
- Add the amounts: $1,900 relevant material cost.
The held material’s $4 historical price does not enter either part.
- 14ChallengeChange the material’s next use
The same job needs 500 kg, with 300 kg held and a current purchase price of $5 per kg. Now M is regularly used in normal products and will be replaced. What material cost belongs to the job?
---reveal---
All 500 kg cost $5 per kg, for $2,500. Using the 300 kg held creates replacement purchases, and another 200 kg must be bought for the job. The resale amount used for nonregular inventory no longer measures the cash effect.
- 15ExampleSeparate idle hours from overtime
A job needs 100 labor hours. Forty are paid idle time, and 60 require overtime at $30 per hour.
In dollars:
The relevant wages are $1,800. Extra variable overhead still applies to all job hours that cause it. Unchanged absorbed fixed overhead is excluded: assigning a rate per labor hour does not create a payment.
- 16ConnectionBusy labor can cost more than its wage
Busy workers earn $20 per hour. Their existing work earns $15 contribution per hour after wages. Diverting them costs $35 per hour.
If wages continue, the old work loses $35 contribution before those wages: its $15 net contribution plus the $20 wage that is no longer saved. Suitable temporary staff at $30 per hour would be cheaper. Check the contribution basis before adding wages so that they are counted once.
- 17ChallengeBring materials and hours together
A job uses 100 kg of regularly replaced material costing $7 per kg. It needs 50 labor hours: 20 paid idle hours and 30 overtime hours at $26. Variable overhead is $2 per job hour. What total relevant resource cost does it create?
---reveal---
Material costs $700, overtime $780 and variable overhead $100 for all 50 hours. Total relevant cost is $1,580. The idle wages add nothing, but the machines still incur the stated variable overhead while the job runs.
- 18RecapKeep the decision’s cash effects visible
State the alternatives and compare their future cash differences. Leave out sunk spending, non-cash charges and payments that stay the same. Add the best benefit sacrificed when a resource has another use.
For materials, ask whether using inventory creates a replacement purchase. For labor, distinguish paid idle time, extra pay and displaced work. Check that wages, overhead and lost contribution have each been counted on the correct basis.
2Choose between orders and outside supply
14 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionThe lowest visible price may mislead
- 2ExplanationCheck the order’s actual terms
- 3ExampleFind the backpack order’s cost
- 4ExampleCalculate the gain and the price floor
- 5ChallengeFind a different order’s minimum price
- 6ConnectionMake the same capacity busy
- 7ExampleCompare a smaller order with an extra shift
- 8ChallengeValue only the hours that are short
- 9TipKeep customer effects in the decision
- 10ExplanationSeparate avoidable making costs
- 11ExampleAdd a use for the space
- 12ChallengeAllow for delivery in a supplier ceiling
- 13ChallengeA cheap quotation with a practical problem
- 14RecapCompare the complete relevant alternatives
3Follow closure and processing effects
13 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionFollow the choice beyond the cost report
- 2ExplanationRead the segment’s contribution
- 3ExampleSouth’s loss hides a positive contribution
- 4ChallengeCheck the lease before using the margin
- 5ConnectionA café can support book sales
- 6ExampleGive the freed floor space a value
- 7ChallengePut the first year in its own period
- 8ExplanationStart where products can be sold
- 9ExampleCream earns more after the extra step
- 10ExampleA higher sales value can still lose profit
- 11ChallengeAllow for processing work displaced
- 12Key InsightThe earlier decision has different relevant costs
- 13RecapUse the whole business’s profit difference
4Put scarce machine hours to their best use
16 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionDemand competes for machine time
- 2ExampleCalculate the resource requirement
- 3ChallengeIs production capacity actually scarce?
- 4ExplanationDivide contribution by the scarce input
- 5ExampleFill demand in ranking order
- 6ExampleTurn the plan into a profit figure
- 7ChallengeBuild a plan for different products
- 8ConnectionReserve the contractual units first
- 9TipCheck the last whole units
- 10ExamplePrice the first block of displacement
- 11ChallengeLet a large order cross a boundary
- 12Key InsightExtra hours are valuable within a range
- 13ExplanationRank components by savings per hour
- 14ExampleBuy the components the hours cannot cover
- 15ChallengeChoose between internal uses of an hour
- 16RecapUse the resource where it earns or saves most
5Write a decision another person can follow
10 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionMake the result useful to a manager
- 2ExplanationCheck the financial margin for error
- 3ChallengeFind the estimate that reverses the choice
- 4ConnectionLonger decisions change what can be avoided
- 5ExampleSet up the hotel-table order
- 6ExampleBuild the resource lines
- 7ExampleCheck the gain two ways
- 8ChallengePrepare a short statement for a new job
- 9ChallengeConnect the recommendation to the facts
- 10RecapShow the calculation and the judgment
Relevant Costs practice questions
Set 1: Find the cash effects of a decision10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Compare orders, suppliers and production plans10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Trace opportunity costs through linked choices10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Make and defend a complete recommendation10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Absorption cost
Allocated fixed overhead
Alternative use
Avoidable fixed cost
B
Book value
C
Capacity shortfall
Closure cost
Committed cost
Common fixed cost
Contractual minimum
Contribution margin
Contribution per limiting factor
D
Decision horizon
Depreciation
Differential analysis
Displaced sales
Double counting
E
Extra capacity cost
F
Feasible plan
Forgone contribution margin
Freed capacity
H
Historical cost
I
Incremental cash cost
Incremental revenue
J
Joint costs
Joint products
K
Knock-on sales effect
L
Limiting factor
M
Make-or-buy decision
Maximum demand
Minimum acceptable price
N
Notional cost
O
Opportunity cost
Order-specific fixed cost
Outsourcing
Overtime
Overtime premium
P
Paid idle time
Partial acceptance
Production mix
Q
Qualitative factor
R
Recommendation
Recurring saving
Relevant cost
Relevant revenue
Relevant-cost statement
Replacement cost
Resale value
Resource availability
Resource requirement
S
Saving per scarce resource unit
Segment
Segment margin
Sensitivity check
Severance pay
Spare capacity
Special order
Split-off point
Sunk cost
Sunk cost fallacy
Supplier-price ceiling
T
Time value of money
Total approach
Traceable fixed cost
U
Unmet demand
V
Variable overhead
W
Whole-unit restriction
About this lesson
Make your own Study Materials
Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.