Decision-Making Under Risk and Uncertainty

Learn how managers choose when the future is not known. Tell risk from uncertainty, set out decisions in payoff tables and compare choices with expected values, the maximax, maximin and minimax regret rules, and decision trees for decisions made in stages. Work out what perfect and imperfect information is worth, and test how robust a decision is with sensitivity analysis and simulation.

IntermediateLesson 5 of 9 in Performance Management Course

What you will learn

  1. Tell risk from uncertainty, set out the choices and possible outcomes of a decision in a payoff table, and recognize how a decision maker's attitude to risk shapes the choice.
    • Tell risk from uncertainty
      Distinguish decisions where probabilities can be estimated from decisions where they cannot, and explain where the probabilities come from.
    • Set out a decision in a payoff table
      Build a payoff table that shows the result of every choice under every possible outcome, using only the costs and revenues that change.
    • Recognize attitudes to risk
      Describe risk-seeking, risk-neutral and risk-averse decision makers and link each attitude to the way it ranks choices.
  2. Calculate expected values from probabilities and payoffs, choose between alternatives with them, and judge when an expected value is a sound basis for a decision.
    • Calculate and compare expected values
      Calculate the expected value of each alternative, choose the best one, and read the result correctly.
    • Judge the limits of expected values
      Explain when an expected value is a good guide, measure the spread of outcomes it hides, and say what else to consider.
  3. Choose under uncertainty with the maximax, maximin and minimax regret rules, and explain why different rules can point to different choices.
    • Apply the maximax and maximin rules
      Use the optimistic maximax rule and the cautious maximin rule on profit tables and adapt both rules to cost tables.
    • Apply the minimax regret rule
      Build a regret table from a payoff table and choose the alternative with the smallest maximum regret.
    • Compare decision rules and recommend a choice
      Explain why the rules can disagree, choose a criterion that fits the decision maker and situation, and justify the recommendation.
  4. Draw decision trees for decisions made in sequence, evaluate them by rolling back expected values, and interpret what the result says about risk.
    • Draw a decision tree
      Show a sequence of decisions and chance outcomes as a decision tree with the right symbols, probabilities, costs and payoffs.
    • Evaluate a decision tree by rolling back
      Work back from the end of the tree to find the best sequence of decisions and its expected value, then judge the risk of that plan.
  5. Identify ways to gather information before deciding and calculate how much perfect and imperfect information is worth.
    • Use research to reduce uncertainty
      Describe research techniques that reduce uncertainty before a decision and weigh what they can and cannot tell a business.
    • Calculate the value of perfect information
      Calculate the expected value of perfect information and use it as the most that any information about the outcome is worth.
    • Calculate the value of imperfect information
      Use the probabilities of research results to find what imperfect research is worth and decide whether to buy it.
  6. Use sensitivity analysis to find how far estimates can change before a decision changes, and use simulation to see the range of results when several factors are uncertain.
    • Apply sensitivity analysis
      Calculate how far each estimate can change before a decision changes, identify the critical estimates and explain the method's limits.
    • Use simulation to model uncertain outcomes
      Run a simple simulation with random numbers and explain when simulation helps and what limits its results.

Decision-Making Under Risk and Uncertainty study guide

6 chapters

1

Frame decisions under risk and uncertainty

Good decisions begin by separating the action management controls from the future outcome it cannot control. The available evidence determines whether probabilities can be estimated, while the payoff table makes the consequences visible. Attitudes to risk then explain why managers who accept the same estimates can still prefer different choices, especially when a poor result would put the business under financial pressure.

1.1 What is known about the future

A manager chooses today, but the result often depends on tomorrow's demand, costs or competitors. Before calculating a result, ask what can happen and what is known about the chance of each outcome. That determines which methods can help.

Certainty, risk and uncertainty
SituationWhat is known?Example
CertaintyEach choice has one known result.A fixed payment for a completed service.
RiskSeveral results are possible, with estimated probabilities.Stocking juice using a record of daily demand.
UncertaintyReliable probabilities cannot be assigned; some outcomes may be unforeseen.Launching a new kind of product with no useful demand history.

In management accounting, risk means that probabilities can be attached to outcomes. It includes a result above expectations as well as a result below them. Upside risk concerns better results; downside risk concerns worse results. A choice can be risky even when every possible payoff is positive.

Frank Knight distinguished measurable risk from uncertainty in 1921. This distinction concerns the information available when the choice is made. It does not divide decisions into those that succeed and those that fail.

Where probabilities come from

An objective probability, also called a relative-frequency probability, uses recorded experience. If demand was 200 bottles on 90 of 300 trading days, the estimated probability is:

90÷300=0.3

That is 30% of the observed days. Using it for the future assumes that the future resembles the period measured. A new competitor or a change in trading hours can make an old record less useful.

A subjective probability uses judgment, experience or expert opinion. A manager might estimate, "There is a 40% chance of strong demand." This permits calculations under risk even without a long record. The numerical result still depends on the quality of that judgment; writing 0.4 does not make it an observed frequency.

Check the outcome list

The states must cover the possibilities in the model without overlapping. The kiosk models demand as 200, 300 or 400 bottles, with probabilities 0.3, 0.5 and 0.2:

0.3+0.5+0.2=1

A total below 1 can signal a missing outcome. A total above 1 can signal overlap or incorrect estimates. Check the meanings of the categories as well as the arithmetic. Probabilities belong to outcomes, not to the choices management controls.

Match the method to the information

Expected values, decision trees and random-number simulation use probabilities. Maximax, maximin and minimax regret can compare choices without them. Sensitivity analysis asks how a changed estimate affects the decision and helps under both risk and uncertainty. Research can improve the evidence before management commits.

A probability of 0.3 does not predict tomorrow's demand. It describes a frequency over many comparable days. Tomorrow still produces one outcome: it does not produce 30% of a low-demand day.

Key Takeaways

  • Risk has estimated probabilities; uncertainty lacks a reliable basis for assigning them.
  • Objective probabilities use records; subjective probabilities use judgment.
  • A complete set of nonoverlapping outcomes has probabilities totaling 1.
  • Risk includes upside and downside results.

1.2 Build a table of choices and results

A payoff table, or profit table, puts each management choice beside the results it could produce. It separates what the business controls from what it must respond to. The same table can then support several decision rules.

Define the rows and columns

Rows show alternatives, also called strategies: actions management can choose. Columns show states of nature: outcomes outside management's control, such as demand. A cell gives the payoff for one alternative in one state. Label whether the payoff is profit, contribution or cost, because the direction of a good result depends on that label.

List the alternatives and states first. Add probabilities to the states when they are known. Then write a rule for calculating a cell before filling in the table.

Work out the juice kiosk's profit

A kiosk can prepare 200, 300 or 400 bottles. Each costs $1.50 to make and sells for $4.00. Unsold bottles are discarded. Demand is 200, 300 or 400 bottles, with probabilities 0.3, 0.5 and 0.2.

Revenue depends on bottles sold. Production cost depends on bottles prepared. Sales are the smaller of production and demand:

Profit=4×min⁡(prepared,demand)−1.5×prepared

Prepare 300 and face demand of 200: sell 200, receive $800, and pay $450 to prepare all 300. Profit is $350. Prepare 400 and face demand of 300: receive $1,200 and pay $600, leaving $600. Prepare 300 and face demand of 400: sales stop at 300, so $1,200 less $450 gives $750. The extra 100 customers cannot buy.

Bottles preparedDemand 200Demand 300Demand 400
200$500$500$500
300$350$750$750
400$200$600$1,000

Using demand as sales would overstate revenue when the kiosk runs out. Charging only for bottles sold would understate cost when stock is discarded.

Include the amounts that affect the comparison

Relevant amounts are future cash flows that change between alternatives or states. A sunk cost cannot be changed by today's choice. A fixed cost that is identical in every cell can be omitted without changing the ranking. If it is omitted, label the resulting payoff clearly; the figures may represent contribution toward that common cost instead of final business profit.

Check for dominance

An alternative dominates another if it pays at least as much in every state and more in at least one. With profits of $10 or $20 for A and $10 or $15 for B, A dominates B. Removing B cannot make the selected result worse. A rule may still tie them: both have a minimum of $10.

No kiosk row dominates another. Preparing 200 protects profit on low-demand days, while preparing 400 gives the best result on high-demand days. That tradeoff is why a decision rule is needed.

For a cost table, lower values are better and the dominance comparison reverses. A table also simplifies reality: real demand can fall between the selected states, and prices and costs remain estimates.

Key Takeaways

  • Rows are controlled alternatives; columns are states outside management’s control.
  • Sales stop at the smaller of stock and demand; all prepared stock incurs its production cost.
  • Use future amounts that affect the comparison and label the payoff basis.
  • For profit, dominance means no worse in every state and better in at least one.
  • Lower is better in a cost table.

1.3 How attitudes to risk affect a choice

Two managers can read the same payoff table and prefer different actions. They may agree on the numbers but place different weight on the chance of a poor result. Attitude to risk explains this difference.

Compare three attitudes
AttitudeWhat the decision maker valuesClosely linked rule
Risk-neutralThe probability-weighted average resultExpected value
Risk-averseGreater certainty and protection from bad resultsMaximin as a strongly cautious rule
Risk-seekingThe opportunity for a very good result despite a wider spreadMaximax

A risk-neutral manager does not require extra reward merely because the outcomes are more spread out. A risk-averse manager may accept a lower average to reduce exposure to a bad result. A risk seeker accepts more variation for the opportunity to obtain a high payoff. Minimax regret reflects a different concern: avoiding a large missed opportunity when looking back after the outcome is known.

Work through one choice

Option X pays a certain $40,000. Option Y pays $100,000 with probability 0.5 or loses $10,000 with probability 0.5. Y's expected profit is:

0.5×100,000+0.5×(−10,000)=45,000

A risk-neutral manager chooses Y because its expected profit is $5,000 higher. That manager is comparing averages, not claiming that Y will pay $45,000.

A risk-averse manager may choose X. The price of removing Y's 50% chance of a $10,000 loss is $5,000 of expected profit. A risk seeker is attracted to Y's $100,000 possible gain. The observed choice alone need not identify an attitude: both a neutral manager and a risk seeker choose Y here, for different reasons.

Risk aversion is not a refusal of every risk

A risk-averse decision maker needs sufficient expected reward to accept a riskier alternative. If Y's possible gain became much larger, many cautious managers would accept it. Their concern about downside remains, but the reward can compensate for it.

Maximin is more restrictive. It compares only the worst payoff of each action. X's worst payoff is $40,000; Y's is a loss of $10,000. Raising Y's best payoff does not change either minimum, so a manager applying maximin still chooses X. Do not treat every risk-averse choice as a mechanical application of maximin.

Ask whose risk is being taken

Attitudes depend on stakes and circumstances. The same manager can use expected value for a small daily purchase and demand stronger protection for a large one-time commitment. A business unable to absorb a loss may value survival more than a small improvement in average profit.

Managers also act for owners. A manager whose job or bonus depends on avoiding losses may favor a safer action than owners who spread their investment across many businesses. A recommendation should identify whose objectives and ability to bear losses it reflects.

Key Takeaways

  • Risk-neutral decision makers rank choices by expected payoff.
  • Risk aversion can justify giving up expected profit for greater certainty.
  • Risk seekers accept wider variation for the chance of a high payoff.
  • Maximin ignores improvements to the best outcome if the worst outcome stays unchanged.
  • Stakes, resources and whose interests are served affect the choice.
2

Use expected values to decide under risk

Probabilities allow managers to compare choices through their average financial results. Calculating expected value is straightforward once the payoff table is correct, but interpreting it needs care. The average may never occur, and two actions with similar averages can expose the business to very different losses. Measures of spread and the decision’s frequency help put that average into perspective.

2.1 Calculate the average payoff of each choice

The expected value (EV) is a probability-weighted average. It combines every possible payoff with its probability. Larger-probability outcomes contribute more to the average, but an unfavorable payoff must still be included with its correct sign.

Calculate one row at a time
EV=∑px

Here, each payoff is multiplied by its probability, then the products are added. Check that the probabilities cover the outcomes and total 1. Use the same time period and payoff basis for every alternative.

For the kiosk, demand of 200, 300 and 400 bottles has probabilities 0.3, 0.5 and 0.2. Preparing 200 bottles earns $500 in every state, so its EV is $500.

Preparing 300 bottles gives payoffs of $350, $750 and $750:

0.3×350+0.5×750+0.2×750=105+375+150=630

Preparing 400 gives payoffs of $200, $600 and $1,000:

0.3×200+0.5×600+0.2×1,000=60+300+200=560

The expected value rule chooses 300 bottles because $630 is the highest expected daily profit. For costs, the rule chooses the lowest expected cost. This is a risk-neutral ranking.

Read the result as an average

If the kiosk repeatedly prepares 300 bottles and demand follows these probabilities, average daily profit approaches $630 over many days. A single day pays $350 or $750. The $630 average is not a third possible payoff and need not occur on any day.

The method uses weighted averages because the states are not equally likely. Adding the three payoffs and dividing by three would silently give each state probability one third, contradicting the demand estimates.

Expected demand is a different calculation

Expected demand is:

0.3×200+0.5×300+0.2×400=290 bottles

That does not establish the best production quantity. Preparing 290 bottles gives profits of $365, $725 and $725. Its expected profit is:

0.3×365+0.7×725=617

This is below the $630 from preparing 300. Unsold stock costs money and unmet demand produces no revenue, so the profit rule responds differently on either side of the stock level. Calculate the EV of each available action instead of treating average demand as certain demand.

Deduct a certain cost once

A campaign costs $20,000 and adds contribution of $60,000 with probability 0.6 or $15,000 with probability 0.4. Expected extra contribution is:

0.6×60,000+0.4×15,000=42,000

The campaign's expected gain is $42,000 less $20,000, or $22,000, so it goes ahead under the EV rule. Equivalently, calculate the weighted average of the net payoffs, $40,000 and a loss of $5,000. Both approaches give $22,000. Subtracting the campaign cost from net payoffs again would count it twice.

Decision trees apply this same calculation at each chance point. Information valuation compares the best EV available before information with the EV of decisions made after receiving it.

Key Takeaways

  • Multiply each payoff by its probability and add all the products.
  • Choose the highest expected profit or lowest expected cost.
  • EV is a long-run average and may never be an actual outcome.
  • Optimizing payoff at expected demand can miss the best expected profit.
  • Deduct a certain cost once, using either gross or net payoffs consistently.

2.2 Look beyond the expected value

An expected value answers an average-profit question. It does not describe how painful a bad result could be, how likely that result is, or whether the business could survive it. These questions matter especially when the decision is made only once.

Repeated decisions and one-time commitments

A kiosk makes a stocking decision every day. Over many comparable days, good and bad outcomes contribute to an average. A company launching one product receives one outcome, which may be far from the EV. A positive expected profit cannot pay an actual bill if the launch produces a loss.

Two choices can have equal EVs and very different spreads. A certain $40,000 and an uncertain mix with the same average are equivalent to a risk-neutral decision maker. A cautious manager can prefer the certain amount. Assess the probability and size of unacceptable losses alongside the average.

Measure the spread

The range runs from the lowest to the highest possible payoff. The kiosk's 300-bottle row runs from $350 to $750, a width of $400. The 400-bottle row runs from $200 to $1,000, a width of $800. A range gives endpoints but does not weight their probabilities.

The standard deviation uses every payoff's distance from the EV:

σ=∑p(x−EV)2

For 300 bottles, the EV is $630. The deviations are −$280, $120 and $120. Squaring removes the signs; weighting gives:

0.3×2802+0.5×1202+0.2×1202=33,600

The square root is about $183.3. For 400 bottles the EV is $560 and the deviations are −$360, $40 and $440:

0.3×3602+0.5×402+0.2×4402=78,400

The square root is $280. Standard deviation is measured in the same unit as the payoff; variance, before taking the square root, is in squared dollars.

The coefficient of variation is standard deviation divided by EV. The kiosk values are about 0.29 for 300 bottles and 0.50 for 400. With positive expected profits, this expresses spread per dollar of expected profit.

Interpret the whole distribution

Preparing 300 has higher EV, lower standard deviation and a better worst payoff than preparing 400. The 300-bottle choice suits both the neutral and cautious kiosk owner. More generally, a higher EV and a lower standard deviation alone do not describe every feature a risk-averse owner may care about. Examine the actual payoffs and probabilities, particularly when a higher average comes with greater spread.

Option Y, paying $100,000 or losing $10,000 with equal probabilities, has EV $45,000 and a 50% loss probability. A company that cannot absorb that loss may prefer certain profit of $40,000.

Check estimates and omitted effects

Historical demand may change when competition or weather changes. Subjective probabilities can reflect optimism. A few demand categories simplify a continuous range, while a financial table may leave out waste and customer goodwill lost through stockouts. Sensitivity analysis can show how far a probability must change before another choice takes the lead.

The most likely outcome is the one with the highest probability. It is not the EV: demand of 300 has probability 0.5 at the kiosk, while the $630 expected profit from preparing 300 is never a daily result.

Key Takeaways

  • EV is more informative for repeated comparable decisions than as a forecast for one event.
  • Range shows endpoints; standard deviation weights deviations by probability.
  • Coefficient of variation compares spread with positive expected profit.
  • Inspect unacceptable outcomes and their probabilities alongside EV.
  • The most likely outcome and the expected value are different concepts.
  • Check the quality of estimates and nonfinancial effects.
3

Apply decision rules when probabilities are unknown

A business may know the possible profits without having reliable probabilities for them. It can still choose a rule that reflects its priorities: pursuing the largest opportunity, protecting its worst result, or limiting a missed opportunity in hindsight. Applying these rules to the same table makes their tradeoffs visible and gives a recommendation a clear basis that management can assess.

3.1 Choose an optimistic or cautious rule

When probabilities are unavailable, a manager can still compare the payoffs. Maximax focuses on opportunity at the favorable end. Maximin focuses on protection at the unfavorable end. Both reduce each alternative to one extreme result.

Apply maximax to profits

First find the largest payoff in each row. Then choose the row with the largest of those figures. The name captures both steps: maximize the maximum.

For the kiosk, the row maxima are $500 for preparing 200 bottles, $750 for preparing 300 and $1,000 for preparing 400. Maximax selects 400 bottles. It is an optimistic choice because it concentrates on the best possible profit without weighting the other results.

A very high best payoff can make an alternative attractive under maximax even when all its other results are poor. Raising the probability of a bad state would not affect the maximax calculation; the rule uses no probabilities.

Apply maximin to profits

First find the smallest payoff in each row. Then choose the row with the largest of those minima. This secures the best guaranteed profit among the listed states.

PreparationLowest profitHighest profit
200 bottles$500$500
300 bottles$350$750
400 bottles$200$1,000

Maximin selects 200 bottles because its worst result, $500, is better than the worst results of the other actions. It gives up the possibility of profits above $500 in exchange for that protection.

The common error is to stop after finding the smallest figure in the table. That would identify a bad outcome, not the best protected action. Maximin has two comparisons: a minimum within each row, then a maximum across those minima.

Reverse the direction for costs

A cost is something to minimize. The cautious version is minimax cost: find each action's highest cost and choose the lowest of them. The optimistic version is minimin: choose the action with the lowest possible cost.

Supplier A costs $12,000 at low demand and $18,000 at high demand. Supplier B costs $14,000 and $15,000 respectively. Their highest costs are $18,000 and $15,000, so the cautious rule chooses B. Their lowest costs are $12,000 and $14,000, so the optimistic rule chooses A.

Payoff basisOptimistic approachCautious approach
ProfitHighest row maximumHighest row minimum
CostLowest row minimumLowest row maximum

The table label matters more than the familiar name of a rule. Mechanically choosing a large number from a cost table would reward an expensive result.

Understand what the rule leaves out

Each extreme-value rule ignores the middle outcomes and their probabilities. Maximin can reject a large potential gain because of one poor result, even if that result is considered very unlikely. Maximax can favor a spectacular gain without reflecting how rarely it may occur. Their simplicity helps under uncertainty, but their recommendations express a chosen attitude to the unknown future.

Key Takeaways

  • Maximax selects the largest row maximum in a profit table.
  • Maximin selects the largest row minimum in a profit table.
  • For costs, caution selects the lowest row maximum; optimism selects the lowest row minimum.
  • Neither extreme-value rule uses probabilities.

3.2 Limit the largest missed opportunity

Regret, also called opportunity loss, measures the gap between the chosen result and the best result that could have been obtained in the state that actually occurs. It is a missed payoff, not necessarily an accounting loss. A profitable action can still create regret.

Build the regret table by state

Use the kiosk's profits:

PreparationDemand 200Demand 300Demand 400
200 bottles$500$500$500
300 bottles$350$750$750
400 bottles$200$600$1,000

Find the best payoff down each column. The benchmarks are $500, $750 and $1,000. Every action in a column faces the same demand, so its payoff can be compared with the best action for that demand.

For profits:

Regret=best payoff in the state−chosen payoff

Preparing 400 when demand is 200 earns $200. Preparing 200 would have earned $500 in that same state, so regret is $300. Comparing the $200 with that row's $1,000 would instead compare different demand states; it would not measure the opportunity missed in the state that occurred.

PreparationDemand 200Demand 300Demand 400Maximum regret
200 bottles$0$250$500$500
300 bottles$150$0$250$250
400 bottles$300$150$0$300
Make the minimax choice

Now work across each regret row to find its maximum. Choose the row with the smallest maximum regret. The kiosk selects 300 bottles: its largest missed opportunity is $250, below the $500 and $300 maximum regrets of the other actions.

This does not guarantee a profit of $250. It means that, in every listed demand state, the chosen action finishes no more than $250 below the best action for that state. No probabilities are required.

Check the completed regret table before selecting. No regret should be negative, because the benchmark is the best available payoff. Each column must contain at least one zero, belonging to its best action; tied best actions produce several zeros.

Use cost regret correctly

For costs, the benchmark is the lowest cost in the state:

Cost regret=chosen cost−lowest cost in the state

Supplier A costs $12,000 or $18,000; B costs $14,000 or $15,000. At low demand A is best, so the regrets are $0 for A and $2,000 for B. At high demand B is best, giving regrets of $3,000 for A and $0 for B. The maximum regrets are $3,000 and $2,000; minimax regret selects B.

Both profit regret and cost regret use a nonnegative shortfall from the best action in the same state. The subtraction reverses because high profit helps while high cost hurts.

Notice the role of available alternatives

The benchmark depends on the alternatives in the table. Adding another alternative can improve a column benchmark and change the regret rows of existing actions. It can therefore change which old action minimax regret selects even if the new action is not selected. Maximin does not have this feature: an old action's worst payoff stays unchanged when another row is added.

Key Takeaways

  • Profit regret is the state’s best payoff minus the chosen payoff.
  • Build benchmarks within states, not across one alternative’s different outcomes.
  • Choose the smallest maximum regret after completing the regret table.
  • Every regret column has a zero and no negative values.
  • Cost regret is chosen cost minus the state’s lowest cost.
  • A new alternative can change the regret benchmarks.

3.3 Support a recommendation with a clear criterion

A payoff table describes possible consequences. A decision rule expresses what the manager wants to achieve with those consequences. A recommendation needs both: a computed result and a reason for using that criterion.

Why rules disagree

The kiosk can prepare 200, 300 or 400 bottles. Its decision rules give these results:

RuleChoiceReason
Maximax400Largest possible profit: $1,000
Maximin200Best worst profit: $500
Minimax regret300Smallest maximum regret: $250
Expected value300Highest expected profit: $630

These answers reflect different aims. Maximax rewards the most favorable possibility. Maximin protects the floor. Minimax regret limits the biggest hindsight shortfall. EV weights all the payoffs by their probabilities. Agreement between EV and regret at the kiosk does not make the methods interchangeable; a different table can make them disagree.

Choose a rule that fits the decision

Start with the evidence. Reliable probabilities permit an EV comparison. If no defensible probabilities exist, a weighted average would rest on unsupported numbers; the rules for uncertainty offer alternatives.

Then consider attitude and stakes. An optimistic owner may prefer maximax. A strongly cautious owner may choose maximin. A manager concerned about a large missed opportunity may use minimax regret. Even with useful probabilities, a business can check a one-time, high-stakes choice against a worst-outcome constraint.

A small repeated decision gives more opportunity for average results to emerge. A large commitment may expose the business to a loss it cannot finance. The same best EV can therefore support different practical recommendations in the two settings.

State the tradeoff in numbers

A useful recommendation identifies the criterion, links it to the manager's aims, states the action and explains the cost of that protection or opportunity. For example:

"A cautious owner applying maximin prepares 200 bottles. This guarantees $500 daily profit across the listed demand states, but sacrifices $130 of expected daily profit compared with preparing 300."

The $130 is $630 less $500. It measures the expected profit given up, not an extra cash payment. If the owner instead chooses 300 under the EV rule, its $350 worst payoff must be acceptable; the $630 EV does not replace that possible bad day.

Include effects the table omits

The kiosk's numerical model may omit goodwill lost when it runs out and the waste caused by discarded stock. Management must also consider its resources and ability to absorb a poor result. These factors should be connected to the decision: waste can make excess stock less attractive, while repeated stockouts can damage customer relationships.

Avoid presenting a rule's choice as universally correct. "Prepare 400 because it can earn $1,000" supports maximax, but says nothing about whether the owner wants that optimistic criterion. "Prepare 300 because its EV is highest" supports a neutral average-profit objective, but does not establish that its downside fits the business's resources.

Key Takeaways

  • A rule’s answer is justified by the objective that the rule serves.
  • Use probabilities when they are reliable and consider attitude and stakes.
  • State the selected action, criterion and tradeoff in a recommendation.
  • Include relevant effects and resource limits that the payoff table omits.
4

Solve multi-stage decisions with decision trees

Some decisions create opportunities to choose again after new information arrives. A decision tree keeps those choices in their proper time order, distinguishes them from chance events and tracks when costs are incurred. Working backward finds the best conditional plan. Checking its terminal outcomes then shows why a positive expected value can still leave a substantial probability of a loss.

4.1 Put decisions and outcomes in time order

A decision tree shows decisions and chance events in the order they occur. Its main advantage is timing: a later action can depend on information learned after an earlier commitment. A single payoff table can hide that flexibility.

Separate choice from chance

A square represents a decision point. Its branches are actions the company controls, so they carry no probabilities. A circle represents a chance point. Its branches are possible outcomes, each labeled with a probability. Probabilities leaving one circle must add to 1.

Draw from left to right in time order. Put each cost on the branch where it is incurred and the result at the end of each path. Include feasible alternatives such as doing nothing or selling an asset; leaving one out can change the recommendation.

Map the development problem

A company must first choose whether to develop a product. The compact tree below shows gross terminal receipts or contributions; branch costs are deducted during evaluation.

□ Initial decision

  • Do nothing → $0.
  • Develop: pay $60,000 → ○ development result.
    • Failure, probability 0.25 → no further receipt.
    • Success, probability 0.75 → □ later decision.
      • Sell the design → $90,000 receipt.
      • Large launch: pay $100,000 → ○ demand: high, probability 0.6, contribution $350,000; low, probability 0.4, contribution $120,000.
      • Small launch: pay $40,000 → ○ demand: high, probability 0.6, contribution $220,000; low, probability 0.4, contribution $100,000.

The second square matters: the company chooses its launch action after learning that development has succeeded. It does not randomly receive a large or small launch. Giving those branches probabilities would replace a management choice with chance.

Keep costs consistent

There are two valid payoff conventions. Under a gross approach, terminal amounts show contribution or receipts, and the relevant branch costs are subtracted during evaluation. Under a net approach, each terminal payoff already contains every cost incurred along that path.

For development success followed by a large launch and high demand, the net result is:

350,000−100,000−60,000=190,000

The large-launch low-demand path gives a loss of $40,000. Development failure loses $60,000. Selling after success leaves $30,000 after development cost. Under the net approach, these figures must not have development or marketing cost deducted again.

Calculate path probabilities

Multiply the chance probabilities encountered along a path. Success followed by high demand has probability:

0.75×0.6=0.45

Success followed by low demand has probability 0.3. Failure has probability 0.25. For a plan that launches after success, these three terminal probabilities total 1. Do not multiply by a probability for choosing the launch: the action is part of the plan.

A final drawing check asks three things: does the tree follow the actual information timing, is every feasible choice included, and do the branches at every chance point form a complete set?

Key Takeaways

  • Squares show controlled decisions; circles show chance events.
  • Draw left to right in time order and label costs where incurred.
  • Chance probabilities at each circle total 1; decision branches have none.
  • Use gross or net payoffs consistently so each cost is deducted once.
  • Multiply chance probabilities along a path.

4.2 Work backward to find the best plan

Rolling back solves a decision tree from right to left. Resolve the last uncertain outcomes and choices first, then carry their values back toward the initial decision. This preserves the value of choices that management can make later.

Resolve the demand circles

Use gross terminal contributions for the product-development tree. At a chance circle, multiply each branch value by its probability and add. For a large launch:

0.6×350,000+0.4×120,000=258,000

Subtract its $100,000 marketing cost to get $158,000. For a small launch:

0.6×220,000+0.4×100,000=172,000

Subtract its $40,000 marketing cost to get $132,000. Selling the design gives $90,000 without a demand chance event.

Resolve the decision after success

At the second square compare $158,000, $132,000 and $90,000. Choose the large launch and carry back $158,000. Mark the rejected small-launch and sale branches, often with a double line. Do not average these three values: management controls this choice.

The $60,000 development cost is already spent when this later decision is reached. It is sunk for the launch choice. It remains relevant at the initial square, where management can still avoid development entirely.

Return to the initial decision

Development succeeds with probability 0.75, bringing the optimized value of $158,000. Failure brings no further receipt:

0.75×158,000+0.25×0=118,500

Deduct the $60,000 development cost once. Developing has EV $58,500, above zero from doing nothing. The plan is to develop and, if development succeeds, launch on a large scale. A plan states the later action and the condition under which it is taken.

Subtracting development cost at the later square and again at the initial square would understate the plan. Using net terminal results instead would require no further subtraction of costs already included.

Check the result by complete paths

Under the selected plan, only three terminal results remain:

ResultProbabilityNet payoff
Success, high demand0.45$190,000
Success, low demand0.30−$40,000
Development failure0.25−$60,000

Their weighted total is:

0.45×190,000+0.30×(−40,000)+0.25×(−60,000)=58,500

The agreement confirms that costs and probabilities have been handled consistently. It also reveals risk that the root EV hides. Two paths lose money, with total probability 0.55. A positive EV of $58,500 therefore sits beside a 55% chance of a loss.

Interpret the business decision

A neutral manager selects the highest-EV plan. A cautious business may reject a one-time plan whose losses it cannot absorb, or obtain research before committing. The tree does not make probabilities more reliable and cannot include every real-world outcome. Large trees become hard to follow, so retain the decisions and chance events that materially affect the comparison.

Key Takeaways

  • At a chance point, calculate EV; at a decision point, select the best branch.
  • Roll back from right to left and subtract each cost once.
  • A cost already incurred is sunk for a later choice but can matter to the initial choice.
  • Describe the chosen plan with its later conditional actions.
  • Check root EV against the weighted net terminal payoffs.
  • A positive root EV can coexist with a high probability of loss.
5

Value information that reduces uncertainty

Information matters when it helps management select a better action before committing resources. Research methods differ in the evidence they provide, and their price must be judged against the expected improvement in the decision. Perfect information establishes an upper limit; imperfect research needs a separate calculation that includes every possible report and the action chosen after it.

5.1 Choose research that answers the decision

Research is useful before a commitment because it can improve what the business knows about demand, costs or customer behavior. The best method depends on the missing information. Learning why customers dislike a design is different from estimating how many will buy it.

Start with existing information

Desk research, or secondary research, uses information already collected: company sales records, government statistics and industry reports. It is usually quick and inexpensive. Its weakness is fit. The data may describe another customer group, period or purpose, so the business must check whether it answers the current question.

A kiosk's own sales record can support demand probabilities. An industry report can give market context, but a national total may not estimate demand at one location. Cheap data have little decision value if they concern the wrong market.

Collect information for the choice

Field research, or primary research, collects new data for the current decision. Methods include customer surveys, interviews and observation. The questions and sample can be designed for the product and market, although collection takes time and money.

A focus group brings together a small group of target customers, often about six to ten, with a moderator. Discussion can reveal reasons, reactions and language that a fixed survey misses. A few participants may not represent the market, so their enthusiasm is not a reliable estimate of the probability of strong demand.

Test marketing offers a product through a limited area or channel. Actual sales provide evidence of purchasing behavior. The trial costs money, delays a full launch and can alert competitors. A limited market can also differ from the intended wider market.

MethodUseful evidenceMain limitation
Desk researchExisting patterns and market contextMay be old or collected for another purpose
Survey or interviewCustomer responses to targeted questionsStated intentions can differ from purchases
Focus groupDetailed reasons and reactionsSmall group may be unrepresentative
Test marketingActual sales in a limited launchCost, delay and competitor visibility

Pilot production runs, user-tested prototypes and expert estimates can answer other uncertainties, such as whether a product can be made consistently or used easily.

Combine methods for different needs

Before a broad snack launch, a company uses focus groups to improve recipe and packaging. It then test-markets the snack for three months in one city. The first method explains reactions; the second supplies sales evidence for estimates of strong and weak wider demand. A positive test still leaves uncertainty because conditions and customer groups may differ.

Connect research to a decision change

Research is worth buying when its expected decision benefit exceeds its cost. Consider what management would do after each possible result. If it would choose the same action whatever the research reports, the information has no decision value for that choice. A changed probability estimate is useful financially only when it helps select a better action.

Samples may be unrepresentative, people may report intentions they never act on, and conditions can change before launch. These limitations affect how much confidence to place in the revised estimates and how much to pay for them.

Key Takeaways

  • Desk research reuses data; field research collects new data for the decision.
  • Focus groups help explain reactions but rarely provide reliable market probabilities on their own.
  • Test marketing observes real buying but costs time and can alert competitors.
  • Research value comes from improving the action selected after a result.
  • Compare expected decision benefit with the research cost.

5.2 Find the most perfect information could be worth

Perfect information reveals which state will occur before the business chooses its action. It lets management select the best action for that state. Before the forecast arrives, however, the state is still unknown, so its value must be assessed across all possible states.

Establish the decision without information

Calculate each alternative's EV and select the best. This is the baseline that management can already achieve without paying for a forecast. Using an inferior alternative as the baseline would overstate what information adds.

At the kiosk, demand probabilities are 0.3, 0.5 and 0.2. The best no-information action is preparing 300 bottles, with EV $630 per day.

Allow a different action in each state

With perfect daily demand information, prepare 200 when demand will be 200, 300 when it will be 300, and 400 when it will be 400. The best payoffs in those states are $500, $750 and $1,000.

Weight these state-by-state best payoffs:

EVwith perfect information=0.3×500+0.5×750+0.2×1,000=725

The expected value of perfect information is:

EVPI=EVwith perfect information−EVbest without information

The kiosk's EVPI is $725 less $630, or $95 per day. It is the highest daily fee justified for a perfect demand forecast under the EV approach. At that fee the expected net benefit is zero; below it the forecast adds expected profit.

The single largest payoff, $1,000, is not the EV with perfect information. A forecast cannot create high demand. It only reveals the state, allowing the best response to whichever state occurs.

Include the option not to proceed

A launch earns $200,000 if demand is strong, with probability 0.4, and loses $60,000 if demand is weak, with probability 0.6. Not launching gives zero.

Without information, launch EV is:

0.4×200,000+0.6×(−60,000)=44,000

That is better than zero. With perfect information, launch only for strong demand and do nothing for weak demand. The EV becomes $80,000. EVPI is $80,000 less $44,000, or $36,000. The improvement comes from avoiding the weak-demand losses, whose expected amount is $36,000.

Use regret as a check

EVPI equals the expected regret of the best no-information alternative. Preparing 300 bottles has regrets of $150, zero and $250. Their weighted average is:

0.3×150+0.5×0+0.2×250=95

This matches the forecast valuation. It is expected regret, weighted by probabilities, not the maximum regret used by minimax regret.

EVPI cannot be negative: information can be ignored if it offers no improvement. It is zero when the same action is best in every state. As the best possible forecast, perfect information sets an upper limit for the value of imperfect research about that same uncertainty. Actual surveys and test markets cannot justify a higher price on the same decision basis.

Key Takeaways

  • Perfect information permits the best action for each state before commitment.
  • Weight the best payoff in every state; do not use the single largest payoff.
  • EVPI subtracts the best EV without information from EV with perfect information.
  • EVPI equals expected regret of the best no-information action.
  • EVPI is nonnegative and bounds the value of imperfect information about the same uncertainty.

5.3 Value a survey before buying it

A survey or test market provides imperfect information: it can be wrong. Management learns a research result and then chooses using revised probabilities. Valuation must include the possibility of every result, because the business buys the research before it knows what it will report.

Keep two kinds of probability separate

The probability of a research result tells how often a positive or negative report is expected. The revised state probabilities tell how likely strong or weak demand is after a particular report. They answer different questions.

Continue the launch that earns $200,000 under strong demand and loses $60,000 under weak demand. The original strong-demand probability is 0.4, giving a no-information launch EV of $44,000. A survey has these estimates:

ReportProbability of reportStrong demand after reportWeak demand after report
Positive0.50.70.3
Negative0.50.10.9

Not launching earns zero. The revised demand probabilities total 1 within each report, as do the probabilities of the reports themselves.

Choose after a positive report
EVlaunch, positive=0.7×200,000+0.3×(−60,000)=122,000

This exceeds zero, so management launches after a positive result. Carry $122,000 into the next stage of the calculation.

Choose after a negative report
EVlaunch, negative=0.1×200,000+0.9×(−60,000)=−34,000

Management chooses not to launch, carrying zero. Weighting −$34,000 in the survey strategy would force a launch after the survey had shown it to be unattractive. The ability to change the action is what gives the report value.

Value the research strategy before its result

Weight the selected payoff after each report:

EVwith survey=0.5×122,000+0.5×0=61,000

The survey's gross decision value is $61,000 less the $44,000 best EV without it: $17,000. This is the maximum justified price under the EV approach. At a $12,000 fee, the expected net improvement is $5,000. At $20,000, the survey costs more than the benefit and should be rejected.

There are two consistent comparisons: compare the $17,000 gross value with the fee, or deduct the fee from $61,000 and compare with $44,000. Do not deduct the fee and then compare the already-net improvement with the fee again.

Check the probabilities and the upper limit

The original strong-demand probability is recovered by weighting the revised probabilities by report probabilities:

0.5×0.7+0.5×0.1=0.4

The survey value of $17,000 is below the $36,000 EVPI for this launch. Both checks help catch inconsistent data or an incorrect baseline.

A decision tree gives the same structure: buy research or not, observe the report, select launch or no launch, then face demand if launching. The survey does not create a guaranteed profitable launch. After a positive report, weak demand still has probability 0.3, and the loss remains possible.

Key Takeaways

  • Separate probabilities of reports from revised probabilities of demand after a report.
  • Choose the best action after each possible report before weighting the results.
  • Subtract the best no-information EV to find gross research value.
  • Compare the research fee once with the expected improvement.
  • Check consistency with original probabilities and the EVPI upper limit.
6

Test how robust a decision is

A recommendation can depend heavily on estimates that later prove wrong. Sensitivity analysis locates the point where an input changes the decision, while simulation shows a distribution of results when uncertain inputs are sampled repeatedly. Together they help management identify the estimates that deserve attention and see the range of financial outcomes that an average can hide.

6.1 Find the estimates that can change the decision

Sensitivity analysis changes one estimate while holding the others fixed. It asks how far that input can move before the result reaches a decision threshold.

Establish the profit to protect

A product sells 10,000 units at $25. Variable cost is $15 per unit and fixed costs are $70,000. Contribution per unit is $10, total contribution is $100,000, and profit is $30,000.

When the decision remains worthwhile while profit is positive, the adverse percentage change that removes profit is:

Sensitivity percentage=profittotal amount affected by the input×100

The denominator depends on the input being tested. It is the amount whose change alters profit, not one universal sales figure.

Calculate four thresholds

For volume, each lost sale loses its $10 contribution because its $15 variable cost is also avoided. Divide $30,000 by $100,000 total contribution. Sales can fall 30%, to 7,000 units, before profit reaches zero.

For price, a price reduction applies to all 10,000 units while unit cost stays fixed. Divide $30,000 by $250,000 revenue. Price can fall 12%, or $3 per unit, to $22.

For variable cost, divide profit by $150,000 total variable cost. A 20% increase, or $3 per unit, takes unit cost to $18 and removes profit.

For fixed cost, divide $30,000 by $70,000. An increase of about 42.9% takes total fixed costs to $100,000 and removes profit.

InputAdverse change to zero profitThreshold
Sales volume30% decrease7,000 units
Selling price12% decrease$22 per unit
Variable cost20% increase$18 per unit
Fixed costAbout 42.9% increase$100,000

The smallest percentage marks the most sensitive input: price at 12%. That estimate merits close checking and monitoring. A large percentage shows more room for movement, not more sensitivity. The percentages do not establish which adverse change is most likely.

Test a probability threshold

At the kiosk, let the probability of demand of 200 be p. Preparing 300 earns $350 in that state and $750 in either other state. Its EV is:

350p+750(1−p)=750−400p

Preparing 200 earns $500. Equating the EVs gives 750−400p=500, so p=0.625. Below 0.625, 300 beats 200; at 0.625 they tie. Preparing 400 never beats 300 when p is at least 0.625, even if all remaining demand is 400.

Alternatively, keep the low-demand probability at 0.3 and shift probability between demand of 300 and 400. Preparing 400 overtakes preparing 300 when the probability of demand of 400 exceeds 0.375. Changing a state probability requires compensating elsewhere so the total remains 1.

Understand the limits

One-input tests do not show the combined effect of a lower price and higher costs. Changing several inputs together to describe one possible future is scenario analysis. Sensitivity analysis also supplies no probability for reaching a threshold and no attitude to risk. A spreadsheet can vary input cells quickly, but those limits remain.

Key Takeaways

  • Sensitivity varies one input while other estimates stay fixed.
  • Volume sensitivity uses total contribution; price sensitivity uses revenue.
  • Cost sensitivity uses the total cost affected by that estimate.
  • The smallest adverse percentage identifies the most sensitive input.
  • Probability changes must preserve a total probability of 1.
  • A threshold does not state the probability that the change will occur.

6.2 Simulate a range of possible results

Simulation repeatedly runs a model with sampled uncertain inputs. Each trial selects values according to their probability distributions, calculates a result and records it. Random-number simulation is often called Monte Carlo simulation.

Build the model and sampling ranges

Identify the uncertain variables, specify their possible values and probabilities, and write the payoff calculation. At the kiosk, demand is 200, 300 or 400 with probabilities 0.3, 0.5 and 0.2. Suppose the policy is to prepare 400 bottles every day. Its profits are $200, $600 and $1,000 respectively.

Use equally likely two-digit random numbers from 00 to 99:

DemandProbabilityNumber rangeCount of numbers
2000.300–2930
3000.530–7950
4000.280–9920

The ranges contain 100 numbers, with no gaps or overlap. Count endpoints carefully: 00–30 contains 31 numbers and would assign the wrong probability to demand of 200.

Run trials and translate each draw

The draws 47, 12, 85, 63, 29, 91, 05, 70, 38 and 88 produce demands of 300, 200, 400, 300, 200, 400, 200, 300, 300 and 400. For example, 47 falls in 30–79, so demand is 300 and the 400-bottle policy earns $600. The draw is an input-selection device; it is not itself demand or profit.

Across these ten trials, demand is 200 three times, 300 four times and 400 three times. Total profit is:

3×200+4×600+3×1,000=6,000

Average profit is $600 per trial. The theoretical EV for the policy is $560, so the short simulation has not reproduced it exactly. The sampling process does not require each block of ten trials to contain exactly three, five and two outcomes.

Repeat and summarize

With many trials, the average tends to settle near the model's EV, while the recorded results also reveal the spread and the frequency of losses. Ten trials are too few for a firm business conclusion. Software can run thousands of trials and summarize average profit, the range and the proportion of results below a chosen threshold.

Simulation is especially useful when uncertain demand, price, unit costs and staff hours interact. Listing every combination in a payoff table or tree can become impractical. Run the model for each alternative and compare the resulting distributions against management's objectives.

Preserve relationships between inputs

If lower prices tend to bring higher demand, sampling the two as unrelated variables can produce unrealistic combinations. The model must build in the relationship. More trials reduce sampling variation; they do not repair an incorrect payoff rule, biased probabilities or missing links between inputs.

Building a realistic simulation takes time and skill. Its output describes what the selected model implies. It does not choose a business action by itself: the manager still weighs expected performance, downside exposure and the reliability of the inputs.

Key Takeaways

  • Simulation samples uncertain inputs, computes a result and repeats many times.
  • Random-number ranges must match probabilities without gaps or overlap.
  • Short runs can differ substantially from theoretical expected values.
  • Summarize the spread and chance of loss as well as the average.
  • Model relationships between uncertain variables explicitly.
  • More trials cannot repair poor input estimates or a wrong model.

Decision-Making Under Risk and Uncertainty examples

6 Walkthroughs

1

Frame a stocking decision

12 steps
Separate evidence, choices and outcomes, build the profit model and consider the owner’s attitude to risk.
  1. 1
    IntroductionWhat can the owner decide?

    A juice kiosk must prepare stock before knowing demand. The owner controls preparation, but customers determine sales demand. We will separate those roles, build the payoffs and see why a cautious owner can favor a different stock level from an optimistic one.

  2. 2
    ExplanationDecide whether probabilities are available

    Under risk, outcome probabilities can be estimated. Under uncertainty, there is no reliable basis for assigning them. A year of daily kiosk records may support probabilities; a completely new product may lack comparable evidence.

    Risk includes a better-than-expected result as well as a worse one. A choice can be risky even if all its possible profits are positive.

  3. 3
    ExampleTurn records into a probability

    If demand reached 200 bottles on 90 of 300 comparable trading days, its estimated probability is:

    90÷300=0.3

    This is an objective, relative-frequency estimate. An expert's judgment would instead give a subjective estimate. Either can support a risk calculation, but the calculation's usefulness still depends on the evidence behind it.

  4. 4
    ChallengeCheck an outcome list

    The kiosk models demand of 200, 300 or 400 with probabilities 0.3, 0.5 and 0.2. Does this probability list pass the total check, and does it tell tomorrow’s demand?

    ---reveal---

    The total is 1, so it passes. Tomorrow still has one uncertain demand result. A probability of 0.3 describes the frequency of a 200-bottle day over comparable repetitions, not certain knowledge of tomorrow.

  5. 5
    ExplanationWrite the payoff rule first

    The kiosk can prepare 200, 300 or 400 bottles. Each costs $1.50 and sells for $4.00; unsold bottles are discarded.

    Sales stop at the smaller of stock and demand. Preparation cost applies to every bottle made. The payoff is sales revenue less preparation cost. These different quantity bases are essential when demand and stock do not match.

  6. 6
    ExampleCalculate a low-demand cell

    Prepare 300 bottles and face demand of 200. Only 200 bottles sell, generating $800. Preparing 300 costs $450, so profit is $350.

    The discarded 100 bottles still incur production cost. Charging for only the 200 sold would overstate profit. A common cost identical for every choice can be omitted from the comparison if the payoff basis is labeled clearly.

  7. 7
    ExampleComplete the other demand states

    With 300 prepared, demand of 300 produces $1,200 revenue less $450 cost: profit $750. Demand of 400 also produces $750 because the extra customers cannot buy.

    For demand 200/300/400, the full profit rows are:

    • Prepare 200: $500/$500/$500.
    • Prepare 300: $350/$750/$750.
    • Prepare 400: $200/$600/$1,000.
  8. 8
    ChallengeCheck a high-stock calculation

    The kiosk prepares 400 bottles and demand is 300. What profit belongs in the payoff table, and why?

    ---reveal---

    It sells 300 for $1,200 and pays $600 for all 400 prepared, leaving $600. Revenue cannot use 400 bottles because demand is only 300. Cost cannot use 300 because the business prepared and paid for 400.

  9. 9
    Key InsightLook for a dominated action

    An action dominates another when it pays at least as much in every state and more in at least one. Removing the dominated action cannot worsen the selected result, though some rules can tie their scores.

    No kiosk quantity dominates another: low stock protects low-demand profit, while high stock gives the highest high-demand profit. There is a real tradeoff to judge.

  10. 10
    ExampleCompare attitudes using one choice

    X gives certain profit of $40,000. Y gives $100,000 or −$10,000 with equal probabilities, so its EV is $45,000.

    A neutral manager prefers Y’s higher average. A cautious manager may choose X to eliminate the loss chance. A risk seeker is attracted to Y’s high possible gain. The same choice can therefore arise from different reasons; ask what feature drove it.

  11. 11
    ChallengeExplain the cautious owner’s choice

    The kiosk owner chooses 200 bottles to protect the $500 minimum profit, despite higher potential gains from more stock. What rule fits this reason, and would raising only the 400-bottle best payoff change that rule’s choice?

    ---reveal---

    This is maximin. Raising only the best payoff leaves all row minima unchanged, so maximin still chooses 200. General risk aversion can respond to greater reward; maximin specifically ignores that reward.

  12. 12
    RecapKeep the three questions separate

    Before ranking actions, establish what probabilities the evidence supports, what each action pays in each state and what the owner wants to protect or pursue. The kiosk’s profit table makes the stock-demand tradeoff visible. The selected rule will determine which side of that tradeoff receives most weight.

2

Compare averages and the risk they hide

11 steps
Calculate expected profits, interpret them and inspect spread and unacceptable outcomes.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionFrom possible payoffs to a useful average
  2. 2
    ExampleWeight the 300-bottle profits
  3. 3
    ExampleCompare every available action
  4. 4
    ChallengeRead the average correctly
  5. 5
    Key InsightDo not optimize at average demand
  6. 6
    ExampleDeduct a fee once
  7. 7
    ExplanationSee what an EV hides
  8. 8
    ExampleMeasure spread using probabilities
  9. 9
    ConnectionCompare spread with expected profit
  10. 10
    ChallengeMake a recommendation under a cash limit
  11. 11
    RecapPair the average with the outcomes
3

Compare optimistic, cautious and regret choices

12 steps
Apply the three uncertainty rules to the kiosk and justify a criterion that fits the owner.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionOne table can support several aims
  2. 2
    ExampleCollect best and worst profits
  3. 3
    ExplanationApply the two extreme-profit rules
  4. 4
    ChallengeReverse the objective for costs
  5. 5
    ExplanationFind the benchmark in each demand state
  6. 6
    ExampleBuild the 300-bottle regret row
  7. 7
    ExampleChoose the smallest maximum regret
  8. 8
    ChallengeCheck a regret calculation
  9. 9
    TipAdapt regret to a cost table
  10. 10
    ConnectionIdentify the criterion behind each answer
  11. 11
    ChallengeState what protection costs
  12. 12
    RecapMake the objective visible
4

Roll back a development and launch tree

13 steps
Preserve the timing of choices, evaluate the launch options and check the selected plan’s loss exposure.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionChoose now and again after success
  2. 2
    ExplanationSet out the first two stages
  3. 3
    ExampleAdd demand after each launch
  4. 4
    TipChoose one cost convention
  5. 5
    ChallengeCheck the path before evaluating
  6. 6
    ExampleEvaluate the large launch
  7. 7
    ExampleCompare all choices after success
  8. 8
    ExampleReturn to the development choice
  9. 9
    Key InsightIdentify the sunk cost at the later square
  10. 10
    ExampleRecover the selected terminal outcomes
  11. 11
    ChallengeCalculate the chance of a loss
  12. 12
    ConnectionUse the model with its estimates in view
  13. 13
    RecapCheck both the plan and its payoffs
5

Find what demand information is worth

16 steps
Select research methods, value perfect foresight and evaluate a survey before its report is known.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionInformation must improve an action
  2. 2
    ExplanationMatch the method to the missing evidence
  3. 3
    ChallengeUse evidence for the question it can answer
  4. 4
    ExampleEstablish the uninformed launch decision
  5. 5
    ExampleChoose with perfect foresight
  6. 6
    ExampleSubtract the existing best opportunity
  7. 7
    ChallengeRecognize when foresight adds nothing
  8. 8
    ExplanationSeparate reports from demand states
  9. 9
    ExampleDecide after a positive report
  10. 10
    ExampleDecide after a negative report
  11. 11
    ExampleWeight the selected strategies
  12. 12
    ChallengeApply the fee once
  13. 13
    TipCheck the revised probabilities
  14. 14
    ConnectionConnect the perfect bound to regret
  15. 15
    ChallengeExplain a report with no decision benefit
  16. 16
    RecapValue the choice enabled by the evidence
6

Test thresholds and simulate results

13 steps
Locate sensitive profit estimates, allocate random numbers and interpret a short simulation.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionAsk two different questions about estimates
  2. 2
    ExampleEstablish the starting profit
  3. 3
    ExampleTest sales volume
  4. 4
    ExampleCompare the other input thresholds
  5. 5
    ExampleTest a probability
  6. 6
    ChallengeInterpret a one-input threshold
  7. 7
    ExplanationAllocate equally likely numbers
  8. 8
    ExampleTranslate draws into financial results
  9. 9
    ExampleSummarize ten trials
  10. 10
    ChallengeCheck a boundary draw
  11. 11
    Key InsightModel linked inputs before adding trials
  12. 12
    ChallengeUse both methods for a fragile forecast
  13. 13
    RecapSeparate thresholds from distributions

Decision-Making Under Risk and Uncertainty practice questions

50 Practice Questions in 5 sets

Set 1: Frame the choice and compare possible payoffs10 Practice Questions

Question 1 of 10

A maintenance firm uses 400 comparable call records to estimate probabilities for tomorrow’s call volume. How is this decision setting classified?
  1. Risk based on subjective probabilities.
  2. Risk based on objective probabilities.
  3. Uncertainty with no probability basis.
  4. Certainty about the daily call volume.
Show answerHide answer
Answer: B
The records provide relative frequencies that can be used to estimate outcome probabilities, making this a decision under risk. Uncertainty would lack a reliable basis for those probabilities; an estimate from records still does not make tomorrow’s call volume certain.

Question 2 of 10

A café prepares 160 meals at $3 each and sells them for $8. Demand is 130 meals and unsold meals have no value. What is the payoff before common fixed costs?
  1. $650
  2. $800
  3. $1,040
  4. $560
Show answerHide answer
Answer: D
Sales revenue is 130 × $8 = $1,040, while preparing all 160 meals costs $480, leaving $560. The $650 result charges only for the meals sold and ignores the cost of the 30 discarded meals. Revenue is limited by actual sales, but production cost is not.

Question 3 of 10

Two contracts have equal expected profits. A manager chooses the certain payment because the alternative can cause a loss. What attitude does this reason show?
  1. Risk aversion.
  2. Risk neutrality.
  3. Risk seeking.
  4. Maximax optimism.
Show answerHide answer
Answer: A
The manager gives up no expected profit and values certainty because the possible loss matters, showing risk aversion. A risk-neutral manager would be indifferent between equal expected profits on the EV criterion, even if their spreads differ. Maximax instead focuses on the highest possible payoff.

Question 4 of 10

A delivery plan earns $18,000 with probability 0.4 or loses $6,000 with probability 0.6. What is its expected profit?
  1. $10,800
  2. $6,000
  3. $3,600
  4. $7,200
Show answerHide answer
Answer: C
Weight the gain and the loss: 0.4 × $18,000 − 0.6 × $6,000 = $3,600. The $10,800 figure adds the weighted loss as though it were a gain. A negative payoff must retain its sign even when the overall expected profit remains positive.

Question 5 of 10

A workshop has possible weekly profits of $2,000 and $8,000, with EV $5,600. What does $5,600 represent?
  1. The profit guaranteed in the next operating week.
  2. The weighted average over comparable repeated weeks.
  3. The most likely individual weekly profit outcome.
  4. The midpoint between the two possible weekly profits.
Show answerHide answer
Answer: B
The EV is a probability-weighted average across the possible results and becomes a guide to the average over repeated comparable weeks. It is not a guarantee or an additional weekly payoff: the stated outcomes remain $2,000 and $8,000. Their simple midpoint would be $5,000.

Question 6 of 10

A printing firm compares profits under low/high demand: A $9,000/$15,000; B $7,000/$24,000; C $11,000/$13,000. What do maximax and maximin recommend?
  1. Maximax B; maximin C.
  2. Maximax B; maximin A.
  3. Maximax C; maximin B.
  4. Maximax A; maximin C.
Show answerHide answer
Answer: A
The row maxima are $15,000, $24,000 and $13,000, so maximax selects B. The minima are $9,000, $7,000 and $11,000, so maximin selects C. Choosing A for maximin overlooks C’s better minimum.

Question 7 of 10

A storage firm compares profits in states L/H: A $30,000/$42,000; B $24,000/$55,000; C $20,000/$58,000. What is B’s maximum regret?
  1. $3,000
  2. $13,000
  3. $31,000
  4. $6,000
Show answerHide answer
Answer: D
The best state profits are $30,000 in L and $58,000 in H. B therefore has regrets of $6,000 and $3,000, making its maximum $6,000. The $31,000 difference compares B’s profits across different states, which measures neither state’s missed opportunity.

Question 8 of 10

A manufacturer studies an existing industry sales report before commissioning a survey. What kind of research is the report review?
  1. Field research using primary data.
  2. Test marketing through a limited launch.
  3. A focus group with target customers.
  4. Desk research using secondary data.
Show answerHide answer
Answer: D
Reviewing information that already exists is desk research, also called secondary research. A new survey would be field research because it collects data for the current decision. The sequence does not make the existing report primary data; classification depends on how the information was obtained.

Question 9 of 10

Demand probabilities are 0.20 for low, 0.45 for medium and 0.35 for high. The 00–99 scale assigns low to 00–19. What medium interval completes a valid consecutive allocation?
  1. 20–65
  2. 21–65
  3. 20–64
  4. 20–54
Show answerHide answer
Answer: C
Medium needs 45 of the 100 equally likely numbers, and 20 through 64 contains 45. The interval 20–65 contains 46 because both endpoints count. Although 21–65 also has 45 numbers, it leaves 20 unassigned after the stated low-demand interval.

Question 10 of 10

Profits in states L/M/H are A $10,000/$30,000/$40,000; B $20,000/$32,000/$52,000; C $5,000/$40,000/$60,000. State probabilities are 0.2/0.5/0.3. An owner wants to limit the largest missed payoff relative to the best action for the state that occurs. What action fits, and how much EV does it give up compared with the neutral choice?
  1. B; it gives up $3,400 compared with C.
  2. C; it gives up $0 compared with C.
  3. A; it gives up $10,000 compared with C.
  4. B; it gives up $8,000 compared with C.
Show answerHide answer
Answer: A
The objective is minimax regret. State bests are $20,000/$40,000/$60,000, giving maximum regrets $20,000 for A, $8,000 for B and $15,000 for C; choose B. B’s EV is $35,600 versus C’s $39,000, so the protection costs $3,400 of expected profit; choosing C pursues the average instead.
Set 2: Use trees, information and robustness checks10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

After observing a prototype test, managers choose to sell the design or manufacture it. What symbol represents this choice in a decision tree?
  1. A circle with outcome branches.
  2. A square with probability branches.
  3. A square with action branches.
  4. A circle with action probabilities.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A trial succeeds with probability 0.8. Conditional on success and choosing to launch, demand is strong with probability 0.35. What is the probability of the successful-trial, strong-demand path?
  1. 0.28
  2. 0.35
  3. 0.45
  4. 0.80
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

Following successful development, launch A has expected contribution $95,000 and marketing cost $30,000. Launch B gives $80,000 and costs $12,000. The design can be sold for $66,000. Development cost of $25,000 is already paid. What action maximizes value now?
  1. Launch A, worth $65,000 from now.
  2. Sell the design for $66,000 now.
  3. Launch B, worth $43,000 from now.
  4. Launch B, worth $68,000 from now.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A contract pays $90,000 if a permit is granted, probability 0.3, and loses $15,000 otherwise. Declining pays zero. What is EVPI for learning the permit outcome before accepting?
  1. $16,500
  2. $10,500
  3. $27,000
  4. $63,000
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A service earns $100,000 with strong demand or loses $40,000 with weak demand; not offering it earns zero. A survey is favorable with probability 0.4, giving strong-demand probability 0.8, or unfavorable with probability 0.6, giving probability 0.3. What is the survey’s maximum justified fee?
  1. $2,400
  2. $27,200
  3. $34,400
  4. $0
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A product sells 5,000 units at $32, with unit variable cost $20 and fixed costs $42,000. How far can sales volume fall before profit reaches zero?
  1. 11.25%
  2. 30%
  3. 18%
  4. 42.86%
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

An analyst samples uncertain demand repeatedly and records each resulting profit. What technique is being used?
  1. Simulation.
  2. Maximin.
  3. Desk research.
  4. Minimax regret.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

Profit alternatives pay A $4,000/$9,000 and B $4,000/$7,000 in the same two states. What relationship holds?
  1. B dominates A because its maximum is lower.
  2. Neither dominates because one state is tied.
  3. A dominates B despite a tied first-state payoff.
  4. A dominates B only if both states favor A strictly.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

Supplier costs in states L/H are A $20,000/$36,000; B $24,000/$29,000; C $27,000/$28,000. Which supplier minimizes maximum regret?
  1. A, with maximum regret $8,000.
  2. B, with maximum regret $4,000.
  3. C, with maximum regret $7,000.
  4. B, with maximum regret $5,000.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A caterer can prepare 80 or 120 packs. Packs sell for $9, cost $4 to prepare and unsold packs are discarded. Demand is 80 with probability 0.65 or 120 with probability 0.35. What action and expected profit follow the EV rule?
  1. Prepare 120; expected profit $470.
  2. Prepare 120; expected profit $366.
  3. Prepare 80; expected profit $400.
  4. Prepare 80; expected profit $260.
Show answerHide answer

Save this lesson to see this answer.

Set 3: Compare methods and interpret the result10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A new-service team has no demand records but assigns outcome probabilities after interviewing experts. How should the resulting EV be interpreted?
  1. It is a risk calculation based on measured frequencies.
  2. It is an uncertainty rule that avoids probability estimates.
  3. It makes the service’s outcome a certain average.
  4. It is a risk calculation based on subjective estimates.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A manager applies maximin. Action A’s profits are $12,000/$18,000; B’s are $5,000/$40,000. Only B’s high-state profit rises to $100,000. What happens to the recommendation?
  1. B becomes preferred because its maximum profit increases.
  2. A remains preferred because the row minima are unchanged.
  3. B becomes preferred because its minimum profit increases.
  4. A and B tie because the low-demand state has no probability.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A plan pays $10,000 or $30,000 with equal probabilities. What are its expected value and standard deviation?
  1. EV $20,000; standard deviation $20,000.
  2. EV $10,000; standard deviation $10,000.
  3. EV $20,000; standard deviation $10,000.
  4. EV $20,000; standard deviation $100,000,000.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A plan’s expected profit is $50,000 and its standard deviation is $15,000. What is its coefficient of variation?
  1. 0.30
  2. 3.33
  3. 0.70
  4. 0.09
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

An owner requires profit of at least $10,000 in every modeled state, then minimizes maximum regret among feasible actions. Profit rows L/M/H are A $14,000/$20,000/$22,000; B $10,000/$24,000/$28,000; C $6,000/$25,000/$40,000. Remove infeasible actions before building regret. What is the recommendation?
  1. B, with maximum regret $4,000.
  2. A, with maximum regret $6,000.
  3. B, with maximum regret $12,000.
  4. C, with maximum regret $8,000.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A firm may pay $20,000 for development, successful with probability 0.6. After success it can sell for $35,000 or launch for $15,000. Launch contribution is $100,000 with probability 0.4 and $30,000 otherwise. Failure gives no receipts; doing nothing pays zero. What plan maximizes EV?
  1. Develop and sell after success; initial EV $1,000.
  2. Develop and launch after success; initial EV $15,000.
  3. Do nothing; development has initial EV −$5,000.
  4. Develop and launch after success; initial EV $5,800.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

Eight customers like a new design in a moderated discussion. The team treats this as a 100% probability of strong market demand. What is the main flaw?
  1. Moderation makes the discussion secondary research rather than primary research.
  2. Positive customer reactions make a test market unable to add any useful evidence.
  3. The small discussion group does not establish a market demand probability.
  4. A focus group measures purchases more reliably than actual trial sales can.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

Profits in weak/strong markets are A $20,000/$50,000 and B −$10,000/$90,000. Weak demand has probability 0.4. What is EVPI?
  1. $24,000
  2. $12,000
  3. $62,000
  4. $18,000
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A business has sensitivity percentages of 8% for price, 22% for volume and 35% for fixed cost. Which estimate has least room for adverse movement?
  1. Selling price.
  2. Sales volume.
  3. Fixed cost.
  4. All have equal room.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A model links lower prices to higher demand, but its simulation samples price and demand independently. What is the best correction?
  1. Increase trial count while keeping independent input sampling.
  2. Replace all demand draws with the single expected demand value.
  3. Model the price-demand relationship before increasing trial count.
  4. Force every short block of trials to reproduce the mean profit.
Show answerHide answer

Save this lesson to see this answer.

Set 4: Evaluate information and multistage choices10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

On an equally likely 00–99 scale, how many numbers should represent an outcome with probability 0.18?
  1. 17
  2. 19
  3. 82
  4. 18
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A manager must choose production capacity before a market report arrives. A proposed tree places the report first and then lets capacity depend on it. What needs correcting?
  1. Put capacity choice before the report outcome.
  2. Put probabilities on the capacity-choice branches.
  3. Replace the capacity square with a chance circle.
  4. Keep the order and subtract the report fee twice.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A pilot costs $12,000 and succeeds with probability 0.7. After success the firm can sell for $22,000 or expand for $18,000. Expansion contribution is $80,000 with probability 0.3 and $20,000 otherwise. Failure gives no receipts. What are the best initial EV and its probability of a loss?
  1. $2,000 and 79%.
  2. $14,600 and 30%.
  3. $3,400 and 30%.
  4. $3,400 and 79%.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

In a cost decision, expected cost without information is minimized at $46,000. With perfect information, state-best costs average $39,000. What is the maximum justified information fee?
  1. $39,000
  2. $7,000
  3. $46,000
  4. $85,000
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A launch pays $150,000 for strong demand or −$50,000 for weak demand; not launching pays zero. A positive report has probability 0.3 with strong-demand probability 0.8; a negative report has probability 0.7 with strong-demand probability 0.2. Research costs $9,000. What is the expected net improvement over the best choice without research?
  1. $7,000
  2. $24,000
  3. $33,000
  4. −$2,000
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A survey has probability 0.25 of a positive result. Strong-demand probability is 0.9 after a positive result and 0.3 after a negative result. What original strong-demand probability is consistent with this?
  1. 0.60
  2. 0.225
  3. 0.45
  4. 0.30
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A product sells 8,000 units at $40, with unit variable cost $28 and fixed costs $72,000. Which input is most sensitive to an adverse percentage change, and what is its zero-profit threshold?
  1. Price; a decrease to $37 per unit.
  2. Volume; a decrease to 6,000 units.
  3. Variable cost; an increase to $31 per unit.
  4. Fixed cost; an increase to $96,000.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

Profit actions in states L/H are A $10,000/$20,000 and B $4,000/$29,000. A new action C pays $15,000/−$20,000. How does adding C affect minimax regret?
  1. It leaves B chosen because the old payoffs do not change.
  2. It switches from B to C because C has the best low-state profit.
  3. It leaves A chosen because its minimum profit is unchanged.
  4. It changes the choice from B to A, while C is not chosen.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

Two plans have equal EV and equal standard deviation, but one can cause a cash loss beyond the owner’s available reserves. What further evidence matters most for affordability?
  1. The coefficient of variation from the same EV and spread.
  2. The size and probability of outcomes beyond the reserves.
  3. The highest payoff and the probability of achieving it.
  4. The overall width of the range of possible profits.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

Costs in low/high demand are A $30,000/$48,000; B $35,000/$40,000; C $33,000/$44,000. What do cautious minimax cost and optimistic minimin choose?
  1. Minimax cost B; minimin A.
  2. Minimax cost A; minimin B.
  3. Minimax cost C; minimin A.
  4. Minimax cost B; minimin C.
Show answerHide answer

Save this lesson to see this answer.

Set 5: Make and challenge a complete recommendation10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A survey would revise demand estimates, but every possible report still leads management to retain the same supplier. What is the survey’s gross decision value for this supplier choice?
  1. Positive, because every revised estimate has a value.
  2. Equal to the fee, because estimates become more detailed.
  3. Zero, because no report changes the selected action.
  4. Equal to EVPI, because the report improves knowledge.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A firm pays $14,000 for a campaign that adds contribution of $70,000 with probability 0.2 or $20,000 with probability 0.8. What is its expected net gain?
  1. $30,000
  2. $2,000
  3. $44,000
  4. $16,000
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

Two profit actions depend on strong-demand probability p. A pays $12,000 in weak demand and $32,000 in strong demand; B pays $4,000 and $50,000. B is currently chosen at p = 0.6. At what probability does the EV choice switch, and which action is favored below it?
  1. At about 0.308; B is favored below it.
  2. At about 0.308; A is favored below it.
  3. At 0.400; A is favored below it.
  4. At 0.500; A is favored below it.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A test costs $8,000 and succeeds with probability 0.8. After success, launch costs $10,000 and yields contribution of $50,000 with probability 0.25 or $18,000 otherwise; selling instead gives $15,000. Failure gives zero receipts. What plan and loss probability follow EV rollback?
  1. Test, then launch after success; loss probability 20%.
  2. Test, then sell after success; loss probability 20%.
  3. Test, then launch after success; loss probability 80%.
  4. Do not test; testing has negative expected value.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

The best action without information has regrets of $6,000, $0 and $15,000 in three states with probabilities 0.2, 0.5 and 0.3. What is EVPI?
  1. $15,000
  2. $7,000
  3. $1,200
  4. $5,700
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A service pays $120,000 in strong demand or −$30,000 in weak demand; doing nothing pays zero. A favorable report has probability 0.4 and strong-demand probability 0.7; an unfavorable report has probability 0.6 and strong-demand probability 0.1. What are the maximum survey fee and the net improvement at a $5,000 fee?
  1. $30,000 maximum; $25,000 net improvement.
  2. $21,000 maximum; $16,000 net improvement.
  3. $9,000 maximum; $4,000 net improvement.
  4. $15,000 maximum; $10,000 net improvement.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A simulation uses outcomes L/M/H with probabilities 0.25/0.50/0.25 and intervals 00–24/25–74/75–99. Their profits are −$10,000/$4,000/$20,000. Draws are 24, 25, 74, 75 and 99. What are the sample average and loss frequency?
  1. $7,600 and 20%.
  2. $4,800 and 40%.
  3. $4,000 and 25%.
  4. $10,400 and 0%.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A new outsourcing offer C joins profit alternatives A/B. State payoffs L/H are A $15,000/$30,000, B $8,000/$39,000 and C −$10,000/$47,000. How does minimax regret change when C is added?
  1. It switches from B to A, whose minimum profit is higher.
  2. It keeps B, whose maximum regret rises from $7,000 to $8,000.
  3. It keeps A, whose maximum regret remains $9,000.
  4. It switches from A to C, whose maximum profit is highest.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A workshop makes either 60 or 90 kits. Each kit costs $5 to make and sells for $12; unsold kits are discarded. Demand may be 60 or 90. A common $100 rental cost is omitted. What is the correct payoff row for making 90 kits, before rent?
  1. $420 at demand 60; $630 at demand 90.
  2. $170 at demand 60; $530 at demand 90.
  3. $270 at demand 60; $630 at demand 90.
  4. $630 at demand 60; $630 at demand 90.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A repeat service plan has highest EV of $18,000 but can lose $9,000. The owner can absorb at most $5,000 of loss. What should a recommendation say?
  1. The highest-EV plan is affordable because its average is positive.
  2. The highest-EV plan breaches the owner’s stated loss limit.
  3. The loss limit can be met by treating the EV as a guaranteed result.
  4. The loss limit is irrelevant because the service decision repeats.
Show answerHide answer

Save this lesson to see this answer.

Stuck on your own question? Homework Help

Key Terms

66 Key Terms, each with its definition

A

Alternative
An alternative is an available course of action controlled by the decision maker and compared with other actions in a model.
For a kiosk, preparing 300 bottles is one alternative; customer purchases determine the demand it faces.

C

Certainty
Certainty is a decision setting in which each available action has one known result, so there is no outcome variation to estimate.
A fixed payment for a completed service can be evaluated under certainty when the receipt is known.
Chance point
A chance point is a circle in a decision tree whose branches show possible outcomes with probabilities that add up to 1.
A chance point after launch splits demand into high and low outcomes with probabilities 0.6 and 0.4.
Coefficient of variation
The coefficient of variation is standard deviation divided by expected value, comparing spread per unit of positive expected payoff.
A coefficient of variation of 0.50 indicates more spread per expected dollar than a value of 0.29.
Conditional plan
A conditional plan states the actions to take at each relevant stage, including how a later action depends on an earlier outcome.
One conditional plan is to develop a product and choose a large launch only if development succeeds.
Cost regret
Cost regret is the chosen action’s cost minus the lowest cost available in the same state, measuring avoidable extra expense.
Supplier B creates $2,000 of cost regret at low demand because supplier A would cost that much less.
Critical estimate
A critical estimate is an input whose small adverse change can overturn a decision, making it a priority for checking and monitoring.
Price is the critical estimate when its sensitivity percentage is smaller than the percentages for volume and costs.

D

Decision criterion
A decision criterion is the objective used to rank alternatives, such as maximizing average profit or protecting the worst result.
The owner chooses a decision criterion before treating one preparation quantity as the recommended action.
Decision point
A decision point is a square in a decision tree where management selects among available actions without assigning branch probabilities.
After successful development, a decision point offers a large launch, a small launch or a sale of the completed design.
Decision tree
A decision tree is a time-ordered diagram of controlled choices, chance outcomes, probabilities, costs and terminal payoffs.
A product development tree places the launch decision after successful development because that is when the choice arises.
Desk research
Desk research uses existing information collected earlier, often offering quick, inexpensive evidence that may need checking for relevance.
The analyst begins desk research by reviewing sales records before deciding whether new customer data are needed.
Dominance
Dominance occurs when an action is at least as good as another in every state and strictly better in at least one state.
A supplier costing no more in either demand state and less in one state dominates its more expensive rival.
Downside risk
Downside risk is the possibility of a result worse than expected, including a lower profit even when no accounting loss occurs.
A kiosk considers downside risk when it compares a weak trading day with its expected daily profit.

E

Expected demand
Expected demand is the probability-weighted average quantity demanded across the demand states in a model of future sales.
Even when expected demand is 290 bottles, a profit comparison can still favor preparing a different quantity.
Expected regret
Expected regret is the probability-weighted average of an action’s regrets; for the best uninformed action, it equals EVPI.
If a kiosk’s 300-bottle action has regrets whose probability-weighted average is $95, its expected regret is $95.
Expected value
An expected value is the probability-weighted average of all possible outcomes, found by adding each payoff times its probability.
If a kiosk’s possible daily profits, weighted by their demand probabilities, average $630, that is its expected profit.
Expected value of perfect information
The expected value of perfect information is the increase over the best no-information EV obtained by choosing with perfect foresight.
A kiosk with an informed EV of $725 and a best uninformed EV of $630 has an EVPI of $95 per day.
Expected value rule
The expected value rule selects the highest expected profit or the lowest expected cost and therefore reflects risk neutrality.
When preparing 300 bottles gives a higher expected profit than any other stock level, the expected value rule favors 300 bottles.

F

Field research
Field research gathers new information for the current decision through methods such as surveys, interviews and direct observation.
The company commissions field research to ask target customers about the proposed product and packaging.
Focus group
A focus group is a small moderated discussion with target customers that investigates their reactions and reasons in detail.
A focus group helps a snack producer understand why customers find one package design easier to recognize.

I

Imperfect information
Imperfect information is evidence that can revise outcome probabilities but may be wrong and therefore does not reveal the future state for certain.
A survey that is positive yet leaves a 30% chance of weak demand supplies imperfect information about a product launch.

L

Long-run average
A long-run average is the average result approached over many comparable repetitions when the modeled probabilities remain applicable.
A kiosk’s daily EV guides a long-run average; it does not promise that the kiosk will earn that amount tomorrow.

M

Maximax
Maximax is an optimistic profit rule that selects the action with the largest best-case payoff after comparing the row maxima.
Maximax chooses preparing 400 bottles when its $1,000 best-case profit exceeds every other action’s best result.
Maximin
Maximin is a cautious profit rule that selects the action with the largest worst-case payoff after comparing the row minima.
Maximin chooses 200 bottles when its $500 minimum profit gives the best protection across demand states.
Minimax cost
Minimax cost is a cautious cost rule that selects the lowest of the actions’ highest costs, limiting the worst possible expense.
Minimax cost favors supplier B’s $15,000 worst cost over supplier A’s $18,000 worst cost.
Minimax regret
Minimax regret is a decision rule that selects the smallest maximum regret, limiting the largest possible missed opportunity.
Minimax regret selects 300 bottles when its $250 maximum regret is smaller than every other action’s maximum regret.
Minimin
Minimin is an optimistic cost rule that selects the lowest of the actions’ minimum costs, focusing on the best possible expense.
Minimin favors supplier A because its possible $12,000 cost is lower than B’s lowest cost of $14,000.
Monte Carlo simulation
Monte Carlo simulation uses random numbers to sample values from probability distributions and repeatedly calculate model outcomes.
Monte Carlo simulation can sample demand and cost together when a complete payoff table would be too large.
Most likely outcome
The most likely outcome is the individual outcome with the highest probability, which need not equal the expected value.
When demand of 300 bottles has the highest probability, it is the most likely demand state even if expected demand is 290 bottles.

N

Nonfinancial factor
A nonfinancial factor is a decision-relevant effect not fully represented by the monetary payoffs used in the comparison.
Customer goodwill from having juice available is a nonfinancial factor that a simple profit table leaves out.

O

Objective probability
An objective probability is an estimated chance based on observed frequencies in past data that are relevant to the decision.
A demand level observed on 90 of 300 days has an objective probability estimate of 0.3 for comparable days.

P

Path probability
A path probability is the chance of the sequence of events on a complete tree path, found by multiplying its chance probabilities.
Success with probability 0.75 followed by high demand with probability 0.6 gives path probability 0.45.
Payoff
A payoff is the financial result produced by a particular action in a particular state, expressed on a clearly stated basis.
A kiosk that prepares 300 bottles but can sell only 200 before closing earns a payoff of $350.
Payoff table
A payoff table is a matrix showing the profit, contribution or cost of every available action under each modeled state of nature.
A kiosk’s payoff table shows each quantity it could prepare against three demand levels and the resulting profits.
Perfect information
Perfect information identifies the future state correctly before commitment, allowing management to select the best action for that state.
With perfect demand information, a kiosk can prepare the quantity that matches the demand that will occur.
Probability distribution
A probability distribution lists possible values of an uncertain variable and their probabilities, covering the modeled outcomes.
For a kiosk, a demand distribution assigns probabilities 0.3, 0.5 and 0.2 to sales demand of 200, 300 and 400 bottles.
Probability of loss
The probability of loss is the combined probability of mutually exclusive outcomes whose net financial results are negative.
If a development plan’s loss-making low-demand and failure paths add up to 0.55, its probability of loss is 0.55.

R

Random-number interval
A random-number interval is a range assigned to an input value so its share of equally likely numbers matches the value’s probability.
The interval 30–79 gives demand of 300 a 50% chance on an equally likely 00–99 random-number scale.
Range
The range of payoffs extends from the lowest possible result to the highest; its width is the difference between those endpoints.
If a 300-bottle policy pays between $350 and $750 across demand states, its payoff range has a width of $400.
Regret
Regret is the financial shortfall from the best action for the state that actually occurs, also called opportunity loss.
If preparing 400 bottles in low demand earns $300 less than the best action, it creates $300 of regret despite earning a profit.
Regret table
A regret table converts each payoff into its shortfall from the best available result within the same state of nature.
Each demand column in a kiosk’s regret table has a zero for the preparation quantity best for that demand.
Report probability
A report probability is the chance that research produces a particular result, assessed before the business receives that report.
If a survey has a 0.5 report probability of being positive, that differs from the chance of strong demand after a positive report.
Representative sample
A representative sample reflects the relevant characteristics of the target market closely enough to support the intended inference.
A sample drawn from only one customer type may fail to represent the wider market the business plans to serve.
Revised probability
A revised probability is an updated estimate of a state’s chance after receiving a particular research result or other information.
When a product-launch model gives strong demand a 0.1 chance after a negative report, 0.1 is the revised probability.
Risk
Risk is a decision setting with several possible outcomes for which probabilities can be estimated from records or judgment.
A kiosk uses a year of recorded demand to estimate the risk of preparing too much juice each morning.
Risk-averse decision maker
A risk-averse decision maker values greater certainty and may accept lower expected profit to reduce exposure to bad results.
A risk-averse owner accepts a lower average profit to avoid a loss that would strain the business’s cash.
Risk-neutral decision maker
A risk-neutral decision maker ranks choices by expected payoff and does not require extra reward merely for a wider spread of results.
A risk-neutral manager chooses the higher-EV plan even when its possible payoffs are more widely spread.
Risk-seeking decision maker
A risk-seeking decision maker accepts wider variation in results in pursuit of the opportunity for a particularly high payoff.
A risk-seeking manager favors the launch with a large possible gain despite its uncertain financial result.
Rollback
Rollback is the right-to-left evaluation of a decision tree, averaging chance outcomes and selecting the best controlled branches.
Rollback first compares the launch choices that follow successful development, then evaluates development using the best of them.

S

Scenario analysis
Scenario analysis changes several inputs together to describe a possible future and assesses the combined effect on the result.
A scenario can combine lower demand with higher unit cost, unlike a test that varies only one of those inputs.
Sensitivity analysis
Sensitivity analysis varies one estimate with the others held fixed to find its effect and the point at which a decision changes.
The analyst tests how far selling price can fall before the product’s forecast profit becomes zero.
Sensitivity percentage
A sensitivity percentage is the adverse percentage change in an input that takes the result to a specified decision threshold.
A price sensitivity of 12% means that a 12% price decrease removes profit while the other inputs stay fixed.
Simulation
Simulation repeatedly runs a model with sampled uncertain inputs and records the resulting distribution of financial or other outcomes.
A kiosk simulation samples demand on many trial days and records the profit from a fixed stock policy.
Standard deviation
Standard deviation is the square root of variance and measures the spread of outcomes around expected value in the payoff’s own units.
A standard deviation of about $183 describes the spread of a kiosk’s profits when it prepares 300 bottles.
State of nature
A state of nature is an outcome outside the decision maker’s control that affects the payoff from the action selected.
High customer demand is a state of nature a kiosk faces after making its morning production choice.
Subjective probability
A subjective probability is an estimated chance based on judgment, experience or expert opinion instead of recorded frequency.
A manager assigns strong demand a subjective probability of 0.4 after consulting experienced sales staff.
Sunk cost
A sunk cost is a cost already incurred that cannot be changed by the decision currently being evaluated and is excluded from that comparison.
Development cost is sunk at the later launch decision but remains avoidable at the original development choice.

T

Terminal payoff
A terminal payoff is the financial result displayed at the end of a tree path, labeled consistently as a gross or net amount.
A net terminal payoff of $190,000 already deducts development and marketing costs on the high-demand path.
Test marketing
Test marketing is a limited product launch used to observe real purchases before committing to a wider release in the market.
A three-month city test gives a snack business actual sales evidence before a broader launch decision.
Tradeoff
A tradeoff is the benefit given up to gain another advantage, such as sacrificing expected profit to secure a higher minimum result.
A cautious kiosk owner who gives up $130 of expected daily profit to secure a guaranteed $500 makes a tradeoff.
Trial
A trial is one complete run of a simulation, from drawing uncertain inputs to calculating and recording the resulting model output.
In one trial of a 400-bottle production policy, a draw of 47 maps to demand of 300 and gives a $600 profit.

U

Uncertainty
Uncertainty is a decision setting with no reliable basis for assigning probabilities to the possible future outcomes.
A business offering an unfamiliar product may face uncertainty because useful demand records do not exist.
Upside risk
Upside risk is the possibility of a result better than expected, such as unusually strong demand producing a higher profit.
An unexpectedly busy day creates upside risk for a kiosk that has prepared enough stock to meet demand.

V

Value of imperfect information
The value of imperfect information is the increase in expected decision payoff from using research, before deducting the research fee.
A survey with a gross decision value of $17,000 and a $12,000 fee gives an expected improvement of $5,000.
Variance
Variance is the probability-weighted average of squared deviations from expected value, expressed in squared payoff units.
When a kiosk prepares 300 bottles, its profit variance is 33,600 in squared dollars before the square root is taken.

W

What-if analysis
What-if analysis changes model inputs, often in a spreadsheet, to observe how the calculated result responds to the chosen changes.
A spreadsheet what-if analysis changes the price cell and shows when the modeled product profit reaches zero.

About this lesson

By StudeliReport a mistake

Make your own Study Materials

Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.

Get Started