Limiting Factors and Linear Programming
IntermediateLesson 4 of 9 in Performance Management Course
What you will learn
- Find which resource stops the business from meeting demand, then build the production plan that earns the most contribution from it.
- Find the limiting factorDecide which resource, if any, prevents the business from making and selling everything customers want, and choose the right technique for the problem.
- Rank products by contribution per unit of the limiting factorCalculate contribution per unit of the scarce resource, rank the products and allocate the resource to build the plan with the highest contribution.
- Adjust the plan for commitments and wider factorsBuild commitments into the plan, measure what they cost, and weigh the assumptions and qualitative factors that the ranking leaves out.
- Find the limiting factor
- Use the scarce resource where it saves or earns the most, and buy in the rest, taking account of the costs and risks of outsourcing.
- Choose which components to make and which to buyRank components by the extra cost of buying per unit of scarce resource saved, so the required quantities are obtained at the lowest total cost.
- Buy in finished products and judge outsourcingDecide when buying finished products from a subcontractor adds contribution, and weigh the qualitative issues of outsourcing.
- Choose which components to make and which to buy
- Turn a product-mix problem with several scarce resources into variables, an objective and constraints.
- Define the decision variables and the objectiveSet up the variables with their units and write the objective function from contribution per unit.
- Write the constraintsExpress every resource limit, demand limit, minimum and ratio as an inequality, and check the formulation with a test plan.
- Define the decision variables and the objective
- Draw the feasible region for a two-product problem, find the optimal plan and handle minimization and special cases.
- Draw the constraints and the feasible regionPlot each constraint from its intercepts, shade the correct side and find the exact corners of the feasible region.
- Find the optimal solutionUse an iso-contribution line or the corner points to find the plan with the highest contribution, and state it in business terms.
- Handle minimization and special casesSolve a cost-minimization problem and recognize multiple optimal solutions, redundant constraints, fractional answers, infeasible problems and unbounded problems.
- Draw the constraints and the feasible region
- Measure unused resources and the value of extra resources at the optimum, and use them in decisions and in managing performance.
- Identify binding constraints, slack and surplusCalculate slack and surplus at the optimum and explain what they mean for decisions and performance management.
- Calculate shadow prices and their rangeFind the shadow price of each constraint by re-solving with one extra unit, and work out how far it stays valid.
- Use shadow prices in decisions and performance managementUse shadow prices to set the most worth paying for extra resources, cost scarce resources in one-off decisions and direct management attention.
- Judge the assumptions and limits of linear programmingExplain the assumptions behind a linear programming result, when they fail, and how managers should use the answer.
- Identify binding constraints, slack and surplus
Limiting Factors and Linear Programming study guide
1Allocate a single scarce resource between products
Production planning starts by testing which resource prevents the business from meeting demand. You will use contribution to decide which products receive that resource, build a feasible output plan, and adjust it for customer commitments. The calculations also show the cost of choosing a different mix, giving managers a financial basis for weighing service, relationships, and ways to ease the shortage.
1.1 Find the limiting factor
A business may have customers ready to buy more than it can produce. Before choosing a product mix, find what prevents it from meeting demand. A limiting factor, also called a key factor or scarce resource, can be machine time, skilled labor, material, storage space, or sales demand.
Compare demand with capacity
For each resource, calculate the quantity needed to meet the maximum demand for every product. Multiply usage per unit by demand, add across products, and compare the total with supply. A shortage identifies a limiting factor. Different resources have different units, so comparing their available quantities directly tells you nothing about scarcity.
Consider three products with these monthly requirements:
| Product | Maximum demand | Machine hours per unit | Labor hours per unit |
|---|---|---|---|
| P | 2,000 | 3 | 2 |
| Q | 1,500 | 5 | 1 |
| R | 2,500 | 2 | 1 |
The business has 15,000 machine hours and 10,000 labor hours. To meet all demand, machine time would be:
The requirement exceeds supply by 3,500 hours. Machine time limits output. Labor would be:
Labor has 2,000 hours to spare at full demand. Its larger available quantity is not the reason it is plentiful; the requirement-to-supply comparison is.
Choose the planning method
With one scarce resource and separate demand limits, rank products by contribution per unit of that resource. Demand limits cap each product's sales; they do not count as additional scarce production resources requiring a different method.
With two or more scarce resources, use linear programming. One product may use machine time well but labor poorly. A ranking based on either resource alone can sacrifice too much of the other. A graph handles two decision variables; larger product ranges require computer methods.
If every production resource can meet full demand, make the quantities customers will buy. Demand is then the limit. Producing beyond it uses resources without adding sales contribution in the period.
Measure the benefit of production
The short-term objective is total contribution:
Fixed costs stay unchanged when the mix changes, so they do not determine the ranking. Subtract total fixed costs from the chosen plan's total contribution to find profit. Allocated fixed overhead per unit is not a resource requirement and should not enter the shortage test.
The test uses one common planning period. Monthly demand needs monthly capacity; daily capacity must first be converted to that same basis. If extra machine time removes the shortage, test the resources again: labor or demand may then become the next limit.
Key Takeaways
- Test every resource using the amount needed to meet full demand.
- One scarce resource calls for contribution-per-resource ranking; several call for linear programming.
- Sales demand caps each product even when production capacity is available.
- Use contribution for the mix decision and subtract unchanged fixed costs afterward.
1.2 Rank products by contribution per unit of the limiting factor
When machine time runs out before demand is met, every hour has an alternative use. The useful comparison is how much contribution each product earns from an hour. A high contribution per product can conceal heavy use of the scarce resource.
Calculate the ranking
For P, Q, and R, machine time is the single limiting factor:
| Product | Contribution per unit | Hours per unit | Contribution per hour | Priority |
|---|---|---|---|---|
| P | $24 | 3 | $8 | 2 |
| Q | $30 | 5 | $6 | 3 |
| R | $20 | 2 | $10 | 1 |
R earns the least per product but the most per machine hour. Allocate hours in the order R, P, Q, stopping at each product's maximum demand.
Build the plan
- Make all 2,500 R units. They use 5,000 hours, leaving 10,000.
- Make all 2,000 P units. They use 6,000 hours, leaving 4,000.
- Use the balance for Q: 4,000 hours divided by 5 gives 800 units.
Total contribution is:
Fixed costs of $70,000 give profit of $52,000. Check that the plan uses all 15,000 hours and stays within every demand limit.
Ranking by contribution per product would put Q first, then P, then R. That produces 1,500 Q, 2,000 P, and only 750 R, earning $108,000. The $14,000 loss comes from using too many hours on Q while higher-value R demand remains unmet. Absorbed profit per unit also brings unchanged fixed overhead into a decision it does not affect.
Value a little more capacity
Q is the product made only in part. An extra hour makes 0.2 more Q and adds $6 contribution. This value lasts until the remaining 700 Q units have been made, requiring 3,500 extra hours. The $6 is a premium above the normal variable cost already deducted in contribution.
For material shortages, the same method gives dollars per kilogram. Keep that unit beside the calculation: dividing hours by contribution and then ranking the highest first reverses the intended priority.
Check whole-number output
The ranking gives the continuous solution, where fractional output is allowed. Whole units can leave unusable capacity. With 10 hours, A earns $13 using 6 hours, while B earns $10 using 5. Ranking chooses A at about $2.17 per hour, above B's $2. But one A leaves 4 unusable hours and earns $13; two Bs use all 10 and earn $20.
Rounding down keeps capacity use feasible but can miss the best whole-number mix. Compare feasible combinations when leftover capacity is substantial relative to a unit's requirement. The P, Q, R plan needs no rounding because the final 4,000 hours make exactly 800 Q.
Key Takeaways
- Divide contribution per product by scarce resource used per product.
- Allocate capacity from the highest return downward, stopping at each demand limit.
- The partially supplied product gives the value of extra capacity until its demand is met.
- Calculate total contribution before deducting fixed costs.
- For whole units, compare feasible combinations when rounding leaves significant capacity unused.
1.3 Adjust the plan for commitments and wider factors
A contract can require a product that ranks below others. Put committed output into the plan before sharing the remaining capacity. The financial question is how much contribution the commitment gives up, alongside the customer and contractual reasons for meeting it.
Reserve capacity for the promise
The P, Q, R business has 15,000 machine hours. P earns $24 using 3 hours; Q earns $30 using 5; R earns $20 using 2. Demand limits are 2,000 P, 1,500 Q, and 2,500 R. The normal ranking is R, P, Q.
Now it must supply at least 1,100 Q. Reserve:
That leaves 9,500 hours. Make all 2,500 R with 5,000 hours, then use the remaining 4,500 hours to make 1,500 P. No capacity remains for further Q.
| Output | Contribution |
|---|---|
| 1,100 Q | $33,000 |
| 2,500 R | $50,000 |
| 1,500 P | $36,000 |
| Total | $119,000 |
Deduct committed quantities from both capacity and remaining demand. Otherwise the same promised units could be counted twice when allocating the balance.
Measure the cost of the commitment
Without the contract, the best plan makes 800 Q, 2,500 R, and 2,000 P, earning $122,000. The contract therefore costs $3,000 in contribution.
The displacement explains that difference. The extra 300 Q need 1,500 hours and add $9,000 contribution. Those hours would have made 500 P and earned $12,000. The net loss is $3,000. Do not count the lost P contribution alone: the extra Q earn something too.
Managers can compare that cost with a contract penalty, customer goodwill, or the value of keeping a complete range. Complementary products also matter. Stopping cartridge supply can reduce printer sales, so treating their demand as independent would miss an important effect.
Know what the ranking assumes
The method assumes one scarce resource, constant contribution and resource use per unit, unchanged fixed costs, independent product demand, divisible output, and reliable estimates. A bulk discount changes unit cost; a required whole batch changes the output choices. Both call for checking the plan using the actual alternatives.
Consider easing the shortage
Overtime, another shift, subcontracting, rented equipment, or a redesign can release the constraint. Compare the additional cost with the extra contribution the change permits. A small capacity increase may help the last partially supplied product; a larger increase can make another resource bind and change that value.
Short-term allocation uses the capacity already available. A permanent expansion needs its own investment appraisal, including the cash flows of obtaining and running that capacity. A favorable hourly return alone does not settle a long-term purchase.
Key Takeaways
- Reserve the capacity required by commitments before ranking the remaining demand.
- Measure a commitment by the net contribution lost between complete feasible plans.
- Include customer relationships, complementary products, and strategic needs in the recommendation.
- Check constant rates, unchanged fixed costs, and divisible output before relying on the ranking.
- Compare the cost of easing a shortage with the extra contribution it creates.
- A long-term capacity investment requires a separate appraisal.
2Decide what to make and what to buy when capacity is scarce
Buying some components or finished products can relieve a capacity shortage. You will compare the relevant costs of making and buying, then allocate internal hours where they create the greatest saving or extra contribution. The distinction matters when a supplier can preserve sales profitably: a product's full made contribution no longer measures what internal production adds. Supplier quality and reliability also shape the recommendation.
2.1 Choose which components to make and which to buy
When all required components cannot be made internally, some must be purchased. Every required unit still has to be obtained. The aim is to minimize total relevant cost by using internal capacity where it avoids the greatest buying cost per scarce hour.
Find the saving from making
With unchanged fixed costs:
A high figure makes internal production attractive. Equivalently, buy first the components with the lowest extra buying cost per hour released. These are two directions of the same ranking.
Allocated factory rent that continues either way is irrelevant. A fixed cost that changes is relevant: for example, buying all of one component may remove a supervisor's salary. Such an all-or-nothing saving requires comparing total costs of alternative plans, including that saving; the simple per-hour ranking alone will not capture it.
Work through a component plan
The business has 8,000 machine hours and needs:
| Component | Quantity | Make per unit | Buy per unit | Hours per unit |
|---|---|---|---|---|
| X | 2,000 | $14 | $20 | 2 |
| Y | 1,500 | $22 | $30 | 4 |
| Z | 1,000 | $9 | $19 | 2.5 |
Making everything would require 4,000 + 6,000 + 2,500 = 12,500 hours. The 4,500-hour shortage means some purchasing is necessary.
X saves $6 per unit, or $3 per hour. Y saves $8, or $2 per hour. Z saves $10, or $4 per hour. Make Z first, then X, then Y.
Z uses 2,500 hours and X uses 4,000. The 1,500-hour balance makes 375 Y. Buy the remaining 1,125 Y units.
Check both quantities and costs
| Cost item | Amount |
|---|---|
| Make 1,000 Z | $9,000 |
| Make 2,000 X | $28,000 |
| Make 375 Y | $8,250 |
| Buy 1,125 Y | $33,750 |
| Total relevant cost | $79,000 |
All component requirements are met and all 8,000 hours are used. Buying everything would cost $104,000, so making saves $25,000. Another check starts with the $70,000 cost of making everything and adds $9,000 for the Y units bought instead.
Ranking the savings per component, without dividing by hours, chooses Z then Y. It makes 1,000 Z and 1,375 Y and buys all X plus 125 Y. Cost rises to $83,000 because the plan gives Y hours that save more when used on X.
If a purchase price is below variable making cost, buying saves money and frees capacity. Buy that component before allocating hours to the others. For the remaining components, the per-hour measure connects directly to product-mix ranking: each hour goes where its financial benefit is greatest.
Key Takeaways
- With unchanged fixed costs, rank making by purchase price minus variable cost, divided by scarce resource use.
- Make the highest-saving components first and buy the unmet requirements.
- Include fixed costs that actually change by comparing total relevant costs of the alternative plans.
- Check that made plus bought quantities meet every component requirement.
- Buy a component whose purchase price is below its variable making cost.
2.2 Buy in finished products and judge outsourcing
Buying a finished product can preserve a sale without using internal bottleneck capacity. The bought-in sale may earn less contribution than a made sale, but that alternative changes the value of using an internal hour on the product.
Compare making with the best alternative
Bought-in contribution is selling price minus purchase price and any variable selling costs. If it is positive and a supplier can supply the unmet demand, buying provides a useful baseline.
Making a product that can be bought in earns only the extra contribution over buying:
For a product that cannot be bought in profitably, use its made contribution per hour. Rank on these figures, allocate internal hours up to demand, and buy the remaining demand for every product with positive bought-in contribution. A negative making advantage means buying earns more: do not allocate internal hours to that product. If no positive making advantage remains, capacity can stay unused.
Add one buying option
Q sells for $80 and costs $50 in variable production costs. Making earns $30. A supplier charges $72, so buying Q earns $8, with no additional variable selling costs in this example. Making adds $22 over buying, or $4.40 per machine hour because Q needs 5 hours.
P and R cannot be bought in. P earns $8 per hour and R $10. The ranking stays R, P, Q. With 15,000 hours, make 2,500 R, 2,000 P, and 800 Q, then buy 700 Q. Made output earns $122,000 and bought output adds $5,600: total contribution is $127,600.
Let the buying option change the mix
Now R can also be bought in, earning $18 per unit. Making R earns $20 and uses 2 hours, so its extra return from making is only $1 per hour. Rank P at $8, Q at $4.40, then R at $1.
Make 2,000 P using 6,000 hours and 1,500 Q using 7,500. The remaining 1,500 hours make 750 R. Buy the other 1,750 R. Contribution is:
Keeping the original ranking and then buying the shortfall earns only $127,600. The original ranking gives too many internal hours to R even though buying R preserves most of its contribution.
Judge the supplier as well as the cost
Unchanged allocated fixed overhead stays out of making cost. Including it can make outsourcing look cheaper even though the business keeps paying it.
A recommendation also needs evidence about quality, delivery reliability, lead times, price changes, dependence on one supplier, confidentiality, and flexibility to change designs. Losing internal skills may make returning to production difficult. Outsourcing can also provide specialist expertise and release management time. A lower calculated cost is one part of that assessment.
Key Takeaways
- Bought-in contribution deducts purchase price and variable selling costs from selling price.
- Rank internal production by its extra contribution over a profitable buying alternative.
- Buy the profitable unmet demand after allocating internal capacity.
- Assess supplier quality, reliability, dependence, and the effect on internal skills.
3Formulate a linear programming model
Several scarce resources can pull a production decision in different directions. A linear programming model records the quantities to choose, the financial objective, and every limit the plan must meet. You will turn product data into a two-variable objective and physical constraints, including demand caps, minimum commitments, and output ratios. Checking units and inequality signs makes the model fit the business situation.
3.1 Define the decision variables and the objective
A product mix can face several shortages at once. Linear programming turns that decision into three linked parts: quantities to choose, a financial objective, and limits on the choices. It finds the combination that maximizes or minimizes a linear objective while meeting every constraint.
Define quantities with a period
Write a definition that can be read without the rest of the calculation: "Let be the number of Alphas made each month and the number of Betas made each month."
Both variables are quantities of output. They are not selling prices, contributions, or hours. Defining them clearly fixes the meaning of every coefficient that follows. A resource figure in hours per product, multiplied by a variable in products per month, gives hours per month.
Calculate the objective coefficients
Alpha sells for $92. It uses 4 kg of material at $5 per kg, 3 labor hours at $8 per hour, and 2 machine hours with variable overhead of $4 per hour. Beta sells for $107 and uses 5 kg, 2 labor hours, and 4 machine hours at the same rates.
| Per unit | Alpha | Beta |
|---|---|---|
| Selling price | $92 | $107 |
| Material | $20 | $25 |
| Labor | $24 | $16 |
| Variable machine overhead | $8 | $16 |
| Total variable cost | $52 | $57 |
| Contribution | $40 | $50 |
The business absorbs fixed overhead at $10 per unit. Leave that allocation out: total fixed costs stay unchanged with the mix. Revenue coefficients of 92 and 107 would also be wrong because they ignore different variable costs.
State what is being optimized
The objective is:
Every Alpha adds $40 and every Beta adds $50. Multiplying by the monthly quantities gives monthly contribution in dollars. The instruction "maximize" matters: an expression alone does not say what decision to make.
With unchanged fixed costs, maximizing contribution also maximizes profit. Subtract those fixed costs from the final objective value to report profit; do not deduct a per-unit allocation from the coefficients.
A cost problem uses a minimization objective. If a blend contains liters of M1 at $2 per liter and liters of M2 at $5, write:
The constraints will ensure the blend meets its requirements. Choosing no ingredients would minimize cost only if the model omitted those requirements.
Recognize a linear model
Each variable is multiplied by a constant and the results are added. Output is not squared, and the two output variables are not multiplied together. In business terms, each extra Alpha uses the same material and hours and earns the same contribution as the previous one. A bulk discount or learning effect breaks those constant rates and needs a revised analysis.
Key Takeaways
- Define each variable as an output quantity with its unit and time period.
- Build a contribution objective from selling price less all variable costs.
- Leave unchanged absorbed fixed overhead out of the objective coefficients.
- State whether the objective is to maximize contribution or minimize cost.
- Linear expressions use constant coefficients and add their variable terms.
3.2 Write the constraints
Constraints describe which production plans are allowed. Write one for each resource, market limit, or commitment, using the same variable definitions and period throughout. A plan is feasible only when it satisfies all of them together.
Translate each physical limit
Let and be monthly Alpha and Beta output. Alpha needs 2 machine hours, 3 labor hours, and 4 kg of material; Beta needs 4 machine hours, 2 labor hours, and 5 kg. Monthly supplies are 4,000 machine hours, 3,600 labor hours, and 7,000 kg.
| Limit | Constraint |
|---|---|
| Machine time | |
| Labor time | |
| Material | |
| Maximum Beta demand | |
| Nonnegative output |
Each left side measures use; each right side measures availability in the same unit. Do not put material cost on the left of a kilograms constraint. If usage is in minutes and capacity is in hours, convert them before writing the inequality. Usage per batch also needs variables measured in batches, or conversion to usage per unit.
Choose the sign from the words
"At most," "no more than," and a maximum available quantity give a less-than-or-equal sign. "At least" and "minimum" give a greater-than-or-equal sign. An exact requirement gives equality.
A commitment of at least 100 Alphas is . It does not replace the upper resource limits: the model must satisfy both. Non-negativity confines output to the first quadrant, including the axes, and rules out negative quantities even if the resource inequalities alone would allow them.
Translate shares using the correct total
"Betas must be at least 25% of total output" means:
Subtract 0.25 times Beta output from both sides to get , or . Writing compares Betas with Alphas alone. It permits a Beta share below 25% of the combined output.
"At least twice as many Alphas as Betas" is . A test quantity helps check direction: with 100 Betas, the rule requires at least 200 Alphas.
Test a complete plan
At and , machine use is 4,000 hours and labor use is 3,600. Material use is 6,200 kg and Beta output is below 900. Both quantities are nonnegative, so the plan satisfies the basic model.
The complete formulation begins with the variable definitions, then "maximize ," then all five constraints. A feasible test plan confirms that the inequalities accept that plan; finding the best feasible plan still requires solving the model.
Key Takeaways
- Write resource constraints in physical quantities with matching units on both sides.
- Use ≤ for maximums, ≥ for minimums, and = for exact requirements.
- Include demand limits, commitments, and non-negativity.
- A percentage of total output uses both products in its denominator.
- Substitute a test plan into every constraint to check feasibility.
- Keep variable definitions, objective, and constraints together as the complete model.
4Solve linear programs graphically
A graph shows which combinations of two products meet every constraint and where the best combination lies. You will plot boundaries, identify the feasible corners, and use contribution lines or corner values to choose a plan. The same ideas support minimum-cost problems and reveal tied optima, conflicting requirements, and missing limits. Whole-number output then requires a further check of feasible combinations.
4.1 Draw the constraints and the feasible region
A graph turns each inequality into an allowed area. Their overlap is the feasible region: every point in it is a plan that meets all the limits. Label the horizontal axis with Alpha output and the vertical axis with Beta output , both in units per month.
Draw the boundary lines
Replace each inequality sign temporarily with equality. Set one variable to zero to find the other intercept, then join the two points.
| Boundary | Horizontal intercept | Vertical intercept |
|---|---|---|
| 2,000 | 1,000 | |
| 1,200 | 1,800 | |
| 1,750 | 1,400 |
For the machine boundary, setting Beta output to zero gives 2,000 Alphas. Setting Alpha output to zero gives 1,000 Betas. The coefficients belong to different axes, so dividing 4,000 by 4 gives the vertical intercept, not the horizontal one.
The Beta demand boundary is horizontal. Every point on it has 900 Betas, whatever the Alpha quantity. Non-negativity keeps the allowed region on or above the horizontal axis and on or to the right of the vertical axis.
Decide which side is allowed
Test a point off the line. The origin gives zero machine use, which satisfies , so the machine constraint allows the origin side. For positive-coefficient resource limits of this form, that is the area below the line.
For a minimum requirement, the allowed side is usually away from the origin. Use the test rather than guessing from the picture. If a line passes through the origin, choose another point: for , the point with 100 Alphas and zero Betas fails, so its side is excluded.
Locate the corners exactly
The basic Alpha/Beta region has corners at (0, 0), (0, 900), (200, 900), (800, 600), and (1,200, 0). A rough sketch identifies which boundaries meet; simultaneous equations give their exact coordinates.
At the machine/labor intersection, rearrange the machine equation:
Substitute into labor:
This gives , so and . At the machine/demand intersection, substitute 900 for Beta output into the machine equation to get 200 Alphas.
A crossing is a corner of the feasible region only if it satisfies every other inequality. The labor/demand crossing is outside the machine limit and must be excluded.
Recognize a constraint that adds no restriction
Material use is at most 6,200 kg over the current feasible region, below the 7,000 kg supply. Removing the material limit leaves the region unchanged, so it is redundant. Its supply could matter after other limits change; redundant describes its role in the current model.
Key Takeaways
- Plot each boundary using two intercepts and label axes with output units.
- Test a point off the boundary to choose the allowed side.
- The feasible region is the overlap of every allowed region, including non-negativity.
- Solve boundary equations for exact corners and test them against every constraint.
- A redundant constraint can be removed without changing the current feasible region.
4.2 Find the optimal solution
Once the feasible region is known, compare its plans using the objective. For Alpha and Beta, maximize . Two graphical approaches lead to the same answer: slide a line of equal contribution, or evaluate the feasible corners.
Draw an iso-contribution line
An iso-contribution line contains product mixes with the same total contribution. Choose a convenient amount, such as $40,000:
Its intercepts are 1,000 Alphas and 800 Betas. Its slope is −0.8. Changing the contribution amount moves the line parallel to itself; it does not change that slope.
Move the line away from the origin in the direction of rising contribution. The last place it touches the feasible region identifies the best mix. Here the machine boundary has slope −0.5, and labor has slope −1.5. The objective slope lies between them, so the last contact is their intersection at 800 Alphas and 600 Betas.
Evaluate all feasible corners
For a bounded feasible region, an optimal linear objective has at least one optimal corner. Substitute each feasible corner into the objective:
| Alpha output | Beta output | Contribution |
|---|---|---|
| 0 | 0 | $0 |
| 0 | 900 | $45,000 |
| 200 | 900 | $53,000 |
| 800 | 600 | $62,000 |
| 1,200 | 0 | $48,000 |
The maximum is $62,000. The two products together outperform either product alone because they share the two resources in different proportions.
The corner list must come from the feasible region. Labor and the demand line cross at 600 Alphas and 900 Betas, but this mix needs 4,800 machine hours against 4,000 available. Its attractive objective value cannot make it an allowed plan.
Report what the answer means
Make 800 Alphas and 600 Betas each month. Check machine use: 1,600 + 2,400 = 4,000 hours. Check labor: 2,400 + 1,200 = 3,600 hours. Material use is 3,200 + 3,000 = 6,200 kg. The plan also meets the 900-Beta limit and non-negativity.
The objective value is contribution, so profit still requires deducting monthly fixed costs. Material has 800 kg unused and demand for 300 Betas remains unmet. Extra material or more Beta demand alone would not help while machine time and labor still restrict production.
Avoid assuming which corner must win
The objective coefficients determine which feasible corner is optimal. If Alpha contribution rose above 1.5 times Beta contribution, the objective line would be steeper than the labor boundary and the best plan would move to 1,200 Alphas and no Betas.
Key Takeaways
- An iso-contribution line joins plans earning the same contribution.
- Move that line parallel in the direction of higher contribution.
- Compare the objective at all feasible corners to verify a bounded maximization.
- A crossing outside any constraint cannot be chosen.
- Report product quantities, period, and contribution; deduct fixed costs separately for profit.
- The objective coefficients decide which feasible corner is optimal.
4.3 Handle minimization and special cases
Not every linear program asks for the greatest contribution. Some find the least expensive way to meet minimum requirements. The same graph also reveals tied optima, conflicting requirements, and answers that need whole-number checking.
Find a minimum-cost blend
Let be liters of M1 at $2 per liter and liters of M2 at $5. A blend needs at least 400 liters, at least 600 active-ingredient units, and at least 100 liters of M1. Each liter of M1 supplies one active unit; M2 supplies three.
Minimize subject to:
The allowed region extends away from the origin. Slide an iso-cost line toward lower cost while keeping contact with the region. Compare its corners:
| M1 liters | M2 liters | Cost |
|---|---|---|
| 100 | 300 | $1,700 |
| 300 | 100 | $1,100 |
| 600 | 0 | $1,200 |
Use 300 liters of M1 and 100 of M2. Both total volume and active ingredient meet their minimums exactly. The unbounded size of the region does not stop it from having a finite minimum.
Recognize several equally good plans
If an objective line is parallel to the feasible edge where it makes optimal contact, every point on that edge is optimal. With Alpha contribution of $75 and Beta contribution of $50, the objective slope equals the labor slope of −1.5. Both (800, 600) and (1,200, 0) earn $90,000, as do all points between them. Managers can choose among these tied plans using customer needs or spare capacity.
Test whole-number alternatives
The continuous Alpha/Beta model with 4,700 machine hours has an optimum of 625 Alphas and 862.5 Betas, earning $68,125. Whole products change the choices. Rounding down to (625, 862) is feasible and earns $68,100. The nearby plan (624, 863) is also feasible and earns $68,110, the best whole-number result. Rounding up to (625, 863) needs 4,702 machine hours and fails.
A feasible rounded point is not sufficient evidence of a best integer plan. Compare the allowed whole-number alternatives, checking every constraint after changing either quantity.
Distinguish three different situations
A redundant constraint changes no part of the current region. It may become active when another capacity changes; material begins limiting the Alpha/Beta plan when labor rises to about 4,667 hours.
An infeasible model has no common allowed point. A minimum of 1,300 Alphas conflicts with labor capacity allowing at most 1,200 even when no Betas are made. A constraint must change before any plan works.
An unbounded maximization has feasible plans with indefinitely rising contribution. In a business model, check for an omitted limit such as demand or resource capacity. This differs from infeasibility: there are feasible plans, but no finite maximum.
Key Takeaways
- Minimization moves toward lower cost while retaining a feasible point.
- Parallel objective and optimal boundary lines can give an entire edge of tied optima.
- Whole-number output requires feasible alternative comparisons, not automatic rounding.
- Infeasible means no plan satisfies all constraints; unbounded means no finite optimum in the improving direction.
- A redundant constraint can matter after other data change.
5Interpret slack, surplus and shadow prices
The optimal mix also reveals unused capacity and the resources that restrict contribution. You will calculate slack and surplus, value an extra unit of a resource, and find where that value changes. These results support overtime offers, special-order costing, new-product decisions, and bottleneck management. Checking which costs are already included, and which model assumptions hold, keeps those decisions consistent.
5.1 Identify binding constraints, slack and surplus
An optimum shows what to produce, but managers also need to know which limits are tight and which resources remain spare. Substitute the optimal quantities into each constraint to measure use and compare it with the boundary.
Calculate slack on upper limits
A binding constraint holds as equality at the optimum. A non-binding constraint has room between the chosen plan and its limit. For a less-than-or-equal constraint:
At 800 Alphas and 600 Betas, the resource and demand calculations are:
| Constraint | Use or output | Limit | Slack |
|---|---|---|---|
| Machine hours | 4,000 | 4,000 | 0 hours |
| Labor hours | 3,600 | 3,600 | 0 hours |
| Material | 6,200 kg | 7,000 kg | 800 kg |
| Beta demand | 600 units | 900 units | 300 units |
Machine and labor constraints bind. Material and Beta demand do not. Demand slack means 300 possible sales remain unsupplied; it does not describe physical goods sitting in inventory.
Slack belongs to the chosen optimum. To find material use, calculate 4 kg times 800 plus 5 kg times 600. Calculating use at maximum demand would answer a different question: whether the resource is scarce before optimization.
Calculate surplus on minimums
For a greater-than-or-equal constraint:
The minimum-cost blend uses 300 liters of M1 and 100 liters of M2. Its M1 minimum is 100 liters, so M1 surplus is 200 liters. Total volume is exactly 400 liters and active ingredient exactly 600 units, giving zero surplus on those two minimums. A negative slack or surplus signals that the proposed plan breaks that constraint.
Connect unused capacity with decisions
An extra kilogram of material adds no contribution while 800 kg are already unused. Its shadow price is zero. Increasing Beta demand also adds nothing while 300 units of existing demand remain unmet because of production bottlenecks.
A non-binding constraint differs from a redundant one. A limit can cut off some possible plans yet remain slack at the best plan. Redundancy means removing it changes no part of the feasible region. Slack only describes the position of the chosen solution.
Manage the bottleneck fairly
Protect machine time and labor that constrain the plan. Waiting for material, avoidable setup delays, or maintenance during bottleneck production can lose contribution. Schedule work so the bottleneck has what it needs when capacity is available.
Spare resources can be reassigned, sold if suitable, or purchased in smaller quantities in future. Some spare capacity also provides flexibility for breakdowns and demand peaks. A non-bottleneck team may be idle because another area restricts flow; judging it only by utilization can encourage unnecessary output. Use slack quantities and shadow values together to decide where action helps.
Key Takeaways
- A binding constraint has zero slack or surplus at the optimum.
- For ≤ constraints, slack is availability minus use; for ≥ constraints, surplus is achievement minus the minimum.
- Demand slack represents unsupplied demand, not unsold inventory.
- A constraint with slack has a zero shadow price.
- Slack at the optimum does not by itself make a constraint redundant.
- Protect bottleneck capacity and assess idle time in the context of the whole plan.
5.2 Calculate shadow prices and their range
A shadow price, or dual price, measures how much the optimal objective changes when one extra unit of a constrained resource becomes available. For contribution maximization it is additional contribution per hour, kilogram, or other resource unit. It is a marginal value, not an average return or a supplier's quoted price.
Re-solve with one extra unit
The Alpha/Beta optimum is 800 Alphas and 600 Betas, earning $62,000. Machine and labor bind:
To value a machine hour, increase only the machine right side to 4,001 and solve again. The new quantities are 799.75 Alphas and 600.375 Betas. Contribution becomes:
The increase is $8.75, so the machine shadow price is $8.75 per hour. Both product quantities change: extra machine time supports more machine-intensive Betas and releases labor by reducing Alphas.
For labor, use 3,601 labor hours and retain 4,000 machine hours. The solution is 800.5 Alphas and 599.75 Betas, earning $62,007.50. Labor's shadow price is $7.50 per hour. Material and Beta demand have slack, so their shadow prices are zero.
Check using resource values
Let be dollars per machine hour and dollars per labor hour. At this optimum, each product's contribution equals the value of the binding resources it uses:
Solving gives and . The capacity value also checks:
Dividing $62,000 by 4,000 machine hours gives $15.50 per hour, but that average includes the effect of labor too. It does not measure the gain from one extra machine hour.
Find where the price changes
The shadow price holds while the same constraints determine the optimal corner. Extra machine hours move the plan along the labor boundary toward more Betas. Beta demand becomes binding at 600 Alphas and 900 Betas. That plan uses 4,800 machine hours, so $8.75 applies to the first 800 extra hours.
Contribution rises by $7,000 to $69,000. Beyond 4,800 hours, extra machine time adds nothing with other data unchanged: labor and Beta demand determine the plan.
Extra labor instead moves the plan along the machine boundary toward more Alphas. Material begins to bind at labor capacity of about 4,667 hours, about 1,067 above current capacity. Labor's $7.50 price applies up to that change. Find that endpoint by solving the machine and material boundaries together:
They give and . Labor use is then hours, so the exact increase is hours. Keep that fraction until the final rounding.
These ranges describe changes in one resource at a time. A different constraint, or a product quantity reaching zero, can end a range. Re-solve when the binding set changes or several model figures change together.
Key Takeaways
- A shadow price is the change in optimal objective from one extra resource unit.
- Increase one capacity, hold other data fixed, re-solve, and compare objective values.
- For the Alpha/Beta model, machine time is worth $8.75 per hour and labor $7.50.
- Unused resources have a zero shadow price.
- Find the next binding constraint to establish the valid range.
- Do not replace marginal value with total contribution divided by capacity.
- Re-solve beyond the range or when several figures change.
5.3 Use shadow prices in decisions and performance management
Shadow prices help value overtime, extra supplies, special orders, and process improvements. First identify which costs have already been deducted in contribution. That determines whether the shadow price is a premium above normal cost or the whole amount available to pay.
Set a maximum total price
Labor costs $8 per hour and has a shadow price of $7.50 in the Alpha/Beta model. Because the $8 is already deducted in product contribution, the maximum total price for extra labor is:
At overtime pay of $12 per hour, the premium above normal cost is $4. The net gain is $7.50 minus $4, or $3.50 per extra hour, within the valid range of about 1,067 additional labor hours.
Machine time has a normal variable overhead of $4 per hour and shadow price of $8.75. The maximum total cost is $12.75 for up to 800 extra hours. If a resource's cost was not deducted in contribution, such as time paid for through an unchanged fixed salary, the shadow price itself is the full extra amount worth paying. Adding a normal cost that was never deducted would overstate the offer.
Cost a job that displaces other work
A one-off order needs 100 labor hours and no other scarce resource. Its relevant labor cost includes normal variable labor cost and the contribution sacrificed elsewhere:
The order must cover this $1,550 plus its other relevant costs to add to the result. Charging only $800 for labor ignores the existing contribution lost when the hours are diverted. Do not deduct the opportunity cost again if it has already been included in the comparison.
Test a new product
Gamma earns $30 contribution and needs one machine hour plus three labor hours. The scarce resources it uses have an opportunity value of:
A small quantity of Gamma would lose $1.25 per unit overall because its own contribution does not cover the contribution displaced. Its contribution must rise above $31.25 to make entry worthwhile at these shadow prices. A larger product change requires solving the revised mix.
Distinguish added capacity from improved efficiency
One extra available machine hour adds $8.75 contribution within range. Saving one hour through better methods also avoids $4 of variable overhead, so a small saving is initially worth about $12.75. This is not the same change as buying another hour: efficiency changes hours per unit and also changes unit contribution.
For a specific redesign, update the usage and cost coefficients and re-solve. The benefit per hour saved falls as the improvement grows. Managers can use the initial values to direct investigation, then compare the full costs and benefits of the proposed change. Shadow prices also guide bottleneck targets and negotiations, with attention to the range and the reliability of the estimates.
Key Takeaways
- Add normal variable cost to the shadow price when that normal cost is already deducted in contribution.
- Compare the extra premium with the shadow price and stay within its valid range.
- A special job using scarce capacity carries the opportunity cost of displaced contribution.
- Test a new product against the value of all scarce resources it consumes.
- Efficiency savings can avoid variable cost as well as free capacity; re-solve the changed coefficients.
5.4 Judge the assumptions and limits of linear programming
A linear program gives a precise answer to a stated model. Its usefulness depends on whether the model represents the business closely enough for the decision. Check its assumptions and the effects that do not appear in the objective before turning the answer into a production plan.
Check the assumptions in business terms
| Assumption | Meaning | A reason to revisit it |
|---|---|---|
| Linearity | Contribution and resource use per unit stay constant. | A bulk discount reduces material cost at higher volume. |
| Divisibility | Fractional output is allowed. | Products must be made as whole units or batches. |
| Certainty | All input figures are treated as known. | Demand or processing time is only an estimate. |
| Single objective | One measure, such as contribution, is optimized. | Managers also have service or strategic aims. |
| Independent products | One product's demand does not depend on another's. | A full range is needed to keep customers. |
| Unchanged fixed costs | Total fixed cost does not vary with the mix. | A plan adds a shift supervisor or closes a department. |
A learning effect can reduce labor hours as workers gain experience. Selling a higher quantity may require a lower selling price. Both change the coefficients used in the model, so a constant-rate plan needs checking against the actual costs and sales conditions.
Certainty describes how the model treats its inputs; it does not remove forecasting error. A demand estimate that proves too high can leave a carefully optimized plan producing goods that cannot be sold. Managers need reliable estimates and a review when those estimates change.
Add the effects that contribution leaves out
A product may support another product's sales, protect a long-standing customer relationship, or build a future market. A supplier decision can affect quality, confidentiality, or staff skills. These effects may justify choosing a plan with less immediate contribution.
The model helps make that choice visible. Calculate contribution under the alternative feasible plan and compare it with the optimum. The difference is the contribution sacrificed for the service or strategic benefit. The recommendation should name the particular benefit that managers are buying with that sacrifice.
Choose the simplest suitable method
With one scarce resource, separate demand caps, constant rates, and divisible output, contribution-per-resource ranking gives the same answer as linear programming with less calculation. With multiple scarce resources, use linear programming because each product draws on several limits in different proportions.
The graph is limited to two decision variables. More products require computer methods, but feasibility, binding constraints, slack, and marginal resource values keep the same meanings.
Even when its assumptions are approximate, the model forces managers to state the objective, quantities, and constraints clearly. It identifies the limits that restrict the chosen plan and values small changes in those limits. Use those results alongside the operational evidence and the business's wider aims when deciding what to do.
Key Takeaways
- Check linearity, divisibility, certainty, independent demand, a single objective, and unchanged fixed costs.
- Discounts, learning effects, and price changes can invalidate constant unit rates.
- Compare feasible plans to measure the contribution sacrificed for wider business aims.
- Use ranking for one scarce resource and linear programming for several, within their assumptions.
Limiting Factors and Linear Programming examples
1Share one scarce resource
14 steps
- 1IntroductionStart with demand and capacity
A factory has orders for several products but limited machine time, the kind of limiting factor that sets the plan. A useful plan needs two answers: which resource actually runs short, and which products earn the most from it, measured as contribution per hour of that resource. You will test the shortage, allocate the capacity, and see what changes when a customer must receive a minimum quantity.
- 2ExampleCalculate full-demand requirements
Monthly demand is 2,000 P, 1,500 Q, and 2,500 R. Each needs 3, 5, and 2 machine hours respectively.
Full-demand machine use is 6,000 + 7,500 + 5,000 = 18,500 hours. Only 15,000 are available, so the shortage is 3,500 hours. The required quantity is calculated before choosing any product mix: it shows whether all demand could be supplied.
- 3ExplanationTest the other resources
P, Q, and R need 2, 1, and 1 labor hours per unit. Full-demand labor use is 4,000 + 1,500 + 2,500 = 8,000 hours against 10,000 available.
Machine time is the single scarce production resource. The labor test matters because a second shortage would require linear programming; the different demand caps alone do not create that second resource shortage.
- 4ChallengeChoose a method after a change
The factory loses 2,500 of its 10,000 available labor hours. Machine capacity and demand stay unchanged. Is the original single-resource ranking still sufficient?
---reveal---
No. Labor capacity is now 7,500 hours against an 8,000-hour requirement, while machine time is also short. Use linear programming because the mix must share two scarce resources.
- 5ExampleUse contribution per hour
P contributes $24 and uses 3 machine hours; Q contributes $30 and uses 5; R contributes $20 and uses 2.
Divide contribution by hours: P earns $8 per hour, Q $6, and R $10. The order is R, P, Q. R's smaller contribution per product is outweighed by its shorter machine time. The comparison follows the resource that runs out.
- 6ExampleAllocate to the first two products
Begin with 15,000 machine hours. R has the highest return, so meet its full 2,500-unit demand using 5,000 hours. The balance is 10,000 hours.
Next make all 2,000 P units using 6,000 hours. There are now 4,000 hours left. Each allocation stops at the demand cap; more units without sales would add no contribution in the period.
- 7ExampleUse the balance and calculate profit
The final 4,000 hours make 800 Q because each Q needs 5 hours. All 15,000 hours are used.
R contributes $50,000, P $48,000, and Q $24,000. Total contribution is $122,000. With unchanged fixed costs of $70,000, profit is $52,000. Fixed costs are deducted after choosing the mix; their allocation per product does not set the ranking.
- 8ChallengeValue the next hours
Q demand is 1,500 units, and the plan makes 800. An extra 200 machine hours become available at normal variable cost. How much contribution can they add?
---reveal---
They make 40 extra Q units at 5 hours each, adding $1,200. That is $6 per hour. Q still has unmet demand, so this small increase stays within the existing allocation pattern.
- 9TipCheck whether whole units change the answer
With 10 hours, A earns $13 using 6 hours and B earns $10 using 5. A ranks slightly higher per hour, but one A leaves 4 hours unusable and earns only $13. Two Bs use all 10 hours and earn $20.
For indivisible units, compare feasible combinations when the leftover capacity is substantial. A rounded-down plan fits capacity but may not be the best whole-number plan.
- 10ExampleReserve the committed output
Return to the factory's 15,000 hours. It must now make at least 1,100 Q, using 5,500 hours before the remaining demand is ranked.
The 9,500-hour balance supplies all 2,500 R with 5,000 hours, then 1,500 P with 4,500 hours. The contract plan earns $33,000 from Q, $50,000 from R, and $36,000 from P: $119,000 in total.
- 11Key InsightMeasure the net cost of the promise
The unrestricted plan earns $122,000 and the committed plan $119,000. The promise costs $3,000 in contribution.
It adds 300 Q, earning $9,000, but displaces 500 P, losing $12,000. Counting only the lost P contribution would miss the benefit of the extra Q. Managers can weigh the net $3,000 against a penalty or the value of the customer relationship.
- 12ChallengeLink an offer to the displaced product
Under the contract plan, 500 P units remain unsupplied. A supplier offers 300 extra machine hours for a premium of $5 per hour above normal variable cost. Should the factory accept on contribution grounds?
---reveal---
Yes. The hours make 100 P, adding $2,400 contribution before the premium. The premium costs $1,500, so the net gain is $900. The extra P remain within demand and labor capacity.
- 13ConnectionCheck the business fit
A ranking assumes constant unit contribution and resource use, unchanged fixed costs, independent demand, and divisible output. Discounts or whole batches can change the result.
A complete range or complementary products may justify a different plan. Calculate the contribution sacrificed, then connect it to the customer or strategic benefit. Options such as overtime or subcontracting may ease the shortage instead.
- 14RecapCarry the plan into the decision
A useful recommendation identifies the scarce resource, gives product quantities within demand, and reports contribution and profit separately. When commitments change the mix, include their net financial effect. If managers choose another plan for a business reason, the contribution comparison gives that reason a visible cost.
2Choose where internal production adds value
12 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionChoose between making and buying
- 2ExampleCalculate the component saving
- 3ExamplePut savings on an hourly basis
- 4ExampleAllocate the available hours
- 5ChallengeRespond to a supplier discount
- 6TipHandle a fixed-cost change
- 7ExampleCalculate bought-in contribution
- 8ExampleFill profitable unmet demand
- 9ChallengeRe-rank when another product can be bought
- 10ExampleCalculate the revised mix
- 11ChallengeCombine cost and supplier evidence
- 12RecapReport the full recommendation
3Turn a production decision into a model
12 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionGive each part of the model a role
- 2ExplanationDefine monthly output
- 3ExampleCalculate Alpha contribution
- 4ExampleWrite the objective
- 5ChallengeAdapt the objective to cost
- 6ExampleTranslate a resource limit
- 7ExplanationAdd market and physical limits
- 8ExampleTranslate a share of total output
- 9ChallengeCheck a different percentage
- 10ExampleUse a plan to check the model
- 11ChallengeConnect the objective to feasibility
- 12RecapKeep the formulation readable
4Find the best feasible point
17 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionRead the production picture
- 2ExampleFind the machine intercepts
- 3ExplanationChoose the allowed side
- 4ExampleSolve a corner exactly
- 5ChallengeReject an infeasible crossing
- 6Key InsightSpot the redundant material limit
- 7ExplanationDraw equal-contribution lines
- 8ExampleCompare the corner values
- 9ChallengeSeparate contribution from profit
- 10ExampleSet up a minimum-cost blend
- 11ExampleMove toward lower cost
- 12Key InsightRecognize a tied edge
- 13ExampleTest the whole-number plan
- 14ChallengeDiagnose conflicting limits
- 15ExplanationInterpret unlimited improvement
- 16ChallengeConnect feasibility, value, and a tie
- 17RecapState the graphical result precisely
5Value scarce capacity and judge the plan
20 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionMove from output to management action
- 2ExampleCalculate unused resources
- 3ExplanationDistinguish surplus from slack
- 4ChallengeDecide whether more material helps
- 5ExplanationDefine the marginal value
- 6ExampleRe-solve for a machine hour
- 7ExampleValue labor and check both prices
- 8ExampleFind the next binding limit
- 9ChallengePrice an increase beyond the range
- 10TipCheck a different resource range
- 11ExampleTurn a premium into a total price
- 12ExampleCost a special order
- 13ExampleScreen a new product
- 14ChallengeUse a revised product offer
- 15ConnectionSeparate efficiency from extra supply
- 16ExplanationCheck the constant-rate assumptions
- 17ChallengeJudge a wider business need
- 18Key InsightUse capacity measures fairly
- 19ChallengeConnect range and the price paid
- 20RecapMake the resource recommendation
Limiting Factors and Linear Programming practice questions
Set 1: Compare making, buying, and model choices10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Find the shortage and allocate capacity10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Solve and interpret the graph10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Measure slack and value extra resources10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Integrate the production decision10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Avoidable fixed cost
Axis intercept
B
Binding constraint
Binding intersection
Bottleneck
Bought-in contribution
Boundary line
C
Capacity
Certainty
Coefficient
Committed output
Complementary products
Constraint
Contribution
Contribution per limiting factor
Contribution sacrificed
Corner-point method
D
Decision variable
Demand cap
Divisibility
Dual price
E
Efficiency improvement
Extra buying cost
F
Feasible region
Full-demand requirement
I
Incremental making contribution
Infeasible model
Iso-contribution line
Iso-cost line
L
Limiting factor
Linear programming
Linearity
M
Marginal contribution
Maximum premium
Minimum requirement
Multiple optima
N
Non-binding constraint
Non-negativity
O
Objective function
Opportunity cost
Optimal solution
Outsourcing
P
Product mix
Q
Qualitative factors
R
Ratio constraint
Re-optimization
Redundant constraint
Relevant making cost
Relevant scarce-resource cost
Resource constraint
S
Saving per scarce hour
Shadow price
Single objective
Slack
Supplier dependence
Surplus
U
Unbounded maximization
V
Validity range
W
Whole-number plan
About this lesson