Budgeting Systems and Forecasting Techniques
IntermediateLesson 6 of 9 in Performance Management Course
What you will learn
- Place budgets within an organization's planning and control, and weigh incremental budgeting against zero-based budgeting for different kinds of cost.
- Explain how budgets fit into planning and controlPlace the budget in the planning hierarchy, contrast feedback with feed-forward control, and identify the internal and external information a budget system draws on.
- Prepare and evaluate an incremental budgetBuild a budget by adjusting the previous period's figures, and judge when this simple approach is good enough and when it lets waste carry forward.
- Build a zero-based budget with decision packagesJustify every activity from a zero base, rank decision packages against a funding limit, and evaluate where zero-based budgeting is worth its cost.
- Explain how budgets fit into planning and control
- Prepare rolling and activity-based budgets, evaluate the beyond budgeting model, and choose a budgetary system that suits the organization and its environment, including when that environment is uncertain.
- Prepare and evaluate a rolling budgetExtend and revise a budget period by period so that it always looks the same distance ahead, and weigh its realism against its cost.
- Prepare and evaluate an activity-based budgetBudget overhead costs from the activities that planned output requires and the cost drivers behind them, and judge when this is worth the effort.
- Evaluate the beyond budgeting modelExplain the criticisms of the fixed annual budget, the principles and tools of beyond budgeting, and the benefits and problems an organization faces in adopting it.
- Choose, change and adapt a budgetary systemMatch a budgetary system to an organization, manage the difficulties of changing systems, and keep budgets useful under uncertainty while respecting ethical and sustainability concerns.
- Prepare and evaluate a rolling budget
- Decide how far managers should take part in setting budgets, set targets of the right difficulty, and recognize and reduce the budget games that distort plans.
- Compare top-down and participative budgetingContrast imposed, participative and negotiated budgets, and judge which suits a given organization and situation.
- Set budget targets of the right difficultyExplain how the difficulty of a budget target affects effort and performance, and reconcile targets that motivate with figures that support planning.
- Recognize and reduce budget gamesIdentify the common ways managers manipulate budgets, explain why they do it, and choose measures that reduce gaming.
- Compare top-down and participative budgeting
- Separate fixed and variable costs with the high-low method and regression analysis, judge a forecast's reliability with correlation, and forecast sales from a time series with trend and seasonal variation.
- Estimate fixed and variable costs with high-low and regressionSplit a semi-variable cost into its fixed and variable parts with the high-low method and least squares regression, and use the result to forecast cost.
- Judge how reliable a regression forecast isCalculate and interpret the correlation coefficient and the coefficient of determination, and recognize the conditions under which a regression forecast can mislead.
- Forecast sales with time series analysisSeparate a time series into trend and seasonal variation with moving averages, forecast with the additive and multiplicative models, and recognize the limits of extrapolating past patterns.
- Estimate fixed and variable costs with high-low and regression
- Explain the learning effect, calculate times and costs with the cumulative average-time model, and use and question the learning curve when budgeting labor-intensive work.
- Calculate times with the learning curve modelExplain why labor time falls as output accumulates, and calculate cumulative average, total and incremental times by doubling and with the learning curve formula.
- Use the learning curve in budgeting and know its limitsEstimate a learning rate from data, budget the time and cost of further orders, handle the steady state, and weigh the reservations about the model.
- Calculate times with the learning curve model
Budgeting Systems study guide
1Compare budgetary systems from incremental to zero-based
Budgets link daily decisions with longer-term plans. The way a budget is built determines which costs managers challenge and which they carry forward. Compare the speed of incremental budgeting with the deeper review of zero-based budgeting, and follow decision packages through a funding limit. Keep approved plans, current forecasts and actual results distinct so each can support the right kind of control.
1.1 Explain how budgets fit into planning and control
A budget turns a plan into quantities, dates and responsibilities. The budgetary system supplies the people, information, approval steps and review timetable that make those figures useful.
Connect the levels of planning
The mission states the organization's purpose. Strategic plans set its long-term direction, often over three to five years. Tactical plans translate that direction into plans for divisions and functions. Operational plans and budgets give teams the short-term detail.
For example, a strategy built on specialist skills needs a training budget. Cutting that budget may improve this year's profit while weakening the strategy. Check both the arithmetic and the link between the planned spending and the objective it supports.
Use results and forecasts differently
A budget is an approved plan or target. A forecast is the best current estimate of what will happen. A manager needs both to see the gap between intention and likely outcome.
| Control | What is compared | When action starts |
|---|---|---|
| Feedback | Actual results against budget | After the result is known |
| Feed-forward | Forecast results against target | Before the result occurs |
Budgeted material cost is $120,000 and actual cost is $131,000. Feedback identifies an $11,000 adverse variance and prompts investigation for later periods. It uses actual evidence, but the cost has already been incurred.
Now take a $500,000 annual profit target. At month 6 the full-year forecast is $430,000. Feed-forward control identifies a $70,000 gap while there is still time to review prices, costs or marketing. Its usefulness depends on the forecast's quality; calling the target a forecast would hide the warning.
Bring together useful information
Internal inputs include past results, confirmed orders, capacity, staffing plans, standard costs and managers' estimates. External inputs include supplier prices, market forecasts, inflation, interest and exchange rates, competitors, customer surveys and changes in laws. Record the assumptions behind uncertain external inputs so that updates can identify which plans need revision.
Keep budget types distinct
A fixed budget covers one planned activity level. A flexible budget gives expected revenue and cost across a range of activity levels. A flexed budget applies those relationships to actual activity, making the performance comparison fair.
Functional budgets cover areas such as sales or production. The master budget brings them together in a budgeted income statement, statement of financial position and cash budget. These describe the scope or activity basis of a budget. Incremental, zero-based, rolling and participative approaches describe how it is built or updated: one organization can combine them.
Choose procedures that suit the stability of demand, the nature of costs, available staff time, information quality and management culture. A more elaborate system earns its place by improving decisions enough to justify its cost.
Key Takeaways
- Budgets translate strategy into short-term quantities and responsibilities.
- Feedback acts on actual results; feed-forward acts on forecast gaps.
- A forecast estimates the likely outcome; a budget records the approved plan.
- A flexible budget covers a range; a flexed budget applies it to actual activity.
- Budget methods can be combined to suit costs, information and culture.
1.2 Prepare and evaluate an incremental budget
Incremental budgeting starts with last period's budget or actual result and adjusts it for known changes. It accepts the existing base, so the review concentrates on what is changing.
Build the adjusted base
Work through the costs in a sensible order:
- Start with last period's figure.
- Remove one-off spending that will not recur.
- Reset volume-related costs for planned activity.
- Apply relevant price and pay increases.
- Add new commitments and remove activities that are ending.
This sequence avoids carrying a nonrecurring cost forward or inflating a cost that no longer belongs in the plan. Separate cost categories when their drivers differ. A fixed office cost does not rise by 10% simply because production is planned to rise by 10%.
Calculate an incremental budget
An administration department spent $240,000 last year, with no one-off items. Pay and prices are expected to rise by 3%. One extra staff member will cost $38,000 for the budget year.
First update the existing spending:
Then add the new staff cost:
The budget is $285,200. The $38,000 is the new staff member's budget-year cost, so it is added after the increase to the existing base.
If last year's spending contained a one-off office move, remove that amount before applying recurring price changes. If the department also pays per transaction, calculate that element from the planned number of transactions and the revised price per transaction.
Decide when the simplicity is useful
Incremental budgeting is quick, inexpensive and easy to understand. The familiar base supports stable planning and usually creates less disagreement than reopening every activity. It works well for mature operations with stable demand and costs such as rent, insurance and core staffing that are committed or well understood.
Its weakness is the accepted base. An obsolete subscription, an inefficient process or hidden slack can survive every annual increase. A department may receive funds because it spent them before, even when strategy now calls for a different use of resources. Managers have less reason to seek a new way of working if only the annual adjustment gets attention.
The same mechanism encourages “spend it or lose it” behavior. A manager may spend an unused allowance near year end to protect next year's starting figure. Actual spending then becomes evidence of need even though the purchase added little value. Occasional zero-based reviews can expose this accumulated waste without requiring a full review every year.
An incremental budget can fall. Closing an office, ending a program or reducing volume produces downward adjustments. The defining feature is accepting the previous base; the sign of the annual change does not define the method.
Key Takeaways
- Remove one-off costs before updating recurring spending.
- Adjust variable costs for volume and apply relevant price changes.
- Incremental budgeting is efficient for stable, well-understood operations.
- An accepted base can preserve waste, slack and obsolete activities.
1.3 Build a zero-based budget with decision packages
Zero-based budgeting (ZBB) asks managers to justify activities and service levels from a zero base. Existing spending has to compete for resources alongside new proposals. Peter Pyhrr developed the approach at Texas Instruments in the late 1960s and described it in 1970.
Turn proposals into decision packages
A decision unit is an area being reviewed, such as a department, cost center or activity. Its manager prepares decision packages explaining each activity's purpose, cost, benefits, alternatives and consequences if it is not funded.
Two package structures answer different questions:
| Structure | Decision | Example |
|---|---|---|
| Mutually exclusive | Which alternative should be chosen? | In-house payroll or outsourcing |
| Base plus increments | How much service should be funded? | Basic support plus extended hours |
Choose between mutually exclusive alternatives before ranking the chosen proposals. A base package is the minimum worthwhile level; an increment adds service and cost. Its extra benefit must justify its extra resources.
Rank within the funding limit
Managers identify objectives and prepare packages. Senior management or a budget committee ranks them by benefits relative to costs. Funds are allocated down the ranking until the available money is exhausted. Funded packages form the budget and are monitored during the year.
Marketing and IT share a $600,000 limit:
| Rank | Package | Cost | Cumulative cost |
|---|---|---|---|
| 1 | IT base service | $250,000 | $250,000 |
| 2 | Marketing base program | $180,000 | $430,000 |
| 3 | 24-hour helpdesk increment | $90,000 | $520,000 |
| 4 | Customer-survey program | $70,000 | $590,000 |
| 5 | Second campaign increment | $60,000 | $650,000 |
Fund the first four packages. Only $10,000 remains, leaving a $50,000 shortfall for the fifth. Funding it requires a larger limit or a changed package selection. A worthwhile proposal can remain unfunded; a positive benefit alone does not make money available.
Weigh the review's value
ZBB exposes obsolete activities and slack, connects spending to objectives and makes managers examine alternatives. It suits discretionary costs, such as marketing, training, research, administration and competing public-service programs. Their funding level depends heavily on management choice. Direct production costs can usually be planned more directly from unit standards and output.
A full review takes substantial time, documentation and skill. Ranking unlike benefits is subjective: staff development and website improvements do not share a simple measure. Quick, measurable gains may crowd out long-term work, and managers may resist losing resources or status. Mandatory activities, including legally required reporting, must be recognized in funding decisions.
ZBB does not require the final total to be zero or lower than last year. It requires justification before allocation. Organizations can rotate departments through zero-based reviews or repeat them every few years, using incremental budgets between reviews to control the workload.
Key Takeaways
- ZBB requires activities and service levels to earn funding from a zero base.
- Decision packages state costs, benefits, alternatives and consequences.
- Mutually exclusive packages are alternatives; incremental packages add service.
- Rank packages and check cumulative cost against the funding limit.
- ZBB is useful for discretionary spending but costly and subjective.
- A zero base describes the review, not the final budget total.
2Use budgets that adapt to change
Changing demand and complex overheads require plans that can respond. A rolling budget updates the horizon; an activity-based budget traces the work behind spending; beyond budgeting changes the management processes around targets and forecasts. Choosing between these approaches also means judging the data, skills and culture needed to use them, and including uncertainty, ethics and sustainability in resource decisions.
2.1 Prepare and evaluate a rolling budget
A budget prepared once a year offers less forward visibility as the year runs down. A rolling budget, also called a continuous budget, replaces each completed period with a new future period and revises the periods still ahead.
Maintain the horizon
For a 12-month quarterly budget, completing Q1 triggers three tasks: compare Q1 actual results with budget, update Q2 to Q4 using current evidence, and add Q1 of the following year. The new horizon is Q2 through next year's Q1. Near periods may have monthly detail while later periods have broader quarterly estimates.
A periodic annual budget stays tied to the original year. Updating its final three quarters improves the estimates but does not make it rolling unless the horizon is extended.
Revise a sales plan
An original budget prices sales at $15 per unit:
| Quarter | Original units | Revised future units |
|---|---|---|
| Q1 | 20,000 | Completed |
| Q2 | 22,000 | 19,800 |
| Q3 | 24,000 | 21,600 |
| Q4 | 21,000 | 18,900 |
| Next Q1 | Not yet included | 19,000 |
Original annual sales total 87,000 units, giving revenue of $1,305,000. Actual Q1 sales are 18,000 units, 10% below plan. Market evidence shows that the shortfall will continue, supporting a 10% reduction in the three remaining quarters.
Add those revised quarters and the new Q1:
At the unchanged $15 price, the new 12-month revenue budget is $1,189,500. Actual Q1 belongs in performance reporting for the completed period; it does not replace a future quarter in the new horizon.
Balance relevance and effort
Rolling budgets keep a full planning horizon and force regular review of demand, prices, staffing and capacity. They are useful in fast-changing markets and reduce the problem of waiting for the next annual cycle before recognizing new conditions.
Every update uses management time and needs reliable information. Frequently changing targets can weaken commitment and blur accountability. Retain the earlier approved figures for comparisons and make clear which figures are forecasts and which remain performance targets. Otherwise a manager can make weak performance disappear by lowering the next version.
Update for evidence
A missed quarter can reflect a temporary shipment delay or a lasting fall in demand. Those causes imply different forecasts. Reduce later periods when orders, customer information or market evidence support a lower outlook. Copying the shortfall mechanically into every future period turns reforecasting into an easy-target routine.
A flexed budget serves a different purpose: it recalculates allowances at actual activity for a period that has ended. A rolling budget changes and extends future plans. A business can use both, one for a fair performance comparison and the other for an up-to-date forward view.
Key Takeaways
- At each update, drop the completed period, revise the remainder and add a new period.
- A rolling budget keeps a constant forward horizon.
- Forecast revisions need evidence about future conditions.
- Frequent updates cost time and can blur targets and accountability.
2.2 Prepare and evaluate an activity-based budget
Activity-based budgeting (ABB) starts with the work that planned output will require. It turns output and product mix into demand for activities, then budgets the resources needed to perform them.
Work backward from output
An activity consumes resources, such as purchasing or setting up machines. A cost driver measures what creates demand for that work. A cost pool collects the costs of an activity.
Start with planned output, mix and batch sizes. Identify activities and drivers, calculate driver quantities, multiply them by budgeted driver rates and add facility-sustaining costs. Assign responsibility for each activity budget.
| Activity level | Typical basis |
|---|---|
| Unit | Number of units |
| Batch | Number of batches or setups |
| Product | Number of product lines supported |
| Facility | Fixed amount for the whole site |
The level matters: doubling units in each batch can reduce setups without reducing total output.
Calculate the overhead budget
A factory plans 10,000 units of X in batches of 500 and 6,000 units of Y in batches of 200. This requires 20 X batches and 30 Y batches.
- One setup per batch at $1,200: 50 setups cost $60,000.
- Purchasing expects 40 X orders and 110 Y orders. At $85, 150 orders cost $12,750.
- X needs one inspection per batch and Y needs two. The 20 plus 60 inspections cost $24,000 at $300 each.
- Factory management adds a facility cost of $45,000.
The total overhead budget is $141,750. Y represents only 37.5% of units but creates 60% of setups and 75% of inspections. An allocation based only on units would hide this demand. A labor-hour allocation needs labor-hour data before the same judgment can be made.
Test a process change
Increase Y's batch size to 400 units. Its 6,000 units now need 15 batches. Total setups become 35, costing $42,000. Inspections become 20 for X plus 30 for Y, costing $15,000. With purchase orders and factory management unchanged, total overhead becomes $114,750, a modeled reduction of $27,000.
Driver-based calculations reveal where a change affects resources. They do not make every cost variable. A salaried setup team can handle fewer setups while payroll stays unchanged. To turn released capacity into cash savings, management must reduce or redeploy the capacity and identify the spending that can actually change.
Evaluate ABB
ABB is useful when overhead is substantial and products consume activities differently. It reveals non-value-adding work and helps managers control cost causes, including batch size and order frequency. It needs detailed data and effort to maintain. Some costs have several drivers or no clear driver, and an activity can cross departmental boundaries, complicating responsibility.
Key Takeaways
- Translate output and mix into activity-driver quantities before applying rates.
- Batch activities depend on batches, not just units.
- Add facility-sustaining costs separately.
- ABB exposes differences in the resources products consume.
- Lower activity demand produces cash savings only when related spending changes.
- Data costs and shared responsibility can limit ABB.
2.3 Evaluate the beyond budgeting model
A fixed annual budget can become a contract that managers defend long after its assumptions stop being useful. Beyond budgeting replaces that fixed performance contract with adaptive management processes and decentralized leadership.
Why change the annual process?
Jeremy Hope and Robin Fraser's Beyond Budgeting (2003) challenged the time, cost and behavior associated with traditional budgeting. Figures may be out of date soon after approval. Annual negotiations can preserve untested assumptions, centralize decisions, encourage gaming and direct attention toward cost limits instead of customer value.
The Beyond Budgeting Institute groups its approach into six leadership principles and six management process principles. These work together: changing the spreadsheet while retaining a culture of tight command and control leaves the main problem in place.
Build a different style of leadership
| Principle | Practical meaning |
|---|---|
| Purpose | Give people a meaningful reason for their work |
| Values | Guide decisions through shared values and judgment |
| Transparency | Open information for learning and control |
| Organization | Build accountable teams with a sense of belonging |
| Autonomy | Give trusted teams freedom to act |
| Customers | Connect work with customer needs |
Freedom needs visible information and accountability. A branch manager can respond to local customers without waiting for every decision to pass through head office, while peers and senior managers can still review results.
Adapt the management processes
| Principle | Practical meaning |
|---|---|
| Targets | Set ambitious direction using relative comparisons |
| Forecasts | Keep estimates lean and unbiased |
| Resource allocation | Release resources as needed with cost discipline |
| Performance evaluation | Use a rounded judgment of results and context |
| Rewards | Recognize shared success relative to competition |
| Coordination | Match management activity to business events and rhythms |
A relative target might seek a cost-to-income ratio better than the average of five main competitors. A quarterly rolling forecast estimates likely performance independently of that target. Key performance indicators and comparisons between teams guide action; resources can be approved when a sound opportunity appears.
Recognize the benefits and adoption problems
Separating forecasts from targets reduces the reason to make estimates artificially easy. Local authority can speed responses, improve attention to customers and save time spent negotiating annual figures. Handelsbanken's changes under Jan Wallander in the 1970s illustrate decentralization and control through profit outcomes and comparisons.
Adoption needs trust, transparent systems and credible comparative data. Senior managers may fear losing control; lenders, owners and regulators may still require financial plans. Public bodies must respect spending authorized by their funding bodies. A deep cultural change can take years and may remain superficial if decision rights stay centralized.
Planning and cost control continue through strategy, forecasts, indicators and resource decisions. Beyond budgeting changes how these tasks are managed; it does not remove the need to decide what the organization can afford.
Key Takeaways
- Beyond budgeting combines adaptive processes with decentralized leadership.
- The twelve principles cover six leadership and six management processes.
- Relative targets and unbiased forecasts have different purposes.
- Resources are made available as needed within cost discipline.
- Trust, transparent data and genuine changes in decision rights are essential.
2.4 Choose, change and adapt a budgetary system
Choosing a budget system means matching the method to costs, uncertainty and the people who will use it. The gain from a better decision must justify the time, data and training the system requires.
Match the method to the organization
| Situation | Suitable starting point | Reason |
|---|---|---|
| Stable utility with committed costs | Incremental plus periodic ZBB | Routine updates are cheap; reviews challenge the base |
| Competing hospital support services | Zero-based budgeting | Packages expose priorities within scarce funding |
| Complex manufacturer with high overhead | Activity-based budgeting | Product mix and batch demand explain resources |
| Fast-changing technology market | Rolling plans or beyond budgeting | Frequent information updates support adaptation |
Also consider size, skills, culture and information quality. A public body's need for authorized spending cannot be solved simply by dropping annual allocations. Methods can be combined: participation determines who contributes, ABB determines resource needs and rolling updates determine when figures change.
Make the change workable
Managers may fear losing budget, status or a familiar routine. Staff need training; new data may require system changes. Running old and new processes together costs time, and early results may expose problems that were previously hidden.
Explain the purpose, secure senior support, involve users and train them. Pilot the method in one division, phase in the rollout, update information systems and review the first cycle. A participative process needs genuine influence over decisions; asking for proposals while ignoring them undermines the change.
Make uncertainty visible
Use rolling forecasts to refresh the outlook and flexible budgets to compare costs at different activity levels. Scenarios combine plausible sets of assumptions, such as weak demand with higher input prices. Sensitivity analysis changes one assumption to show its effect. Probabilistic budgets can use expected values; explicit contingencies provide room for identified uncertainty. Feed-forward control connects the latest outlook with action before a gap becomes an actual loss.
A plan sells 100,000 units at $8 contribution each and has $600,000 fixed costs:
With volume 10% lower, contribution is $720,000 and profit is $120,000. The $80,000 loss of profit is 40% of the original $200,000. Fixed costs stay unchanged, so profit is more sensitive than sales volume.
Keep ethics and sustainability in the budget
Use honest estimates and apply integrity, objectivity, professional competence and due care, confidentiality and professional behavior. Hidden padding, premature sales recognition and pressure to cut safety spending damage both decisions and professional standards.
Include energy, emissions, waste, water and fair-pay commitments alongside financial targets. Spending needed for environmental regulations and organizational commitments belongs in the plan. Cutting maintenance or training can shift costs and risks into later years, so assess effects across the period the strategy actually covers.
Key Takeaways
- Choose a system for its fit with costs, uncertainty, skills and culture.
- Pilot changes, train users and secure senior support.
- Scenarios vary a set of assumptions; sensitivity varies one.
- Fixed costs can make profit much more sensitive than volume.
- Honest estimates and sustainability commitments belong in budget decisions.
- A more elaborate system must earn its additional cost.
3Manage the behavioral side of budgeting
Budget figures shape behavior as well as resource plans. Managers may contribute useful local knowledge, accept a stretching target or respond to pressure by making the figures easier. Compare who sets the budget, separate realistic planning from motivation, and recognize the games that distort forecasts and reported performance. The design of the process affects both the quality of information and the effort it receives.
3.1 Compare top-down and participative budgeting
The people who set a budget affect both its information quality and the commitment it receives. Top-down, participative and negotiated budgets give operational managers different degrees of influence.
Compare the approaches
| Approach | How figures are developed | Main strength | Main risk |
|---|---|---|---|
| Top-down or imposed | Senior management sets the figures | Speed and strategic coordination | Lost local knowledge and ownership |
| Participative or bottom-up | Responsible managers shape proposals | Detailed knowledge and commitment | Slack and competing local aims |
| Negotiated | Proposals move between levels | Combines local and central information | Time and bargaining |
An imposed budget can be appropriate when a crisis requires rapid action, operational managers lack skills, or senior managers have the strongest information. It aligns departments with overall targets and gives less scope for managers to pad their own proposals. Senior management can still set unrealistic figures if it overlooks operating constraints.
Participation gives managers a voice in targets they must deliver. Their knowledge of customers, processes and capacity can improve the plan. Discussion also helps them understand expectations and creates ownership. The process takes time, and local managers may favor their own department or add slack. The individual proposals may fail to support the organization's overall strategy.
See negotiation improve the information
A regional manager proposes 9,000 sales units from the local order book. Head office wants 10,500 units based on market growth. They discuss a new key customer known locally and the growth evidence available centrally. They agree on 9,800 units.
The value of negotiation is the information shared, not simply finding the midpoint. The arithmetic midpoint would be 9,750 units, but a useful plan reflects the evidence about achievable sales. A higher target is not automatically a better forecast.
Make participation genuine
Pseudo-participation occurs when managers are asked for views that have no meaningful influence on the decision. They spend time preparing proposals and then discover that the figures were effectively settled already. That can damage morale more than a clearly imposed process.
Set the overall constraints openly, explain which decisions managers can shape and show how proposals affect the result. Senior management can establish strategic direction and spending limits while departments build the operating detail. Participation does not remove the need to challenge estimates or reconcile conflicting proposals.
Judge the setting
Participation works best when managers have relevant knowledge, time and skills, and the culture supports local judgment. Some managers prefer clear direction or need support before they can budget effectively. A decentralized business with dispersed customer knowledge gains more from local input than a small business whose owner already knows the operations closely.
The effect on motivation depends on genuine influence, personal preferences, culture and fair use of the agreed targets. Consultation alone does not ensure commitment.
Key Takeaways
- Top-down budgeting supports speed and strategic consistency.
- Participation brings local knowledge and can increase ownership.
- Negotiation should improve evidence, not merely split the difference.
- Pseudo-participation damages trust by offering influence that is not real.
3.2 Set budget targets of the right difficulty
A target affects effort only if the manager takes it seriously. A manager's aspiration level is the personal performance goal they adopt. The challenge is to set a target that stretches performance while remaining credible.
Relate difficulty to effort
| Target | Likely response |
|---|---|
| Too easy | Little extra effort; performance can settle below potential |
| Challenging but attainable | Accepted challenge encourages greater effort |
| Seen as impossible | Rejection, reduced effort or pressure to manipulate results |
Performance tends to rise as targets become harder until managers stop accepting them. Beyond that point, a still harder target can reduce performance. This is why “set the highest possible number” is a poor target-setting rule.
Acceptance depends on experience, controllability, predictability, culture and how results will be used. An experienced team with reliable demand can accept a different stretch from a new team facing unstable orders. Hold managers responsible for outcomes they control or significantly influence.
Separate planning from motivation
Production, purchasing, cash and borrowing plans need the most likely outcome. A motivational target may be somewhat above it. Using the same stretched figure for both purposes risks spending money on sales that are not expected to occur.
Expected annual sales are $2.0 million. The team adopts a $2.2 million aspiration target, a 10% stretch. The cash budget and borrowing plan use $2.0 million. If cash plans assumed $2.2 million, the company could commit spending against a $200,000 sales gap before the stretch was achieved.
These two figures have distinct jobs:
- The expectations budget supports realistic resource and cash planning.
- The aspiration target aims to motivate improvement above the expected result.
Communicate which figure supports planning and which is used to discuss performance. Otherwise the team may believe that reporting a lower honest forecast amounts to admitting failure, making forecasting less useful.
Diagnose a target problem
Suppose a department repeatedly rejects a proposed output target because its staff lack the required skills. Increasing the target again does not repair the skills gap. Review training, capacity and the assumptions behind attainable output. A challenging number has to connect with a credible route to performance.
At the other extreme, accepting a manager's easy proposal without challenge can leave useful capacity idle. Use operational evidence and genuine discussion to set the level of difficulty.
Key Takeaways
- An accepted challenging target tends to motivate better than an easy or impossible one.
- Planning needs expected outcomes; motivation may use a higher aspiration target.
- Clarify the purpose of each figure and consider controllability.
3.3 Recognize and reduce budget games
Budget games improve the appearance of performance without improving the underlying operation. They are encouraged when a fixed budget determines judgments and rewards, especially when local managers know more about operations than their superiors.
Recognize hidden slack
Budgetary slack is deliberate cost overstatement or revenue understatement. A manager expects costs of $360,000 but requests $400,000. Hidden slack is $40,000.
The percentage depends on the question:
The request is 11.1% above expected cost. Slack as a share of the requested budget is instead:
State the denominator before calculating. A disclosed contingency for uncertain demand is different from hidden slack: the reason, amount and uncertainty are visible to the people approving the plan.
Identify other games
| Game | What the manager does | Effect on decisions |
|---|---|---|
| Lowballing or sandbagging | Understates expected sales | Production and cash plans become misleading |
| “Spend it or lose it” | Uses an unnecessary year-end allowance | Waste protects next year's base |
| Timing games | Pulls sales forward or postpones costs | One period improves at a later period's expense |
| Empire building | Requests resources to increase status | Funds follow size instead of need |
| Cost shifting | Moves costs to another account or team | Responsibility and performance are obscured |
A “hockey stick” plan promises weak results now and a sharp recovery later. Its shape can postpone scrutiny unless the recovery has credible support. Delaying maintenance, training or research can also make a current result look better while damaging future capacity.
Games occur under newer methods too. Managers can hide an essential service in a low-ranked zero-based package to force its funding. A rolling process can repeatedly lower targets after missed results. Changing the name of the system leaves the incentive to mislead intact unless the process changes.
Reduce the reason and opportunity to game
Separate honest forecasts from performance targets. Challenge proposals with external data and past forecasting accuracy, and use relative comparisons where suitable. Periodic zero-based reviews can remove accumulated padding. Allowing some unused funds to carry forward reduces pressure for unnecessary year-end spending.
Use several financial and nonfinancial measures, and hold managers responsible for what they control. A budget committee can examine interdependent proposals so one department's easy target does not distort purchasing or capacity elsewhere. These measures need a culture that values an early warning more than an artificially reassuring forecast.
The costs of gaming include wasted money, poor resource allocation, unreliable plans, weakened trust and damage to long-term performance. Open estimates and visible contingencies help reviewers distinguish a realistic allowance for risk from a deliberate effort to make a target easier.
Key Takeaways
- Hidden slack deliberately overstates costs or understates revenue.
- Name the denominator when expressing slack as a percentage.
- Lowballing, timing games and unnecessary spending distort real decisions.
- Zero-based and rolling processes can also be gamed.
- Separate targets from forecasts and challenge estimates with evidence.
- An openly justified contingency makes uncertainty visible.
4Forecast costs and sales with quantitative techniques
Forecasts turn past observations into estimates of future costs and sales. High-low and regression estimate cost relationships, correlation helps interpret past fit, and time series methods separate trend from seasonal patterns. Work through the calculations while keeping activity units and time periods consistent. Then judge whether the relationship is credible for the proposed forecast, especially outside the observed range.
4.1 Estimate fixed and variable costs with high-low and regression
A semi-variable cost combines a fixed amount per period with a variable amount per unit of activity. Within its relevant range, use the cost equation . Here is activity, is total cost, is fixed cost and is variable cost per unit.
Estimate a line with high-low
Select the highest and lowest activity observations. Divide their cost difference by their activity difference to estimate , then subtract variable cost from either observation to find . Make costs comparable first, including adjustments for inflation or fixed-cost steps.
Six months have these observations:
| Output, thousand units | Cost, thousand dollars |
|---|---|
| 10 | 60 |
| 15 | 74 |
| 18 | 85 |
| 22 | 97 |
| 26 | 106 |
| 30 | 120 |
The high-low slope is:
Both axes are in thousands, so the slope is $3 per unit. Fixed cost is , or $30,000 per month. At 24,000 units the estimate is thousand dollars, or $102,000.
High-low is quick but ignores four of the six observations. If an endpoint is unusual, it has a large effect on the line.
Use all observations with least squares
Least squares regression chooses the line with the smallest sum of squared vertical distances from actual costs to predicted costs. The slope and intercept are:
For the data above, , , , and . Thus:
Using the unrounded slope gives thousand dollars. At 24,000 units:
The forecast is about $101,736, or $101,700 to the nearest hundred dollars. It differs slightly from high-low because all six points influence the fitted line.
Read and use the result correctly
Keep activity as the explanatory variable and total cost as the dependent variable. If a spreadsheet stores activity in single units, enter 24,000; if the equation uses thousands, enter 24. Using 24,000 in this thousands-based equation would greatly overstate the cost.
Retain the full slope when calculating the intercept and the forecast. Early rounding shifts both results. The equation supplies cost allowances for planned activity levels; it can help construct a flexible budget. Regression can also fit a trend when time is the explanatory variable, but a well-fitted line still needs an operating reason for the relationship.
Key Takeaways
- Use activity for the high and low observations, then calculate slope and fixed cost.
- Regression fits all observations by minimizing squared vertical errors.
- Keep the units of the data and forecast input consistent.
- Retain unrounded coefficients until the final answer.
- A cost equation supports budgets within an appropriate operating range.
4.2 Judge how reliable a regression forecast is
A fitted cost line is useful only if its relationship is credible for the planned activity. Correlation describes the past linear association; operating evidence helps judge whether that association will continue.
Interpret correlation and fit
The correlation coefficient, , runs from −1 to +1. Its sign shows direction and its size shows strength of linear association.
| Value | Interpretation |
|---|---|
| +1 | Perfect positive linear association |
| −1 | Perfect negative linear association |
| 0 | No linear association |
A value near −1 represents a strong relationship, with one variable falling as the other rises. Zero correlation can coexist with a curved relationship because the coefficient measures straight-line association.
Calculate it from:
For the six-month cost data, the numerator is 4,798. The two variation terms are 1,613 and 14,312, using . This gives:
The coefficient of determination, , is about 0.997. The fitted line accounts for about 99.7% of observed cost variation; about 0.3% remains unexplained by the model. It measures past fit, not the percentage accuracy of a future cost estimate.
Check the forecast range
Interpolation uses an activity inside the observed range. With data from 10,000 to 30,000 units, a forecast at 24,000 units is interpolation. Extrapolation uses an activity outside that range, such as 40,000 units.
The regression line gives about $149,300 at 40,000 units, but an extra shift or capacity expansion could change the cost pattern. Interpolation is generally more dependable because the model has evidence around the forecast level. It still depends on the relationship continuing.
Ask what could break the relationship
Review whether costs are approximately linear, the observations are numerous enough and prices and operating conditions are comparable. An outlier can distort the fitted line. Inflation can make old and new money values inconsistent. One driver may leave out other important influences.
Correlation alone cannot establish a cause. Ice cream and sunscreen sales can rise together because of hot weather; increasing one does not itself cause the other to rise. For a cost forecast, seek a plausible link between the activity and the resources consumed.
Regression and correlation use the full data set, give a reproducible fitted line and quantify the past association. Spreadsheet calculations make them convenient, but few observations can produce an apparently strong relationship by chance. Combine the statistical result with knowledge of demand, capacity and costs before using it in a budget.
Key Takeaways
- The sign of correlation gives direction; closeness to 1 in magnitude gives linear strength.
- In simple regression, r² measures the share of observed variation explained by the line.
- Past fit is different from future forecast accuracy.
- Extrapolation adds risk because the operating relationship may change.
- Check data comparability, outliers and a plausible causal link.
4.3 Forecast sales with time series analysis
A time series records values at regular intervals. Its trend is the long-term direction; seasonality repeats within each year; cycles are longer economic swings; random variation is the irregular remainder.
Estimate the trend with moving averages
Average one full seasonal cycle to smooth the recurring pattern. Odd-length averages align with a middle period. An even-length average lies between periods, so average adjacent moving averages to center it.
Quarterly sales, in thousand units, are 50, 70, 90, 60, 58, 78, 98 and 68. The four-quarter averages are 67.5, 69.5, 71.5, 73.5 and 75.5. The first two center to:
This belongs to year 1 Q3. The next centered estimates are 70.5 for Q4, 72.5 for year 2 Q1 and 74.5 for Q2. The estimated trend rises by 2 thousand units per quarter.
Separate seasonal and random effects
| Model | Detrend actual data | Pattern it suits |
|---|---|---|
| Additive: | Subtract trend | Similar-sized seasonal changes |
| Multiplicative: | Divide by trend | Seasonal changes proportional to trend |
For year 1 Q3, additive detrending gives thousand units. Multiplicative detrending gives . Both contain random effects as well as the seasonal effect.
The other additive detrended figures are −10.5 for year 1 Q4, −14.5 for year 2 Q1 and +3.5 for year 2 Q2, all in thousand units. Average the detrended figures for the same quarter across several years to estimate seasonality.
Additive quarterly effects should total zero: subtract their mean from each rough seasonal average if adjustment is needed. Multiplicative quarterly indices should total 4: divide each rough index by the mean of the four indices. One observation per quarter produces only rough seasonal estimates.
Project and reseasonalize
A trend equation is , where quarter 1 is year 1 Q1. Year 4 Q1 is quarter 13, so the projected trend is units.
With a Q1 additive effect of −30, forecast 526 units. With a Q1 multiplicative index of 0.92, forecast , about 512 units. Apply the seasonal effect to the projected trend, keeping the two models separate.
Use other evidence when history is weak
A compound average growth rate is:
Here counts growth intervals. From 1,000 to 1,331 units over three years gives 10% a year and a next-year forecast of about 1,464 units. Managers, market research, the sales force and experts can supply judgment-based estimates, especially for a new product without history, though their estimates can be biased.
Past trends and seasonal patterns can change with competitors, demand and the economy. Few cycles make separation unreliable, and cycles and random effects are difficult to disentangle. Check the quarter numbering before extrapolating: the right seasonal index applied to the wrong trend period still gives the wrong forecast.
Key Takeaways
- Center moving averages over an even number of periods.
- Detrending leaves seasonal and random effects together.
- Average across years and normalize seasonal estimates.
- Additive effects total zero; quarterly multiplicative indices total four.
- Project the correct trend period, then apply its seasonal effect.
- Growth models count elapsed intervals; judgment helps when history is limited.
- Forecasts depend on past patterns remaining relevant.
5Apply learning curves to budgets
Repeated labor-intensive work becomes faster, affecting staffing, cost and delivery plans. The cumulative average model captures that learning, but its average is easy to confuse with the time for a new unit. Follow output doublings, calculate later orders by subtracting totals, estimate a learning rate from records and handle the point where improvement stops. These distinctions also help set fair labor standards.
5.1 Calculate times with the learning curve model
Repeated labor-intensive work becomes faster as workers gain experience. T. P. Wright described this learning effect in aircraft production in 1936. The cumulative average-time model tracks the average for all output made so far.
Understand the learning rate
Every doubling of cumulative output reduces cumulative average time to a fixed percentage of its previous value. An 80% learning rate means a 20% fall in that average at each doubling.
If the first unit takes 100 hours:
| Cumulative units | Average hours per unit | Total hours |
|---|---|---|
| 1 | 100 | 100 |
| 2 | 80 | 160 |
| 4 | 64 | 256 |
| 8 | 51.2 | 409.6 |
The average includes the slower early units. The second unit alone takes hours. Units 5 to 8 take hours, averaging 38.4 hours each. Multiplying four new units by 51.2 would incorrectly apply the average for the entire eight-unit run to just the later units.
Calculate between doublings
Use:
Here is cumulative average time per unit, is first-unit time, is cumulative output and is the learning rate as a decimal. The exponent is negative when the learning rate is below 100%. Any logarithm base gives the same ratio.
At 80%, . For 10 units, cumulative average time is about 47.65 hours and total time is 476.51 hours. For nine units, total time is 443.65 hours. Subtracting the unrounded totals gives 32.86 hours for unit 10.
A useful working sequence is to label each result as an average or a total. Multiply average time by cumulative output before taking differences. The formula's is not the time for the last unit.
Keep the production measure consistent
A learning curve may be expressed per batch. Then is first-batch time and counts batches. If 120 units are made in batches of 20, the cumulative batch count is six. Entering 120 would apply far too many stages of learning.
Learning is most relevant when work is repetitive, new or complex and depends substantially on labor. Stable workers, continuous production and motivation support it. Staff turnover or long interruptions can disrupt progress. A highly automated process whose pace is set by machines has less room for labor learning to change output time.
Translate time into relevant costs
Lower hours reduce direct labor cost and costs that vary with labor hours, such as variable overhead charged per hour. If later work needs 153.6 hours, use those incremental hours for its labor and hourly-overhead budget. Material quantity per unit does not fall just because labor becomes faster; budget materials from their own usage relationship.
Key Takeaways
- The learning rate applies to cumulative average time at each output doubling.
- The model gives an average; multiply by cumulative output to obtain total time.
- Find a later unit or order by subtracting cumulative totals.
- Count batches when first-batch time is the model input.
- Learning affects labor and hour-driven costs, not material quantity per unit.
- Repetitive labor and stable production support learning.
5.2 Use the learning curve in budgeting and know its limits
A learning curve supports labor budgets, quotations, schedules and capacity decisions. To use it for new work, first estimate the rate from cumulative averages, then isolate the hours belonging to that work.
Estimate the rate
The first unit takes 500 hours. The first four units take 1,620 hours, so their cumulative average is hours. Four units represent two doublings:
The learning rate is 90%. Dividing 405 by 500 gives 81%, the combined effect of two doublings, not the rate for one doubling.
For output that is not a doubling, rearrange:
If the first unit took 200 hours and three units averaged 160 hours, and the learning rate is about 86.9%.
Budget the additional order
Continue the 500-hour, 90% case. At eight units, three doublings give an average of hours and total time of 2,916 hours.
Units 5 to 8 require hours. At $25 per hour, the labor budget is $32,400. Add any variable overhead using those same incremental hours and its hourly rate. Materials are calculated separately from the number of units.
This difference-of-totals approach makes later orders cheaper in labor time than the same-sized early order. It helps with tender prices, delivery dates, capacity and cash planning. Learning can support a lower launch price, but pricing still needs the other costs and commercial information.
Stop learning at the steady state
At the steady state, later units take the same time as the last unit completed during learning. If learning stops after unit 16, calculate that unit's incremental time:
For this curve, totals are 5,248.8 hours at 16 units and about 4,969.26 at 15. Unit 16 takes about 279.54 hours. Ten further units therefore need about 2,795.4 hours, using the unrounded unit time. The cumulative average at 16 includes slow early work and overstates the time for each steady-state unit.
Set standards and question assumptions
A first-unit standard applied throughout learning creates favorable efficiency variances from expected learning. A steady-state standard applied too early creates adverse variances while learning is still occurring.
Rates are hard to estimate and may change. Staff turnover, interruptions, design changes and new methods can alter the pattern. The stopping point is uncertain; actual hours scatter around the fitted curve. Keep accurate records and investigate deliberately slow initial work that could produce easier standards.
The experience curve extends beyond labor time to total unit cost. Learning, process improvements, purchasing gains and economies of scale can all reduce cost as cumulative volume grows.
Key Takeaways
- Estimate learning from cumulative average time and count every doubling.
- Budget further work from the difference between cumulative totals.
- At steady state, repeat the final learning unit’s incremental time.
- Standards should reflect the current learning phase.
- Rates, continuity and the stopping point need review.
- The experience curve describes broader reductions in total unit cost.
Budgeting Systems examples
1From an accepted base to justified activities
11 steps
- 1IntroductionConnect spending with purpose
A budget gives a future plan amounts, dates and responsibilities. The system around it determines who proposes the figures, what evidence is used and how the result is reviewed. Incremental budgeting and a zero-based review differ in how far they challenge the base.
Start with the purpose: the mission leads to strategy, strategy to tactical plans, and those plans to operational budgets. A skills-based strategy needs training resources in the annual plan, even when a short-term cut would improve reported profit.
- 2ExplanationKeep the target and the estimate separate
A budget records the approved plan or target. A forecast estimates what will actually happen using the latest information.
Feedback control compares actual results with the plan after the event. Feed-forward compares a forecast with the target before the final result, allowing action in time. New orders, capacity data and supplier prices can change the forecast without changing what management originally intended to achieve.
- 3ChallengeAct before the result arrives
The annual profit target is $420,000. In September the full-year forecast is $365,000. What control opportunity does this create?
---reveal---
There is a $55,000 forecast gap. Feed-forward control can prompt a review of costs, prices or sales actions before year end. Waiting for actual annual profit would turn this into an after-the-event comparison and lose the remaining time to respond.
- 4ExplanationAdjust an accepted base
Incremental budgeting starts with the previous budget or actual result. Remove costs that will not recur, reset activity-related spending for the new volume, apply relevant price changes, then add new commitments and remove ending activities.
The attraction is speed: the existing operation does not need a fresh justification every year. The weakness comes from the same choice—inefficient activities or hidden slack can stay inside the accepted base.
- 5ExampleCalculate the recurring budget
Administration cost $240,000 last year, with no one-off items. Existing pay and prices will rise by 3%, and a new staff member will cost $38,000 for the budget year.
Update the old cost first:
Then add the new commitment:
The $285,200 budget accepts the old activities. It has not established whether every activity in that base still deserves funding.
- 6ChallengeRemove the one-time cost
Last year’s spending of $130,000 included a completed $10,000 relocation. Recurring prices rise by 5%, with no other changes. What budget follows?
---reveal---
Remove the relocation to leave $120,000, then multiply by 1.05 to obtain $126,000. Inflating the full old total would carry the relocation into a year when it will not recur. The recurring base must be corrected before the price adjustment.
- 7ExplanationDescribe an activity worth funding
A zero-based review requires fresh justification. A decision package states the activity’s purpose, cost, benefits, alternatives and consequences if it receives no funds.
Mutually exclusive packages offer substitute methods, such as internal payroll or outsourcing. A base plus increments instead offers successive service levels, such as basic support and then extended opening hours. Choose methods and understand dependencies before ranking spending proposals.
- 8ExampleFollow the ranked packages
Marketing and IT have $600,000 available. Ranked packages cost $250,000, $180,000, $90,000, $70,000 and $60,000.
Their cumulative costs are $250,000, $430,000, $520,000, $590,000 and $650,000. The first four fit; the fifth does not. Only $10,000 remains toward its $60,000 cost, leaving a $50,000 gap. The existence of some unused money does not make the next complete package affordable.
- 9ChallengeFind the funding shortfall
Ranked packages cost $90,000, $65,000 and $55,000. The funding limit is $195,000. How much more is needed to fund all three?
---reveal---
The packages total $210,000, so the shortfall is $15,000. The first two use $155,000, leaving $40,000 toward the last package. A worthwhile proposal can stay unfunded when its full cost exceeds the remaining allocation.
- 10ChallengeChoose how deeply to review
A support division has stable rent and core staffing but several campaigns with uncertain benefits. Reviewing every cost from scratch each year would be expensive. How could it combine the two approaches?
---reveal---
Use incremental updates for stable, understood costs and a zero-based review for discretionary campaigns. Rotate or repeat deeper reviews periodically. This challenges activities where management choice matters while controlling the time and paperwork needed for a full review.
- 11RecapCheck purpose, base and priority
Use three checks when reviewing a proposed budget:
- Does the spending support the strategy and operating plan?
- Has the incremental base been corrected for one-offs, volume and new commitments?
- Have zero-based packages been justified and ranked within the funding limit?
Keep the forecast distinct from the approved target. That separation lets managers see an emerging problem while there is still time to act.
2Make plans respond to changing demand
15 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionChange the right part of the system
- 2ExplanationReplace the completed quarter
- 3ExampleUpdate sales using market evidence
- 4ChallengeKeep the full forward view
- 5ExplanationTurn products into activity demand
- 6ExampleCount batches before costing them
- 7Key InsightSeparate resources released from cash saved
- 8ChallengeBudget the activity, then assess capacity
- 9ExplanationSeparate purpose from prediction
- 10ConnectionMake autonomy accountable
- 11ChallengeDiagnose a superficial change
- 12ExampleMeasure exposure to lower volume
- 13TipSupport the change and fund commitments
- 14ChallengeCombine the methods for the need
- 15RecapChoose a useful combination
3Set useful targets without distorting the forecast
10 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionConsider the people behind the figures
- 2ExplanationDecide who contributes
- 3ExampleNegotiate from evidence
- 4ChallengeChoose participation under pressure
- 5ExplanationFind a credible stretch
- 6ChallengeSeparate the planning figure
- 7ExampleMeasure hidden padding
- 8ChallengeRecognize the cost of timing games
- 9ChallengeRepair the information incentive
- 10RecapProtect knowledge, effort and honesty
4From cost observations to a seasonal sales forecast
18 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionCalculate, then judge the relationship
- 2ExplanationName the parts of the cost line
- 3ExampleFind the variable rate
- 4ExampleRecover fixed cost and forecast
- 5ExplanationFit all observations with least squares
- 6ExampleUse the regression coefficients
- 7ChallengeEstimate a new cost allowance
- 8ExplanationRead correlation and explained variation
- 9ChallengeInterpret a negative coefficient
- 10Key InsightLook beyond a high fit statistic
- 11ExplanationSeparate the time patterns
- 12ExampleCenter the quarterly averages
- 13ExplanationDetrend without losing the random effect
- 14ExampleProject the right future quarter
- 15ChallengeApply a normalized seasonal effect
- 16ConnectionUse growth or judgment when appropriate
- 17ChallengeJudge a tempting projection
- 18RecapKeep the calculation tied to its meaning
5Turn learning averages into an order budget
15 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionTrack which hours the model describes
- 2ExplanationApply the rate at each doubling
- 3ExampleConvert the averages into totals
- 4ChallengeFind the hours for the second order
- 5ExplanationUse the formula away from doublings
- 6ExampleIsolate the tenth unit
- 7TipMatch batches and cost drivers
- 8ExampleInfer the learning rate
- 9ConnectionEstimate from a non-doubling quantity
- 10ExampleCost the additional four units
- 11ChallengeInfer, extend and subtract
- 12ExplanationStop at the last learning unit
- 13Key InsightSet standards for the production phase
- 14ChallengeBudget after learning has ended
- 15RecapUse averages to obtain the hours you need
Budgeting Systems practice questions
Set 1: Build and compare budget systems10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Adapt plans and manage budget behavior10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Calculate and assess cost and sales forecasts10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Budget hours and costs through the learning phase10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Make connected budgeting decisions10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Activity
Activity-based budgeting
Aspiration level
Aspiration target
B
Batch-level activity
Beyond budgeting
Budget
Budget base
Budget games
Budget horizon
Budgetary slack
Budgetary system
C
Capacity planning
Centered moving average
Coefficient of determination
Committed cost
Compound growth rate
Contingency allowance
Controllability
Correlation
Correlation coefficient
Cost driver
Cost pool
Cumulative average-time model
Cumulative total time
Cyclical variation
D
Decentralization
Decision package
Decision unit
Dependent variable
Discretionary cost
E
Empire building
Expectations budget
Experience curve
Explanatory variable
Extrapolation
F
Facility-sustaining cost
Feed-forward control
Feedback control
Flexed budget
Flexible budget
Forecast
H
High-low method
I
Incremental budgeting
Incremental package
Incremental time
Information asymmetry
Integrity
Interpolation
L
Labor efficiency variance
Learning effect
Learning exponent
Learning phase
Learning rate
Least squares regression
Lowballing
M
Mutually exclusive packages
N
Negotiated budget
O
One-off cost
P
Participative budgeting
Periodic budget
Pilot
Pseudo-participation
R
Random variation
Relative target
Relevant range
Resource allocation
Rolling budget
Rolling forecast
S
Scenario planning
Seasonal index
Seasonal variation
Semi-variable cost
Sensitivity analysis
Steady state
Sustainability budgeting
T
Time series
Timing game
Top-down budgeting
Transparency
Trend
Z
Zero-based budgeting