- Learn
- Business & Economics
- Business Management
- Principles of Management
- Planning and Control
Planning and Control
Planning, Goals and Control
BeginnerLesson 4 of 8 in Principles of Management Course
What you will learn
- See what planning is, what it gains and where it falls short, then follow the planning process from a realistic starting point to a written action plan, using the tools managers rely on to look ahead and schedule work.
- Explain what planning is and why it mattersDefine planning, compare formal and informal planning, weigh its benefits against its criticisms, and see how planning sets up control.
- Work through the planning process step by stepFollow the steps from assessing the current situation and setting goals to choosing among alternatives, writing an action plan and reviewing the results.
- Use planning tools to look ahead and schedule workUse forecasting, benchmarking, scenario and contingency planning, participatory planning, scheduling and time management, and decide how much flexibility a plan needs.
- Explain what planning is and why it matters
- Distinguish vision, mission and values statements, then classify plans by level, time frame, specificity and frequency of use, so that every plan supports the ones above it.
- Write and assess vision, mission and values statementsTell vision, mission and values apart, judge whether a statement is useful, and see how these statements frame an organization's goals and plans.
- Distinguish strategic, tactical and operational plansClassify plans by the level and breadth they cover and by their time frame, and check that plans at different levels fit together.
- Classify plans as single-use or standing, specific or directionalTell one-time plans from ongoing ones, distinguish policies, procedures and rules, and decide when a plan should be specific or directional.
- Write and assess vision, mission and values statements
- Understand how goals work and link across levels, write SMART goals, set and score OKRs, and apply management by objectives.
- Explain how goals work and how they link across levelsDistinguish goals from plans, stated from real goals and financial from nonfinancial goals, link goals across levels, and use what research shows about specific, challenging goals.
- Write SMART goalsUse the SMART criteria to turn vague intentions into clear goals, calculate targets from a baseline, and know the limits of SMART.
- Set and score OKRsWrite objectives and key results, tell key results from tasks, score an OKR at the end of a period, and compare OKRs with SMART goals and KPIs.
- Apply management by objectivesDescribe management by objectives, follow its steps in a worked case, weigh its strengths and problems, and compare it with OKRs.
- Explain how goals work and how they link across levels
- See why control matters, carry out the control process from standards to corrective action, choose between feedforward, concurrent and feedback control, and design controls that people accept and that do not backfire.
- Set standards and measure performanceDefine controlling and the steps of the control process, set clear standards, and choose what, how and how often to measure.
- Compare results and take corrective actionCalculate and judge variances against an acceptable range, distinguish percentage points from percent, and choose between correcting performance, revising the standard and doing nothing.
- Choose feedforward, concurrent and feedback controlsClassify controls by when they act, weigh the strengths and limits of each type, and combine them into a complete control system.
- Design controls that work with peopleCompare bureaucratic, market and clan control and internal and external control, apply the qualities of effective controls, and avoid controls that backfire.
- Set standards and measure performance
- Choose and calculate key performance indicators, tell leading from lagging indicators, and build a simple balanced scorecard that looks beyond financial results.
- Choose and calculate key performance indicatorsDefine KPIs, calculate common ones from real figures, tell efficiency from effectiveness and leading from lagging indicators, and choose KPIs that drive the right action.
- Build a simple balanced scorecardExplain the four perspectives of the balanced scorecard, link them through cause and effect, build a small scorecard with objectives, measures, targets and initiatives, and use it for control.
- Choose and calculate key performance indicators
Planning and Control study guide
1Turn a problem into a workable plan
Managers need a clear destination and a way to reach it before they can assign work or judge results. Planning connects those decisions: it sets goals, compares possible actions and prepares people for change. Follow a bakery from a shipping problem to an action plan, then use forecasts, backup plans and a task schedule to see how managers turn an uncertain future into work they can organize and check.
1.1 Why planning helps people work together
Planning means defining goals, choosing how to reach them and coordinating the work. It covers both the desired result and the means of achieving it. In the four management functions, planning comes first: organizing assigns the work, leading helps people carry it out, and controlling checks the results against the plan.
Make the plan visible
| Informal planning | Formal planning |
|---|---|
| Mainly stays in the manager's head | Records goals for a stated period |
| Little is written or shared | Shares actions and responsibilities |
| Common in very small businesses | Helps people coordinate across teams |
A written plan can change. Its value is that people can see what they have agreed to do. If a shop owner plans a promotion without telling the stockroom, the advertising may succeed while the shelves run empty. A shared plan lets purchasing, staffing and sales prepare together.
What planning contributes
Planning gives direction: departments know which results matter and can settle conflicting priorities. It reduces uncertainty by making managers look ahead and prepare responses. It reduces waste and overlap when teams arrange their work together. It also provides the goals and standards that controlling will use.
These benefits support flexibility and time management. Preparing an alternative before a supplier fails makes a quick response possible. Scheduling important work protects it from the stream of small, urgent requests. Participatory planning brings in the people who will carry out the plan; they contribute practical knowledge and are more likely to support decisions they helped shape.
Every manager plans. Top managers consider the whole organization and several years ahead. Middle managers plan for departments or divisions. First-line managers arrange daily and weekly team work. A plan prepared by specialists still needs the understanding and commitment of the managers who will use it.
Where planning can fail
Planning takes time and resources. It can create rigidity when people follow a timetable after its assumptions have stopped fitting. It can also crowd out creativity or focus too heavily on today's competitors. Past success can make managers overconfident: a candy maker may repeat its successful fruit-candy range while customers move toward chocolate. Carrying out that old plan perfectly will not solve the changed demand.
Research generally links formal planning with better financial performance, but quality and execution matter more than the amount of planning. A sudden downturn or other external shock can undermine a sound plan. Planning reduces uncertainty; it does not remove it.
Close the loop
Planning sets the intended result. Controlling measures actual results and feeds the findings into the next plan. The plan-do-check-act (PDCA) cycle, also called the Deming cycle, makes this connection explicit: plan a change, try it, check its results and act on what you learn. State assumptions, schedule checkpoints and keep an important backup ready so that learning changes the next decision.
Key Takeaways
- Planning defines both results and the actions needed to reach them.
- Formal plans make coordination possible by sharing goals and actions.
- Participation adds practical knowledge and commitment.
- Plans need review when conditions or assumptions change.
- Control returns evidence to the next round of planning.
1.2 From a baseline to an action plan
An effective planning process begins with evidence and ends with a review of what happened. A useful sequence has six steps. Each step answers a different question, so writing a target alone leaves most of the planning unfinished.
Establish the starting point and destination
1. Assess the situation. Gather facts about performance, resources and outside conditions. Sales trends, complaints, staff skills and capacity show where the problem lies. This measured starting point is the baseline. Organization-wide reviews can use SWOT to organize information about strengths, weaknesses, opportunities and threats.
2. Set goals. State the result and deadline. Connect the goal to the mission and the goals above it. A baseline helps you judge whether a target would represent a meaningful improvement.
Choose a route
3. State premises and develop alternatives. Planning premises are assumptions about demand, prices, staffing or other conditions. Record them so they can be checked. Ask employees for ideas and consider several routes before choosing.
4. Evaluate and choose. Compare cost, time, risk, resources, fit with the goal and effects on people. Managers can combine alternatives and keep one in reserve. The cheapest option may fail if it cannot deliver the required result on time.
Assign the work and review it
5. Write and carry out the action plan. For each task, state the owner, resources, deadline and review points. People need to know both their own responsibilities and the work on which they depend.
6. Monitor and adjust. Compare progress with checkpoints. Change actions when they fall short; review the plan or goal when a premise fails. These findings become evidence for the next planning round.
Work through the bakery case
An online bakery receives 300 orders weekly and ships 180 on the day of placement:
The team finds packaging shortages and only one afternoon packer. Its goal is 85% same-day shipping within 12 weeks. At unchanged volume, this means:
The premise is about 300 weekly orders. Alternatives are another afternoon packer, automatic packaging reordering and an earlier order cut-off. Managers choose reordering and the earlier cut-off, keeping the extra packer as backup. The operations lead sets the reorder level by week 2; the web manager changes the cut-off by week 1.
The plan sets a week-6 checkpoint of at least 75%, with the backup triggered below it. At week 6 the rate is 78% and has risen for three weeks. It clears that checkpoint, so the backup stays in reserve while weekly checks continue toward 85%.
Keep the measure consistent: count same-day shipments against all orders placed, including orders after the new cut-off. Otherwise a changed denominator could make the rate look better without improving the experience being measured. An action plan also needs owners and checkpoints; without them, a good idea can remain nobody's task.
Key Takeaways
- A baseline anchors the goal in current performance.
- Record premises and compare several routes before choosing.
- An action plan assigns owners, resources, deadlines and checkpoints.
- Judge progress against the planned checkpoint, using a consistent measure.
1.3 Forecast, prepare alternatives and schedule tasks
Planning tools answer different questions: what might happen, how to prepare and when work can finish. Choose a tool for the decision it helps you make.
Look ahead without treating estimates as facts
Forecasting estimates future demand, costs or staffing. Quantitative forecasts use data and calculations; qualitative forecasts use informed judgment, such as expert panels or sales staff estimates. Stable conditions make forecasting easier than sudden changes do.
A shop's last three monthly sales were 1,200, 1,350 and 1,500 units. A three-month moving average gives:
Sales increased by 150 each month, so extending that trend gives:
The moving average smooths the figures and lags behind growth. The trend estimate assumes growth continues. Managers must judge the assumptions behind the 300-unit difference.
Benchmarking studies strong performance and adapts the methods behind it. Choose the process, find a good comparison, collect evidence, identify the gap and test improvements. A hospital can learn sample tracking from a parcel carrier; a branch can learn from another branch.
Prepare for more than one future
Scenario planning considers several plausible futures and the response to each. Contingency planning prepares a specific backup and a trigger, such as: "If a delivery is more than two days late, order from the backup supplier." Crisis planning prepares for damaging events such as fires or data breaches. A simulation tests a model under different assumptions before resources are committed.
Forecasts, budgets and simulations can serve short or long horizons. Daily schedules mostly support operational work; strategic plans look further ahead. Policies continue until revised. Their duration alone does not make them forecasts or long-term strategic choices.
Find what controls the finish date
A Gantt chart shows task bars along a timeline. For a training day:
| Task | Duration | Must follow |
|---|---|---|
| A: design content | 3 days | Start |
| B: prepare materials | 4 days | A |
| C: book room and trainers | 2 days | A |
| D: run training | 1 day | B and C |
B and C run together after A. The earliest finish is:
A–B–D is the critical path: delay on it delays completion. C has two days of slack, because it takes two days while parallel task B takes four. Adding every duration would wrongly treat parallel work as sequential.
Match planning to the work
Sort personal tasks by importance and urgency: do urgent, important work now; schedule important work before it becomes urgent; delegate urgent, less important work where possible; drop work that is neither. Protect time blocks for planned priorities.
Higher managers plan more broadly. Greater uncertainty calls for flexibility, shorter review intervals and more frequent revision. The commitment concept adds another requirement: plans must reach far enough ahead to cover commitments made today. A ten-year lease needs a plan for that whole commitment, even when near-term details change.
Key Takeaways
- Forecasts depend on assumptions about future conditions.
- Benchmarking adapts the methods behind strong performance.
- A contingency plan pairs a backup with a trigger.
- Parallel tasks are not added together when finding the finish date.
- Critical-path delays delay completion; slack gives a noncritical task room to move.
- Uncertainty affects flexibility and review frequency; commitments affect planning reach.
2Connect purpose to everyday plans
A mission gives people a purpose, but it does not tell a supervisor how to staff tomorrow’s shift. Organizations connect those decisions through a chain of plans. Learn how vision, mission and values guide the chain, how plans differ in scope and time, and how recurring work uses policies, procedures and rules. These distinctions help you identify what a plan is meant to decide and whether it supports the work around it.
2.1 Vision, mission and values guide decisions
Organizations need a shared purpose before they choose targets and actions. Vision, mission and values serve different roles in that purpose. Their usefulness lies in the decisions they guide.
Read what a statement actually says
| Statement | Main question | Focus |
|---|---|---|
| Mission | What do we do, for whom and why? | Present purpose |
| Vision | What future do we want to create? | Desired future |
| Values | How should we behave as we pursue it? | Guiding principles |
A mission statement may name customers, products or services, markets, an approach or philosophy, and what makes the organization distinctive. It need not contain every possible element. A vision statement usually offers a shorter, more ambitious picture of the future. Core values guide behavior, especially when short-term rewards pull in another direction.
Some organizations combine purpose and vision or use different labels. Classify the content by the question it answers. A sentence called a mission can still describe a desired future.
Use the grocery chain's statements
An invented chain of 12 neighborhood stores has this vision: "Every neighborhood we serve has fresh, affordable food within a ten-minute walk." It describes a future state for the communities the stores serve.
Its mission is: "We run neighborhood grocery stores that sell fresh, mostly local food at fair prices and make shopping quick for busy families." It identifies the present activity, products, customers and approach. A manager can use it to choose products and decide how to staff checkouts.
Its values are: "Freshness, fairness to farmers and customers, respect for our team." These principles matter when a decision is difficult. Pressuring suppliers for a price that conflicts with fairness would put a short-term saving ahead of a stated value. A value such as "safety before speed" matters when meeting an urgent order would require unsafe work.
Judge a statement by the choices it helps settle
A statement such as "We strive for excellence in everything we do" could fit almost any organization. It gives little help when a manager must choose between two investments. More useful statements make purpose clear enough to support some choices and question others.
For the grocery chain, a proposal should be assessed against fresh food, fair prices, neighborhood access and quick shopping. The mission does not supply a complete plan, but it gives managers a reason to favor one proposal over another. Values then help judge how the proposal will be carried out.
Connect purpose to goals
Vision and mission sit above strategic goals in the planning hierarchy. Strategic goals turn purpose into targets over the next few years. Tactical plans organize departments' contributions, and operational plans arrange the team's work.
If a goal supports neither mission nor vision, managers need to review the goal or the purpose statement. A mission can become outdated as an organization changes. Keeping the words visible is useful only when they continue to guide resources, priorities and behavior.
Key Takeaways
- Mission states present purpose; vision describes a desired future.
- Values guide behavior when choices involve trade-offs.
- Useful statements help managers judge concrete decisions.
- Strategic goals translate purpose into targets.
2.2 Match the scope of strategic, tactical and operational plans
Plans at different levels answer different questions. To classify one, look first at its scope and role in the organization. Time frame helps, but duration alone does not determine the level.
Follow the planning chain
| Plan | What it decides | Usual lead and horizon |
|---|---|---|
| Strategic | Overall direction and position of the organization | Top managers; often three to five years or more |
| Tactical | How major units or functions deliver that direction | Middle managers; typically six months to two years |
| Operational | Detailed tasks, staffing, schedules and procedures | First-line managers; usually a year or less |
Each lower plan is a means of achieving the one above it. The plans must also fit across departments. Sales cannot promise a 24-hour delivery while the warehouse plans to ship within 48 hours. The manager responsible for both must resolve the conflict.
Trace one organization's plans
The 12-store grocery chain sets a four-year strategic goal: grow to 18 stores and make online orders 15% of sales. Adding six stores to the original 12 is:
Its marketing and operations units create an 18-month tactical plan: launch online ordering and home delivery around the six largest stores and reach 2,000 weekly online orders.
A store's operational plan for next month schedules two order pickers per shift from 8 a.m. to 2 p.m. and calls for packing each online order within two hours. This is the concrete work that supports the larger direction. Adding more stores is not a task that an individual shift schedule can decide.
Keep levels of strategy distinct
Strategy also has corporate, business and functional levels. These describe the scope of strategic choices, so they do not match the three plan types one for one.
Corporate strategy decides which businesses the organization will operate and whether to grow, remain stable or retrench. Retrenchment reduces size or scope to recover. Business strategy decides how a particular business competes, for example through low cost or a distinctive product. Functional strategy sets how an area such as marketing or IT supports that competition. An e-business plan addresses the use of the internet in selling, customer service or supplier relationships.
Business strategy is still strategic. A functional strategy can also extend well beyond routine daily activity. Tactical and operational plans turn these choices into work.
Interpret time frames sensibly
A common convention calls plans over three years long-term, plans of one year or less short-term, and the period between them intermediate. Industry conditions affect these horizons: an electricity provider may plan decades ahead, while a fashion retailer works season by season.
A three-year machine-maintenance schedule remains operational because it arranges recurring work. Calling it strategic simply because it lasts three years confuses horizon with organizational direction. Some books use only strategic and operational categories, with operational covering everything below strategy; the role of the plan still needs to be understood.
Key Takeaways
- Classify plan levels by scope and role, supported by the time frame.
- Lower-level plans provide the means to achieve higher-level plans.
- Plans across departments must fit together.
- Corporate, business and functional strategy describe strategic scope.
- A long schedule can still be an operational plan.
2.3 Choose the right plan for recurring and one-time work
Some plans serve a unique result and then end. Others guide situations that return again and again. A separate distinction concerns how tightly the plan specifies actions and targets.
One-time plans focus a defined effort
A single-use plan serves a unique situation. A program coordinates a large set of activities toward a one-time goal and often contains several projects. A project is narrower, with its own deadline and resources. Opening a distribution center can be a program; redesigning its website can be one project.
A budget expresses planned resources in numbers, mainly money, for a stated period. Projects and programs can each have a budget, and departments often have annual budgets. Planned amounts also become standards for comparing actual spending. The fact that an organization prepares a new budget every year does not make the previous year's figures an ongoing rule.
Standing plans guide repeated work
| Standing plan | What it provides | Room for judgment |
|---|---|---|
| Policy | A general guideline for decisions | Yes |
| Procedure | Ordered steps for a recurring situation | Follows the defined sequence |
| Rule | An explicit required or prohibited action | No discretion about compliance |
For a hotel, "Checkout is at 11 a.m.; a later checkout costs $30" states a rule. "Managers may waive the fee for regular guests when it protects the relationship" is a policy. The steps for replacing a lost room key form a procedure. A manual can contain all three even if its cover says "Policies."
A procedure answers "What steps do I follow?" A policy answers "What should guide this decision?" A rule answers "What must or must not happen?" Written form does not determine the classification; the instruction's function does.
Describe how specific the plan is
A specific plan leaves little room for interpretation: "Raise sales by 8% in 12 months by adding two sales representatives and entering two new cities." It fixes the result and route.
A directional plan gives general guidance and flexibility: "Raise profits by 5 to 10% over the next year." It still sets a direction, but lets managers adapt as conditions develop. Specific plans suit stable conditions; directional plans help when uncertainty makes detailed commitments less useful.
These dimensions combine. Renovating the hotel's lobby by May is a single-use project. Allocating $450,000 to it is a numerical plan. A recurring safety rule is a standing plan, regardless of whether it appears beside the project schedule.
Review what repeated use can hide
Standing plans save decision time, support fair treatment and make training easier. They can also become outdated. Managers must review them as work changes. Single-use plans end with their goal; using an old project plan for a new project requires checking its tasks, assumptions and resources again. Familiarity with the document does not show that it fits the new situation.
Key Takeaways
- Single-use plans serve unique results; standing plans guide recurring work.
- Programs coordinate broader efforts that may contain projects.
- A budget sets planned numerical amounts and supports control.
- Policies allow judgment, procedures sequence steps, and rules require compliance.
- Specificity and frequency of use are separate ways to classify a plan.
3Write goals and use them to guide performance
A useful goal gives people a result they can work toward and a basis for checking progress. The wording matters, but so do commitment, resources and feedback. Connect goals across the organization, turn a vague intention into a SMART target, and score an OKR from its baseline. Then follow management by objectives to see how managers and employees agree on results, plan the work and review achievement together.
3.1 Goals link people’s work to organizational results
A goal, or objective, is a desired result. A plan describes the actions, resources and schedule for reaching it. "Resolve 90% of complaints at first contact" is a goal; arranging product training and changing call routing are parts of a plan.
Balance different results
Financial goals concern revenue, profit and cash. Nonfinancial goals concern results such as quality, customer satisfaction, market share, employee skills or environmental impact. Managers usually pursue several at once. Cutting service costs can conflict with faster, more personal help. Priorities and trade-offs need to be explicit so that teams do not optimize different results at one another's expense.
An organization's stated goals are the aims it announces. Its real goals, also called operational goals, show in its spending and rewards. A company may say "Quality first" but give supervisors bonuses based only on volume. Employees then have a strong reason to prioritize volume. To understand the goals people actually pursue, inspect both the statements and the decisions.
Build a means-ends chain
A goal hierarchy links levels: achievement lower down becomes a means to a higher end. Suppose the company wants customer retention to rise from 80% to 85% this year. Customer service aims to resolve 90% of complaints at first contact. An agent completes product training by March and aims to resolve at least 90% of their own cases at first contact.
The link needs a sensible explanation. Training helps an agent solve problems, better first-contact resolution improves the customer experience, and that supports retention. A lower goal should contribute to the higher result, rather than simply repeat its wording.
In traditional goal setting, senior managers set goals and pass them down. Vague aims can acquire conflicting meanings: "Improve profit" may become "Cut costs" in one department and "Raise prices" in another. The people responsible may also have little commitment if they had no input. Specific goals and meaningful participation address these weaknesses.
Use challenge with support
Goal-setting theory, developed by Edwin Locke and Gary Latham, finds that specific, difficult goals produce stronger performance than easy goals or a vague request to "do your best" when people accept the goal, have the ability to reach it and receive feedback. The mechanism is practical: a clear target directs effort and feedback shows whether the approach is working.
A goal seen as impossible can cause people to give up. A stretch goal pushes well beyond current performance, supported by resources and an understanding that some shortfall is acceptable. Complex, unfamiliar work may need a learning goal first, such as "Find and test three ways to shorten delivery time." Setting a rigid output target before people know how to improve can focus effort on the wrong activity.
Once a measurable goal is agreed, it also supplies a control standard. The team can compare actual first-contact resolution with 90% and decide what action the gap requires.
Key Takeaways
- A goal states a result; a plan describes how to reach it.
- Spending and rewards reveal the goals an organization actually pursues.
- Lower-level goals should contribute to higher-level results.
- Specific, challenging goals need acceptance, ability and feedback.
- Learning goals can suit complex work where the method is still unknown.
3.2 Turn an intention into a SMART goal
SMART is a checklist for making a goal clear enough to act on and check. Its common modern form is Specific, Measurable, Achievable, Relevant and Time-bound. George T. Doran introduced the term in 1981; his wording was Specific, Measurable, Assignable, Realistic and Time-related. The shared purpose is a goal people understand consistently.
Ask five concrete questions
| Test | Question to answer |
|---|---|
| Specific | What exactly changes, and where? |
| Measurable | What measure, baseline and target will show progress? |
| Achievable | Can the team reach it with the available time and resources? |
| Relevant | Which mission or higher goal does it serve? |
| Time-bound | By what date must the result be reached? |
Start with "Improve customer service." It names an intention but gives no target or deadline. Rewrite it as: "Raise the share of customer emails answered within four business hours from 62% to 85% by June 30."
The subject is email response time. The measure is the share answered within four hours, with a baseline of 62% and a target of 85%. The change is 23 percentage points. Before agreeing, the team checks its staffing and workload to judge achievability. Faster answers support customer retention, making the goal relevant. June 30 supplies the deadline.
Calculate a target and checkpoints
A sales representative currently sells $40,000 per month and agrees to reach $46,000 in monthly sales within six months. First calculate the change:
Then express it relative to the baseline:
An even path would add $1,000 to monthly sales at each monthly checkpoint: $41,000 after month 1, $42,000 after month 2, ending at $46,000. These checkpoints help the manager review progress before the deadline. They are planned milestones, not a claim that sales must grow smoothly.
Choose a measure that reflects success
An outcome goal names a result, such as timely email responses. An activity goal names effort, such as making 50 calls a day. Activity is useful in the action plan, but a count of calls says little about whether customers bought anything or received helpful service. Set the main goal on a result the person can influence, with activity targets supporting it.
A number alone does not establish a good goal. It may be too easy, unattainable, unrelated to the mission or left unmeasured in practice. Too many simultaneous goals also divide attention.
SMART can favor safe, easily counted work. Important qualitative aims such as creativity or ethical behavior may need interviews, reviewed examples or a rating rubric. Choose evidence that fits the aim, instead of dropping the aim because it is harder to count.
Key Takeaways
- Use SMART to make the intended result and deadline clear.
- Check achievability against resources and relevance against higher goals.
- Calculate percent change from the baseline; rate differences use percentage points.
- Activity targets support outcomes but do not establish success by themselves.
3.3 Write and score objectives and key results
OKRs pair a qualitative objective with a few measurable key results. The objective names what the team wants to achieve. Usually two to five key results show whether that change has happened. Initiatives are the actions intended to move those results.
Separate results from tasks
"Make our online shop the easiest place to reorder coffee" is an objective. "Launch a new checkout page" is an initiative: the team can finish it without making ordering easier. A result such as "Raise checkout completion from 55% to 70%" tests whether customers' experience improved. Key results need a baseline, target, owner and checkable data.
OKRs grew from MBO. Andy Grove developed the approach at Intel in the 1970s and described it in High Output Management in 1983. John Doerr introduced it to Google's founders in 1999 and later popularized it through Measure What Matters in 2018.
Teams often set quarterly OKRs, sometimes beneath annual objectives. A small number keeps attention focused. Visibility across teams supports alignment, and employees can propose OKRs that contribute to company goals. Regular checks allow action during the period.
Agree what success means
| Kind | Expected achievement |
|---|---|
| Committed | Full delivery: score 1.0 |
| Aspirational | A stretch beyond expected achievement; Google's guidance expects about 0.7 on average, with wide variation |
Aspirational targets ask people to seek new ways of working. Scores are often kept separate from pay so that employees can set ambitious goals honestly. Directly rewarding the score encourages sandbagging, or choosing easy targets to protect it.
Score the planned change
One method calculates the fraction of planned improvement achieved:
Limit each result to 0.0–1.0 before averaging: worse than baseline becomes 0.0, beyond target becomes 1.0. The method also handles a measure that should decrease.
For the coffee shop objective:
| Key result | Actual | Score |
|---|---|---|
| Repeat-purchase rate: 20% to 30% | 27% | |
| Delivery time: 5 days to 3 days | 3.5 days | |
| Successful repeat orders: 60% to 80% | 70% |
The mean is . This shows substantial progress toward an aspirational objective, with successful repeat orders needing most attention. The score measures improvement from the baseline, so dividing actual performance by the target would answer a different question.
A KPI tracks ongoing performance; an OKR targets change. An off-track delivery KPI can prompt an OKR to raise its rate. Key results can use SMART wording, while the objective stays qualitative. Too many OKRs, task lists disguised as results and reviews delayed until quarter-end weaken that focus.
Key Takeaways
- An objective names the desired change; key results provide outcome evidence.
- Initiatives are actions, so completing one does not establish the result.
- Committed and aspirational OKRs use different success expectations.
- Score the change from baseline, limit each score, then average.
- KPIs monitor ongoing performance; OKRs focus improvement.
- Frequent review and separation from pay help preserve honest stretch targets.
3.4 Agree objectives and review them together
Management by objectives (MBO) involves managers and employees in setting specific performance objectives, reviewing progress at agreed times and linking rewards to achievement. Peter Drucker introduced the idea in The Practice of Management in 1954. It combines a management philosophy with planning, control and employee involvement.
Build the agreement
MBO rests on four elements: specific goals, participation, an explicit time period and performance feedback. Participation means that the employee helps shape the objective, not simply that they sign a target already imposed.
A typical program follows this chain:
- Set overall organizational objectives and strategies.
- Allocate objectives to divisions and departments.
- Agree unit objectives between managers and their own managers.
- Agree individual objectives with each employee.
- Agree action plans and resources.
- Carry out those plans.
- Review progress and give feedback at set times.
- Assess achievement and provide performance-based rewards.
The chain gives people a link between their work and the organization's purpose. The agreed objective becomes the standard used during reviews.
Follow a sales agreement
A software company aims to grow annual revenue by 10%. A regional manager and sales representative agree: "Close $300,000 in new annual contracts by December 31, including at least five healthcare contracts." Last year's total was $260,000. The new target is about 15% higher:
They plan 20 product demonstrations per month and two healthcare trade fairs. These activities support the contract outcome; they do not replace it.
At midyear the representative has closed $140,000:
Half the year has passed, so the result is slightly below a simple halfway checkpoint. They agree to direct more demonstrations toward healthcare clients. This is a chance to improve the route while time remains. Year-end assessment compares the achieved contracts with the objective and informs the bonus.
Understand the benefits and pressures
Joint goal setting can increase commitment, clarify expectations and make feedback more useful. Employees can also exercise self-control because they know what result they agreed to achieve. Top-management commitment matters: research reviews found larger productivity gains where senior managers strongly supported the program.
MBO takes time and can become paperwork. Annual objectives can become outdated, and attention can narrow toward short-term results that are easy to count. A signature cannot create commitment if the employee had no meaningful input.
| Typical MBO | Typical OKRs |
|---|---|
| Annual manager–employee agreement | Quarterly, visible across teams |
| Full achievement expected | May include aspirational stretch |
| Feeds appraisal and pay | Often separated from pay |
Both approaches align measurable goals across levels and require progress reviews. Their different treatment of stretch and rewards changes the incentives people face.
Key Takeaways
- MBO combines joint objectives, a time period and performance feedback.
- Action plans and periodic reviews turn the agreement into ongoing management.
- Achievement informs performance-based rewards.
- MBO depends on real participation and support from senior managers.
- Typical MBO and OKRs differ in cadence, visibility and links to pay.
4Use control to find gaps and improve work
Plans become useful standards only when managers compare them with actual work. A control process makes that comparison systematic and gives people a reason to act. Set a standard, choose evidence and judge the gap before deciding whether to correct performance or revise the target. The timing and design of a control matter too: the same measure can help people learn, or encourage them to improve a number while neglecting the goal.
4.1 Set standards and gather useful evidence
Controlling means monitoring work against plans and correcting significant deviations. It shows whether goals are being reached, supports delegation and protects people and resources from errors, unsafe conditions, loss and other threats.
Establish the comparison before measuring
The control process has four steps: set standards, measure actual performance, compare and take action. Standards come from planning. Organizing identifies responsibility for each result. Leading often supplies the coaching, communication or motivation needed to improve it. The findings return to planning.
A standard is the target level against which performance is judged. It must be understandable, measurable and linked to the goal. Acceptance by the people doing the work helps make it useful.
| Standard concerns | Example |
|---|---|
| Quantity | Orders packed per hour |
| Quality | No more than 1% defective units |
| Time | Delivery within 48 hours |
| Cost | Cost per unit no higher than $4.20 |
| Customer experience | Satisfaction of at least 4.5 out of 5 |
| Behavior | Compliance with safety rules |
Choose what reflects the goal. A count of meetings may be easy to collect but weak evidence of good coaching. Work that is hard to quantify can be assessed through peer review or a clear rubric. Leaving it unmeasured can direct attention away from an important result.
Combine sources of information
Personal observation gives detail and context but takes time and can feel intrusive. Statistical reports reveal trends and comparisons but show only what the recording system captures. Oral reports allow quick questions but leave little permanent record. Written reports provide a lasting account but take longer to prepare.
These sources can complement one another. A report may reveal a delay; a conversation with the team can explain it. Accurate numbers are useful only when they measure the intended work.
Measurement frequency should match how quickly a problem develops and how soon action is possible. A production-line temperature may need continuous monitoring. Sales can be checked daily and customer satisfaction quarterly. Faster reporting is not always worth its cost, but a report arriving after the chance to act loses practical value.
Set up the call-center control
The aim is to reduce waiting. The standard is to answer at least 90% of calls within 30 seconds each week. The phone system records waiting times and produces a weekly statistical report. A supervisor also listens to a sample of calls to check answer quality. This balances speed with whether callers receive useful help.
A cybernetic system measures and adjusts automatically, such as a thermostat or inventory system that reorders at a trigger level. A noncybernetic system needs a person, such as a supervisor or auditor, to judge and correct the result. Automatic data collection alone does not complete an automatic control loop: the system must also perform the correction.
Key Takeaways
- Control follows standards, measurement, comparison and action.
- Choose evidence that reflects the goal, including judgment-based evidence where needed.
- Observation and reports provide different kinds of information.
- Measurement timing should leave time for a useful response.
- Cybernetic control includes automatic correction.
4.2 Judge a variance and choose an action
A difference between actual and planned performance is a variance. Calculate it before deciding what it means:
The sign describes direction. Whether that direction is favorable depends on the measure: higher sales can be favorable, while higher defects are unfavorable. Managers set an acceptable range in advance to distinguish routine variation from results needing attention.
Calculate the call-center gap
The weekly standard is at least 90% of calls answered within 30 seconds. The manager accepts results down to 87%. Of 2,400 calls, 1,968 meet the time limit:
The variance is percentage points. The result is below the 87% lower limit, so action is needed. Relative to the 90% standard, the shortfall is:
An eight-point difference between rates is not an 8% relative decrease. State which calculation you mean.
For a defect standard of no more than 2%, 130 defective units out of 5,000 give 2.6%. The variance is positive 0.6 percentage points and unfavorable, because more defects are worse. A much better-than-standard result also deserves investigation: it can reveal a useful practice, an easy target or a measurement error.
Choose among three responses
| Response | When it fits |
|---|---|
| Do nothing | Results are within the acceptable range |
| Correct performance | The plan is reasonable but work has gone off course |
| Revise the standard | Evidence shows an unrealistic target or changed conditions |
Immediate corrective action restores performance now, such as moving two people onto the phones. Basic corrective action addresses the cause. If 40% of calls are password resets, adding self-service reset can reduce the recurring workload. Asking why the gap appeared helps the manager move beyond repeated short-term fixes.
Changing a standard needs evidence. A new product may make calls longer, or resources may never have been sufficient for the agreed target. Lowering a target simply because it was missed hides the problem instead of addressing it.
Respond fairly when a person needs help
Start by clarifying expectations and checking whether coaching, training or task redesign is needed. For continuing conduct or performance problems, many organizations use progressive discipline: increasingly serious, documented steps such as verbal and written warnings, suspension and eventual dismissal. Its corrective purpose is to make expectations clear and provide a fair opportunity to improve.
Management by exception focuses managers' attention on results outside acceptable ranges. It saves time when reports make the exceptions visible and the limits are sensible. It still requires a response: highlighting a red figure without deciding who acts leaves the loop unfinished.
Key Takeaways
- Variance is actual minus standard; favorability depends on the measure.
- A difference between rates is measured in percentage points.
- Compare results with the acceptable range before acting.
- Immediate action restores performance; basic action addresses its cause.
- Revise standards on evidence, not simply to remove a missed target.
- Management by exception directs attention to significant deviations.
4.3 Control before, during and after the work
A control's timing is defined relative to the activity being controlled. Ask when the check can affect that work: before it begins, while it happens or after it ends.
Match the timing to the problem
| Type | Main purpose | Examples and limits |
|---|---|---|
| Feedforward | Prevent trouble before work begins | Input inspection, training and preventive maintenance; needs timely information about possible trouble |
| Concurrent | Correct trouble during work | Supervision, screening checks and automatic stops; needs attention and can feel intrusive |
| Feedback | Learn from completed results | Appraisals, final inspections and result reports; the damage may already have happened |
Feedforward is also called preliminary, preaction or precontrol. Concurrent includes screening or yes/no checks during the process. Feedback is also called postaction control. The label describes timing, not the equipment or person involved.
Work through a restaurant's controls
Before service, the chef checks incoming fish for freshness and temperature and trains new cooks on recipes. These are feedforward controls on preparing and serving meals: they address the quality of inputs and readiness of people before the work.
During service, the head chef checks plates at the pass and the manager walks the dining room. These concurrent controls can catch a problem before it reaches more tables. An automated temperature stop during cooking would also be concurrent; automation does not make a control feedforward.
Afterward, comment cards, online reviews and the weekly food-cost report provide feedback. Food costs of $9,300 on sales of $30,000 give:
Compared with a 30% standard, the cost rate is one percentage point high. The report cannot recover food already wasted, but it can guide the next week's purchasing, portion checks or training.
Combine controls across cycles
A hybrid control system uses all three timings. Feedback from completed work can change the next cycle's feedforward checks. Repeated late-delivery complaints may lead purchasing staff to review a supplier's delivery record before placing a new order.
Likewise, a year-end appraisal is feedback on the year just finished. Using its findings to arrange training before new work makes that training feedforward for the next period. Identify the activity and period before classifying the control.
Choose prevention where errors are especially costly or hard to undo. Use concurrent control where staff or systems can detect and correct problems during the process. Use feedback where outcomes become clear only at completion or where the purpose is learning and rewards. Compare the value of prevented errors with the cost of the control: an expensive check that adds little protection can consume resources needed elsewhere.
Key Takeaways
- Classify controls by timing relative to a named activity.
- Feedforward prepares inputs and people before work starts.
- Concurrent checks can correct work while it is happening.
- Feedback evaluates completed work and informs later plans.
- A hybrid system combines timings and connects successive cycles.
4.4 Design controls people can use well
Controls shape attention and behavior. A useful design considers both the information managers need and the incentives employees face.
Choose how behavior will be guided
| Approach | Basis of control | Where it helps |
|---|---|---|
| Bureaucratic | Authority, rules, procedures, budgets and supervision | Stable, routine work |
| Market | Prices, competition, market share and divisional profit | Units with distinct outputs that can be judged through markets |
| Clan | Shared values, norms and traditions | Professional or changing work where rules cannot cover every situation |
William Ouchi is associated with this classification. Organizations often combine the three approaches. A profit center can face market measures, follow formal safety rules and rely on professional norms at the same time.
External control is imposed by others, including supervision, compensation systems and discipline. Internal control, or self-control in this management context, comes from employees' own commitment and discipline. It is not the accounting use of the phrase. Goal setting, MBO and OKRs can strengthen self-control by making responsibilities clear and meaningful.
In control-oriented management, managers direct and check while employees follow instructions. In involvement-oriented management, employees help plan and monitor their work. Involvement needs skills, information and trust; signing a form without real influence does not provide those conditions.
Make information lead to action
Effective controls use accurate data and deliver it in time to help. Their benefits exceed their cost, their standards are attainable, and users understand how to interpret them. Flexible controls can adapt when conditions change.
Place checks where errors are most likely or costly. Highlight exceptions so that managers can focus attention. Combine several criteria and specify what happens when a limit is crossed. A dashboard that reports a problem without an owner or response leaves the manager with information but no completed control process.
Watch the behavior the measure rewards
Suppose agents are judged only by average call length. They can improve that number by ending calls quickly or transferring difficult customers. The reported speed improves while customers' problems remain unresolved. This is gaming: changing behavior to improve a measured score without serving the real goal.
Balance call length with first-contact resolution and customer satisfaction, and explain the purpose of the measures. The idea often summarized as Goodhart's law is that a measure can lose its usefulness when people optimize it as a target. Adding endless measures is not the solution either: focus on a few that jointly reflect the result.
Match oversight to risk and capability
Too much control slows decisions and can undermine motivation. Too little permits waste, errors and fraud. Experienced, committed employees can take more responsibility for checking their work, while high-risk activities may still require formal safeguards. Employee monitoring also has to respect applicable privacy requirements; explain its purpose openly so people understand what is being checked and why.
Key Takeaways
- Bureaucratic, market and clan controls guide behavior in different ways.
- Internal control here means employee self-control.
- Involvement needs information, skills and trust.
- Controls need accurate, timely evidence and a planned response.
- Multiple criteria help reduce gaming of a single measure.
- The amount of oversight should fit risk and employee capability.
5Choose measures that show results and their drivers
A manager can collect hundreds of figures and still miss the few that matter. Key performance indicators connect measures to goals, targets and responsibility. Calculate common rates, distinguish efficiency from effectiveness, and combine early signals with completed results. A balanced scorecard then places those measures in a wider view, linking people and processes to customers and financial performance so managers can choose where to act.
5.1 Choose and calculate useful KPIs
A key performance indicator (KPI) is a measure selected as especially important for tracking a key goal. It needs a defined calculation, target and responsible owner. All KPIs are metrics, but the organization should not treat every recorded metric as equally important.
Ask whether the result and resources fit
Effectiveness means achieving the intended goal. Efficiency means obtaining more output with fewer inputs. Productivity measures output divided by input.
A kitchen makes 1,200 meals in 300 labor hours:
Next month it makes 1,300 meals in 310 hours:
Using the unrounded quotient, productivity rose by about 4.8%. Making more meals is not enough to show higher productivity; the labor input must also be considered. The kitchen can become more efficient while remaining ineffective if customers do not want those meals.
Define the numerator and denominator
| KPI | Calculation | Worked result |
|---|---|---|
| On-time delivery | On-time orders ÷ all orders | |
| Customer retention | (End customers − new customers) ÷ start customers | |
| Employee turnover | Employees who left ÷ average employees | |
| Net profit margin | Net profit ÷ revenue |
These fractions become percentages by multiplying the decimal result by 100. Retention removes new customers because they were not in the starting group. Dividing 530 by 500 would give 106%, which mixes growth from new customers with retention.
A spending comparison is another control measure. Travel spending of $23,000 against a $20,000 budget is $3,000 unfavorable, or 15% over budget. A positive spending variance is not favorable merely because its sign is positive.
Combine drivers with results
Lagging indicators record completed outcomes, such as revenue, profit and last year's retention. Leading indicators track activities or conditions that predict later outcomes, such as qualified sales leads, training hours or maintenance completed on schedule. They offer earlier warning, but their usefulness depends on a meaningful link to the desired result. Training attendance alone does not show that skills improved.
For each KPI, specify the goal, formula, data source, target, acceptable range, owner and review frequency. People held responsible need some influence over the result. Keep definitions stable so that a trend compares like with like.
A dashboard displays targets, actual results and trends. Colors can highlight exceptions, but the figures and limits still need to be clear. Avoid vanity metrics, such as total downloads when regular app use is the goal, and avoid so many indicators that nobody knows which one requires action.
Key Takeaways
- KPIs select the measures that matter most to key goals.
- Productivity compares output with input; effectiveness checks goal achievement.
- Retention excludes new customers from the ending count.
- Leading indicators offer early signals; lagging indicators record results.
- Define each KPI consistently and assign an owner and response.
5.2 Build a balanced view of performance
The balanced scorecard connects financial results with the people, processes and customer outcomes that help produce them. Robert Kaplan and David Norton introduced it in 1992. The four common perspective names are financial, customer, internal business processes, and learning and growth. The original article called the last two "internal business" and "innovation and learning."
Give each perspective a useful question
| Perspective | Question | Example measures |
|---|---|---|
| Financial | How do owners judge our results? | Revenue growth, profit margin, cost per unit |
| Customer | How do customers see us? | Satisfaction, retention, market share |
| Internal business processes | What must we do well? | Defects, delivery time, on-time delivery |
| Learning and growth | Can we keep improving and creating value? | Skills, training, staff retention, information systems |
Financial measures report past outcomes. Relying on them alone can reward cuts to training or maintenance that help this quarter while damaging later performance. The scorecard combines financial and nonfinancial evidence and balances near-term results with future capability. Public and nonprofit organizations may put their mission or the people they serve above financial outcomes.
Write objectives, measures, targets and initiatives
For each perspective, select a few objectives, choose a measure, set a target and name initiatives intended to achieve it. An initiative is the action, not the evidence that the action worked.
An eight-club fitness chain wants to retain members and grow membership revenue:
- Learning and growth: develop expert trainers; measure the share with current certification; target 100% by December; fund certification courses.
- Internal processes: keep equipment available; measure machines out of service; target no more than 3%; schedule weekly preventive maintenance.
- Customer: keep members; measure 12-month retention; raise the baseline of 68% to a target of 75%; improve the experience through trainers and equipment.
- Financial: grow total monthly membership revenue. At $48 per member, 4,000 members generate $192,000. A target of 4,300 members generates $206,400, a 7.5% increase.
The chain is plausible: skilled trainers and usable equipment improve the experience, fewer members leave, and a larger membership supports revenue. Retention helps preserve customers; it does not raise the fee paid per member. A goal for higher revenue per member would need its own measure and initiative.
Use the links to choose action
A strategy map draws the expected cause-and-effect relationships. Treat them as links to test against evidence. If maintenance improves but satisfaction does not, investigate what else affects members instead of assuming the chain has worked.
Review the scorecard monthly or quarterly, compare actual results with targets and inspect patterns across perspectives. Rising equipment downtime alongside falling retention gives managers a place to investigate. Measures can become KPIs, and an improvement objective can be pursued through OKRs. A scorecard loses value when it merely reports figures, contains too many measures or gives financial results all the influence despite its four headings.
Key Takeaways
- The balanced scorecard combines four perspectives on performance.
- Each perspective needs objectives, measures, targets and initiatives.
- People and processes can drive customer and financial outcomes.
- Test the proposed causal links against evidence.
- Review patterns and act on them; reporting alone does not improve performance.
Planning and Control examples
1Plan a reliable course launch
13 steps
- 1IntroductionStart with a result worth improving
A learning center wants people to receive booking confirmations reliably. A plan needs to connect that result with changes staff can make, and formal planning shares it with the people involved. You will establish the starting point (the baseline), compare possible actions and schedule the work, finding the critical path. The same plan will give the manager evidence for deciding whether the changes are working.
- 2ExplanationMake the intention a shared plan
The manager’s intention, "Make booking easier," does not yet coordinate anyone’s work. Formal planning records goals and actions for a stated period and shares them with the people involved. Reception staff can then prepare for the same change as the technical team. The document remains open to revision when demand, staffing or another important condition changes.
- 3ChallengeWhy sharing matters
Reception learns about a new booking system only on launch morning. Staff cannot answer visitors’ questions. Which benefit of formal planning was lost, and how would participation help?
---reveal---
The teams lost coordination. Involving reception earlier would add knowledge about common booking problems and help staff understand the change they need to carry out.
- 4ExampleMeasure the starting position
Of 400 weekly bookings, 280 receive confirmation within one business day. The baseline is . Looking at the records, staff find that most delays occur when registrations need manual checking. This gives managers both a measured starting point and a specific process to investigate; the overall booking count alone would not reveal the delay.
- 5ExampleSet a target and state the premise
The goal is to confirm 90% within one business day by the end of eight weeks. At 400 bookings, that means timely confirmations. The plan assumes booking volume remains near 400 per week. Recording that premise makes it possible to revisit staffing and capacity if demand changes, while keeping the confirmation-rate definition consistent.
- 6ExplanationCompare routes before assigning tasks
Staff propose a clearer registration form, a second checker or dedicated checking time each morning. Managers compare cost, speed, resources and the likely effect on confirmation delays. They choose a clearer form plus protected morning checking time. The second checker stays in reserve. An alternative can be useful as a backup even when it is not chosen for immediate use.
- 7ExampleGive the work an owner and review point
The technical lead tests the clearer form by the end of week 2. The reception lead protects checking time from week 1 and reviews the recorded rate each Friday. The plan requires at least 82% by week 4. If it falls below 82%, the manager activates the reserve checker. Owners, deadlines and a checkpoint turn the chosen ideas into work that can be followed up.
- 8ChallengeJudge progress at the checkpoint
At week 4 the rate is 84%, measured against all bookings in the same way as the baseline. The agreed checkpoint is 82%, with a reserve checker below it. Should the reserve be activated now?
---reveal---
No. The result clears the checkpoint, so the reserve stays available while monitoring continues toward 90%. Being below the final goal at an intermediate checkpoint is not itself a missed milestone.
- 9ConnectionPrepare for different demand levels
A forecast estimates expected bookings. Scenario planning prepares responses to several plausible demand levels, such as steady demand or a sudden increase. The reserve-checker trigger is a contingency plan for a specific problem. These tools answer different questions: an estimate helps allocate resources, while scenarios and a backup help the center respond if conditions depart from the estimate.
- 10ExamplePut dependent tasks on a timeline
For the form launch, A designs the form in 2 days. B tests it in 4 days after A. C prepares instructions in 3 days after A, alongside B. D launches it in 1 day after both B and C. A Gantt chart would show B and C overlapping. D cannot start until the longer branch finishes, even if instructions are ready earlier.
- 11ExampleFind the earliest finish
The earliest finish is . The path A–B–D determines completion, so it is the critical path. C has of slack. Adding all four durations would wrongly assume that testing and instruction writing cannot happen together; overlap is the reason the plan finishes sooner.
- 12ChallengeCombine the schedule with the checkpoint
Testing takes 2 days longer, while instruction writing takes 1 day longer. What happens to launch timing, and should managers simply move the performance checkpoint without review?
---reveal---
Launch takes 9 days because testing extends the critical path by 2 days; instruction writing uses its 1 day of slack. Managers should review the action plan and its checkpoint in light of the delay, not silently change the agreed measure of progress.
- 13RecapKeep the plan usable
The center now has a baseline, a target, a stated premise and an assigned action plan. The checkpoint determines when to use the backup. The task schedule shows where delays affect launch, giving the manager two different checks: progress on the work and progress toward the service result.
2Connect a store’s purpose to daily decisions
11 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionA new service needs several kinds of decisions
- 2ExampleRead the present purpose and future aim
- 3ChallengeTest whether a value guides a choice
- 4ExplanationSeparate direction from departmental contributions
- 5ExampleFind a conflict between plans
- 6ChallengeClassify by the decision being made
- 7ConnectionKeep strategy levels distinct
- 8ExampleChoose guidance for repeated returns
- 9ExplanationDistinguish a project from continuing guidance
- 10ChallengeAdapt expansion while keeping routine work clear
- 11RecapIdentify what each plan decides
3Set and review a repair team’s goals
18 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionTurn better service into a checkable result
- 2ExplanationLink the desired result to team work
- 3ChallengeRead the incentive behind the statement
- 4ExplanationApply the SMART questions
- 5ExampleWrite the target and interpret the change
- 6ChallengeKeep the outcome above the activity
- 7ConnectionGive improvement an objective and evidence
- 8ExampleScore the result that should fall
- 9ExampleScore the result that should rise
- 10ExampleApply limits before combining scores
- 11ChallengeInterpret the commitment
- 12TipDo not turn the score into an easy-target contest
- 13ExplanationBuild a joint MBO agreement
- 14ExampleUse the midyear review while time remains
- 15ChallengeDistinguish participation from paperwork
- 16Key InsightSet challenge at a level people can use
- 17ChallengeCombine the goal with a fair review
- 18RecapUse the agreement to guide the next action
4Investigate a service gap and redesign its controls
16 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionA target becomes useful through comparison
- 2ExplanationChoose a standard that reflects the promise
- 3ExampleGather the evidence consistently
- 4ChallengeDo automatic reports complete the control?
- 5ExampleCalculate and judge the variance
- 6ExplanationRestore today’s performance and inspect the cause
- 7ChallengeShould the target simply be lowered?
- 8ExamplePrevent the next handover problem
- 9ExplanationWatch the queue during the work
- 10ChallengePlace the report in the correct cycle
- 11ExplanationCombine clear expectations with self-control
- 12ExampleNotice what a single target rewards
- 13ChallengeChoose a proportionate redesign
- 14ConnectionGive exceptions an owner
- 15ChallengeBring the control loop back to the goal
- 16RecapAct on the gap and the incentives
5Build a dashboard and balanced scorecard
13 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionChoose a few measures that support a decision
- 2ExplanationDefine the KPI before showing its color
- 3ExampleSeparate retained customers from new customers
- 4ChallengeInterpret growth and retention together
- 5ExampleRead profit as a share of revenue
- 6ConnectionBalance early signals with completed outcomes
- 7ChallengeDistinguish efficiency from effectiveness
- 8ExplanationGive each perspective a place
- 9ExampleBuild a capability-to-process link
- 10ExampleConnect customers to the financial result
- 11ChallengeFind the missing part of the scorecard
- 12ChallengeCheck the chain instead of assuming it
- 13RecapMake the measures lead to decisions
Planning and Control practice questions
Set 1: Build a plan and connect its levels10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Write goals and check what success means10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Design controls and respond to gaps10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Select measures and interpret performance10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Apply planning and control across a changing organization10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Acceptable range
Action plan
Activity goal
Aspirational OKR
B
Balanced scorecard
Baseline
Basic corrective action
Benchmarking
Budget
Bureaucratic control
Business-level strategy
C
Checkpoint
Clan control
Commitment concept
Committed OKR
Concurrent control
Contingency plan
Controlling
Core values
Corporate-level strategy
Critical path
Customer perspective
Customer retention rate
Cybernetic control
D
Directional plan
E
Effectiveness
Efficiency
Employee turnover rate
F
Feedback control
Feedforward control
Financial perspective
Forecasting
Formal planning
Functional-level strategy
G
Gaming
Gantt chart
Goal
Goal-setting theory
H
Hybrid control system
I
Immediate corrective action
Informal planning
Initiative
Internal business process perspective
Involvement-oriented management
K
Key performance indicator
Key result
KPI dashboard
L
Lagging indicator
Leading indicator
Learning and growth perspective
Learning goal
M
Management by exception
Management by objectives
Market control
Means-ends chain
Mission statement
Moving average
N
Net profit margin
Noncybernetic control
O
OKR
Operational plan
Outcome goal
P
Participation
Participatory planning
PDCA cycle
Percentage-point change
Performance appraisal
Performance feedback
Performance standard
Personal observation
Planning
Planning premise
Policy
Procedure
Productivity
Program
Progressive discipline
Project
R
Real goals
Retrenchment
Rule
S
Sandbagging
Scenario planning
Self-control
Simulation
Single-use plan
Slack
SMART goal
Specific plan
Standing plan
Stated goals
Statistical report
Strategic plan
Strategy map
Stretch goal
T
Tactical plan
V
Variance
Vision statement
About this lesson
Make your own Study Materials
Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.