Planning and Control

Planning, Goals and Control

Learn how managers decide where an organization is going and how they keep it on course. Work through the planning process, connect vision and mission to strategic, tactical and operational plans, and tell policies, procedures and rules apart. Write SMART goals, set and score OKRs and apply management by objectives. Then design a control process with standards, measures and corrective action, choose between feedforward, concurrent and feedback controls, and track results with key performance indicators and a balanced scorecard. Worked examples from shops, call centers, restaurants and sales teams show every step with real numbers.

BeginnerLesson 4 of 8 in Principles of Management Course

What you will learn

  1. See what planning is, what it gains and where it falls short, then follow the planning process from a realistic starting point to a written action plan, using the tools managers rely on to look ahead and schedule work.
    • Explain what planning is and why it matters
      Define planning, compare formal and informal planning, weigh its benefits against its criticisms, and see how planning sets up control.
    • Work through the planning process step by step
      Follow the steps from assessing the current situation and setting goals to choosing among alternatives, writing an action plan and reviewing the results.
    • Use planning tools to look ahead and schedule work
      Use forecasting, benchmarking, scenario and contingency planning, participatory planning, scheduling and time management, and decide how much flexibility a plan needs.
  2. Distinguish vision, mission and values statements, then classify plans by level, time frame, specificity and frequency of use, so that every plan supports the ones above it.
    • Write and assess vision, mission and values statements
      Tell vision, mission and values apart, judge whether a statement is useful, and see how these statements frame an organization's goals and plans.
    • Distinguish strategic, tactical and operational plans
      Classify plans by the level and breadth they cover and by their time frame, and check that plans at different levels fit together.
    • Classify plans as single-use or standing, specific or directional
      Tell one-time plans from ongoing ones, distinguish policies, procedures and rules, and decide when a plan should be specific or directional.
  3. Understand how goals work and link across levels, write SMART goals, set and score OKRs, and apply management by objectives.
    • Explain how goals work and how they link across levels
      Distinguish goals from plans, stated from real goals and financial from nonfinancial goals, link goals across levels, and use what research shows about specific, challenging goals.
    • Write SMART goals
      Use the SMART criteria to turn vague intentions into clear goals, calculate targets from a baseline, and know the limits of SMART.
    • Set and score OKRs
      Write objectives and key results, tell key results from tasks, score an OKR at the end of a period, and compare OKRs with SMART goals and KPIs.
    • Apply management by objectives
      Describe management by objectives, follow its steps in a worked case, weigh its strengths and problems, and compare it with OKRs.
  4. See why control matters, carry out the control process from standards to corrective action, choose between feedforward, concurrent and feedback control, and design controls that people accept and that do not backfire.
    • Set standards and measure performance
      Define controlling and the steps of the control process, set clear standards, and choose what, how and how often to measure.
    • Compare results and take corrective action
      Calculate and judge variances against an acceptable range, distinguish percentage points from percent, and choose between correcting performance, revising the standard and doing nothing.
    • Choose feedforward, concurrent and feedback controls
      Classify controls by when they act, weigh the strengths and limits of each type, and combine them into a complete control system.
    • Design controls that work with people
      Compare bureaucratic, market and clan control and internal and external control, apply the qualities of effective controls, and avoid controls that backfire.
  5. Choose and calculate key performance indicators, tell leading from lagging indicators, and build a simple balanced scorecard that looks beyond financial results.
    • Choose and calculate key performance indicators
      Define KPIs, calculate common ones from real figures, tell efficiency from effectiveness and leading from lagging indicators, and choose KPIs that drive the right action.
    • Build a simple balanced scorecard
      Explain the four perspectives of the balanced scorecard, link them through cause and effect, build a small scorecard with objectives, measures, targets and initiatives, and use it for control.

Planning and Control study guide

5 chapters

1

Turn a problem into a workable plan

Managers need a clear destination and a way to reach it before they can assign work or judge results. Planning connects those decisions: it sets goals, compares possible actions and prepares people for change. Follow a bakery from a shipping problem to an action plan, then use forecasts, backup plans and a task schedule to see how managers turn an uncertain future into work they can organize and check.

1.1 Why planning helps people work together

Planning means defining goals, choosing how to reach them and coordinating the work. It covers both the desired result and the means of achieving it. In the four management functions, planning comes first: organizing assigns the work, leading helps people carry it out, and controlling checks the results against the plan.

Make the plan visible
Informal planningFormal planning
Mainly stays in the manager's headRecords goals for a stated period
Little is written or sharedShares actions and responsibilities
Common in very small businessesHelps people coordinate across teams

A written plan can change. Its value is that people can see what they have agreed to do. If a shop owner plans a promotion without telling the stockroom, the advertising may succeed while the shelves run empty. A shared plan lets purchasing, staffing and sales prepare together.

What planning contributes

Planning gives direction: departments know which results matter and can settle conflicting priorities. It reduces uncertainty by making managers look ahead and prepare responses. It reduces waste and overlap when teams arrange their work together. It also provides the goals and standards that controlling will use.

These benefits support flexibility and time management. Preparing an alternative before a supplier fails makes a quick response possible. Scheduling important work protects it from the stream of small, urgent requests. Participatory planning brings in the people who will carry out the plan; they contribute practical knowledge and are more likely to support decisions they helped shape.

Every manager plans. Top managers consider the whole organization and several years ahead. Middle managers plan for departments or divisions. First-line managers arrange daily and weekly team work. A plan prepared by specialists still needs the understanding and commitment of the managers who will use it.

Where planning can fail

Planning takes time and resources. It can create rigidity when people follow a timetable after its assumptions have stopped fitting. It can also crowd out creativity or focus too heavily on today's competitors. Past success can make managers overconfident: a candy maker may repeat its successful fruit-candy range while customers move toward chocolate. Carrying out that old plan perfectly will not solve the changed demand.

Research generally links formal planning with better financial performance, but quality and execution matter more than the amount of planning. A sudden downturn or other external shock can undermine a sound plan. Planning reduces uncertainty; it does not remove it.

Close the loop

Planning sets the intended result. Controlling measures actual results and feeds the findings into the next plan. The plan-do-check-act (PDCA) cycle, also called the Deming cycle, makes this connection explicit: plan a change, try it, check its results and act on what you learn. State assumptions, schedule checkpoints and keep an important backup ready so that learning changes the next decision.

Key Takeaways

  • Planning defines both results and the actions needed to reach them.
  • Formal plans make coordination possible by sharing goals and actions.
  • Participation adds practical knowledge and commitment.
  • Plans need review when conditions or assumptions change.
  • Control returns evidence to the next round of planning.

1.2 From a baseline to an action plan

An effective planning process begins with evidence and ends with a review of what happened. A useful sequence has six steps. Each step answers a different question, so writing a target alone leaves most of the planning unfinished.

Establish the starting point and destination

1. Assess the situation. Gather facts about performance, resources and outside conditions. Sales trends, complaints, staff skills and capacity show where the problem lies. This measured starting point is the baseline. Organization-wide reviews can use SWOT to organize information about strengths, weaknesses, opportunities and threats.

2. Set goals. State the result and deadline. Connect the goal to the mission and the goals above it. A baseline helps you judge whether a target would represent a meaningful improvement.

Choose a route

3. State premises and develop alternatives. Planning premises are assumptions about demand, prices, staffing or other conditions. Record them so they can be checked. Ask employees for ideas and consider several routes before choosing.

4. Evaluate and choose. Compare cost, time, risk, resources, fit with the goal and effects on people. Managers can combine alternatives and keep one in reserve. The cheapest option may fail if it cannot deliver the required result on time.

Assign the work and review it

5. Write and carry out the action plan. For each task, state the owner, resources, deadline and review points. People need to know both their own responsibilities and the work on which they depend.

6. Monitor and adjust. Compare progress with checkpoints. Change actions when they fall short; review the plan or goal when a premise fails. These findings become evidence for the next planning round.

Work through the bakery case

An online bakery receives 300 orders weekly and ships 180 on the day of placement:

180÷300=60%

The team finds packaging shortages and only one afternoon packer. Its goal is 85% same-day shipping within 12 weeks. At unchanged volume, this means:

0.85×300=255

The premise is about 300 weekly orders. Alternatives are another afternoon packer, automatic packaging reordering and an earlier order cut-off. Managers choose reordering and the earlier cut-off, keeping the extra packer as backup. The operations lead sets the reorder level by week 2; the web manager changes the cut-off by week 1.

The plan sets a week-6 checkpoint of at least 75%, with the backup triggered below it. At week 6 the rate is 78% and has risen for three weeks. It clears that checkpoint, so the backup stays in reserve while weekly checks continue toward 85%.

Keep the measure consistent: count same-day shipments against all orders placed, including orders after the new cut-off. Otherwise a changed denominator could make the rate look better without improving the experience being measured. An action plan also needs owners and checkpoints; without them, a good idea can remain nobody's task.

Key Takeaways

  • A baseline anchors the goal in current performance.
  • Record premises and compare several routes before choosing.
  • An action plan assigns owners, resources, deadlines and checkpoints.
  • Judge progress against the planned checkpoint, using a consistent measure.

1.3 Forecast, prepare alternatives and schedule tasks

Planning tools answer different questions: what might happen, how to prepare and when work can finish. Choose a tool for the decision it helps you make.

Look ahead without treating estimates as facts

Forecasting estimates future demand, costs or staffing. Quantitative forecasts use data and calculations; qualitative forecasts use informed judgment, such as expert panels or sales staff estimates. Stable conditions make forecasting easier than sudden changes do.

A shop's last three monthly sales were 1,200, 1,350 and 1,500 units. A three-month moving average gives:

(1,200+1,350+1,500)÷3=1,350

Sales increased by 150 each month, so extending that trend gives:

1,500+150=1,650

The moving average smooths the figures and lags behind growth. The trend estimate assumes growth continues. Managers must judge the assumptions behind the 300-unit difference.

Benchmarking studies strong performance and adapts the methods behind it. Choose the process, find a good comparison, collect evidence, identify the gap and test improvements. A hospital can learn sample tracking from a parcel carrier; a branch can learn from another branch.

Prepare for more than one future

Scenario planning considers several plausible futures and the response to each. Contingency planning prepares a specific backup and a trigger, such as: "If a delivery is more than two days late, order from the backup supplier." Crisis planning prepares for damaging events such as fires or data breaches. A simulation tests a model under different assumptions before resources are committed.

Forecasts, budgets and simulations can serve short or long horizons. Daily schedules mostly support operational work; strategic plans look further ahead. Policies continue until revised. Their duration alone does not make them forecasts or long-term strategic choices.

Find what controls the finish date

A Gantt chart shows task bars along a timeline. For a training day:

TaskDurationMust follow
A: design content3 daysStart
B: prepare materials4 daysA
C: book room and trainers2 daysA
D: run training1 dayB and C

B and C run together after A. The earliest finish is:

3+max⁡(4,2)+1=8 days

A–B–D is the critical path: delay on it delays completion. C has two days of slack, because it takes two days while parallel task B takes four. Adding every duration would wrongly treat parallel work as sequential.

Match planning to the work

Sort personal tasks by importance and urgency: do urgent, important work now; schedule important work before it becomes urgent; delegate urgent, less important work where possible; drop work that is neither. Protect time blocks for planned priorities.

Higher managers plan more broadly. Greater uncertainty calls for flexibility, shorter review intervals and more frequent revision. The commitment concept adds another requirement: plans must reach far enough ahead to cover commitments made today. A ten-year lease needs a plan for that whole commitment, even when near-term details change.

Key Takeaways

  • Forecasts depend on assumptions about future conditions.
  • Benchmarking adapts the methods behind strong performance.
  • A contingency plan pairs a backup with a trigger.
  • Parallel tasks are not added together when finding the finish date.
  • Critical-path delays delay completion; slack gives a noncritical task room to move.
  • Uncertainty affects flexibility and review frequency; commitments affect planning reach.
2

Connect purpose to everyday plans

A mission gives people a purpose, but it does not tell a supervisor how to staff tomorrow’s shift. Organizations connect those decisions through a chain of plans. Learn how vision, mission and values guide the chain, how plans differ in scope and time, and how recurring work uses policies, procedures and rules. These distinctions help you identify what a plan is meant to decide and whether it supports the work around it.

2.1 Vision, mission and values guide decisions

Organizations need a shared purpose before they choose targets and actions. Vision, mission and values serve different roles in that purpose. Their usefulness lies in the decisions they guide.

Read what a statement actually says
StatementMain questionFocus
MissionWhat do we do, for whom and why?Present purpose
VisionWhat future do we want to create?Desired future
ValuesHow should we behave as we pursue it?Guiding principles

A mission statement may name customers, products or services, markets, an approach or philosophy, and what makes the organization distinctive. It need not contain every possible element. A vision statement usually offers a shorter, more ambitious picture of the future. Core values guide behavior, especially when short-term rewards pull in another direction.

Some organizations combine purpose and vision or use different labels. Classify the content by the question it answers. A sentence called a mission can still describe a desired future.

Use the grocery chain's statements

An invented chain of 12 neighborhood stores has this vision: "Every neighborhood we serve has fresh, affordable food within a ten-minute walk." It describes a future state for the communities the stores serve.

Its mission is: "We run neighborhood grocery stores that sell fresh, mostly local food at fair prices and make shopping quick for busy families." It identifies the present activity, products, customers and approach. A manager can use it to choose products and decide how to staff checkouts.

Its values are: "Freshness, fairness to farmers and customers, respect for our team." These principles matter when a decision is difficult. Pressuring suppliers for a price that conflicts with fairness would put a short-term saving ahead of a stated value. A value such as "safety before speed" matters when meeting an urgent order would require unsafe work.

Judge a statement by the choices it helps settle

A statement such as "We strive for excellence in everything we do" could fit almost any organization. It gives little help when a manager must choose between two investments. More useful statements make purpose clear enough to support some choices and question others.

For the grocery chain, a proposal should be assessed against fresh food, fair prices, neighborhood access and quick shopping. The mission does not supply a complete plan, but it gives managers a reason to favor one proposal over another. Values then help judge how the proposal will be carried out.

Connect purpose to goals

Vision and mission sit above strategic goals in the planning hierarchy. Strategic goals turn purpose into targets over the next few years. Tactical plans organize departments' contributions, and operational plans arrange the team's work.

If a goal supports neither mission nor vision, managers need to review the goal or the purpose statement. A mission can become outdated as an organization changes. Keeping the words visible is useful only when they continue to guide resources, priorities and behavior.

Key Takeaways

  • Mission states present purpose; vision describes a desired future.
  • Values guide behavior when choices involve trade-offs.
  • Useful statements help managers judge concrete decisions.
  • Strategic goals translate purpose into targets.

2.2 Match the scope of strategic, tactical and operational plans

Plans at different levels answer different questions. To classify one, look first at its scope and role in the organization. Time frame helps, but duration alone does not determine the level.

Follow the planning chain
PlanWhat it decidesUsual lead and horizon
StrategicOverall direction and position of the organizationTop managers; often three to five years or more
TacticalHow major units or functions deliver that directionMiddle managers; typically six months to two years
OperationalDetailed tasks, staffing, schedules and proceduresFirst-line managers; usually a year or less

Each lower plan is a means of achieving the one above it. The plans must also fit across departments. Sales cannot promise a 24-hour delivery while the warehouse plans to ship within 48 hours. The manager responsible for both must resolve the conflict.

Trace one organization's plans

The 12-store grocery chain sets a four-year strategic goal: grow to 18 stores and make online orders 15% of sales. Adding six stores to the original 12 is:

6÷12=50%

Its marketing and operations units create an 18-month tactical plan: launch online ordering and home delivery around the six largest stores and reach 2,000 weekly online orders.

A store's operational plan for next month schedules two order pickers per shift from 8 a.m. to 2 p.m. and calls for packing each online order within two hours. This is the concrete work that supports the larger direction. Adding more stores is not a task that an individual shift schedule can decide.

Keep levels of strategy distinct

Strategy also has corporate, business and functional levels. These describe the scope of strategic choices, so they do not match the three plan types one for one.

Corporate strategy decides which businesses the organization will operate and whether to grow, remain stable or retrench. Retrenchment reduces size or scope to recover. Business strategy decides how a particular business competes, for example through low cost or a distinctive product. Functional strategy sets how an area such as marketing or IT supports that competition. An e-business plan addresses the use of the internet in selling, customer service or supplier relationships.

Business strategy is still strategic. A functional strategy can also extend well beyond routine daily activity. Tactical and operational plans turn these choices into work.

Interpret time frames sensibly

A common convention calls plans over three years long-term, plans of one year or less short-term, and the period between them intermediate. Industry conditions affect these horizons: an electricity provider may plan decades ahead, while a fashion retailer works season by season.

A three-year machine-maintenance schedule remains operational because it arranges recurring work. Calling it strategic simply because it lasts three years confuses horizon with organizational direction. Some books use only strategic and operational categories, with operational covering everything below strategy; the role of the plan still needs to be understood.

Key Takeaways

  • Classify plan levels by scope and role, supported by the time frame.
  • Lower-level plans provide the means to achieve higher-level plans.
  • Plans across departments must fit together.
  • Corporate, business and functional strategy describe strategic scope.
  • A long schedule can still be an operational plan.

2.3 Choose the right plan for recurring and one-time work

Some plans serve a unique result and then end. Others guide situations that return again and again. A separate distinction concerns how tightly the plan specifies actions and targets.

One-time plans focus a defined effort

A single-use plan serves a unique situation. A program coordinates a large set of activities toward a one-time goal and often contains several projects. A project is narrower, with its own deadline and resources. Opening a distribution center can be a program; redesigning its website can be one project.

A budget expresses planned resources in numbers, mainly money, for a stated period. Projects and programs can each have a budget, and departments often have annual budgets. Planned amounts also become standards for comparing actual spending. The fact that an organization prepares a new budget every year does not make the previous year's figures an ongoing rule.

Standing plans guide repeated work
Standing planWhat it providesRoom for judgment
PolicyA general guideline for decisionsYes
ProcedureOrdered steps for a recurring situationFollows the defined sequence
RuleAn explicit required or prohibited actionNo discretion about compliance

For a hotel, "Checkout is at 11 a.m.; a later checkout costs $30" states a rule. "Managers may waive the fee for regular guests when it protects the relationship" is a policy. The steps for replacing a lost room key form a procedure. A manual can contain all three even if its cover says "Policies."

A procedure answers "What steps do I follow?" A policy answers "What should guide this decision?" A rule answers "What must or must not happen?" Written form does not determine the classification; the instruction's function does.

Describe how specific the plan is

A specific plan leaves little room for interpretation: "Raise sales by 8% in 12 months by adding two sales representatives and entering two new cities." It fixes the result and route.

A directional plan gives general guidance and flexibility: "Raise profits by 5 to 10% over the next year." It still sets a direction, but lets managers adapt as conditions develop. Specific plans suit stable conditions; directional plans help when uncertainty makes detailed commitments less useful.

These dimensions combine. Renovating the hotel's lobby by May is a single-use project. Allocating $450,000 to it is a numerical plan. A recurring safety rule is a standing plan, regardless of whether it appears beside the project schedule.

Review what repeated use can hide

Standing plans save decision time, support fair treatment and make training easier. They can also become outdated. Managers must review them as work changes. Single-use plans end with their goal; using an old project plan for a new project requires checking its tasks, assumptions and resources again. Familiarity with the document does not show that it fits the new situation.

Key Takeaways

  • Single-use plans serve unique results; standing plans guide recurring work.
  • Programs coordinate broader efforts that may contain projects.
  • A budget sets planned numerical amounts and supports control.
  • Policies allow judgment, procedures sequence steps, and rules require compliance.
  • Specificity and frequency of use are separate ways to classify a plan.
3

Write goals and use them to guide performance

A useful goal gives people a result they can work toward and a basis for checking progress. The wording matters, but so do commitment, resources and feedback. Connect goals across the organization, turn a vague intention into a SMART target, and score an OKR from its baseline. Then follow management by objectives to see how managers and employees agree on results, plan the work and review achievement together.

A goal, or objective, is a desired result. A plan describes the actions, resources and schedule for reaching it. "Resolve 90% of complaints at first contact" is a goal; arranging product training and changing call routing are parts of a plan.

Balance different results

Financial goals concern revenue, profit and cash. Nonfinancial goals concern results such as quality, customer satisfaction, market share, employee skills or environmental impact. Managers usually pursue several at once. Cutting service costs can conflict with faster, more personal help. Priorities and trade-offs need to be explicit so that teams do not optimize different results at one another's expense.

An organization's stated goals are the aims it announces. Its real goals, also called operational goals, show in its spending and rewards. A company may say "Quality first" but give supervisors bonuses based only on volume. Employees then have a strong reason to prioritize volume. To understand the goals people actually pursue, inspect both the statements and the decisions.

Build a means-ends chain

A goal hierarchy links levels: achievement lower down becomes a means to a higher end. Suppose the company wants customer retention to rise from 80% to 85% this year. Customer service aims to resolve 90% of complaints at first contact. An agent completes product training by March and aims to resolve at least 90% of their own cases at first contact.

The link needs a sensible explanation. Training helps an agent solve problems, better first-contact resolution improves the customer experience, and that supports retention. A lower goal should contribute to the higher result, rather than simply repeat its wording.

In traditional goal setting, senior managers set goals and pass them down. Vague aims can acquire conflicting meanings: "Improve profit" may become "Cut costs" in one department and "Raise prices" in another. The people responsible may also have little commitment if they had no input. Specific goals and meaningful participation address these weaknesses.

Use challenge with support

Goal-setting theory, developed by Edwin Locke and Gary Latham, finds that specific, difficult goals produce stronger performance than easy goals or a vague request to "do your best" when people accept the goal, have the ability to reach it and receive feedback. The mechanism is practical: a clear target directs effort and feedback shows whether the approach is working.

A goal seen as impossible can cause people to give up. A stretch goal pushes well beyond current performance, supported by resources and an understanding that some shortfall is acceptable. Complex, unfamiliar work may need a learning goal first, such as "Find and test three ways to shorten delivery time." Setting a rigid output target before people know how to improve can focus effort on the wrong activity.

Once a measurable goal is agreed, it also supplies a control standard. The team can compare actual first-contact resolution with 90% and decide what action the gap requires.

Key Takeaways

  • A goal states a result; a plan describes how to reach it.
  • Spending and rewards reveal the goals an organization actually pursues.
  • Lower-level goals should contribute to higher-level results.
  • Specific, challenging goals need acceptance, ability and feedback.
  • Learning goals can suit complex work where the method is still unknown.

3.2 Turn an intention into a SMART goal

SMART is a checklist for making a goal clear enough to act on and check. Its common modern form is Specific, Measurable, Achievable, Relevant and Time-bound. George T. Doran introduced the term in 1981; his wording was Specific, Measurable, Assignable, Realistic and Time-related. The shared purpose is a goal people understand consistently.

Ask five concrete questions
TestQuestion to answer
SpecificWhat exactly changes, and where?
MeasurableWhat measure, baseline and target will show progress?
AchievableCan the team reach it with the available time and resources?
RelevantWhich mission or higher goal does it serve?
Time-boundBy what date must the result be reached?

Start with "Improve customer service." It names an intention but gives no target or deadline. Rewrite it as: "Raise the share of customer emails answered within four business hours from 62% to 85% by June 30."

The subject is email response time. The measure is the share answered within four hours, with a baseline of 62% and a target of 85%. The change is 23 percentage points. Before agreeing, the team checks its staffing and workload to judge achievability. Faster answers support customer retention, making the goal relevant. June 30 supplies the deadline.

Calculate a target and checkpoints

A sales representative currently sells $40,000 per month and agrees to reach $46,000 in monthly sales within six months. First calculate the change:

46,000−40,000=6,000

Then express it relative to the baseline:

6,000÷40,000=15%

An even path would add $1,000 to monthly sales at each monthly checkpoint: $41,000 after month 1, $42,000 after month 2, ending at $46,000. These checkpoints help the manager review progress before the deadline. They are planned milestones, not a claim that sales must grow smoothly.

Choose a measure that reflects success

An outcome goal names a result, such as timely email responses. An activity goal names effort, such as making 50 calls a day. Activity is useful in the action plan, but a count of calls says little about whether customers bought anything or received helpful service. Set the main goal on a result the person can influence, with activity targets supporting it.

A number alone does not establish a good goal. It may be too easy, unattainable, unrelated to the mission or left unmeasured in practice. Too many simultaneous goals also divide attention.

SMART can favor safe, easily counted work. Important qualitative aims such as creativity or ethical behavior may need interviews, reviewed examples or a rating rubric. Choose evidence that fits the aim, instead of dropping the aim because it is harder to count.

Key Takeaways

  • Use SMART to make the intended result and deadline clear.
  • Check achievability against resources and relevance against higher goals.
  • Calculate percent change from the baseline; rate differences use percentage points.
  • Activity targets support outcomes but do not establish success by themselves.

3.3 Write and score objectives and key results

OKRs pair a qualitative objective with a few measurable key results. The objective names what the team wants to achieve. Usually two to five key results show whether that change has happened. Initiatives are the actions intended to move those results.

Separate results from tasks

"Make our online shop the easiest place to reorder coffee" is an objective. "Launch a new checkout page" is an initiative: the team can finish it without making ordering easier. A result such as "Raise checkout completion from 55% to 70%" tests whether customers' experience improved. Key results need a baseline, target, owner and checkable data.

OKRs grew from MBO. Andy Grove developed the approach at Intel in the 1970s and described it in High Output Management in 1983. John Doerr introduced it to Google's founders in 1999 and later popularized it through Measure What Matters in 2018.

Teams often set quarterly OKRs, sometimes beneath annual objectives. A small number keeps attention focused. Visibility across teams supports alignment, and employees can propose OKRs that contribute to company goals. Regular checks allow action during the period.

Agree what success means
KindExpected achievement
CommittedFull delivery: score 1.0
AspirationalA stretch beyond expected achievement; Google's guidance expects about 0.7 on average, with wide variation

Aspirational targets ask people to seek new ways of working. Scores are often kept separate from pay so that employees can set ambitious goals honestly. Directly rewarding the score encourages sandbagging, or choosing easy targets to protect it.

Score the planned change

One method calculates the fraction of planned improvement achieved:

score=actual−baselinetarget−baseline

Limit each result to 0.0–1.0 before averaging: worse than baseline becomes 0.0, beyond target becomes 1.0. The method also handles a measure that should decrease.

For the coffee shop objective:

Key resultActualScore
Repeat-purchase rate: 20% to 30%27%(27−20)/(30−20)=0.7
Delivery time: 5 days to 3 days3.5 days(3.5−5)/(3−5)=0.75
Successful repeat orders: 60% to 80%70%(70−60)/(80−60)=0.5

The mean is (0.7+0.75+0.5)/3=0.65. This shows substantial progress toward an aspirational objective, with successful repeat orders needing most attention. The score measures improvement from the baseline, so dividing actual performance by the target would answer a different question.

A KPI tracks ongoing performance; an OKR targets change. An off-track delivery KPI can prompt an OKR to raise its rate. Key results can use SMART wording, while the objective stays qualitative. Too many OKRs, task lists disguised as results and reviews delayed until quarter-end weaken that focus.

Key Takeaways

  • An objective names the desired change; key results provide outcome evidence.
  • Initiatives are actions, so completing one does not establish the result.
  • Committed and aspirational OKRs use different success expectations.
  • Score the change from baseline, limit each score, then average.
  • KPIs monitor ongoing performance; OKRs focus improvement.
  • Frequent review and separation from pay help preserve honest stretch targets.

3.4 Agree objectives and review them together

Management by objectives (MBO) involves managers and employees in setting specific performance objectives, reviewing progress at agreed times and linking rewards to achievement. Peter Drucker introduced the idea in The Practice of Management in 1954. It combines a management philosophy with planning, control and employee involvement.

Build the agreement

MBO rests on four elements: specific goals, participation, an explicit time period and performance feedback. Participation means that the employee helps shape the objective, not simply that they sign a target already imposed.

A typical program follows this chain:

  1. Set overall organizational objectives and strategies.
  2. Allocate objectives to divisions and departments.
  3. Agree unit objectives between managers and their own managers.
  4. Agree individual objectives with each employee.
  5. Agree action plans and resources.
  6. Carry out those plans.
  7. Review progress and give feedback at set times.
  8. Assess achievement and provide performance-based rewards.

The chain gives people a link between their work and the organization's purpose. The agreed objective becomes the standard used during reviews.

Follow a sales agreement

A software company aims to grow annual revenue by 10%. A regional manager and sales representative agree: "Close $300,000 in new annual contracts by December 31, including at least five healthcare contracts." Last year's total was $260,000. The new target is about 15% higher:

300,000÷260,000≈1.154

They plan 20 product demonstrations per month and two healthcare trade fairs. These activities support the contract outcome; they do not replace it.

At midyear the representative has closed $140,000:

140,000÷300,000≈47%

Half the year has passed, so the result is slightly below a simple halfway checkpoint. They agree to direct more demonstrations toward healthcare clients. This is a chance to improve the route while time remains. Year-end assessment compares the achieved contracts with the objective and informs the bonus.

Understand the benefits and pressures

Joint goal setting can increase commitment, clarify expectations and make feedback more useful. Employees can also exercise self-control because they know what result they agreed to achieve. Top-management commitment matters: research reviews found larger productivity gains where senior managers strongly supported the program.

MBO takes time and can become paperwork. Annual objectives can become outdated, and attention can narrow toward short-term results that are easy to count. A signature cannot create commitment if the employee had no meaningful input.

Typical MBOTypical OKRs
Annual manager–employee agreementQuarterly, visible across teams
Full achievement expectedMay include aspirational stretch
Feeds appraisal and payOften separated from pay

Both approaches align measurable goals across levels and require progress reviews. Their different treatment of stretch and rewards changes the incentives people face.

Key Takeaways

  • MBO combines joint objectives, a time period and performance feedback.
  • Action plans and periodic reviews turn the agreement into ongoing management.
  • Achievement informs performance-based rewards.
  • MBO depends on real participation and support from senior managers.
  • Typical MBO and OKRs differ in cadence, visibility and links to pay.
4

Use control to find gaps and improve work

Plans become useful standards only when managers compare them with actual work. A control process makes that comparison systematic and gives people a reason to act. Set a standard, choose evidence and judge the gap before deciding whether to correct performance or revise the target. The timing and design of a control matter too: the same measure can help people learn, or encourage them to improve a number while neglecting the goal.

4.1 Set standards and gather useful evidence

Controlling means monitoring work against plans and correcting significant deviations. It shows whether goals are being reached, supports delegation and protects people and resources from errors, unsafe conditions, loss and other threats.

Establish the comparison before measuring

The control process has four steps: set standards, measure actual performance, compare and take action. Standards come from planning. Organizing identifies responsibility for each result. Leading often supplies the coaching, communication or motivation needed to improve it. The findings return to planning.

A standard is the target level against which performance is judged. It must be understandable, measurable and linked to the goal. Acceptance by the people doing the work helps make it useful.

Standard concernsExample
QuantityOrders packed per hour
QualityNo more than 1% defective units
TimeDelivery within 48 hours
CostCost per unit no higher than $4.20
Customer experienceSatisfaction of at least 4.5 out of 5
BehaviorCompliance with safety rules

Choose what reflects the goal. A count of meetings may be easy to collect but weak evidence of good coaching. Work that is hard to quantify can be assessed through peer review or a clear rubric. Leaving it unmeasured can direct attention away from an important result.

Combine sources of information

Personal observation gives detail and context but takes time and can feel intrusive. Statistical reports reveal trends and comparisons but show only what the recording system captures. Oral reports allow quick questions but leave little permanent record. Written reports provide a lasting account but take longer to prepare.

These sources can complement one another. A report may reveal a delay; a conversation with the team can explain it. Accurate numbers are useful only when they measure the intended work.

Measurement frequency should match how quickly a problem develops and how soon action is possible. A production-line temperature may need continuous monitoring. Sales can be checked daily and customer satisfaction quarterly. Faster reporting is not always worth its cost, but a report arriving after the chance to act loses practical value.

Set up the call-center control

The aim is to reduce waiting. The standard is to answer at least 90% of calls within 30 seconds each week. The phone system records waiting times and produces a weekly statistical report. A supervisor also listens to a sample of calls to check answer quality. This balances speed with whether callers receive useful help.

A cybernetic system measures and adjusts automatically, such as a thermostat or inventory system that reorders at a trigger level. A noncybernetic system needs a person, such as a supervisor or auditor, to judge and correct the result. Automatic data collection alone does not complete an automatic control loop: the system must also perform the correction.

Key Takeaways

  • Control follows standards, measurement, comparison and action.
  • Choose evidence that reflects the goal, including judgment-based evidence where needed.
  • Observation and reports provide different kinds of information.
  • Measurement timing should leave time for a useful response.
  • Cybernetic control includes automatic correction.

4.2 Judge a variance and choose an action

A difference between actual and planned performance is a variance. Calculate it before deciding what it means:

variance=actual−standard

The sign describes direction. Whether that direction is favorable depends on the measure: higher sales can be favorable, while higher defects are unfavorable. Managers set an acceptable range in advance to distinguish routine variation from results needing attention.

Calculate the call-center gap

The weekly standard is at least 90% of calls answered within 30 seconds. The manager accepts results down to 87%. Of 2,400 calls, 1,968 meet the time limit:

1,968÷2,400=82%

The variance is 82−90=−8 percentage points. The result is below the 87% lower limit, so action is needed. Relative to the 90% standard, the shortfall is:

8÷90≈8.9%

An eight-point difference between rates is not an 8% relative decrease. State which calculation you mean.

For a defect standard of no more than 2%, 130 defective units out of 5,000 give 2.6%. The variance is positive 0.6 percentage points and unfavorable, because more defects are worse. A much better-than-standard result also deserves investigation: it can reveal a useful practice, an easy target or a measurement error.

Choose among three responses
ResponseWhen it fits
Do nothingResults are within the acceptable range
Correct performanceThe plan is reasonable but work has gone off course
Revise the standardEvidence shows an unrealistic target or changed conditions

Immediate corrective action restores performance now, such as moving two people onto the phones. Basic corrective action addresses the cause. If 40% of calls are password resets, adding self-service reset can reduce the recurring workload. Asking why the gap appeared helps the manager move beyond repeated short-term fixes.

Changing a standard needs evidence. A new product may make calls longer, or resources may never have been sufficient for the agreed target. Lowering a target simply because it was missed hides the problem instead of addressing it.

Respond fairly when a person needs help

Start by clarifying expectations and checking whether coaching, training or task redesign is needed. For continuing conduct or performance problems, many organizations use progressive discipline: increasingly serious, documented steps such as verbal and written warnings, suspension and eventual dismissal. Its corrective purpose is to make expectations clear and provide a fair opportunity to improve.

Management by exception focuses managers' attention on results outside acceptable ranges. It saves time when reports make the exceptions visible and the limits are sensible. It still requires a response: highlighting a red figure without deciding who acts leaves the loop unfinished.

Key Takeaways

  • Variance is actual minus standard; favorability depends on the measure.
  • A difference between rates is measured in percentage points.
  • Compare results with the acceptable range before acting.
  • Immediate action restores performance; basic action addresses its cause.
  • Revise standards on evidence, not simply to remove a missed target.
  • Management by exception directs attention to significant deviations.

4.3 Control before, during and after the work

A control's timing is defined relative to the activity being controlled. Ask when the check can affect that work: before it begins, while it happens or after it ends.

Match the timing to the problem
TypeMain purposeExamples and limits
FeedforwardPrevent trouble before work beginsInput inspection, training and preventive maintenance; needs timely information about possible trouble
ConcurrentCorrect trouble during workSupervision, screening checks and automatic stops; needs attention and can feel intrusive
FeedbackLearn from completed resultsAppraisals, final inspections and result reports; the damage may already have happened

Feedforward is also called preliminary, preaction or precontrol. Concurrent includes screening or yes/no checks during the process. Feedback is also called postaction control. The label describes timing, not the equipment or person involved.

Work through a restaurant's controls

Before service, the chef checks incoming fish for freshness and temperature and trains new cooks on recipes. These are feedforward controls on preparing and serving meals: they address the quality of inputs and readiness of people before the work.

During service, the head chef checks plates at the pass and the manager walks the dining room. These concurrent controls can catch a problem before it reaches more tables. An automated temperature stop during cooking would also be concurrent; automation does not make a control feedforward.

Afterward, comment cards, online reviews and the weekly food-cost report provide feedback. Food costs of $9,300 on sales of $30,000 give:

9,300÷30,000=31%

Compared with a 30% standard, the cost rate is one percentage point high. The report cannot recover food already wasted, but it can guide the next week's purchasing, portion checks or training.

Combine controls across cycles

A hybrid control system uses all three timings. Feedback from completed work can change the next cycle's feedforward checks. Repeated late-delivery complaints may lead purchasing staff to review a supplier's delivery record before placing a new order.

Likewise, a year-end appraisal is feedback on the year just finished. Using its findings to arrange training before new work makes that training feedforward for the next period. Identify the activity and period before classifying the control.

Choose prevention where errors are especially costly or hard to undo. Use concurrent control where staff or systems can detect and correct problems during the process. Use feedback where outcomes become clear only at completion or where the purpose is learning and rewards. Compare the value of prevented errors with the cost of the control: an expensive check that adds little protection can consume resources needed elsewhere.

Key Takeaways

  • Classify controls by timing relative to a named activity.
  • Feedforward prepares inputs and people before work starts.
  • Concurrent checks can correct work while it is happening.
  • Feedback evaluates completed work and informs later plans.
  • A hybrid system combines timings and connects successive cycles.

4.4 Design controls people can use well

Controls shape attention and behavior. A useful design considers both the information managers need and the incentives employees face.

Choose how behavior will be guided
ApproachBasis of controlWhere it helps
BureaucraticAuthority, rules, procedures, budgets and supervisionStable, routine work
MarketPrices, competition, market share and divisional profitUnits with distinct outputs that can be judged through markets
ClanShared values, norms and traditionsProfessional or changing work where rules cannot cover every situation

William Ouchi is associated with this classification. Organizations often combine the three approaches. A profit center can face market measures, follow formal safety rules and rely on professional norms at the same time.

External control is imposed by others, including supervision, compensation systems and discipline. Internal control, or self-control in this management context, comes from employees' own commitment and discipline. It is not the accounting use of the phrase. Goal setting, MBO and OKRs can strengthen self-control by making responsibilities clear and meaningful.

In control-oriented management, managers direct and check while employees follow instructions. In involvement-oriented management, employees help plan and monitor their work. Involvement needs skills, information and trust; signing a form without real influence does not provide those conditions.

Make information lead to action

Effective controls use accurate data and deliver it in time to help. Their benefits exceed their cost, their standards are attainable, and users understand how to interpret them. Flexible controls can adapt when conditions change.

Place checks where errors are most likely or costly. Highlight exceptions so that managers can focus attention. Combine several criteria and specify what happens when a limit is crossed. A dashboard that reports a problem without an owner or response leaves the manager with information but no completed control process.

Watch the behavior the measure rewards

Suppose agents are judged only by average call length. They can improve that number by ending calls quickly or transferring difficult customers. The reported speed improves while customers' problems remain unresolved. This is gaming: changing behavior to improve a measured score without serving the real goal.

Balance call length with first-contact resolution and customer satisfaction, and explain the purpose of the measures. The idea often summarized as Goodhart's law is that a measure can lose its usefulness when people optimize it as a target. Adding endless measures is not the solution either: focus on a few that jointly reflect the result.

Match oversight to risk and capability

Too much control slows decisions and can undermine motivation. Too little permits waste, errors and fraud. Experienced, committed employees can take more responsibility for checking their work, while high-risk activities may still require formal safeguards. Employee monitoring also has to respect applicable privacy requirements; explain its purpose openly so people understand what is being checked and why.

Key Takeaways

  • Bureaucratic, market and clan controls guide behavior in different ways.
  • Internal control here means employee self-control.
  • Involvement needs information, skills and trust.
  • Controls need accurate, timely evidence and a planned response.
  • Multiple criteria help reduce gaming of a single measure.
  • The amount of oversight should fit risk and employee capability.
5

Choose measures that show results and their drivers

A manager can collect hundreds of figures and still miss the few that matter. Key performance indicators connect measures to goals, targets and responsibility. Calculate common rates, distinguish efficiency from effectiveness, and combine early signals with completed results. A balanced scorecard then places those measures in a wider view, linking people and processes to customers and financial performance so managers can choose where to act.

5.1 Choose and calculate useful KPIs

A key performance indicator (KPI) is a measure selected as especially important for tracking a key goal. It needs a defined calculation, target and responsible owner. All KPIs are metrics, but the organization should not treat every recorded metric as equally important.

Ask whether the result and resources fit

Effectiveness means achieving the intended goal. Efficiency means obtaining more output with fewer inputs. Productivity measures output divided by input.

A kitchen makes 1,200 meals in 300 labor hours:

1,200÷300=4.0 meals per labor hour

Next month it makes 1,300 meals in 310 hours:

1,300÷310≈4.19 meals per labor hour

Using the unrounded quotient, productivity rose by about 4.8%. Making more meals is not enough to show higher productivity; the labor input must also be considered. The kitchen can become more efficient while remaining ineffective if customers do not want those meals.

Define the numerator and denominator
KPICalculationWorked result
On-time deliveryOn-time orders ÷ all orders1,140÷1,200=95%
Customer retention(End customers − new customers) ÷ start customers(530−80)÷500=90%
Employee turnoverEmployees who left ÷ average employees6÷40=15%
Net profit marginNet profit ÷ revenue45,000÷600,000=7.5%

These fractions become percentages by multiplying the decimal result by 100. Retention removes new customers because they were not in the starting group. Dividing 530 by 500 would give 106%, which mixes growth from new customers with retention.

A spending comparison is another control measure. Travel spending of $23,000 against a $20,000 budget is $3,000 unfavorable, or 15% over budget. A positive spending variance is not favorable merely because its sign is positive.

Combine drivers with results

Lagging indicators record completed outcomes, such as revenue, profit and last year's retention. Leading indicators track activities or conditions that predict later outcomes, such as qualified sales leads, training hours or maintenance completed on schedule. They offer earlier warning, but their usefulness depends on a meaningful link to the desired result. Training attendance alone does not show that skills improved.

For each KPI, specify the goal, formula, data source, target, acceptable range, owner and review frequency. People held responsible need some influence over the result. Keep definitions stable so that a trend compares like with like.

A dashboard displays targets, actual results and trends. Colors can highlight exceptions, but the figures and limits still need to be clear. Avoid vanity metrics, such as total downloads when regular app use is the goal, and avoid so many indicators that nobody knows which one requires action.

Key Takeaways

  • KPIs select the measures that matter most to key goals.
  • Productivity compares output with input; effectiveness checks goal achievement.
  • Retention excludes new customers from the ending count.
  • Leading indicators offer early signals; lagging indicators record results.
  • Define each KPI consistently and assign an owner and response.

5.2 Build a balanced view of performance

The balanced scorecard connects financial results with the people, processes and customer outcomes that help produce them. Robert Kaplan and David Norton introduced it in 1992. The four common perspective names are financial, customer, internal business processes, and learning and growth. The original article called the last two "internal business" and "innovation and learning."

Give each perspective a useful question
PerspectiveQuestionExample measures
FinancialHow do owners judge our results?Revenue growth, profit margin, cost per unit
CustomerHow do customers see us?Satisfaction, retention, market share
Internal business processesWhat must we do well?Defects, delivery time, on-time delivery
Learning and growthCan we keep improving and creating value?Skills, training, staff retention, information systems

Financial measures report past outcomes. Relying on them alone can reward cuts to training or maintenance that help this quarter while damaging later performance. The scorecard combines financial and nonfinancial evidence and balances near-term results with future capability. Public and nonprofit organizations may put their mission or the people they serve above financial outcomes.

Write objectives, measures, targets and initiatives

For each perspective, select a few objectives, choose a measure, set a target and name initiatives intended to achieve it. An initiative is the action, not the evidence that the action worked.

An eight-club fitness chain wants to retain members and grow membership revenue:

  • Learning and growth: develop expert trainers; measure the share with current certification; target 100% by December; fund certification courses.
  • Internal processes: keep equipment available; measure machines out of service; target no more than 3%; schedule weekly preventive maintenance.
  • Customer: keep members; measure 12-month retention; raise the baseline of 68% to a target of 75%; improve the experience through trainers and equipment.
  • Financial: grow total monthly membership revenue. At $48 per member, 4,000 members generate $192,000. A target of 4,300 members generates $206,400, a 7.5% increase.

The chain is plausible: skilled trainers and usable equipment improve the experience, fewer members leave, and a larger membership supports revenue. Retention helps preserve customers; it does not raise the fee paid per member. A goal for higher revenue per member would need its own measure and initiative.

Use the links to choose action

A strategy map draws the expected cause-and-effect relationships. Treat them as links to test against evidence. If maintenance improves but satisfaction does not, investigate what else affects members instead of assuming the chain has worked.

Review the scorecard monthly or quarterly, compare actual results with targets and inspect patterns across perspectives. Rising equipment downtime alongside falling retention gives managers a place to investigate. Measures can become KPIs, and an improvement objective can be pursued through OKRs. A scorecard loses value when it merely reports figures, contains too many measures or gives financial results all the influence despite its four headings.

Key Takeaways

  • The balanced scorecard combines four perspectives on performance.
  • Each perspective needs objectives, measures, targets and initiatives.
  • People and processes can drive customer and financial outcomes.
  • Test the proposed causal links against evidence.
  • Review patterns and act on them; reporting alone does not improve performance.

Planning and Control examples

5 Walkthroughs

1

Plan a reliable course launch

13 steps
Follow a learning center from a booking problem to a target, action plan, backup and task schedule.
  1. 1
    IntroductionStart with a result worth improving

    A learning center wants people to receive booking confirmations reliably. A plan needs to connect that result with changes staff can make, and formal planning shares it with the people involved. You will establish the starting point (the baseline), compare possible actions and schedule the work, finding the critical path. The same plan will give the manager evidence for deciding whether the changes are working.

  2. 2
    ExplanationMake the intention a shared plan

    The manager’s intention, "Make booking easier," does not yet coordinate anyone’s work. Formal planning records goals and actions for a stated period and shares them with the people involved. Reception staff can then prepare for the same change as the technical team. The document remains open to revision when demand, staffing or another important condition changes.

  3. 3
    ChallengeWhy sharing matters

    Reception learns about a new booking system only on launch morning. Staff cannot answer visitors’ questions. Which benefit of formal planning was lost, and how would participation help?

    ---reveal---

    The teams lost coordination. Involving reception earlier would add knowledge about common booking problems and help staff understand the change they need to carry out.

  4. 4
    ExampleMeasure the starting position

    Of 400 weekly bookings, 280 receive confirmation within one business day. The baseline is 280÷400=70%. Looking at the records, staff find that most delays occur when registrations need manual checking. This gives managers both a measured starting point and a specific process to investigate; the overall booking count alone would not reveal the delay.

  5. 5
    ExampleSet a target and state the premise

    The goal is to confirm 90% within one business day by the end of eight weeks. At 400 bookings, that means 0.9×400=360 timely confirmations. The plan assumes booking volume remains near 400 per week. Recording that premise makes it possible to revisit staffing and capacity if demand changes, while keeping the confirmation-rate definition consistent.

  6. 6
    ExplanationCompare routes before assigning tasks

    Staff propose a clearer registration form, a second checker or dedicated checking time each morning. Managers compare cost, speed, resources and the likely effect on confirmation delays. They choose a clearer form plus protected morning checking time. The second checker stays in reserve. An alternative can be useful as a backup even when it is not chosen for immediate use.

  7. 7
    ExampleGive the work an owner and review point

    The technical lead tests the clearer form by the end of week 2. The reception lead protects checking time from week 1 and reviews the recorded rate each Friday. The plan requires at least 82% by week 4. If it falls below 82%, the manager activates the reserve checker. Owners, deadlines and a checkpoint turn the chosen ideas into work that can be followed up.

  8. 8
    ChallengeJudge progress at the checkpoint

    At week 4 the rate is 84%, measured against all bookings in the same way as the baseline. The agreed checkpoint is 82%, with a reserve checker below it. Should the reserve be activated now?

    ---reveal---

    No. The result clears the checkpoint, so the reserve stays available while monitoring continues toward 90%. Being below the final goal at an intermediate checkpoint is not itself a missed milestone.

  9. 9
    ConnectionPrepare for different demand levels

    A forecast estimates expected bookings. Scenario planning prepares responses to several plausible demand levels, such as steady demand or a sudden increase. The reserve-checker trigger is a contingency plan for a specific problem. These tools answer different questions: an estimate helps allocate resources, while scenarios and a backup help the center respond if conditions depart from the estimate.

  10. 10
    ExamplePut dependent tasks on a timeline

    For the form launch, A designs the form in 2 days. B tests it in 4 days after A. C prepares instructions in 3 days after A, alongside B. D launches it in 1 day after both B and C. A Gantt chart would show B and C overlapping. D cannot start until the longer branch finishes, even if instructions are ready earlier.

  11. 11
    ExampleFind the earliest finish

    The earliest finish is 2+max⁡(4,3)+1=7 days. The path A–B–D determines completion, so it is the critical path. C has 4−3=1 day of slack. Adding all four durations would wrongly assume that testing and instruction writing cannot happen together; overlap is the reason the plan finishes sooner.

  12. 12
    ChallengeCombine the schedule with the checkpoint

    Testing takes 2 days longer, while instruction writing takes 1 day longer. What happens to launch timing, and should managers simply move the performance checkpoint without review?

    ---reveal---

    Launch takes 9 days because testing extends the critical path by 2 days; instruction writing uses its 1 day of slack. Managers should review the action plan and its checkpoint in light of the delay, not silently change the agreed measure of progress.

  13. 13
    RecapKeep the plan usable

    The center now has a baseline, a target, a stated premise and an assigned action plan. The checkpoint determines when to use the backup. The task schedule shows where delays affect launch, giving the manager two different checks: progress on the work and progress toward the service result.

2

Connect a store’s purpose to daily decisions

11 steps
Classify statements and plans by what they decide, then choose suitable guidance for recurring work.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionA new service needs several kinds of decisions
  2. 2
    ExampleRead the present purpose and future aim
  3. 3
    ChallengeTest whether a value guides a choice
  4. 4
    ExplanationSeparate direction from departmental contributions
  5. 5
    ExampleFind a conflict between plans
  6. 6
    ChallengeClassify by the decision being made
  7. 7
    ConnectionKeep strategy levels distinct
  8. 8
    ExampleChoose guidance for repeated returns
  9. 9
    ExplanationDistinguish a project from continuing guidance
  10. 10
    ChallengeAdapt expansion while keeping routine work clear
  11. 11
    RecapIdentify what each plan decides
3

Set and review a repair team’s goals

18 steps
Build a goal hierarchy, write a SMART target, score improvement and distinguish OKRs from MBO.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionTurn better service into a checkable result
  2. 2
    ExplanationLink the desired result to team work
  3. 3
    ChallengeRead the incentive behind the statement
  4. 4
    ExplanationApply the SMART questions
  5. 5
    ExampleWrite the target and interpret the change
  6. 6
    ChallengeKeep the outcome above the activity
  7. 7
    ConnectionGive improvement an objective and evidence
  8. 8
    ExampleScore the result that should fall
  9. 9
    ExampleScore the result that should rise
  10. 10
    ExampleApply limits before combining scores
  11. 11
    ChallengeInterpret the commitment
  12. 12
    TipDo not turn the score into an easy-target contest
  13. 13
    ExplanationBuild a joint MBO agreement
  14. 14
    ExampleUse the midyear review while time remains
  15. 15
    ChallengeDistinguish participation from paperwork
  16. 16
    Key InsightSet challenge at a level people can use
  17. 17
    ChallengeCombine the goal with a fair review
  18. 18
    RecapUse the agreement to guide the next action
4

Investigate a service gap and redesign its controls

16 steps
Measure a result, judge its range, act on its cause and combine controls without encouraging score manipulation.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionA target becomes useful through comparison
  2. 2
    ExplanationChoose a standard that reflects the promise
  3. 3
    ExampleGather the evidence consistently
  4. 4
    ChallengeDo automatic reports complete the control?
  5. 5
    ExampleCalculate and judge the variance
  6. 6
    ExplanationRestore today’s performance and inspect the cause
  7. 7
    ChallengeShould the target simply be lowered?
  8. 8
    ExamplePrevent the next handover problem
  9. 9
    ExplanationWatch the queue during the work
  10. 10
    ChallengePlace the report in the correct cycle
  11. 11
    ExplanationCombine clear expectations with self-control
  12. 12
    ExampleNotice what a single target rewards
  13. 13
    ChallengeChoose a proportionate redesign
  14. 14
    ConnectionGive exceptions an owner
  15. 15
    ChallengeBring the control loop back to the goal
  16. 16
    RecapAct on the gap and the incentives
5

Build a dashboard and balanced scorecard

13 steps
Calculate customer and financial measures, separate drivers from results and test a simple performance chain.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionChoose a few measures that support a decision
  2. 2
    ExplanationDefine the KPI before showing its color
  3. 3
    ExampleSeparate retained customers from new customers
  4. 4
    ChallengeInterpret growth and retention together
  5. 5
    ExampleRead profit as a share of revenue
  6. 6
    ConnectionBalance early signals with completed outcomes
  7. 7
    ChallengeDistinguish efficiency from effectiveness
  8. 8
    ExplanationGive each perspective a place
  9. 9
    ExampleBuild a capability-to-process link
  10. 10
    ExampleConnect customers to the financial result
  11. 11
    ChallengeFind the missing part of the scorecard
  12. 12
    ChallengeCheck the chain instead of assuming it
  13. 13
    RecapMake the measures lead to decisions

Planning and Control practice questions

50 Practice Questions in 5 sets

Set 1: Build a plan and connect its levels10 Practice Questions

Question 1 of 10

What makes a plan formal?
  1. It is prepared entirely by senior managers.
  2. It records and shares goals and actions.
  3. It keeps its original timetable unchanged.
  4. It estimates results over several years.
Show answerHide answer
Answer: B
Formal planning makes goals and actions explicit for a stated period and shares them with the people involved. A long horizon alone does not make a plan formal; an unwritten long-range intention can still remain only in a manager’s head.

Question 2 of 10

What type of statement is "We provide reliable repair services for local community organizations"?
  1. A vision describing a desired future
  2. A value guiding individual behavior
  3. A strategic target for market growth
  4. A mission stating present purpose
Show answerHide answer
Answer: D
The statement identifies a present service, reliable repairs, and the group served, local community organizations. That is the role of a mission: explaining the organization’s current purpose. A vision describes a future state it wants to create, so positive wording alone is not enough to make this a vision.

Question 3 of 10

A library wants to shorten reservation delays. Staff have measured the current delay and agreed a target. They now propose hiring an assistant, changing shelf labels or redesigning collection slots. What should managers do before choosing?
  1. Compare cost, time, risk and goal fit.
  2. Assign deadlines for the first idea proposed.
  3. Replace the baseline with the desired delay.
  4. Measure results after implementing all three.
Show answerHide answer
Answer: A
The team has a baseline, a target and several possible routes, so it should evaluate those routes against cost, time, risk, resources and goal fit. That comparison gives a basis for choosing which action to carry out. Assigning deadlines to the first suggestion would skip the choice between alternatives.

Question 4 of 10

A manufacturer plans to enter a new product market over four years. Its production department plans how to provide the needed capacity over 18 months. What level is the department’s plan?
  1. Strategic, because it supports market entry
  2. Operational, because it concerns production
  3. Tactical, as a department’s contribution
  4. Corporate, because it allocates capacity
Show answerHide answer
Answer: C
The production plan translates the organization’s new-market direction into the contribution required from a major department. That translating role makes it tactical. It supports a strategic decision, but that does not give it the same whole-organization scope; the 18-month horizon is consistent with its departmental role.

Question 5 of 10

A clinic gives staff ordered steps for recording a new appointment. What kind of standing plan does this provide?
  1. A procedure for recurring work
  2. A project for a unique result
  3. A policy allowing case-by-case judgment
  4. A budget assigning numerical resources
Show answerHide answer
Answer: A
A procedure provides a sequence for handling a recurring situation. A policy guides judgment without prescribing the ordered process; the appointment instructions tell staff the steps to follow, so calling them a policy would miss their function.

Question 6 of 10

A manager prepares this response: "If the main printer is unavailable for more than one day, send the remaining work to a partner." What makes it a contingency plan?
  1. It selects the most likely demand forecast.
  2. It compares the partner with competitors.
  3. It fixes every task’s place on a timeline.
  4. It ties a specific trigger to a backup.
Show answerHide answer
Answer: D
The printer outage has a stated threshold of more than one day, and crossing it activates a named replacement action. Together, the trigger and backup make this a contingency plan. A forecast would estimate future conditions, while this statement prepares a response without claiming the outage will occur.

Question 7 of 10

A repair shop announces "Reliable repairs first" but pays technicians only for the number of repairs completed. What best reveals the real goal encouraged by this arrangement?
  1. The wording of the reliability statement
  2. The bonus based on completed repair counts
  3. The length of the annual planning period
  4. The existence of a written mission statement
Show answerHide answer
Answer: B
Rewards reveal which results employees have a practical incentive to pursue, so the arrangement emphasizes volume. The reliability statement expresses a stated goal; it does not outweigh an incentive that pays for repair counts without measuring reliability.

Question 8 of 10

A team says "Improve reservation accuracy" and orders new software without measuring current errors. What information would a baseline add?
  1. The desired future accuracy rate.
  2. The deadline for completing the software change.
  3. The current rate of reservation errors.
  4. The resources assigned to implementing the change.
Show answerHide answer
Answer: C
The baseline records the present error rate before the software change, giving the team a starting point for judging improvement. A desired future accuracy rate would be a target, not a baseline. A deadline and resource assignment help carry out the change, but neither supplies evidence of current performance.

Question 9 of 10

A facility manager schedules recurring equipment inspections for the next five years. Why is the schedule still operational?
  1. It organizes routine work rather than organizational direction.
  2. It was written below the top level and therefore cannot be strategic.
  3. It covers maintenance rather than any customer-facing activity.
  4. It stays unchanged because its horizon extends beyond one year.
Show answerHide answer
Answer: A
The schedule arranges recurring work, so its function is operational despite its five-year horizon. Planning level is not determined by duration alone, and the author’s job title does not by itself establish whether a particular plan is strategic.

Question 10 of 10

For an event, A takes 2 days. B takes 5 days after A; C takes 3 days after A. D takes 2 days after both B and C. C is delayed by 1 day and B by 2 days. How long does the event plan now take?
  1. 9 days
  2. 10 days
  3. 12 days
  4. 11 days
Show answerHide answer
Answer: D
B and C run in parallel, so their durations are compared rather than added. With the delays, B takes 7 days and C takes 4; A and D add 2 days each, giving 11 days overall. Adding both branch delays to the original 9-day finish would wrongly treat C’s delay as critical even though it fits within its slack.
Set 2: Write goals and check what success means10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A goal names a specific improvement, a measure and a justified target, but gives no date. Which modern SMART criterion is missing?
  1. Achievable
  2. Relevant
  3. Time-bound
  4. Measurable
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

In an OKR, what role does "Complete the new booking form" play?
  1. An initiative describing an action
  2. A key result measuring an outcome
  3. An objective describing a future experience
  4. A KPI tracking a continuing performance rate
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

An employee signs objectives written by a supervisor without being invited to discuss them. Reviews and a deadline are present. Which core MBO element is weak?
  1. Specific objectives
  2. A defined time frame
  3. Performance feedback
  4. Joint goal setting
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A representative aims to increase monthly sales from 32,000 to 36,800 in the same currency. What percentage increase does the target require?
  1. 13.0%
  2. 15.0%
  3. 4.8%
  4. 115.0%
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A team faces an unfamiliar process and does not yet know which changes improve it. What goal best fits this stage?
  1. Match the highest output achieved by an expert team.
  2. Increase output sharply before testing any new method.
  3. Test approaches and compare their delay effects.
  4. Maintain output while leaving the process unchanged.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A committed OKR receives a score of 0.72. How should the team interpret that score against the expected achievement?
  1. It meets the normal average for committed delivery.
  2. It proves that the original target was too difficult.
  3. It means 72% of all assigned tasks were completed.
  4. It falls short of the expected full result of 1.0.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

In MBO, what should the year-end performance reward primarily reflect?
  1. Achievement of agreed performance objectives
  2. The number of goal documents the employee signed
  3. The total hours spent preparing review paperwork
  4. The ambition of the original objective wording
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A manager may approve flexible starting times when customer coverage is maintained. What makes this instruction a policy?
  1. It supplies ordered steps for making each schedule.
  2. It provides a guideline while allowing judgment.
  3. It prohibits every departure from a fixed start time.
  4. It ends when one scheduling project is completed.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A key result aims to cut processing time from 12 days to 8 days; actual time is 9 days. Another aims to raise successful applications from 50% to 70%; actual is 60%. Using planned-change scores, what is their mean?
  1. 0.875
  2. 0.500
  3. 0.625
  4. 0.750
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A firm wants fewer repeat customer complaints. A department proposes rewarding only the number of cases closed each day. What is the main problem with this lower-level goal?
  1. It counts an activity that may improve while repeat problems persist.
  2. It uses a daily horizon when every departmental goal must be annual.
  3. It gives employees influence when only senior managers should set goals.
  4. It measures a nonfinancial result when corporate goals must be financial.
Show answerHide answer

Save this lesson to see this answer.

Set 3: Design controls and respond to gaps10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

In a four-step control process, what follows measuring actual performance?
  1. Rewriting the organization’s mission
  2. Choosing a new set of corporate businesses
  3. Setting an unrelated activity target
  4. Comparing performance with the standard
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A workshop inspects raw materials before production starts. What timing of control does this represent?
  1. Feedback control
  2. Feedforward control
  3. Concurrent control
  4. Postaction control
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A packing team targets a defect rate no higher than 1.5%. It finds 48 defective items in 2,400 produced. What is the variance from the standard?
  1. −0.5 percentage points, favorable
  2. +0.5%, favorable
  3. +0.5 percentage points, unfavorable
  4. +2.0 percentage points, unfavorable
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

A sensor records room temperature and emails a supervisor, who decides how to adjust heating. Why is this not a fully cybernetic control system?
  1. The corrective adjustment still depends on a person.
  2. The measurement is collected by an electronic sensor.
  3. The temperature result cannot be compared with a target.
  4. The system communicates results before a written report.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A design team follows shared professional norms when detailed rules cannot cover new client problems. What approach provides this guidance?
  1. Market control
  2. Bureaucratic control
  3. Financial control
  4. Clan control
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A supervisor temporarily moves staff to clear an order backlog, then changes a recurring approval step that caused it. How do these actions differ?
  1. The first is basic correction; the second is immediate correction.
  2. The first is immediate correction; the second is basic correction.
  3. Both revise the standard because they change the workflow.
  4. Both are feedback reports because the backlog already exists.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A plant stops a production line automatically when a fault appears during assembly. How is the stop classified relative to assembly?
  1. Concurrent control during the activity
  2. Feedforward control before the activity
  3. Feedback control after the activity
  4. Postaction control of completed products
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A courier targets 94% on-time deliveries and accepts results down to 91%. Of 800 deliveries, 720 are on time. What is the appropriate initial judgment?
  1. The −4% variance is inside the accepted range.
  2. The −1-point variance requires lowering the standard.
  3. The −4-point variance falls outside the accepted range.
  4. The −10-point variance establishes the need for discipline.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A service team is rewarded for shorter handling time. Handling time falls, but unresolved cases rise. What control redesign best addresses the behavior?
  1. Lower the time target and remove quality reviews.
  2. Reward the number of transfers as a second speed measure.
  3. Keep the same reward and publish a longer monthly report.
  4. Include resolution and satisfaction in assessment.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A support team misses a response target. Logs show the target was attainable with the promised staffing, but half that staffing was repeatedly assigned elsewhere. What should managers address first?
  1. Lower the target solely because it was missed.
  2. Restore the agreed resources and review the allocation problem.
  3. Discipline all agents because the standard was attainable.
  4. Ignore the variance because the target was previously justified.
Show answerHide answer

Save this lesson to see this answer.

Set 4: Select measures and interpret performance10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

What makes a metric a KPI?
  1. It tracks a key goal with a target and owner.
  2. It is collected automatically each period.
  3. It is a count that rose in the latest period.
  4. It is a measure that every competitor publishes.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A maintenance team completes 1,050 checks in 210 labor hours. What is its labor productivity?
  1. 0.2 labor hours per check
  2. 210 checks per labor hour
  3. 840 checks per labor hour
  4. 5 checks per labor hour
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A balanced scorecard tracks the share of employees qualified to use a new system. Which perspective does this directly measure?
  1. Customer experience
  2. Learning and growth
  3. Financial performance
  4. Internal process speed
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

Net profit is 28,800 and revenue is 360,000 in the same currency. The margin target is 9%, with results accepted down to 8.5%. What is the margin and the appropriate initial control judgment?
  1. 9%; exactly at the margin target
  2. 8%; inside the acceptable range
  3. 8%; below the acceptable limit
  4. 12.5%; above the margin target
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A scorecard objective is "Improve delivery reliability." The team plans route training, measures on-time delivery and sets 96% as the goal. What role does route training play?
  1. The objective
  2. The measure
  3. The target
  4. The initiative
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

A service starts with 640 customers, gains 150 new customers and ends with 726. What is the retention rate of the starting customer group?
  1. 90.0%
  2. 113.4%
  3. 79.3%
  4. 86.6%
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A club keeps its monthly membership fee at 35 in one currency. Membership grows from 1,200 to 1,320. What happens to total membership revenue and revenue per member?
  1. Both increase by 10%.
  2. Total rises 10%; per member stays unchanged.
  3. Total stays unchanged; per member rises 10%.
  4. Both remain unchanged because the fee is fixed.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

Output rises from 1,600 units in 400 labor hours to 1,980 units in 440 hours. How much does productivity change?
  1. It rises 23.75%.
  2. It rises 10.0%.
  3. It rises 12.5%.
  4. It rises 13.75%.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A dashboard for reducing breakdowns shows last month’s repair costs and the share of planned servicing completed this week. How should these measures be used together?
  1. Treat both as proof of fewer future failures.
  2. Replace cost with servicing because results no longer matter.
  3. Treat servicing as a completed financial outcome.
  4. Use servicing as a lead and repair cost as a lag.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

Certification meets its scorecard target, but process errors and customer complaints remain high. What should managers conclude about the proposed skills-to-service link?
  1. Its expected effects need investigation using the other measures.
  2. The training result guarantees that the complaints will disappear.
  3. The customer and process targets should be removed from the scorecard.
  4. The financial perspective can confirm the causal link by itself.
Show answerHide answer

Save this lesson to see this answer.

Set 5: Apply planning and control across a changing organization10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

What does the value "Safety before speed" guide?
  1. The exact number of units produced each hour
  2. Behavior when speed conflicts with safe work
  3. The desired market position in five years
  4. The sequence of payroll-processing tasks
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A shop sells 720, 810 and 900 units over three months. What do a three-month moving average and a continuation of the monthly trend predict for the next month?
  1. 900 units and 990 units
  2. 810 units and 900 units
  3. 990 units and 810 units
  4. 810 units and 990 units
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A review of last quarter’s errors leads to a skill check before staff begin the next quarter’s work. How are these two checks classified relative to the work they address?
  1. The review is feedback; the later pre-work check is feedforward.
  2. Both are feedback because the same errors prompted them.
  3. The review is concurrent; the later pre-work check is feedback.
  4. Both are feedforward because they inform later decisions.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

An employee has achieved 72,000 of an agreed annual 180,000 contract target at the six-month review. What share of the target is achieved, and what is the appropriate MBO use of that finding?
  1. 60%; replace the annual target with the current result.
  2. 50%; reward full achievement at the halfway point.
  3. 40%; discuss progress and adjust the action plan.
  4. 40%; wait until year-end before discussing progress.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

An organization signs a seven-year equipment lease while demand changes quickly. How should its planning respond to both facts?
  1. Limit every plan to one month and ignore the later lease years.
  2. Keep all operating details fixed for the full seven-year lease.
  3. Cover the lease and frequently review near-term actions.
  4. Delay reviewing demand until the lease commitment has ended.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

Three key results have baseline, target and actual values of (20, 40, 46), (10, 6, 11) and (50, 70, 60). Using capped planned-change scores, what is the OKR mean?
  1. 0.600
  2. 0.500
  3. 0.650
  4. 0.517
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A defect target is 3%, with acceptable results up to 3.4%. Inspection finds 80 defects in 2,500 items, with no other exception. What variance and initial response follow from the agreed range?
  1. +0.2 percentage points; take no corrective action
  2. +0.2 percentage points; correct performance now
  3. −0.2 percentage points; revise the target upward
  4. +3.2 percentage points; reward favorable performance
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A professional team is trusted to monitor its results. Delays still matter greatly, but detailed approvals are slowing routine decisions. What redesign best supports involvement-oriented control?
  1. Replace team judgment with a single reward for closing work as fast as possible.
  2. Remove the standards, reports and risk checks to demonstrate complete trust.
  3. Add individual approval steps while continuing to withhold performance data.
  4. Share standards and results, train the team and retain checks for major risks.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A firm faces uncertain demand and a one-time expansion project. It also needs consistent steps for recurring supplier returns. What combination best fits these needs?
  1. A fixed project route and a one-time return project
  2. A directional project plan and a standing return procedure
  3. A standing expansion rule and a flexible return slogan
  4. An annual expansion budget and a return mission statement
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

A retailer executes its launch plan on time, but demand collapses after customers adopt a new alternative. What does this show about planning?
  1. Executing the plan confirms that demand premises stayed sound.
  2. Meeting launch deadlines is enough to judge the plan’s success.
  3. Participatory planning prevents changes in customer demand.
  4. Changed demand can undermine even a well-executed launch plan.
Show answerHide answer

Save this lesson to see this answer.

Stuck on your own question? Homework Help

Key Terms

98 Key Terms, each with its definition

A

Acceptable range
An acceptable range is the set of performance results managers agree in advance will not require corrective action.
A 91% lower limit makes a 90% on-time rate an exception even if the result seems close to the target.
Action plan
An action plan converts a chosen approach into tasks with assigned owners, resources, deadlines and review checkpoints.
An action plan gives an operations lead responsibility for testing a new order process by Friday.
Activity goal
An activity goal specifies effort or work completed, such as calls made, without directly establishing the desired outcome.
An activity goal for product demonstrations supports sales, but a full calendar does not establish contract wins.
Aspirational OKR
An aspirational OKR sets stretch results beyond expected delivery; Google's guidance expects about 0.7 on average, with variation.
An aspirational OKR encourages new methods when the team accepts that full achievement may remain out of reach.

B

Balanced scorecard
A balanced scorecard organizes objectives and measures across financial, customer, process, and learning and growth perspectives.
The balanced scorecard shows why saving on maintenance may help current profit while harming later customer retention.
Baseline
A baseline is the measured starting level of performance against which a target and later progress can be judged.
A baseline of 40 late orders per week helps the team assess whether its delivery plan improves results.
Basic corrective action
Basic corrective action identifies why performance went off course and changes the source of the recurring problem.
A self-service reset option is basic corrective action when repeated password-reset calls drive long waits.
Benchmarking
Benchmarking studies strong performance and adapts the methods behind it to improve an organization's own work.
Benchmarking a successful branch's handover process helps another branch investigate its repeated delays.
Budget
A budget is a numerical plan that allocates resources for a stated period and supplies amounts for later comparison.
The renovation budget gives the manager a planned spending amount against which to check invoices.
Bureaucratic control
Bureaucratic control guides work through formal authority, including rules, procedures, budgets and direct supervision.
Bureaucratic control gives a routine packing line clear instructions and formal quality checks.
Business-level strategy
Business-level strategy determines how a particular business competes, such as through lower cost or a distinctive offering.
A repair business chooses quick, reliable service as the focus of its business-level strategy.

C

Checkpoint
A checkpoint is a planned review point at which actual progress is compared with the expected stage of a plan.
A week-4 checkpoint lets managers adjust staffing while time remains to reach the final target.
Clan control
Clan control guides behavior through shared values, traditions and norms, especially where detailed rules cannot cover the work.
Clan control helps a professional team judge a novel client problem using shared standards of conduct.
Commitment concept
The commitment concept says planning should extend far enough into the future to cover commitments made in the present.
A seven-year equipment lease requires planning beyond next month's detailed operating schedule.
Committed OKR
A committed OKR is an objective-and-results agreement expected to be achieved fully, with a score of 1.0 as the expectation.
A committed OKR scoring 0.72 requires review of the shortfall instead of applying an aspirational expectation.
Concurrent control
Concurrent control monitors and corrects work while an activity is happening, before problems grow or spread further.
The head chef's plate checks during service provide concurrent control before dishes reach more tables.
Contingency plan
A contingency plan is a prepared backup for a specific disruption, paired with a trigger that states when it is used.
The contingency plan switches a print order to a partner after the main printer has been unavailable a day.
Controlling
Controlling is monitoring activities against plans and correcting significant deviations so work serves the intended results.
Controlling connects the promised response time with waiting-time records and the manager's staffing decisions.
Core values
Core values are the principles that guide organizational behavior while people work toward the mission and vision.
The value of fairness shapes a supplier decision even when a tougher bargain could improve this month's profit.
Corporate-level strategy
Corporate-level strategy determines which businesses an organization operates and whether its overall scope grows or shrinks.
A corporate-level strategy may exit one business so the organization can concentrate resources on another.
Critical path
The critical path is the task sequence that determines a plan's earliest finish, so a delay on it delays completion.
When preparing materials for a training session is on the critical path, a late materials task postpones the session even if its room is booked on time.
Customer perspective
The customer perspective examines how customers experience the organization, using measures such as satisfaction and retention.
The customer perspective tests whether better service is followed by fewer members canceling their subscriptions.
Customer retention rate
Customer retention rate measures the share of starting customers still present, excluding new customers from the ending count.
The retention rate subtracts the new arrivals so growth does not hide losses from the original customer group.
Cybernetic control
Cybernetic control is a self-regulating system that measures performance and makes corrective adjustments automatically.
Cybernetic control lets a stock system place a reorder automatically when inventory reaches the agreed trigger.

D

Directional plan
A directional plan sets broad guidance and leaves managers flexibility to choose details as uncertain conditions develop.
A directional plan allows the expansion team to adjust its route as customer demand becomes clearer.

E

Effectiveness
Effectiveness means achieving the intended goals, which can differ from producing output cheaply or quickly.
A fast kitchen lacks effectiveness if it efficiently produces meals that customers do not want.
Efficiency
Efficiency means obtaining output with economical use of inputs such as time, labor, materials or equipment.
A kitchen improves efficiency when it serves more meals per labor hour without using proportionally more input.
Employee turnover rate
Employee turnover rate is employees leaving during a period divided by average employment for that period, expressed as a percentage.
For a team with six departures, employee turnover rate compares them with average staffing, not only the staff present on the last day.

F

Feedback control
Feedback control evaluates completed activity, supplying information for learning, rewards and later planning decisions.
Weekly customer-review analysis provides feedback control on service that customers have already received.
Feedforward control
Feedforward control checks inputs or readiness before an activity begins to prevent problems during that activity.
Training employees before they serve customers is feedforward control on the upcoming service work.
Financial perspective
The financial perspective examines results for owners, using measures such as revenue growth, profit margin or cost per unit.
The financial perspective tracks total membership revenue while the customer perspective tracks member retention.
Forecasting
Forecasting estimates future conditions or results using numerical patterns, informed judgment or a combination of both.
Forecasting next month's bookings helps a training center decide how many sessions to schedule.
Formal planning
Formal planning records goals for a stated period and shares the plans for reaching them with the people responsible.
Formal planning connects a store's promotion schedule with its stockroom's preparations for higher demand.
Functional-level strategy
Functional-level strategy determines how an area such as marketing or IT supports the business's competitive direction.
An IT functional-level strategy supports reliable service by improving the systems used to track repairs.

G

Gaming
Gaming is behavior that improves a reported measure without improving the underlying result the measure is meant to represent.
Transferring difficult callers quickly can be gaming when agents are judged only by average handling time.
Gantt chart
A Gantt chart displays tasks as bars along a timeline, showing planned timing, overlap and progress against the schedule.
A Gantt chart for a training session shows that booking a room can run alongside preparation of the materials.
Goal
A goal is a desired result for an individual, group or organization that guides action and can become a control standard.
A goal of fewer repeated complaints guides both a team's training plan and its later performance review.
Goal-setting theory
Goal-setting theory links specific, difficult goals with higher performance when people have acceptance, ability and feedback.
Goal-setting theory helps explain why a clear, supported target can guide effort better than "Do your best."

H

Hybrid control system
A hybrid control system combines checks before, during and after work so prevention, correction and learning support each other.
A hybrid control system combines material inspection, machine monitoring and final quality reports.

I

Immediate corrective action
Immediate corrective action restores performance promptly, without necessarily removing the source of the deviation.
Moving staff onto a busy phone line is immediate corrective action while the cause of the workload is investigated.
Informal planning
Informal planning keeps goals and intended actions mainly in a manager's head, with little written down or shared.
Informal planning can leave employees unaware that the owner expects a large order later in the week.
Initiative
An initiative is a project or action intended to move an outcome measure toward its target, without guaranteeing the outcome.
A team tests a simpler checkout as an initiative and then checks whether more customers finish ordering.
Internal business process perspective
The internal business process perspective examines how well essential work performs, using measures such as defects and delivery time.
Machine downtime belongs to the internal business process perspective because it affects equipment availability.
Involvement-oriented management
Involvement-oriented management lets employees help plan and control their work, supported by skills, information and trust.
Involvement-oriented management shares team results so employees can adjust routine work without repeated approvals.

K

Key performance indicator
A key performance indicator is a selected measure of progress toward a key goal, with a defined calculation, target and owner.
The delivery team makes on-time completion a key performance indicator because reliability is central to its goal.
Key result
A key result is a measurable outcome that supplies evidence of progress toward an OKR's objective during a defined period.
A higher booking-completion rate is a key result; launching a booking form is only an intended means.
KPI dashboard
A KPI dashboard displays important measures with their targets, actual results and trends so users can spot exceptions.
A KPI dashboard highlights late deliveries and identifies the responsible team before the weekly review.

L

Lagging indicator
A lagging indicator records a result that has already occurred, showing what past decisions and activities produced.
Last quarter's retention is a lagging indicator that can help managers choose improvements for the next period.
Leading indicator
A leading indicator measures an activity or condition expected to affect a future result, providing an early performance signal.
Maintenance completed on schedule is a leading indicator used alongside later breakdown costs.
Learning and growth perspective
The learning and growth perspective examines the people, skills and systems that support improvement and future value creation.
The learning and growth perspective tracks trainer qualifications as a capability supporting a better member experience.
Learning goal
A learning goal focuses on finding or developing an effective method when work is complex or unfamiliar to the learner.
The team sets a learning goal to test three routes before committing to a demanding delivery-time target.

M

Management by exception
Management by exception directs managerial attention to results outside agreed acceptable ranges instead of every routine result.
Management by exception lets a manager focus the meeting on delivery rates that crossed the agreed lower limit.
Management by objectives
Management by objectives is joint goal setting by managers and employees, with scheduled reviews and achievement-based rewards.
Management by objectives gives a sales representative a role in agreeing targets and revising the action plan.
Market control
Market control steers performance through external market measures such as prices, competition, market share and divisional profit.
Market control lets managers judge a division's output through the results it achieves with its own products.
Means-ends chain
A means-ends chain links goals across levels so that reaching a lower-level result helps achieve a higher-level objective.
Product training supports complaint resolution, which supports customer retention in the means-ends chain.
Mission statement
A mission statement expresses an organization's present purpose, including what it does, whom it serves and often how.
A repair service uses its mission to decide whether a proposed service fits the customers it aims to help.
Moving average
A moving average is a forecast method that averages a set of recent observations and updates the set as new data arrive.
A three-month moving average can lag behind a shop's steadily rising sales even while smoothing changes.

N

Net profit margin
Net profit margin is net profit divided by revenue, expressed as a percentage showing how much revenue remains as net profit.
A net profit margin of 8% means 8 out of every 100 revenue units remain after all costs counted in net profit.
Noncybernetic control
Noncybernetic control relies on a person outside the activity to monitor performance and decide or carry out a correction.
A supervisor who reads an alert and decides the heating adjustment provides noncybernetic control.

O

OKR
An OKR pairs a qualitative objective with measurable key results that show whether the desired change has been achieved.
An OKR for easier ordering connects an ambitious customer experience with checkout and repeat-order outcomes.
Operational plan
An operational plan specifies everyday work, such as team schedules, staffing, procedures and production targets.
The warehouse's operational plan assigns two packers to the early shift and sets the day's dispatch times.
Outcome goal
An outcome goal specifies the result an activity is meant to achieve, such as customer retention or response reliability.
An outcome goal checks whether a new booking process reduces failures, beyond whether staff installed it.

P

Participation
Participation is meaningful involvement by the people responsible in shaping objectives and the plans for reaching them.
Participation lets a representative discuss workload and customer opportunities before agreeing the annual target.
Participatory planning
Participatory planning involves the people who will carry out a plan in shaping it, adding practical knowledge and commitment.
Participatory planning lets reception staff explain booking problems before the technical team changes a form.
PDCA cycle
The PDCA cycle is a repeating process of planning a change, doing it, checking results and acting on what was learned.
The PDCA cycle lets a team revise a trial collection system after comparing waiting times with its goal.
Percentage-point change
A percentage-point change is the arithmetic difference between two percentages, without dividing by the original rate.
The rise from 64% to 79% is a 15-percentage-point change, while the relative percent increase is larger.
Performance appraisal
A performance appraisal assesses an employee's achievement over a period against agreed expectations and relevant evidence.
The year-end performance appraisal compares completed contracts with the objectives agreed in the MBO process.
Performance feedback
Performance feedback provides information about results relative to expectations so people can adjust their work and effort.
Midyear performance feedback gives the employee time to change demonstrations before the annual sales deadline.
Performance standard
A performance standard is a target level of quantity, quality, time, cost or behavior used to judge actual results.
A performance standard for phone service requires at least 90% of calls to be answered within 30 seconds each week.
Personal observation
Personal observation gathers first-hand information about work, adding context but requiring time and careful use.
Personal observation helps a supervisor see why a repeated handover problem does not appear clearly in system logs.
Planning
Planning is the management function of setting goals and choosing the actions and resources that coordinate work toward them.
Planning lets a repair shop arrange staff and parts before it promises customers a faster service.
Planning premise
A planning premise is an assumption about conditions, such as demand or available resources, on which a plan depends.
A premise of stable demand needs review when bookings suddenly double during a plan's first month.
Policy
A policy is a standing guideline for decisions that allows the person applying it to judge the circumstances.
A fee-waiver policy lets a manager consider a regular customer's relationship with the hotel.
Procedure
A procedure is an ordered sequence of steps for handling a situation that occurs repeatedly in an organization.
A returns procedure tells staff to verify the receipt before recording the refund and returning payment.
Productivity
Productivity is output divided by input, expressed with units that make the use of resources and comparisons clear.
Meals per labor hour show productivity; total meals alone hide how much labor produced them.
Program
A program is a broad set of coordinated activities for a one-time goal and often contains several narrower projects.
A program to open a distribution center combines construction, staffing and system-installation projects.
Progressive discipline
Progressive discipline uses increasingly serious documented responses to continuing problems, aiming to correct behavior fairly.
A manager uses progressive discipline after clear expectations and support have not resolved a continuing conduct issue.
Project
A project is a defined effort with its own result, resources and deadline, usually narrower than a broader program.
The website redesign project supports the larger program to introduce a new service to customers.

R

Real goals
Real goals are the objectives actually pursued, revealed by resource choices, behavior and the results that receive rewards.
Volume-only bonuses reveal real goals that may conflict with a public commitment to careful service.
Retrenchment
Retrenchment is a corporate strategic choice to reduce an organization's size or scope in order to recover performance.
Closing an unviable business line can be retrenchment when it helps the organization regain stability.
Rule
A rule is an explicit requirement or prohibition that leaves no discretion about whether the specified action is followed.
The loading-area rule requires hard hats even when a visitor expects to stay for only a short time.

S

Sandbagging
Sandbagging is choosing targets that are easier than appropriate so that reported achievement or reward is easier to secure.
A direct bonus for OKR scores can encourage sandbagging when employees protect their score with safe targets.
Scenario planning
Scenario planning develops several plausible futures and prepares responses so managers can adapt as events unfold.
Scenario planning prepares a venue for strong, flat or falling demand without selecting one as certain.
Self-control
Self-control is an employee's internal guidance through commitment, discipline and personal objectives that support agreed work.
Self-control helps a skilled employee check progress without waiting for a supervisor to inspect every task.
Simulation
A simulation is a model used to test how a plan may perform under different assumptions before resources are committed.
A simulation tests staffing needs when customer demand is higher or lower than the central forecast.
Single-use plan
A single-use plan is designed for a unique situation and ends when its particular result has been achieved.
A single-use plan coordinates the office move and ends once the new workplace is ready for normal use.
Slack
Slack is the time a task can be delayed without delaying the finish of the overall plan, given the task dependencies.
Booking a room for a training session has two days of slack when the materials task running alongside it takes two days longer.
SMART goal
A SMART goal is specific, measurable, achievable, relevant and time-bound, making the intended change clear and checkable.
A SMART goal gives the response team a baseline, a target and a due date that its staffing can support.
Specific plan
A specific plan defines its target and intended actions clearly, leaving little room for different interpretations.
A specific plan fixes the sales increase, deadline and staffing changes when conditions support a clear route.
Standing plan
A standing plan provides continuing guidance for activities or situations that recur, until the guidance is revised.
A standing plan gives each shift a consistent way to handle customer returns without planning from scratch.
Stated goals
Stated goals are the objectives an organization publicly announces in documents, websites, reports or speeches.
The firm's stated goals put quality first, so managers compare that message with what the bonus system rewards.
Statistical report
A statistical report summarizes recorded performance in numerical form, making trends and comparisons easier to inspect.
A statistical report that reveals waiting times rising each afternoon prompts a review of shift coverage.
Strategic plan
A strategic plan sets overall goals and direction for the whole organization and its position in the environment.
A strategic plan commits a store chain to expand access and develop online sales over the next four years.
Strategy map
A strategy map displays expected cause-and-effect links between strategic objectives, which managers check against performance evidence.
A strategy map links skills to process reliability and customer retention without treating the link as guaranteed.
Stretch goal
A stretch goal reaches well beyond current performance to encourage new approaches, with resources and some shortfall accepted.
The stretch goal prompts the team to rethink its process instead of making only small changes to familiar work.

T

Tactical plan
A tactical plan translates strategic direction into specific contributions from major departments, divisions or functions.
An operations team's tactical plan arranges capacity so the organization can launch a new online delivery service.

V

Variance
A variance is the difference between actual performance and its standard, calculated as actual minus standard.
A positive spending variance means actual cost exceeded the budget, which is unfavorable for a cost limit.
Vision statement
A vision statement describes the future an organization wants to create or the position it aims to reach over time.
A neighborhood store's vision can describe convenient access to affordable fresh food for local families.