- Learn
- Business & Economics
- Business Management
- Principles of Management
- Organizational Structure and Design
Organizational Structure and Design
BeginnerLesson 5 of 8 in Principles of Management Course
What you will learn
- Explain what organizational structure is, read an organization chart, and analyze how work is divided into jobs and how jobs are grouped into departments.
- Read an organization chart and name the elements of structureDefine organizational structure and organizational design, read what an organization chart shows and what it leaves out, and use six elements to describe any structure.
- Analyze work specialization and redesign specialized jobsExplain why dividing work into specialized tasks raises productivity, recognize when specialization goes too far, and compare job simplification, rotation, enlargement and enrichment.
- Group jobs into departmentsCompare functional, product, geographic, process and customer departmentalization, and choose a grouping that fits what an organization most needs to coordinate.
- Read an organization chart and name the elements of structure
- Analyze the vertical side of structure: the chain of command and delegation, span of control and the number of levels, and how centralized and formalized decision-making is.
- Trace the chain of command and delegate authorityExplain the chain of command, authority, responsibility and accountability, apply unity of command, delegate a task step by step, and distinguish line from staff authority.
- Calculate span of control and compare tall and flat structuresCalculate how span of control changes the number of managers and levels, compare tall and flat structures, and judge the right span from the conditions of the work.
- Balance centralization, decentralization and formalizationDecide which decisions to centralize or decentralize, explain empowerment and formalization, and analyze how these choices affect speed, consistency and control.
- Trace the chain of command and delegate authority
- Describe the simple, functional, divisional, hybrid, matrix and project structures, recognize each on a chart, and weigh their strengths and weaknesses for a given organization.
- Explain simple and functional structuresDescribe the simple structure of small firms and the functional structure, explain why functional silos form, and use coordination mechanisms to link functions.
- Explain divisional and hybrid structuresDescribe divisional structures based on products, regions or customers, explain why diversified firms adopt them, and show how hybrid structures combine divisions with central functions.
- Explain matrix and project structuresDescribe how a matrix structure gives employees two reporting lines, manage the conflicts it creates, and contrast it with a project structure.
- Explain simple and functional structures
- Evaluate team-based, network and boundaryless designs, explain how changing work arrangements reshape structure, and analyze the informal organization that runs alongside every formal design.
- Evaluate team-based structuresExplain how team-based structures make teams the basic unit of work, compare self-managed and cross-functional teams, and judge when teams improve performance.
- Evaluate network, virtual and boundaryless designsExplain how network and virtual organizations outsource work to partners, how boundaryless designs reduce internal and external barriers, and when these designs fit.
- Explain how flexible work arrangements reshape structureCompare flextime, compressed workweeks, job sharing, remote and hybrid work and contingent work, and explain how the changing nature of work affects coordination, structure and the employee–organization relationship.
- Analyze the informal organizationDescribe the informal groups, leaders, norms and grapevine that grow alongside the formal structure, weigh their benefits and risks, and explain how managers work with them.
- Evaluate team-based structures
- Place designs on the mechanistic–organic continuum, explain how strategy, size, technology and environment shape the best design, and diagnose an organization's structure to recommend changes.
- Contrast mechanistic and organic designsDescribe mechanistic and organic designs on the six elements of structure, trace them to Weber and to Burns and Stalker, and judge which conditions each suits.
- Explain how contingency factors shape structureApply the contingency approach to show how strategy, size, technology and environmental uncertainty push a design toward mechanistic or organic, and resolve cases where the factors conflict.
- Diagnose a structure and recommend a designUse a step-by-step method to describe an organization's structure, spot symptoms of misfit, and recommend a design with its trade-offs and the mechanisms that manage them.
- Contrast mechanistic and organic designs
Organizational Structure and Design study guide
1How jobs and departments fit together
A customer sees one finished product, but many people may have helped deliver it. Dividing that work builds expertise; connecting the pieces keeps the customer from being passed from one department to another. Read a chart to see the formal arrangement, then look beyond its boxes to understand how work flows. The six elements of structure give you a way to describe the design before deciding whether it fits the organization.
1.1 Reading the structure behind an organization chart
An organizational structure arranges jobs, groups and reporting relationships. Organizational design creates or changes that arrangement. Planning sets the intended result; organizing assigns the work, people and resources to achieve it.
Divide work and connect the pieces
Differentiation separates work into specialized parts; integration coordinates them. Specialized hospital wards develop expertise, but patient transfers need dependable handovers. Greater differentiation increases the need for integration.
Lawrence and Lorsch's 1967 research found that effective firms in changing industries achieved both. Shared plans, handover routines and connecting roles joined specialized units while preserving their expertise.
Ask six structural questions
| Element | Question |
|---|---|
| Work specialization | How narrow is each job? |
| Departmentalization | How are jobs grouped? |
| Chain of command | Who reports to whom? |
| Span of control | How many people report directly to a manager? |
| Centralization | At what level are decisions made? |
| Formalization | How much do written rules standardize work? |
A chart gives clues about grouping and reporting. Decisions and procedures need further investigation.
Read the bakery chart
A CEO has three VPs: Production, Sales and Finance. Production has two plant managers, each with four shift supervisors. Sales has three regional managers; Finance has an accounting manager and a payroll manager.
There are 19 managerial positions. The production path has four management levels: CEO, VP, plant manager and shift supervisor. The CEO's span is 3; each plant manager's is 4. Count direct reports, not everyone farther down the branch.
The top grouping follows functions; Sales uses geography one level down. Different grouping bases can coexist at different levels.
What the picture leaves out
Boxes represent positions or units. Solid lines show reporting; dotted lines often show advisory or secondary relationships, subject to the chart's key. A regional HR manager might report to a regional director while receiving corporate HR guidance.
The formal organization is deliberately designed. The informal organization grows through personal relationships and unwritten norms. Charts leave out much informal influence, actual authority, culture and information flow, and can become outdated. Interviews and tracing a task reveal connections that boxes miss.
Key Takeaways
- Structure is the arrangement of work; design is the process of choosing or changing it.
- Greater differentiation increases the need for integration.
- Use all six structural elements; chart shape alone gives an incomplete picture.
- Count direct reports for span and positions along a reporting path for levels.
- The formal chart and the informal network describe different parts of working life.
1.2 Specialized jobs and ways to broaden them
Work specialization, or division of labor, divides an activity into separate tasks. One person may take an order, another prepare it and another arrange delivery. Each learns a limited part of the process in depth.
Why dividing work raises output
Repetition builds skill and speed. Workers spend less time changing tools or switching tasks. Training can focus on a narrow job, and the employer can match each task to the skill it needs. High volumes also make specialized equipment worthwhile.
Adam Smith illustrated this in The Wealth of Nations in 1776. Pin making involved about 18 operations. Ten workers dividing those operations produced upward of 48,000 pins a day, or about 4,800 each. Smith judged that an untrained person doing every operation alone could not make 20 pins a day and might not make one. Henry Ford's moving assembly line of 1913 later extended specialization in mass production.
Where the gains run out
Very narrow, repetitive work can bring boredom, fatigue and stress. Quality may suffer, and absence and turnover can rise. Every task boundary also creates a handoff. An employee may pass a problem onward because solving it falls between job descriptions.
The useful degree of specialization depends on the task. Repeated payroll processing benefits from consistent specialist methods. A hotel employee resolving an unusual guest problem needs a broader view and discretion. Organizations can keep deep specialists while bringing them together in cross-functional teams.
Four ways to design a job
| Approach | What changes | Password-help example |
|---|---|---|
| Simplification | Tasks are split or removed, narrowing the job. | One agent verifies identity; another resets the password. |
| Rotation | A person moves between existing jobs. | The agent spends different weeks on resets, billing and tracking. |
| Enlargement | More tasks at a similar responsibility level enter one job. | One agent handles resets, billing and order questions. |
| Enrichment | Planning, decisions or control move into the job. | The agent approves refunds up to $100 and reviews their own quality data. |
To classify a redesign, first ask whether the job itself changed. Rotation changes the person's assignment while leaving each job intact. Next ask whether new tasks bring new authority. Enlargement adds breadth. Enrichment adds control over the work, such as scheduling it, deciding exceptions or checking quality.
Enlargement can feel like extra work without extra influence. Enrichment can make work more meaningful by adding autonomy and responsibility, but employees need the skills and information to use them. Moving decisions into a job while withholding access to the necessary information makes the added authority hard to exercise.
Connect job design to the wider structure
Narrow tasks need coordination across many handoffs. Functional departments, clear procedures and close supervision often support them. Broad, enriched jobs fit teams that can solve a problem together and make decisions close to the work. The choice changes both what one employee does and how managers connect the whole process.
Key Takeaways
- Specialization improves skill, switching time, training and use of equipment.
- Human costs and handoffs can outweigh the gains from very narrow jobs.
- Rotation changes assignments; enlargement adds tasks within a job.
- Enrichment adds authority over planning, decisions or control.
1.3 Choosing a basis for departments
Departmentalization groups jobs under managers so related work can be coordinated. The basis determines which activities sit together and which must connect across unit boundaries.
Compare five bases
| Basis | Example | Benefit | Cost |
|---|---|---|---|
| Function | Operations, marketing and finance | Shared specialists and economies of scale | Silos and narrow departmental goals |
| Product | Small Appliances, Major Appliances and Commercial Equipment | Product focus and accountability | Repeated activities and less specialist depth |
| Geography | East, Central and West regions | Local knowledge and responsiveness | Duplication and regional isolation |
| Process | Cutting, assembly and finishing | Efficient specialist work stages | Delays at handoffs |
| Customer | Individuals, small businesses and large accounts | Understanding of each buyer type | Duplication and overlapping accounts |
Functional grouping lets specialists share equipment, learn from peers and follow professional career paths. Its coordination weakness appears when departments meet their own targets while the whole customer result suffers.
Product, geographic and customer grouping bring related market needs together. They also repeat resources. A customer operating across several regions can fit more than one unit, so managers need a clear owner for that relationship.
Recognize process grouping
Process departments handle sequential stages. Furniture moves from cutting to assembly to finishing. A licensing office can separate document checks, testing, photos and issuing, and payment. Each transfer needs a dependable handoff.
Written procedures concern formalization. A marketing department can follow detailed procedures while remaining functionally grouped. Identify the basis of the units from the work they bring together.
Choose the connection that matters most
A 120-person software firm with one product in one country benefits from shared expertise and little duplication, making functions a useful fit. Three unrelated products across Europe and Asia create harder product or market coordination, strengthening the case for product or geographic grouping.
Large organizations mix bases: geographic units at the top can contain functions, with Sales divided by customer type. Name each level separately. Regional sales teams inside Sales do not make the whole firm geographic.
Put together the work that most needs close coordination. Then connect what the choice separates: market-focused units still need professional standards; specialist departments still need shared customer commitments.
Key Takeaways
- Five bases are function, product, geography, process and customer.
- Functional grouping shares expertise but can create silos.
- Product, geographic and customer grouping improve market focus at a cost of duplication.
- Process grouping follows sequential work stages and needs reliable handoffs.
- Identify the basis at each chart level; organizations often mix bases.
- Group the work that most needs coordination and connect the boundaries that remain.
2Authority, reporting and decisions
A reporting line tells you who answers to whom, but a workable structure also makes clear what people may decide and how much support they receive. Follow a delegated task to see how authority and accountability travel together. Then calculate what different spans do to management levels, and separate two choices that are often confused: where decisions sit and how much written rules standardize the work.
2.1 Giving people authority to deliver a result
The chain of command is the line of authority from the top of an organization to its lowest level. It identifies who directs a person's work and who holds that person answerable for results. Henri Fayol called it the scalar chain.
Authority, responsibility and accountability
| Term | Meaning | Scheduling example |
|---|---|---|
| Authority | The right attached to a position to direct action | Permission to assign shifts and approve swaps |
| Responsibility | The duty to perform assigned work | Preparing a schedule that meets coverage needs |
| Accountability | Being answerable for the result | Explaining an understaffed shift to the manager |
Authority belongs to the position; someone leaving a management job leaves its formal authority behind. Responsibility needs matching authority. An assistant who must fill shifts but cannot assign staff lacks a necessary part of the job.
Fayol's unity of command principle says that each employee should report to one manager. It reduces conflicting instructions. A matrix deliberately creates reporting along more than one dimension, which requires explicit ways to resolve priorities.
Delegate a complete task
Delegation assigns a task and the authority needed to carry it out. Work through five steps:
- Define the task and expected result.
- Choose someone with the skills and time.
- Grant authority that fits the task.
- Agree on the deadline and checkpoints.
- Monitor progress and give feedback.
A store needs at least three employees on the floor from 7 a.m. to 10 p.m., seven days a week. That is 15 hours daily, giving:
The assistant must provide 315 floor staff-hours within a budget of 420 labor hours. The budget also has to accommodate work away from the floor and other paid time. The assistant can assign shifts and approve swaps, submits the schedule by Thursday noon, and receives close review for the first two weeks before the manager moves to spot-checks.
If Saturday is understaffed, the assistant answers to the store manager. The store manager still answers to the district manager. Delegation gives another person authority to act without removing the delegating manager's accountability.
Distinguish line and staff roles
Line authority directs subordinates along the reporting chain. Production and sales managers commonly hold line roles because they lead activities directly serving the organization's main goals. Staff authority supports and advises line managers: legal, HR and IT specialists provide expertise.
Some specialists also receive functional authority over a defined issue. A safety specialist may have authority to stop unsafe work across departments. That specific power should be stated clearly so advice and binding decisions do not become confused. A line-and-staff structure places these supporting units alongside the line hierarchy.
People can exchange information directly across departments while keeping clear reporting relationships. A purchasing employee can discuss a delivery with production without becoming production's subordinate. The chain establishes decision authority and accountability; it need not route every message through the top.
Key Takeaways
- The chain of command identifies authority and accountability.
- Responsibility requires enough authority to carry out the task.
- Delegation covers the result, person, authority, checkpoints and feedback.
- A manager remains accountable after delegating.
- Line roles direct operations; staff roles advise, with any functional authority explicitly defined.
- Direct communication can cross the hierarchy while reporting lines stay clear.
2.2 Spans, levels and the cost of supervision
Span of control, also called span of management, counts a manager's direct reports. A VP with four managers reporting directly has a span of 4, even if those managers lead hundreds of employees.
Calculate managers one level at a time
For 4,096 front-line employees, assume every manager has the same span and each division produces a whole number. Divide the population at each level by the span until one top manager remains.
| Management level above front line | Span of 4 | Span of 8 |
|---|---|---|
| First | 1,024 | 512 |
| Second | 256 | 64 |
| Third | 64 | 8 |
| Fourth | 16 | 1 |
| Fifth | 4 | — |
| Sixth | 1 | — |
For span 4, add the managers:
For span 8:
The difference is 780 managers. At $90,000 each in annual salary and benefits, the wider-span arrangement costs $70.2 million less per year in management. These are six versus four management levels; the front-line employees are an additional organizational level.
Real designs need rounding and uneven spans when teams do not divide exactly. This worked comparison uses equal spans to isolate their effect.
Weigh tall and flat designs
| Tall: narrower spans, more levels | Flat: wider spans, fewer levels |
|---|---|
| More time for supervision and coaching | More employee autonomy |
| More management cost and promotion steps | Lower management cost and fewer promotion steps |
| More upward approvals and filtered information | Shorter paths to top management |
| Risk of excessive control | Risk of overloaded managers and missed guidance |
Delayering removes management levels, commonly widening the remaining managers' spans. The saving comes with a new workload: fewer managers must still make decisions, coordinate work and support employees.
Match the span to the work
Wider spans fit skilled employees doing similar, routine tasks with clear procedures and useful information systems. Close working locations, an autonomy-supporting culture and few competing duties for the manager also help.
Complex, varied or new tasks take more discussion. Inexperienced employees need coaching; dispersed teams need deliberate contact. A manager with heavy technical duties has less time for direct reports. In these conditions, a narrower span can provide necessary support.
V. A. Graicunas's 1933 model shows why coordination can grow faster than headcount. With n direct reports, potential direct, group and cross-relationships total:
This gives 44 relationships for 4 reports, 100 for 5 and 1,080 for 8. The count describes possible relationships, many of which never become active. It is a way to understand coordination load, not a rule for selecting a universal span.
Key Takeaways
- Span counts direct reports, not all employees below a manager.
- Divide repeatedly to count managers at each level, then add those levels.
- For the same workforce, wider spans generally mean fewer managers and levels.
- Compare management savings with coaching and coordination needs.
- Skills, task complexity, location, systems and other managerial duties shape a workable span.
2.3 Deciding locally while keeping clear standards
Centralization concentrates decision-making at upper levels. Decentralization gives lower managers and employees more input or decision authority. Empowerment increases employees' discretion over their work. Organizations combine these choices decision by decision.
Place a decision where it can be made well
| More central control fits | More local authority fits |
|---|---|
| Significant decisions with costly errors | Routine decisions needing a fast response |
| Strong need for brand or policy consistency | Strong need for local knowledge |
| Less experienced local managers | Capable managers ready to decide |
| A crisis requiring coordinated action | Complex, changing conditions across locations |
Centralization supports control, consistency, shared purchasing power and coordination. It can also overload senior managers and delay action because decisions are far from the relevant information. Decentralization uses local knowledge, develops managers and can increase motivation, but inconsistent decisions and duplicated effort need attention.
A company can have 500 stores and remain highly centralized if headquarters decides every price, staffing level and stock choice. Geographic spread describes location. Decentralization describes decision rights.
Work through a mixed design
A 40-store grocery chain keeps supplier contracts at headquarters to gain buying power. It also centralizes branding, IT systems and food-safety standards. Store managers decide schedules, choose local products for an agreed share of shelf space and approve customer refunds up to $50.
The managers can respond quickly within clear limits. Headquarters still sets goals and budgets and reviews performance. Delegating one refund task is a manager-to-person action; maintaining local refund authority across all stores is an enduring pattern of decentralization.
Separate rules from the location of authority
Formalization is the extent to which written rules, procedures and job descriptions standardize jobs and behavior. High formalization supports predictable quality, equal treatment and efficiency in repeated work. Its cost is rigidity when a rule no longer fits a situation. Low formalization leaves more discretion and produces less predictable methods.
Airline pre-flight checks and surgical safety checklists formalize well-understood steps where errors have serious consequences. An advertising team's creative work changes from one assignment to the next, so detailed instructions for every action would hinder the work.
A franchise can have a detailed operating manual while its local managers decide schedules and customer remedies within it. This is high formalization with decentralized decisions. Rules and decision location are separate dimensions, even though tightly controlled mechanistic designs often combine high formalization with centralization.
A useful diagnosis asks two questions independently: “Who may decide?” and “What procedure or limit must that person follow?” Local authority works better when people know the boundary of their discretion and when unusual cases have a clear route for escalation.
Key Takeaways
- Centralization concerns the level of decision-making; location alone tells you little about it.
- Decentralize decisions that need capable local judgment and fast action.
- Formalization standardizes work through written rules and procedures.
- High formalization can coexist with decentralized decisions.
3Choosing among traditional structures
Different structures solve different coordination problems. A small firm's owner can connect almost everything personally; a diversified business needs people who own the results of whole product lines or regions. Complex projects may need to share scarce specialists across several teams. Compare each structure by the connections it strengthens, the costs it creates and the decisions it asks managers to coordinate.
3.1 Simple and functional structures
Small firms can coordinate through one owner. Growing work may need specialist departments, creating a different coordination problem.
Compare the two forms
| Design | Arrangement | Strength | Main risk |
|---|---|---|---|
| Simple | Little departmentalization or formalization, wide spans and central authority | Fast, flexible and inexpensive | Dependence on one person |
| Functional | Top-level departments by specialty | Shared resources and deep expertise | Silos and conflicts sent upward |
In a nine-person landscaping firm, the owner quotes jobs, schedules two crews and handles bills. Employees get quick answers, but growth can turn the owner into a bottleneck. An absence can interrupt decisions that nobody else may make.
A functional structure groups operations, marketing, finance, HR and perhaps research and development under functional heads reporting to the chief executive. Specialists share equipment and training and have clear career paths. The form fits one product line or a few related ones in a fairly stable environment where efficiency matters.
Find the missing connection
Operations may prefer long production runs while Sales promises short custom orders. Both can meet separate targets while the customer waits. With nobody below the top owning the overall product result, conflicts climb to the chief executive. These separated outlooks are silos.
A 180-person regional brewery launches a seasonal beer late because Marketing chose a date without checking brewing capacity. A joint launch team brings brewing, marketing and finance together. A product manager coordinates commitments, and a shared calendar links the launch date to production. The firm can fix the missing connection while retaining its departments.
Select an integration mechanism
A liaison keeps departments in contact. A task force addresses a temporary problem. A standing committee handles recurring issues. An integrating manager coordinates activities around a product or brand. Shared information systems make plans visible across boundaries.
Choose the mechanism to suit the dependency: a one-time fault investigation needs a different arrangement from recurring capacity decisions. If numerous unrelated products require constant negotiation, the basic functional form may need reconsidering.
Growth often brings a move from simple to functional, while diversification can favor divisions. A firm with a few hundred employees and one product family can remain effectively functional; headcount alone does not select the next structure.
Key Takeaways
- A simple structure combines central authority with little departmentalization or formalization.
- A functional structure shares specialist resources and supports expertise.
- Functional silos appear when departmental goals obstruct the whole result.
- Liaisons, task forces, committees, integrating managers and shared systems connect functions.
- Growth and diversification create different pressures; the next structure is a choice.
3.2 Divisions and shared central services
A divisional structure groups the organization into semi-autonomous businesses around products, regions or customer groups. A division has its own functions and a manager accountable for its overall performance. Headquarters sets strategy, allocates resources and monitors results. This is also called the multidivisional form, or M-form.
Bring a whole market together
A consumer-goods company might have Beauty, Home Care and Food divisions. Each division can connect its own operations, marketing and sales. Regional divisions fit strongly different local markets; customer divisions fit strongly different groups such as consumers, small businesses and large enterprises.
Divisional managers see a whole business, which develops general-management skills. They can respond to their markets without sending every issue through a single set of functional heads. Accountability for a product or region becomes easier to locate.
The cost is repetition. Separate divisions may each need marketing, finance and other specialists. They may compete for resources, develop inconsistent standards or fail to share useful knowledge. Headquarters must connect them without taking every operating decision back.
Calculate the cost of duplication
A company has one marketing department with 30 people. It creates three product divisions, each needing 14 marketers.
It now employs 12 more marketers. The extra cost can be worthwhile if product knowledge and faster decisions improve results enough. A recommendation should name both the responsiveness gained and the resources repeated.
Alfred Chandler's Strategy and Structure (1962) described how firms including DuPont and General Motors developed divisions as they diversified in the 1920s. Structure follows strategy expresses the connection: entering different markets can make the old coordination pattern unsuitable.
Keep selected functions shared
A hybrid structure combines divisions with central functional services. Activities needing close market contact sit inside divisions; activities benefiting from scale, expertise or consistent standards stay central.
| Activity in a home-goods group | Possible location | Reason |
|---|---|---|
| Product development and marketing | Furniture, lighting or textile division | Close knowledge of the product and customer |
| Finance, HR, legal and IT | Shared central departments | Specialist depth and common standards |
A hybrid can also share production or purchasing where scale matters. This creates a new coordination need: divisions must agree how to use shared resources. A capacity-planning meeting and clear authority for resolving competing requests can support that arrangement.
A product team inside Marketing is only one department's grouping. A division controls several functions and owns broader results. Divisional designs also retain central strategic and financial decisions. The relevant question is which activities and decisions belong in each division and which need organization-wide coordination.
Key Takeaways
- Divisions combine functions around products, regions or customers and own broad results.
- Headquarters retains strategy, resource allocation and performance oversight.
- Divisional responsiveness carries duplication and coordination costs.
- A hybrid shares selected central functions while divisions manage market-facing activities.
3.3 Sharing specialists across projects
A matrix structure combines two reporting dimensions, commonly function and project. A specialist keeps a functional home while working for one or more project managers.
Read the matrix
Imagine Engineering, Finance and Procurement as columns and projects as rows. A person at an intersection answers to the relevant functional manager and project manager. Someone assigned to two projects reports to a functional manager plus both project managers: three managers across two dimensions.
The matrix deliberately breaks unity of command. It allows scarce specialists to serve several complex projects while keeping professional standards and learning within their function. Engineering, construction, consulting and research organizations often face this need.
The gain is flexible staffing and strong coordination around a project. The costs include meetings, conflicting instructions, unclear roles, power struggles and stress. Decisions can slow while managers negotiate priorities.
Divide authority before priorities collide
A common arrangement gives the project manager control of what must be delivered and when, including goals, schedule and project budget. The functional manager handles how and who, including technical standards, staffing and professional development. Performance reviews use input from both.
| Matrix form | Where most authority sits |
|---|---|
| Weak | Functional managers; project managers mainly coordinate |
| Balanced | Shared between functional and project managers |
| Strong | Project managers, especially over project work and budget |
Work through a resource conflict
An engineer has a 40-hour week, with 60% assigned to a hospital and 40% to a stadium.
Both project managers request Friday drawings that cannot fit the available hours. The engineer should raise the conflict with the project managers and functional manager. They agree priorities and the functional manager assigns part of the stadium work to a colleague. Asking the engineer to choose privately would leave the resource conflict unresolved and hide the impact on a project.
Compare a project home with a functional home
In a project structure, staff belong to project teams, complete the assignment and move to another project. Film productions and design studios can organize this way. Dedicated teams can act quickly, but staffing must be continually reassigned. Gaps between projects and weaker continuity of specialist development need attention.
To distinguish a matrix from a temporary team, look for continuing authority along both dimensions, including control over resources, priorities and performance review.
Key Takeaways
- A matrix creates reporting across two dimensions; several project assignments can mean more than two managers.
- The project manager commonly owns deliverables and timing; the functional manager owns staffing and standards.
- Conflicting demands require a joint priority decision and a feasible resource plan.
- Weak, balanced and strong matrices differ in the distribution of authority.
- A project structure makes projects the organizational home; a matrix retains functional homes.
4Teams, partners and changing work
Work crosses departmental boundaries, company boundaries and locations. Teams can own a complete result; outside partners can provide activities a company chooses not to keep inside. Flexible schedules and remote work change how people coordinate, while informal relationships shape the flow of advice and news. Evaluate these designs by asking who owns the result, how people stay connected and what new risks need managing.
4.1 Making teams responsible for complete work
A team-based structure builds all or a substantial part of the organization around teams with shared results and authority over their work.
Distinguish membership from control
A self-managed team plans, performs and controls work without a formal supervisor. A cross-functional team combines people from different specialties. A team can have both features. Teams may be permanent or temporary; a task force addresses a particular problem. They can supplement functional or divisional departments instead of replacing them.
W. L. Gore & Associates, known for Gore-Tex, describes a lattice of direct connections and personal commitments. Leaders often emerge through capability and followership. Fewer traditional hierarchical barriers still leave a need for leadership and commitments.
Follow a complete claim
An insurer routes claims through intake, assessment, approval and payment: four departments and three handoffs. Average processing time is 12 days. It forms cross-functional teams of six, each handling regional claims from start to finish, and the average falls to five days.
The original 12 days is the comparison base. Ownership of the whole claim removes transfers and lets the team coordinate its stages directly.
Give teams the means to deliver
| Gain | Necessary support |
|---|---|
| Decisions close to work | Real authority and information |
| Cross-functional coordination | A suitable mix of skills |
| Involvement and commitment | Meaningful influence over results |
| Fewer management layers | Clear roles and accountability |
Teams need problem-solving and decision skills. Meetings and conflict consume time. Social loafing occurs when someone contributes less while relying on others; clear contributions and responsibility help address it. Some employees prefer more individual direction.
Several teams still need coordination between them. Shared goals, team-level measures and rewards should encourage members to help deliver the joint result. Leaders must surface conflicts and secure resources. Calling a group a team while sending every choice to the old supervisor leaves authority unchanged.
Key Takeaways
- A team-based structure gives teams ownership of results and authority over work.
- Self-managed describes control; cross-functional describes the mix of expertise.
- Teams can reduce handoffs by keeping a whole process together.
- Training, goals, measures and rewards must support shared results.
- Teams still need clear roles, leadership and coordination between teams.
4.2 Coordinating work across company boundaries
A network structure keeps key activities in a core organization and contracts other functions to partners. Contracts, standards and information systems connect the parts. A related virtual organization combines a small permanent core with outside specialists engaged as projects require.
Decide what stays inside
A 25-person toy brand designs and markets products. Two contract factories make them, a logistics firm stores and ships them, and a service company handles customer calls. The brand concentrates its own staff on the activities where it creates distinctive value.
Nike uses independent contract factories to make most footwear and apparel. Apple designs the iPhone and uses contract manufacturers such as Foxconn for assembly. These arrangements show that a company can coordinate a large production system without employing all the people who make its products.
Outsourcing suits activities that partners can perform well and that can be specified and checked. It is harder to justify when the activity contains the company's key know-how or when critical quality is difficult to define and verify.
What the network gains and gives up
| Gains | Risks |
|---|---|
| Access to partners' specialist skills | Dependence on their capacity and performance |
| Lower fixed costs and easier scaling | Less direct control over quality and delivery |
| Focus on core competencies | Exposure of valuable know-how |
| Faster access to capabilities | Contract changes and cross-company coordination |
The core must actively manage these relationships. Shared planning data, clear delivery standards, quality checks and audits help connect partners. A supplier's failure can damage the brand's reputation, including through poor working conditions. Moving work outside the legal organization leaves a continuing need to oversee the result customers receive.
Understand boundaryless design
A boundaryless organization reduces barriers that make cooperation difficult. Jack Welch, General Electric's CEO from 1981 to 2001, popularized the term.
- Vertical barriers separate hierarchy levels. Fewer levels and teams mixing levels make communication easier.
- Horizontal barriers separate functions. Cross-functional teams and end-to-end processes connect them.
- External barriers separate the company from customers, suppliers and partners. Alliances and shared design or planning data open these connections.
Boundaryless designs retain authority and responsibilities. The aim is to make useful connections easier, not to remove every boundary. A customer involved in product design still needs to know who approves the final design.
Compare the terms accurately
A network concerns the division of activities between organizations. A virtual organization concerns a small core and changing external specialists. A virtual team concerns people collaborating across locations; its members can all work for the same employer. Digital collaboration helps all three, but using a video meeting platform alone says little about who employs the participants or owns the work.
Key Takeaways
- A network keeps key activities in a core and contracts other functions to partners.
- Outsourcing exchanges lower fixed commitments and specialist access for control and dependency risks.
- The core needs standards, contracts, shared information and oversight.
- Boundaryless design reduces vertical, horizontal and external barriers.
- A virtual organization and a virtual team describe different arrangements.
4.3 Flexible schedules, locations and work relationships
Flexible work changes when, where or under what continuing arrangement people work. Digital tools and knowledge work make more arrangements possible. The structure still needs clear reporting, decisions and coordination.
Compare time and location arrangements
| Arrangement | What changes | Example |
|---|---|---|
| Flextime | Start and finish times within limits | An eight-hour day plus lunch, starting between 7 and 9 a.m. |
| Compressed workweek | Full weekly hours fit fewer days | Four ten-hour days give 40 hours |
| Job sharing | People split one full-time job | Two partners each work 20 hours |
| Remote work | Work takes place away from the employer's site | Home-based work linked by technology |
| Hybrid work | On-site and remote days are combined | Three days on site and two remote |
Flextime often includes core hours when everyone must be available. With an eight-hour day, a one-hour lunch and core hours of 9 a.m. to 4 p.m., starting at 7 a.m. means finishing at 4 p.m.; starting at 9 a.m. means finishing at 6 p.m. The timing changes while the total work stays the same.
Each arrangement needs a suitable coordination plan. Job sharers need compatible working methods and handovers. Compressed weeks provide longer breaks but can bring fatigue on long days. Remote work removes commuting and can aid concentration, but isolation, weak informal learning and blurred home–work boundaries need attention. Flextime makes scheduling meetings and service coverage harder.
Distinguish hours from continuity
Contingent work is temporary or otherwise nonpermanent work. It can include temporary staff, fixed-term workers and freelancers engaged for limited assignments. Some gig work involves short online tasks. Full-time hours can occur in a temporary role; permanent part-time work remains a continuing employment arrangement.
A core of permanent employees can work alongside a flexible periphery. This supplies specialist skills and lets capacity change, but knowledge can leave when assignments end, and coordination and commitment may be harder to sustain. Legal worker classifications depend on the country's employment law.
Replace chance contact with deliberate coordination
A 60-person accounting firm works on site Tuesday through Thursday for joint work, client meetings and training. Monday and Friday support focused remote work. Core availability is 10 a.m. to 3 p.m.; employees agree weekly outputs, and new hires have an on-site mentor for their first three months.
The schedule gives each work pattern a purpose. Written documentation, planned contact and response-time norms replace information that once traveled through chance meetings. Managers assess agreed results. New employees still need coaching, so remote working does not by itself justify wider spans.
The unwritten expectations
The psychological contract consists of beliefs about what employer and employee owe one another, such as loyalty for security or effort for development. Outsourcing, delayering and temporary work can shift expectations toward shorter transactions. A perceived broken promise damages trust and commitment.
Design also signals culture. Giving teams schedule authority communicates trust; open access to senior managers supports voice. Requiring approval for every minor timing change signals tight control. Those signals should agree with the responsibilities and discretion employees actually receive.
Key Takeaways
- Flextime changes timing; compression changes the number of workdays; job sharing splits a role.
- Remote and hybrid arrangements need deliberate communication, availability and coaching.
- Contingent work concerns continuity, not the number of weekly hours.
- Agreed outputs provide a basis for managing work across locations.
- The psychological contract concerns unwritten reciprocal expectations.
- Work arrangements and decision rights send signals about organizational culture.
4.4 Following relationships that the chart leaves out
People develop relationships as they work together. They ask a trusted colleague for advice, share news over lunch and learn unwritten expectations from the group. These connections form the informal organization alongside the formal design.
Identify its main parts
Informal groups form through friendship or shared interests and can cross departments. Informal leaders influence people through experience, expertise or personality. Their influence comes from being trusted, even when they have no supervisory title.
Group norms are unwritten expectations about behavior: what counts as a fair day's output, whether people ask for help or whether staying late is expected. The grapevine is the informal communication network through which news travels.
The bank wiring observation room in the Hawthorne studies of 1931–1932 illustrates the strength of norms. Workers wiring telephone equipment had pay partly tied to group output. Their group settled on an acceptable output below management's hopes and used social pressure on people who worked too fast or too slowly. Informal expectations could outweigh the intended pay incentive.
See both the help and the risk
| Helpful connections | Possible costs |
|---|---|
| Fast problem-solving through trusted contacts | Controls bypassed without oversight |
| Practical advice for newcomers | Dependence on a few well-connected people |
| Belonging and mutual support | Cliques that exclude colleagues |
| Rapid exchange of news | Incomplete stories and harmful rumors |
The grapevine can carry accurate information but leave gaps, especially during uncertainty. Managers can listen for concerns, explain decisions promptly and correct false reports with facts. Silence leaves more room for speculation; trying to suppress informal discussion removes a useful way of hearing what worries employees.
Diagnose a workaround
A factory's purchasing process allows up to ten working days to approve spare parts. When equipment fails, a maintenance technician phones a friend in Purchasing and obtains a part in one day.
Follow what happened. The formal route was too slow for urgent maintenance. A personal contact solved the immediate problem, but spending bypassed a control. The repeated workaround identifies a structural gap: routine and emergency purchases need different routes.
The manager can establish an urgent-parts process up to $500, with a named approver and a record of the purchase. This retains speed while making authority and review visible. Punishing the relationship alone would leave the slow process in place.
Map advice and information
Social network analysis asks people whom they consult and maps the connections. It can reveal hubs, bridges between functions and bottlenecks. An engineer consulted by 15 colleagues across four departments may connect work that appears separate on the formal chart.
Managers can involve trusted informal leaders early, reward helpful cooperation and spread knowledge so it does not depend on one person. Formal and informal arrangements shape each other: changing a reporting line can disrupt a useful relationship, while a dependable informal connection can reveal a better formal coordination route.
Key Takeaways
- The informal organization grows through relationships, norms and communication.
- Informal leaders gain influence through trust, expertise or experience.
- Norms can support or obstruct formal performance goals.
- Listen to the grapevine and fill information gaps with timely facts.
- Workarounds can expose a formal process that needs redesign.
- Social network analysis reveals advice links, hubs and bridges absent from charts.
5Matching a design to its conditions
A structure can be efficient in one setting and frustrating in another. Predictable processing needs consistency; uncertain product development needs room for judgment. Use mechanistic and organic designs as reference points, then examine strategy, size, technology and the environment together. A strong recommendation connects a specific problem to a design choice, names the cost and explains how people will coordinate under the new arrangement.
5.1 Mechanistic and organic patterns
Mechanistic and organic describe broad structural patterns. Real organizations sit between these ends and can design units differently.
Compare the six elements
| Element | Mechanistic tendency | Organic tendency |
|---|---|---|
| Specialization | Narrow, fixed jobs | Broad, adaptable roles |
| Grouping | Rigid departments | Cross-functional and cross-level teams |
| Chain of command | Hierarchical authority | Authority also follows expertise |
| Span | Often narrower | Often wider |
| Decisions | More centralized | More decentralized |
| Formalization | Detailed written rules | Fewer prescribed methods |
Mechanistic information mainly follows the hierarchy, often downward. Organic systems encourage sideways and upward information as people solve changing problems.
Trace the ideas
Max Weber's bureaucracy is an ideal type with divided work, hierarchy, written procedures, impersonal rules and selection and promotion by qualifications. Its technical meaning describes predictable administration, beyond the everyday complaint about paperwork.
Burns and Stalker's The Management of Innovation (1961) examined British firms, including businesses entering electronics after World War II. Stable conditions suited mechanistic systems; rapid technological and market change needed organic connections that brought knowledge to unfamiliar problems.
Judge the combined pattern
A payroll-processing center divides tasks among specialist clerks, follows detailed procedures and centralizes key decisions. A supervisor might lead about 15 clerks because routine work and clear procedures support the span. The overall pattern remains mechanistic.
A video-game studio uses broad roles, cross-functional teams and team-level design decisions. Leads coordinate contributions as development changes, forming an organic pattern.
Mechanistic designs offer efficiency, consistency, predictability and clear accountability but can adapt slowly and discourage initiative. Organic designs support innovation and flexibility but can bring role confusion, negotiation and less predictable coordination costs.
A drug company can use formal controls in manufacturing and flexible collaboration in research. An operating room combines formal safety protocols with open communication and adaptive judgment across specialties. A checklist makes a known routine dependable while teamwork handles unexpected events.
Key Takeaways
- Mechanistic designs emphasize specialization, hierarchy, central control and formal rules.
- Organic designs emphasize adaptable roles, open information and local judgment.
- Weber described bureaucracy; Burns and Stalker linked structural patterns to conditions.
- Classify the combined pattern, not one feature in isolation.
- Different units, including safety-critical ones, can combine mechanistic and organic features.
5.2 Using strategy, size, technology and environment
The contingency approach says that effective design depends on the situation. Four factors guide the analysis: strategy, size, technology and environmental uncertainty. Each supplies a reason for a design choice.
Strategy gives structure a purpose
An innovation strategy needs new ideas, flexible roles and information moving across specialties. It favors organic features. Cost minimization depends on efficiency, stable methods and close cost control, favoring mechanistic features. An imitation strategy combines controlled current operations with flexibility to identify and adapt ideas developed elsewhere.
Diversification adds a different coordination need: products or markets may require their own management attention. Divisional or hybrid structures can give each business that focus. Chandler's phrase structure follows strategy captures why a changed direction can make an existing structure unsuitable.
Size changes coordination demands
Growth usually brings more specialized jobs, departments, procedures and levels. A common textbook benchmark describes firms above about 2,000 employees as large; it is not a boundary at which a company must adopt a particular structure. Adding 500 people changes a 300-person organization far more than a 30,000-person one that already has extensive systems.
Technology means the work process
In organizational design, technology means how inputs become outputs, not just computers. Joan Woodward's study of about 100 manufacturing firms in South Essex, published in 1965, compared three types:
| Production technology | Example | Effective structural pattern in the study |
|---|---|---|
| Unit or small batch | Custom machinery or tailored suits | Organic |
| Large batch or mass | Standard items on assembly lines | Mechanistic |
| Continuous process | Oil refining or chemicals | Organic |
Routine tasks generally suit standard methods and mechanistic control. Nonroutine tasks call for more judgment and organic coordination. A continuously running process can require expert cooperation when conditions change; continuous production does not mean employees repeat simple assembly tasks.
Environment combines speed and complexity
A stable, simple environment has relatively predictable demands and few different outside elements to track. A dynamic, complex one changes quickly and has many different customers, competitors, suppliers, regulators or technologies. Uncertainty increases the value of information sharing and decisions close to emerging problems.
Resolve conflicting pressures
A 300-person credit union competes on low fees using standard products under stable regulation. Routine processing and cost control support mechanistic features. Its digital-banking unit faces changing technologies and competitors, so cross-functional teams and local decisions fit that work.
A large firm in a fast-changing market faces competing pressures. It can standardize repeatable core operations and give innovation units organic freedom, then connect the units with shared plans and clear interfaces. The factors guide a justified choice; they do not mechanically select one structure for every activity.
Key Takeaways
- The contingency approach connects design choices to the situation.
- Innovation favors organic features; cost minimization favors mechanistic ones.
- Growth increases coordination needs, with a stronger relative impact in smaller firms.
- Woodward linked mass production to mechanistic design and unit and process production to organic design.
- Environmental uncertainty combines rate of change and complexity.
- When factors conflict, different units can use different designs with strong integration.
5.3 From symptoms to a supported recommendation
A design recommendation needs a clear chain of reasoning: what the organization is trying to do, where its current arrangements obstruct that goal and how a proposed design addresses the obstruction.
Use six steps
- State the strategy and main goals.
- Describe the current form and its six structural elements.
- Assess size, technology and environment.
- Identify symptoms of misfit.
- Develop two or three options.
- Recommend one, including its costs and coordination mechanisms.
A symptom points toward a question, not a complete diagnosis. Decisions waiting at the top suggest centralization or too many levels. Repeated conflicts and dropped tasks suggest weak integration. Duplication and inconsistent standards suggest divisions need more central coordination. Overloaded managers and absent coaching suggest spans are too wide. High management costs and filtered information suggest too many narrow-span layers.
Work through a diversified company's problem
An outdoor-gear company has 850 employees, three product families and new European sales. It remains organized by design, manufacturing, marketing, sales and finance. Seven management levels separate the CEO from the factory floor, and the CEO approves every price and new product. Launches take 18 months; competitors take about nine.
The strategic need is responsiveness across different products and markets. The functional arrangement creates heavy cross-department coordination. Central approvals and many levels add delay. The design that worked for one domestic product line now obstructs a broader strategy.
Compare three options:
| Option | Benefit | Cost or limit |
|---|---|---|
| Retain functions and add launch teams | Better integration with little duplication | Central approval bottlenecks still need changing |
| Create self-contained product divisions | Clear product ownership and local action | Duplicated resources and lost scale |
| Use a hybrid | Product focus with shared specialist resources | Negotiation over shared capacity |
Recommend product divisions controlling design, marketing and product management, with central manufacturing and finance. Give divisions pricing authority within headquarters' ranges, remove one management layer where remaining spans are workable, and use cross-functional launch teams. A monthly division–manufacturing meeting allocates factory capacity. The proposal accepts some repeated marketing work while protecting production scale.
A 12-person start-up with four management levels has a different problem: excessive design. A simple structure, daily team decisions and a few spending rules can fit its small size and changing work.
Make decision rights visible
A RACI chart clarifies tasks: Responsible performs the work; Accountable is the one person ultimately answerable for successful completion and sign-off; Consulted gives input beforehand; Informed receives updates. Name these roles for disputed activities alongside the reporting chart.
Judge the proposal by strategic fit, conditions, accountability, coordination cost, staff skills and culture. Changing boxes while leaving decisions, measures and rewards untouched can preserve the same problems. A structure also cannot resolve an unclear strategy or replace sound leadership. Putting a chosen design into practice requires planning and communication as an organizational change.
Key Takeaways
- Connect strategy, structural evidence, contingency factors and symptoms before recommending.
- Compare feasible options and name the cost of the preferred one.
- Match a coordination mechanism to the weakness the design creates.
- RACI separates doing, ultimate accountability, prior input and updates.
- Check decision rights, measures, rewards, skills and culture alongside reporting lines.
Organizational Structure and Design examples
1Trace a repair from request to completion
12 steps
- 1IntroductionFollow the work as well as the chart
A repair passes through reception, diagnosis and collection. Each person owns a step, but the customer needs one finished repair. How those steps are arranged is a matter of structure and design, and it decides whether handoffs help or delay the customer.
Trace how reporting lines, job content and department boundaries (departmentalization) connect those contributions.
- 2ExplanationDistinguish the arrangement from the design process
Structure is the arrangement of jobs, groups and reporting relationships. Design is the process of choosing or changing that arrangement.
A chart pictures formal roles and reporting. It leaves out many decisions, rules and personal connections.
- 3ExampleRead one branch carefully
The repair director has two direct reports: an Operations head and a Finance head. Operations has three workshop managers, each leading four technicians.
The director’s span is 2, the Operations head’s is 3 and each workshop manager’s is 4. The technician path has four organizational levels, including the technicians. Only the first three are management levels.
- 4ChallengeCount reports without counting the whole branch
The Operations head leads three workshop managers. Each workshop manager leads four technicians. What is the Operations head’s span, and why?
---reveal---
The span is 3 because only the workshop managers report directly to that head. The 12 technicians report through those managers. Counting all 15 people below Operations would confuse direct supervision with the size of the branch.
- 5ConnectionA chart is the start of an investigation
Describe more than the reporting lines. Ask how specialized jobs are, how jobs are grouped, who reports to whom, how many direct reports managers have, where decisions sit and how much written rules prescribe.
If technicians get advice directly from a trusted finance employee, that information path may be invisible on the formal chart. Following actual work reveals these extra connections.
- 6ExplanationSee the gain and cost of a narrow job
Repeating a narrow task builds speed and reduces training and tool-switching time. But more specialized stages also create more transfers.
When nobody owns the whole repair, a problem can fall between jobs. Repetition can also bring boredom and fatigue.
- 7ExampleBroaden tasks or broaden control
An intake employee starts by recording requests. Adding collection booking to that same job is enlargement: more tasks at a similar responsibility level.
Letting the employee decide appointment priorities within agreed limits is enrichment: more control. Moving the employee to booking for one week and intake the next is rotation, with the existing jobs left intact.
- 8ChallengeName the change in the job itself
The repair business adds parts ordering to a technician’s job, but every order still needs the supervisor’s approval. Has this change enlarged or enriched the job? Explain the decisive feature.
---reveal---
It has enlarged the job by adding a task. The technician has gained no stated decision authority over ordering. Enrichment would add control, such as authority to select and approve routine parts within a limit.
- 9ExplanationDecide what belongs together
Departmentalization groups jobs so related work can be coordinated. Grouping all technicians together follows function. Separate household and commercial-customer units follow customer. Workshops serving different territories follow geography.
Grouping diagnosis, repair and final testing as separate stages follows process. Product grouping would organize work around different appliance lines.
- 10ExampleChoose the most important connection
Suppose commercial repairs require service agreements and rapid on-site visits, while household repairs mainly arrive at a workshop. Customer-focused units can keep each group’s service needs together.
That choice can repeat administrative work, so compare the value of customer focus with its cost. Functional grouping would share expertise more easily but need stronger coordination around each customer’s full repair.
- 11ChallengeJoin job design with departmental grouping
A repair firm groups work by customer type. Each service employee now tracks a case from booking through collection and may approve routine appointment changes. Name the grouping basis and the authority-related job change.
---reveal---
The basis is customer departmentalization. Authority to approve routine changes is job enrichment. Tracking more stages also broadens tasks, but the new decision right is what establishes enrichment.
- 12RecapUse three views of the same work
Read reporting lines, job content and grouping as three views of the same work. Narrow jobs create handoffs; department boundaries separate activities.
Integration mechanisms connect those pieces around the result the customer needs.
2Build a workable supervision and decision plan
15 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionGive a result an owner and the means to deliver it
- 2ExplanationKeep the three obligations distinct
- 3ExampleSpecify the scheduling result
- 4ExampleComplete the delegation
- 5ChallengeFind what is missing from a delegation
- 6TipSeparate advice from a binding decision
- 7ExplanationCount the people directly supervised
- 8ExampleCalculate a span-three hierarchy
- 9ExampleChange the span and compare
- 10ChallengeTest whether the cheaper plan can work
- 11ExplanationPlace decisions one issue at a time
- 12ExampleUse rules without reclaiming every decision
- 13ChallengeDistinguish a rule from an approval level
- 14ChallengeIntegrate support and local authority
- 15RecapEvaluate both authority and capacity
3Choose how an audio business should organize
13 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionWatch the coordination problem change
- 2ExampleStart with one owner
- 3ExplanationCreate a specialist home
- 4ChallengeRepair the link while keeping functions
- 5ExplanationGive products broad responsibility
- 6ExampleLocate the duplicated work
- 7ChallengeClassify the mix
- 8ExplanationKeep two dimensions of reporting
- 9ExampleSplit a limited week
- 10ChallengeResolve a conflict without hiding it
- 11Key InsightA project can also be the home
- 12ChallengeChoose the design for scarce expertise
- 13RecapName what each design brings together
4Connect teams, partners and dispersed workers
16 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionLook for the connections beyond departments
- 2ExplanationGive a team the whole result
- 3ExampleCompare team membership and control
- 4ChallengeFind why a team keeps waiting
- 5ExplanationKeep a core and coordinate partners
- 6ExampleDistinguish three kinds of boundary
- 7ChallengeSpot what outsourcing leaves to manage
- 8ExplanationSeparate time, place and continuity
- 9ExamplePlan a shared role’s handover
- 10ExampleReplace missing chance contact
- 11ChallengeClassify a permanent flexible arrangement
- 12ConnectionExpectations travel with design choices
- 13ExplanationFind the advice network
- 14ExampleTreat a shortcut as evidence
- 15ChallengeIntegrate formal and informal coordination
- 16RecapAsk who connects the work
5Recommend a design with reasons and trade-offs
14 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionStart with the work the design must support
- 2ExplanationCompare two broad patterns
- 3ExampleClassify a combined pattern
- 4ChallengeExplain a mixed design
- 5ExplanationUse four lenses on the situation
- 6ConnectionTechnology means the conversion process
- 7ExampleResolve the supplier’s competing pressures
- 8ChallengeLook at both uncertainty dimensions
- 9ExplanationBuild the diagnosis before the proposal
- 10ExampleCompare options against the actual problem
- 11ExampleTurn the choice into an operating arrangement
- 12TipAssign a disputed task with RACI
- 13ChallengeAudit the recommendation as a whole
- 14RecapMake the chain of reasoning visible
Organizational Structure and Design practice questions
Set 1: Reading jobs, reporting lines and design choices10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Connecting departments, authority and markets10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Working through coordination and resource trade-offs10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Diagnosing designs under competing demands10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Evaluating a complete structural recommendation10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Accountability
Authority
B
Balanced matrix
Boundaryless organization
Bureaucracy
C
Centralization
Chain of command
Compressed workweek
Contingency approach
Contingent workforce
Continuous-process production
Coordination cost
Core competency
Core hours
Cost-minimization strategy
Cross-functional team
Customer departmentalization
D
Decentralization
Decision rights
Delayering
Delegation
Departmentalization
Differentiation
Division
Divisional structure
E
Economies of scale
Employee empowerment
Environmental uncertainty
F
Flat structure
Flextime
Formal organization
Formalization
Functional authority
Functional departmentalization
Functional manager
Functional structure
G
Geographic departmentalization
Grapevine
Group norm
H
Hybrid structure
Hybrid work
I
Imitation strategy
Informal group
Informal leader
Informal organization
Innovation strategy
Integrating manager
Integration
Integration mechanism
J
Job design
Job enlargement
Job enrichment
Job rotation
Job sharing
Job simplification
L
Liaison role
Line authority
M
Mass production
Matrix structure
Mechanistic design
Mechanistic–organic continuum
N
Network structure
O
Organic design
Organization chart
Organizational design
Organizational structure
Outsourcing
P
Process departmentalization
Product departmentalization
Production technology
Project manager
Project structure
Psychological contract
R
RACI chart
Remote work
Responsibility
S
Self-managed team
Silo
Simple structure
Social loafing
Social network analysis
Span of control
Staff authority
Standing committee
Strong matrix
Structural misfit
Structure follows strategy
T
Tall structure
Task force
Team-based structure
U
Unit or small-batch production
Unity of command
V
Virtual organization
Virtual team
W
Weak matrix
Work specialization
About this lesson
Make your own Study Materials
Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.