Five-Step Revenue Model: Contracts with Customers, Part 1
IntermediateLesson 3 of 9 in Intermediate Accounting 1 Course
What you will learn
- Describe what revenue is, which contracts the revenue standard covers, and how its five steps turn a contract into revenue amounts.
- Define revenue, customers and the scope of the standardUse the core principle and the key definitions to decide whether a transaction is revenue from a contract with a customer.
- Follow one contract through the five stepsSee what each step decides, work a simple bundle from contract to revenue, and record the contract assets and contract liabilities that arise.
- Define revenue, customers and the scope of the standard
- Decide when an agreement is a contract the standard accounts for, when contracts are combined, and how changes to a contract are treated.
- Test whether a contract existsApply the five contract criteria, judge collectibility, and account for any consideration received while the criteria are not met.
- Combine contracts and account for contract modificationsDecide when separate contracts form one, and apply the three treatments of a change in a contract's scope or price.
- Test whether a contract exists
- Find every promise in a contract and group the promises into distinct performance obligations, including series and customer options.
- Decide whether goods and services are distinctApply the two criteria for a distinct good or service and combine promises that are not distinct into a single performance obligation.
- Recognize series, setup activities and material rightsTreat repeated services as one obligation where the series rule applies, leave out activities that transfer nothing, and identify customer options that give a material right.
- Decide whether goods and services are distinct
- Measure the consideration the entity expects to be entitled to, including variable amounts, the constraint, financing effects, noncash consideration and payments to customers.
- Measure the transaction price and its fixed and noncash partsStart from the consideration the entity expects to be entitled to, exclude amounts collected for others, and account for noncash consideration and consideration payable to a customer.
- Estimate variable considerationIdentify variable amounts and estimate them with the expected value or the most likely amount, updating the estimate at each reporting date.
- Apply the constraint on variable considerationLimit estimated variable consideration to the amount that is not expected to be reversed, using the factors that signal a risk of reversal.
- Adjust for a significant financing componentRecognize revenue at the cash selling price when payment timing gives the customer or the entity a significant financing benefit, and account for the interest.
- Measure the transaction price and its fixed and noncash parts
- Determine stand-alone selling prices and allocate the transaction price, discounts, variable amounts and later price changes to the performance obligations.
- Determine stand-alone selling pricesUse observable prices where they exist and estimate stand-alone selling prices with the adjusted market assessment, expected cost plus a margin or the residual approach.
- Allocate the price, discounts and later changesAllocate the transaction price on a relative stand-alone selling price basis, apply the exceptions for discounts and variable consideration, and allocate changes after inception.
- Determine stand-alone selling prices
- Work complete contracts through the first four steps and explain where US GAAP reaches a different answer.
- Work a full contract through steps one to fourApply the contract test, identify the obligations, measure the price and allocate it in one realistic case, and see how a change in the facts changes the answer.
- Compare IFRS 15 and ASC 606Explain the differences between IFRS 15 and ASC 606 that affect steps one to four, and the terms that differ while the requirements are the same.
- Work a full contract through steps one to four
Five-Step Revenue Model study guide
1Connect customer promises to revenue
A sale can involve several promises, several delivery dates, and one payment. Revenue accounting connects those facts: it identifies what the seller owes, measures the price, and links that price to the goods and services transferred. Start by separating ordinary revenue from other inflows, then follow a bundle through the five steps and see why cash, revenue, and a customer balance can change at different times.
1.1 Revenue, customers, and covered contracts
Revenue is income earned from an entity's ordinary activities. A car dealer earns revenue by selling cars. A profit on selling its old office building is a gain, a different kind of income. The activity that produces the inflow matters.
Start with the transfer
The core principle connects revenue to the transfer of promised goods or services to customers. The amount reflects the consideration the seller expects to be entitled to for that transfer. Control is the trigger: the customer obtains the good or service. Payment can occur earlier or later.
A customer pays a deposit before receiving a machine. The seller has cash, but it also owes the machine, so the deposit is a liability. A bank loan creates a repayment liability, and an owner's contribution creates equity. None is revenue merely because cash arrived. Income is broader than revenue: it covers asset increases or liability decreases that increase equity, excluding owner contributions.
Find the customer relationship
A customer contracts to obtain an output of the seller's ordinary activities in exchange for consideration. Two drug companies jointly developing a medicine and sharing its risks and benefits are collaborators for that work. Their shared project costs are not customer sales between them.
Four terms organize a customer sale:
- A contract creates enforceable rights and obligations between parties.
- A performance obligation is a promise to transfer a distinct good or service, a distinct bundle, or a qualifying series.
- The transaction price is the consideration the seller expects to be entitled to, excluding amounts collected for others.
- A stand-alone selling price is the price the seller would charge for an item sold separately to a customer.
Check which standard applies
IFRS 15 and ASC 606 do not govern every contract. Leases fall under IFRS 16 or ASC 842; insurance contracts under IFRS 17 or ASC 944. Financial instruments and rights governed by the financial instruments, consolidation, and investment standards also follow their own requirements.
A fuel distributor swaps 50,000 liters of fuel with another distributor to serve customers in different regions. This nonmonetary exchange between entities in the same line of business facilitates later sales; the swap itself produces no revenue under the revenue standard.
A contract may contain both a machine lease and maintenance. Apply another standard's separation and measurement requirements first, then apply the revenue standard to the remaining service. The legal document need not belong wholly to one standard.
One model across many sales
IFRS 15 and ASC 606 were issued in May 2014 as a converged model. IFRS 15 replaced IAS 18, IAS 11, and related interpretations and became effective for annual periods beginning on or after January 1, 2018. ASC 606 first applied to public business entities for annual periods beginning after December 15, 2017.
The model normally starts with one contract. A portfolio of similar contracts may be assessed together when the result is reasonably expected not to differ materially from individual accounting. That can help a network operator with 200,000 similar 12-month plans; similarity alone is insufficient without that expectation.
Key Takeaways
- Revenue comes from ordinary activities; cash receipts can instead create liabilities or equity.
- A customer buys an ordinary output; a collaborator shares an activity’s risks and benefits.
- Apply the relevant other standard to excluded contract elements before accounting for the revenue portion.
- The portfolio expedient requires a result not expected to differ materially from contract-by-contract accounting.
1.2 The five decisions and the resulting balances
The five-step model turns a contract into amounts attached to promises, then decides when those amounts become revenue. Keeping the decisions separate prevents a payment date from deciding the whole accounting answer.
What each step decides
- Identify the contract: establish the enforceable arrangement and its boundaries.
- Identify performance obligations: find the distinct promises that are the units of account.
- Determine the transaction price: measure the total consideration expected.
- Allocate the price: assign that consideration to the obligations.
- Recognize revenue: record each allocated amount when or as its obligation is satisfied.
Steps 1–4 establish how much each promise carries. Step 5 links those amounts to control passing to the customer, at a point in time or over time. An invoice describes a billing event; it does not establish that every promise has been fulfilled.
Work a machine-and-maintenance bundle
On January 1, a retailer delivers a coffee machine and begins a 24-month maintenance plan for $1,600, paid that day. Their separate selling prices are $1,500 and $500. The parties are committed, rights and payment terms are clear, the sale changes cash flows, and collection is certain because payment occurs immediately. The machine and maintenance are distinct promises.
The seller assesses the advance payment for maintenance and concludes that it provides no significant financing benefit. This is an assessment, not use of the one-year financing expedient: maintenance lasts longer than a year. The transaction price is therefore $1,600.
The total stand-alone selling price is $2,000. Allocate the price proportionately:
| Promise | Share of separate prices | Allocated price |
|---|---|---|
| Machine | 1,500 ÷ 2,000 = 75% | $1,200 |
| Maintenance | 500 ÷ 2,000 = 25% | $400 |
At delivery, record Dr Cash $1,600; Cr Revenue $1,200; Cr Contract liability $400. As maintenance is provided evenly over 24 months, record Dr Contract liability $16.67; Cr Revenue $16.67 each month, adjusting the last month for rounding so maintenance revenue totals $400.
Distinguish three customer balances
A contract liability is an obligation to provide goods or services for consideration received or already due. The $400 maintenance balance represents future service owed to this customer.
A contract asset is a right to consideration for performance already transferred, with a further condition beyond time before payment becomes unconditional. Suppose a contractor transfers part A, carrying $3,000 of allocated price, but must also deliver part B before its right to payment becomes unconditional. It records Dr Contract asset $3,000; Cr Revenue $3,000 for part A.
A receivable is an unconditional right to consideration. Only time must pass before payment is due. Once part B is delivered and the right becomes unconditional, the contractor reclassifies the contract asset to a receivable. Whether the invoice has been printed is not the defining test.
| Position | What remains? |
|---|---|
| Contract liability | The seller owes future performance. |
| Contract asset | The seller has performed but a further payment condition remains. |
| Receivable | Only time remains before payment is due. |
Key Takeaways
- Identify the contract and promises before measuring and allocating their price.
- Recognize each allocation when or as the related promise is satisfied.
- Payment for future service creates a contract liability.
- A contract asset has a further payment condition; a receivable does not.
- Billing and cash collection do not determine revenue timing.
2Establish the contract and handle changes
Before measuring a sale, establish the rights and obligations that can be enforced. Approval, identifiable terms, commercial substance, and collectibility all matter, including when no paper contract was signed. Related agreements may need one accounting answer. Later, an approved change can create a separate contract, change only the remaining deliveries, or change cumulative revenue on work already underway.
2.1 Contract criteria and collectibility
A contract is an enforceable agreement, which may be written, oral, or implied by customary business practices. A familiar customer ordering by phone can create a contract. Enforceability depends on law; a signature alone does not settle the accounting test.
Apply all five criteria
Account for the contract under the revenue model when all five conditions hold:
- The parties approved the arrangement and are committed to perform.
- Each party's rights concerning the goods or services can be identified.
- Payment terms can be identified.
- The contract has commercial substance: it is expected to change the risk, timing, or amount of future cash flows.
- Collection of the consideration to which the seller expects to be entitled is probable.
Two software companies exchanging $500,000 license sales without changing either company's expected cash flows lack commercial substance. Reciprocal invoices do not create genuine revenue.
Collectibility concerns the customer's ability and intention to pay when due. IFRS interprets probable as more likely than not. US GAAP uses likely to occur, a higher threshold. The same credit evidence can therefore pass IFRS 15 and fail ASC 606.
Price concession or credit loss?
A supplier bills a hospital $1,000,000 but, following its customary practice in that market, expects to accept $600,000. The expected $400,000 concession reduces the transaction price. Test collectibility on $600,000, the amount the supplier expects to be entitled to. The concession is never revenue and is not a bad-debt expense.
If the supplier instead expects full payment and the customer later becomes unable to pay an amount already recognized, assess impairment of the receivable or contract asset under the credit-loss requirements. A credit loss affects an asset's recoverability; a price concession changes the amount charged for the transfer.
Establish the enforceable term
No contract exists yet if each party can unilaterally terminate a wholly unperformed arrangement without compensating the other. For a service that either party can cancel monthly without penalty, enforceable rights and obligations extend one month at a time. A document headed “three-year agreement” does not itself make all three years enforceable.
Once the criteria are met at inception, reassess only when facts indicate a significant change, such as a sharp deterioration in the customer's ability to pay. A failure on reassessment affects further performance and revenue accounting. It does not by itself reverse revenue already recognized; existing assets still require a credit-loss assessment.
Cash received before the criteria are met
Under IFRS 15, keep assessing the arrangement. Until it qualifies, recognize received consideration as a liability unless either of these events occurs:
- No goods or services remain to be transferred, all or substantially all consideration has been received, and it is nonrefundable.
- The contract has been terminated and the consideration received is nonrefundable.
A developer receives $10,000 toward a $100,000 sale from a buyer whose collectibility fails the test. Goods remain to be transferred and the contract continues. Record Dr Cash $10,000; Cr Deposit liability $10,000. A small nonrefundable deposit alone does not meet either revenue event.
ASC 606 adds a third event involving control already transferred, cessation of further transfers with no obligation to transfer more, and nonrefundable consideration. The framework therefore matters when a failed contract produces cash.
Key Takeaways
- All five criteria must be met; a contract may be oral or implied.
- Collectibility concerns ability and intention to pay the amount the seller expects to be entitled to.
- An expected price concession reduces price; subsequent credit deterioration calls for impairment assessment.
- Contract duration follows enforceable rights and obligations.
- Reassess a qualifying contract when a significant change is indicated.
- Cash received while the criteria fail normally remains a liability until a specified revenue event occurs.
2.2 Combining agreements and modifying a contract
The accounting contract can differ from the number of signed documents. Start with agreements made at or near the same time with the same customer or its related parties.
When agreements form one contract
Combine agreements when any one condition holds: they were negotiated as a package with one commercial objective; the price or performance of one affects consideration in another; or their promises form one performance obligation.
A hospital signs a $200,000 system contract and a $50,000 adaptation contract in the same week. The system was priced low because adaptation would follow. The linked negotiation supports accounting for one $250,000 contract.
An approved change
A modification changes enforceable scope, price, or both, with the parties' approval. Approval can be written, oral, or implied. If scope is approved before price is settled, estimate the price change as variable consideration and apply the constraint.
Use this decision order:
| Test | Accounting |
|---|---|
| Added goods or services are distinct and added price reflects their stand-alone selling prices | Separate contract |
| Separate-contract test fails; remaining items are distinct from past transfers | Prospective treatment |
| Remaining work belongs to a partly satisfied single obligation | Cumulative catch-up |
Distinct added units
A manufacturer contracts for 120 units at $100 each and delivers 60. The customer adds 30 units at $95, their current stand-alone selling price. The added units form a separate contract. The 60 remaining original units still earn $100 each; the new units earn $95 each.
Now change the added price to $80, which does not reflect their stand-alone selling price. All remaining units are distinct from those delivered. Pool the unrecognized original consideration, 60 × $100 = $6,000, with the added consideration, 30 × $80 = $2,400. Spread $8,400 over 90 remaining units: $93.33 each, with final rounding adjustment. The $6,000 already recognized for the first 60 units stays unchanged.
Work within one combined obligation
A builder has a $1,000,000 contract and expected costs of $700,000. Its cost-based progress measure is $280,000 ÷ $700,000 = 40%, giving $400,000 cumulative revenue. An approved change adds $200,000 to price and $120,000 to expected cost. The remaining work is part of the same combined obligation.
Recompute progress using the revised total cost: $280,000 ÷ $820,000, approximately 34.15%. Multiply the unrounded fraction by the new $1,200,000 price to obtain $409,756.10 cumulative revenue. Subtract the $400,000 already recorded: the current catch-up is $9,756.10, or $9,756 rounded to whole dollars. Using the old 40% ignores the added work.
Some modifications contain both distinct remaining items and further work within a partly satisfied obligation. Apply the corresponding treatment to each part. Updating a bonus estimate without an agreed scope or price change is different: it is a transaction-price estimate change, allocated under the price-change rules.
Key Takeaways
- Combine related agreements when any one combination condition is met.
- An approved change to enforceable scope or price is a modification.
- Added distinct items priced at stand-alone selling prices create a separate contract.
- Prospective treatment pools unrecognized and added consideration without revising past revenue.
- A catch-up adjusts cumulative revenue for a partly satisfied combined obligation.
3Find the promises the customer receives
A contract may list many activities without promising many separate outputs. Identify the goods and services the customer will receive, including promises created by normal business practice. Then decide which promises stand on their own and which form a combined output. Repeated services, setup fees, and purchase options need particular care because their labels can hide what the customer actually receives.
3.1 Distinct items and combined outputs
A performance obligation is a promise to transfer a distinct good or service, a distinct bundle, or a qualifying series. The promise can be explicit in the contract or implied by practices, published policies, or statements that create a valid customer expectation.
Two tests, both required
First ask whether the customer can benefit from the item on its own or with readily available resources. Such resources include items the customer already has and goods or services sold separately by this seller or another supplier. The customer can benefit by using, consuming, or selling an item for more than scrap value.
Then ask whether the promise is separately identifiable within the contract. Is the seller promising individual outputs, or a combined output made from several inputs? An item can pass the first test and fail the second.
| Question | Focus |
|---|---|
| Capable of being distinct? | Can the customer benefit from the item? |
| Distinct within this contract? | Is the seller's promise separately identifiable? |
Separate selling is evidence for the first question. It is not a requirement, and it does not settle the second question.
Look for a combined promise
Three features signal that promises may not be separately identifiable:
- The seller significantly integrates inputs into the combined output the customer ordered.
- One item significantly modifies or customizes another.
- Items are highly interdependent or interrelated, with each significantly affected by the others.
A hospital building contract includes design, materials, labor, and site management. Those inputs could be bought separately, but the contractor promises to integrate them into one hospital. The contract has one performance obligation. Counting inputs would misdescribe the output sold to the customer.
Standard software versus a customized system
A software supplier promises a standard accounting license, installation, two years of unspecified updates, and two years of phone support. Other firms can install the software, installation does not change it, and it functions without the updates or support.
The customer can benefit from each promise with available resources. The supplier is also transferring separately identifiable outputs: routine installation does not transform the license into a different combined product. There are four performance obligations.
Now installation adds significant features needed to connect the software to the customer's systems. The supplier promises a customized system. The license and installation become inputs to that combined output and form one obligation. Updates and support can remain separate, producing three obligations overall.
Group until the output is distinct
When an item is not distinct, combine it with other promises until a distinct bundle emerges. Sometimes the bundle is the entire contract. Dates and invoice lines do not perform this analysis: items delivered on different dates can belong to one obligation, while items delivered together can be separate obligations.
For a machine requiring routine installation available from another firm, the need for installation alone does not prevent the machine from being capable of being distinct. The relevant resource is readily available. Significant customization would change the separate-identification test, which asks what this seller has promised to deliver.
Key Takeaways
- Identify explicit promises and promises implied by practices that create a valid customer expectation.
- An item is distinct only if the customer can benefit from it and its promise is separately identifiable.
- Readily available resources can come from the customer or another supplier.
- Significant integration or customization can turn individually usable inputs into one obligation.
- Combine nondistinct items until the bundle is distinct.
- Invoice lines and delivery dates do not decide the number of obligations.
3.2 Repeated services, upfront fees, and future rights
Some contracts contain many daily services but only one performance obligation. Others contain a future benefit that receives part of today's price. Focus on what transfers to the customer, including rights to later purchases.
Repeated services as a series
A series is one performance obligation when its distinct goods or services are substantially the same and transfer in the same pattern. Each would be satisfied over time, using the same method to measure progress. A three-year daily office-cleaning service is therefore one obligation. Hotel management can also be a series: daily tasks vary, but the nature of the daily management service stays the same.
Setup is an activity, not always an output
Creating a gym member's file or configuring the provider's own cloud servers transfers no separate good or service to the customer. Such setup activities are not performance obligations. A fee described as nonrefundable still pays for the actual services promised.
A gym charges a $120 joining fee plus $50 monthly for 12 months. The setup transfers nothing, and membership gives no reduced-price renewal right. The price for the membership service is $120 + 12 × $50 = $720. With service provided evenly, revenue is $60 monthly. The joining fee does not become revenue when the file is opened.
Does an option give a material right?
A future purchase option is an obligation when it gives a material right: a benefit the customer would not receive without the present contract. An option at the normal stand-alone selling price is only a marketing offer. A discount available to everyone also adds no contract-specific benefit.
Estimate a material right's separate price from the incremental discount, expected purchase amount, and likelihood of exercise. A $100 product sale includes a voucher for 40% off a future purchase. A public promotion already gives 10% off, expected future purchases average $50, and 80% of vouchers will be used.
- Additional discount: 40% − 10% = 30%.
- Separate price of the right: $50 × 30% × 80% = $12.
- Total separate prices: $100 + $12 = $112.
- Allocate $100 × 100 ÷ 112 = $89.29 to the product and the remaining $10.71 to the right.
The $10.71 is deferred until the option's goods or services transfer or the option expires. The $12 measures a relative selling price; it is not itself the amount deferred.
Loyalty points and “free” goods
Points can give the same kind of right. Sales of $10,000 earn 1,000 points worth $1 each, with 90% expected redemption. Their estimated separate price is $900. Allocate $10,000 × 10,000 ÷ 10,900 = $9,174.31 to the goods and $825.69 to the points. The latter is a contract liability pending satisfaction of the points obligation.
A phone case promised “free” with a phone is still a promised good. If it is a distinct obligation, it receives allocated consideration even though the invoice lists no separate charge. ASC 606 explicitly allows promises immaterial in the contract to be left unassessed. IFRS 15 uses general financial-statement materiality and has no equivalent explicit contract-level exemption.
Key Takeaways
- A qualifying series of substantially the same services forms one performance obligation.
- Setup activities that transfer nothing are not obligations; their fees pay for actual promised outputs.
- An option becomes an obligation when it gives a material right beyond benefits otherwise available.
- Estimate the right using the incremental discount and likelihood of exercise.
- Allocate consideration using the right’s separate price; that price need not equal deferred revenue.
- Loyalty points can require deferral of part of the current sale.
- A distinct good described as free can still receive part of the transaction price.
4Measure the consideration for the sale
The invoice amount is a starting point for measurement. Determine what the seller expects to be entitled to after customer payments, taxes, noncash amounts, and uncertain outcomes are considered. Estimate variable amounts before testing the risk of reversal. When payment timing provides significant financing, separate the cash selling price from interest so revenue reflects the goods or services transferred.
4.1 Cash, noncash payments, and amounts paid to customers
The transaction price is consideration expected in exchange for the promised goods or services, excluding collections for third parties. It can contain fixed and variable amounts. Measurement assumes the promised transfer occurs and the contract is not canceled, renewed, or modified.
Start with the seller's consideration
Assess variable consideration and its constraint, significant financing, noncash consideration, and amounts payable to the customer. These features can make the accounting price differ from both the invoice total and the cash collected.
A seller bills $10,800, comprising a $10,000 sale and $800 of tax collected for a government. The entry is Dr Receivable $10,800; Cr Revenue $10,000; Cr Sales tax payable $800. The third-party collection belongs in a payable, not the transaction price.
Under IFRS 15, assess whether each tax is collected for another party or is the seller's own cost. ASC 606 permits an accounting policy election to exclude qualifying sales and similar taxes collected from customers.
Measure noncash consideration
Customers can pay with goods, services, or shares. Measure that consideration at fair value. If fair value cannot be reasonably estimated, use the stand-alone selling price of the goods or services the seller promised as an indirect measure.
A consultant accepts 1,000 customer shares worth $20 each at contract inception. Using inception as the measurement date gives $20,000 consideration. ASC 606 requires the inception date; IFRS 15 does not specify a measurement date, so the IFRS preparer selects and applies its approach consistently.
Separate changes caused by the payment's form from changes caused by performance. A change in the market price of a fixed number of shares is not variable consideration subject to the constraint. Under ASC 606, a later market-price change leaves revenue unchanged because measurement occurred at inception. Under IFRS 15, changes before the consistently applied measurement date can affect the measured amount. If the number of shares depends on performance, that uncertainty is variable consideration and requires the constraint.
Materials or equipment contributed to help fulfill a contract count as noncash consideration only if the seller obtains control. Merely being allowed to use customer-owned equipment does not establish that transfer.
Paying the customer
Cash, credits, coupons, and vouchers payable to a customer reduce the transaction price unless they buy a distinct good or service from the customer. A food producer sells $1,000,000 to a supermarket and pays $50,000 for shelf placement that transfers no distinct service. The transaction price is $950,000.
If the $50,000 instead buys a distinct advertising campaign worth $30,000, treat $30,000 as advertising expense and the $20,000 excess as a revenue reduction. The customer's role as both buyer and supplier does not make the whole payment an expense. If the distinct service's fair value cannot be reasonably estimated, the entire $50,000 reduces the transaction price.
Recognize that revenue reduction at the later of recognizing the related revenue and paying or promising the customer the consideration. A promise can be implied by customary practice; waiting for the cash payment cannot defer a reduction once both recognition conditions have been met.
Key Takeaways
- Exclude amounts collected for third parties from the transaction price.
- Measure noncash consideration at fair value, using the seller’s separate selling price if fair value cannot be estimated.
- ASC 606 specifies inception measurement; IFRS 15 does not specify a date.
- Variability caused only by the form of noncash consideration does not enter the variable-consideration constraint.
- Payments to a customer reduce price unless they purchase a distinct good or service.
- Any payment above the fair value of a distinct purchase reduces revenue.
4.2 Estimate bonuses, rebates, and penalties
Consideration is variable when the seller's entitlement depends on a future event. Bonuses increase it; rebates, penalties, refunds, credits, and price concessions can reduce it. A customer's valid expectation from customary practices can create variability even when the written price looks fixed.
Choose the method that predicts entitlement
The expected value weights possible amounts by their probabilities and adds the results. It often suits many outcomes or a large population of similar contracts. The most likely amount selects the single most likely outcome and often suits a binary bonus.
| Method | Calculation | Useful setting |
|---|---|---|
| Expected value | Sum of probability-weighted amounts | Several outcomes or many similar contracts |
| Most likely amount | Single most likely amount | Earn or miss one bonus |
Use the method that better predicts the entitlement, consistently for that uncertainty throughout the contract. Separate uncertainties can use different methods. Bring together historical, current, and forecast information reasonably available, including information management uses in pricing bids.
Work the estimates
A contractor can earn a bonus of $0 with 20% probability, $30,000 with 50%, or $60,000 with 30%. The weighted contributions are $0, $15,000, and $18,000. Their sum, $33,000, is the expected value. The estimate need not be an individual possible outcome.
A different contract has a $2,000,000 fixed price and a $150,000 completion bonus judged 70% likely. The most likely bonus is $150,000, giving a $2,150,000 estimate before the constraint. The $105,000 probability-weighted bonus would blur the two outcomes when the most likely amount better predicts this contract.
Estimation is followed by the reversal-risk constraint. A likely bonus does not bypass that separate assessment.
A rebate affects earlier units too
A supplier charges $100 per unit, falling to $90 for every unit bought during the year if annual purchases exceed 1,000. In the first quarter, 75 units sell and the threshold is not expected to be met. Revenue is $7,500.
In the second quarter, purchases of 500 units change the forecast: the threshold is now expected to be exceeded. Apply the $90 price to all 575 units purchased so far. Cumulative revenue becomes 575 × $90 = $51,750. Subtract the first quarter's $7,500 to find second-quarter revenue of $44,250. Equivalently, record $45,000 for current units less a $750 adjustment on the first 75 units. Pricing only the latest units at $90 misses the retrospective rebate.
If the threshold had been expected from the first sale, the initial $7,500 billing would produce $6,750 revenue and a $750 refund liability for the expected rebate.
Update the estimate
A $500,000 contract carries a $20,000 late-delivery penalty. If late delivery is the most likely outcome, estimated consideration is $480,000 before applying the constraint. The penalty changes the selling price; it is not a separate operating expense.
Reassess variable consideration at each reporting date. New circumstances can increase or decrease the transaction price. A reasonable estimate revised for new information is a current-period estimate change, not an error in the earlier accounts.
Key Takeaways
- Variable consideration includes increases and reductions in price, including implied concessions.
- Choose expected value or most likely amount by predictive value, not by which gives more revenue.
- Apply the selected method consistently to each uncertainty.
- A retrospective rebate changes the effective price of earlier units as well as current units.
- Record an expected refund as a liability and reassess estimates each reporting date.
4.3 Limit estimates for the risk of reversal
Estimating variable consideration and including it in the transaction price are two separate decisions. The constraint limits the estimate to the amount for which a significant reversal of cumulative revenue is highly probable not to occur when uncertainty is resolved.
Estimate first, constrain second
Start with expected value or most likely amount. Then test how much can be included. A full estimate can pass, only part can pass, or the entire variable amount can be excluded. The constraint does not replace the estimation method or force the seller to choose the lowest possible outcome in every contract.
IFRS 15 calls the threshold highly probable; ASC 606 calls it probable. These words are intended to express the same constraint threshold. This differs from the collectibility test, where probable has a higher meaning under US GAAP.
Assess likelihood and size together
Consider both the chance that revenue would reverse and the size of that reversal. Judge significance against the contract's cumulative revenue, including fixed and variable consideration. Looking only at the percentage of the bonus that might disappear uses the wrong reference amount.
Risk grows when the entitlement is strongly exposed to outside forces such as market prices, weather, or a third party's decision. A long wait for resolution, limited predictive experience, a history of wide price concessions, and many widely spread outcomes also raise concern. These are evidence to assess, not automatic rules that every uncertain amount must be zero.
A fully constrained bonus
A laboratory earns $500,000 fixed plus $300,000 if a regulator approves the customer's product. The regulator's judgment is outside the laboratory's influence. After considering the available evidence, the laboratory cannot support the conclusion that including the bonus would avoid a significant reversal with the required confidence.
The transaction price is $500,000: none of the $300,000 bonus passes the constraint. Once approval occurs, the uncertainty disappears and the transaction price increases by $300,000. The part allocated to obligations already satisfied becomes revenue immediately; the remainder follows the unsatisfied obligations.
Part of an estimate can pass
An adviser estimates an incentive fee of $0, $100,000, or $200,000 with probabilities of 10%, 40%, and 50%. Expected value is $140,000. Market movements could reduce the eventual fee, but the evidence supports at least $100,000 meeting the constraint. Include $100,000, leaving $40,000 of the estimate out.
The answer is not $140,000 merely because the expected-value calculation was correct. It is also not zero merely because markets remain uncertain. The constraint asks what portion has sufficiently low risk of a significant reversal.
Reassess at each reporting date
Update both the estimate and its constraint using current evidence. An increase allocated to completed work adds current revenue; a decrease allocated to completed work reduces it. Changes assigned to future performance remain attached to that future performance.
Credit risk asks a different question: can and will the customer pay? The constraint asks how much the seller is entitled to under uncertain contract terms. A well-funded customer can owe an uncertain bonus, and an exactly fixed invoice can face credit risk.
Key Takeaways
- Estimate variable consideration before applying the constraint.
- Include only the amount meeting the required confidence against a significant cumulative revenue reversal.
- Assess both likelihood and magnitude using the whole contract’s cumulative revenue.
- Risk factors inform judgment; none is a universal automatic exclusion.
- The IFRS and US GAAP constraint thresholds have the same intended meaning.
- Reassess upward and downward; changes allocated to satisfied obligations affect current revenue.
4.4 Separate revenue from significant financing
A long gap between payment and delivery can mean one party finances the other. Adjust for a significant financing benefit so revenue reflects the cash selling price at transfer. Account for the financing return or cost as interest, even when the contract is described as “interest-free.”
Decide whether financing is present
Consider the difference between the promised amount and cash selling price, the expected time gap, and market interest rates. The one-year practical expedient allows no financing adjustment when, at inception, the expected interval between transfer and payment is one year or less. It is available under both IFRS 15 and ASC 606.
A longer gap requires assessment, not an automatic financing adjustment. No significant financing component arises when advance payment leaves transfer timing at the customer's discretion, when substantial variable consideration depends on events outside both parties' control, or when the price difference serves another purpose proportionate to that purpose. A retention protecting the customer against unfinished work can fall in the last category.
Select and retain the rate
Use the rate a separate financing transaction between these parties would have at contract inception. It reflects the credit characteristics of the party receiving financing. The rate must fit the financed party; a risk-free rate or the seller's borrowing rate may fail that requirement. Keep the inception rate throughout the contract even if market rates or credit conditions later change.
The seller finances the customer
A machine transfers on January 1, Year 1. Its cash selling price is $100,000, with $121,000 payable on December 31, Year 2. The implied annual rate is 10%: $100,000 × 1.10 × 1.10 = $121,000.
| Event | Entry |
|---|---|
| Delivery | Dr Receivable $100,000; Cr Revenue $100,000 |
| Year 1 interest | Dr Receivable $10,000; Cr Interest income $10,000 |
| Year 2 interest | Dr Receivable $11,000; Cr Interest income $11,000 |
| Collection | Dr Cash $121,000; Cr Receivable $121,000 |
The second year's interest uses the $110,000 carrying amount, including the first year's interest. Revenue remains $100,000; the $21,000 financing return is interest income.
The customer finances the seller
A customer pays $400,000 on January 1, Year 1 for equipment delivered on December 31, Year 2. The appropriate annual rate is 6%, and the advance provides significant financing.
Receipt creates Dr Cash $400,000; Cr Contract liability $400,000. In Year 1, record Dr Interest expense $24,000; Cr Contract liability $24,000. In Year 2, interest is 6% of $424,000, or $25,440, producing a $449,440 liability. At delivery, record Dr Contract liability $449,440; Cr Revenue $449,440.
The seller has received financing, so it incurs interest expense and the obligation grows before delivery. Recording interest income here would put the financing direction backward. Present financing interest separately from customer revenue, and recognize it only to the extent a related contract asset, receivable, or contract liability is recognized.
Key Takeaways
- Adjust significant financing so revenue equals the cash selling price at transfer.
- The one-year expedient uses the expected payment-to-transfer interval at inception.
- Long payment gaps may have a commercial purpose other than financing.
- The rate reflects the financed party’s credit and stays fixed at inception.
- Deferred payment can create interest income; advance financing can create interest expense.
- Interest is presented separately from customer revenue.
5Assign the price to the promises
Once the obligations and total transaction price are known, determine how much belongs to each promise. The best starting evidence is what the seller charges for the same item separately in comparable circumstances. Where that evidence is missing, estimate a selling price. Relative prices spread the contract amount, while specific evidence can direct a discount or variable amount to particular obligations.
5.1 Find and estimate separate selling prices
A stand-alone selling price is what the seller would charge a customer for a good or service sold separately. Determine it for each distinct promise at contract inception. The contract's invoice allocation or published list price is evidence to examine, not an automatic answer.
Prefer comparable separate sales
The strongest evidence is an observable separate selling price in similar circumstances to similar customers. A price charged to a different market may need adjustment. Keep the inception prices for this contract; later market-price changes do not trigger reallocation.
When no comparable separate price is observable, estimate one using as many observable inputs as possible. Apply the estimation approach consistently in similar circumstances.
Three useful approaches
| Approach | Basis | Example |
|---|---|---|
| Adjusted market assessment | Price customers in the market would accept | Competitor installation prices adjusted for the seller's service |
| Expected cost plus a margin | Forecast cost plus an appropriate profit margin | Support costs increased by a market-supported markup |
| Residual | Total price less other observable separate prices | A new or highly variably priced item left within a bundle |
For market assessment, competitors charge $3,200 to install comparable printers. The seller's job is less extensive, supporting an estimated $3,000 price. Copying $3,200 without adjusting for the different work would ignore relevant evidence.
For cost plus a margin, annual support is expected to cost $240 and an appropriate margin is 25% on cost. Multiply $240 by 1.25 to obtain $300. Dividing by 0.75 instead would calculate a 25% margin on selling price, a different measure. The margin must suit the service and its market; it is not simply whichever markup gives the preferred allocation.
Residual estimation has conditions
The residual approach can be used when the item's selling price is highly variable or uncertain. Highly variable means separate sales occur across a broad range of prices. Uncertain means no price has yet been established and the item has not previously been sold separately. Lack of an observable price alone does not make every item eligible.
A $1,000 bundle contains A with an observable separate price of $600, B at $250, and a new item C with no established price or prior separate sale. Estimate C at $1,000 − $600 − $250 = $150, provided this reasonably represents its separate selling price.
Check the result against the item's economic value. A zero or trivial residual for a valuable item signals that the calculation fails to give a faithful estimate. If two eligible items share a residual amount, another appropriate method can split that amount between them.
Keep estimation separate from allocation
Estimating a stand-alone selling price creates an input to allocation; it does not normally decide revenue by itself. A service with a $300 separate selling price can receive less than $300 in a discounted bundle. First estimate all needed prices, then allocate the measured transaction price using the relative amounts and any supported allocation exception.
Key Takeaways
- Determine stand-alone selling prices at inception using comparable separate sales where observable.
- Contract and list prices are not presumed to be stand-alone selling prices.
- Estimate using market assessment, cost plus a margin, or an eligible residual approach.
- A margin on cost differs from a margin on selling price.
- Residual estimation requires a highly variable or uncertain selling price and a reasonable result.
5.2 Allocate discounts, variable amounts, and price changes
Allocation attaches consideration to the goods or services promised. Each obligation should receive the consideration expected for transferring it. The general method uses the relative stand-alone selling prices determined at inception.
Allocate in proportion
For each obligation, multiply the transaction price by its stand-alone selling price divided by the total stand-alone selling prices. Products A, B, and C sell separately for $50,000, $25,000, and $75,000. Their total is $150,000; the bundle price is $100,000.
| Item | Relative share | Allocation |
|---|---|---|
| A | 50,000 ÷ 150,000 | $33,333.33 |
| B | 25,000 ÷ 150,000 | $16,666.67 |
| C | 75,000 ÷ 150,000 | $50,000.00 |
The allocations sum to $100,000. The $50,000 discount is spread proportionately. A single obligation normally needs no split, although variable amounts within a series may relate to specific distinct periods.
Direct a discount only with evidence
Allocate a discount entirely to selected obligations only when all three conditions hold: the seller regularly sells each item separately; it regularly sells a subset as a discounted bundle; and that bundle's discount is substantially the same as the full contract's discount, with observable evidence identifying where the discount belongs.
A, B, and C separately sell for $40, $55, and $45. The contract price is $100, a $40 discount. The seller regularly sells A alone for $40 and B plus C for $60. The evidence places the $40 discount on B and C. Allocate $40 to A, then split $60 between B and C in their 55:45 ratio: $33 and $27.
Allocate such a specific discount before applying a residual approach to another item. Neither the highest margin nor the largest invoice line justifies assigning the discount to one item.
Direct variable consideration when both tests hold
A variable amount can go entirely to one obligation, or one distinct service in a series, when its terms relate specifically to that effort or outcome and the allocation is consistent with the overall objective.
Equipment sells for $40,000, its separate price. Training costs $10,000 plus a $2,000 certification bonus; training's separate price is $12,000. Once the bonus is includable, assigning it entirely to training leaves both obligations at their separate prices and reflects the training outcome. A clause naming training establishes the connection, but the allocation objective must also be satisfied.
Later price changes retain the original basis
If a contract allocated 60% to delivered equipment and 40% to future services, a later $10,000 price increase generally gives $6,000 to equipment and $4,000 to services. Record the equipment portion as current revenue because its obligation is satisfied. The service portion becomes revenue with future service.
Use inception selling prices even if today's separate prices have changed. Apply the specific-variable-allocation exception when its conditions hold. An approved modification changes the analysis: first use the modification rules instead of treating every approved price change as an ordinary revised estimate.
Key Takeaways
- Allocate price using each obligation’s share of total inception stand-alone selling prices.
- Check that allocations add back to the transaction price.
- Direct a discount to selected obligations only when all three evidence conditions hold.
- Allocate a qualifying specific discount before a residual estimate.
- A variable amount needs a specific link and consistency with the allocation objective.
- Later estimate changes follow the inception basis and affect current revenue for satisfied obligations.
- Apply modification accounting to approved changes in enforceable scope or price.
6Work a complete contract and compare frameworks
A complete case requires the decisions to fit together: the identified promises determine what needs a separate price, and the measured contract amount determines what can be allocated. Use an equipment bundle to connect those decisions to customer balances and entries. Then compare IFRS 15 with ASC 606, keeping shared requirements separate from differences in thresholds, elections, and measurement guidance.
6.1 A printer, installation, and support
On March 1, 2027, a printer maker agrees to deliver an industrial printer on March 15, install it by March 20, and provide support from March 15, 2027 through March 14, 2028. The $54,000 price is payable on delivery. The print shop has a good payment record.
Establish the contract and its promises
The written agreement demonstrates approval and commitment. Printer, installation, and support rights are identified, payment terms are clear, the contract changes expected cash flows, and collection is probable. All five contract criteria are met.
Routine installation can be bought from another firm and does not modify the printer. Support is separately useful. The customer can benefit from each with readily available resources, and the promises are separately identifiable. There are three obligations.
The fixed $54,000 needs no variable-consideration estimate. Payment partly precedes support, but every part of support transfers within one year of the March 15 payment. Applying the financing practical expedient leaves the transaction price at $54,000.
Determine the selling prices
The maker separately sells the printer for $48,000. Competitors charge $3,200 for a slightly more extensive installation, supporting an adjusted market estimate of $3,000. Support is expected to cost $7,200. A suitable 25% margin on cost gives $7,200 × 1.25 = $9,000.
The total stand-alone selling prices are $60,000. The contract has a $6,000 discount, or 10%. No evidence assigns that discount specifically, so allocate it proportionately.
| Obligation | Calculation | Allocation |
|---|---|---|
| Printer | $54,000 × 48,000 ÷ 60,000 | $43,200 |
| Installation | $54,000 × 3,000 ÷ 60,000 | $2,700 |
| Support | $54,000 × 9,000 ÷ 60,000 | $8,100 |
The $54,000 total now has three destinations. The support's $9,000 estimated selling price is an allocation weight, not the support revenue amount.
Connect allocation to entries
At printer delivery, control of the printer transfers. Record Dr Cash $54,000; Cr Revenue $43,200; Cr Contract liability $10,800. Installation and support remain owed.
When routine installation is completed on March 20, record Dr Contract liability $2,700; Cr Revenue $2,700. Support revenue over each full month is $8,100 ÷ 12 = $675: Dr Contract liability $675; Cr Revenue $675. Partial-period cutoffs would follow the actual service period.
Change the facts and revisit the affected step
Suppose installation significantly customizes the printer. The promise becomes a combined installed printer. Estimate a stand-alone selling price for that combined obligation before allocating. If its supported estimate is $51,000 and support remains $9,000, the combined obligation receives $54,000 × 51,000 ÷ 60,000 = $45,900. That amount follows satisfaction of the combined promise; physical delivery alone does not justify the earlier $43,200 revenue entry.
If the $54,000 is instead paid two years after delivery, the one-year expedient no longer applies. Assess the financing benefit and, if significant, measure consideration at the cash selling price and recognize the financing return separately as interest. Reusing the original $54,000 transaction price without that assessment would skip a changed measurement fact.
Key Takeaways
- The printer case has three distinct obligations and a $54,000 transaction price.
- Observable, market-based, and cost-plus selling prices can be used within one contract.
- Allocate $43,200 to the printer, $2,700 to installation, and $8,100 to support.
- Cash for unperformed promises remains a contract liability.
- Significant customization changes the obligation and requires a supported combined selling price.
- Changed payment timing can require a financing assessment.
6.2 Shared model, different thresholds and elections
IFRS 15 and ASC 606 share the core principle and five steps. Most contracts reach the same answer, but a difference in a threshold, election, or measurement rule can change the result. Identify the framework before deciding an edge case.
Two meanings of probable
| Issue | IFRS 15 | ASC 606 |
|---|---|---|
| Collectibility | Probable means more likely than not | Probable means likely to occur, a higher threshold |
| Variable-consideration constraint | Highly probable no significant reversal | Probable no significant reversal, with the same intended threshold as IFRS |
A customer of doubtful credit can therefore pass the IFRS contract test but fail US GAAP. Do not extend that difference to the constraint: its differently worded thresholds are intended to converge.
Cash received when the contract test fails
Both frameworks permit revenue when no obligations remain, substantially all consideration has been received and is nonrefundable, or when the contract is terminated and cash received is nonrefundable. ASC 606 adds a third event: control of the relevant goods or services has transferred, the seller has stopped transfers with no obligation to provide more, and consideration received is nonrefundable. A nonrefundable receipt by itself is insufficient.
Contract-level choices under US GAAP
ASC 606 explicitly permits the seller not to assess promises immaterial in the context of the contract. IFRS 15 has no parallel statement; the general financial-statement materiality concept applies.
ASC 606 also permits a policy election to treat shipping and handling after the customer obtains control as a fulfillment activity. IFRS 15 has no such election. A distinct post-control shipping service under IFRS therefore receives part of the transaction price as a performance obligation.
For qualifying sales and similar taxes collected from customers, ASC 606 permits an exclusion election. IFRS 15 requires analysis of whether a tax is collected for a government or is the seller's own cost.
Noncash amounts and customer awards
ASC 606 measures noncash consideration at fair value at contract inception. IFRS 15 does not specify the measurement date. In both, distinguish variability caused only by the form of the consideration from performance-related variability; a changing share price is different from a changing number of shares earned.
Equity instruments granted to a customer fall under ASC 718 measurement, using a grant-date fair-value-based measure. ASU 2025-04 clarifies that the variable-consideration constraint does not apply to these awards; vesting probability follows ASC 718. The amendments apply for annual periods beginning after December 15, 2026, including interim periods within them, with early adoption permitted. IFRS has no corresponding specific rule for share-based consideration payable to a customer; relevant standards must be considered together.
Requirements that remain shared
Both frameworks permit the one-year financing expedient and the portfolio approach, use the same contract-modification treatments, and generally allocate by relative inception selling prices. “Stand-alone selling price” in IFRS and “standalone selling price” in ASC 606 describe the same concept.
Key Takeaways
- The five steps and most requirements are shared.
- Collectibility has a higher probable threshold under US GAAP; the constraint has the same intended threshold.
- ASC 606 adds a revenue event for certain nonrefundable receipts when the contract criteria fail.
- US GAAP has specific guidance or elections for immaterial promises, post-control shipping, and qualifying taxes.
- ASC 606 fixes noncash measurement at inception; IFRS 15 does not specify the date.
- Customer equity awards follow ASC 718, including the ASU 2025-04 clarification and its effective date.
- Modifications, relative allocation, and the one-year financing expedient generally operate the same way.
Five-Step Revenue Model examples
1Follow a sale from promise to revenue
12 steps
- 1IntroductionStart with what was promised
A seller can collect cash today and owe service for months. To explain the accounting, follow the promised goods and services, not just the bank account. You will first decide whether an inflow is customer revenue, then use a machine-and-maintenance bundle to connect the five steps to revenue and customer balances.
- 2ExplanationRevenue is one kind of income
Revenue comes from ordinary activities. A car dealer earns revenue when it sells cars. Profit on selling its old office building is a gain, another kind of income.
The core principle measures revenue at consideration expected for transferring promised goods or services to a customer. Control passing to that customer is the recognition trigger; collecting cash can happen on another date.
- 3ExampleFind the customer
A manufacturer buys a laboratory’s ordinary testing service. It is a customer because it obtains an output in exchange for consideration.
Two laboratories developing a new testing method together and sharing costs, risks, and benefits are collaborators for that work. The relationship matters: receiving money from another entity does not establish that it bought an ordinary output.
- 4ConnectionCheck the applicable standard
Leases, insurance contracts, and financial instruments follow their own standards. A machine lease bundled with maintenance can therefore need more than one standard: apply the lease standard’s separation and measurement rules first, then the revenue model to the service.
A same-business nonmonetary fuel swap to facilitate sales is also excluded. Later sales of that fuel to external customers are different transactions.
- 5ChallengeClassify an advance
A repair business receives $600 for service it will provide next month. No service has yet transferred. Does the cash create revenue now?
---reveal---
No. It creates a contract liability because the business still owes the promised repair service. The receipt increases cash and the obligation to the customer; revenue follows transfer of the service, not the payment date.
- 6ExplanationGive each step its own job
The model makes five decisions in order:
- Identify the contract.
- Identify its performance obligations.
- Determine the transaction price.
- Allocate that price to the obligations.
- Recognize revenue as obligations are satisfied.
The first four identify and measure the promises. The fifth attaches the allocated amounts to the periods when control transfers.
- 7ExampleSet up the bundle
On January 1, a retailer delivers a coffee machine and begins 24 months of maintenance for $1,600 paid immediately. Separate prices are $1,500 for the machine and $500 for maintenance. The contract qualifies and the promises are distinct.
The seller assesses the advance and concludes it provides no significant financing benefit. The one-year expedient cannot cover a service period longer than a year; this case uses the assessment.
- 8ExampleAllocate the $1,600
The separate-price total is $1,500 + $500 = $2,000. The machine carries 75% of that total and maintenance 25%.
Allocate $1,600 × 75% = $1,200 to the machine, and $1,600 × 25% = $400 to maintenance. The allocations add to the $1,600 price. The discount follows relative separate prices; neither the invoice label nor which item was delivered first determines its allocation.
- 9ExampleRecord only the earned portion
Delivery satisfies the machine obligation, so record Dr Cash $1,600; Cr Revenue $1,200; Cr Contract liability $400.
Even maintenance transfers over 24 months. Each month releases about $16.67 from the liability to revenue, with final rounding adjusted to make the total $400. The liability is the remaining performance owed for money already received.
- 10Key InsightSeparate an asset from a receivable
After transferring a deliverable, a seller may still need to deliver another item before its payment right is unconditional. The earned amount is then a contract asset.
Once only time remains before payment is due, it is a receivable. The defining issue is the condition attached to the right, not whether a billing clerk has sent an invoice. A contract liability points the other way: the seller still owes performance.
- 11ChallengeConnect the steps and balances
A seller transfers part A carrying $2,400 of allocated price. Its right to payment remains conditional on delivering part B. What is the entry for part A, and which step supplies its timing?
---reveal---
Dr Contract asset $2,400; Cr Revenue $2,400. Step 5 supplies recognition timing because part A has transferred. The payment condition makes the earned right a contract asset, not an unconditional receivable.
- 12RecapUse three questions at a cutoff
At a reporting date, ask what has transferred, how much price belongs to it, and what conditions remain on payment. Those questions identify earned revenue, future performance liabilities, and conditional or unconditional customer rights.
2Decide what contract to account for
14 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionRead the enforceable arrangement
- 2ExplanationApply the five criteria
- 3ExampleTest the expected entitlement
- 4TipFind the enforceable term
- 5ExplanationCash while the criteria fail
- 6ChallengeSeparate concession and credit loss
- 7ConnectionSeveral agreements can be one contract
- 8ExplanationFirst test a separate contract
- 9ExampleA lower added price changes the result
- 10ExamplePool only what remains
- 11ExampleUpdate one partly satisfied output
- 12Key InsightRecord the catch-up
- 13ChallengeChoose the treatment and protect past revenue
- 14RecapFollow the modification decision order
3Find outputs behind contract labels
13 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionList what the customer receives
- 2ExplanationFirst test customer benefit
- 3ExplanationThen identify the actual promise
- 4ExampleRoutine installation leaves separate outputs
- 5ChallengeChange installation into customization
- 6ConnectionRepeated service can be one series
- 7Key InsightAn internal setup task transfers nothing
- 8ExplanationLook for an incremental option benefit
- 9ExampleEstimate the voucher’s separate price
- 10ExampleAllocate today’s price to tomorrow’s right
- 11ConnectionApply the same idea to points
- 12ChallengeDistinguish a free good from setup
- 13RecapTest the output, then the grouping
4Build the transaction price
20 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionStart from expected entitlement
- 2ExampleExclude third-party collections
- 3ExplanationMeasure shares received
- 4ChallengePaying a customer can reduce revenue
- 5ExplanationChoose a predictive estimation method
- 6ExampleCalculate an expected bonus
- 7ExampleA rebate revises past units
- 8ChallengeDiagnose the missing rebate adjustment
- 9Key InsightEstimate, then constrain
- 10TipRead the risk evidence
- 11ExampleAllow only the supported portion
- 12ChallengeSeparate entitlement from ability to pay
- 13ExplanationFind the financing benefit
- 14ExampleMeasure a deferred sale
- 15ExampleAccrue interest on the growing receivable
- 16ConnectionTurn the financing direction around
- 17TipChoose the financed party’s rate
- 18ChallengeCheck a protective retention
- 19ChallengePut the measurement decisions together
- 20RecapKeep the measurement questions separate
5Estimate selling prices and allocate a bundle
13 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionBuild weights before allocating
- 2ExplanationPrefer observable separate sales
- 3ExampleUse market and cost evidence
- 4ChallengeCheck residual eligibility
- 5ExampleCalculate the relative shares
- 6TipReconcile after rounding
- 7ExplanationAsk for all discount evidence
- 8ExampleAllocate the subset’s discount
- 9Key InsightA bonus can belong to one promise
- 10ChallengeUse the inception basis for an estimate change
- 11Key InsightDo not accept a meaningless residual
- 12ChallengeDistinguish estimation from allocation
- 13RecapFollow the allocation order
6Complete the printer case and compare standards
16 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionConnect the four decisions
- 2ExampleEstablish the case
- 3ExplanationIdentify three distinct promises
- 4Key InsightMeasure the fixed consideration
- 5ExampleFind all three selling prices
- 6ExampleSpread the 10% discount
- 7ExampleEnter the delivered printer
- 8ChallengeRevisit a customized promise
- 9ConnectionCompare the two probable tests
- 10ExplanationA failed contract can produce different cash accounting
- 11TipIdentify the US policy elections
- 12ChallengeRead the noncash measurement date
- 13ExplanationCustomer equity awards follow ASC 718
- 14Key InsightKeep shared requirements shared
- 15ChallengeChange payment timing and choose the next step
- 16RecapTrace the result to its decision
Five-Step Revenue Model practice questions
Set 1: Contracts, promises, and customer balances10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Contract changes and future purchase rights10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Variable prices, constraints, and financing10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Selling prices and complete bundle cases10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Framework differences and mixed decisions10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Accounting policy election
Adjusted market assessment approach
Allocated consideration
Allocation objective
ASC 606
ASC 718
B
Bundle discount
C
Cash selling price
Collectibility
Commercial substance
Consideration payable to a customer
Contract
Contract asset
Contract combination
Contract liability
Contract modification
Control
Credit loss
Cumulative catch-up
Cumulative revenue
Customer
D
Distinct good or service
E
Enforceable contract term
Expected cost plus a margin approach
Expected value
F
Fair value
Five-step model
Fixed-price contract
G
Grant-date fair-value-based measure
I
IFRS 15
Implicit price concession
Inception discount rate
Incremental discount
Interest accretion
L
Loyalty points
M
Margin on cost
Material right
Most likely amount
N
Noncash consideration
Nonrefundable upfront fee
O
One-year financing expedient
P
Performance obligation
Portfolio approach
Prospective treatment
R
Readily available resource
Reassessment
Receivable
Refund liability
Relative allocation
Residual approach
Retrospective volume rebate
Revenue
S
Separate-contract treatment
Series
Setup activity
Significant customization
Significant financing component
Significant integration service
Significant revenue reversal
Specific discount allocation
Stand-alone selling price
T
Third-party collection
Transaction price
Transaction-price change
V
Variable consideration
Variable-consideration constraint
About this lesson
Make your own Study Materials
Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.