Enterprise Systems and Implementation
BeginnerLesson 4 of 7 in Management Information Systems Course
What you will learn
- Describe how business processes run across departments, and how an ERP system supports them with shared data and integrated modules.
- Follow a business process across departmentsDefine business processes and functional silos, trace order-to-cash and procure-to-pay, and explain what changes when departments share one set of data.
- Explain what an ERP system does and what it demandsDescribe the modules and shared database of ERP, how built-in best practices and configuration work, the deployment options, and the benefits and challenges of ERP.
- Follow a business process across departments
- Explain how CRM systems support sales, marketing and customer service, and how firms use customer data to measure and grow customer value.
- Describe how CRM supports sales, marketing and serviceExplain the customer view a CRM system builds, its sales, service and marketing functions, and the difference between operational and analytical CRM.
- Measure customer value with CRM dataCalculate churn rate, acquisition cost, customer lifetime value and a weighted sales forecast, and use them to decide where to invest in customers.
- Describe how CRM supports sales, marketing and service
- Explain how information systems plan and run the flow of goods, information and money from suppliers to customers, and how enterprise applications connect inside and beyond the firm.
- Describe the supply chain and the bullwhip effectDescribe the parts and flows of a supply chain, the trade-off between inventory and service, and how distorted information causes the bullwhip effect.
- Explain how SCM systems plan and run the supply chainDistinguish supply chain planning from execution systems, compare push and pull models, and measure supply chain performance.
- Connect enterprise applications inside and beyond the firmExplain how ERP, CRM and SCM systems exchange data through interfaces, middleware, APIs and shared master data, and how they reach suppliers and partners.
- Describe the supply chain and the bullwhip effect
- Describe the activities of systems development, compare development approaches, and choose between building, buying, subscribing and outsourcing.
- Describe the activities of systems developmentExplain systems analysis, requirements, design, programming, testing, conversion and maintenance, and the role of business users in each.
- Choose a development approachCompare the traditional life cycle, prototyping, rapid and agile development, DevOps and end-user development, and match an approach to the situation.
- Decide whether to build, buy, subscribe or outsourceCompare in-house development, software packages, software as a service and outsourcing, and use fit-gap analysis to decide between changing the process and changing the software.
- Describe the activities of systems development
- Estimate the costs and benefits of an information system, evaluate the investment with standard financial measures, and choose among projects and vendors in a structured way.
- Identify and estimate costs and benefitsEstimate the total cost of ownership of a system, distinguish tangible from intangible benefits, and put money values on expected benefits.
- Evaluate the investment with payback, ROI and NPVCalculate the payback period, return on investment and net present value of a system investment, test the result with sensitivity analysis, and know the limits of these measures.
- Select projects and vendors in a structured wayLink projects to strategy, balance a portfolio of projects by benefit and risk, compare options with a weighted scoring model, and run a vendor selection.
- Identify and estimate costs and benefits
- Plan the conversion to a new system, manage the organizational change it brings, and recognize and control the risks that make IT projects fail.
- Plan the conversion and go-livePrepare data, users and the cutover, choose among parallel, direct, pilot and phased conversion, and support the system after go-live.
- Manage the organizational change a system bringsExplain the kinds of organizational change systems bring, apply the Lewin, Kotter and ADKAR models, and use user involvement and management support to overcome resistance.
- Explain why IT projects fail and control the risksName the forms and common causes of IT project failure, assess project risk by size, structure and technology experience, and choose ways to reduce it.
- Plan the conversion and go-live
Enterprise Systems study guide
1Explain how enterprise systems integrate business processes
An order moves through sales, operations and finance before the customer pays. Following that work exposes the hand-offs where separate records create delays and errors. Shared enterprise data links those events, while ERP brings core processes into an integrated set of modules. Understanding those links makes it easier to judge both ERP benefits and the process, data and people changes needed to achieve them.
1.1 Follow the work from order to payment
A customer experiences one order, even when several departments handle it. A business process is a linked set of activities that turns inputs into a useful result. A cross-functional process crosses department boundaries, where a missed message can interrupt the whole job.
Follow two common processes
Order-to-cash begins with a customer order. Sales records the request, finance checks credit, and operations checks available stock or production capacity. The warehouse picks and packs the goods, logistics ships them, and finance invoices and collects payment. Shipping completes a delivery; collecting payment completes the wider process.
Procure-to-pay starts when someone needs goods or services. A request is approved, purchasing issues a purchase order, receiving records the delivery, and accounts payable checks the invoice before payment. A three-way match compares the purchase order, goods receipt and supplier invoice. Agreement shows that the organization ordered the goods, received them and was billed consistently. A mismatch needs investigation before payment.
See what goes wrong in silos
A functional silo is a department operating with its own records and systems. Customer names, item codes and quantities may differ across those records. Staff bridge the gaps with email, spreadsheets and repeated typing. Each hand-off can create delay or a new error.
Consider a distributor that accepts an order for 500 units. Sales emails the order to the warehouse, whose separate stock list shows only 300. The warehouse ships those 300. Two days later, finance receives a spreadsheet and bills for 500. The 200-unit difference is not simply an invoicing mistake: the process failed to carry the actual shipment quantity across departments.
Follow the same order through shared records
With integrated records, sales sees the 300 units available while taking the order. It promises those now and the remaining 200 later. Posting the first shipment reduces inventory and supports an invoice for exactly 300 units. Finance sees the amount owed without re-entering the order.
Integration means data entered once becomes available to the processes that need it, and transactions update related records automatically. The important link is between business events and their effects. An accepted order, a shipment and a payment are different events and must keep their own status.
Enterprise applications support these links across the organization. Enterprise resource planning (ERP) links core internal transactions. Customer relationship management (CRM) supports customer-facing work, and supply chain management (SCM) coordinates supply and delivery, including partners. Knowledge management systems support sharing organizational knowledge.
Shared data also spreads errors. If a clerk enters the wrong customer address, several departments may use it immediately. Clear ownership, checks and a sensible process still matter. A department is a group of people; a process is the work flowing between people and groups.
Key Takeaways
- A process follows a result across department boundaries.
- Order-to-cash ends with collected payment.
- Procure-to-pay checks the order, receipt and invoice before payment.
- Integration links business events to consistent updates.
- Shared records need clear ownership and input checks.
1.2 Connect core work with ERP
Enterprise resource planning (ERP) brings core business processes into integrated software modules that share a common database. Finance is one module among several: ERP also covers purchasing, inventory, production, sales, distribution and human resources, including payroll.
Follow one transaction through the modules
When a warehouse posts a shipment of 300 units, the record can reduce inventory, record the cost of goods sold, create the customer invoice and accounts receivable entry, and update sales reports. These are connected views of one business event. Staff do not each type a separate version of the shipment.
This connection gives managers current, consistent information. It can speed month-end closing, standardize work across sites and make inventory and orders visible across the firm. Those benefits depend on departments using agreed processes and maintaining the shared data.
Decide what to change
ERP packages contain reference processes, often called best practices. An implementation compares the firm's current work with these standard processes. Employees may need different approval paths, responsibilities or ways of recording transactions.
| Choice | What changes | Example | Consequence |
|---|---|---|---|
| Configuration | Built-in settings and workflows | Set purchase approval limits | Stays within the supported package design |
| Customization | Program code or added code | Build a special pricing routine | Adds testing and upgrade work |
A firm should ask why a requested difference matters before writing code. Heavy customization costs money now and again when an upgrade requires the code to be checked or rewritten. Installing software without fixing a poor approval process simply lets the poor process operate through new screens.
Choose a deployment arrangement
On-premises ERP runs on servers the firm controls; its staff or a provider maintains it. Cloud ERP runs on cloud infrastructure. A common cloud arrangement is software as a service (SaaS): the vendor operates the application, supplies updates and charges a subscription. Cloud hosting and SaaS are related choices, but cloud infrastructure alone does not define the software's ownership or operating responsibilities.
Two-tier ERP combines a main headquarters system with a simpler system in subsidiaries. Links between the tiers support consolidated reporting. This can give small sites a manageable application while keeping their results visible centrally.
Budget for the organizational demands
Costs include software, consultants, employee project time, data conversion and training. Large implementations commonly take many months to several years. Teams must agree common processes, cleanse old records and prepare people for changed jobs.
Vendor lock-in arises when processes, data and skills become closely tied to one supplier. Moving later creates switching costs and disruption. Compare exit arrangements as well as initial fit. Product families include SAP S/4HANA, Oracle Fusion Cloud ERP, Microsoft Dynamics 365 and Infor; lighter options include Oracle NetSuite and Odoo. Industry versions adapt standard processes to particular sectors.
Key Takeaways
- ERP connects finance with operations and other core functions.
- Configuration uses supported settings; customization changes or adds code.
- Cloud describes infrastructure; SaaS describes vendor-operated subscription software.
- Two-tier ERP links headquarters and subsidiary systems.
- Process changes, data work and training determine value.
- Switching costs make exit planning part of selection.
2Manage customer relationships with CRM systems
Customer relationships develop across purchases, questions, service cases and marketing contacts. Connecting those contacts helps employees choose a useful next action and gives managers evidence about value. CRM combines this daily work with analysis of retention, acquisition spending and expected sales. The calculations depend on consistent periods, reliable customer records and a clear distinction between revenue and margin.
2.1 Use a shared customer record
Customer relationship management (CRM) combines a strategy for attracting and keeping profitable customers with systems that support the work. A touchpoint is a contact with the firm, such as a call, store visit, purchase, email or support chat. Each contact adds context to the relationship.
Build a useful customer view
Without a shared record, a service agent may not see an unresolved complaint or a waiting order. A CRM system combines contact details, purchase history, open orders, cases and campaign responses into a 360-degree view. The phrase means a joined view across channels; its usefulness depends on what employees record and keep current.
Three groups of daily functions use that record:
- Sales force automation (SFA) manages contacts, leads and opportunities. A lead is a possible customer; an opportunity is a potential deal tracked through stages such as qualification, proposal, negotiation and won or lost. This sales pipeline supports follow-up, quotes and forecasts.
- Service manages cases or tickets, assigns work and escalates unresolved problems. Call centers, chat, self-service portals and a knowledge base help customers get answers. First-contact resolution measures the share solved at the first contact; resolution time tracks how long cases take.
- Marketing organizes campaigns and customer segments. Cross-selling offers a related product, such as a keyboard with a tablet. Up-selling offers a higher-value version, such as a larger storage plan.
Separate running the work from analyzing it
| CRM focus | Main job | Example |
|---|---|---|
| Operational | Run sales, service and marketing activities | Assign a service ticket |
| Analytical | Analyze customer records to support decisions | Identify customers likely to cancel |
| Collaborative | Share customer information across teams or partners | Give a reseller relevant account information |
Operational CRM creates much of the data that analytical CRM studies, often through a warehouse or analytics platform. Analysis may reveal a pattern; staff then need a process for acting on it.
Follow a customer across channels
A customer leaves a laptop in an online cart and calls the next day. The agent sees the cart and purchase history, answers the question and records the outcome. Once the purchase is logged, marketing can stop sending laptop acquisition messages to that customer. The benefit comes from connecting the next action to the latest record.
Now suppose the agent resolves a complaint but leaves the case open. Another employee may contact the customer about a problem already solved. More software features will not repair that missing update. Clear responsibilities, convenient screens and trust in the record help employees maintain it.
Staff may resist CRM if they see it mainly as surveillance or extra administration. Involving them in the design helps make the record useful in their own work. Customer data must also be collected and used lawfully, respecting applicable privacy rules and the consent customers have given.
Key Takeaways
- CRM joins customer strategy with sales, service and marketing work.
- Operational CRM runs interactions; analytical CRM studies their data.
- A pipeline tracks opportunities through sales stages.
- Cross-selling adds a related product; up-selling moves to a higher-value version.
2.2 Calculate customer value and expected sales
Customer counts alone do not show whether customer relationships are profitable. CRM data supports measures of loss, acquisition spending, expected margin and future sales. Keep the period and population consistent before comparing any rates.
Calculate churn and acquisition cost
Churn rate is customers lost during a period divided by customers at its start. Starting with 2,000 subscribers and losing 300 gives 15% annual churn. The retention rate of that starting group is 85%. New subscribers do not belong in its starting denominator.
Customer acquisition cost (CAC) divides marketing and sales acquisition spending by new customers won. Spending $60,000 to acquire 400 customers gives $150 each. Use spending and customers from a matching period; dividing by the entire customer base would understate the cost of winning new business.
Estimate the relationship's margin
Customer lifetime value (CLV) estimates margin across the relationship. In a simple model with constant annual churn, expected lifetime is 1 divided by churn expressed as a decimal. Multiply that lifetime by annual margin, which is revenue less the direct costs of serving the customer.
With $120 annual margin and 20% churn:
- Convert 20% to 0.20.
- Expected lifetime is 1 ÷ 0.20 = 5 years.
- CLV is $120 × 5 = $600.
- Subtract the $150 acquisition cost to obtain $450 beyond the cost of winning the customer.
The $600 estimate is undiscounted and does not deduct acquisition cost. Discounting future margins would lower their present value. Comparing CAC only with one year's margin misses later years of the relationship.
If churn falls to 15%, lifetime becomes about 6.7 years and CLV becomes $120 ÷ 0.15 = $800. Holding margin constant, retaining customers raises expected value. A retention program still needs its own cost and evidence that it changes behavior.
Weight the pipeline
A weighted pipeline forecast multiplies each deal value by its estimated closing probability, then adds the amounts. For deals of $50,000 at 20%, $30,000 at 50% and $20,000 at 90%, the contributions are $10,000, $15,000 and $18,000. Expected sales total $43,000.
This is an expectation across uncertain outcomes. A specific deal will not close for its probability-weighted amount. Outdated stages or optimistic probabilities make the total unreliable.
Choose useful segments
Segmentation groups customers with similar behavior or value so that service and marketing can fit them. RFM analysis considers recency, frequency and monetary value: how recently customers bought, how often they buy and how much they spend. A recent, regular buyer calls for a different action from someone who purchased once years ago. High spending is useful evidence, but serving costs still matter when estimating profit.
Key Takeaways
- Churn uses the customer count at the start of the period.
- CAC divides acquisition spending by new customers won.
- Simple CLV uses margin and expected lifetime, with constant churn.
- Lower churn raises simple CLV when margin stays constant.
- Pipeline forecasts weight deal values by closing probabilities.
- RFM groups customers by recency, frequency and monetary value.
3Coordinate the supply chain with SCM systems
Products reach customers through a network of suppliers, internal operations and delivery partners. Each participant makes decisions from information that may be late or incomplete. Shared supply chain systems help coordinate plans and daily execution, while links among applications carry orders and status updates. Following those signals explains demand swings, inventory trade-offs and the importance of consistent data meanings.
3.1 Explain how demand swings grow upstream
A supply chain is a network of organizations and processes that obtains inputs, transforms them and delivers products to customers. Upstream means suppliers and their suppliers. Internal processes transform inputs within the firm. Downstream includes distributors, retailers and customers.
Trace the three flows
Products and materials move mainly downstream; returns move upstream. Money moves mainly upstream as customers pay sellers and sellers pay suppliers. Information moves both ways: orders and forecasts travel toward suppliers, while availability and shipment updates travel toward customers. Supply chain management (SCM) systems manage information that helps coordinate the other flows.
The aim is the right product, place and time at the lowest total cost. These aims can conflict. More inventory protects service but uses cash and warehouse space. Less stock reduces carrying costs but can leave customers waiting. Safety stock is extra inventory held against uncertain demand or deliveries. Better forecasts and dependable supplier dates can support the same service with a smaller buffer.
Follow a demand signal
The bullwhip effect occurs when demand changes grow larger as orders move upstream. Imagine that every stage normally orders 100 units a week. Consumers then buy 110, an increase of 10%.
- The retailer expects growth and adds a buffer, ordering 130 units: 30% above normal.
- The wholesaler sees that order increase and orders 170: 70% above normal.
- The manufacturer schedules 220: 120% above normal.
The consumer increase was small. Each stage reacted to the next stage's orders and added its own response. When consumer demand returns to 100, the chain holds excess stock and cuts orders, producing a swing in the other direction.
Identify what amplifies the signal
Forecasting only from a customer's orders hides the end consumer's actual demand. Large order batches turn smooth consumption into uneven purchases. Promotions encourage customers to buy early and hold stock. During shortages, buyers may inflate orders to secure a larger allocation and cancel the excess later. Long lead times give each distortion more time to affect plans.
These actions need not come from careless managers. A buyer can make a reasonable local decision while helping create an unstable chain. Adding stock everywhere treats the symptom and can increase the later surplus.
Improve the shared information
Sharing point-of-sale data lets suppliers see consumption instead of interpreting only replenishment orders. Shared forecasts and current inventory data reduce conflicting assumptions. Smaller, more frequent orders reduce batch swings. With vendor-managed inventory, the supplier monitors the customer's stock and handles replenishment.
These arrangements need accurate records and clear responsibilities. If a supplier sees an old stock balance as current, the shared feed can still produce the wrong replenishment. Useful visibility includes knowing when information was last updated.
Key Takeaways
- Materials, information and money follow different paths through a supply chain.
- Inventory decisions balance cost with customer service.
- The bullwhip effect amplifies demand changes upstream.
- Batching, promotions, shortage gaming and delay distort orders.
- Shared consumption and inventory data improve replenishment decisions.
3.2 Plan supply, run deliveries and measure service
Supply chain systems support both decisions about future work and the execution of today's work. A good forecast does not move a parcel, and a well-run warehouse cannot correct every mistake in the product plan.
Separate planning and execution
| System focus | Decisions or activities | Examples |
|---|---|---|
| Planning | What, how much, when and where | Demand forecasts, production and inventory plans, network design |
| Execution | Carry out and track physical flows | Receiving, picking, shipping, procurement and transportation |
A warehouse management system (WMS) tracks storage locations and guides receiving, picking, packing and shipping. A transportation management system (TMS) plans loads and routes and follows shipments. Order and procurement systems coordinate the related requests and purchases.
Decide what triggers production
A push system produces to a forecast and moves stock toward customers. A pull system starts production or replenishment when a customer order or downstream consumption triggers it. A hybrid can make standard parts to forecast and assemble a customer's chosen product after an order arrives.
Just-in-time (JIT) delivery brings materials when needed, keeping little inventory. It relies on dependable suppliers and accurate shared schedules. A transport disruption exposes the cost of having little buffer; firms balance low stock with resilience.
Visibility means seeing order, inventory and shipment status across partners. Barcodes, radio-frequency identification (RFID) tags and connected sensors feed status information into the systems. Earlier notice of a delay gives planners time to adjust the promise or the supply plan.
Read measures together
Inventory turnover divides annual cost of goods sold by average inventory value. With $12,000,000 cost of goods sold and $2,000,000 average inventory, turnover is 6 times a year. Average inventory days are about 365 ÷ 6 = 61 days. Higher turnover reduces money tied up in stock, provided service remains acceptable.
Fill rate measures demand met from stock. Order cycle time runs from order to delivery. On-time delivery tracks promises met. A perfect order is complete, on time, undamaged and correctly invoiced. A fast shipment with missing items is not a perfect order.
The Association for Supply Chain Management's SCOR Digital Standard gives shared process language: orchestrate, plan, order, source, transform, fulfill and return. Orchestrate guides strategy; the other six describe major operational process groups.
Check a planning system's output
Nike's new planning system disrupted supply in 2000–2001, producing excesses of some products and shortages and late deliveries of others. Contemporary reporting put lost sales at about $100 million. Integration problems, errors and inadequate preparation were reported contributors; Nike later moved footwear demand planning into its ERP system. Forecasts need checks against actual demand and business knowledge before they drive large commitments.
Key Takeaways
- Planning sets future quantities and timing; execution carries out the flow.
- Push follows forecasts; pull follows orders or consumption.
- JIT lowers inventory and increases dependence on reliable supply.
- Turnover needs to be read alongside service measures.
- A perfect order meets all four delivery and billing conditions.
- Visibility and checked forecasts support timely action.
3.3 Make applications exchange meaningful data
ERP, CRM and SCM are often separate applications. Connecting them requires more than moving bytes: the sender and receiver must agree what each message means and what happens when delivery fails.
Follow an order across systems
CRM captures the customer's order. ERP performs the credit check and handles invoicing. Demand passes to SCM for planning and shipping, and shipment status returns to CRM so sales can answer the customer. This is one business flow supported by several applications.
A point-to-point interface directly links two systems. If every pair needs a connection, the number is the number of systems multiplied by one less than that number, divided by two. Six systems need 15 links; ten need 45. Each link adds construction, testing, monitoring and change work.
Middleware, including enterprise application integration (EAI) tools, connects applications through a hub or message bus. Each application connects to that shared layer. An integration platform as a service (iPaaS) offers this capability as a cloud subscription. Central connections reduce the web of direct links, but message rules and monitoring still need attention.
Agree the business meaning
An application programming interface (API) is a published way for software to request data or services, such as creating an order or retrieving stock. An API defines access, but a field named "ship date" still needs a clear meaning. One system may mean planned departure and another actual departure.
Master data describes shared entities such as customers, products, suppliers and employees. Master data management (MDM) maintains an authoritative, consistent version. Decide who can change an address, which system is authoritative and how that change reaches the others. An address corrected in CRM but left unchanged in ERP can send invoices to the wrong place.
Reach customers and suppliers
Electronic data interchange (EDI) exchanges standard business documents between organizations in agreed formats. Purchase orders, advance shipping notices and invoices can pass without re-keying. APIs can also carry partner transactions and status requests.
Supplier relationship management supports sourcing, purchasing and supplier evaluation. Partner relationship management shares leads, prices and orders with resellers. Portals let customers and suppliers check their own orders, deliveries and invoices. Together these links extend the enterprise beyond its legal boundary.
Choose and monitor the connections
An integrated suite from one vendor generally reduces integration work but increases vendor dependence. A best-of-breed approach selects the strongest application for each function, adding interface work and risk. Functional fit must be weighed against integration cost.
A sent message is not proof of a completed business update. Interfaces can fail, run late or map fields incorrectly. A timed-out order request may have succeeded even if its reply was lost. Repeating it needs to preserve the order identity so the same purchase does not create two orders. Monitor failures, investigate records that disagree and reconcile totals. Otherwise an apparently connected chain can still show different order or balance information to different employees.
Key Takeaways
- Interfaces must align field meanings as well as formats.
- All-to-all direct links grow quickly as applications are added.
- Middleware and iPaaS provide shared integration layers.
- MDM gives shared entities authoritative records.
- EDI exchanges standard business documents between firms.
- Integrated suites and best-of-breed choices carry different fit and dependency costs.
- Monitoring and reconciliation detect failed or delayed updates.
4Compare ways to develop and acquire information systems
A useful system begins with a business problem and develops through requirements, design, testing and adoption. Teams can arrange this work in stages or repeated cycles, and they can build software or obtain existing products and services. The choice depends on how clear the needs are, which capabilities distinguish the firm and who will operate and maintain the result. Business users help make each of those choices testable.
4.1 Turn a business problem into a tested system
Systems development produces an information system solution to a business problem or opportunity. Its activities include analysis, design, programming or configuration, testing, conversion, and production and maintenance. Different approaches arrange and repeat these activities differently.
Define the problem before designing the solution
Systems analysis investigates the problem, its causes and possible solutions. A feasibility study asks three different questions. Is a solution technically achievable? Is it economically worthwhile? Will it work for the people and organization? A system can be technically possible yet fail operationally because employees cannot use it within their working conditions.
Requirements state what the system must do or the qualities it must have. Gather them through interviews, observation, workshops, documents and process models. Observation is especially useful when actual work differs from the written procedure.
| Requirement type | Focus | Example |
|---|---|---|
| Functional | A function or data behavior | "Block an order that exceeds the customer's credit limit." |
| Nonfunctional | A quality or constraint | "Return a stock query within 2 seconds." |
Vague requests such as "make stock information better" are difficult to test. A measurable requirement gives users and developers a common acceptance condition.
Connect requirements, design and tests
A retailer wants online shoppers to see store stock. Analysis finds that the store records update only overnight. A requirement says, "Store stock shown online is at most 15 minutes old." Design specifies the interface from stores to the online shop, including data, screens, controls and infrastructure. Programming or configuration builds that design.
The test plan supplies starting data, an action and an expected result. Record a store sale, then check that the online stock changes within 15 minutes. This links the test directly to the requirement instead of merely checking whether a screen opens.
- Unit testing checks an individual component.
- System and integration testing check components working together, including interfaces.
- Acceptance testing lets business users and management confirm readiness with realistic work.
A component can pass its own tests while the complete order flow still fails, so one level cannot replace the others.
Prepare use and later change
Conversion moves the organization from the old system to the new one. It includes data conversion, training and the switching strategy. Store staff in the example must record every sale correctly; a timely interface cannot repair sales that were never entered.
Production means normal operation. Maintenance corrects defects, meets new requirements and improves performance; the retailer might later add click-and-collect. These continuing changes form a substantial part of lifetime cost.
A requirement error found late can affect design, code, data, tests and training already built around it. Business users therefore help throughout development: define the work, resolve design choices, test real cases and own the results.
Key Takeaways
- Analysis identifies the problem and checks technical, economic and operational feasibility.
- Functional requirements state behavior; nonfunctional requirements state qualities.
- Design explains how requirements will be met.
- Unit, system/integration and acceptance tests check different levels.
- Conversion prepares data and users; maintenance continues after normal use begins.
4.2 Match the development approach to the uncertainty
Development approaches differ in when users see working software, how requirements are refined and how changes are released. The best fit depends on uncertainty, control needs and the work the team must deliver.
Compare the approaches
| Approach | How it works | Best fit or main risk |
|---|---|---|
| Traditional life cycle/waterfall | Analysis, design, programming, testing and conversion follow formal stages | Stable, agreed needs; late changes are difficult |
| Prototyping | Users try a working model and refine it in rounds | Unclear needs; a rushed model may be mistaken for a production system |
| Rapid application development (RAD) | Reuses components, prototypes and visual tools | Fast development; still needs sound controls |
| Agile development | Delivers tested working parts in short iterations | Changing priorities and regular user feedback |
| DevOps | Joins development and operations with automation and monitoring | Frequent reliable changes to a running service |
| End-user development | Business users build local tools, often with low-code/no-code platforms | Close fit and speed; weak governance can create shadow IT |
Joint application design (JAD) uses intensive workshops where users and developers agree requirements and design. It can help close gaps in their understanding before a solution is built.
Use feedback without abandoning discipline
Agile iterations commonly last one to four weeks. Users see a working part, provide feedback and help adjust priorities before the next iteration. The 2001 Agile Manifesto places greater value on people and interaction, working software, customer collaboration and responding to change than on tools and processes, extensive documentation, contract negotiation and following a fixed plan. The latter items still have value.
Agile teams plan and document what the system needs. A sequence of rushed releases with no tested result is not the intended approach. Prototyping has a related trap: a model that helps discover needs may lack the testing, security and documentation required for everyday use.
Choose for a concrete situation
A regulated process with stable requirements can suit formal staged development. A new service whose users cannot yet describe a workable screen may benefit from a prototype and iterative feedback. Frequent small improvements to an established service benefit from continuous integration and continuous delivery: automated build, test and release preparation, supported by production monitoring.
A department can create a small approval app with visual tools, but the organization still needs standards for access, data, testing and maintenance. Otherwise the tool becomes shadow IT, operating outside normal oversight and depending on one employee.
Modern teams often assemble components, services and packages through APIs. Phone and tablet use adds touch, small-screen and responsive-layout needs. A large package rollout can combine formal milestones with repeated configuration demonstrations and user tests; the approaches are useful practices that can work together.
Key Takeaways
- Stable needs favor staged development; uncertain needs favor feedback and iteration.
- A prototype clarifies needs but may lack production controls.
- Agile values working software and adaptation while retaining planning and documentation.
- DevOps joins delivery automation with operational feedback.
- End-user tools need ownership, testing and data standards.
- Package projects can combine approaches.
4.3 Choose what to build and what to obtain
Acquisition choices allocate control, effort and responsibility differently. A firm can build a distinctive application while obtaining standard finance or customer software from a vendor. Decide from the process needs and the full lifetime cost.
Compare the choices
| Choice | Main advantage | Main demand or limitation |
|---|---|---|
| In-house development | Close fit and control | The firm funds development and maintenance |
| Commercial off-the-shelf (COTS) package | Ready-made functions and vendor updates | Processes rarely fit perfectly |
| Software as a service (SaaS) | Lower upfront investment and less operating work | Dependence on vendor availability, updates and exit terms |
| Outsourcing | Access to external skills and capacity | Transition, communication and contract management |
A licensed package can run on customer-controlled infrastructure or be hosted by a provider. In SaaS, the vendor runs the application, commonly on a multi-tenant platform shared by customers. Hosting location alone does not distinguish a package from SaaS.
Outsourcing means an external firm develops, operates or maintains the system. Offshore sourcing adds time-zone and cultural coordination. Lower quoted labor costs must be weighed against vendor selection, knowledge transfer, quality checks and ongoing contract management.
Find the gaps before promising a fit
Fit-gap analysis compares each requirement with the package. Suppose 200 requirements divide into 160 met by standard functions, 25 met by configuration and 15 gaps. The shares are 80%, 12.5% and 7.5%. The first two groups do not all require custom code: configuration is already supported by the product.
For each gap, examine four responses: change the process, accept a workable workaround, add another product, or extend the package. A critical legal requirement needs a reliable solution even if it is only one item among many. A minor preference for a familiar screen may not justify new code.
Protect distinctive value and future upgrades
Standard processes such as paying suppliers rarely make a firm different from competitors. Adopting the package process can reduce maintenance and upgrade effort. A route-planning method central to a logistics firm's advantage may justify a separate custom system linked to standard ERP finance.
"Keep the core clean" means using supported extension tools and APIs while keeping additions separate from the vendor's code. Changing the core makes later releases harder to test and adopt. Supported extensions still need ownership and tests, but avoid much of that direct code conflict.
A wholesaler with 300 employees, standard processes, a small IT team and a start deadline within a year is a strong candidate for configured SaaS ERP. Selection must still examine migration, integration, training, support and data export. Subscription price alone does not establish affordability or a safe exit.
Key Takeaways
- Build can protect a distinctive process but creates maintenance responsibility.
- Packages and SaaS offer ready-made capability with different operating arrangements.
- Outsourcing retains a need for strong client-side oversight.
- Fit-gap analysis separates standard fit, configuration and unresolved needs.
- Resolve routine gaps through process change when appropriate.
- Supported separate extensions reduce upgrade conflict.
5Build the business case for a system and select it
A system investment uses money and staff time before its full benefits appear. A credible business case compares complete costs with measurable improvements, then examines both the size and timing of the returns. Financial measures help evaluate the proposal, while portfolio and vendor selection methods make strategic and operational trade-offs visible. Consistent assumptions matter as much as the arithmetic.
5.1 Build a complete cost and benefit case
A business case explains the problem or opportunity, the options, expected costs, benefits and risks, and the recommended investment. It guides both approval and the later check that the promised benefits occurred.
Estimate the total cost of ownership
Total cost of ownership (TCO) covers acquiring, implementing, running, supporting and eventually retiring the system. Use a stated period so alternatives can be compared fairly. Include internal staff as well as supplier invoices.
One-time costs include initial implementation, migration, integration and training. Recurring costs include subscriptions, hosting, maintenance and support. Users' time, temporary cover, future upgrades and exit work can also be substantial.
For a five-year cloud ERP example:
| Cost | Five-year amount |
|---|---|
| Subscription, $180,000 yearly | $900,000 |
| Implementation consultants | $600,000 |
| Migration | $120,000 |
| Integration | $140,000 |
| Training | $90,000 |
| Temporary staff covering trainees | $150,000 |
| Two support staff, $80,000 each yearly | $800,000 |
| Total | $2,800,000 |
The subscription is about 32% of this total. Comparing only subscriptions leaves out about 68% of the cost. The support calculation needs both the number of employees and all five years.
Distinguish money released from annual savings
Tangible benefits can be valued in money: reduced inventory, fewer errors, lower running costs or faster payment collection. Intangible benefits, such as better decisions and employee satisfaction, are useful but difficult to price reliably.
Suppose better planning cuts average inventory of $2,000,000 by 15%. The stock reduction is $300,000, releasing cash once. If annual holding costs equal 20% of inventory value, the yearly holding-cost saving is $60,000. The $300,000 stock release is not another $300,000 saving every year.
Likewise, reducing transaction time creates capacity. It becomes a cash saving only when an actual cost falls, such as overtime or temporary staffing. Avoid counting the same released hours once as time savings and again as a separate salary saving.
Assign each benefit to someone who can deliver it
A benefit needs a measured baseline, a target, a date and a business owner. For inventory, the baseline is today's average balance; the target is a lower balance by a stated date; an operations manager owns the changed planning practices.
A software feature is not a benefit by itself. A forecast screen creates value when planners use it to change orders and stock decisions. Tracking the baseline and the actual result makes that link visible during the post-implementation review. Keep intangible gains visible beside the financial estimates instead of inventing precise cash amounts for them.
Key Takeaways
- TCO includes implementation, internal work, operations and exit over a stated period.
- Separate one-time costs from recurring costs.
- Inventory cash release and annual holding savings are different benefits.
- Freed employee time is not automatically a cash reduction.
- Benefits need a baseline, target, date and owner.
5.2 Compare payback, ROI and present value
A system's financial value depends on how much it returns and when. Payback, return on investment (ROI) and net present value (NPV) answer different questions, so they can lead to different rankings.
Start with one cash-flow schedule
A system costs $1,000,000 at year 0. Net benefits, after running costs, are $300,000 in year 1 and $400,000 in each of years 2, 3 and 4. Do not subtract the running costs again: they are already included in these net amounts.
Payback asks when cumulative net benefits recover the initial investment. After year 1, $300,000 is recovered. After year 2, the total is $700,000. The remaining $300,000 takes 0.75 of year 3 at that year's $400,000 rate, giving 2.75 years if benefits arrive evenly within the year. Payback ignores later benefits and the time value of money.
Simple ROI compares total net benefits less investment with the investment. Four-year benefits are $1,500,000. The gain is $500,000, and dividing by $1,000,000 gives 50% over four years. It is not an annual return.
Discount each future flow
NPV converts future cash to today's value using a required return, or discount rate. Divide each year's flow by one plus the rate raised to that year's number, then subtract the initial investment. At 10%, the present values are:
| Year | Net benefit | Present value |
|---|---|---|
| 1 | $300,000 | $272,727 |
| 2 | $400,000 | $330,579 |
| 3 | $400,000 | $300,526 |
| 4 | $400,000 | $273,205 |
The total present value is about $1,177,037, so NPV is about $177,037. A positive NPV means the forecast earns more than the required return. A higher rate or a later benefit lowers present value. The internal rate of return (IRR) is the discount rate that makes NPV zero.
Test the estimates
Sensitivity analysis changes an assumption and recalculates. If every benefit is 20% lower, annual flows become $240,000, then $320,000 for each later year. NPV at 10% becomes about −$58,370, payback about 3.4 years and four-year ROI 20%. The project can still show a positive undiscounted ROI while failing the required return.
Delays matter because costs often arrive early and benefits depend on adoption. Check a later start as well as lower benefit levels. Financial measures still depend on uncertain forecasts and may omit hard-to-price benefits, so combine them with strategic fit, risk and required capabilities. A legally required system can be necessary even when its standalone NPV is negative.
Key Takeaways
- Payback measures recovery time and ignores benefits after recovery.
- ROI must state the measurement period.
- NPV discounts each flow and deducts the initial investment.
- Higher rates and later benefits reduce present value.
- Sensitivity analysis shows how assumptions affect the decision.
- Financial results need to be weighed with risk, strategy and required capabilities.
5.3 Select projects and vendors with clear criteria
An information systems plan links proposed systems to business goals, current capabilities, budgets, timing and responsibilities. A feature-rich product is difficult to justify when it does not solve an agreed business problem.
Compare investments as a portfolio
Portfolio analysis examines the combination of benefit and risk across projects. High-benefit, low-risk work is attractive. High-benefit, high-risk work deserves careful examination. Low-benefit, high-risk work is usually avoided, while low-benefit, low-risk work may offer routine gains. A balanced portfolio can include some uncertain projects with large potential value.
Make trade-offs visible
A weighted scoring model sets criteria, weights totaling 100%, and a common score scale. Multiply each score by its weight and add the contributions. Use the same direction throughout: if a larger score is better, a lower TCO must receive a higher cost score.
Using fit 40%, five-year TCO 25%, usability 20% and vendor viability 15% on a 1–5 scale:
| Vendor | Fit | TCO score | Usability | Viability | Weighted total |
|---|---|---|---|---|---|
| A | 5 | 2 | 3 | 5 | 3.85 |
| B | 4 | 4 | 5 | 3 | 4.05 |
| C | 3 | 5 | 4 | 2 | 3.55 |
For A, the contributions are 2.00, 0.50, 0.60 and 0.75. B wins overall despite A's stronger functional fit. Scores organize judgments; they do not make those judgments objective. Test reasonable weight changes and set minimum thresholds for must-have requirements before comparing totals. A failure on a critical requirement must not be hidden by minor strengths.
Ask vendors to prove fit
Start with requirements and criteria. A request for information (RFI) explores the market and builds a long list. A request for proposal (RFP) gives detailed needs, volumes and contract conditions. Shortlisted vendors then demonstrate the firm's own scenarios, followed by checks with comparable customers and contract negotiation.
A scripted demonstration might ask the vendor to handle a partial shipment, a price change and an invoice dispute. Watching the product follow the firm's case reveals more than a polished tour of easy features. Include integration, security, data location, vendor stability, product plans and available implementation skills in the assessment.
Agree service and exit responsibilities
A service-level agreement (SLA) states service commitments such as availability and support response time. Contracts also need prices for growth and renewals, upgrade responsibilities, data ownership and how data will be returned at exit. An affordable first term can become expensive if extra users, renewals or migration are poorly defined. Agree these terms while the firm can still compare alternatives.
Key Takeaways
- Project choices should support an agreed strategy.
- Portfolio analysis weighs benefit with risk across investments.
- Weighted scores need consistent scales, agreed weights and must-have thresholds.
- Scripted demonstrations test real work against requirements.
- RFI explores vendors; RFP requests detailed proposals.
- Service, renewal and exit terms belong in selection.
6Lead implementation and prevent project failure
The switch to a new system changes real work while the business must keep operating. Data, processes and people need coordinated preparation, a workable conversion strategy and support after the first live day. Change models help diagnose adoption problems, while risk analysis identifies where the project needs stronger controls. Readiness and later business results provide better evidence of success than a launch date alone.
6.1 Prepare the switch and support the new system
Implementation brings the selected system into real use. Data migration, final tests, training, conversion and stabilization have to work together: a ready application is only one part of a ready business.
Move data that the business can trust
Decide what to migrate, such as active customers, products, open orders and balances. Full historical data may not need to move. Cleanse duplicates, missing fields and errors; map old fields to new meanings; run trial loads; then reconcile results. A successful load count does not prove that the receivables total is correct.
Reconciliation compares meaningful results, such as balances and open quantities, between old and new records. Resolve unexplained differences before those records begin driving orders or payments.
Choose how to convert
| Strategy | What happens | Main trade-off |
|---|---|---|
| Parallel | Old and new run together and results are compared | A running backup, but extra work and a need for comparable processes |
| Direct cutover/big bang | New replaces old on one date | Fast and low conversion cost, with concentrated operational risk |
| Pilot | One limited site or area goes first | Local learning, but the pilot must represent wider needs |
| Phased | Modules or regions move in stages | Smaller steps, but a longer transition and temporary interfaces |
Parallel conversion provides the strongest running fallback when comparable processes can operate side by side. Direct cutover is the fastest, cheapest switching strategy, but errors can interrupt the whole operation. A direct switch needs thorough tests, a recovery plan where feasible and a suitable date. Pilot and phased approaches contain exposure while increasing coordination work during the transition.
Learn from a badly timed start
Hershey's 1999 introduction of integrated enterprise applications disrupted ordering and shipping during peak seasonal demand. Reports described about $100 million of undelivered orders and a 19% fall in quarterly profit. The practical lessons are to test the complete process, prepare users and avoid a cutover immediately before peak activity. Operational constraints also matter: the company's subsequent report identified limited dock space as an aggravating factor.
Make readiness a decision
Train people by role using realistic transactions, close enough to go-live that they can retain the steps. Departmental key users, or super-users, help colleagues with both screens and the changed process.
The cutover plan assigns responsibilities for stopping old entries, loading and reconciling final data, checking agreed go/no-go conditions and switching service. A date alone is not evidence of readiness. After go-live, hypercare provides extra support while issues are resolved. A later post-implementation review compares performance and benefits with the business case. The first live transaction begins a period of learning; it does not complete benefit delivery.
Key Takeaways
- Migration requires cleansing, mapping, trial loads and reconciliation.
- Conversion strategies distribute risk and workload differently.
- End-to-end tests and peak-season timing matter.
- Role-based practice and key users support readiness.
- Cutover needs responsibilities and go/no-go criteria.
- Hypercare and benefit review continue after go-live.
6.2 Help people adopt the new way of working
A new system changes more than screens. It can alter jobs, skills, workloads and who controls information or approves decisions. Change management prepares and supports people so that these changes lead to sustained use and useful results.
Recognize the depth of change
Automation makes an existing task faster. Rationalization streamlines procedures, such as removing repeated checks. Business process redesign, also called reengineering, radically changes the flow of work. A paradigm shift changes the nature of the business itself. Risk and possible reward generally rise across this sequence because progressively more established work is disrupted.
Use change models for different questions
Lewin describes unfreeze, change and refreeze. Unfreezing creates readiness by showing why the present way must change. During change, people learn and practice the new work. Refreezing makes it normal through procedures, measures and rewards. Without that support, employees may return to private spreadsheets.
Kotter's eight steps develop organization-wide momentum: establish urgency, form a guiding group, shape a shared vision, mobilize willing participants, remove barriers, create early wins, keep progress moving and embed the change. For example, a visible reduction in lost orders can make the change credible, but leaders must keep removing obstacles after that early success.
ADKAR, Prosci's individual-change model, asks whether a person has awareness, desire, knowledge, ability and reinforcement. Someone may understand the new screens yet distrust why the system is being introduced. More screen training addresses knowledge, not that person's desire to participate.
| Model | Useful focus |
|---|---|
| Lewin | Readiness, transition and making the new work normal |
| Kotter | Leadership, momentum and organization-wide action |
| ADKAR | What an individual needs to adopt and sustain the change |
Listen to resistance and fix the work
Resistance can reflect fear of job loss, reduced status, unfamiliar routines, temporary overload or distrust of data. Ask what the concern reveals. A complaint that an approval screen takes too long may identify a genuine usability problem.
An active executive sponsor sets priorities and resolves conflicts. Users contribute to requirements, design and testing. Shared examples help close the user–designer communications gap: a developer's "completed order" may mean something different from the warehouse employee's.
Sociotechnical design considers technology and people together: job design, workload, usability and cooperation. In a hospital introducing electronic test orders, involving nurses in trials and providing a respected key user can improve the workflow and confidence in it. Imposing the same system without that involvement can leave paper forms beside digital records, creating duplicate work. Communicate the reasons early, provide realistic practice and reinforce the agreed process through everyday management.
Key Takeaways
- System change can alter authority, jobs and workload.
- Change ranges from automation to a new business model.
- Lewin focuses on readiness, transition and sustained routines.
- Kotter supports collective momentum; ADKAR diagnoses individual adoption needs.
- Resistance can reveal a design or workload problem.
- Sponsors and involved users improve both decisions and commitment.
- Sociotechnical design develops the work and technology together.
6.3 Recognize failure early and respond to its causes
An IT project can fail by being abandoned, overrunning time or budget, missing promised benefits, or producing a technically working system that people bypass. Delivery and business success are separate judgments.
Look beyond software defects
Unclear requirements, weak sponsorship, unavailable users, unrealistic schedules, poor data and excessive customization are frequent causes. Scope creep adds work without controlled decisions about time, cost and benefit. Cutting testing or training to preserve a date can move the problem into live operations.
Warning signs include missed milestones alongside optimistic reports, unresolved issues growing faster than they close, unavailable key users and data cleansing far behind plan. An honest review may lead to a smaller release or later go-live. Reporting green status does not remove an unresolved operational problem.
Match controls to three risk dimensions
McFarlan's risk view examines size, structure and technology experience. Size includes budget, duration, staff and the number of affected users or units. Structure concerns how clearly needs and outputs are defined and agreed. Technology experience concerns the team's familiarity with the tools.
| Main exposure | Suitable response | Why it helps |
|---|---|---|
| Large, well-defined work | Formal planning, milestones and progress controls | Makes dependencies and slippage visible |
| Unfamiliar technology | Experienced leadership, skilled staff and frequent technical coordination | Builds internal problem-solving capacity |
| Unclear needs affecting users | Users in decisions, regular feedback and sign-off | Builds external integration between team and business |
Here, "external integration" means connecting the project team with business users, not connecting software interfaces. A large project with unclear needs and unfamiliar tools may need all three responses. More detailed schedules alone cannot settle disagreement about what the system should do.
Reassess using future value
Escalation of commitment means continuing because much has already been spent. Those past costs are sunk costs: the next decision cannot recover them. Compare future costs, future benefits and the feasible alternatives.
Lidl stopped its SAP-based merchandise project in 2018 after about seven years; reports put spending near €500 million. It chose to develop its existing in-house system further. The reported spending shows the scale of the decision, but cannot itself justify more spending. A smaller remaining cost could be worthwhile, or still be poor value: the future comparison decides.
Reduce exposure before go-live
Keep a clear business owner and a current business case. Approve scope changes deliberately, prefer standard processes where appropriate and start data cleansing early. Test realistic end-to-end scenarios, train users and select a suitable conversion strategy and date. Independent reviews at major decision points can challenge a team's optimism before an irreversible operational switch.
Key Takeaways
- Failure includes missing benefits or adoption even when software works.
- Scope, sponsorship, data, testing and training are major risk factors.
- Assess size, requirement clarity and technology experience separately.
- Match planning, technical coordination and user involvement to the risk.
- Past spending is sunk; continuation depends on future costs and benefits.
Enterprise Systems examples
1Follow one order through an enterprise
11 steps
- 1IntroductionStart with the customer's result
A customer orders equipment, receives a delivery and pays an invoice. Behind those events, sales, the warehouse and finance each perform part of the work. Follow the order as one business process to see where information must pass between departments and how enterprise resource planning (ERP) supports those links.
- 2ExplanationMark the events in order-to-cash
Order-to-cash runs from a customer order through credit and availability checks, picking, packing, shipment, invoicing and collection. The final event is collected payment. Sales accepting an order does not mean goods have shipped; goods shipping does not mean cash has arrived. Each event needs its own quantity, status and responsible people.
- 3ExampleFind the broken hand-off
A supplier accepts an order for 120 chairs. The warehouse can ship only 90, but sales sends finance the original order spreadsheet. Finance invoices 120.
The 30-chair billing error comes from using the order quantity after fulfillment changed it. Faster transfer of the same spreadsheet would not repair that missing shipment information.
- 4ExampleConnect billing to the shipment
Sales first sees that 90 chairs are available and agrees a later date for 30. The warehouse records 90 shipped. That event reduces inventory and supports an invoice for 90, while the remaining 30 stay open.
Integration carries the effects of one business event into the records other functions need, without separate re-entry.
- 5ChallengeCheck a supplier invoice
A purchase order requests 60 chairs, receiving records 55, and the supplier invoices 60. What should accounts payable check before paying?
---reveal---
Compare the purchase order, goods receipt and invoice: a three-way match. Investigate the five-chair difference before payment. Agreement between the order and invoice alone leaves the actual delivery unchecked.
- 6ExplanationSee ERP as connected modules
ERP uses a common database and integrated modules for finance, purchasing, inventory, production, sales and human resources. In the chair example, posting a shipment can update stock, cost of goods sold, invoicing and receivables.
The value is the connected transaction. A finance screen using an isolated stock spreadsheet would preserve the old hand-off problem.
- 7TipChoose settings before code
A package includes reference processes, often called best practices. Configuration selects built-in settings, such as approval limits and workflows. Customization changes or adds code.
If the firm wants a new approval limit, first check supported settings. Custom code adds construction and testing work now, and must be checked again during upgrades.
- 8ExplanationSeparate deployment and operating choices
On-premises ERP runs on controlled servers. Cloud ERP runs on cloud infrastructure; in the common software as a service (SaaS) model, the vendor runs and updates the application for a subscription.
Two-tier ERP links a main headquarters system with simpler subsidiary systems. Consolidated reporting then depends on reliable links between the tiers.
- 9ChallengeDecide which adaptation is needed
The chair supplier can set a purchase approval threshold in the ERP settings, but a unique pricing rule would require added code. Which request is configuration, and which creates additional upgrade work?
---reveal---
The approval threshold is configuration. The added pricing code is customization and needs future upgrade tests as well as initial development.
- 10ChallengeDiagnose an ERP promise
A manager says, "Once we buy ERP, our incorrect delivery quantities will disappear." Staff still record estimates as actual shipments. What must change for accurate invoices?
---reveal---
The process must capture the actual shipped quantity reliably and link invoicing to it. ERP can share that record, but cannot turn an estimated quantity into an observed one. Agree responsibilities and checks as part of implementation.
- 11RecapReview the process before approving it
Check a proposed process by asking where the order, shipment and payment are recorded, who owns each record and what updates the next function. Then check which ERP settings support the agreed work and which requests need code. Include data preparation, training and future switching costs when judging the proposed solution.
2Use customer data to choose the next action
13 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionConnect a customer's history with a decision
- 2ExplanationBuild a view across touchpoints
- 3ExplanationSeparate running work from studying it
- 4ChallengeChoose the appropriate offer
- 5ExampleUse the starting group for churn
- 6ExampleFind acquisition cost
- 7ExampleEstimate a customer's lifetime
- 8ExampleConvert lifetime to margin
- 9ChallengeTest a retention improvement
- 10ExampleWeight each sales opportunity
- 11ConnectionChoose segments with a purpose
- 12ChallengeLink the action and its evidence
- 13RecapCheck the record and the measure
3Follow a supply signal from demand to delivery
15 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionTrack products and the signals that direct them
- 2ExplanationDistinguish the three flows
- 3ExampleWatch a small rise grow
- 4Key InsightReduce distortion at its source
- 5ChallengeChoose a useful demand signal
- 6ExplanationSeparate the plan from the daily flow
- 7ExampleFind the push-pull boundary
- 8ExampleRead turnover alongside service
- 9ChallengeTest a claim of better performance
- 10ExplanationPass one order across applications
- 11TipKeep the integration network manageable
- 12ExplanationGive shared records an owner
- 13ChallengeRepair a misleading date
- 14ChallengeConnect the plan with a failed update
- 15RecapReview the chain as one flow
4From an unclear problem to a sourcing choice
14 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionStart with what the business needs
- 2ExampleInvestigate the cause
- 3ExplanationWrite a requirement that can be checked
- 4ExplanationTest the complete path
- 5ChallengeChoose evidence for acceptance
- 6ExplanationUse a prototype when needs are unclear
- 7ExplanationCompare sequence with iteration
- 8ConnectionMake small releases reliable
- 9ChallengeProtect the learning from a prototype
- 10ExplanationAllocate responsibility through sourcing
- 11ExampleClassify the fit before estimating code
- 12ChallengeKeep a distinctive capability
- 13ChallengeCombine uncertainty and package fit
- 14RecapConnect the decisions before committing
5Build and challenge an investment recommendation
19 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionMake the recommendation traceable
- 2ExampleCount the complete ownership period
- 3ExampleSeparate stock release from holding cost
- 4Key InsightTurn a claim into a tracked benefit
- 5ChallengeCheck a staff-time claim
- 6ExampleBuild a separate cash-flow schedule
- 7ExampleRecover the initial investment
- 8ExampleState the ROI period
- 9ExampleDiscount year 1
- 10ExampleComplete the NPV calculation
- 11ChallengeChallenge the benefit forecast
- 12ConnectionKeep financial measures in context
- 13ExplanationCompare projects before suppliers
- 14ExampleUse weighted criteria
- 15ChallengeCheck what the total hides
- 16TipAsk vendors to show your work
- 17ExplanationNegotiate service and the future exit
- 18ChallengeCombine a fragile case with selection risk
- 19RecapPresent the decision with its assumptions
6Decide whether the organization is ready to go live
16 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionTreat readiness as a business decision
- 2ExplanationPrepare and reconcile the data
- 3ExplanationChoose where the exposure sits
- 4ChallengeDecide on a migration discrepancy
- 5TipPractice the actual job
- 6ExplanationIdentify how much work changes
- 7ExplanationCreate readiness and sustain the routine
- 8ExplanationBuild collective momentum
- 9ExampleDiagnose the individual barrier
- 10ChallengeRespond to the stated concern
- 11ConnectionDesign the job with the technology
- 12ExplanationAssess three different risk dimensions
- 13ExplanationMatch the response to the cause
- 14ChallengeDecide from the future, not sunk spending
- 15ChallengeRespond to a threatened launch
- 16RecapJudge success after the switch
Enterprise Systems practice questions
Set 1: Connect systems with everyday business work10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Choose approaches and reliable information10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Connect measures with business decisions10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Evaluate trade-offs before the switch10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Make decisions across the full implementation10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Acceptance testing
ADKAR
Agile development
Analytical CRM
Application programming interface (API)
B
Baseline
Benefit owner
Best practice
Best-of-breed
Bullwhip effect
Business case
Business process
Business process redesign
C
Change management
Churn rate
Clean core
Commercial off-the-shelf software (COTS)
Configuration
Continuous integration
Cross-functional process
Cross-selling
Customer acquisition cost (CAC)
Customer lifetime value (CLV)
Customer relationship management (CRM)
Customization
D
Data migration
DevOps
Direct cutover
Discount rate
Downstream
E
Electronic data interchange (EDI)
Enterprise resource planning (ERP)
ERP module
Escalation of commitment
Executive sponsor
External integration tools
F
Feasibility study
Fit-gap analysis
Functional requirement
Functional silo
H
Hypercare
I
In-house development
Intangible benefit
Integration
Integration platform as a service (iPaaS)
Internal integration tools
Internal rate of return (IRR)
Inventory turnover
J
Joint application design (JAD)
Just-in-time (JIT)
K
Kotter's model
L
Lewin's model
M
Maintenance
Master data management (MDM)
Middleware
Multi-tenancy
N
Net present value (NPV)
Nonfunctional requirement
O
Operational CRM
Order-to-cash
Outsourcing
P
Parallel conversion
Payback period
Perfect order rate
Phased conversion
Pilot conversion
Point-to-point interface
Portfolio analysis
Procure-to-pay
Project structure
Prototyping
Pull system
Push system
R
Rapid application development (RAD)
Reconciliation
Request for information (RFI)
Request for proposal (RFP)
Retention rate
Return on investment (ROI)
RFM analysis
S
Safety stock
Sales force automation (SFA)
Sales pipeline
Scope creep
Scripted demonstration
Sensitivity analysis
Service-level agreement (SLA)
Shadow IT
Sociotechnical design
Software as a service (SaaS)
Sunk cost
Supply chain
Supply chain planning
Systems analysis
Systems design
T
Tangible benefit
Three-way match
Total cost of ownership (TCO)
Touchpoint
Transportation management system (TMS)
Two-tier ERP
U
Unit testing
Up-selling
Upstream
V
Vendor lock-in
Vendor-managed inventory
W
Warehouse management system (WMS)
Waterfall
Weighted pipeline forecast
Weighted scoring model
About this lesson
Make your own Study Materials
Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.