The Cost of Capital
IntermediateLesson 10 of 10 in Corporate Finance 1 Course
What you will learn
- Describe the cost of capital as the return investors require for the risk they bear, and see how it sets the hurdle every investment must clear.
- Explain the cost of capital as an opportunity costDefine the cost of capital, connect it to the return investors give up elsewhere, and use it as the discount rate that decides whether a project creates value.
- Compare the sources of capital and the returns their investors requireIdentify debt, preferred stock and common equity as the firm's sources of capital, rank their risks and required returns, and outline how the overall cost of capital is built from them.
- Explain the cost of capital as an opportunity cost
- Estimate what shareholders require with the capital asset pricing model and the dividend growth model, measure beta from market data, and judge between the estimates.
- Estimate the cost of equity with the CAPMApply the capital asset pricing model, choose the risk-free rate and market risk premium, and explain the model's assumptions, strengths and weaknesses.
- Estimate and interpret betaCalculate beta from return data, read it as a measure of systematic risk, and decide how far a raw estimate can be trusted.
- Estimate the cost of equity with the dividend growth model and compare estimatesRearrange the constant-growth dividend model to find the cost of equity, estimate the growth rate, cross-check with a bond-yield approach and choose a sensible final estimate.
- Estimate the cost of equity with the CAPM
- Find what lenders and preferred shareholders require from current market prices, and adjust the cost of debt for the tax deductibility of interest.
- Estimate the pre-tax cost of debt from market yieldsMeasure the return lenders require today from bond yields, credit ratings or current loan rates, and allow for default risk when it is large.
- Calculate the after-tax cost of debtAdjust the cost of debt for the tax saving on interest, choose the right tax rate and recognize when the saving is smaller or delayed.
- Estimate the cost of preferred stockCalculate the cost of preferred stock from its dividend and market price, including issue costs and redeemable shares, and explain why no tax adjustment is made.
- Estimate the pre-tax cost of debt from market yields
- Weight each source by its market value, calculate and interpret the WACC, and use it correctly to judge investments of average risk.
- Measure the capital structure with market value weightsFind the market values of equity, preferred stock and debt, turn them into weights, and decide when target or book values are used instead.
- Calculate and interpret the WACCCalculate the weighted average cost of capital from component costs and weights, explain what it means and avoid common calculation errors.
- Use the WACC to evaluate investmentsApply the WACC as a discount rate when its conditions hold, keep cash flows and rates consistent, and treat financing sources and issue costs correctly.
- Measure the capital structure with market value weights
- Explain why one company-wide rate misjudges projects of different risk, estimate a project's rate from comparable firms, and set rates for divisions and risk classes.
- Explain why projects need risk-adjusted discount ratesShow how a single company-wide rate leads to wrong decisions, and identify which kinds of risk should change a project's discount rate.
- Estimate a project's discount rate with the pure-play methodUse the betas of comparable firms, remove and restore the effect of debt, and build a project-specific cost of equity and WACC.
- Set divisional and risk-class discount ratesGive each division a rate based on its own risk, relate divisional rates to the firm's rate, and use risk classes when market data are scarce.
- Explain why projects need risk-adjusted discount rates
Cost of Capital study guide
1The opportunity cost of investors’ money
An investor who supplies money gives up another investment. The return available on an alternative with the same risk sets the hurdle a firm must clear. Debt, preferred stock, and common equity carry different claims on the firm's cash, so they also carry different required returns. Connecting those claims to the risk of an investment explains why cheap borrowing and retained profits do not make a project cheap to finance.
1.1 The return an investment must earn
A firm uses investors' money today in exchange for uncertain future cash. The cost of capital is the return those investors could expect from an alternative with the same risk. It is an annual required return, also called an opportunity cost or hurdle rate.
Why money has an opportunity cost
Suppose shareholders could earn 9% on another investment with the same risk. Keeping their money in a project that offers only 7% leaves them worse off, even if that project reports a profit. The comparison is between expected returns on equally risky uses of money. The market sets that comparison; management cannot lower the required return by announcing a lower target.
Retained earnings have this cost too. Shareholders could receive the money as a dividend and invest it elsewhere. Keeping earnings inside the business forgoes that alternative. No underwriting fee is needed to retain profits, but their opportunity cost is still the cost of equity.
Turn the required return into a decision
Discount expected project cash flows at their risk-appropriate cost of capital. Subtract the investment made today to find net present value, or NPV. Positive NPV means the expected cash flows cover the required return and leave additional value for investors.
A project costs $10 million and is expected to pay $11.2 million in one year. At 9%, its NPV in millions is:
If its risk instead calls for 13%, the same calculation gives:
The expected dollar receipt has not changed. A higher required return reduces what that receipt is worth today. The project clears the first hurdle but fails the second.
Attach the rate to the investment
The risk of the use of funds sets the required return. A risky product launch does not become a safe investment because the firm pays for it with a low-rate loan. A low-risk replacement project also does not acquire the average risk of every other business the firm owns.
Estimate the rate from current market data: government yields, bond prices, share prices, and the risks investors face now. An old bond coupon or last year's accounting return describes a different quantity. Neither directly measures what investors currently give up by supplying money.
Match what is paid and what is discounted
A nominal rate includes expected inflation and belongs with nominal cash flows. A rate estimated in a currency belongs with cash flows in that currency. Mixing a rate in one currency with receipts in another changes the economic comparison.
The investor's required return and the firm's financing cost are two views of the same exchange, with two useful adjustments. Deductible interest saves the firm tax, so debt can cost the firm less than lenders receive. Issue fees reduce the cash a firm receives from a new security, so raising fresh money can cost more than the return investors receive.
Key Takeaways
- The cost of capital is the expected return available on an equally risky alternative.
- A positive NPV means expected cash flows exceed the risk-appropriate hurdle.
- Retained earnings carry the shareholders’ opportunity cost.
- Use current market evidence and match the rate to the cash flows.
1.2 Debt, preferred stock, and common equity
Each source of capital gives its investors a different claim on the firm's cash. A claim with stronger payment rights usually carries less risk and a lower required return. The firm's overall hurdle combines these claims in proportion to their market values.
Compare the claims
| Source | What investors receive | Position and risk |
|---|---|---|
| Debt | Contractual interest and repayment of principal | Lenders rank ahead of shareholders. |
| Preferred stock | A fixed dividend, usually with no maturity date | Preferred dividends rank ahead of common dividends but can be suspended. |
| Common equity | Dividends and value left after other claims | Common shareholders bear the residual risk. |
Preferred stock is also called preferred shares or preference shares; common stock is also called ordinary shares. Preferred stock usually has no vote. On cumulative preferred stock, missed dividends build up as arrears that must be paid before a common dividend can be paid. Missing a preferred dividend does not by itself force bankruptcy as a missed contractual debt payment can.
For one firm, the usual ranking of pre-tax required returns is:
Debt is usually cheapest because of its payment priority. Common equity is usually most expensive because shareholders receive what remains. In the running estimates, debt costs 5.53% before tax, preferred stock 6.25%, and common equity 10.6%. These are estimated returns for that firm, not a fixed ranking of every security across unrelated firms.
Decide what belongs in the financing mix
Count interest-bearing investor capital: bonds, bank loans, preferred stock, and common equity, including retained earnings. Regularly renewed short-term borrowing can be part of permanent financing. Lease liabilities are commonly included as debt too.
Accounts payable and accrued wages are operating liabilities. Leave them out of this financing mix: their effects already enter operating cash flows. Adding them as another cheap source in the weighted average would give them an extra role in the calculation.
Build the combined hurdle
The weighted average cost of capital, or WACC, combines the return owed to each investor group:
Here equity, preferred stock, and debt have market values , , and ; total capital is . The marginal tax rate is . Only debt receives the interest tax adjustment. Preferred and common dividends come from after-tax profit.
Estimate the component returns, measure the market values, calculate the weighted average, and then check whether the project's risk matches that rate. A firm without preferred stock leaves out its preferred term.
Why cheap debt is not the whole answer
Replacing equity with debt changes the risks investors bear. More debt makes the remaining equity riskier, raising its required return. Heavy borrowing can raise lenders' required return as well. Comparing debt's current rate with equity's current rate while holding both fixed misses that change.
Key Takeaways
- Payment priority helps explain the usual ranking of required returns.
- Cumulative preferred dividends in arrears must be cleared before common dividends.
- Operating liabilities stay out of the investor-capital weights.
- WACC weights component costs by market value and adjusts only debt for tax.
- More debt can raise both equity risk and borrowing costs.
2Estimate shareholders’ required return
Shareholders have no promised interest payment from which to read their required return. Two models make that return estimable: the CAPM links it to market risk, while the dividend growth model works back from price and expected dividends. Both depend on inputs that need judgment. Understanding beta, growth, and the difference between a market return and a market risk premium helps you choose and compare estimates.
2.1 Use the CAPM to price market risk
The capital asset pricing model, or CAPM, estimates the return shareholders require for bearing systematic risk. This is the part of risk that remains in a diversified portfolio because it moves with the market.
Separate the safe return and the risk premium
The risk-free rate rewards investors for waiting. The market risk premium, , is the extra expected return on the market portfolio above that safe return. Equity beta scales that premium for the stock's market risk.
With a risk-free rate of 4%, beta of 1.2, and market risk premium of 5.5%, the equity risk premium is:
Add the safe return:
A beta of 0.8 in the same market gives 8.4%. The lower beta earns a smaller premium because it adds less market risk to a diversified investor's portfolio.
Read the security market line
The security market line plots required return against beta. Its intercept is the risk-free rate and its slope is the market risk premium. A beta of zero gives the safe rate; a beta of one gives the expected market return. Each extra unit of beta adds one market risk premium.
The line relates expected return to systematic risk, not to the full volatility of one stock. Company-specific setbacks can be diversified across many holdings. In the CAPM, that diversifiable risk does not earn an extra expected return.
Choose consistent inputs
Use a current government bond yield with negligible default risk in the same currency as the cash flows. For a long-lived investment, a long-term yield such as a 10-year government yield is a common choice. A government bond in a different currency is not interchangeable simply because its yield is lower.
The market premium is estimated, not directly observed. A historical estimate averages market returns above government bond returns. A forward-looking estimate works back from market prices and expected cash flows. Different methods and time periods can give different inputs; a premium is not a promised market payoff.
Avoid charging for the safe return twice
If the expected market return is 9.5% and the risk-free rate is 4%, first calculate the premium:
Multiplying beta by 9.5% instead gives 15.4% after adding the safe rate. That calculation scales the whole market return and then adds the safe return again.
The CAPM is useful even when a firm pays no dividends. Its limitations lie in its simplifying, single-period model and estimated inputs. Raising the market premium from 5.5% to 6.5% in the worked estimate raises the cost of equity to 11.8%. A useful final estimate should therefore explain the chosen inputs and the effect of plausible changes.
Key Takeaways
- CAPM adds the risk-free rate to beta times the market risk premium.
- Subtract the risk-free rate when the input is a total market return.
- Systematic risk earns the CAPM premium; diversifiable risk does not.
- Use a currency-appropriate risk-free rate and examine input sensitivity.
2.2 Estimate beta from returns
Beta measures a stock's sensitivity to market returns. A high standard deviation by itself does not establish a high beta: the stock must also move with the market. Beta captures that shared movement.
Calculate beta from summary data
Covariance measures shared return movements; market variance measures how much the market itself varies. The equivalent formula combines the correlation with the ratio of the stock's standard deviation to the market's.
If correlation is 0.6, stock standard deviation is 30%, and market standard deviation is 15%, then:
Covariance is 0.027 and market variance is 0.0225, giving the same ratio. Keep units consistent: using decimals for both standard deviations or percentages for both gives the same beta.
See the slope in a small data set
In practice, estimate beta as the slope of a regression of stock returns on market returns over matching periods. For an illustration, market returns over four quarters are 2%, −1%, 4%, and −1%; stock returns are 3%, −1.5%, 6%, and −1.5%. Their means are 1% and 1.5%.
The market deviations from its mean are 1, −2, 3, and −2 percentage points. The stock deviations are 1.5, −3, 4.5, and −3. The sum of paired products is 27; the sum of squared market deviations is 18:
Subtract each series' own mean before forming these products. The covariance and variance use the same observation-count divisor, so it cancels in their ratio.
A real estimate needs many more observations. Common choices include 60 monthly returns or about two years of weekly returns against a broad market index. Match dates and return frequencies across the two series.
Interpret what the estimate leaves out
A stock with 50% standard deviation but only 0.2 correlation with a market whose standard deviation is 15% has beta about 0.67. It can be very volatile yet contribute less market risk than the market portfolio. Reading its 50% volatility as beta would confuse total risk with systematic risk.
Sampling error makes estimates sensitive to the time window and data frequency. Comparing several firms in the same business helps reduce reliance on one noisy estimate. A past beta also becomes less useful if a firm changes its operations or debt level.
Adjust toward the market and separate financing
A common Blume adjustment pulls a raw beta toward one:
A raw beta of 1.45 becomes 1.30. This is a statistical adjustment, not removal of debt risk. A traded stock's equity beta reflects both business risk and the extra risk debt places on shareholders. An asset beta removes that financing effect. For a private firm or an unlisted division, comparable listed businesses provide the starting evidence.
Key Takeaways
- Beta measures systematic risk, not total return volatility.
- A regression beta is the slope of stock returns against matching market returns.
- Short or changed histories can make beta estimates unreliable.
- Blume adjustment moves raw beta toward one.
- Asset beta removes financing risk; adjusted beta serves a different purpose.
2.3 Infer the return from dividends and growth
For a firm with stable dividend growth, today's share price reflects the return shareholders require on future dividends. Rearranging the constant-growth dividend model turns that price into an estimate of the cost of equity.
Use the next dividend and the right price
The model assumes one constant growth rate forever, with growth below the required return. Use the dividend expected in one year, , and today's ex-dividend price, , which excludes any dividend about to be paid.
A share trades ex-dividend at $40. The dividend just paid was $2.00 and expected annual growth is 4%. Grow that dividend first:
Then add dividend yield and growth:
Using the dividend just paid gives 9.0%, understating the estimate. If a $42 cum-dividend price includes a $2 dividend due shortly, subtract that dividend to obtain the $40 ex-dividend price before applying the model.
Estimate sustainable growth
Historical growth uses a compound annual rate:
Dividends growing from $1.70 to $2.00 over four years imply about 4.15% annual growth. Count four intervals of growth, although the dated series contains five dividends.
A second estimate uses the retention ratio, the fraction of earnings reinvested:
Retaining 40% of earnings and earning 10% on those reinvested earnings supports 4% growth. The payout ratio is the fraction distributed, so retention is one minus payout. Analysts' forecasts offer another input, but a short burst of rapid growth cannot be projected forever without a reason.
Judge how much the answer depends on growth
If expected growth rises to 5%, next year's dividend becomes $2.10 and the estimate becomes 10.25%. Growth changes both the future dividend and the added growth term. Holding the next dividend fixed while changing growth from the latest dividend would miss part of the effect.
The model is simple and ties the estimate to prices and dividends. It is unsuitable for a firm paying no dividends or one without a defensible constant long-run growth rate. The CAPM can still be used for such a firm.
Compare independent estimates
A rough bond-yield-plus-risk-premium check adds an equity premium to the firm's own long-term debt yield. A 5.6% yield plus a judged premium of 3–5 percentage points gives 8.6–10.6%. That extra premium reflects equity's greater risk; it is not the market risk premium in the CAPM.
If the CAPM gives 10.6% and the dividend model 9.2%, examine beta, growth, prices, and the reliability of each method. A justified estimate or a range around 9–11% is more useful than an unexplained average with many decimal places.
Key Takeaways
- Use next year’s dividend and an ex-dividend price.
- Constant dividend growth must stay below the required return.
- Historical growth counts time intervals; sustainable growth uses retention times ROE.
- Growth assumptions can materially change the equity estimate.
- A bond-yield check adds a judged equity premium to the firm’s own debt yield.
- Choose between estimates by examining the quality of their inputs.
3Estimate debt and preferred returns
Debt and preferred stock have payment terms that help reveal what their investors require. Current prices turn those payments into yields, and the firm's tax position changes the net cost of interest. The work is to distinguish old contract rates from today's borrowing cost, identify which payments receive tax relief, and handle securities with a repayment date through their full stream of cash flows.
3.1 Read today’s borrowing cost from the market
The pre-tax cost of debt is the return lenders currently require on the firm's borrowing. The interest rate printed on an old bond describes its contract. Its current price reveals whether investors now require a higher or lower yield.
Use yield to maturity for redeemable bonds
A bond's yield to maturity, or YTM, is the discount rate that equates its price to all remaining promised payments. A bond with ten years left pays a $50 annual coupon and repays $1,000 at maturity. At a price of $960, solve:
A financial calculator or spreadsheet gives about 5.53%. Because the price is below face value, investors receive both coupons and a gain toward redemption. The YTM therefore exceeds the 5% coupon rate. Dividing the coupon by price gives current yield, which omits the redemption gain and is not the YTM.
Set the calculator to annual payments for these annual-coupon examples. Use opposite signs for price paid and payments received. The maturity payment includes the final coupon as well as principal.
Find evidence when no bond is traded
For a firm without a traded bond, start with the government yield at a suitable maturity and add the credit spread for comparable debt with the firm's credit rating. A 4.0% government yield plus a 1.6% spread gives a 5.6% borrowing estimate. For bank debt, use the rate available on a new long-term loan today.
When several bond issues exist, market-value-weight their yields or use the rate on new long-term borrowing. Interest expense divided by book debt averages past financing terms; it does not measure today's required return.
Handle debt that never matures
Irredeemable debt pays interest forever without repayment of principal. Its cost is a perpetuity yield:
Annual interest of $6 and a price of $96 imply 6.25%. No redemption gain or loss needs to be included because there is no redemption date.
Distinguish promised and expected returns
YTM assumes every scheduled payment is made in full. When default risk is material, lenders' expected return is lower than this promised yield. A simple expected-loss approximation is:
Here is annual default probability and is the fraction lost if default occurs. A 9% promised yield, 4% default probability, and 60% loss rate give an expected loss of 2.4 percentage points and an expected return of about 6.6%. Do not subtract the default probability alone; the recovery on default matters too. The adjustment is usually small for high-quality debt.
Include the firm's interest-bearing bonds and loans, permanent rolled-over short-term borrowing, and commonly lease liabilities in the debt measure. Use financing costs and values that describe the same set of claims.
Key Takeaways
- Current YTM is a borrowing-cost estimate; an old coupon rate is not.
- Current yield omits a redeemable bond’s principal gain or loss.
- A credit spread or new loan quote can supply missing market evidence.
- Perpetual debt costs annual interest divided by current price.
- Default losses separate expected return from promised yield.
3.2 Allow for the tax saving on interest
Deductible interest reduces taxable profit. If a firm can use the deduction immediately, part of every interest payment is offset by a lower tax bill. This makes the firm's net debt cost lower than the return its lenders receive.
Apply the marginal tax rate once
At a 25% marginal rate, $100 of deductible interest saves $25 in tax and costs $75 net. A 5.53% pre-tax debt cost therefore becomes about 4.15%. Use the marginal tax rate, which applies to the next dollar of taxable profit. An effective tax rate, total tax divided by reported profit, can reflect credits and allowances that do not change the saving on extra interest.
If the marginal rate is 25% and the effective rate is 18%, use 25% for a fully usable interest deduction. Do not apply the tax factor to equity or preferred dividends; those distributions are paid from after-tax profit.
Check when the tax saving is usable
A loss-making firm may have no current taxable profit against which to deduct interest. A carried-forward deduction saves tax later, so its present value is smaller than an immediate saving. If the firm will never pay tax, the interest deduction has no value and after-tax debt cost equals pre-tax debt cost.
Deduction limits can also reduce the immediate saving. Some systems cap net interest deductions using 30% of a tax-based earnings measure before interest, taxes, depreciation, and amortization. US and EU rules use versions of this approach, with exceptions and detailed differences. Interest above a current cap does not generate the full current tax saving. The relevant rate in the cost estimate must reflect the benefit the firm can actually obtain.
For redeemable debt, tax the actual interest cash flows
An alternative calculation finds the after-tax IRR directly. Consider a bond priced at $96, paying a $5 annual coupon for four years and repaying $100 at maturity. With an immediately usable 25% deduction on coupons, after-tax interest is:
The firm's financing cash flows are $96 received today, $3.75 paid at each of the first three year-ends, and $103.75 paid at the fourth. Equivalently, enter −96 followed by 3.75, 3.75, 3.75, and 103.75 in an IRR calculation. The rate is about 4.87%.
For this bond, pre-tax YTM is about 6.16%. Multiplying that whole yield by 0.75 gives about 4.62%, a different result. The direct cash-flow method reduces coupons for tax while leaving the $100 principal repayment intact. Its treatment of the $4 price-to-redemption difference causes the gap. Use one specified method consistently; do not multiply an after-tax IRR by the tax factor again.
For perpetual debt, there is no redemption difference. Interest of $6, price of $96, and tax of 25% give:
Key Takeaways
- Fully usable interest deductions reduce debt cost by the marginal tax factor.
- Tax losses and deduction caps can reduce or delay the benefit.
- After-tax bond IRR reduces interest payments, not the principal repayment.
- An after-tax rate needs no second tax adjustment.
3.3 Price the cost of preferred stock
Preferred stock usually promises a fixed dividend with no maturity date. Its dividend is senior to common dividends but junior to interest. Current market price, not the stated dividend percentage, determines the return investors require today.
Turn the dividend into a required return
For perpetual preferred stock:
A preferred share with $100 par value and a 5% dividend pays $5 a year. If its market price is $80, the required return is:
The stated 5% is a percentage of par value. An investor buying the same annual dividend for $80 earns 6.25%. Using par value as the denominator would ignore the price the investor actually pays.
A lower price for the same perpetual dividend means a higher yield. For example, at $75 the $5 dividend gives about 6.67%. The price and dividend must refer to the same security and payment period.
Allow for new-issue fees
When a new preferred issue has costs of $2 per share, the firm receives only $78 of the $80 paid by investors. Its cost of raising new preferred funds is:
Investors still receive $5 on an $80 purchase. The firm's cost is higher because fees reduce net proceeds. This new-issue cost and the market cost of existing preferred stock answer different questions.
Keep preferred dividends after tax
Preferred dividends receive no interest deduction in the standard treatment here. Do not multiply the preferred yield by one minus the tax rate. With preferred stock at 6.25% and debt at about 4.15% after tax, preferred stock is the more expensive source for this firm.
Preferred holders accept less risk than common shareholders because they rank first for dividends and have a fixed claim. They bear more risk than lenders because preferred dividends rank below interest and can be suspended. That position helps explain the usual required-return ranking within a firm.
Include repayment when shares are redeemable
Redeemable preferred stock has a scheduled repayment date. Calculate the IRR from its current price, all dividends, and the redemption payment. For a price of $95, annual dividends of $6, and redemption at $100 after five years:
The cost is about 7.23%, with no tax adjustment. Dividend divided by price alone gives about 6.32% and misses the gain from $95 to $100.
In WACC, the preferred weight is its total market value divided by the market value of all investor capital. For two million shares at $80, preferred capital is $160 million. A firm with no preferred stock omits that component.
Key Takeaways
- Perpetual preferred cost is its annual dividend divided by market price.
- New issues use proceeds net of issue fees.
- Preferred dividends receive no interest tax adjustment.
- Redeemable preferred cost includes dividends and the repayment through IRR.
- Preferred stock enters WACC at its total market value.
4Build and apply the company’s WACC
The cost of each source becomes useful for an investment decision only after it is combined with the amount of that source the firm uses. Market values supply the weights, and the interest tax saving enters once through debt's cost. A calculated WACC then needs a matching set of cash flows and a project with suitable risk. That connection keeps financing payments, inflation, and issue fees from distorting the decision.
4.1 Turn current financing values into weights
WACC weights measure how much of the firm's investor capital each group supplies at today's prices. Express all market values in the same currency and scale, add them, and divide each by that total.
Value each source
Common equity is shares outstanding times the current share price. With 50 million shares at $40:
The result is $2,000 million. Preferred stock is valued the same way: two million preferred shares at $80 give $160 million.
For bonds, apply the quoted price to the outstanding face value. Bonds with $800 million face value trading at 96% are worth:
For untraded loans, discount remaining payments at today's borrowing rate. Book debt can be a reasonable shortcut when rates and credit conditions have changed little. Book equity is a historical accounting balance and is often far below what shareholders' claims are worth today.
Divide by total market capital
Total value in millions is:
| Source | Market value, millions | Weight |
|---|---|---|
| Common equity | 2000 | 68.31% |
| Preferred stock | 160 | 5.46% |
| Debt | 768 | 26.23% |
Calculate with the unrounded ratios. Rounded display weights can differ slightly from 100%, but the underlying fractions sum to one. Do not divide debt by equity when the needed weight is debt divided by total capital; those are different ratios.
Compare market, book, and target weights
For the same firm, book values of $1,100 million equity, $200 million preferred stock, and $800 million debt give weights of 52.38%, 9.52%, and 38.10%. That mix assigns much more weight to debt than current market values do. Mixing book equity with market debt in a single total would produce neither a consistent book mix nor a consistent market mix.
Use target weights when the firm is moving toward a financing mix it intends to maintain. A documented financing policy, a persistent historical mix, and comparable firms can support that choice. A temporary loan used for one project does not by itself define a permanent target.
Treat cash and operating liabilities consistently
Some analyses use net debt, subtracting cash and short-term investments that are surplus to operating needs. Debt of $768 million minus $100 million excess cash gives net debt of $668 million. Using net debt changes the financing total and therefore all the weights. Keep that choice consistent with the risk and return estimates used in the rest of the analysis.
Accounts payable and accrued operating expenses stay out of investor-capital weights. Their effects belong in operating cash flows. The final check is practical: each included claim should have a matching component cost, all values should share one basis, and the weights should add to 100%.
Key Takeaways
- Use shares times price for equity and preferred values, and market price for debt.
- Divide each source by total investor capital; weights sum to one.
- Market weights measure current claims; target weights represent a maintained future mix.
- Book values and market values can produce materially different financing weights.
- Subtract only surplus cash when using net debt, and apply the choice consistently.
4.2 Calculate and interpret WACC
The weighted average cost of capital combines each financing source's required return with its share of total market value. The result is an annual hurdle for the firm's average-risk assets, including the firm's interest tax saving.
Calculate each contribution
Use equity cost 10.6%, preferred cost 6.25%, pre-tax debt cost 5.53%, and tax of 25%. The market values are $2,000 million equity, $160 million preferred stock, and $768 million debt. Divide each by the $2,928 million total.
First calculate debt's after-tax cost:
Then find the contributions, keeping unrounded weights internally:
| Component | Weight times cost | Contribution |
|---|---|---|
| Common equity | 7.24 percentage points | |
| Preferred stock | 0.34 percentage points | |
| Debt | 1.09 percentage points |
Adding the unrounded contributions gives WACC of about 8.67%. A contribution is a number of percentage points in the total, not a separate investor's required return.
Interpret the hurdle
At this financing mix, average-risk investments must earn enough after operating taxes to cover investors' required returns after allowing for the interest deduction. A suitable project with positive NPV at 8.67% is expected to create value.
Leaving debt pre-tax gives about 9.03% and overstates the financing cost. Taking a simple average of 10.6%, 6.25%, and 4.15% gives about 7.00%, ignoring equity's much larger financing share. Applying the tax factor to the entire average would incorrectly give equity and preferred dividends a tax deduction.
Book weights produce about 7.73% in this example. That lower figure arises because book debt receives more weight. It is not evidence that the firm's actual market-based funding hurdle is lower.
Distinguish average and marginal cost
WACC describes the average cost at a chosen financing mix. The marginal cost of capital is the cost of raising the next dollar. A large funding program can exhaust cheaper sources or add issue fees, so its marginal cost may rise above the existing average. Retained earnings already carry an equity opportunity cost; selling new shares can add flotation costs on top.
Re-estimate component costs and weights as markets change. Higher government yields or weaker credit quality can raise financing costs. A lower share price also reduces the equity weight and may reflect lower expected cash flows, so price alone cannot establish that WACC rose. Examine both the return estimates and the current financing values before drawing that conclusion.
Key Takeaways
- Weight each component and apply the tax factor only to debt.
- Add weighted contributions, keeping intermediate values unrounded.
- WACC is an average-risk asset hurdle at the chosen financing mix.
- The next dollar’s financing cost can exceed the existing average.
- Changes in share price alone do not determine the direction of WACC.
4.3 Use WACC with the cash flows it fits
A correctly calculated WACC can still produce a poor decision if it is attached to the wrong project or cash flows. Match the risk, financing policy, inflation treatment, and currency before discounting.
Check the project and financing policy
The firm's WACC fits a project when it has the same risk as the existing business, the debt-to-value ratio stays roughly constant, and the project is small enough not to alter the firm's overall risk or financing. A new line of business may need a different rate even if head office supplies the funds.
Discount free cash flows after operating taxes and investment but before interest or loan repayments. Debt's required return and interest tax saving already enter WACC. Subtracting interest in those cash flows would charge for financing a second time.
An average-risk project costs $50 million and generates $9 million at each year-end for eight years. At 8.67%, its NPV in millions is:
Its IRR is about 8.90%, just above WACC. If the project's risk instead requires 9.74%, its NPV is about −$1.53 million. The favorable result at the company average would then be misleading.
Keep inflation and currency consistent
Nominal cash flows include expected inflation and need a nominal rate. Real cash flows exclude inflation and need a real rate:
At 9% nominal WACC and 3% expected inflation:
Subtracting 3% from 9% gives only an approximation. Also estimate a discount rate in the same currency as the cash flows.
Separate the funding transaction from project risk
An average-risk project funded today by a loan does not use only the after-tax borrowing rate as its hurdle. Borrowing uses debt capacity within the firm's overall financing mix. The mix and the investment's risk determine the applicable WACC, even when the immediate transaction uses one source.
Count issue costs at the time they occur
New-issue costs reduce net proceeds. In a dividend-based equity estimate, a fee fraction gives:
With a $2.08 next dividend, $40 price, 4% growth, and 5% fee, the estimate becomes about 9.47%. A generally preferred project treatment records a one-time fee in the initial outflow, instead of charging a higher rate every future year.
Be clear about the fee base. A gross $100 million issue with a 5% fee costs $5 million and leaves $95 million. If the project needs $100 million net, gross funds must be million, with fees of about $5.263 million. Do not charge the same fee through both a higher discount rate and an extra initial outflow.
Key Takeaways
- Company WACC requires matching project risk and a stable financing mix.
- Discount operating free cash flows before financing payments.
- Match nominal or real treatment and currency across rates and cash flows.
- A project’s immediate funding source does not set its hurdle.
- Issue fees are one-time costs; distinguish gross funding from net cash needed.
- A project with different business risk needs its own discount rate.
5Match project and divisional risk
A company may run businesses whose cash flows respond very differently to the economy. Its average cost of capital cannot judge every new investment fairly. Comparable firms provide evidence about a project's business risk, but their debt levels must be removed before their betas can be reused. Project and divisional rates then combine that risk with the planned financing, with risk classes offering a rougher fallback.
5.1 Give each project a hurdle for its own risk
A company's average hurdle is a useful benchmark for its usual business. Applying it to every project creates a predictable bias: it penalizes safer investments and gives riskier investments too easy a test.
Compare projects at their own required returns
For an all-equity firm, the security market line gives each project's required return directly from its asset beta. The company average is a horizontal line; it matches the security market line only at the company's average beta.
Suppose the company hurdle is 9%, the risk-free rate is 4%, and the market risk premium is 5.5%. Consider two all-equity projects:
| Project | Asset beta | Required return | IRR | Decision |
|---|---|---|---|---|
| A | 0.5 | 6.75% | 8% | Accept |
| B | 1.6 | 12.80% | 11% | Reject |
Project A clears its own hurdle even though 8% is below the company average. Project B fails its own hurdle even though 11% exceeds that average. A uniform 9% rule reverses both decisions. These comparisons concern conventional investment cash flows, for which the usual IRR decision rule applies.
Keep the equity-only picture separate from WACC
When a project uses debt, the CAPM return at its asset beta is its unlevered required return. The appropriate project discount rate is an after-tax project WACC. First relever its asset beta for the target debt-to-equity ratio, estimate the corresponding equity return, then combine equity and after-tax debt costs at the target weights.
The simple security market line picture therefore illustrates the risk error cleanly for all-equity investments. A levered firm's after-tax WACC should not be plotted as if it were simply the CAPM return at asset beta; interest tax relief changes the level of the financing hurdle.
Identify the risk the market prices
Systematic risk comes from cash flows that move with the wider economy. Luxury purchases and construction can be sensitive to business cycles. High operating leverage, meaning a large fixed-cost share, can amplify the effect of sales changes on profits and increase exposure to those cycles.
A technology failure unique to one project is diversifiable risk. Include its probability in the expected cash flows and examine scenarios. Adding an arbitrary premium to the discount rate for the same failure would mix a cash-flow forecast problem with the market-risk price. Diversifiable risk still matters to the amount of cash expected; it is not a reason to ignore possible losses.
See the effect across repeated decisions
A company that repeatedly uses one hurdle tends to reject worthwhile safer projects and accept too many risky ones. Its business mix can become riskier over time. Routine replacement and expansion in the existing business can still use the firm-wide WACC when they keep its usual risk and financing mix. The needed adjustment follows the project's exposure, not the label “new” or the enthusiasm of its sponsor.
Key Takeaways
- A uniform rate can reject good safer projects and accept poor riskier ones.
- Use asset-beta CAPM returns directly only for an all-equity hurdle.
- Debt-financed project rates require project equity cost and after-tax WACC.
- Price systematic risk in the rate and reflect diversifiable outcomes in expected cash flows.
5.2 Build a project rate from comparable firms
A new project has no traded shares from which to estimate its own beta. The pure-play method borrows evidence from listed firms in the same business. It separates business risk from the financing risk in their equity betas.
Choose and unlever comparables
Select firms whose operations resemble the project. Similar size is not enough if revenues respond to different economic forces. For each comparable, obtain its equity beta, market debt-to-equity ratio, and tax rate.
With debt beta taken as zero, the tax-adjusted unlevering formula is:
A comparable has equity beta 1.5, debt-to-equity ratio 0.5, and tax rate 25%. Its financing multiplier is:
Its asset beta is . Dividing removes the extra risk its debt places on shareholders. It does not remove the business's market risk.
Use several comparables when possible. Unlever each one at its own debt ratio and tax rate before averaging. Asset betas of 1.05, 1.12, and 1.10 average to 1.09. Averaging raw equity betas first can mix different financing effects into the business-risk estimate.
Add the project's financing risk
Relever at the project's target ratio:
Using the single comparable's unrounded asset beta and a target ratio of 0.25 gives:
This target has 20% debt and 80% equity because debt is 0.25 for each 1 of equity. A 25% debt-to-equity ratio is not a 25% debt weight.
Convert beta into the final project rate
At a 4% risk-free rate and 5.5% market premium:
Debt costs 5.6% before tax, or 4.2% after tax. The project WACC is:
Use that project rate for matching project free cash flows. The firm's own 8.67% average would understate this project's hurdle.
Apply one beta convention consistently
A no-tax value-weighted beta convention instead starts with:
With zero debt beta, the comparable above has asset beta 1.0. Relevering without the tax factor at a target ratio of 0.25 gives equity beta 1.25. Its equity cost is 10.875%, and using after-tax debt in WACC gives about 9.54%.
The two beta conventions produce different estimates. Use the specified convention for both removal and restoration of leverage. Taking a tax-adjusted asset beta and then adding leverage with the no-tax multiplier creates a third, inconsistent calculation.
Key Takeaways
- Choose comparables for business risk, then remove each one’s financing effect.
- Unlever before averaging asset betas.
- Relever using the project’s target market debt-to-equity ratio.
- Convert debt-to-equity into debt-to-value before forming WACC weights.
- Use the same beta convention in both directions.
- A levered project’s final hurdle combines equity and after-tax debt costs.
5.3 Set divisional rates and review rough risk classes
A diversified company contains businesses with different market exposures. Each division needs a rate for its own average-risk projects. A project that differs from its division's usual risk needs a further project-level assessment.
Build a divisional benchmark
Estimate asset betas from pure-play firms in each division's business. Use the division's financing policy to relever the asset beta, apply the CAPM, and combine equity and after-tax debt costs into a divisional WACC.
Head office's internal loan rate and a division's accounting return on assets do not measure its systematic risk. Accounting return reports performance on book capital; a cost of capital measures the market return investors require on the risk they bear.
Weight divisions by their economic values
A company has 60% of its asset value in a division with asset beta 0.8 and 40% in one with asset beta 1.4. Its asset beta is:
At a 4% risk-free rate and 5.5% market premium, the divisions' unlevered required returns are 8.4% and 11.7%. The company's unlevered return is 9.72%, also the value-weighted average of those returns.
These are all-equity benchmarks. When divisions use debt, calculate their after-tax WACCs from their relevered equity betas and financing weights. Do not call an asset-beta CAPM return a levered divisional WACC. A common 9.72% all-equity hurdle would discourage good projects in the safer division and favor weak projects in the riskier one.
Use risk classes when market evidence is scarce
A firm with WACC of 8.67% might set the following illustrative classes:
| Project class | Adjustment | Class hurdle |
|---|---|---|
| Cost reduction | −2 percentage points | 6.67% |
| Existing-business expansion | None | 8.67% |
| New products | +3 percentage points | 11.67% |
| New markets | +6 percentage points | 14.67% |
These adjustments are managerial judgments, not measured market premiums for every project carrying the label. Review them against business exposure and comparable evidence. A project near a class boundary can receive a sharply different rate even though its underlying risk changes only slightly.
Examine uncertainty before deciding
Pure plays can be hard to find because listed firms often combine several businesses. Overseas comparables can also differ in tax, borrowing, and markets. Use a group of reasonable comparables and remove each financing effect before combining evidence.
Check NPV over a plausible range of rates. If NPV remains positive throughout, the decision is less sensitive to the precise estimate. If it changes sign within that range, identify which business-risk inputs drive the result and investigate them further. Averaging the rates into one apparently precise number would hide the uncertainty that matters to the investment decision.
Key Takeaways
- Divisional hurdles reflect each division’s business risk and financing policy.
- Company asset beta is a value-weighted average of divisional asset betas.
- An unlevered CAPM return and an after-tax divisional WACC are different rates.
- Risk-class adjustments are judgments that need review against evidence.
- An NPV sign change within a plausible rate range calls for closer analysis.
Cost of Capital examples
1Follow investors’ money to the project hurdle
10 steps
- 1IntroductionWhat must the investment earn?
A project can return more cash than it costs and still leave investors worse off. They could have put their money into another investment with the same risk. The return they give up is the cost of capital, the hurdle a project must clear to create value.
Follow one investment from that alternative return to its NPV. Then connect debt, preferred stock, and common equity to the different returns their holders require, which combine into WACC.
- 2ExplanationStart with the forgone alternative
The cost of capital is the expected return investors could earn elsewhere at the same risk. If that alternative offers 9%, the project needs to compensate them at 9% too.
This is an opportunity cost, even when no interest bill arrives. Retained earnings belong to shareholders, who could receive that cash and invest elsewhere. Keeping profits inside the firm therefore still uses equity capital.
- 3ExamplePut the future receipt into today’s money
A project requires $10 million today and is expected to pay $11.2 million in one year. Its risk-appropriate rate is 9%.
Discount the receipt before comparing it with the outlay:
The expected receipt is worth about $10.275 million today. Subtracting the $10 million investment gives NPV of about +$0.275 million, so the project adds value at this risk.
- 4ExampleChange the risk and the hurdle
Now suppose the same expected receipt carries risk requiring 13%. Its present value becomes:
NPV is about −$0.088 million. The nominal cash surplus is still $1.2 million, but that surplus no longer covers investors' opportunity cost. This is why an investment decision needs both an expected payoff and a rate for the risk of receiving it.
- 5ChallengeDoes a cheap loan change project risk?
A risky project is funded with a low-rate bank loan. A manager proposes the loan rate as the project's hurdle. Is that a sound choice?
---reveal---
No. The project's cash-flow risk sets its required return. A borrowing transaction does not remove that risk. The loan also uses capacity within the firm's financing mix, so its rate alone does not measure the return required on the whole investment.
- 6ExplanationCompare the investor claims
Debt promises interest and principal, with priority over shareholders. Preferred stock generally promises a fixed dividend ahead of common dividends, but that dividend can be suspended.
Common equity receives the residual after other claims. For one firm, this ranking usually means debt has the lowest required return, preferred lies between, and common equity has the highest. Higher expected return compensates for weaker payment protection.
- 7ConnectionWhich claims enter the financing mix?
Investor capital includes interest-bearing debt, preferred stock, and common equity. A revolving loan used as permanent financing can count as debt; accounts payable and accrued operating expenses stay in operating cash flows.
Combining the sources gives WACC, their market-value-weighted cost. Only debt receives the interest tax adjustment. Preferred and common dividends are paid from after-tax profit.
- 8ChallengeTest payment priority
A firm has missed dividends on cumulative preferred stock and wants to pay common shareholders. What must it do first?
---reveal---
Pay the accumulated preferred dividend arrears before the common dividend. “Cumulative” means missed dividends build up. It does not turn preferred dividends into debt interest or automatically require the firm to redeem the preferred shares.
- 9ChallengeCombine the financing and opportunity-cost ideas
A manager says, “Use retained earnings because they are free, then switch entirely to debt because its current rate is lowest.” What is missing from both claims?
---reveal---
Retained earnings cost the equity return shareholders give up elsewhere. More debt also raises the financial risk of the remaining equity and can raise borrowing cost. Comparing today's component rates while holding risk fixed does not establish the cost of a new financing mix.
- 10RecapCarry the right question into the calculations
Begin by identifying the investment's risk and the equally risky alternative return. Use that rate to discount expected receipts and compare them with the initial outlay.
Then identify the investor claims behind the funding: debt, preferred stock, and equity. Their market values and current required returns will build the overall hurdle, with interest tax relief affecting debt's net cost.
2Build and compare equity return estimates
18 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionTwo routes to the shareholders’ hurdle
- 2ExplanationSeparate the safe return and the premium
- 3ExampleCalculate the stock’s premium
- 4ChallengeCheck a market-return input
- 5Key InsightKnow what the model rewards
- 6ExplanationMeasure shared movement
- 7ExampleSee beta as a fitted slope
- 8TipPull a noisy estimate toward one
- 9ChallengeCan high volatility coexist with low beta?
- 10ExplanationWork backward from the dividend price
- 11ExampleMove the dividend forward one year
- 12TipRemove an imminent dividend from the price
- 13ExplanationEstimate growth from earnings or history
- 14ChallengeCheck the forecast before dividing
- 15ExampleSee how growth changes both terms
- 16ConnectionCross-check against the firm’s debt
- 17ChallengeChoose a method for a nonpayer
- 18RecapKeep the inputs tied to their meaning
3Turn bond and preferred prices into financing costs
16 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionFollow all the promised payments
- 2ExampleRead today’s bond yield
- 3TipEnter the bond without losing the last coupon
- 4ExplanationUse alternative borrowing evidence
- 5Key InsightDistinguish promised and expected debt return
- 6ChallengeChoose the borrowing-cost measure
- 7ExplanationSubtract the usable tax saving
- 8ConnectionA deduction may be worth less today
- 9ExampleConstruct after-tax bond payments
- 10TipExplain two different after-tax estimates
- 11ChallengeCheck partial interest relief
- 12ExamplePrice a fixed preferred dividend
- 13ExplanationInclude fees or a redemption date
- 14ChallengeCompare preferred and debt correctly
- 15ChallengeCheck the whole component worksheet
- 16RecapTake usable component costs into WACC
4Build WACC and apply it once
15 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionConnect claims to the investment decision
- 2ExampleValue the common and preferred claims
- 3ExampleApply the bond quote to face value
- 4TipChoose the intended financing basis
- 5ChallengeConvert a debt-to-equity target
- 6ExplanationCalculate after-tax debt before weighting
- 7ExampleAdd the weighted contributions
- 8ChallengeCatch a tax error in a short calculation
- 9ExplanationCheck whether company WACC fits
- 10ExampleDiscount operating cash before financing
- 11ConnectionKeep real and nominal estimates matched
- 12TipPay a one-time fee once
- 13ChallengeTest cash-flow consistency
- 14ChallengeRevisit the estimate when funding expands
- 15RecapUse the calculated rate with matching evidence
5Build a hurdle for a different business
17 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionThe company average can hide the project
- 2ExampleWatch the safer project fail the wrong test
- 3ExampleWatch a risky project pass too easily
- 4Key InsightPut failure probabilities in the forecast
- 5ChallengePrice the expected receipt
- 6ExplanationFind a business-risk match
- 7ExampleRemove the comparable’s debt effect
- 8TipAverage comparable businesses after unlevering
- 9ExampleRestore the project’s financing effect
- 10ExampleFinish with equity cost and project WACC
- 11ChallengeCheck the direction of the leverage change
- 12ExplanationGive each division a matching benchmark
- 13ExampleWeight the divisional business risks
- 14TipTreat classes as rough risk estimates
- 15ChallengeInterpret a decision that changes with the rate
- 16ChallengeCombine the risk and financing checks
- 17RecapFollow risk into the final rate
Cost of Capital practice questions
Set 1: Estimate and combine component costs10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Investor returns and financing basics10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Check timing, taxes, and project risk10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Apply the full method in new cases10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Evaluate estimates and investment decisions10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Adjusted beta
After-tax cost of debt
After-tax financing IRR
Asset beta
Average cost of capital
B
Beta
Book value
C
Capital asset pricing model
Common equity
Compound annual growth rate
Correlation
Cost of capital
Coupon rate
Covariance
Credit spread
Cum-dividend price
Cumulative preferred stock
Current yield
D
Debt
Default probability
Diversifiable risk
Dividend growth model
Divisional cost of capital
E
Effective tax rate
Equity beta
Ex-dividend price
Expected cash flow
F
Financing-source error
Flotation costs
Free cash flow
I
Interest deduction limit
Interest tax shield
Irredeemable debt
L
Loss rate in default
M
Marginal cost of capital
Marginal tax rate
Market capitalization
Market risk premium
Market value weight
N
Net debt
Net present value
Net proceeds
Nominal rate
O
Operating leverage
Operating liability
Opportunity cost
P
Par value
Preferred dividend yield
Preferred stock
Project cost of capital
Pure-play comparable
R
Real rate
Redeemable preferred stock
Regression beta
Relevering beta
Required return
Retention ratio
Return on equity
Risk class
Risk-free rate
S
Sampling error
Security market line
Sensitivity analysis
Sustainable growth rate
Systematic risk
T
Target capital structure
U
Unlevering beta
V
Value-weighted asset beta
W
Weighted average cost of capital
Weighted contribution
Y
Yield to maturity
About this lesson
Make your own Study Materials
Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.