Task Systems and Digital Organization

Keep every task, idea and commitment in one system you can trust. Learn to capture whatever has your attention, decide what each item means, and organize the results in lists, a digital task manager or a personal kanban board. Set up email and notification rules, arrange files and notes around your projects, and keep everything current with a weekly review based on David Allen's Getting Things Done.

BeginnerLesson 3 of 5 in Time Management and Productivity Course

What you will learn

  1. Understand why keeping tasks in your head costs attention, and capture everything that has your attention into a few inboxes you trust.
    • Explain why a trusted system works better than memory
      Describe open loops, what makes a system trustworthy, and the five steps of the Getting Things Done workflow.
    • Capture everything into a few inboxes
      Choose a small number of capture tools, write items down as they appear, and empty your head with a complete mind sweep.
  2. Decide for every captured item whether it needs action, define outcomes and next physical steps, and empty your email and other inboxes regularly.
    • Decide what each item is and where it goes
      Work through the clarifying questions for each inbox item: is it actionable, what is the outcome and the next action, and should you do it, delegate it or defer it?
    • Write clear projects and next actions
      Define a project as an outcome that needs more than one step, write it as a finished result, and phrase next actions as concrete physical steps.
    • Process email and other inboxes to zero
      Understand what inbox zero really means and process an email inbox with five quick decisions: delete, delegate, respond, defer or do.
  3. Place each clarified item where it will remind you at the right moment, set up a digital task manager, and use a kanban board to see and limit work in progress.
    • Sort actions into the right lists and onto the calendar
      Use the standard GTD categories (projects, next actions by context, waiting for, calendar, someday/maybe and reference) and keep each one clean.
    • Set up and use a digital task manager
      Choose a task manager that supports quick capture everywhere, map the GTD lists onto its features, and use dates, tags and recurring tasks without overloading it.
    • Visualize and limit your work with personal kanban
      Build a personal kanban board, apply its two rules, set a work-in-progress limit and use the board alongside your lists.
  4. Set rules that sort incoming email and notifications automatically, and organize files and notes so that they match your projects and areas.
    • Automate incoming email with rules and filters
      Write email rules from conditions and actions, choose which messages should skip the inbox, and test and maintain your rules.
    • Set notification rules that inform without interrupting
      Decide which notifications may interrupt you, which can wait for a summary and which should be off, and route task-like alerts into your system.
    • Organize files and notes around your projects
      Keep project material and reference where you can find it, mirror your project list in folders and notes, name files consistently, and archive finished work.
  5. Run a weekly review that keeps the system complete and current, use it to decide what to do each day, and repair it when your trust in it slips.
    • Run a weekly review
      Work through the three phases of the weekly review (get clear, get current, get creative) in a fixed weekly time slot.
    • Choose what to do now with confidence
      Use your calendar and lists to choose the next action in the moment, applying the four criteria of context, time, energy and priority.
    • Keep your system healthy and review at higher levels
      Recognize when trust in your system is slipping, repair it, and review your areas, goals and purpose on a longer cycle.

Task Systems study guide

5 chapters

1

Build one trusted system for your commitments

Everyday commitments arrive as messages, thoughts, papers and promises. A reliable system gives them a home outside your memory and a routine for bringing them back when useful. Begin by understanding how capture, decisions and review work together, then choose a few collection points you can reach wherever you are. A mind sweep helps you gather the loose ends that have never reached a list, including small home tasks as well as major work and study commitments.

1.1 Give commitments a reliable home

Remembering a task is different from being reminded when you can act. You may remember a return while commuting, then forget it when you leave home. A trusted system gives commitments a place outside your head and brings them back into view.

Open loops and attention

An open loop is an unfinished commitment, idea, task or worry that has not been recorded and decided. “Call the dentist” counts, as does “Look for a cheaper phone plan.” Small personal items belong beside work and study commitments because each can need your attention.

Memory often prompts you at the wrong moment: batteries come to mind in the shower, then disappear from thought at the store. In experiments published in 2011, E. J. Masicampo and Roy Baumeister found that unfinished goals could interrupt attention during unrelated work. Committing to specific plans for what to do, when and where reduced that interference before the goals were completed. A GTD system follows a similar practical idea: record a commitment, decide its next step and give yourself a reliable reminder.

What makes a system trustworthy?

A system needs three qualities:

  • Complete: it holds all your commitments, including home and personal ones.
  • Current: you update and review it as work changes.
  • Accessible: you can consult it where you need it, such as on your phone while out.

“One system” can include a calendar, task lists, a paper inbox and file storage. The parts have different jobs. What matters is knowing where every kind of item belongs and when you will check that place. Five disconnected task lists create gaps if you cannot tell which one is current.

The five steps of GTD

David Allen introduced Getting Things Done in 2001 and revised the book in 2015. Its workflow has five steps:

  1. Capture: record what has your attention.
  2. Clarify: decide what it means and whether it needs action.
  3. Organize: put the result where it belongs.
  4. Reflect: review and update the system regularly.
  5. Engage: choose and do the next action.

Suppose you notice a damaged bicycle light. Capture “Bicycle light broken.” Later, clarify that you need a replacement and choose “Check the light model on the bicycle.” Put that action on @home. Consult the list at home, do the check, and update the system with the next step. A weekly review catches the project if it stops moving.

Each stage supports the next. Captured notes that are never clarified become a backlog. Well-organized lists that are never reviewed become old guesses about your life. Reflecting includes daily calendar and list checks as well as the weekly review.

Choose a routine you can keep

Paper, a whiteboard and a digital app can all work. A feature-rich app cannot decide what a vague item means or review neglected lists for you. Start with tools you can reach and routines you can repeat. A complete inventory may reveal more promises than you can carry out; that gives you concrete commitments to renegotiate or drop.

Key Takeaways

  • A trusted system is complete, current and accessible.
  • GTD connects capture, clarify, organize, reflect and engage.
  • Daily checks and a weekly review keep decisions usable.
  • The tool holds information; the routine makes it trustworthy.

1.2 Capture quickly and clear your head

A capture tool should be easy to use at the moment a thought appears. You are collecting something to decide about later. A quick, meaningful note is enough; choosing its folder and priority can wait.

Use a few collection points

An inbox is a place for items you have not processed. It can be an email inbox, a task app’s inbox, a notebook, a paper tray or voice memos. Choose as few as you can while still being able to capture wherever you are. For example, use email for incoming messages, a phone inbox for quick thoughts and a tray for paper at home.

Test how quickly you can add an item. A shortcut, widget, voice input or pocket notebook can remove the steps that make you postpone capture. A forwarding address can collect email in a task app. If a tool is awkward in the places where you need it, change the capture route.

Write enough to recognize the item later. “Ana — budget question” is quick but meaningful. “That thing” will make you reconstruct the thought. Capture a large physical item with a note: “Repair hallway lamp” can stand for a lamp that cannot fit in the tray.

Run a mind sweep

A mind sweep collects every open loop you can recall, one per line or note. Allow 30 to 60 minutes for a first sweep and continue until nothing new comes to mind. Do not sort, judge or start the tasks while collecting them.

A trigger list helps you search your memory. Work through prompts such as unfinished projects, promises, upcoming meetings, money, home repairs, appointments, family events, purchases, learning and things other people owe you. For each prompt, ask, “Is there anything here I have not written down?” Check physical piles too: papers and objects can hold commitments that memory misses.

Separate collection from decisions

A first sweep might produce 30 items in 40 minutes. Later processing could send 4 to trash, 5 to reference and 6 to someday/maybe. You might complete 3 short actions, record 8 single next actions and define 4 projects, each with a first next action. All 30 items are accounted for. You did not need to make those decisions while capturing.

This separation matters when one thought leads to another. If you stop to research a course after writing “Learn a new skill,” you may lose the other thoughts that were ready to surface. Finish collecting, then return to the inbox for clarification.

Give every inbox an emptying routine

Process daily collection points, such as email and your phone inbox, typically every day. Process every other inbox at least weekly. Emptying means deciding what each item is and moving the result to its proper place; it does not mean completing every task.

An open tab or flagged message works as a reminder only if you have a routine for reviewing it. If you never scan those places, copy the item into an inbox you do process and close or clear the temporary reminder.

Key Takeaways

  • Use a small set of quick, reachable inboxes.
  • Capture one recognizable item at a time.
  • A mind sweep collects thoughts before you sort them.
  • Trigger lists and physical piles help find missed commitments.
  • Every inbox needs a regular processing time.
2

Clarify what each item means and get your inboxes to zero

A full inbox mixes decisions with information and work of very different sizes. Processing separates those jobs: you identify what each item means, give active outcomes a clear next step and put reminders where they belong. The same decisions work for paper, notes and email. Learning to distinguish a finished outcome from a doable action makes your lists easier to use, while inbox processing lets messages leave the inbox without losing the work they represent.

2.1 Decide what each captured item needs

Processing an inbox means making a decision about every item. Most decisions create a reminder or store useful information. You can empty an inbox while much of the work itself remains to be done.

Start with action or no action

Take one item and ask, “What is it?” Then ask, “Is it actionable?” For something that needs no action, choose among three destinations:

DestinationWhat belongs there
TrashSomething you no longer need
ReferenceInformation worth keeping for later
Someday/maybe or a future reminderAn idea you have not committed to, or something to reconsider later

A product manual can go into reference. A class flyer can go to someday/maybe. A reminder to reconsider a seasonal purchase can return on a future date. Moving an active obligation to someday/maybe would hide a commitment you still need to meet.

Define the outcome and next step

For actionable items, ask, “What outcome do I want?” If it needs more than one step, record a project. Then identify the next action, the next visible, physical step that moves it forward. “Passport renewed” is an outcome; “Download and print the renewal form” is an action.

When an item is unclear, finding the missing information is itself an action. “Ask Dan what ‘the usual format’ means” lets you move forward without pretending you already understand the request.

Do, delegate or defer

During processing, use the two-minute rule: do a next action that takes less than about two minutes. Tracking and rereading such a small task can take longer than doing it. This rule belongs to processing; it is not a reason to interrupt focused work whenever a small request arrives.

For a longer action, decide who should do it. If someone else should, delegate it and record the person, expected result and request date on Waiting For. If you should do it, defer it to a next actions list, or to the calendar if it must happen at a fixed time or on a required day.

Work through six items

A receipt for new headphones goes into reference. A pottery-class flyer goes to someday/maybe. A meeting-time confirmation takes 30 seconds to answer, so you reply now. An updated price sheet belongs to Lee: send the request and record “Lee — updated price sheet, asked 2026-11-03.” A passport renewal becomes a project with its first action. A dentist appointment for May 14 at 9:30 a.m. goes on the calendar.

Each item leaves the inbox with a decision. Work from one end, one item at a time, and do not put an item back. Skipping difficult items preserves the decisions you most need to make. Spending an hour completing one long task during processing leaves the rest of the inbox undecided; record that action and keep processing.

Key Takeaways

  • No-action items go to trash, reference or incubation.
  • Actionable items need an outcome and a next physical step.
  • Use the two-minute rule during processing.
  • Delegated work needs a Waiting For record.
  • Defer your longer work to a list or a required calendar date.
  • Process one item at a time without putting it back.

2.2 Turn vague projects into doable steps

A list becomes hard to use when “Call Sam” sits beside “Move home” as though both were the same size. Separate finished outcomes from the actions that move them forward. Each reminder then asks you to do a recognizable piece of work.

Name a result you can finish

In GTD, a project is a committed outcome that needs more than one action and can be completed within about a year. Hiring an assistant, arranging a birthday party and fixing a leaking faucet all qualify. Size and formality do not decide whether something is a project; the need for several steps does.

Write the project as a finished result: “Kitchen faucet replaced,” “Tax return filed” or “Trip to Lisbon booked.” You should be able to recognize completion. “Car” and “Garden” describe ongoing areas of responsibility. “Car inspected” and “Vegetable beds planted” describe projects within those areas.

Make the next action visible

A next action begins with a concrete verb and names a step you could do with the right tools in the right place. Ask, “Could I do this now without deciding what it means first?”

Vague reminderUsable next action
“Plan party”“Text Jo three possible party dates”
“Report”“Draft the report’s opening paragraph”
“Plumber”“Call Ravi for a plumber recommendation”

You may need to think, write or research as part of an action. Make the activity specific enough to start: “Draft three interview questions in the hiring document” gives thinking a visible output.

Separate available actions from later steps

For “Team offsite in June organized,” two actions can start now: “Email Priya for the budget limit” and “Search for three venues within 30 km of the office.” They can happen in parallel. Booking a venue and sending invitations depend on decisions still to come, so keep those future steps in project notes until they become available.

Every active project needs at least one live reminder: a next action, a Waiting For entry or a calendar entry. If you have requested the budget and cannot proceed until it arrives, the dated waiting entry keeps the project visible. The projects list is still needed so you can check the whole outcome during review.

Plan more when the project needs it

Small projects often need only a clear outcome and first action. For larger ones, Allen’s natural planning model gives five phases:

  1. Define purpose and principles: why you are doing it and the standards you will keep.
  2. Picture the successful outcome.
  3. Brainstorm possibilities.
  4. Organize ideas into steps and order.
  5. Identify next actions.

For a study event, the purpose may be to help learners prepare, with accessible materials as a principle. The outcome describes a prepared event; brainstorming supplies ideas; organizing puts them in a workable order. The next actions are only the steps you can actually start.

Key Takeaways

  • A project names a committed, finishable outcome needing several steps.
  • A next action is concrete enough to begin without more clarification.
  • Keep dependent future steps in project support notes.
  • Every active project needs a next action, waiting item or calendar entry.
  • Use the natural planning model when a larger project needs more thought.

2.3 Process messages without keeping them as reminders

Repeatedly reading the same messages uses attention without moving decisions forward. Inbox zero gives each message a destination and any needed action a reliable reminder. The work continues in your task system after the message leaves the inbox.

What “zero” means

Merlin Mann introduced inbox zero on 43 Folders in 2006. The zero refers to the attention your inbox occupies. An empty inbox is a common result of processing, not the purpose of keeping email under control.

Checking means looking at new mail. Processing means deciding what each message needs. A message you have read several times but left untouched is still waiting for a decision, even if it is no longer marked new.

Make one of five decisions
ActionWhat you do
Delete or archiveRemove mail that needs no action; archive useful information
DelegateSend work to the appropriate person and track the expected result
RespondSend a short reply now
DeferRecord a longer action in your system, then archive the message
DoComplete quick work now

An archive keeps messages searchable outside the inbox. A broad archive or a few broad folders often makes filing easier than dozens of narrow folders. Useful information can remain available without sharing space with undecided messages.

Turn a message into an action

Suppose Elena asks for third-quarter numbers. Write “Send Elena the third-quarter numbers — email of 2026-10-14,” adding a link or enough context to find the thread. Then archive the message. A flag saying “important” does not tell you what to do, and marking the message unread mixes a known task back into new arrivals.

Delegation also needs a reminder. Forwarding alone records what you sent, but Waiting For tells you what to follow up and when you asked.

Account for a batch

After a day away, 40 messages arrive. You delete or archive 14 without action, delegate 3, answer 9 briefly, defer 6 as tasks and file 8 as reference. The categories total 40, leaving the inbox empty. The 9 replies take at most two minutes each, so together they take at most 18 minutes. The task system gains 6 deferred actions and 3 Waiting For entries: 9 tracked items.

Keep processing separate from long work

Choose regular processing times, for example two or three times a day, and turn off new-mail alerts between them when your work allows. Work from one end and finish making decisions. A long response belongs on an action list; composing it during processing can leave the remaining messages waiting.

Use the same routine for voicemail, saved chat, phone notes, paper and downloads. For a large old email backlog, search for important senders before considering a one-time archive. Archiving unread mail without checking for important commitments can hide work you still owe.

Key Takeaways

  • Inbox zero concerns attention, with an empty inbox as a useful result.
  • Checking reads messages; processing decides their destinations.
  • Deferred messages need clear task reminders before archiving.
  • Delegated messages need Waiting For entries.
  • Use regular processing times and keep long work on action lists.
3

Organize tasks in lists, a task manager and a personal kanban board

An organized system brings up the right reminders for the situation you are in. Lists separate outcomes, available actions, waiting items and possibilities; the calendar protects fixed commitments. A task app can hold these categories and show useful views, while a personal kanban board makes current work and blocked tasks visible. Dates, tags and limits are useful when they help you find an action or notice unfinished work; each needs a clear job.

3.1 Give each reminder the right destination

Once you have clarified an item, its destination should make it easy to find when useful. A project, an appointment and a manual need different kinds of reminders. Mixing them into one list makes every scan harder.

Keep outcomes and actions distinct

The projects list indexes the outcomes you have committed to. It lets you check each project during the weekly review; it does not need to contain every step. Available next actions go on lists grouped by context, the place, tool or person they require.

Use a small set that matches your life: @calls, @computer, @errands, @home or @anywhere. At the store, scan @errands. If you use the same laptop everywhere, separate @computer and @office lists may add little. Some people use an energy context to find low-energy tasks. Add a category when it makes a real choice easier.

An agenda holds points to raise with a particular person. “Ask Maya about the parking permit” belongs on “Agenda — Maya” if you will raise it at your next conversation. It does not have to become an immediate call.

Reserve the calendar for its job

GTD calls the calendar the hard landscape: it holds fixed times, actions required on a particular day and day-specific information. A meeting at 2 p.m., a call promised for Tuesday and a colleague’s last day belong there.

If a bank reopens Tuesday, Tuesday is the earliest possible start, not necessarily the required day for your call. Use a start date or tickler, a reminder that brings an item back on a chosen date. The paper tickler has 43 folders: 31 for days and 12 for months. Digital start dates can do the same reminder job.

Filling the calendar with wished-for tasks creates repeated moves. It becomes harder to spot what really must happen that day. Record genuine deadlines accurately, and use action lists for flexible work.

Track waiting, possibilities and information
PlaceWhat it keeps visible
Waiting ForWhat another person owes you, their name and the date requested
Someday/maybeIdeas you may pursue but have not committed to
ReferenceUseful information with no action attached
Project supportFiles and notes used to carry out a current project

“Hotel — deposit refund, requested 2026-10-02” tells you what to follow up. “Take a sailing course” can stay on someday/maybe until you choose to commit. Manuals and contracts belong in reference; an active project’s draft stays with its support material.

Sort a mixed group

“Buy printer ink” goes on @errands. A dentist appointment on March 3 at 8 a.m. goes on the calendar. The lease contract goes into reference. “Kitchen renovation planned” goes on the projects list, with “Measure the kitchen walls” on @home. The outcome and the next step stay connected, but each has its own job in the system.

Key Takeaways

  • The projects list indexes outcomes; action lists hold doable steps.
  • Contexts and agendas bring actions up in useful situations.
  • The calendar holds fixed times, required days and day-specific information.
  • A start date or tickler brings future-relevant work into view.
  • Waiting For records what, who and when asked.
  • Separate uncommitted ideas and reference from active work.

3.2 Build a task app around your workflow

A task manager should make capture and choosing work easier. Start with the lists you need, then map them onto the app. Adding every available feature can create more maintenance than useful support.

Choose for daily use

A digital task manager stores tasks and projects and syncs them across devices. Useful features can include an inbox, lists, tags, dates, repeating tasks, notes, attachments, search and saved views. Choose by the needs of your actual system: quick capture on the devices you use, reliable sync and a way to view next actions by context. Consider offline access if you need it, export, cost and a privacy policy you accept.

A workplace tool may already meet those needs. Paper can also work. Spend your effort establishing capture, clarification and review before adding integrations or switching tools to chase features.

Map the lists once

Use the app inbox for capture. Give each project a project or list. Contexts can become tags such as @calls and @errands. Waiting For can be a tag or separate list, and someday/maybe can be a separate list or paused project group. Keep reference in files or notes so task views contain work you can choose.

A workable setup could have one inbox, 12 active projects, a someday/maybe folder, five tags (@calls, @computer, @errands, @home and waiting), and three saved views: Today, Next by context and Waiting. This can be set up in an hour; the value comes from using and reviewing it.

Tell dates apart
Date typeMeaningExample
Due dateA real deadline, with a consequence if missedAn application closing date
Start dateThe earliest useful time to show an action“Book summer flights,” visible from January 10

A date you wish to do something is different from a deadline. If the app supports chosen tasks in a Today view, use that feature for daily choices without manufacturing overdue warnings. A useful context view shows tasks available now, excluding those with future start dates.

Choose how a routine repeats

“Pay rent on the 1st” follows a fixed schedule. “Replace the water filter every 60 days” may need to repeat from completion because the next interval begins when replacement actually happens. If a delayed replacement still repeats from the old due date, the next reminder comes too soon for that intended interval. Check the app’s repeat behavior when setting up the task.

Add connections only when they help

Email forwarding, shared household lists and calendar views can save steps. First make the basic system work, then connect the routes you use. Keep one authoritative reminder for each action. A second app kept “just for now,” too many tags or almost everything marked high priority makes it harder to know which view you can trust.

Key Takeaways

  • Choose an app for capture, access and the views your system needs.
  • Map GTD lists to app features without building duplicate task lists.
  • Use due dates for real deadlines and start dates for availability.
  • Choose fixed or completion-based repetition to match the routine.
  • Saved views should show actions you can actually choose now.

3.3 Limit the work you have started

A personal kanban board makes work visible as cards moving through stages. Its two rules are simple: visualize work and limit work in progress. The limit helps you notice unfinished work before starting more.

Set up a small board

Jim Benson and Tonianne DeMaria Barry described Personal Kanban in their 2011 book. Kanban means a signboard or visual card in Japanese and comes from lean manufacturing. For a personal board, begin with Ready, Doing and Done. Add Backlog for later possibilities or Waiting for blocked tasks when useful.

Write each card as a finishable piece of work. “Draft the welcome email” has an end; “Website” may stay in Doing indefinitely. Choose a Done point that means the task is actually complete, then move the card when that point is reached.

Pull work when space opens

A WIP limit caps the cards in a column, especially Doing. Start with 2 or 3 and adjust after a week or two. With a Doing limit of 3, a fourth task can start only after a current card finishes or moves to Waiting. Pulling work into a free slot keeps arrivals from automatically becoming active work.

Moving a blocked card to Waiting frees a Doing slot. It does not finish the task. Total WIP includes every started, unfinished card, including Waiting. A growing Waiting column can therefore hide overload if you look only at Doing.

Understand average time

Throughput is the number of tasks finished per unit of time. In a stable system, Little’s Law relates averages:

Average time in progress=Average total WIPAverage throughput

With 12 tasks in progress on average and 4 finished per week, average time in progress is 3 weeks. At the same throughput with 4 tasks in progress on average, it is 1 week. You finish the same number per week, but tasks spend less time unfinished. Individual tasks can still take longer or shorter than the average.

Use the board with your lists

Your task manager can keep the full inventory while the board shows the few tasks you are moving this week. Review the board daily and ask what is blocking the oldest card. Follow up waiting items during the weekly review.

A board can also show stages of one larger project, such as To apply, Drafted, Sent and Interview for job applications. Keep the columns useful for your own work. A board without limits becomes a visual to-do list, and too many columns make its meaning harder to read. Shared team boards follow the team’s agreed practices.

Key Takeaways

  • Personal kanban visualizes work and limits WIP.
  • Pull a new card into Doing only when a slot is available.
  • Waiting frees a Doing slot but remains part of total WIP.
  • Little’s Law relates average WIP, throughput and time in a stable system.
  • Use finishable cards and check where older work is blocked.
  • Keep the full task inventory and the board consistent.
4

Make email, notifications, files and notes feed your system

Incoming messages and stored information should support the same task system. Email rules can route predictable mail, and notification settings can preserve the alerts that need immediate attention. Files and notes hold project details and reusable information. You will connect these routes to clear action reminders, test automated choices and organize support material so the next step on a list leads to the information needed to carry it out.

4.1 Test email rules before trusting them

Routine messages do not all need the same attention as requests that require a decision. Email rules can route predictable mail while preserving a manageable inbox. Each rule needs a clear match, a useful destination and a way to check what it catches.

Pair a condition with an action

Gmail calls them filters; Outlook calls them rules. A condition identifies messages, such as a sender, subject words or mailing list. An action labels, moves, archives, marks, forwards or otherwise handles matching messages. Some programs also support exceptions.

A rule might match a known newsletter sender, apply “Reading” and skip the inbox. The label still needs a review time. Routing mail to ten folders that you never open creates ten neglected collection points.

Test the match first

Build a rule in this order:

  1. Search for the group you want to route.
  2. Inspect the results for missing matches and important messages caught by mistake.
  3. Turn the tested conditions into a rule.
  4. Choose a reversible action, such as labeling and archiving.
  5. Check its destination after new messages arrive.

A broad match for “invoice” could catch routine receipts and an urgent supplier reminder. Use conditions that distinguish what you actually want to route. Automatic deletion under broad conditions makes mistakes harder to recover from.

Check overlap and old mail

A message can match more than one rule. Outlook applies rules in list order, and “Stop processing more rules” can prevent later rules from running after a match. Check the order and stopping behavior when one rule protects key mail and another routes routine messages.

A new rule generally acts on future arrivals unless you choose to apply it to existing messages. Creating a good rule does not mean the old inbox has already been processed.

See what routing changes

Suppose 140 messages arrive daily: 48 newsletters, 30 app notifications, 12 receipts and 50 other messages. Routing the first three groups removes 90 from the inbox and leaves 50 to process, about 36% of the original flow. Those 90 still have destinations: newsletters might be read weekly, while receipts stay available as reference.

Rules can also preserve visibility, for example marking key client messages important. Check what a routine notification contains before deciding it can skip your inbox; some alerts carry an obligation or need prompt action.

Connect actions and maintain the rules

When a message needs work, turn it into a clear next action with a link or usable reference. A task app’s forwarding address can help. A flag is useful only when it appears in a task view you review and the action is clear.

Review rules a few times a year and when routing goes wrong. Remove obsolete rules, inspect rule-fed destinations and unsubscribe from newsletters you no longer read. A small set of maintained rules is easier to trust than a rule for every sender.

Key Takeaways

  • A rule combines matching conditions with actions.
  • Test a search and inspect mistakes before automating it.
  • Check rule order, overlaps and whether old mail is included.
  • Every routed destination needs a review habit.
  • Use clear action reminders for messages that require work.
  • Remove obsolete rules and unwanted subscriptions.

4.2 Choose which alerts may interrupt you

A notification can interrupt, wait silently or stay off. Setting these choices deliberately keeps essential contacts reachable and routine updates available. Task-like alerts also need a route into the system you review.

Sort alerts into three tiers

A notification rule controls how a person or app reaches you: sound, banner, badge, summary or no notification. Device settings control each app; Do Not Disturb or Focus modes can allow chosen people and apps through.

TierPurposeExamples
Interrupt nowSomething worth stopping forEssential family calls, alarms, a requested security code
See laterInformation you can check in a batchRoutine messages, social updates, shopping updates
OffAlerts you do not needPromotions you never use

Only a few apps need the first tier. The exact choice depends on your responsibilities. Someone on call needs different exceptions from someone who can answer routine work messages later. Preserve a clear emergency route and tell colleagues how to use it when email and chat are checked on a schedule.

Apply the choices to real apps

An audit might put 4 of 30 apps in interrupt now, 10 in see later and 16 off. The groups account for all 30. More than half stop alerting, and only 4, about 13%, can interrupt. Review new apps as you add them so their default requests do not undo your choices.

Use task and calendar reminders selectively. An alert to leave for a train or attend a meeting is time-specific. Alerting for every flexible task teaches you to dismiss reminders without deciding what they need.

Capture actions before dismissing alerts

“Your library book is due Friday” is also a commitment. Capture “Return library book” with the real deadline and any needed details, then dismiss the alert. Keeping it unread leaves another reminder pile outside the system you already trust.

Do the same with chat requests. Record the action in your task inbox and mark the message handled in chat. If you need the original details, include a link or enough context to retrieve them. A notification is the arrival route; your task system is the place to manage the work.

Give chat its own settings

Use direct-message and name-mention alerts for conversations that need them. Mute busy channels you only need to scan, and use status or working hours to show when you will respond. Check that urgent contacts can still get through under your device’s focus settings.

Review notification settings monthly or quarterly, and after a change in work or home responsibilities. Turning everything off can miss genuinely urgent contacts; leaving every app at its defaults lets apps decide your interruption rules.

Key Takeaways

  • Assign alerts to interrupt now, see later or off.
  • Keep exceptions and an emergency route that match your responsibilities.
  • Capture actions from alerts and chat before clearing them.
  • Reserve timed reminders for items that need them.
  • Revisit settings as apps and responsibilities change.

4.3 Connect files and notes to the work they support

A task list tells you what to do; files and notes hold the information needed to do it. Matching the names and locations makes it easier to move from reminder to working material. Keep actions visible in the task system while their detail stays in the right project or reference home.

Distinguish support from reference

Project support is material for an active outcome: drafts, quotes, plans and meeting notes. Reference is information you may need later with no action attached, such as a manual, contract or past report.

Mirror project names across your task manager, folders and notes. If the project is “Kitchen renovation planned,” use that name in all three. You can then find its details from the projects list and recognize which material to archive when the outcome is finished.

Use PARA as a simple structure

Tiago Forte’s PARA method groups files and notes into four categories:

CategoryWhat belongs there
ProjectsActive efforts with an outcome and an end
AreasOngoing responsibilities, such as health or finances
ResourcesTopics of interest and reference information
ArchivesInactive material from the other categories

“Health” is an area; “Annual checkup completed” is a project. Moving a finished project’s folder and notes into Archives clears active space while leaving the material searchable. A few broad folders are usually easier to maintain than a deep tree in which several locations seem equally plausible.

Name records so they sort and search

Use a consistent date-first format with leading zeros, followed by a meaningful description. “2026-03-05 Lease signed.pdf” sorts before “2026-11-20 Lease renewal.pdf.” Year-month-day order follows ISO 8601 and avoids mixing day-month and month-day readings. Add a version such as “v2” where useful, instead of accumulating “final,” “final2” and “final really.”

Folders give an item one main home. Tags can connect several themes, such as “tax” and “house.” Search can find content without browsing. A simple folder structure, a few useful tags and search support one another; tagging every possible theme adds work without necessarily helping retrieval.

Process notes as well as tasks

Quick notes can land in a default notes inbox. During processing, move each note to its project, area or resource, discard what is no longer useful, and copy actions to the task manager with a link back. Notes keep decisions and context; action lists keep reminders to act.

For “2026-10-14 Supplier call,” keep three decisions in the note under “New supplier chosen.” Move “Email the supplier our order volume” to @computer and “Price list from supplier, asked 2026-10-14” to Waiting For. Leaving those actions only inside the note would require you to reread meeting notes as a task list.

Key Takeaways

  • Keep active project support with its project and reference by topic.
  • Mirror project names across tasks, folders and notes.
  • PARA separates projects, areas, resources and archives.
  • Use consistent date-first names and useful descriptions.
  • Folders, tags and search do different retrieval jobs.
  • Extract note actions into your task system and link back to details.
5

Review your system and choose what to do

A task system changes as quickly as your commitments do. Daily checks support choices in the moment, and a weekly review catches missing items, changed plans and stalled projects. Reviewing makes the inventory current before you plan the next week. Longer-cycle checks connect projects with responsibilities and goals. When the system starts to feel unreliable, you can use the workflow to find and repair the missing decisions without rebuilding everything.

5.1 Bring the whole system up to date each week

A weekly review makes your inventory of commitments complete and current. It catches forgotten items, stalled projects and changes that have not reached your lists. Give it a recurring calendar appointment so the system stays worth consulting.

Get clear

Gather loose papers, receipts and notes into your inboxes. Process paper, email, phone notes and voicemail to zero by making the required decisions. Do a short mind sweep for new open loops. Include every capture point, not just the app you use most.

Keep processing separate from doing long tasks. If a note reveals a presentation you need to prepare, record its outcome and next action. Preparing the whole presentation during the review would leave the rest of your system unchecked.

Get current

Work through the reminders that already exist:

  1. Review next action lists. Mark completed work and update what changed.
  2. Look back at the past week’s calendar for loose ends.
  3. Look ahead at the coming weeks for preparation you need to capture.
  4. Check Waiting For. Record follow-ups where needed and remove received items.
  5. Review projects one at a time. Each active project needs an available next action, a Waiting For entry or a calendar entry.
  6. Check any relevant checklists for missing work.

If a project has only a title, clarify the next step. If all its available work depends on an unanswered request, confirm that the waiting entry names the person and expected result. The review checks whether every outcome has a way to move, including a follow-up when progress is blocked.

Get creative

Review someday/maybe. Activate ideas you now commit to by adding projects and next actions. Delete ideas you no longer want, and add new possibilities worth keeping. Possibilities can change without becoming active obligations simply because you saved them.

Protect a workable review slot

A Friday review could take 65 minutes: 25 to get clear, 30 to get current and 10 to get creative. That sample includes the desk tray, 38 emails, phone notes, a five-minute sweep, the past week and next two weeks of calendar entries, 12 projects and Waiting For. Your time depends on what has accumulated; first reviews often take longer.

Choose a recurring time when you have energy and few interruptions. Many people use the end of the work week, but consistency matters more than a particular day. In a busy week, a shorter review is more useful than postponing all review until a quiet month.

Review first, then plan

The review updates what you have committed to. Weekly planning decides which work gets time next week. Planning before reviewing can allocate time using an incomplete list, missing promises hidden in mail or notes. Complete the inventory first, then use it to plan.

Key Takeaways

  • Get clear: collect loose items, process inboxes and sweep your mind.
  • Get current: update actions, calendars, Waiting For, projects and checklists.
  • Get creative: reconsider someday/maybe and capture new ideas.
  • Use a recurring review slot and keep long task work separate.
  • The review updates commitments before weekly planning assigns time.

5.2 Choose a task that fits this moment

A current system gives you options you can trust. Start by checking the calendar so fixed appointments and required days shape your choices. In the time around them, use the action lists to choose work that fits the situation.

Filter before choosing priority

Allen’s four criteria apply in this order:

  1. Context: What can I do here with these tools or people?
  2. Time available: What fits before my next commitment?
  3. Energy available: What can I do well with the energy I have?
  4. Priority: Of the actions left, what matters most?

The first three remove actions that cannot be done well now. Priority then chooses among feasible actions. A high-priority private call is still unsuitable in a place where you cannot speak privately. Keep it visible for a suitable context instead of repeatedly selecting something you cannot start.

Work through a choice

You have 25 minutes before a meeting, a laptop in an open-plan office and low energy after lunch. Private calls are not possible, so look at @computer. “Draft the quarterly report” needs about two hours of high focus, so it does not fit. “Enter three receipts in the expense spreadsheet” takes about 15 minutes and little energy. It releases a reimbursement due this week, so it is the best fit on priority among the available actions.

Choosing feasible work does not mean always choosing easy work. When context, time and energy support an important demanding action, give it proper attention. Repeatedly filling every suitable period with quick tasks can leave major projects stalled.

Balance three kinds of work

Daily work includes doing previously defined work from lists, handling work as it appears, and defining work by clarifying and planning. Each has a place. If incoming work crowds out the other two for days, inboxes build up and lists become unreliable.

When a new request arrives, compare it with existing commitments. If it truly outranks what you are doing, handle it now. Otherwise capture it for the next processing time. Someone else’s urgent wording still needs a decision about its place among your responsibilities.

Use a short daily routine

At the start of the day, check the calendar and real deadlines and choose a few key actions. During the day, capture new requests and thoughts. At the end, process the day’s inboxes and identify a first action for tomorrow.

Clear next actions reduce the need to rethink the same work each time you scan. If you keep rereading a reminder without acting, check whether it is concrete, available and still a commitment. A list is useful when it helps you make a choice, not when scanning it becomes another task.

Key Takeaways

  • Check the calendar before choosing flexible work.
  • Apply context, time, energy and then priority.
  • Balance defined work, arriving work and defining work.
  • Compare new requests with existing commitments.
  • Daily capture and processing keep the system usable between reviews.

5.3 Repair lost trust and keep the system simple

You can often see a system losing trust before it stops being used. Tasks return to your head, the inbox falls behind, and a second private list appears because the main one feels unusable. Treat these signs as clues about a neglected workflow step.

Diagnose what stopped working

A long capture backlog points to missing clarification. Repeatedly skipped items may be vague actions or commitments you no longer intend to keep. Projects without next actions point to missing project review. A separate paper list can mean your main views no longer show what is current.

Adding a new app moves the same commitments into another container. Identify the missing decisions and reviews so the repaired system will stay usable.

Reset through the workflow

Do a full mind sweep and collect loose reminders. Process every inbox to zero. Rewrite vague actions so you can start them, remove completed or obsolete work, and move uncommitted ideas to someday/maybe. Finish with a weekly review to check the whole inventory.

A reset may take a few hours. A next actions list with 150 items cannot be scanned in a minute; check whether it includes ideas you have not committed to, stale entries or future steps that are not yet available. Move each to its proper destination. Keep real commitments visible, and decide which need renegotiation instead of hiding them among possibilities.

Review above the task level

Allen’s horizons of focus describe six levels:

HorizonWhat you review
GroundCurrent actions and calendar
ProjectsFinishable outcomes
Areas of focus and accountabilityOngoing responsibilities
GoalsResults for the next one to two years
VisionA picture of three to five years ahead
Purpose and principlesWhy you act and the standards you keep

The weekly review covers ground-level work and projects. A monthly or quarterly review can check higher levels. An area such as health may have been neglected with no active project. A project may no longer serve your goals. Decide which projects to start, pause or drop, then reflect those decisions in action lists.

Adapt when life changes

A new job, move, baby or course changes your responsibilities, contexts and incoming information. Run a new mind sweep, update areas and contexts, and revise email and notification rules. A list built for an old role may be complete for that role but incomplete for the one you have now.

Keep only the structure you use. Add a tag, list, column or rule when its absence causes a real problem; remove unused ones. Making the system smaller is useful when it reduces maintenance while preserving the commitments and reminders you need.

Key Takeaways

  • Trust problems often point to a neglected workflow step.
  • Reset by capturing, processing, rewriting actions and reviewing.
  • Move uncommitted ideas out of active lists while keeping obligations visible.
  • Higher-level reviews connect projects to responsibilities and goals.
  • Update contexts and rules after major life changes.
  • Add structure only when it solves a real problem.

Task Systems examples

5 Walkthroughs

1

Collect the commitments you are carrying

11 steps
Build a reachable capture routine and understand how decisions and reviews make it trustworthy.
  1. 1
    IntroductionStart with the loose ends

    You have work messages, a home repair in mind and a course form somewhere in your notes. Each is easy to lose when it stays in a different place.

    You will follow these items into a small set of inboxes and see what must happen after capture. The goal is a reliable inventory you can consult, including the small personal commitments that rarely get a formal project plan.

  2. 2
    ExplanationRecognize an open loop

    An open loop is an unfinished commitment, task, idea or worry without a recorded decision. “Repair the door” and “Consider a drawing course” can both occupy attention, though only one may become active work.

  3. 3
    ExplanationGive the system three qualities

    A trusted system is complete, current and accessible. All commitments reach it, reviews keep it updated, and you can consult it where you need reminders.

    A list at home may be current but unavailable during errands. A phone app may be reachable but incomplete if it omits promises in paper notes. Check the quality that is missing before adding another tool.

  4. 4
    ChallengeFind the missing quality

    Mara records every commitment in an app and can open it anywhere. Completed tasks and canceled projects have stayed there for months. What should she repair first?

    ---reveal---

    Bring the system current: remove or mark completed work and update canceled commitments. Access and initial capture are working; the neglected review is leaving stale reminders in her choices.

  5. 5
    ExampleFollow an item through GTD

    “Replace the bicycle light” begins as capture. During clarification, you decide the outcome and identify “Check the light model on the bicycle.” Organize that action on @home.

    Reflect by consulting the list and checking project progress. Engage by choosing and doing the action. Capture → clarify → organize → reflect → engage is a connected workflow, not five alternative techniques.

  6. 6
    ConnectionWhy a plan helps attention

    In 2011, Masicampo and Baumeister studied unfinished goals and attention during unrelated tasks. Committing to specific plans for what to do, when and where reduced the interference before the goals were completed.

    GTD follows a similar practical idea: decide the next step and how it will return to view. Simply installing an app leaves those decisions to you.

  7. 7
    ExplanationChoose quick collection points

    Use a few inboxes that cover the places where commitments appear: perhaps email, a phone task inbox and a paper tray. An inbox temporarily holds unprocessed items.

    Try adding a thought while out. A shortcut, voice input or notebook should make it quick. “Ask Lila about the lesson time” is enough; selecting its final list can wait until processing.

  8. 8
    ExampleSweep your mind before sorting

    Allow 30 to 60 minutes for a first mind sweep. Write one open loop per line without judging or organizing it.

    Use prompts: work projects, promises, appointments, repairs, money, family, purchases, learning and things owed to you. Check papers and objects too. A broken lamp can enter the system as “Repair hallway lamp” when the object itself cannot fit in the tray.

  9. 9
    ChallengeKeep capture moving

    During a mind sweep, Devon writes “Look into a language course” and opens a browser to compare every course. What should Devon do to finish the capture session?

    ---reveal---

    Return to collecting open loops and leave the course item for clarification. Research is doing work on one item; it interrupts the sweep and can cause other thoughts to disappear before they are recorded.

  10. 10
    ChallengeConnect capture with a return route

    A new voice-memo shortcut makes capture easy, but the recordings are never opened. The phone task inbox is processed daily. How can this setup become trustworthy?

    ---reveal---

    Give voice memos a regular processing time, or route their content into the inbox already processed. Quick capture supports completeness only when the collected items later receive decisions. Keep daily inboxes moving daily and every collection point at least weekly.

  11. 11
    RecapUse a small complete routine

    Your first setup needs reachable capture tools and a return route for every collection point. Collect thoughts quickly, then clarify them into usable reminders and information.

    Check the system for completeness, current entries and access where work happens. During your next mind sweep, preserve each thought without starting its work; the processing session is where you decide what those items mean.

2

Turn an inbox into decisions and next steps

14 steps
Process a mixed inbox, define a project and move email work into reliable reminders.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionAn empty inbox can leave work to do
  2. 2
    ExplanationAsk whether action is needed
  3. 3
    ExampleHandle the actionable items
  4. 4
    ChallengeClarify an unclear request
  5. 5
    ExplanationName the event’s finished outcome
  6. 6
    ExampleChoose actions that can start now
  7. 7
    TipPlan a larger outcome
  8. 8
    ChallengeSeparate an area, outcome and action
  9. 9
    ExplanationProcess instead of repeatedly checking
  10. 10
    ExampleCarry the action out of email
  11. 11
    ExampleCount the reminders left by processing
  12. 12
    ChallengeKeep a long reply visible
  13. 13
    ChallengeKeep the outcome alive after delegating
  14. 14
    RecapLeave each item with a decision
3

Build lists, dates and a board you can use

17 steps
Place reminders by their jobs, set up helpful task views and apply a personal WIP limit.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionChoose work without scanning everything
  2. 2
    ExplanationMatch lists to situations
  3. 3
    ExampleKeep the calendar’s meaning clear
  4. 4
    ChallengeSort a date and a conversation item
  5. 5
    ExplanationChoose an app for daily use
  6. 6
    ExplanationMap lists onto app features
  7. 7
    ExampleBuild a view of available actions
  8. 8
    ExampleUse the right repeat clock
  9. 9
    ChallengeRepair the dates without losing a deadline
  10. 10
    ExplanationMake current work visible
  11. 11
    ExampleMove a blocked card honestly
  12. 12
    ExplanationRelate WIP to average time
  13. 13
    ExampleCompare two stable workflows
  14. 14
    ChallengeCount beyond the Doing column
  15. 15
    TipUse the board beside the full inventory
  16. 16
    ChallengeConnect a blocked card to its reminder
  17. 17
    RecapKeep the views faithful to the work
4

Make incoming information feed the same system

15 steps
Test mail routing, choose alert tiers and extract actions from project notes.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionConnect arrivals with working reminders
  2. 2
    ExplanationSpecify what matches and what happens
  3. 3
    ExampleTest before routing automatically
  4. 4
    ChallengeProtect a message that needs a decision
  5. 5
    ExplanationAssign alert tiers
  6. 6
    ExampleAudit the apps that can reach you
  7. 7
    ExampleTake the task out of an alert
  8. 8
    ChallengeKeep urgent contact and routine requests distinct
  9. 9
    ExplanationGive project detail a shared name
  10. 10
    ExplanationSeparate current and ongoing material
  11. 11
    TipName records for finding them again
  12. 12
    ExampleProcess the supplier meeting note
  13. 13
    ChallengeChoose the right home for each part
  14. 14
    ChallengeRepair a chain that hides work
  15. 15
    RecapKeep actions visible and detail findable
5

Review, choose and restore trust

14 steps
Run the weekly review, select work for the moment and repair a system after change.

Save this lesson to follow every Walkthrough step by step.

  1. 1
    IntroductionKeep the inventory fit for real choices
  2. 2
    ExplanationGet clear across every inbox
  3. 3
    ExplanationGet current across existing commitments
  4. 4
    ExplanationGet creative with possibilities
  5. 5
    ExampleUse a review slot you can keep
  6. 6
    ChallengeFind preparation before it becomes urgent
  7. 7
    ExplanationFilter the choices in order
  8. 8
    ExampleUse the gap before a meeting
  9. 9
    ChallengeChoose without defaulting to the easiest task
  10. 10
    ConnectionMake room for defining work
  11. 11
    ExplanationReset the workflow that lost trust
  12. 12
    ExplanationReview the levels above current tasks
  13. 13
    ChallengeRepair the system after a change
  14. 14
    RecapMaintain the system at the right levels

Task Systems practice questions

40 Practice Questions in 4 sets

Set 1: Capture and make clear decisions10 Practice Questions

Question 1 of 10

A task app holds all of Jules’s commitments, but many entries describe work completed last month. What quality most clearly needs repair?
  1. Making the system accessible.
  2. Keeping the system current.
  3. Capturing items more quickly.
  4. Adding more project categories.
Show answerHide answer
Answer: B
The system needs to be current: finished work should be marked off and changed commitments updated. Jules has already captured the commitments, so completeness is not the stated problem. More categories would leave the stale entries in place and make the same review problem harder to see.

Question 2 of 10

While boarding a train, Amira remembers a question for a course tutor. What is a useful capture?
  1. “Course” in a general notes file with no question.
  2. A browser tab left on the tutor’s contact page.
  3. A flagged course message without the new question.
  4. “Ask tutor whether the draft needs references.”
Show answerHide answer
Answer: D
A quick note with the question’s meaning preserves the thought for later clarification. Planning every step during capture adds work when Amira only needs to record the item. An open tab or an intention to remember needs its own review habit, which the situation has not established.

Question 3 of 10

While processing an inbox, Ren finds a confirmation that takes about one minute to send. How should Ren handle it?
  1. Send the confirmation during processing.
  2. Add it to the next weekly review checklist.
  3. Schedule it as a fixed calendar appointment.
  4. Keep it unread until a longer work session.
Show answerHide answer
Answer: A
The two-minute rule applies while processing: a one-minute next action is quick enough to do now. Creating and maintaining a reminder can take more effort than sending it. This shortcut is tied to processing; it does not establish a general rule to interrupt other work for every small request.

Question 4 of 10

“Storage area” has sat on a project list for weeks. Mina wants the room usable and can start by sorting the empty boxes. How can she rewrite the outcome and next action?
  1. “Storage area cleared”; “Sort the empty boxes for recycling.”
  2. “Storage area”; “Sort the empty boxes for recycling.”
  3. “Sort the empty boxes”; “Storage area cleared.”
  4. “Storage area cleared”; “Work on clearing the storage area.”
Show answerHide answer
Answer: A
“Storage area cleared” names a recognizable finished outcome, and sorting the empty boxes is a concrete step Mina can start. “Sort boxes” is an action, not the whole desired result. A broad instruction to finish organizing still leaves the first physical step undecided.

Question 5 of 10

An email asks for a comparison that will take 45 minutes. Niko has decided to do it later. How should the message and work be handled?
  1. Leave the message unread and scan the inbox again tomorrow.
  2. Archive the message and rely on searching when it comes to mind.
  3. Record “Compare the proposals” with the email link, then archive.
  4. Flag the subject as important and keep it among incoming mail.
Show answerHide answer
Answer: C
A clear task reminder keeps the comparison visible in the system, while the link preserves its details and the message can leave the inbox. Archiving alone stores information without a reminder to act. Marking unread keeps decided work mixed with messages still awaiting decisions.

Question 6 of 10

A studio begins accepting bookings on August 6. Ravi can book on any day afterward and has no deadline yet. What reminder fits August 6?
  1. A due date declaring the booking late after August 6.
  2. A time-specific calendar appointment on August 6.
  3. A completed entry because the opening date is known.
  4. A start date or tickler entry for the booking action.
Show answerHide answer
Answer: D
August 6 is the first useful day for action, so a start date or tickler brings the reminder into view then. The opening date does not require Ravi to book that day. Treating it as a deadline or fixed appointment would add a constraint the situation does not contain.

Question 7 of 10

An email rule matches a newsletter sender and applies a Reading label. What is the condition in this rule?
  1. The message receives the Reading label.
  2. The message comes from the newsletter sender.
  3. The Reading folder is checked on weekends.
  4. The newsletter is kept for later reference.
Show answerHide answer
Answer: B
The condition identifies messages that match: here it is the sender. Applying the Reading label is the action performed after that test succeeds. A weekend reading habit is useful maintenance, but it is not the matching test that determines whether this rule runs.

Question 8 of 10

A meeting note contains a venue decision and a request to send equipment sizes. How should Inez process it?
  1. File both with the project and treat the note as the action reminder.
  2. Capture both as separate tasks and remove the decision from the note.
  3. File the decision as general reference and flag the note for all action.
  4. File the decision with the project and capture the sending action.
Show answerHide answer
Answer: D
The decision is project support; the request creates a next action that belongs in the task system, linked to the note’s details. Finishing a meeting does not finish the work it produced. Keeping the request only in the note leaves it outside the action lists Inez uses to choose work.

Question 9 of 10

During a weekly review, Sam notices a 90-minute editing task that has not been started. What should Sam do before continuing the review?
  1. Finish the editing before inspecting any more lists.
  2. Leave editing on the list without clarifying it until next week.
  3. Clarify and record the editing task’s next action.
  4. Schedule the full edit now and defer the remaining review.
Show answerHide answer
Answer: C
The review should leave a usable reminder for the editing work and then continue checking the rest of the system. Doing the full task would turn the review into a work session. Moving a commitment to someday/maybe would change its status without a decision that Sam no longer intends to pursue it.

Question 10 of 10

A board has a Doing limit of 2, with 2 cards in Doing and 3 started cards in Waiting. One Doing card moves to Waiting, then a Ready card starts. How do Doing and total WIP change from the beginning?
  1. Doing stays at 2; total WIP stays at 5.
  2. Doing stays at 2; total WIP rises from 5 to 6.
  3. Doing falls to 1; total WIP stays at 5.
  4. Doing rises to 3; total WIP rises from 5 to 6.
Show answerHide answer
Answer: B
Moving the blocked card frees a Doing slot but finishes nothing, so total WIP remains 5 at that point. Starting a Ready card fills the slot and adds another started, unfinished task: Doing returns to 2 and total WIP reaches 6. A column limit and total WIP measure different things.
Set 2: Organize dates, lists and information10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

A brochure describes a course Theo may want next year, but he has not committed to taking it. Where should the possibility go?
  1. Active projects, with a deadline invented for the next review.
  2. Waiting For, with the course provider treated as the task owner.
  3. Someday/maybe, with useful course information kept for later.
  4. Next actions, with registration assumed to be the next obligation.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

Omar must arrange a study-group visit, which needs several actions. What would be a clear project title?
  1. “Study-group visit arranged.”
  2. “Email the venue for dates.”
  3. “Study-group visits.”
  4. “Discuss possible visit plans.”
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

Lena needs to raise two questions at her next routine conversation with Pavel. Neither needs an earlier reply. Where should she put them?
  1. On Waiting For under Pavel.
  2. On the calendar as two calls.
  3. On the someday/maybe list.
  4. On an agenda list for Pavel.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

An air filter must be checked 40 days after each actual check. The latest check happened late. What repeat setting fits the requirement?
  1. Repeat 40 days after the due date.
  2. Repeat 40 days after completion.
  3. Repeat on the same date monthly.
  4. Repeat 40 days from the start date.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A board has a Doing limit of 3 and already contains 3 Doing cards. No card is finished or blocked. How many more cards can enter Doing now?
  1. One if its deadline is earlier.
  2. One if it takes less than two minutes.
  3. One if it belongs to a different project.
  4. None until a Doing slot is free.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

Most work messages can wait an hour, but Leila is the contact for urgent equipment failures. How should she set alerts?
  1. Silence routine messages and preserve an agreed urgent route.
  2. Silence all work alerts and rely on hourly checks for failures too.
  3. Keep alerts on for every work channel to avoid missing failures.
  4. Silence routine messages and leave the urgent route unspecified.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

An active project ends, but its drafts may be useful later. What should happen to its support folder and notes?
  1. Move only the drafts to Archives.
  2. Move both into general reference.
  3. Move them together to Archives.
  4. Keep both in active project storage.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

A project can start October 8 and must finish October 15. A partner has booked its review call for October 13 at 2 p.m. The project’s @computer task appears in an “available now” view on October 2. How should Pat repair the view while preserving the commitments?
  1. Exclude future starts, change the due date to October 8, and keep the call on October 13.
  2. Exclude future starts from the view, keep October 15 as due, and keep the call on October 13.
  3. Keep all future starts visible, keep October 15 as due, and move the call to October 8.
  4. Exclude future starts, keep October 15 as due, and make the call a flexible next action.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

In an Outlook setup, rules run in order and can stop later rules. A broad “delivery” rule archives routine notices and client rescheduling requests. Bea must keep all mail from a key client visible; some old requests are still in the inbox. What repair covers overlap, matching and existing work?
  1. Protect the client first with a stopping rule, narrow routine routing and process existing requests.
  2. Route routine mail first with a stopping rule, protect the client later and process existing requests.
  3. Protect the client first with a stopping rule, narrow routine routing and leave existing requests untouched.
  4. Protect the client first without stopping later rules, keep broad routine routing and process old requests.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

After a role change, Ken’s app lists old projects, misses new requests and shows contexts he no longer uses. He plans to buy another app. What sequence addresses the stated problems?
  1. Capture new commitments, keep every old entry active, update contexts and review.
  2. Capture new commitments, clarify old entries, keep old contexts and skip the review.
  3. Clarify old entries, update contexts and review before collecting the new requests.
  4. Capture new commitments, clarify old entries, update contexts and review.
Show answerHide answer

Save this lesson to see this answer.

Set 3: Review and diagnose a working system10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

Aisha can find a current list at her desk but cannot reach it when she is out doing errands. What system quality needs attention?
  1. Completeness of the commitments already recorded.
  2. Currency of completed and changed list entries.
  3. The choice of priority labels inside the list.
  4. Accessibility where the actions can happen.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

During review, Joel sees a presentation on next week’s calendar but no preparation on his lists. What should he add?
  1. A copy of the presentation appointment on the projects list.
  2. The needed preparation outcome and a concrete next action.
  3. A reminder to reread the calendar at next week’s review.
  4. The presentation slides in reference without an action reminder.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

Dara has 15 minutes, a laptop, no private place to call and low energy. A routine data check takes 10 minutes; a confidential call takes 8; a difficult draft takes 50. What is the feasible action?
  1. Do the routine data check.
  2. Make the confidential call.
  3. Complete the difficult draft.
  4. Begin by doing all three briefly.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

In PARA, where does an ongoing responsibility such as maintaining professional qualifications belong?
  1. Projects.
  2. Archives.
  3. Areas.
  4. Resources.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

A request belongs to Mei’s colleague, who agrees to send the figures. Mei forwards the details. What reminder should Mei add?
  1. An agenda point to discuss the figures, with no waiting entry.
  2. A task for Mei to make the figures, with the colleague named in a note.
  3. A Waiting For entry naming the colleague, figures and request date.
  4. A flagged sent message, kept outside the reviewed waiting list.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

In a stable workflow, average total WIP falls from 15 tasks to 9 while throughput stays at 3 tasks per week. What changes, and what remains the same?
  1. Average time falls from 5 to 3 weeks; completions rise to 5 per week.
  2. Average time falls from 5 to 3 weeks; completions stay at 3 per week.
  3. Average time falls from 3 to 1 week; completions stay at 3 per week.
  4. Average time stays at 5 weeks; completions fall from 5 to 3 per week.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

“Course showcase ready” depends on a venue reply already requested. The invitation cannot be drafted until the reply, but speaker biographies can be collected now. What reminders represent the project accurately?
  1. Keep the outcome, track the venue reply and add a biography action.
  2. Keep the outcome, track the venue reply and wait to collect biographies.
  3. Keep the outcome, add a biography action and leave the request in sent mail.
  4. Keep the outcome, track the venue reply and add an invitation action.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

Noah’s next action list includes many hobbies he might try but has never committed to. The list is becoming hard to scan. What change improves its meaning?
  1. Keep the hobbies on the list with low priority.
  2. Make an active project for every possible hobby.
  3. Hide the hobbies behind future start dates.
  4. Move the uncommitted hobbies to someday/maybe.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

A weekly review clears email but skips paper notes, future calendar entries and the projects list. Later, a promised preparation task is missed. What review design best addresses all three gaps?
  1. Process paper, inspect only past events and give each active project a live reminder.
  2. Process paper, look ahead for preparation and give each active project a live reminder.
  3. Process paper, look ahead for preparation and review project titles without next steps.
  4. Store paper as reference, look ahead for preparation and give each project a live reminder.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

During a silent-work period, only a supervisor’s urgent calls should interrupt; routine chat can wait. A task request arrives as a silent chat message and is read at the scheduled check. What should happen next?
  1. Capture its action, leave it unread as a second reminder and preserve the call exception.
  2. Mark the chat handled, leave the request only in chat and preserve the call exception.
  3. Capture its action, mark the chat handled and preserve the urgent-call exception.
  4. Capture its action, mark the chat handled and silence all work contacts including the supervisor.
Show answerHide answer

Save this lesson to see this answer.

Set 4: Adapt the system when work changes10 Practice Questions

Save this lesson to see every answer and practice every set.

Question 1 of 10

What keeps useful email searchable while removing it from the inbox?
  1. Archiving it.
  2. Marking it unread.
  3. Flagging it.
  4. Pinning it.
Show answerHide answer

Save this lesson to see this answer.

Question 2 of 10

A phone inbox is processed daily, but voice memos have gone unchecked for six weeks and contain several promises. How should Luis repair capture?
  1. Copy the memos into a permanent notes folder without clarifying the promises.
  2. Keep recording in memos and plan to search them only when a promise comes to mind.
  3. Process the memos and add their collection point to the regular routine.
  4. Process the current memos once and leave the future collection point unscheduled.
Show answerHide answer

Save this lesson to see this answer.

Question 3 of 10

A new email rule has worked correctly on today’s messages, but last month’s matching messages remain in the inbox. What should Pia check?
  1. Whether the rule’s condition matches the old messages.
  2. Whether a later rule moved the old messages back.
  3. Whether the destination already holds the old messages.
  4. Whether the rule was applied to existing messages.
Show answerHide answer

Save this lesson to see this answer.

Question 4 of 10

Sol has 35 minutes, a quiet computer workspace and high energy. A high-priority review needs 30 minutes, an optional tidy-up needs 15, and a more important interview requires a person who is unavailable. What should Sol choose now?
  1. Do the high-priority review.
  2. Wait for the interview partner.
  3. Do the shorter optional tidy-up.
  4. Plan the unavailable interview.
Show answerHide answer

Save this lesson to see this answer.

Question 5 of 10

Two apps hold conflicting copies of a project: its confirmed deadline is December 3, but the home copy says December 1, a preferred workday. One app also holds an uncommitted language-course idea. Some real commitments appear only in one app. What reconciliation preserves the meaning of the items?
  1. Merge verified commitments, use December 1 as due and keep the language idea on someday/maybe.
  2. Merge verified commitments, retain the December 3 deadline and keep the language idea on someday/maybe.
  3. Merge verified commitments, retain December 3 as due and activate the uncommitted language idea.
  4. Keep separate home and work inventories, retain December 3 as due and keep the idea on someday/maybe.
Show answerHide answer

Save this lesson to see this answer.

Question 6 of 10

“Digital course launched” has the same name in a task manager, folder and notebook. What practical job does this naming choice do?
  1. Make the folder’s contents visible automatically in every action view.
  2. Remove the need to link actions to the relevant information inside notes.
  3. Ensure every item in the notebook is also a current task reminder.
  4. Connect the outcome with its support material for retrieval and archiving.
Show answerHide answer

Save this lesson to see this answer.

Question 7 of 10

A board shows 1 card in Doing and 8 in Waiting. Its Doing limit is 2. The owner says, “Starting another card will keep my total WIP at two.” What is wrong with that claim?
  1. Total WIP is already 1 and would become 2 when another card starts.
  2. Total WIP is already 9 and would stay 9 when another card starts.
  3. Total WIP is already 9 and would become 10 when another card starts.
  4. Total WIP is already 8 and would become 9 when another card starts.
Show answerHide answer

Save this lesson to see this answer.

Question 8 of 10

At a quarterly review, Alma finds an active project serving an old goal, an ongoing responsibility with no current project, and three unused tags. How should the review affect the working system?
  1. Keep the project active, choose needed outcomes for the area and remove unused tags.
  2. Reconsider the project, choose needed outcomes for the area and remove unused tags.
  3. Reconsider the project, leave the neglected area without a decision and remove unused tags.
  4. Reconsider the project, choose needed outcomes for the area and keep the unused tags.
Show answerHide answer

Save this lesson to see this answer.

Question 9 of 10

An inbox note says “Ask Farah which documents are needed.” Farah has not been asked yet, and the answer is needed before preparation can start. Where does the item go after clarification?
  1. Waiting For with Farah named as the expected information source.
  2. Reference with the needed documents described as missing information.
  3. Someday/maybe until the missing information becomes available.
  4. A next action to ask Farah, in a suitable contact context.
Show answerHide answer

Save this lesson to see this answer.

Question 10 of 10

During get creative, Wes decides a saved idea is now a commitment that will take several steps. What should he change?
  1. Add its project outcome and first next action to the active system.
  2. Add the project outcome but leave its first step to be decided when working.
  3. Add a first action but keep the committed outcome only on someday/maybe.
  4. Give the whole idea a preferred due date without separating an outcome and action.
Show answerHide answer

Save this lesson to see this answer.

Stuck on your own question? Homework Help

Key Terms

65 Key Terms, each with its definition

A

Actionable item
An actionable item is something that needs a step you or another person should take, unlike information kept only for reference.
A request to approve a draft is actionable; the attached style manual can be kept as reference.
Agenda
An agenda is a list of points to raise with a particular person when you next speak, kept ready for that conversation.
“Ask about the shared printer” waits on the agenda for the colleague she meets each Wednesday.
Archives
Archives are the PARA home for inactive material from projects, areas and resources, kept retrievable without crowding active work.
After the workshop ends, its folder and notes move to Archives so current project views stay clear.
Area
An area is an ongoing responsibility with no finish date, such as health, finances or a work role, which may contain several projects.
“Home maintenance” remains an area after the project “Entrance door repaired” has been completed.

C

Capture
Capture is recording an item outside your head when it appears, before deciding what to do with it or where the result belongs.
“Ask Luis about the practice room” goes into the phone inbox during a quick capture on the train.
Checking email
Checking email is looking at new messages without necessarily making decisions about them or recording the work they contain.
Repeated checking leaves the same request in view, but does not decide how she will handle it.
Clarify
To clarify is to decide what one captured item means, whether it needs action and what you will do about it before organizing the result.
Clarifying “Room booking” produces a question for the venue and a clear record of the desired result.
Condition
A condition is a test that identifies messages an email rule should match, such as a sender address, mailing list or subject phrase.
A sender condition catches the newsletter more precisely than matching a common word in any message.
Context
A context is the place, tool or person needed for an action, used to group reminders so you can find work suited to your situation.
At the shopping center, he checks @errands because those actions fit the place he is in.

D

Date-first file name
A date-first file name begins with a year-month-day date, using leading zeros, so records sort chronologically and dates read clearly.
“2026-07-06 Site notes v2” uses a date-first file name with a description that makes search useful.
Defer
To defer is to record an action for later in a next actions list or, for fixed commitments, on the calendar, instead of doing it during processing.
She defers a long comparison by recording “Compare the three supplier quotes” on @computer.
Defining work
Defining work is the daily work of clarifying incoming items and planning, which supplies usable actions alongside doing existing or arriving work.
She leaves time for defining work so requests become clear actions instead of an expanding inbox.
Delegate
To delegate is to pass an action to the person who should carry it out, while tracking the expected result for your own follow-up.
He delegates the stock count to its owner and records the requested totals on Waiting For.
Digital task manager
A digital task manager is an app for storing tasks and projects, usually with capture, dates, lists, search and access across devices.
The digital task manager lets him capture on his phone and choose available actions at his laptop.
Do Not Disturb
Do Not Disturb is a device mode that silences selected interruptions while allowing exceptions for chosen people or apps.
He tests Do Not Disturb so the agreed urgent contact can reach him while routine chat stays quiet.
Due date
A due date is the real deadline for a task, where passing the date has a consequence, rather than a preferred date to work on it.
The application’s closing date is its due date; an earlier chosen workday is a planning choice.

E

Email archive
An email archive is searchable message storage outside the inbox, used to keep mail you may need without leaving it among new arrivals.
The archived delivery details can be found from a link in the task when he is ready to act.
Email rule
An email rule is an automatic instruction that matches messages using conditions and applies actions such as labeling or moving them.
A tested email rule moves a known newsletter into Reading, where it is checked each weekend.
Engage
To engage in GTD is to choose and do work using the calendar and action lists, taking account of the conditions in which you can act.
After checking the calendar, she engages by selecting an available action that fits the next half hour.

F

Finished outcome
A finished outcome is a description of the result you want, written so you can recognize when the project has been completed.
“Registration submitted” describes a finished outcome more clearly than the topic “Conference.”
Four-criteria model
The four-criteria model chooses work by context, time available, energy available and then priority, narrowing feasible actions before ranking them.
The four-criteria model rules out a private call on a crowded bus before considering its importance.

G

Get clear
Get clear is the weekly review phase for gathering loose material, processing all inboxes and doing a short mind sweep for missing items.
During get clear, she collects loose receipts and turns a voice memo into a clarified action.
Get creative
Get creative is the weekly review phase for reconsidering someday/maybe, activating or deleting ideas and adding new possibilities.
During get creative, she decides to begin a saved course idea and gives the new project a first step.
Get current
Get current is the weekly review phase for updating actions, past and future calendars, Waiting For, projects and relevant checklists.
During get current, he finds preparation for a coming appointment and records its next action.
Getting Things Done
Getting Things Done is David Allen’s method for managing commitments through capture, clarify, organize, reflect and engage.
She applies Getting Things Done with a paper inbox, task lists, a calendar and regular reviews.

H

Hard landscape
The hard landscape is the GTD calendar’s fixed content: time-specific actions, day-specific actions and day-specific information.
A promised Tuesday call is part of the hard landscape; flexible research stays on an action list.
Horizons of focus
The horizons of focus are GTD’s six levels linking actions, projects, areas, goals, vision, and purpose and principles.
A horizons-of-focus review reveals that an active project no longer serves the direction he wants.

I

Inbox
An inbox is a collection point where unprocessed items wait for decisions, such as an email inbox, notes folder or paper tray.
The tray is an inbox for papers needing decisions; filed contracts are stored somewhere else.
Inbox zero
Inbox zero is an email approach that reduces the attention occupied by an inbox by deciding what each message needs and moving it onward.
An archived thread can still have a tracked action, so inbox zero does not mean all work is finished.
Interrupt-now tier
The interrupt-now tier contains alerts worth stopping for, with access limited to essential contacts or events for your responsibilities.
The on-call contact belongs in the interrupt-now tier during the period when he is responsible.

L

Little’s Law
Little’s Law relates averages in a stable system: average time in progress equals average total WIP divided by average throughput.
At the same average throughput, a lower average total WIP corresponds to a shorter average time.

M

Mind sweep
A mind sweep is a session for writing down every open loop you can recall, one item at a time, without sorting or judging it.
During her mind sweep, family promises appear alongside unfinished course and work commitments.

N

Natural planning model
The natural planning model develops a project through purpose and principles, outcome, brainstorming, organizing and next actions.
They use the natural planning model to move from the event’s purpose to actions that can start.
Next action
A next action is the next physical, visible step that moves work forward, phrased clearly enough to begin with the right tools and place.
“Text Ada for the measurements” is a next action; “Shelving” still leaves the first step undecided.
Notification rule
A notification rule controls how an app or person may reach you, including sounds, banners, silent badges, summaries or no alert.
Her notification rule allows essential calls through but leaves routine service updates silent.

O

Open loop
An open loop is an unfinished commitment, task, idea or worry that has not been recorded with a decision about what it means.
“Arrange a hearing test” remains an open loop while it is only a thought with no recorded decision.

P

PARA
PARA is Tiago Forte’s organizing method that groups digital material into Projects, Areas, Resources and Archives according to its role.
She uses PARA to separate current course projects from ongoing responsibilities and reusable notes.
Personal kanban
Personal kanban is a visual way to manage work with cards and columns, governed by the rules to visualize work and limit work in progress.
His personal kanban board shows this week’s selected actions while the full inventory stays in lists.
Priority
Priority is the relative importance of an available action among other feasible actions, judged against your goals and responsibilities.
Once time and context fit, priority gives the needed submission attention before optional reading.
Processing email
Processing email is deciding whether to delete or archive, delegate, respond, defer or do the work represented by each message.
Processing the request creates an action reminder before the message moves to the archive.
Project
A GTD project is a committed outcome needing more than one action step and able to be completed within about a year.
“Training session prepared” is a project because several actions lead to a recognizable finish.
Project support material
Project support material is information used to carry out an active project, such as drafts, quotes, meeting notes and future-step plans.
The venue quotes stay as project support material beside the plan for the event being arranged.
Projects list
A projects list is an index of committed, finishable outcomes that need several steps, used during review to check that each is moving.
She scans the projects list and notices one outcome with no next action or waiting reminder.
Pull
To pull work is to bring a ready task into Doing when capacity is available, instead of starting every new task as it arrives.
A finished card frees a slot, so he pulls the next suitable action from Ready into Doing.
Purpose and principles
Purpose and principles describe why you act and the standards you keep, at the broadest horizon and as a starting point for project planning.
They revisit purpose and principles when deciding whether a new project fits their responsibilities.

R

Recurring task
A recurring task is a reminder that repeats on a fixed schedule or after completion, according to how the underlying routine works.
He uses a recurring task for an inspection interval measured from the day the check is completed.
Reference material
Reference material is information kept because it may be useful later, without an action attached, such as manuals or past reports.
A completed report stays as reference material while any new work from it has separate task reminders.
Reflect
To reflect in GTD is to review and update the system as often as needed, including daily checks and the full weekly review.
He reflects by checking changed appointments today and reviewing all active projects each week.
Rule action
A rule action is what an email rule does to matching messages, such as adding a label, archiving, forwarding or moving to a folder.
The rule action applies a label while preserving the message, making mistaken matches recoverable.
Rule order
Rule order is the sequence in which email rules run, affecting overlapping matches and whether later rules still get a chance to act.
He checks rule order so a broad routing rule does not hide messages protected by an earlier rule.

S

Saved view
A saved view is a reusable filter that displays a useful selection of tasks, such as available @computer actions or Waiting For items.
Her saved view excludes future start dates, so it offers actions she can actually choose now.
See-later tier
The see-later tier holds useful notifications that can wait, delivered silently or in a summary instead of interrupting immediately.
A routine discussion update goes in the see-later tier because a reply can wait until her next check.
Start date
A start date is the date when a task becomes relevant or available, often used to keep it out of current views until that point.
The start date reveals the booking task when reservations open, a week before its real deadline.
System reset
A system reset restores trust by collecting missing items, processing inboxes, rewriting actions and completing a review of commitments.
A system reset clears stale reminders and gives each remaining active outcome a usable next step.

T

Task-like alert
A task-like alert is a notification that carries an action or commitment, which needs capture into the system you use to manage work.
She captures the item-return deadline from a task-like alert before clearing it from the screen.
Throughput
Throughput is the average number of items finished per unit of time, such as tasks completed per week in a personal workflow.
She measures throughput using completed cards over several weeks, not the number of tasks started.
Tickler
A tickler is a system that brings an item back on a chosen date, using dated paper folders or a digital start-date reminder.
A tickler shows the renewal reminder when applications open, without making that day a deadline.
Trigger list
A trigger list is a set of categories that prompts memory during a mind sweep, helping uncover commitments you have not recorded.
The “home repairs” trigger brings a sticking door to mind, so he adds a note to the capture list.
Trusted system
A trusted system is an external set of tools that holds your commitments, stays current through review and is accessible when needed.
I trust the system because home promises and work requests both reach lists I check regularly.
Two-minute rule
The two-minute rule says to do a next action under about two minutes while processing, because tracking it can cost more effort.
While processing, she sends a short confirmation instead of adding a reminder to confirm later.

V

Vision
A vision is the horizon of focus describing the life or work you want three to five years ahead, reviewed less often than current actions.
Her vision helps her reconsider which projects deserve commitment during a broader review.

W

Waiting For
Waiting For is a list of expected results from others, recording the person, item and request date so you can review and follow up.
“Tariq — room layout, asked 2026-08-12” makes the missing information visible during review.
Weekly review
A weekly review is a regular session for making the whole task system complete and current through get clear, get current and get creative.
The weekly review catches requests in paper notes as well as stalled projects in the task app.
WIP limit
A WIP limit is the maximum number of cards permitted in a column, used especially in Doing to restrict how much work is active at once.
With a Doing WIP limit of two, she finishes one of the two cards before starting another task.
Work in progress
Work in progress is all work that has started and is not finished, including blocked tasks in Waiting as well as tasks in Doing.
Moving a card to Waiting changes its stage, but it remains part of total work in progress.

About this lesson

By StudeliReport a mistake

Make your own Study Materials

Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.

Get Started