Provisions and Contingencies
Provisions, Contingencies and Subsequent Events
IntermediateLesson 1 of 9 in Intermediate Accounting 2 Course
What you will learn
- Tell provisions apart from other liabilities and apply the three recognition criteria of IAS 37 to decide whether a provision exists at the end of the reporting period.
- Tell provisions apart from other liabilitiesDefine a provision, separate it from payables, accruals and other uses of the word, and know which obligations IAS 37 covers.
- Apply the three recognition criteriaTest whether a present obligation exists, whether an outflow is probable and whether the amount can be estimated reliably, using legal and constructive obligations.
- Recognize costs that do not create a provisionExplain why future losses, future maintenance, future compliance costs and general business risks are not provisions, and apply the obligating-event rule to levies.
- Tell provisions apart from other liabilities
- Classify uncertain obligations and claims by probability, decide what is disclosed rather than recognized, and explain the different treatment of liabilities and assets.
- Identify and disclose contingent liabilitiesUse the definition and the probability scale to separate provisions, contingent liabilities and items that need no disclosure.
- Identify and disclose contingent assetsApply the stricter rules for possible inflows and explain why gains and losses are treated asymmetrically.
- Identify and disclose contingent liabilities
- Measure a provision at the best estimate of the amount needed to settle it, discount it when timing matters, and update, use and disclose it over its life.
- Estimate the best amount for a provisionChoose between the expected value, the most likely outcome and the midpoint of a range, and reflect risk, future events and warranty types correctly.
- Discount long-term provisions and unwind the discountMeasure a provision at present value when the time value of money is material, choose the right discount rate and record the unwinding as a finance cost.
- Update, use and disclose provisions over timeReview provisions at each reporting date, charge only the intended expenditure against them, account for reimbursements and prepare the movement disclosure.
- Estimate the best amount for a provision
- Use the general recognition and measurement rules in the three situations that IAS 37 treats specially: loss-making contracts, restructurings and obligations to dismantle assets or restore sites.
- Measure provisions for onerous contractsRecognize when a contract has become onerous and measure the provision at the least net cost of exiting it.
- Recognize and measure restructuring provisionsDecide when a restructuring creates a constructive obligation and which costs belong in the provision.
- Account for decommissioning and environmental obligationsRecognize obligations to dismantle assets and restore sites, include them in the asset's cost, and unwind and revise them over the asset's life.
- Measure provisions for onerous contracts
- Decide which events between the reporting date and the date the financial statements are authorized for issue change the amounts reported, which are only disclosed, and when the going concern basis no longer applies.
- Distinguish adjusting from non-adjusting eventsDefine the period IAS 10 covers and classify events by whether they give evidence of conditions at the end of the reporting period.
- Adjust, disclose and apply the going concern exceptionRecord adjusting events, disclose material non-adjusting events, treat dividends declared after the reporting date correctly and recognize when the going concern basis must be abandoned.
- Distinguish adjusting from non-adjusting events
Provisions and Contingencies study guide
1Decide when a provision must be recognized
An uncertain bill can belong in the accounts even before the amount or payment date is fixed. The key is to identify an obligation that already exists, then assess payment and measurement. Distinguishing provisions from accruals, asset allowances and equity reserves helps you put each balance in the right place. The same recognition tests also explain why forecasts of losses, maintenance plans and general business risks do not create provisions.
1.1 Tell provisions apart from other liabilities
A warranty may require repairs next month or next year, and the number of claims is unknown. That uncertainty does not erase the company's responsibility for products already sold. A provision is a liability whose timing or amount is uncertain.
Identify what the balance represents
A liability is a present obligation from past events that is expected to require resources to settle. Those resources may be cash, goods or services. A provision is a particular kind of liability; it is not a separate pool of cash.
| Balance | What has happened? | Main uncertainty |
|---|---|---|
| Trade payable | Goods or services have been received and invoiced or formally agreed. | Usually little uncertainty about the amount owed. |
| Accrual | Goods or services have been received but not yet invoiced. | An estimate may be needed, but uncertainty is usually limited. |
| Provision | An obligation exists, such as repairing products under warranty. | The amount or settlement date is more uncertain. |
For example, a company reports CU 420,000 of trade payables, CU 35,000 of accrued expenses and CU 186,000 for warranty repairs. CU means currency units. The warranty balance is the provision: the company does not yet know which customers will claim or what the repairs will cost. December electricity billed in January is an accrual, even though the final invoice is not yet available.
Separate liabilities from asset reductions and equity
An allowance for doubtful receivables reduces the carrying amount of receivables. Depreciation and impairment also reduce asset amounts. They are not obligations to transfer resources to someone else, so calling them “provisions” in everyday accounting language does not bring them into IAS 37.
A reserve is part of equity. Moving retained earnings into a reserve changes the labels within equity; it creates neither an expense nor a liability. Likewise, transferring cash into a separate bank account changes where cash is held, not whether a provision exists.
Record and present the obligation
Recognizing the warranty provision gives this entry:
- Debit Warranty expense CU 186,000.
- Credit Provision for warranties CU 186,000.
Profit falls and liabilities rise. Cash does not change until repairs are paid for. For a decommissioning obligation, the debit initially forms part of the related asset's cost instead of an immediate expense.
Provisions are presented separately in the statement of financial position, also called the balance sheet. Expected settlement helps determine current or non-current classification: a warranty expected to be settled within twelve months is usually current; dismantling due in ten years is non-current.
Check the applicable standard
IAS 37 covers obligations such as assurance warranties, lawsuits, clean-up costs and onerous contracts. A more specific standard takes priority for income taxes, leases, employee benefits, insurance contracts and financial instruments within its scope.
An executory contract is one under which neither party has performed, or both have performed partly to the same extent. A routine order awaiting delivery is normally outside IAS 37. It enters the provision rules if it becomes onerous: the contract then binds the company to an unavoidable net loss.
Key Takeaways
- A provision is a liability with uncertain timing or amount.
- Payables and accruals usually involve less uncertainty than provisions.
- Asset allowances reduce assets; reserves belong to equity.
- Recognizing a provision does not set aside or pay cash.
- Apply a more specific standard before IAS 37.
1.2 Apply the three recognition criteria
The starting question is whether something has already happened that the company must answer for. An expected payment is not enough by itself. IAS 37 requires three recognition tests to be met at the reporting date.
Apply all three tests
- There is a present legal or constructive obligation from a past event.
- An outflow of resources to settle it is probable.
- The amount can be estimated reliably.
The past event is the obligating event. It leaves the entity with no realistic alternative to settlement. The obligation must exist independently of the company's future actions. Contamination already caused may qualify; a cost that would arise only if production continues next year does not yet qualify.
A legal obligation comes from a contract, legislation or another operation of law. A constructive obligation comes from the company's conduct: established practice, a published policy or a sufficiently specific statement creates a valid expectation in others that it will accept responsibility. An oil company with a public clean-up promise that it has consistently honored can have an obligation once it contaminates land, even without a clean-up law.
The obligation is owed to another party, which can be the public at large. The company need not identify each person individually. A private board decision does not create expectations in those affected; communication must be specific enough, and must occur before the reporting date, to create the obligation at that date.
Evaluate the evidence and probability
Sometimes the existence of an obligation is disputed. Consider all available evidence, including expert opinions and later evidence about conditions at year-end. Treat a present obligation as existing when that is more likely than not.
Then assess the outflow. Probable in IAS 37 means more likely than not: above 50%. For a large class such as warranties, assess the class as a whole. Each individual product may be unlikely to fail while repairs across the whole portfolio are probable.
Reliable estimation rarely prevents recognition. Management normally can develop a range using experience and expert advice. In the extremely rare case where it cannot make a reliable estimate, it discloses a contingent liability instead of recording a provision.
Work through a lawsuit
Guests become ill after a catering company's November wedding meal. At December 31, lawyers conclude that the company will more likely than not be liable and estimate damages of CU 400,000.
- Serving the meal is the past event that created the present obligation.
- The legal assessment supports a probable outflow.
- CU 400,000 is a reliable estimate.
Recognize an expense and a provision of CU 400,000. The payment date may still be uncertain.
Follow the branch that fits
A present obligation with a probable outflow and a reliable estimate leads to a provision. A present obligation that fails the outflow or estimate test leads to contingent-liability disclosure unless the outflow is remote. A possible obligation also leads to disclosure unless remote; it never leads directly to a provision. If neither a present nor a possible obligation exists, there is nothing to recognize or disclose under these rules.
Key Takeaways
- All three recognition tests must be met at the reporting date.
- A constructive obligation requires valid expectations in others.
- For disputed obligations, weigh all available evidence.
- Probable means an outflow is more likely than not.
- Assess similar warranty obligations as a class.
- An unrecognized obligation may still require contingent-liability disclosure.
1.3 Recognize costs that do not create a provision
A likely future cost can still fail the recognition tests. The issue is whether a past event has created an obligation that exists independently of the company's future actions. Prudence does not permit a liability for every expected difficulty.
Future losses and general risks
Future operating losses are never provided for. A forecast of poor trading does not oblige the entity to transfer resources because of a past event. It may indicate that assets need an impairment test under IAS 36.
Self-insurance does not change this rule. An uninsured company cannot build up a provision for a fire that has not occurred. It has a business risk, not a present obligation. A general reserve within equity is different from recognizing a liability and expense.
Repairs and legal compliance
A furnace lining replaced every five years does not create a provision during the years before replacement. The company can avoid the future work by selling the furnace. When installed, the new lining is recorded as a separate asset component and depreciated over its useful life. A legally required aircraft overhaul follows the same reasoning: future use can be avoided.
Suppose a law requires smoke filters by June 30, 20X2. At December 31, 20X1, there is no provision for installing the filters. The installation is future expenditure needed to operate. If the factory later operates illegally without filters, that breach can create a separate obligation for fines. At December 31, 20X2, a provision for those fines is recognized when payment is probable and the amount can be estimated reliably.
The filter cost and the fine have different triggers. One buys equipment for future operations; the other settles responsibility for a breach already committed. Merely reading that a cost is “required by law” does not identify its obligating event.
Plans versus damage already caused
A plan to retrain staff, move an office or increase advertising creates no provision on its own. Management can change the plan, and no other party has gained a valid expectation that meets the constructive-obligation test.
Contamination already caused is different. A law or a constructive clean-up obligation can make the entity responsible at once. Future production damage is recognized as that damage occurs, not as an estimate of all harm that future operations might cause.
Find the trigger for a levy
For a government levy within IFRIC 21, identify the activity that triggers payment under the legislation. If payment is due from companies operating on January 1, the full liability arises on January 1. At December 31, intending or being economically compelled to keep operating does not bring that trigger forward. Going concern accounting does not create it either.
Recognition follows the actual legal trigger: a levy triggered progressively arises progressively; one triggered by a minimum activity threshold arises when that threshold is reached. Do not spread a point-in-time levy across a year just because the charge recurs annually.
Without this discipline, managers could charge speculative expenses in a strong year and release them to boost a weak year's profit. IAS 37 ties recognition to obligations, which prevents this use of provisions to smooth performance.
Key Takeaways
- Future operating losses and general business risks are not provisions.
- Future maintenance and compliance expenditure do not create present obligations.
- A past legal breach can create an obligation for fines.
- Recognize clean-up responsibility for damage already caused.
- For a levy, follow the activity trigger defined in the legislation.
2Identify and disclose contingent liabilities and contingent assets
An unresolved lawsuit can matter to users even when it creates no recognized liability. Notes explain exposures that fall short of the provision tests, while claims for possible gains face a stricter threshold. Working from the direction of the cash flow and the evidence for it helps you distinguish recognition, disclosure and no action. Reassessing the evidence matters too: a contingent item can become a recognized balance in a later period.
2.1 Identify and disclose contingent liabilities
A company can face a genuine financial exposure without having a recognized liability. A contingent liability describes uncertainty that does not meet the conditions for a provision. Notes then give users information that the balance sheet alone cannot show.
Identify either kind of contingent liability
The first kind is a possible obligation from a past event. Its existence depends on uncertain future events not wholly within the entity's control. A disputed lawsuit can fit this description when the evidence does not support a present obligation.
The second kind is a present obligation that is not recognized because an outflow is not probable, or because a reliable estimate cannot be made in an extremely rare case. “Present” therefore does not always mean “recorded”: the outflow and estimate tests still matter.
Contingent liabilities are not recognized in the statement of financial position. They are disclosed unless the possibility of an outflow is remote, meaning very unlikely.
Use the probability terms carefully
| Assessment | Treatment of an obligation |
|---|---|
| Present obligation, probable outflow, reliable estimate | Recognize a provision and give provision disclosures. |
| Possible obligation, or present obligation without a probable outflow | Disclose a contingent liability unless remote. |
| Remote outflow | No provision or contingent-liability disclosure. |
“Virtually certain” means almost no doubt; “probable” means more likely than not; “possible” is below probable but above remote. IAS 37 gives a numerical anchor only for probable: above 50%. Do not assign invented percentage bands to the other judgments.
Explain the exposure in the notes
For each class, describe the nature of the contingency. Where practicable, give its estimated financial effect, uncertainties about amount or timing and possible reimbursement. Disclosure of an estimated amount does not turn that amount into a recognized liability.
In extremely rare disputes, some details could seriously prejudice the company's position. Those details may be omitted, but the company still discloses the general nature of the dispute and explains the omission and its reason.
Split joint and several liability
Two companies are jointly and severally liable for a CU 900,000 clean-up. Each is expected to pay half. Company A recognizes CU 450,000 for its own probable payment and discloses CU 450,000 as a contingent liability for the other company's expected share. The legal exposure to the whole amount explains why the second half cannot simply be ignored.
Reassess at each reporting date
At the end of 20X1, lawyers estimate a 30% chance of losing a patent case. The company discloses the exposure. At the end of 20X2, new evidence raises the chance to 70%, with estimated damages of CU 600,000. It recognizes a CU 600,000 provision and expense in 20X2. A reasonable earlier estimate is not rewritten merely because later evidence changes the assessment.
Calling every uncertain liability “contingent” misses the dividing line. A provision is uncertain too, but it meets the recognition tests and is recorded.
Key Takeaways
- Contingent liabilities include possible obligations and some unrecognized present obligations.
- Disclose a contingent liability unless the outflow is remote.
- Only probable has a numerical anchor in IAS 37.
- Joint and several liability can require both a provision and a contingency note.
- Reassess exposures at every reporting date.
- Seriously prejudicial details have a narrow disclosure exception.
2.2 Identify and disclose contingent assets
Uncertainty about receiving money has a stricter recognition threshold than uncertainty about paying it. A company pursuing a claim must separate a promising outcome from an asset it can record.
Recognize the possible asset
A contingent asset is a possible asset arising from past events. Its existence will be confirmed by uncertain future events not wholly within the entity's control. Examples include a lawsuit the company is pursuing and an insurance claim that the insurer has not accepted.
The treatment depends on the expected inflow:
| Inflow assessment | Treatment |
|---|---|
| Virtually certain | Recognize the asset; it is no longer contingent. |
| Probable | Disclose the contingent asset; do not recognize it. |
| Possible or remote | Neither recognize nor disclose a contingent asset. |
Recognizing every probable gain could put income into the statements that never arrives. IAS 37 therefore requires virtual certainty for recognition, while a present obligation with a probable outflow and a reliable estimate already qualifies for a provision. This difference is deliberate.
Follow a claim across reporting dates
A manufacturer sues a supplier for CU 250,000 over defective materials. At December 31, 20X1, lawyers judge that winning is more likely than not. The company discloses a contingent asset but records no receivable and no gain.
In 20X2, a final judgment awards CU 250,000 and the supplier's ability to pay is not in doubt. The inflow is now virtually certain. The manufacturer debits Receivable CU 250,000 and credits Gain CU 250,000 in 20X2. An expected victory alone did not justify that entry in 20X1.
The note for a probable contingent asset briefly describes its nature and, where practicable, estimates the financial effect. Its wording must reflect the uncertainty. It should not present a favorable judgment that is still in doubt as if collection were assured.
Keep separate claims separate
Suppose a company will probably pay CU 400,000 to a customer but is pursuing its own uncertain CU 150,000 counterclaim. The probable loss is not reduced to CU 250,000. Recognize the CU 400,000 provision and assess the counterclaim independently under the contingent-asset rules. Even if winning the counterclaim is probable, disclosure does not provide a recognized asset to offset the liability.
Distinguish a reimbursement
An insurance recovery for expenditure covered by a recognized provision has a specific reimbursement rule. Recognize a separate asset only when receipt is virtually certain if the entity settles the obligation. The recognized asset cannot exceed the provision.
A CU 400,000 provision with a virtually certain CU 250,000 insurance recovery therefore gives a CU 400,000 liability and a CU 250,000 asset. The statement of financial position shows both gross. The related expense may be presented net in profit or loss. This presentation permission does not lower the asset's recognition threshold or turn an uncertain claim into a receivable.
Key Takeaways
- A probable inflow supports disclosure, not asset recognition.
- Recognize the asset when the inflow becomes virtually certain.
- A counterclaim does not reduce a provision.
- A reimbursement asset requires virtual certainty and cannot exceed the provision.
3Measure provisions with best estimates and discounting
The amount of a provision must reflect the obligation at the reporting date. Different kinds of uncertainty call for different estimation methods, and a distant payment may need discounting. After recognition, settlement, revised estimates and the passage of time change the balance in different ways. Following those movements lets you calculate the expense, keep reimbursements separate and explain the closing liability in the notes.
3.1 Estimate the best amount for a provision
Recognition decides whether a provision belongs in the statements. Measurement decides how much belongs there. Use the best estimate of the expenditure needed to settle the present obligation at the reporting date: what the entity would rationally pay to settle it or transfer it to a third party.
Match the method to the obligation
For a large population of similar items, use expected value, weighting outcomes by their probabilities. Consider 40,000 appliances with assurance warranties. Repairing minor defects in every appliance would cost CU 800,000; repairing major defects in every appliance would cost CU 3,000,000. Experience gives 85% with no defects, 12% with minor defects and 3% with major defects.
The provision is CU 186,000. The two repair figures already describe the whole population, so do not multiply the result by 40,000 again. Management supports the estimate with past experience and, where useful, independent expert reports.
For a single obligation, start with its individual most likely outcome and then consider the other outcomes. A lawsuit with a 70% chance of paying CU 400,000 and a 30% chance of paying nothing is commonly measured at CU 400,000 after that review. Automatically taking 70% of the damages to record CU 280,000 applies a portfolio method without examining the single case.
The most likely result is not a ceiling. A machine repair most likely costs CU 120,000 on the first attempt. If there is a significant chance of further costly attempts, the best estimate is higher. Where other outcomes are mostly lower, an adjustment downward may be needed.
A continuous range with every point equally likely uses its midpoint. For a clean-up costing between CU 300,000 and CU 500,000, the best estimate is CU 400,000. Equal likelihood across the range is essential to this method.
Keep the estimate balanced
Risks and uncertainties belong in measurement, but they do not justify excessive provisions. Count each risk once: a risk adjustment in cash flows must not also appear in the discount rate. Measure before tax; account for tax consequences separately under IAS 12.
Reflect future events only when sufficient objective evidence supports them. Improved clean-up technology may reduce estimated costs if that improvement has objective support. Proposed legislation affects the obligation when enactment as drafted is virtually certain. Do not deduct gains expected from disposing of related assets, even when the disposal and obligation are closely linked.
Decide what the warranty promises
An assurance-type warranty promises that the product works as agreed and is measured as an IAS 37 provision. A service-type warranty supplies an extra service, such as separately purchased extended cover. It is a performance obligation under IFRS 15: part of the selling price is deferred as revenue. Applying the repair-provision method to that service promise would bypass the revenue treatment.
Key Takeaways
- Use expected value for a large population of similar obligations.
- For a single obligation, consider other outcomes after identifying the most likely result.
- Use the midpoint for an equally likely continuous range.
- Reflect risks once and measure before tax.
- Do not deduct expected asset-disposal gains.
- Assurance and service warranties follow different accounting treatments.
3.2 Discount long-term provisions and unwind the discount
A payment due several years from now is not the same liability amount as an immediate payment of the same cash sum. When the time value of money is material, measure a provision at present value. Short-term provisions are usually not discounted because the effect is immaterial.
Choose the rate and the period
Use a pre-tax discount rate reflecting current market assessments of the time value of money and risks specific to the liability. Do not use the company's investment return or general cost of capital. Do not add a risk to the rate if the cash-flow estimate already reflects that risk.
For a single future payment:
Here, is the expected payment, is the rate per period and is the number of periods until payment. Match the period used for the rate to the period counted in the exponent. The provision is the present value; the future cash amount remains the expected settlement.
Discount a legal obligation
A company expects to pay CU 1,157,625 in three years. The appropriate pre-tax rate is 5% annually.
Initially debit Expense CU 1,000,000 and credit Provision CU 1,000,000. Recording CU 1,157,625 immediately would include three years of financing effects in the initial operating expense.
Unwind the discount as time passes
The liability grows because settlement gets closer. This growth is the unwinding of the discount, recorded as a finance cost.
| Year | Opening provision | Finance cost at 5% | Closing provision |
|---|---|---|---|
| 1 | CU 1,000,000 | CU 50,000 | CU 1,050,000 |
| 2 | CU 1,050,000 | CU 52,500 | CU 1,102,500 |
| 3 | CU 1,102,500 | CU 55,125 | CU 1,157,625 |
Year 1's entry debits Finance cost CU 50,000 and credits Provision CU 50,000. Each year's interest uses that year's opening liability, not the original CU 1,000,000 every year. If the estimate proves exact, settlement debits Provision CU 1,157,625 and credits Cash for the same amount.
Separate time passing from a revised estimate
At the end of year 1, suppose the appropriate rate falls to 4%. The payment is still CU 1,157,625, now due in two years.
Compare that amount with CU 1,050,000 after unwinding. The rate change adds CU 20,289 to the liability, charged to profit or loss for this ordinary legal provision. A lower rate raises present value because less discount is deducted.
For decommissioning initially included in an asset's cost, a remeasurement adjusts the asset under the cost model. The unwinding itself remains a finance cost; it is not added to the asset. Keeping these movements separate also makes the provision reconciliation easier to explain.
Key Takeaways
- Discount when the time value of money is material.
- Use a current pre-tax rate suited to the liability and avoid counting risk twice.
- Unwinding increases the provision and is a finance cost.
- Remeasure using the remaining settlement period when estimates or rates change.
- Decommissioning remeasurement and unwinding have different debit entries.
3.3 Update, use and disclose provisions over time
A provision is a current best estimate, not a permanent balance. Review it at each reporting date, record settlement against the right obligation, and explain the movements in the notes.
Use the provision, then update what remains
Only expenditure for the purpose originally provided for can be charged against a provision. Warranty repairs can use a warranty provision; unrelated restructuring costs cannot. When a repair is performed, debit the provision and credit Cash, Inventory or the relevant payable. Do not charge the same repair to expense a second time.
An opening warranty provision is CU 186,000. Repairs costing CU 150,000 are charged against it, leaving CU 36,000. The year-end best estimate for warranties still open is CU 210,000. The required additional expense is:
Debit Warranty expense CU 174,000 and credit Provision CU 174,000. The CU 210,000 estimate is the required closing balance, not the amount to add to the balance already remaining.
A revision based on new evidence is a change in estimate recognized in the current period. It does not restate a reasonable estimate in earlier statements. Reverse the provision if an outflow is no longer probable. For an amount originally expensed, the reversal goes through profit or loss, usually in the original expense line.
Account for reimbursements separately
Recognize a reimbursement asset only if receipt is virtually certain if the entity settles the obligation. The asset is capped at the provision. For a CU 400,000 lawsuit provision and a virtually certain CU 250,000 insurance recovery, present a CU 400,000 liability and a CU 250,000 asset. They are not offset on the statement of financial position. The expense may be shown net at CU 150,000 in profit or loss.
Check who remains liable if the third party fails to pay. If the company would still have to settle, it records its own obligation and assesses reimbursement separately. If it is not liable for those costs even if the third party fails, it includes neither those costs in its provision nor a recovery asset.
Reconcile the liability
For each class of provision, show opening and closing carrying amounts and explain additions, amounts used, unused reversals, discount unwinding and effects of rate changes. For example:
The figures mean opening CU 500,000, additions CU 120,000, settlement CU 180,000, reversal CU 40,000 and unwinding CU 25,000. Comparative figures for this movement reconciliation are not required.
Also describe the obligation, expected settlement timing, major uncertainties and relevant assumptions about future events. Disclose expected reimbursements and the reimbursement asset recognized.
A cost-model decommissioning decrease has a different destination from an ordinary expense reversal: reduce the related asset, with only any decrease beyond its carrying amount recognized in profit or loss.
Key Takeaways
- Use a provision only for its original purpose.
- Compare the remaining balance with the required closing estimate.
- Recognize a qualifying reimbursement as a separate, capped asset.
- Present liability and reimbursement gross on the balance sheet.
- Reconcile additions, use, reversals and financing movements.
- Do not retain an unnecessary provision to support future profit.
4Apply the provision rules to onerous contracts, restructurings and decommissioning
A contract, a closure program and an installed asset can each create an obligation, but their triggers and debit entries differ. Work from what binds the company, identify which costs belong to that obligation and measure the unavoidable amount. These cases connect the general provision tests with contract losses, expectations created by restructuring announcements and the cost of removing an asset after years of use.
4.1 Measure provisions for onerous contracts
A business can expect future losses without owing anyone for them. A binding contract can change that conclusion: it may already require the business to bear an unavoidable loss. An onerous contract has unavoidable costs greater than the economic benefits expected under it.
Compare the available exit routes
The unavoidable cost is the least net cost of exiting the contract. Compare:
- The net cost of fulfilling the contract: directly related fulfillment costs less expected benefits.
- Compensation or penalties for failing to fulfill it.
Use the lower amount. Both alternatives must be on a net basis. Comparing a cancellation penalty with gross production costs ignores revenue earned by completing the contract.
A normal executory contract has no provision while it is profitable. A contract that earns less profit than management hoped is also not onerous if the expected benefits still cover unavoidable costs.
Count all directly related fulfillment costs
The cost of fulfilling includes incremental costs, such as direct materials and direct labor, plus an allocation of other costs directly related to fulfilling contracts, such as depreciation of production equipment. An incremental-cost-only calculation can miss a real loss. General administrative costs that do not relate directly to the contract are excluded.
Before recognizing a separate onerous-contract provision, recognize any impairment loss on assets used in fulfilling it. The provision covers the remaining obligation after the asset write-down, so the same loss is not counted twice.
Work through the net costs
A manufacturer is bound to deliver 10,000 units for CU 50 each. It will receive CU 500,000. Each unit now costs CU 58: CU 46 of incremental costs and CU 12 of directly related equipment depreciation.
- Total fulfillment cost is CU 580,000.
- Expected benefits are CU 500,000.
- Net fulfillment loss is CU 80,000.
- Canceling costs CU 120,000 and brings no revenue.
The least net cost is CU 80,000, so recognize that provision. Debit Onerous contract expense and credit Provision for CU 80,000. Using only incremental costs would report costs of CU 460,000 and incorrectly miss the contract loss.
If the cancellation penalty is CU 60,000 instead, recognize CU 60,000. The company can escape the larger fulfillment loss through the cheaper cancellation route. The provision measures the unavoidable amount, regardless of management's preferred course.
Link the obligation to the right standard
The IAS 37 onerous-contract rules apply to contracts such as sales, purchase and service contracts, including customer contracts under IFRS 15. Most lessee obligations are already recognized under IFRS 16. An unprofitable lease is normally addressed by testing the right-of-use asset for impairment.
The reason an onerous contract qualifies, while a general operating forecast does not, is the existing contract. That past commitment binds the company to an unavoidable net loss even if it changes its future business plans.
Key Takeaways
- An onerous contract binds the entity to an unavoidable net loss.
- Compare net fulfillment loss with the cancellation cost and use the lower amount.
- Include incremental and allocated directly related costs.
- Recognize impairment on contract assets before a separate provision.
4.2 Recognize and measure restructuring provisions
A restructuring is a management-controlled program that materially changes a business's scope or how it operates. Closing locations, removing a management layer or ending a business line may qualify. Planning a change and creating an obligation for it are separate events.
Establish a constructive obligation
A restructuring needs both a detailed formal plan and a valid expectation in those affected that it will be carried out. The plan identifies the business concerned, principal locations, location and functions of affected employees, approximate numbers receiving termination compensation, expenditure and implementation timing.
Create the valid expectation by starting implementation or announcing the main features to those affected. A board decision kept internal does not do this. Implementation should start soon and finish quickly enough to make the expectation credible; a long delay leaves more scope to change the plan.
For the sale of an operation, no obligation arises until a binding sale agreement commits the company to the sale. Merely announcing a search for a buyer leaves the company able to withdraw or fail to find acceptable terms.
Identify the eligible costs
Include only direct expenditure necessarily caused by the restructuring and unrelated to ongoing activities. Penalties for canceling a closed site's contracts qualify. Termination payments for jobs that end belong to the employee-benefits rules in IAS 19; they must be recognized no later than the related restructuring provision.
Exclude retraining and relocating continuing staff, marketing and new systems or distribution networks. Those costs prepare future operations. Exclude future operating losses before closure unless a separate onerous contract creates an obligation. Expected gains on asset sales do not reduce the liability.
Build the closing balance
A board approves a detailed factory-closure plan on December 10, 20X1 and announces it to employees, customers and suppliers on December 20. Expected amounts are:
| Cost or gain | CU | Treatment |
|---|---|---|
| Termination payments | 1,800,000 | Recognize under IAS 19. |
| Cancellation penalties | 300,000 | Include in the restructuring provision. |
| Retraining continuing staff | 250,000 | Exclude. |
| Relocating continuing staff | 150,000 | Exclude. |
| New IT system | 400,000 | Exclude; account for it when appropriate. |
| Marketing | 120,000 | Exclude. |
| Operating losses until closure | 500,000 | Exclude. |
| Expected building-sale gain | 600,000 | Do not deduct. |
The total recognized restructuring-related liabilities are CU 2,100,000: CU 1,800,000 plus CU 300,000. Within that total, the termination liability follows IAS 19 and the cancellation provision follows IAS 37. The other CU 1,420,000 of expected costs are outside this liability calculation; apply the relevant expense or asset accounting as they arise.
Check the announcement date
If the same plan is first announced on January 15, 20X2 and implementation has not started before year-end, there is no restructuring provision at December 31, 20X1. The later announcement creates a new condition and is disclosed as a non-adjusting event if material. It does not turn the earlier internal approval into an obligation.
Key Takeaways
- A formal plan and a valid expectation in those affected are both needed.
- Internal approval alone does not create a constructive obligation.
- A sale of an operation requires a binding sale agreement.
- Recognize direct exit costs, with termination benefits governed by IAS 19.
- Exclude future operating costs and do not deduct disposal gains.
- A later announcement does not create a year-end obligation.
4.3 Account for decommissioning and environmental obligations
Installing an asset can create an obligation to remove it years later. The cash payment is distant, but the obligation already exists once installation has caused the work that must eventually be done.
Recognize the installation obligation
A decommissioning obligation may arise from a site lease, law or constructive commitment. Examples include dismantling an offshore platform and restoring the land beneath a mast. For installation-related damage, recognize the full present value when the asset is constructed or installed.
Under IAS 16, include the initial dismantling and restoration estimate in the asset's cost. Debit the asset and credit the provision. Depreciation then spreads that part of the asset's cost over its useful life; it is not left entirely until closure.
Calculate the asset and liability
A platform costs CU 20,000,000 on January 1, 20X1. Removal after ten years is expected to cost CU 5,000,000. The appropriate pre-tax rate is 6%.
Debit Platform CU 2,791,974 and credit Decommissioning provision for the same amount. The total initial asset cost is CU 22,791,974. Using CU 5,000,000 immediately would overstate both the asset and the liability because the financing period has been ignored.
With zero residual value and straight-line depreciation over ten years, annual depreciation is CU 2,279,197, rounded. It reduces the asset. Year 1's discount unwinding is CU 167,518, rounded, and increases the provision to CU 2,959,492. Debit Finance cost and credit Provision for the unwinding. It is not added to the platform.
With unchanged estimates, the liability grows to CU 5,000,000 by settlement. Pay it by debiting the provision and crediting Cash. Carry unrounded present values through calculations and round displayed final amounts to whole CU.
Remeasure under the cost model
A change in expected cash flows, settlement timing or the current discount rate changes the liability. Add an increase to the related asset or deduct a decrease from it, then depreciate the adjusted carrying amount over the remaining life. If a decrease exceeds the asset's carrying amount, recognize the excess in profit or loss. This is the IFRIC 1 treatment for an asset under the cost model.
Do not combine this remeasurement with unwinding. A new estimate changes the restoration cost included in the asset; time passing creates a finance cost.
Separate installation damage from later production
In another case, total restoration costs are CU 4,500,000. Removing the platform and repairing construction damage account for 90%, or CU 4,050,000; extraction damage accounts for 10%, or CU 450,000. The installation part gives rise to an obligation at construction. Recognize the extraction part as extraction causes damage, as a production cost.
Environmental contamination already caused supports a provision when a legal or constructive clean-up obligation exists. Virtually certain enactment of a proposed clean-up law can also create the legal obligation. Serious damage alone does not establish that the entity has an obligation.
Key Takeaways
- Recognize installation-related removal obligations at installation.
- Add the initial present value to the asset cost.
- Depreciation reduces the asset; discount unwinding increases the liability.
- Under the cost model, remeasurement usually adjusts the related asset.
- Recognize damage caused by later production as it occurs.
- Environmental clean-up requires a legal or constructive obligation.
- Unwinding is always a finance cost in profit or loss.
5Account for events after the reporting period
Information received after year-end may reveal what was already true at year-end or describe a condition that arose later. A clear timeline separates those cases before you decide on an entry or a note. That distinction guides lawsuit settlements, customer failures, inventory sales and later dividends. A decision to liquidate or stop trading raises a broader question: whether the statements can still use the going concern basis.
5.1 Distinguish adjusting from non-adjusting events
Year-end numbers use information that may arrive after year-end. IAS 10 calls these events after the reporting period, also known as subsequent events. The question is whether the information explains an old condition or reveals a new one.
Set the evaluation window
The window runs from the end of the reporting period to the date the statements are authorized for issue. For December 31, 20X1 statements authorized on March 15, 20X2, consider events from January 1 through March 15.
Authorization usually comes from management or the board with authority to issue the statements. A later shareholder approval date does not extend the window. If management submits statements to a supervisory board made up only of non-executives, the relevant date is management's authorization for that issue. An earlier public announcement of selected profit figures does not end the window.
Both favorable and unfavorable events count. A very large event is not necessarily adjusting, and a small event is not necessarily non-adjusting.
Date the underlying condition
| Event type | What does it tell you? | Main action |
|---|---|---|
| Adjusting | Evidence of a condition that existed at the reporting date. | Update recognized amounts and related notes. |
| Non-adjusting | A condition arose after the reporting date. | Keep year-end amounts; disclose if material. |
The date the company learns something and the date the condition arose can differ. Draw a timeline if the distinction is unclear: mark the reporting date, the origin of the condition, the new evidence and authorization.
Compare two customer failures
A customer owes CU 80,000 on December 31. In February it goes bankrupt because of financial difficulties that built up during the previous year. The bankruptcy supplies evidence about collectibility at December 31, so it is adjusting.
Now suppose a financially sound customer loses its warehouse in a February flood and then cannot pay. The new flood caused the loss of ability to pay. That is non-adjusting for December 31. The invoice existed at year-end in both cases; the timing of the cause differs.
Recognize common evidence patterns
A later lawsuit settlement may confirm an existing year-end obligation. A sale of inventory below its carrying amount may provide evidence of year-end net realizable value. Later determination of a pre-year-end purchase cost or sales proceeds, or bonuses for which a year-end obligation existed, can also adjust the statements. Discovery of fraud or errors can show the year-end figures were incorrect.
New fires or floods, later market-price declines, major business combinations, disposals, share transactions and new commitments are non-adjusting when their underlying conditions arise after year-end. The same applies to a restructuring first announced later, new litigation based solely on later events, and tax-law or tax-rate changes enacted or announced after year-end.
For a later market decline, do not replace the year-end market measurement with the newest price. First classify the condition by timing. Then assess whether the non-adjusting event is material enough to need a note.
Key Takeaways
- Evaluate events through authorization for issue, including favorable events.
- Adjusting events give evidence about conditions existing at year-end.
- Non-adjusting events arise from later conditions.
- Classify the underlying condition, not the news date or size.
5.2 Adjust, disclose and apply the going concern exception
Once an event has been classified, turn that conclusion into entries and disclosures. Keep the reporting date visible: an adjustment belongs in the statements for that date even when the confirming evidence arrives later.
Record adjusting events
A company recorded a CU 200,000 lawsuit provision at December 31, 20X1. The case is settled for CU 260,000 on February 10, 20X2, before authorization. The settlement confirms the existing obligation.
Increase the 20X1 provision by CU 60,000 and charge an additional CU 60,000 expense to 20X1. If no provision had been recorded because management expected to win, the confirming settlement would require recognition of CU 260,000 in those statements. It is not simply a new expense of February.
A CU 80,000 year-end receivable becomes recoverable at only 10% when a customer's February bankruptcy confirms earlier financial trouble. Expected recovery is CU 8,000, so increase the loss allowance by CU 72,000 in the year-end statements. Inventory costing CU 50,000 and sold in January for net proceeds of CU 42,000 gives a CU 8,000 write-down when the sale evidences year-end net realizable value.
Update notes too. New evidence about a contingent liability existing at year-end can change its disclosure even when no liability is recognized.
Disclose material new events
For a material non-adjusting event, leave year-end recognized amounts unchanged and disclose its nature and estimated financial effect. If the effect cannot be estimated, say so.
A warehouse carried at CU 1,500,000 burns down on January 20, 20X2. The fire is a new condition, so disclose it in the 20X1 notes if material. Do not remove the warehouse from December 31 assets merely because the fire occurred before authorization.
Dividends declared after year-end are not liabilities at year-end: there was no obligation then. Disclose them in the notes. The decision to distribute profits later does not backdate the obligation.
Reassess going concern
A different rule applies if, after the reporting date, management decides to liquidate, cease trading or has no realistic alternative. Do not prepare the statements on a going concern basis, even if the cause arose after year-end. This changes the basis of preparation, not just the amount of one asset or liability.
A deterioration after year-end is a reason to reassess the basis. A serious event that still leaves a realistic ability to continue does not, by itself, force abandonment of going concern; evaluate the actual conclusion about continued operation.
Tell users when the window closed
Disclose the authorization date and who authorized the statements. Also disclose whether owners or others can amend the statements after issue. These facts identify the boundary of the information considered.
Apply the same timing logic to provisions: a later court ruling may confirm a year-end obligation, while a restructuring first announced in January cannot create a December constructive obligation.
Key Takeaways
- Adjust amounts and notes for evidence about year-end conditions.
- Disclose the nature and financial effect of material non-adjusting events.
- Later-declared dividends are not year-end liabilities.
- Abandon going concern when liquidation or cessation is intended or unavoidable.
- Disclose when and by whom the statements were authorized.
Provisions and Contingencies examples
1Decide whether there is a provision
12 steps
- 1IntroductionStart with what the company owes
A provision records an obligation already created, even though its amount or timing remains uncertain. It does not record every cost the business expects.
Work through three questions: what kind of balance is this, what past event binds the company, and do the payment and measurement tests support recognition?
- 2ExplanationSeparate an accrual from a provision
December electricity has been used but the bill arrives in January. That is an accrual: the service has been received and uncertainty is limited.
A warranty for goods already sold is different. Unknown claims and repair costs make its amount or timing more uncertain, so it can be a provision. An invoiced supplier amount is a trade payable.
- 3ExampleRecord the liability before paying it
A manufacturer estimates CU 186,000 of repairs owed under assurance warranties.
- Debit Warranty expense CU 186,000.
- Credit Provision for warranties CU 186,000.
The liability rises and profit falls. No bank transfer occurs. Actual repairs later reduce the provision. Asset allowances reduce assets, while an equity reserve stays within equity; neither is this liability.
- 4ChallengeClassify an unpaid service
A laboratory has used an external testing service before December 31. The service is complete, the amount is readily estimated, but the supplier has not issued an invoice. Is the balance a payable, accrual or provision?
---reveal---
It is an accrual for services received but not yet invoiced. Limited estimation does not by itself make the balance a provision.
- 5ExplanationLocate the obligating event
A provision needs a present obligation from a past event. Settlement must be unavoidable through realistic future choices.
A legal obligation can come from a contract or law. A constructive obligation comes from conduct that creates valid expectations in others, such as a consistent public clean-up policy. A private board intention has not created those expectations.
- 6ExampleApply the tests to a lawsuit
Guests become ill after a November meal. At year-end, lawyers say the catering company is more likely than not liable and estimate damages at CU 400,000.
The meal created the obligation; settlement is probable; and the amount is reliably estimable. All three tests are met, so debit expense and credit a provision for CU 400,000. A final court judgment is not needed before recognition.
- 7Key InsightAssess a warranty class together
An individual product may have only a small chance of failure. Across thousands of products, some repairs can still be more likely than not.
Assess similar obligations as a class. IAS 37’s probable threshold is above 50%, but it applies to the outflow for the class, not to the chance of failure for every product. A reliable portfolio estimate then supports recognition.
- 8ChallengeRecognize a public commitment
A chemical company publicly promises to restore all land it contaminates and has consistently done so. It causes damage before year-end; payment is probable and reliably measurable. There is no clean-up statute. Does it recognize a provision?
---reveal---
Yes. Its policy and conduct create valid expectations and a constructive obligation once damage occurs. The other recognition tests are met.
- 9ExplanationExclude avoidable future spending
A future overhaul is not a liability simply because continued use requires it. Selling the equipment can avoid the work. Likewise, future operating losses and planned advertising create no present obligation.
A fine for a breach already committed is different: the past breach may bind the company to pay. Identify that past event separately from spending needed to comply in future.
- 10ChallengeRead the levy trigger
A hypothetical levy is payable by every business operating on July 1. On June 30, management expects to continue and can estimate the levy reliably. What is recognized on June 30?
---reveal---
No levy liability. The activity specified by law has not yet occurred. Recognize the full charge on July 1 if the business operates then; expected continued trading does not accelerate the trigger.
- 11ChallengeSeparate a loss from a clean-up duty
At year-end, a mine forecasts CU 310,000 of future trading losses and owes CU 125,000 for existing contamination under a restoration law. Clean-up payment is probable and measurable. What provision is recognized?
---reveal---
Recognize CU 125,000 for the existing clean-up obligation. Do not provide for the CU 310,000 future operating loss: it has no present obligation behind it.
- 12RecapUse the obligation as the dividing line
Identify the liability, then apply all three tests: present obligation from a past event, probable outflow and reliable estimate.
If recognition fails, check the contingent-liability branch. Future spending with no present or possible obligation does not enter that branch merely because it is expected.
2Follow uncertain payments and receipts
10 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionKeep the direction of the flow visible
- 2ExplanationIdentify a contingent liability
- 3ExampleSplit shared legal exposure
- 4ChallengeUpdate a changed legal assessment
- 5TipDescribe uncertainty without inventing percentages
- 6ExplanationUse the stricter asset threshold
- 7ExampleMove from a claim to a receivable
- 8ChallengeKeep the counterclaim separate
- 9ChallengeCombine a provision and a recovery
- 10RecapChoose the threshold for the item
3Measure a provision and explain its movements
15 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionSeparate the causes of a changing balance
- 2ExampleSet up the warranty outcomes
- 3ExampleCalculate the expected value
- 4Key InsightChoose the method that fits
- 5ChallengeMeasure an equally likely range
- 6ExplanationBring the payment to today’s value
- 7ExampleDiscount the three-year payment
- 8ExampleRecord the first year passing
- 9ChallengeCompute the next finance cost
- 10ExampleUse the warranty provision first
- 11ExampleTop up to the required closing amount
- 12ExplanationRecord a reimbursement separately
- 13ChallengeCalculate a year-end top-up
- 14ChallengeReconcile an ordinary legal provision
- 15RecapRead the movement before choosing the entry
4Work through three special provision cases
17 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionMatch the cost to what created it
- 2ExampleFind the contract’s fulfillment cost
- 3ExampleCompare the net exit routes
- 4TipWrite down impaired assets first
- 5ChallengeCount directly related depreciation
- 6ExplanationCreate an expectation through action or announcement
- 7ExampleDate the factory closure obligation
- 8ExampleSeparate exit costs from future operations
- 9ChallengeMeasure the eligible closure amounts
- 10ExplanationRecognize removal when installation creates the duty
- 11ExampleDiscount the platform’s removal cost
- 12ExampleKeep depreciation and unwinding separate
- 13Key InsightDistinguish a new estimate from time passing
- 14ChallengeRecord a cost-model decrease
- 15ConnectionRecognize later production damage as it occurs
- 16ChallengeChoose the debit for two increases
- 17RecapUse the trigger and the cost boundary
5Close the year using later evidence
13 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionPlace the condition on the timeline
- 2ExplanationClose the window at authorization
- 3ExampleCompare the two bankruptcy causes
- 4ChallengeClassify newly discovered fraud
- 5TipClassify first, then assess materiality
- 6ExampleIncrease the old lawsuit provision
- 7ExampleUpdate a receivable’s recovery estimate
- 8ChallengeSeparate the year-end entry from the later note
- 9ExplanationTreat a later dividend declaration at its actual date
- 10Key InsightReassess the basis of preparation
- 11ChallengeRespond when continuation is impossible
- 12ChallengeCombine the window and the condition test
- 13RecapFinish the statements and their boundary note
Provisions and Contingencies practice questions
Set 1: Choose recognition, disclosure or no action10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Find the obligation at year-end10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Calculate and update the reported amount10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Apply contracts, closure and restoration rules10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Resolve the year-end reporting decisions10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Accrual
Adjusting event
Allocated directly related costs
Amounts used
Asset allowance
Assurance-type warranty
Asymmetric thresholds
Authorization for issue
B
Best estimate
C
Capitalized restoration cost
Constructive obligation
Contingency disclosure
Contingent asset
Contingent liability
Cost model
Counterclaim
D
Decommissioning obligation
Detailed formal plan
Direct restructuring expenditure
Double counting risk
E
Environmental clean-up obligation
Equity reserve
Events after the reporting period
Executory contract
Expected value
F
Finance cost
Financial effect
Future maintenance
Future operating loss
G
Going concern basis
Gross presentation
I
Incremental costs
J
Joint and several liability
L
Least net exit cost
Legal obligation
Levy
M
Midpoint estimate
Most likely outcome
N
Non-adjusting event
O
Obligating event
Onerous contract
P
Possible obligation
Post-year-end dividend
Pre-tax discount rate
Present obligation
Present value
Probable outflow
Production-related damage
Provision
Provision reconciliation
R
Reassessment
Reimbursement asset
Reliable estimate
Remeasurement
Remote outflow
Restructuring
Reversal
S
Self-insurance
Service-type warranty
T
Trade payable
U
Unwinding of the discount
Updated disclosure
V
Valid expectation
Virtually certain inflow