- Learn
- Business & Economics
- Business Management
- International Business
- Global Production and Sourcing
Global Production and Sourcing
Global Production, Sourcing and Supply Chains
IntermediateLesson 6 of 7 in International Business Course
What you will learn
- Explain why the places where a company makes and buys things shape its cost, quality, speed and risk, and use the vocabulary of outsourcing, offshoring, nearshoring and reshoring precisely.
- Explain what global operations decisions involveDescribe production, sourcing and the global supply chain, and the goals of cost, quality, responsiveness and resilience that these decisions must balance.
- Tell outsourcing, offshoring, nearshoring and reshoring apartClassify a sourcing arrangement by who does the work and where it is done, and use each term correctly.
- Explain what global operations decisions involve
- Weigh country, technology and product factors to decide where to produce, compare candidate locations with total landed cost and weighted scoring, and plan how foreign plants can grow in importance over time.
- Judge a country as a production locationExplain location economies and assess how labor productivity, infrastructure, politics, culture, trade rules, exchange rates and industry clusters make a country more or less attractive for production.
- Decide between concentrated and spread-out productionUse fixed costs, minimum efficient scale, flexible manufacturing, value-to-weight ratio and the product's universal appeal to decide whether to make a product in one or a few plants or near each major market.
- Compare locations with landed cost and weighted scoringCalculate the total landed cost per unit for candidate locations, combine cost with factors that are hard to price in a weighted scoring model, and test how sensitive the result is.
- Develop the role of foreign plants over timeClassify the strategic role of a foreign factory and explain how a plant set up for low costs can become a source of knowledge and innovation for the whole company.
- Judge a country as a production location
- Make make-or-buy decisions across borders, weigh the gains and hidden costs of global sourcing and offshoring, and judge when reshoring or nearshoring is the better choice.
- Make or buy across bordersDecide whether to produce a component or service in-house or buy it from an independent supplier, using relevant costs and strategic reasons, and recognize the options between full ownership and arm's-length buying.
- Weigh the gains and hidden costs of global sourcing and offshoringExplain why companies source and offshore goods and services abroad, identify the hidden costs and risks, and use total cost of ownership to decide.
- Judge when to reshore or nearshoreExplain the forces behind reshoring, nearshoring and regional supply, recognize their limits, and compare options on total cost including speed and risk.
- Make or buy across borders
- Arrange plants, suppliers and distribution centers across countries so the chain fits the product, choose how goods cross borders, plan inventory and information over long distances, and build resilience against disruption.
- Match the supply chain configuration to the productDescribe the main global supply chain configurations, link them to international strategy, and choose an efficient or a responsive chain according to the type of product.
- Choose how to move goods across bordersCompare delivering to local, national and international markets, choose a transport mode, explain the steps of customs clearance, and describe the roles of freight forwarders, customs brokers and logistics providers.
- Plan inventory and information across long distancesCalculate how long lead times raise pipeline and safety stock, explain why just-in-time is harder across borders, and show how shared information reduces the bullwhip effect.
- Build resilience against disruptionIdentify the main sources of global supply chain risk and choose mitigation measures, weighing what they cost against the expected cost of disruption.
- Match the supply chain configuration to the product
- Select and segment suppliers in other countries, govern each relationship with clear contracts and performance measures, and make sure sourcing meets labor, environmental and legal standards.
- Select and segment global suppliersFollow the steps of choosing a supplier abroad, apply selection criteria and qualification checks, and use the Kraljic matrix to treat different purchases differently.
- Govern supplier relationships with contracts and performance measuresChoose the right type of relationship, set out the key terms of an international supply contract, measure supplier performance, and work across cultures and distance.
- Source responsibly and comply with trade rulesExplain why companies answer for conditions in their supply chains, use codes of conduct, audits and traceability, and recognize the main kinds of law that govern forced labor, due diligence and emissions in sourcing.
- Select and segment global suppliers
Global Production and Sourcing study guide
1Understand global operations choices
Companies divide work among their own sites and outside suppliers across countries. Those choices shape the cost of a product, the service customers receive and the damage a disruption can cause. Start with the objectives of global operations, then separate the question of who performs an activity from the question of where it happens. This makes terms such as outsourcing and offshoring useful tools for describing a real business decision.
1.1 Cost, quality, speed and continuity
A production decision shapes far more than the factory bill. It also affects how quickly customers receive orders, how consistently products work and what happens when a link fails. Global operations joins these choices across countries. It includes services such as software development and customer support as well as manufacturing.
Follow the network
A supply chain connects raw-material producers, component makers, plants, distributors, retailers and customers. Goods move toward customers, while orders, forecasts and payments connect the same organizations in other directions. A tier-1 supplier sells directly to the company; a tier-2 supplier supplies that tier-1 firm. A global chain crosses national borders at some of these links.
A smartphone illustrates the division of work. A brand can design the phone and software at home, buy processors from specialist foundries in Taiwan or South Korea, buy displays from South Korean or Chinese firms and assemble phones in China, India or Vietnam. Skills, scale and cost favor different places for different activities.
Set the priorities
| Objective | What managers look for |
|---|---|
| Total cost | The full cost of supplying the customer, including transport, inventory and failures |
| Quality and reliability | Consistent output that meets requirements |
| Responsiveness | Short lead times and the ability to adapt to local demand |
| Resilience | Continued supply or fast recovery after a disruption |
ISO 9001 concerns a quality-management system. Six Sigma is an improvement method associated with a target of 3.4 defects per million opportunities under its conventional long-term shift assumption. Neither label removes the need to measure actual output.
These objectives compete. One large plant can spread fixed costs across many units but expose the company to a single shutdown and long delivery routes. Several local plants improve access to customers but duplicate facilities. State which objective matters most for the product before choosing a network.
Connect operations to strategy
Global standardization favors a few large, efficient production locations for common products. Localization favors production close to markets that need different versions. A transnational strategy can combine central component plants with local final assembly, sharing scale while adapting the finished product.
Purchasing improvements can have a large profit effect. A company earns USD 100 million in revenue, spends USD 60 million on purchases and makes USD 5 million in profit. A 2% purchase saving is USD 1.2 million. With sales and other costs unchanged, profit rises by 24%, because the saving is measured against the original USD 5 million profit.
A footprint needs review as productivity, wages, exchange rates, tariffs and technology change. The lowest quoted price may lose its advantage once long delivery routes, extra stock and rework are counted.
Key Takeaways
- Total cost, quality, responsiveness and resilience must be weighed together.
- Production includes both goods and services.
- Supplier tiers describe distance from the buying company in the supply network.
- Operations configuration should support the international strategy.
- A purchase saving raises profit directly when sales and other costs stay unchanged.
1.2 Who does the work, and where?
A company can move work abroad while keeping it inside the business. It can also hire an outside firm without moving any work across a border. Classify arrangements by separating ownership from location.
Use two questions
First ask who carries out the activity. In-house production keeps it inside the company; outsourcing contracts it to an independent firm. Then ask where the work happens. Offshoring moves an activity to another country. These dimensions give four combinations.
| Location | Company carries out the work | Independent supplier carries out the work |
|---|---|---|
| Home country | Domestic in-house production | Domestic outsourcing |
| Abroad | Captive offshoring | Offshore outsourcing |
A bank's own overseas support center is captive offshoring. Hiring an overseas service company is offshore outsourcing. Hiring a local accounting firm is outsourcing without offshoring. Joint ventures can also provide a partly owned overseas operation; the ownership arrangement needs to be identified separately.
Global sourcing describes the worldwide reach of purchasing. Buyers search for suitable cost, quality and capability wherever suppliers are located. It can include domestic suppliers alongside foreign ones.
Describe a change of location
Nearshoring moves work to a nearby country, often within the same region and similar time zones. Examples include US production in Mexico and Western European production in Poland, Romania, Morocco or Türkiye. Nearness can shorten coordination and delivery time, but the border and its rules still matter.
Reshoring, also called onshoring or backshoring, brings previously offshored work home. Ownership can change at the same time or stay the same: switching from a foreign contractor to a domestic contractor is reshoring while continuing to outsource.
Friend-shoring shifts supply toward politically allied countries. China plus one retains Chinese production while adding another country, such as Vietnam or India. The latter diversifies a network; it does not mean leaving China completely.
Classify actual arrangements
A German carmaker opening its own engine plant in Hungary combines captive offshoring with nearshoring. A US bank hiring an Indian IT services firm uses offshore outsourcing. A Canadian furniture maker buying cushions from an independent firm in the next town uses domestic outsourcing. A US appliance maker bringing production from a Chinese contractor to its own US plant combines reshoring with insourcing.
The same product can use several arrangements. A brand may retain design and final testing while a contract manufacturer assembles the product to its design abroad. Classify the activity named in the decision; the location of assembly alone does not tell you who owns design, testing or distribution.
Key Takeaways
- Outsourcing concerns who does the work; offshoring concerns where it happens.
- Captive offshoring keeps overseas work within the company.
- Reshoring can use either an owned operation or a domestic supplier.
- Nearshoring, friend-shoring and China plus one describe different location choices.
2Choose production locations
A production location combines a country’s operating conditions with the scale and technology of a plant. Compare productivity, trade and currency exposure before weighing the benefits of a few large sites against local production. Full cost calculations and weighted scores help turn those factors into a recommendation. The role assigned to a foreign factory also matters, because a site can build skills and contribute much more over time.
2.1 Compare countries beyond wages
Location economies arise when an activity gains a cost or quality advantage from being carried out in a suitable place. A global web of value creation puts design, components and assembly in different locations when their needs differ. A country comparison must examine both the resources available and the conditions for using them.
Calculate labor cost per unit
An hourly wage says little without productivity. Divide hourly labor cost by output per hour to find unit labor cost.
| Country | Hourly labor cost | Units per hour | Labor cost per unit |
|---|---|---|---|
| A | USD 30 | 40 | USD 0.75 |
| B | USD 6 | 6 | USD 1.00 |
| C | USD 12 | 20 | USD 0.60 |
Country C has the lowest cost per unit. Country B pays the lowest wage but produces too few units each hour to win this comparison. A productivity improvement can therefore outweigh a wage difference.
Check the operating environment
Factor costs also include energy, land, capital and taxes. Technical skills, reliable electricity, internet, ports, roads and rail determine whether the plant can operate as planned. A cheap site with unreliable power may require generators, while unpredictable port clearance requires extra stock.
Political stability, rule of law, intellectual-property protection and corruption affect risk. Labor laws and tax rules affect costs and obligations. Grants, tax holidays and special economic zones can attract investment; their value must be weighed alongside operating conditions. Language, hierarchy and teamwork influence coordination. Cultural distance creates work for managers, not a verdict that a country is unsuitable.
Industry clusters bring specialist suppliers, skilled workers and research institutions together. Electronics around Shenzhen, software in Bengaluru and technology in Silicon Valley illustrate how nearby knowledge and inputs can attract more firms.
Include trade and currency
High import tariffs can favor a plant inside the customer market, a choice called tariff jumping. Trade agreements can support a regional production base, provided goods meet their rules of origin. Under the United States–Mexico–Canada Agreement, also called CUSMA and T-MEC, passenger vehicles have a 75% regional value content requirement as part of the automotive origin rules. Other automotive requirements also apply; assembly in a member country alone is insufficient.
Exchange rates alter the buyer's cost without changing the supplier's local price. A part priced at CNY 56 costs USD 8.00 at 7.00 CNY per USD. At 6.40 CNY per USD, it costs USD 8.75: each dollar buys fewer yuan, so the yuan has strengthened. The increase is about 9.4%.
Location advantages change over time. Rising manufacturing wages in China since the early 2000s have encouraged some labor-intensive work to move to countries such as Vietnam or Bangladesh. Productivity, logistics and supplier capability still determine whether that move lowers total cost.
Key Takeaways
- Unit labor cost combines wages and productivity.
- Infrastructure, skills, institutions and clusters affect production performance.
- Trade preferences depend on origin requirements, not just the shipping country.
- A stronger supplier currency raises the buyer’s cost of a fixed local-currency price.
- Country advantages change as costs and capabilities develop.
2.2 Concentrate production or locate near markets
A plant can serve the world, one region or one local market. Concentrated production uses one or a few sites; decentralized production spreads work among sites near major markets. The right choice depends on how production costs behave and how the product travels and changes.
Match scale to demand
A high fixed cost favors large volumes at a few plants. A leading-edge semiconductor factory costs well over USD 10 billion, so duplicating it in every market is difficult to justify. Simple garment sewing has much lower setup costs and can support more locations.
Minimum efficient scale (MES) is the lowest output at which most scale economies have been captured. Above it, average cost falls little as output rises. If MES is 2 million units a year and world demand is 2.5 million, ten equal national plants would each make only 250,000 units. Each would run far below efficient scale.
Flexible manufacturing uses quick changeovers, computer-controlled machines and robots to switch efficiently among variants. It supports mass customization: customized output at costs close to mass production. Lean production has a broader focus on waste and flow; quick changeovers support both. Flexibility can let one central plant supply many national versions, but it can also make small local plants more practical.
Examine what is being shipped
A high value-to-weight ratio makes long-distance shipping a small part of product value. A USD 600 smartphone weighing 0.2 kg has a value of USD 3,000 per kilogram. Cement and bottled water have low values per kilogram, so their freight cost quickly absorbs a production saving.
Products serving universal needs, such as chips or standard industrial chemicals, suit common production. Fresh bakery goods are perishable and often locally adapted. They favor nearby production even when distant labor is cheaper.
| Factors favoring concentration | Factors favoring decentralization |
|---|---|
| High fixed costs and large MES | Low fixed costs and small MES |
| Low trade barriers | High trade barriers |
| High value per kilogram | Heavy, low-value or perishable output |
| Similar needs across countries | Strong local adaptation |
| Large location advantages | Small location advantages or volatile currencies |
Split stages when their needs differ
Soft-drink firms can make valuable flavor concentrate centrally and bottle near customers. Shipping the concentrate captures scale without sending the water in finished drinks around the world. Chip designers use a small number of costly foundries and can ship tiny, valuable processors globally.
No single factor settles every case. A light, valuable product may still need a local plant when tariffs or local-content rules make imports costly. Identify the factors that dominate this product, then check whether the proposed volume can support the chosen number of plants.
Key Takeaways
- Large fixed costs and large MES favor a few high-volume plants.
- Heavy or perishable products often favor production near customers.
- Flexible manufacturing changes the feasible scale and variety of production.
- Different stages can use different locations within one product network.
2.3 Compare full costs and decision scores
A supplier's price is only the starting point. Total landed cost measures the cost of getting a unit to its point of use or sale. A second comparison can weigh skills, stability and speed when these cannot be priced well.
Build comparable costs
Add purchase or production cost, freight, insurance, duty, nonrecoverable import taxes, brokerage, port handling, inland transport, inventory carrying cost and expected inspection or rework. Leave out recoverable import VAT or sales tax because it is not a final business cost. Check the Incoterms® 2020 rule so that a cost included in the quotation is not added again.
An ad valorem duty is a percentage of customs value. EU valuation generally includes freight and insurance to the entry point. US valuation generally excludes international freight and insurance; Canada excludes transport from the place of direct shipment to Canada, while earlier transport can be included. Australia's customs value also generally excludes international freight and insurance. Use the importing country's valuation rules to establish the base.
| USD per unit | Distant A | Nearby B | Domestic D |
|---|---|---|---|
| Price | 8.00 | 9.20 | 10.40 |
| Freight and insurance | 0.90 | 0.30 | 0.15 |
| Duty | 0.40 | 0.00 | 0.00 |
| Fees | 0.15 | 0.10 | 0.00 |
| Inventory | 0.35 | 0.10 | 0.05 |
| Quality cost | 0.20 | 0.10 | 0.05 |
| Total | 10.00 | 9.80 | 10.65 |
Here A's duty is 5% of its USD 8.00 price. B is cheapest overall, saving USD 0.20 per unit against A, or USD 10,000 on 50,000 units. A USD 0.20 reduction in A's freight creates a tie. A larger reduction reverses the ranking: this is a sensitivity check.
Score factors with one consistent direction
Choose factors, assign weights totaling 1 and score each location on the same scale. Higher scores must always mean better performance, including the cost score. Multiply each score by its weight and add the results.
For cost, skills, infrastructure, stability and proximity, use weights of 0.35, 0.20, 0.15, 0.15 and 0.15. Scores X: 9, 5, 5, 6, 3 give 6.25. Y: 6, 7, 8, 8, 9 give 7.25. Z: 3, 9, 9, 9, 10 give 7.05. Y wins under these priorities.
Raising the cost weight to 0.50, retaining skills at 0.20 and assigning 0.10 to each remaining factor gives X and Y 6.90 and Z 6.10. The recommendation now depends on how strongly cost matters. A score organizes judgment; it does not make the chosen weights objective.
Put a price on risk where possible
Expected disruption cost equals probability multiplied by impact. A 5% annual chance of a shutdown costing USD 1,200,000 gives USD 60,000 expected annual cost. It belongs on an annual comparison, not directly beside a per-unit figure.
A landed-cost score may sit alongside nonfinancial scores, with one explicit cost weight. Counting the same tariff saving again under a separate tariff factor gives that saving extra influence.
Key Takeaways
- Landed cost includes logistics, inventory, duty and expected quality costs.
- The duty base follows the importing country’s valuation rules.
- Weights total 1, and every score must use the same better-to-worse direction.
- Sensitivity checks show when a close ranking depends on assumptions.
- Expected annual disruption cost equals annual probability times impact.
- Avoid counting the same cost component twice.
2.4 Help foreign plants build capability
A foreign plant can contribute cheap production, market access or knowledge. Its role can expand as engineers and managers gain skills and authority. Kasra Ferdows's 1997 framework separates the reason for locating a plant from its competence, the range of technical activities it performs.
Identify the plant’s present role
| Main reason for the site | Role with a narrower remit | Role with broader capability |
|---|---|---|
| Low-cost production | Offshore: makes specified items with little engineering authority | Source: controls procurement, planning, process changes and some design |
| Access to a market | Server: supplies a national or regional market with limited autonomy | Contributor: also adapts products, improves processes and develops suppliers |
| Access to knowledge | Outpost: learns from nearby skills, laboratories or demanding customers | Lead: creates products, processes or technology for the whole company |
An offshore factory exports specified output and receives little investment in engineering or management. A source factory can become the company's principal global source of a product. A server factory can reduce tariff, logistics or exchange-rate exposure by supplying its region. A contributor adds local improvement and adaptation.
An outpost's primary purpose is access to knowledge. Its location near a research center or advanced suppliers matters more than cheap labor. A lead factory has the authority and capability to develop methods used throughout the company. A plant's country alone cannot identify its role.
Follow an upgrade path
An electronics firm opens a Malaysian assembly plant to exploit low costs. Instructions and designs arrive from headquarters, so the plant starts as offshore. Local engineers learn to solve production problems. Managers gain authority to select component suppliers and change processes: the role develops into source.
Later, the plant designs the production process for a new product line and teaches it to other sites. It now acts as a lead factory. Another common path starts with a server plant, develops into a contributor serving regional needs, and can reach a lead role as its expertise grows.
Invest in the change
Rising wages can erode a site's original cost advantage while its engineers and supplier network become more valuable. Upgrading requires training, engineers, decision authority and assignments that let the site practice new skills. Announcing a new role without these resources leaves the old capability in place.
Knowledge must also travel between sites. Staff exchanges and shared improvement databases give other plants access to local learning. Headquarters needs to recognize a useful method and create a route for adopting it elsewhere.
Keeping every foreign plant on simple assembly wastes potential. Outsourcing production has the opposite learning risk: the supplier may acquire the know-how to become a competitor. Decisions about plant roles therefore connect to decisions about which activities and knowledge the company retains.
Key Takeaways
- Factory roles combine location purpose with site competence.
- Offshore and source plants share a cost motive but differ in authority.
- Server and contributor plants serve markets at different capability levels.
- Outpost plants seek knowledge; lead plants create it for the wider company.
- Upgrading requires investment, authority and channels for sharing learning.
3Make, buy and bring supply closer
Making an activity inside the company and buying it from a supplier create different costs and dependencies. A quoted saving needs a check against avoidable costs, coordination demands and the knowledge the company may lose. When supply is distant, longer lead times and uncertain demand can change the result. Compare ownership choices and location changes together, including the value of bringing selected activities closer to customers.
3.1 Compare making with buying
The make-or-buy decision chooses between carrying out an activity inside the company and buying it from an independent supplier. In international business, that ownership choice combines with a location choice. Either an owned plant or a supplier can operate abroad.
Compare the costs that change
Relevant costs differ between the alternatives. Making a part requires USD 300,000 of avoidable annual fixed cost and USD 12 per unit. Buying costs USD 18 per unit. The fixed cost is recovered through a USD 6 saving on each unit made.
The break-even quantity is:
At 40,000 units, making costs USD 780,000 and buying costs USD 720,000. At 80,000 units, making costs USD 1,260,000 and buying costs USD 1,440,000. Buying wins below the break-even volume; making wins above it under this cost structure.
Now suppose USD 100,000 of the fixed amount is allocated head-office overhead that continues after outsourcing. Only USD 200,000 can be avoided, so relevant break-even falls to about 33,333 units. Including overhead that stays either way can lead a company to outsource an activity it could make more cheaply.
Weigh strategic reasons
| Reasons to make | Reasons to buy |
|---|---|
| A genuine internal cost advantage | A specialist supplier's scale and focus |
| Protection of proprietary technology | Concentration on core competencies |
| Coordination of closely linked steps | Flexibility to change sources and countries |
| Control of specialized assets | Local sourcing commitments or offsets |
A specialized asset has much less value in another use: a custom mold or a facility beside one customer is an example. Once a party has invested, the other may demand better terms because switching would waste that investment. This is hold-up. Ownership, careful contracts or a close partnership can help manage that dependence.
Offsets are sourcing commitments that a government customer may seek, for example requiring an aircraft seller to buy some parts in the customer’s country.
Buying creates transaction costs: searching for suppliers, qualification, negotiation, monitoring and dispute resolution. Complex customized work and distant suppliers can increase these costs. Add them to the buying alternative instead of comparing the supplier's quote with a full internal average cost.
Choose the relationship as well as the price
An electric-vehicle maker may retain battery-pack production because the design affects range, is proprietary and must develop with the vehicle. It can buy tires, glass and seats from specialists that serve several customers at scale.
The alternatives extend beyond complete ownership and occasional bidding. Long-term contracts, supplier alliances, minority stakes and joint ventures can offer coordination with less ownership. Toyota's close supplier networks illustrate sustained coordination without owning every supplier. Buying can improve flexibility, but losing a core skill can make the company dependent on a supplier that later becomes a competitor.
Key Takeaways
- Compare avoidable fixed costs and variable costs, leaving out costs common to both choices.
- Break-even volume spreads the extra fixed cost over the per-unit saving.
- Specialized assets create dependence and potential hold-up.
- Supplier qualification and monitoring create transaction costs.
- Technology, coordination and core competencies can outweigh a narrow cost comparison.
- Long-term partnerships offer an alternative between full ownership and spot buying.
3.2 Find the full cost of sourcing abroad
A foreign source can offer lower costs, scarce materials or expertise unavailable at home. It can also help a company meet local-content expectations. Services such as accounting, software development and customer support can follow work across time zones, extending the working day.
Separate the saving from the quotation
A company can use an overseas service provider or operate its own captive center, often called a global capability center. India and the Philippines are important service locations. Digitally delivered work has no physical freight cost. Customs treatment depends on national rules and trade commitments; duties on digitally delivered services are uncommon.
The low quoted rate may conceal a different amount of work. A home support operation costs USD 34 per agent-hour. An offshore provider quotes USD 14, apparently saving about 59%. If the offshore team needs 15% more hours for the same workload, its labor cost is USD 16.10 per home-equivalent hour. Management, travel and checks add USD 2, bringing the total to USD 18.10. The effective saving is about 47%.
The comparison uses equal output, not equal paid hours. For goods, the same principle requires comparing equivalent quality and service levels.
Extend landed cost to ownership cost
Total cost of ownership (TCO) covers acquisition, use and disposal over the item's life. Begin with landed cost, then add costs not already counted: supplier management, warranty claims, other life-cycle costs, risk and lost flexibility. A quality allowance already in landed cost must not be added again under another heading.
Long-distance sourcing can require more pipeline and safety stock. Search, qualification, visits and monitoring add cost. Language and time-zone gaps slow problem solving; unclear instructions can create rework. Other risks include intellectual-property leakage, currency movements, tariffs, political changes, labor abuse and disruption on long routes.
Manage the exposure
If a supplier invoices in its own currency, the buyer bears exchange-rate movements. Quoting in the buyer's currency transfers much of that exposure to the supplier, which may price the risk into its offer. Forward contracts can hedge an agreed currency need; adjustment clauses can share large movements.
Protect valuable designs by sharing only the information each supplier needs, using confidentiality agreements and choosing jurisdictions with effective IP enforcement. Splitting critical work can prevent one supplier from seeing the entire design. The most valuable processes may remain in-house.
Activities with stable requirements and clear documentation travel more easily. Work that relies on tacit knowledge, constant contact with engineers or customers, frequent changes or strict confidentiality is harder to coordinate at a distance. A low wage cannot resolve those demands by itself.
Compare performance after the move with the original business case. Longer handling times, warranty claims or repeated travel can erode an expected saving even when the supplier keeps its quoted rate.
Key Takeaways
- Global sourcing can provide capabilities and material access as well as savings.
- Compare equal workloads and output quality when assessing service rates.
- TCO adds life-cycle and relationship costs without duplicating landed-cost items.
- Currency clauses and hedging allocate or manage exchange-rate exposure.
- Stable documented work is easier to coordinate remotely than tacit, fast-changing work.
3.3 Value speed when bringing supply closer
Reshoring returns previously offshored work home. Nearshoring moves work to a nearby country. Regionalization organizes production in each major region for that region's customers. A company can change one part of its network while retaining distant sources elsewhere.
Understand why the comparison changes
Rising wages in former low-cost locations, costly or volatile freight, tariffs and disruption can reduce the appeal of distant supply. Automation reduces labor's share of total cost. Speed, small batches and IP protection can make nearby production more valuable. The US CHIPS and Science Act of 2022 and the EU Chips Act of 2023 are examples of government support for semiconductor capacity.
In 2023, US goods imports from Mexico were about USD 476 billion, compared with USD 427 billion from China. Mexico became the largest source of US goods imports. Proximity and the North American trade agreement supported regional supply, alongside other changes in trade. European firms also use nearby locations in Central and Eastern Europe, Türkiye and North Africa; China plus one adds countries such as Vietnam or India while retaining Chinese operations.
Calculate the value of a smaller commitment
A clothing company expects to sell 7,500 jackets at full price. With long lead times, it orders 10,000 at USD 12 and later clears 2,500 leftovers at USD 6.
Purchase cost is USD 120,000; clearance receipts are USD 15,000. The net cost spread over the 7,500 full-price sales is USD 14 per jacket.
A nearby supplier charges USD 13 but supports quick reorders. The company buys 8,000, sells 7,500 at full price and clears 500 at USD 6. Purchase cost is USD 104,000; clearance receipts are USD 3,000. The same net-cost measure is about USD 13.47 per full-price sale.
The higher unit quote wins because it reduces the stock committed before demand is known. This measure compares the two sourcing plans using the same full-price sales and clearance treatment; it is not the invoice price.
Check practical limits
Supplier networks in Asia may take years to reproduce elsewhere. Home locations can lack skilled workers and face higher building costs. Heavy automation can make a reshored plant viable while creating fewer jobs than the original operation. Bringing an activity home therefore says little by itself about employment gains.
Nearness also leaves risk: two suppliers in one region may share exposure to weather, political changes or border rules. Test total ownership cost under different wage, tariff, freight and currency scenarios, and include disruption and the value of faster response.
A hybrid footprint can reserve distant sources for stable, high-volume products and nearby capacity for uncertain or urgent demand. Inditex, the owner of Zara, illustrates this segmentation with fast-changing items produced in or near its European base and stable basics sourced from Asia.
Key Takeaways
- Speed can reduce markdowns and the stock committed before demand is known.
- Reshoring, nearshoring and regionalization can affect only part of a network.
- Automation can support reshoring while reducing the number of jobs needed.
- A nearby source still faces regional and border risks.
- Use future cost scenarios and consider a hybrid footprint.
4Design and protect the supply chain
A supply network needs to fit both the product and the delivery promise. Predictable basics can use a different chain from fast-changing products with uncertain demand. Facility locations, transport modes and border procedures shape how long supply takes and how much stock is tied up. Demand information and continuity planning then help the network cope with variation and disruption without spending equally on every possible risk.
4.1 Build a supply chain that fits demand
A supply chain configuration sets the number, location and roles of suppliers, plants and distribution centers, plus the flows between them. It must fit the product's demand pattern as well as the company's strategy.
Choose the network pattern
| Pattern | How supply is organized |
|---|---|
| Centralized global | A few plants supply the world |
| Regional hubs | Facilities serve major regions |
| Local for local | Plants supply their own major markets |
| Hybrid | Central components feed local assembly or customization |
Centralization fits global standardization; local production fits localization. A hybrid can support a transnational strategy by combining component scale with local adaptation. Adding facilities can shorten customer delivery and reduce outbound transport, but it raises facility and inventory costs.
Match supply to the product
Marshall Fisher's 1997 distinction separates functional products, with stable needs and predictable demand, from innovative products, with uncertain demand, short life cycles and many variants. Functional products generally have long life cycles and low margins; innovative products often have higher margins but greater stockout and markdown risk.
| Functional products | Innovative products |
|---|---|
| Basic groceries, plain T-shirts, standard tires | Seasonal fashion, new consumer electronics |
| Physically efficient supply chain | Market-responsive supply chain |
| High utilization and low total physical cost | Spare capacity and shorter lead times |
| Cost and quality drive supplier choice | Speed, flexibility and quality drive supplier choice |
A slow, low-cost chain can leave a fashion retailer short of popular items and overloaded with unpopular ones. An expensive fast chain for predictable basics adds costs customers may not value. The same company can therefore need different chains for different products.
Delay the uncertain step
Postponement leaves the final market-specific step until actual orders arrive. A printer maker ships generic printers to regional centers. These add the correct power supply, plug and language manuals when orders are known. One pool of generic printers can then serve several countries, reducing stock tied to the wrong version.
Postponement does not delay every stage. It separates common production that benefits from scale from final differentiation that benefits from demand information. The generic product and late-stage capacity must be designed to support that split.
An apparel company can buy plain white T-shirts in large distant batches and ship them by sea to regional warehouses. Its seasonal jackets use nearby production, stocked fabric and frequent reorders based on actual sales. This segmentation gives each product group its own sourcing, transport and inventory choices.
When assessing a new facility, compare the customer service gained with the extra capacity and inventory required. A shorter route is valuable only in relation to the delivery promise and product it serves.
Key Takeaways
- Network configuration connects facility locations, roles and flows.
- Predictable functional products favor efficient supply.
- Uncertain innovative products favor responsive supply.
- Postponement pools generic stock and delays market-specific differentiation.
- Segmenting products can justify several supply chains within one company.
4.2 Choose transport and clear the border
Local delivery usually uses short routes and few parties. National distribution adds distance, carriers and planning. International delivery adds customs, import rules, currencies, documents and intermediaries, making timing less predictable.
Select a mode for the shipment
| Mode | Useful strengths and limits |
|---|---|
| Ocean | High capacity and low long-distance cost per ton-kilometer; slow and exposed to port delays |
| Air | Fast, costly transport for urgent, valuable or perishable goods |
| Rail | Efficient movement of heavy loads over long land routes |
| Road | Flexible door-to-door service, especially over short and medium distances |
| Pipeline | Continuous movement of oil and gas |
A Shanghai–Rotterdam container voyage can take about four to five weeks port to port, with actual schedules changing by route and conditions. China–Europe rail is often faster than ocean and costs between sea and air. Air shipments can move door to door in a few days. Intermodal transport transfers the same container between ship, rail and truck without unpacking. A 40-foot container counts as 2 TEU, or twenty-foot equivalent units.
Choose on cost, speed, reliability, value per kilogram, perishability, temperature requirements and shipment size. Refrigerated reefer containers protect temperature-sensitive goods. Climate can close winter routes or expose cargo to heat and storms; mountains slow land routes. Landlocked countries such as Paraguay or Uganda depend on neighboring ports or river connections for sea access.
For 2,000 kg of spare parts, illustrative rates of USD 4.50 per kg by air and USD 0.40 by sea give freight bills of USD 9,000 and USD 800. Air adds USD 8,200. If delay stops a factory at USD 50,000 per day, the time saved can justify that premium. Routine replenishment has a different trade-off.
Prepare for clearance
The importer or agent declares the goods' description, classification, value and origin, pays duties and taxes, and obtains release, sometimes after inspection. The World Customs Organization's Harmonized System (HS) aligns the first six classification digits internationally; countries add digits for their tariffs. Incorrect declarations cause delays, storage charges and penalties.
Bonded warehouses and free trade zones can defer duty; re-exported goods can avoid domestic import duty under the applicable procedure. Duty drawback refunds qualifying duties after export. Trusted trader programs, including EU AEO, US CTPAT and Canada's Partners in Protection, offer qualifying firms facilitation, subject to checks.
Assign the work and cost
A freight forwarder arranges carriage and shipment coordination. A customs broker specializes in declarations and clearance. A 3PL performs contracted logistics services such as transport and warehousing. Trade offices and chambers provide information on procedures and markets.
An Incoterms® 2020 rule, such as FOB, CIF, DAP or DDP, allocates delivery tasks, costs and the point of risk transfer. There are eleven rules. Read the named rule before adding uncovered costs to a supplier quote; comparing quotations on different delivery bases can conceal a large cost difference.
Key Takeaways
- Compare transport on the total service and cost consequences, including lateness.
- Climate, topography and product requirements constrain routes and modes.
- HS classification, customs value and origin are separate declaration inputs.
- Duty relief and trusted trader procedures require qualifying conditions.
- Forwarders, brokers and 3PLs perform different functions.
- Incoterms® 2020 rules allocate delivery obligations, costs and risk.
4.3 Count stock in transit and control order signals
Long distances tie up inventory before it reaches a warehouse. They also delay feedback about demand and delivery. Planning therefore needs both a stock calculation and a clear view of the information moving between firms.
Calculate the pipeline
Lead time runs from order placement to receipt. Pipeline inventory is stock in transit. With a steady flow, average pipeline inventory equals daily demand multiplied by transit days.
At 400 units per day, 30 transit days mean 12,000 units in transit; three days mean 1,200. If each unit is worth USD 25, those stocks tie up USD 300,000 and USD 30,000. At a 20% annual carrying rate, their annual costs are USD 60,000 and USD 6,000.
Carrying cost includes capital, storage, insurance, damage and obsolescence. Rates are often estimated around 15–30% a year. Apply the annual rate to average stock value; multiplying it again by annual shipment count would overstate the cost.
Protect against variability
Safety stock buffers uncertain demand or lead time. For independent daily demand with a constant lead time, a common model is:
Here is a service factor, is the standard deviation of daily demand and is lead time in days. With approximately normal lead-time demand, 1.65 corresponds to about 95% of cycles without stockout. With daily standard deviation 50 units, 36 days requires 495 units; four days requires 165. Variable lead times require additional treatment of delivery uncertainty.
Pipeline stock covers the expected flow during transport. Safety stock covers uncertainty. Cutting transit time lowers the former directly and can reduce the latter through a shorter exposure to variable demand.
Keep lean delivery workable
Just-in-time supplies materials close to when they are used, reducing stock and making quality problems visible quickly. An ocean shipment is large and infrequent, so companies may hold distant stock near the plant and feed the line locally. Nearby JIT supply can coexist with buffers of critical distant parts. A low stock level leaves little time to respond when one part fails to arrive.
Prevent the bullwhip effect
The bullwhip effect amplifies order variation upstream. A 5% consumer demand rise might produce retailer orders up 10%, distributor orders up 20% and factory material orders up 40% as each stage rebuilds buffers and forecasts from the orders it sees.
Batch buying, promotions and over-ordering during shortages worsen this distortion. Share point-of-sale and inventory data, plan jointly, shorten lead times, keep prices steady and order smaller quantities more frequently. Vendor-managed inventory lets the supplier manage the customer's stock using shared data.
EDI and portals exchange orders and invoices; ERP supports planning. GPS and RFID improve shipment visibility. Tracking a delayed container helps managers act, but reducing distorted orders also requires partners to share demand and inventory information.
Key Takeaways
- Pipeline inventory equals daily demand times transit days under a steady flow.
- Annual carrying cost applies to average stock value.
- Safety stock buffers uncertainty and differs from pipeline stock.
- JIT needs reliable replenishment and suitable protection for critical parts.
- The bullwhip effect amplifies order variation upstream.
- Shared demand data and smaller, steadier orders reduce distortion.
4.4 Protect the links that can stop supply
A supply chain can face floods, earthquakes, pandemics, wars, sanctions, supplier fires, bankruptcy, cyberattacks or sudden demand shifts. Resilience means absorbing a disruption and recovering quickly enough to keep supplying customers.
Look beyond the immediate supplier
The Ever Given blocked the Suez Canal from March 23 to March 29, 2021. Red Sea attacks from late 2023 led container services to divert around the Cape of Good Hope, adding roughly 10–14 days on affected Asia–Europe voyages. Japan's 2011 earthquake and tsunami interrupted component supply worldwide, and the 2020–2023 semiconductor shortage forced vehicle plants to idle. A distant event can reach a company through a part or route it rarely considers.
Map tier-2 and tier-3 suppliers as well as direct suppliers. Two independent tier-1 firms may rely on the same material producer. Their names differ, but that shared upstream site can still stop both.
Compare recovery with survival
Time to recover (TTR) is the time a site or supplier needs to return to full operation. Time to survive (TTS) is the time the chain can continue meeting demand without it, using stock and alternatives. When TTR exceeds TTS, the chain has an uncovered interval.
A component site needing 30 days to recover cannot be covered by ten days of stock alone. Reducing recovery time, expanding usable alternatives or holding more critical stock can narrow the gap. Rank actions by the lost output or sales as well as the duration.
Pay for protection where it matters
Single sourcing can offer volume discounts, consistent quality and a close relationship. Multiple sourcing creates competition and backup but divides volume and needs more management. Dual sourcing, such as a 70/30 allocation, keeps a second source active without dividing orders equally.
Suppose a sole source creates an expected annual disruption cost of USD 60,000. A second source receives 30% of 400,000 units and charges USD 0.15 more per unit. Its premium costs USD 18,000 a year. If expected disruption cost falls to USD 15,000, the reduction is USD 45,000, giving a net expected benefit of USD 27,000.
Check whether the second supplier has enough available capacity and independent upstream sources to deliver the estimated risk reduction.
Other measures include standard parts that several suppliers can make, prequalified backups, flexible production capacity, regional supply and buffers of critical parts. Early warnings and continuity plans help teams choose alternate routes or production arrangements before stock runs out.
Lean efficiency often removes buffers that resilience needs. Protecting every item equally wastes resources, so focus first on high-impact components, long recovery times and common upstream dependencies.
Key Takeaways
- Map shared upstream sites and routes to find hidden common risks.
- A TTR longer than TTS identifies an uncovered disruption interval.
- Dual sourcing trades a premium and management effort for backup capacity.
- Compare protection costs with expected loss reduction and operational impact.
- Prioritize critical components instead of buffering everything equally.
5Select and manage global suppliers
Buying globally creates a continuing relationship with firms whose capabilities, working conditions and legal obligations matter to the customer. Selection starts with specifications and evidence, while purchase importance guides the depth of the relationship. Contracts, scorecards and joint improvement keep expectations practical. Traceability and responsible sourcing extend that work beyond direct suppliers to the materials and sites behind them.
5.1 Qualify suppliers and match the buying approach
A suitable supplier can meet specifications repeatedly, not simply quote a low price once. Selection combines commercial comparison with checks on capability, finances and responsible behavior. The effort spent should reflect the purchase's importance and supply risk.
Move from need to qualified supply
Start with the required specification. Search through trade fairs, databases, agents or trade offices. A request for information establishes basic capability; a request for quotation (RFQ) obtains an offer for a defined requirement. Compare total ownership cost before qualifying the best candidates, negotiating, contracting and onboarding.
Check technical skills, capacity, quality systems, delivery reliability, lead time, finances, location, logistics and communication. Include labor, environmental, anti-corruption and trade compliance. Country stability and restrictions on the supplier or its owners can affect an otherwise strong offer.
Qualification can combine a site audit, financial review, samples, first-article inspection and a pilot order. ISO 9001 concerns quality management; ISO 14001 concerns environmental management. A certificate supports the assessment of a system, but actual parts and delivery performance still need checking.
Segment purchases with the Kraljic matrix
Peter Kraljic's 1983 framework compares profit impact with supply risk. Impact reflects effects on cost, quality or the product. Risk reflects scarcity, the number of suitable suppliers and the difficulty of switching.
| Category | Profit impact | Supply risk | Buying approach |
|---|---|---|---|
| Strategic | High | High | Long-term partnership and joint planning |
| Leverage | High | Low | Competitive bidding and buying power |
| Bottleneck | Low | High | Secure supply through buffers, contracts or substitutes |
| Non-critical | Low | Low | Simplify and automate purchasing |
For a carmaker, costly battery cells with few qualified producers are strategic. Standard steel sheet can be leverage when spending is high and many capable suppliers compete. A low-cost special sensor from one hard-to-replace source is a bottleneck. Routine office supplies are non-critical.
Price alone cannot distinguish the categories. A cheap part may create severe delivery dependence even when its direct profit impact is low. Identify both dimensions before choosing a relationship or negotiation method.
Use checks to support the relationship
Strategic items justify deeper qualification and continuing joint work. Leverage items still need competent suppliers, but competition can discipline price. Bottleneck items need continuity arrangements; demanding a lower quote does little if there is no alternative source. Routine items benefit from catalogs and simple processes.
Keep monitoring after onboarding. Supplier capacity, ownership, finances and trade restrictions can change. Screening and performance checks must continue as the relationship develops.
Key Takeaways
- Define specifications before requesting and comparing quotations.
- Qualification tests capability before large orders.
- Kraljic categories depend on profit impact and supply risk.
- Strategic items need partnership; leverage items support competition.
- Bottleneck items need continuity; non-critical items need simple buying processes.
5.2 Use contracts, scorecards and joint improvement
A supplier relationship needs clear terms and evidence of actual performance. Standard items with many alternatives often suit transactional buying. Strategic items usually justify collaboration, shared forecasts and joint development. The written agreement and the working relationship support each other.
Set out the obligations
International supply contracts specify the product and quality standard, price and currency, volumes, forecasts, lead times and delivery terms. They also address inspection, acceptance, warranties, remedies, IP, confidentiality, conduct standards and audit access. A currency-adjustment clause can allocate large exchange-rate changes.
Incoterms® 2020 terms allocate delivery responsibilities. Force majeure addresses defined exceptional events under the contract. Governing law and dispute-resolution clauses establish how disagreements will be handled. Agreeing these before a failure gives both parties a clearer basis for action.
Arbitration uses a tribunal to resolve a dispute. The 1958 New York Convention supports recognition and enforcement of foreign arbitral awards across more than 170 countries, subject to its conditions and national procedures. This helps explain its use in international contracts.
Measure what the customer receives
A supplier scorecard follows a small set of meaningful measures over time. On-time delivery rate divides on-time deliveries by total deliveries: 188 out of 200 is 94%. Defect rate in parts per million divides defective units by delivered units and multiplies by one million: 45 defects among 150,000 units is 300 ppm.
Choose denominators carefully. Delivery events measure punctuality; delivered units measure unit defects. A supplier can improve one while missing the other, so combining them into a single unexplained percentage loses information. Lead time, responsiveness, cost trends and compliance findings can complete the picture.
Turn a miss into a verified correction
Discuss scorecards in regular business reviews. A corrective action plan identifies the root cause, assigns a fix and checks whether later data show improvement. Replacing defective parts addresses the immediate loss; correcting the process addresses recurrence.
Supplier development means actively helping a supplier improve through engineering support, training or joint projects. Toyota's close work with suppliers illustrates how stronger processes can lower cost and risk for both sides. Repeated price cuts that undermine quality can instead increase the buyer's real cost.
Make distance easier to manage
Language, time zones, expectations about hierarchy and styles of directness affect communication. Clear written specifications, confirmed decisions and regular meetings reduce ambiguity. Personal contact and visits can build trust, especially where relationships carry considerable business weight.
When changing suppliers, qualify the new source and plan the transfer of production. A period of dual supply can protect continuity while the new supplier proves capacity and quality.
Key Takeaways
- Match transactional or collaborative relationships to the purchase.
- Contracts define specifications, commercial terms, remedies and dispute handling.
- On-time delivery and defect ppm use different denominators.
- Corrective action must address root causes and verify the result.
- Supplier development and clear communication support lasting performance.
5.3 Follow conditions and impacts through the chain
Responsible sourcing addresses labor rights, safety, environmental harm and corruption in the supplier network. A buying company needs evidence of conditions beyond its own sites. A signed conduct clause starts the relationship; it does not transfer away the consequences of poor sourcing.
Find problems and verify improvement
On April 24, 2013, the Rana Plaza building near Dhaka collapsed, killing more than 1,100 workers; the widely cited final count is 1,134. Cracks had been seen the day before. Brands and unions later signed a binding agreement for independent fire and building safety inspections in Bangladesh.
Supplier codes of conduct set minimum standards. Audits, certifications, corrective action plans and safe worker grievance channels help reveal and address problems. Audits are snapshots: records can be false and production can move to undisclosed subcontractors. Follow-up checks and worker information are therefore essential.
Traceability follows materials and products back through supplier tiers to origin. Cotton, cobalt and tin can carry risks beyond tier 1. Supplier lists, purchase records and material testing help connect a finished item with the places that contributed to it.
Distinguish reporting from import restrictions
The United States prohibits forced-labor imports under the Tariff Act of 1930. The Uyghur Forced Labor Prevention Act was enacted in December 2021; its rebuttable presumption has applied since June 21, 2022 to goods made wholly or partly in Xinjiang or by listed entities. Canada has prohibited forced-labor imports since July 1, 2020. The EU's 2024 Forced Labour Regulation applies from December 14, 2027 and prohibits affected products on the EU market and exports from it.
Reporting laws serve a different function. The UK Modern Slavery Act 2015 and Canada's Fighting Against Forced Labour and Child Labour in Supply Chains Act, effective January 1, 2024, require covered organizations to report on relevant risks and actions. A shipment needs evidence about its actual inputs and production conditions as well as any required company report. Conflict-minerals rules in the US and EU address tin, tantalum, tungsten and gold.
Include emissions and restricted trade
Under the GHG Protocol, Scope 3 covers indirect value-chain emissions outside Scope 2, both upstream and downstream. Purchased electricity, steam, heating and cooling belong in Scope 2. Producing purchased materials and transport by other companies can contribute to Scope 3. Air freight generally emits much more per ton-kilometer than ocean freight.
The EU Carbon Border Adjustment Mechanism's definitive phase began January 1, 2026. It covers specified iron and steel, aluminum, cement, fertilizer, electricity and hydrogen goods. Certificates for 2026 imports go on sale in February 2027. An annual exemption applies to importers of no more than 50 metric tons combined of the covered iron and steel, aluminum, cement and fertilizer goods; it does not apply to electricity or hydrogen.
Trade compliance also requires screening suppliers, owners, customers and shipments against sanctions and export controls. Some dealings are prohibited; others need a license.
Respond to a dangerous subcontractor
If a supplier sends embroidery to a workshop with locked fire exits, secure immediate safety or stop work there. Investigate the subcontracting, agree deadlines for correction and verify completion. Require written approval for further subcontracting and use worker feedback to check conditions. Abruptly ending orders can harm workers, so the response must address the danger and the route to safe work.
Key Takeaways
- Responsible sourcing combines standards, evidence, remediation and follow-up.
- Traceability extends risk checks beyond direct suppliers.
- Reporting duties and product restrictions are different legal tools.
- Scope 3 covers value-chain emissions outside Scope 2.
- CBAM has product, date and threshold conditions.
- Sanctions and export controls require screening and, where applicable, licenses.
Global Production and Sourcing examples
1Describe ownership, location and operating priorities
11 steps
- 1IntroductionDescribe a global operating decision
A kitchen-appliance company is deciding where to assemble a new mixer and who should handle its support service. The two activities may need different arrangements. Assembly needs parts and physical transport; support needs trained staff and clear communication.
Start by deciding what the operation must deliver: cost, quality, responsiveness or resilience. Then describe each proposal with separate answers to who performs the work (outsourcing changes this) and where it happens (offshoring changes this).
- 2ExplanationFollow suppliers through the chain
A supply chain connects raw materials, components, assembly, distribution and customers. The company’s direct motor supplier is tier 1. A wire producer selling to that motor supplier is tier 2 from the appliance company’s perspective.
The network also carries orders, forecasts and payments. Understanding those links helps reveal how a change in one country can affect production or service somewhere else.
- 3ExampleSee the four objectives in one decision
One large mixer plant could lower unit cost by using equipment at high volume. Several plants near customers could deliver faster and adapt versions more easily. A second qualified source could help production continue after a shutdown.
These proposals emphasize different objectives: total cost, quality and reliability, responsiveness, and resilience. A location comparison needs priorities because one site rarely leads on all four.
- 4ChallengeChoose the objective that is missing
The company ranks plants using unit production cost and defect rates. Customers cancel orders because delivery takes too long. Which objective needs more attention?
---reveal---
Responsiveness: the ability to supply quickly and adapt to demand. Cost and quality matter, but they do not capture the customer’s delivery problem. The comparison should include lead time and the service level the product needs.
- 5ConnectionConnect the footprint to strategy
A common mixer model sold worldwide can support concentrated production under global standardization. Strong country-specific needs may support local plants.
A transnational approach can centralize common motors and mechanisms while assembling market-specific versions nearby. The company keeps scale where parts are shared and places adaptation closer to demand.
- 6Key InsightMeasure a saving against profit
A purchasing saving adds directly to profit when revenue and other costs stay unchanged. The percentage gain in profit uses the original profit as its base, not revenue.
If purchases of USD 20 million fall by 3%, the saving is USD 600,000. Against original profit of USD 2 million, that is a 30% increase. A small change in a large purchasing budget can therefore have a large effect on the smaller profit figure.
- 7ExplanationSeparate ownership from country
Ask who does the work: the company or an independent provider. Then ask where: the home country or abroad.
Outsourcing changes the first answer. Offshoring changes the second. A company-owned foreign support center is captive offshoring, while a foreign independent provider is offshore outsourcing. An independent provider at home is domestic outsourcing. The same distinction works for goods and services.
- 8ChallengeClassify the support proposal
The mixer company hires an independent support firm in its home country, replacing its internal team. Has it outsourced, offshored or both?
---reveal---
It has outsourced because a separate firm now performs the activity. It has not moved the work abroad.
- 9ExplanationName the location change precisely
Nearshoring moves activity to a nearby foreign country. Reshoring returns previously offshored work home. Friend-shoring favors politically allied countries. China plus one retains Chinese production and adds another country.
These labels describe different features of a network change. A nearby country can shorten transport but still require border clearance. A reshored activity can stay outsourced if a domestic contractor performs it.
- 10ChallengeCombine a move with a service priority
The company brings assembly from an owned foreign site to an independent supplier at home to shorten delivery. What changes in ownership and location, and which objective motivates the move?
---reveal---
The move combines outsourcing with reshoring. The service priority is responsiveness through shorter lead time. Ownership shifts to a provider while the activity comes home; neither change alone explains the whole proposal.
- 11RecapUse two classifications and clear priorities
Describe an arrangement in terms of the activity, its operator and its country. Then assess what it delivers on total cost, quality, responsiveness and resilience.
The mixer company can keep common component production concentrated, adapt assembly near markets and choose a separate support arrangement. These are linked decisions, but each activity has its own operating needs and can use a different ownership structure.
2Choose a location and develop its role
18 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionChoose a site for a pump component
- 2ExampleTurn wages into cost per unit
- 3ExplanationCheck what the site needs to operate
- 4ChallengeRead the direction of the currency move
- 5TipCheck origin before assuming tariff savings
- 6ExplanationCompare plant scale with market demand
- 7ExampleSeparate heavy output from valuable inputs
- 8ChallengeChoose a network from competing factors
- 9ExampleAssemble the first landed cost
- 10ExampleCompare the second offer and test the gap
- 11ChallengeIdentify the cost that changes the result
- 12ExplanationWeight the unpriced factors consistently
- 13ExampleCalculate a weighted result
- 14ExplanationDistinguish the purpose from capability
- 15ChallengeRecognize an upgrade in responsibility
- 16ConnectionShare the learning beyond one site
- 17ChallengeJoin the cost and capability evidence
- 18RecapMake a location recommendation reviewable
3Make, buy and value faster response
16 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionCompare the real alternatives
- 2ExplanationRemove costs that stay either way
- 3ExampleFind the volume that recovers fixed cost
- 4ExampleTest output on each side
- 5ChallengeCorrect an overhead mistake
- 6Key InsightConsider dependence after investment
- 7ExplanationCompare equal service output
- 8ExampleAdjust a service-offshoring quote
- 9ChallengeBuild TCO without repeating costs
- 10TipMatch distance to the kind of work
- 11ExampleCalculate the distant stock commitment
- 12ExamplePrice the nearby response option
- 13ChallengeExplain the source of the saving
- 14ConnectionUse a mixed footprint where needs differ
- 15ChallengeBring costs and knowledge together
- 16RecapCompare cost, capability and flexibility
4Connect product demand, transport, stock and resilience
19 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionDesign supply for two product lines
- 2ExplanationStart with demand behavior
- 3ExampleDelay the country-specific step
- 4ChallengeSpot a demand mismatch
- 5ExplanationChoose transport for the product and route
- 6ExampleCompare the premium with avoided delay
- 7ExplanationAssign border information and responsibilities
- 8ChallengeChoose the specialist for a border problem
- 9ExampleCount the units still traveling
- 10ExampleTurn pipeline stock into an annual cost
- 11ExplanationKeep the uncertainty buffer separate
- 12ChallengeRecognize a distorted demand signal
- 13TipUse JIT where replenishment supports it
- 14ExplanationMap the shared upstream sources
- 15ExampleCompare recovery with survival
- 16ChallengeCheck whether the backup is useful
- 17ExampleCompare the protection bill with the risk reduction
- 18ChallengeJoin product fit with continuity
- 19RecapConnect facilities, flows and protection
5Select, measure and improve global suppliers
14 steps
Save this lesson to follow every Walkthrough step by step.
- 1IntroductionBuild a supplier relationship with evidence
- 2ExplanationSpecify and qualify before scaling orders
- 3ExamplePlace the purchase on two dimensions
- 4ChallengeMatch the approach to the dependency
- 5ExplanationMake the contract useful before a failure
- 6ExampleCalculate punctuality separately from defects
- 7ChallengeTurn replacements into improvement
- 8TipMake communication explicit
- 9ExplanationFollow production beyond the direct supplier
- 10ChallengeRespond to an immediate safety danger
- 11ExplanationSeparate disclosure from product restrictions
- 12ConnectionInclude climate and restricted trade
- 13ChallengeCombine price, qualification and compliance
- 14RecapKeep evidence connected to action
Global Production and Sourcing practice questions
Set 1: Location costs, scoring and plant capability10 Practice Questions
Question 1 of 10
Show answerHide answer
Question 2 of 10
Show answerHide answer
Question 3 of 10
Show answerHide answer
Question 4 of 10
Show answerHide answer
Question 5 of 10
Show answerHide answer
Question 6 of 10
Show answerHide answer
Question 7 of 10
Show answerHide answer
Question 8 of 10
Show answerHide answer
Question 9 of 10
Show answerHide answer
Question 10 of 10
Show answerHide answer
Set 2: Ownership, location and operating priorities10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 3: Make-or-buy and the value of shorter lead times10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 4: Transport, inventory and continuity under pressure10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Set 5: Supplier evidence, performance and responsible decisions10 Practice Questions
Save this lesson to see every answer and practice every set.
Question 1 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 2 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 3 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 4 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 5 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 6 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 7 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 8 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 9 of 10
Show answerHide answer
Save this lesson to see this answer.
Question 10 of 10
Show answerHide answer
Save this lesson to see this answer.
Stuck on your own question? Homework Help
Key Terms
A
Ad valorem duty
Arbitration
B
Bonded warehouse
Bottleneck item
Break-even volume
Bullwhip effect
C
Captive center
Captive offshoring
Carbon Border Adjustment Mechanism
China plus one
Common upstream dependency
Concentrated production
Continuity plan
Contract manufacturer
Contributor factory
Corrective action plan
Customs broker
Customs clearance
Customs value
D
Decentralized production
Defect ppm
Dual sourcing
Duty drawback
E
Exchange-rate risk
Expected disruption cost
F
Flexible manufacturing
Freight forwarder
Friend-shoring
Functional product
G
Global operations
Global sourcing
H
Harmonized System
Hold-up
Hybrid footprint
I
Incoterms® 2020
Industry cluster
Innovative product
Intellectual property
Intermodal transport
Inventory carrying cost
J
Just-in-time
K
Kraljic matrix
L
Lead factory
Lead time
Leverage item
Location economies
M
Make-or-buy decision
Markdown
Market-responsive supply chain
Mass customization
Minimum efficient scale
N
Nearshoring
Non-critical item
O
Offshore factory
Offshoring
On-time delivery rate
Outpost factory
Outsourcing
P
Physically efficient supply chain
Pipeline inventory
Postponement
R
Regionalization
Relevant cost
Request for quotation
Reshoring
Resilience
Responsible sourcing
Responsiveness
Rules of origin
S
Safety stock
Scope 3 emissions
Sensitivity analysis
Server factory
Source factory
Special economic zone
Specialized asset
Strategic item
Supplier audit
Supplier code of conduct
Supplier development
Supplier qualification
Supplier scorecard
Supply chain
Supply chain configuration
T
Tacit knowledge
Tariff jumping
Third-party logistics provider
Tier-1 supplier
Time to recover
Time to survive
Total cost of ownership
Total landed cost
Traceability
Trade compliance
Transaction cost
U
Unit labor cost
V
Value-to-weight ratio
Vendor-managed inventory
W
Weighted factor scoring
About this lesson
Make your own Study Materials
Turn your notes, slides and documents into Study Guides, Practice Questions, Flashcards and 6 more tools.